Page 1: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

1

FlexFactory®

Defining the future ofbiomanufacturing

Daniel Bauer

Xcellerex, Inc.

June 2011

Page 2: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

2

• Founded 2003 as a Disposable Flow Path focused CMO

• Facility: 100,000 sq. ft. laboratory, GMP mfg and office

• 140 employees

• Global sales and service network including EU, APAC -based operations

• 8 INDs filed based FlexFactory Platform

• Over 150 XDR bioreactors, 350 XDM mixers deployed in the last three years

• Five Operational FlexFactory platform

• Recent press releases by RPharm, Gallus and Diosynth

• 1st Commercial Product Manufactured in a Disposable Bioreactor

• GROW CELLS DAILY

Company Facts

Page 3: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

3

Traditional Stainless Steel Facilities – Time andCosts Traditional Stainless Steel Facilities

• Prohibitive cost to build new mfg. capacity…$1500-2,000/sq ft

• $200-$400M total installed capital cost

• 4 year timeline for new capacity

• Risk of committing capital during early high-risk stage

• Expensive to operate and modify

• Limited long-term asset utilization

• Low terminal value (even lower in today’sdisposable environment)

• Many are obsolete before they are validated

Page 4: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

4

Barriers to biotech success

Mismatch between legacy mfg. model and futureindustry needs

Conventionalapproaches

• Large, single-productplants

• Inflexible, fixed pipe

• Built for blockbusters

New future requires:

• Low cost & flexible

• Validated productcomparability

• Local production

Page 5: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

5

• Driving the rush to low cost,high quality manufacturing

• Get in Front Ride the Wave…

• Or be Crushed by the Wave

The Building Wave of Opportunity…Biosimilars and Biobetters

Effectively creating a bio arms race

Page 6: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

6

Getting drugs to market – 15% probability, 7 yrs, $1B

Chips CDU SNPGene/TargetIdentification

Drug(s)discovery

Lead drugIdentification

Drug TestingPreclinical

HumanClinical Trials

Commercialdrug sales/marketing

ChemistryCell Line

developmentProcess

DevelopmentPre-ClinicalTox. studies

Phase 3clinical trials

Phase 3Clinical trials

FDAApproval

MarketLaunch

Phase 3clinical trials

Phase 1, 2a, 2bclinical trials

FDA ApprovalMarket launch

Faster, better, cheaper drugdevelopment and manufacturing

FlexFactory® Transplanttransferable GMP

facilities

Mfg. Services produceclinical material inFlexFactory®

Xcellerex Focus

De-RiskedRapid PlantLicsensure

Page 7: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

7

Xcellerex Strategic Rationale – QbDFlexFactory®

Dramatic improvements in deployment speed, quality,

flexibility and overall economics can only be achieved by

taking a fresh, holistic comprehensive QbD approach to

biomanufacturing

EquipmentQbD

FacilityQbD

RegulatoryQbD

Services/Training QbD

Page 8: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

8

Plant Footprint ReductionJust disposables vs. FlexFactory

Plant Footprint ReductionJust disposables vs. FlexFactory

for 4 x 2000L lines, cell vial to purified API bulk

MEDIA BUFFER

LABSU.S.P.

D.S.P.

U.S.P.

D.S.P. WAREHOUSE

LOCKERS/GOWNING

OFFICES

PLANTUTILITIES

CLEANUTILITIES

EQUIP.PREP

C.I.P./S.I.P.

WASH

LOCKERS/GOWNING

OFFICES

PLANTUTILITIES

LABS

WAREHOUSE

FlexFactory™PROCESSING

SUITE

Page 9: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

9

Page 10: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

10

Page 11: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

11

2000L GMP FlexFactory #2 at Xcellerex

Page 12: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

12

All XDRs have a 5:1 turn down ratio(Each can operate at 20% working volume)

XDR-5000 in development

Breakthroughs in Biomanufacturing from Xcellerex

XDR-200 XDR-500 XDR-2000XDR-1000

XDR GMP Single-Use Bioreactor

XDR-50

Page 13: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

13

CEMs Replace Clean Rooms

• Reduces mfg plantfootprint 35%

• Decreases gowning,reduces labor 30%

• Protects productfrom greatest sourceof environmentalcontamination (theoperator)

Page 14: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

14

CEMs are CleanroomsEliminating the need for Wall Segregation

Page 15: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

15

CEM Operational Benefits• Segregation of each unit operation from the general environment,

• CEMs have independent (from room) fresh air supply, independent ofthe room supply is a major segregation factor and virus reductionprotection design feature for prevention of cross contamination across15-20 logs of virus clearance or across pre and post virus inactivation,

• In excursion event management, segregation allows protection ofremaining unit operations from excursion operation,

• CEMs provide spill containment, prevent exposure to other unit ops inpressurized CEMs

• CEMs can be decontaminated in situ

• Requirement to turn around only one unit op at a time versus multipleunit ops in large clean rooms

Page 16: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

16

CEM Operational Benefits• Data historization of environmental conditions real time with process

data,

• Ability to operate all process operations in one larger manufacturingspace,

• Reduction of gowning requirements in a manufacturing facility,

• Elimination of multiple clean rooms for process operations,

• Reduction of airlocks for material, personnel and product flowstrategies,

• Increase in operator efficiency with increased focus on processoperations,

Page 17: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

17

CEM Operational Benefits• Single pass air supply and exhaust,

• HEPA-filtered supply air,

• HEPA-filtered exhaust air,

• Responsive control of environmental conditions (differential pressure,air changes),

• CEMs are cleaned using standard clean room sanitization agents, andcan be further decontaminated with chlorine dioxide if needed for morepathogenic bugs

Page 18: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

18

Single-Use Unit Operations

• Eliminates CIP/SIPoperations andinfrastructure

• Reduced labor

• Reduced carbonfootprint

• Improved safety

• Enhanced flexibility

• An “open” platform

Page 19: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

19

Integrated real time automation

• Reduces operatorhands-on operations

• Provides mechanismfor automated QA,data mining

• Real-time capture ofprocess and humandeviation

Page 20: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

20

• Disposableseliminate crosscontamination

• CEM - Operatorsremoved fromclean room

• On-line eFactoryquality assurancetrackscompliance

The Xcellerex QbD SolutionFlexFactory® Biomanufacturing Platform

Quality

Risk R

edu

ction

Page 21: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

21

The Xcellerex QbD SolutionFlexFactory® Biomanufacturing Platform

Speed

• 6-12 months vs.2-5 years fornew capacity

• Enables moreinformedinvestmentdecisions

• Faster productchangeovers

• Rapid expansionof mfg capacity

Risk R

edu

ction

Page 22: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

22

• Compactclean roomarchitecture

• Modular

• Portable

• Multiple productmanufacturing

• Ability toTransPlant™ tocustomer

• Avoid long-termCMO lock-up

The Xcellerex QbD SolutionFlexFactory® Biomanufacturing Platform

Flexibility

Risk R

edu

ction

Page 23: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

23

• Lower capital cost(50%-75%)

• Lower operatingcosts (20%)

• Higher assetutilization

• Shorter timelineto product revenue

• Improvedenvironmentalimpact

The Xcellerex QbD SolutionFlexFactory® Biomanufacturing Platform

Economics

Risk R

edu

ction

Page 24: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

FlexFactory designs underway for 3rd parties

CourtesyParsonsEngineering

Page 25: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

25

Facilities

Modular Cleanrooms

Page 26: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

Manufacturing Floor 4 x 2000L Scale

Page 27: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

27

FlexFactory and Facility 4 x 2000LGreenfield

• Capital:

Facility +Process Equipment +Install & Qualify = 40 – 45 MM

• Schedule:

Design Agreement to GMP Production ~ 18 months

Renovation

• Capital:

Facility +Process Equipment + Install & Qualify = 14 – 20 MM

• Schedule:

Design Agreement to GMP Production ~ 12 months

Page 28: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

28

EquipmentPlatform

ServicesPlatform

Integration & Process Know-How

Unique Business Structure LeveragesCustomer Adoption

FlexFactory

Page 29: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

29

FlexFactory Services• FlexFactory® Services

portfolio adds speed,security to newdeployments:• Process developmentand optimization

•Bridge GMPmanufacturing forclinical trials

•Validation and training

• TransPlant™ toCustomer site

Page 30: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

30

TransPlant

Bringing it all together

A Typical FlexFactory® Deployment

BuildFlexFactory Line

Client builds facilityat their own pace

(with Xcellerex design help)

Compress deployment time

Reduce risk/delay critical decisions

Customer control

AT XCELLEREX

AT CLIENT

Validate/OperateFlexFactory Line

Train Client Team

RestartFlexFactory

Page 31: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

31

FlexFactory® Regulatory MilestonesDec. 2002 Previous owner filed CTX in UK for mAb

Dec. 2003 Type C meeting with FDA – strong support

Apr. 2004 Presentation to FDA Advisory Committee for Pharm. Sci.

Jan. 2007 Client filed IND

Jan. 2007 Training seminar for CDER DMPQ

May 2007 Seminar for NAFDAC (Nigeria)

June 2007 Seminar for WHO IVR

Oct. 2007 Training seminar for CBER DMPQ

Nov. 2008 2nd client filed IND amendment

May 2008 EMEA GMP Inspectorate Feedback

Jan. 2009 Client filed IND for their second product

Feb. 2009 Training seminar for Boston FDA compliance inspectors

Nov. 2009 Xcellerex filed IND for Yellow Fever inactivated vaccine

Dec. 2009 Mexican FDA COFEPRIS inspection for swine flu H1N1

Mar 2010 EMA QP Certification for Phase 3 mfg. underway

Mar 2011 Planned start of Phase 3 mfg for EU client31

7 US INDs filed,1 UK filing

Page 32: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

32

Advantages of FlexFactory®

• 50% reduced capital

• 30% reduction in mfg. labor, gowning costs, HVAC

• 70% reduced facility build out time

• 30% reduction in plant footprint

• 25% reduction in QA

• Reduced carbon footprint

• Simultaneous multi-product manufacturing and flexibility

Page 33: FlexFactoryfi · 2018-02-19 · 3 Traditional Stainless Steel Facilities Time and Costs Traditional Stainless Steel Facilities "Prohibitive cost to build new mfg. capacity & $1500-2,000/sq

33

170 Locke Drive, Marlborough, Massachusetts 01752

www.xcellerex.com

1.866.Xcellerex

THANK YOU!