Alpiq AG 1 BAF/27.05.12 Martin Eschle, Head of Markets Western Europe, Alpiq AG Flexible grid management solutions in UK and CH smart energy, 05.09.2014 in Sion

Upload: thearkvalais

Post on 24-May-2015

188 views

Category:

Engineering


5 download

DESCRIPTION

by Martin Eschle, Head of Market Western Europe, Alpiq SA

TRANSCRIPT

Page 1: Flexible grid management solutions in UK and Switzerland

Alpiq AG 1

BAF/27.05.12Martin Eschle, Head of Markets Western Europe, Alpiq AG

Flexible grid management solutions in UK and CH

smart energy, 05.09.2014 in Sion

Page 2: Flexible grid management solutions in UK and Switzerland

Alpiq AG 2

Overview UK and CH (2013)

CHProduction:-Thermal and Others (Renewables) 3.90-Nuclear 24.90-Hydro 39.60

-Imports 38.60-Exports 36.20

Final Consumption 60.00 Per Capita 7.5 kWh

Peak load 12 GW

gCO2/kWh < 100

NTC in MW-Import 7000 -Export 11000

UKProduction:-Coal 130.80-Oil 2.20-Gas 95.60-Nuclear 70.60-Hydro 4.70-Wind & Solar 30.50-Bioenergy 18.50-Imports 17.50-Exports 3.10

Final Consumption 314.90Per Capita 5.5 kWh

Peak load 56 GW

gCO2/kWh > 400(Target 2030 < 100)

NTC in MW-UK <> FR 2000-UK <> NL 1000-UK > IRL/NI 1000

Page 3: Flexible grid management solutions in UK and Switzerland

Alpiq AG 3

UK Electricity Distribution Areas

Source: Energy Network Association

- The local networks are connected to National Grid’s transmission network.

- The „customers‟ are the suppliers who rent out the network to pass electricity to their customers.

- Each DNO is a regional monopoly

- The system is regulated by the UK’s Office of Gas and Electricity market

Page 4: Flexible grid management solutions in UK and Switzerland

Alpiq AG 4

Top 5 negative Events in 2013- average duration 195 minutes

Source: Energy Network Association

Page 5: Flexible grid management solutions in UK and Switzerland

Alpiq AG 5

Price Control Reviews and Guaranteed Standards

- All 14 DNOs submit detailed business plans on the same cycle (currently 5 years transitioning to 8 years).

- Ofgem evaluates the DNOs plans and revenue requests against each

other and against other efficiency benchmarks.

- The outcome of the price control review is a set of allowed revenues (not rates) on a forward looking basis.

Supply restoration incentives:

£ 54 per household if outage is longer than 18 hours.

(additional £ 27 for each 12 hours)

£ 50 for 4 or more cuts each longer than 3 hours in a 12

month period.

Page 6: Flexible grid management solutions in UK and Switzerland

Alpiq AG 6

Triad: National Peak Load Reduction

Source: Ofgem

Incentives to reduce peak load on national grid level

Triad warning as a service Less than 30 hours of operation per

year for triad management

Tarif for three half-ours that have

the highest peak on national grid

Page 7: Flexible grid management solutions in UK and Switzerland

Alpiq AG 7

TSO’s in UK

Source: Energy Network Association

Page 8: Flexible grid management solutions in UK and Switzerland

Alpiq AG 8

Balancing market products in UK

(2800 MW)

(1200 MW)

(800 MW)

Page 9: Flexible grid management solutions in UK and Switzerland

Alpiq AG 9

Minimum criteria for DSM accaptance

Response Time

Minimum Duration

Minimum Power

2s 30s 2min 240min

30min 10min 15min 2h

3MW 10MW 50MW 3MW

Frequency Response

Fast

ReserveSTOR Product

Page 10: Flexible grid management solutions in UK and Switzerland

Alpiq AG 10

Balancing cost in UK

Total ~ 800 million

Total ~ 860 million

Page 11: Flexible grid management solutions in UK and Switzerland

Alpiq AG 11

Electricity Market Reform UK

Investment in secure and low carbon electricity generation

Estimated investment of £ 250 billion and 250 000 jobs

The four phases of EMR:

- 1 (to 2017): Contracts for Differences and first capacity auctions for winter

2018/19

- 2 (to 2020): Capacity Market is fully operational

- 3 ( 2020s): Maturity of technologies (neutral auctions), DSR, storage and

interconnection

- 4 (late 2020s): Carbon price is high, end of intervention

Page 12: Flexible grid management solutions in UK and Switzerland

Alpiq AG 12

Key differences between electricity, capacity and balancing services markets in UK

Electricity market:

Generators sell electricity (£/MWh) to suppliers for particular periods of time

Hedging price risk

Capacity market:

National Grid will buy capacity (£/kW/yr) on behalf of suppliers

Sufficient investment and reliability (4 years ahead, demand- or supply-side)

Balancing services market:

National Grid pays capacity providers (£/kW) for an option to buy energy at an agreed price (£/MWh)

Sufficient capacity at least cost to consumers

value for capacity in particular locations or particular flexibility

Page 13: Flexible grid management solutions in UK and Switzerland

Alpiq AG 13

Balancing market products in CH

Source: Swissgrid

+/- 71 MW +/- 400 MW

(~65% of total cost)

+ 450 MW

- 390 MW

Yearly cost ~ 200 Mio CHF

Page 14: Flexible grid management solutions in UK and Switzerland

Alpiq AG 14

DNO’s in CH

• More than 700 DNO’s

• Most DNO’s linked to TSO via «RNO’s»

• DNO’s customers are endcustomers

• Low constraints/ outages

• Regulation by StromVG and ElCom

Page 15: Flexible grid management solutions in UK and Switzerland

Alpiq AG 15

Energiestrategie 2050

Page 16: Flexible grid management solutions in UK and Switzerland

Alpiq AG 16

Overview of Flexitricity’s smart grid

high demand

TSO needs STOR services

TSO signal to aggregators

TSO signal to aggregators

Less thermal powerplants in standby

Balacing new

renewable energy

Industry is opting out

Supermarktes switch of air-condition

CHP units produce more electricity Activation of

standby generator

Cold storage has reduced consumption

Off-Grid with own generation

Delay of non critical process

Page 17: Flexible grid management solutions in UK and Switzerland

Alpiq AG 17

Some products

Page 18: Flexible grid management solutions in UK and Switzerland

Alpiq AG 18

Some products

Page 19: Flexible grid management solutions in UK and Switzerland

Alpiq AG 19

Revenue expectations with Capacity Market from 2018

Capacity

- Estimate £20k-£60k/MW pa

– Timescale: years

Headroom

– £15k-£35k/MW pa

– Timescale: hours/minutes/seconds

Footroom

– Estimate £15k-£35k/MW pa

– Timescale: hours

Page 20: Flexible grid management solutions in UK and Switzerland

Alpiq AG 20

Some facts

4,000 demand response calls

More than 200 MW

Market leader UK

24-hour operations

CHP, diesel, hydro, UPS, load

Fully automated

1s to 30 minute response

International experience

Page 21: Flexible grid management solutions in UK and Switzerland

Alpiq AG 21

Starting Position in CHScope of Benefits (only Xamax-Case)

• Distribution grid operators mostly charge maximum peak prices in the grid access (partly also in the energy price).

• Peak-Prices (Distribution grid): 25’000-120’000 CHF/MW/year

• Identification of rough potential due to historical load data

• Detailed on-site analysis

• Installation load management system and integration of the suitable

Page 22: Flexible grid management solutions in UK and Switzerland

Alpiq AG 22

Typical installation of Xamax

Payback less than 3 years on grid cost

Engineering and installation by Xamax

Page 23: Flexible grid management solutions in UK and Switzerland

Alpiq AG 23

From peak load reduction to secondary control power

From discrete steps to continous signals

Technology developed by Alpiq

Page 24: Flexible grid management solutions in UK and Switzerland

Alpiq AG 24

Demo

set value / actual value

Switches / Channels

Status by site (actual load, nominal values for poweralliance and local loadmanagement)

Control / Monitoring tolerance

Switched load by customers site

Page 25: Flexible grid management solutions in UK and Switzerland

Alpiq AG 25

Demo

Page 26: Flexible grid management solutions in UK and Switzerland

Alpiq AG 26

Some facts

More than 1500 existing systems

Market leader CH for load management

85 % load

15 % CHP, diesel, UPS

Objective: secondary control

<< 1s response

Open for Swiss partners (DNO’s)

Page 27: Flexible grid management solutions in UK and Switzerland

contact

Martin Eschlephone +41 62 286 73 [email protected]

Page 28: Flexible grid management solutions in UK and Switzerland

Alpiq AG 28

Backup