fleet numerical update csabc meeting 15 april 2009 james a. vermeulen data ingest team supervisor...

36
Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943 [email protected] (831) 656-4393

Upload: adele-bridges

Post on 28-Dec-2015

227 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Fleet Numerical UpdateCSABC Meeting

15 April 2009

Fleet Numerical UpdateCSABC Meeting

15 April 2009

James A. VermeulenData Ingest Team Supervisor

FNMOC7 Grace Hopper Ave., Stop 1

Monterey, CA 93943

[email protected](831) 656-4393

James A. VermeulenData Ingest Team Supervisor

FNMOC7 Grace Hopper Ave., Stop 1

Monterey, CA 93943

[email protected](831) 656-4393

Page 2: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

• Introduction• Overview of Operations• Overview of POPS and A2• Cross Domain Solutions• UKMO Engagement• MILCON Project• FY09 Objectives• Summary

OutlineOutline

Page 3: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

IntroductionIntroduction

Page 4: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Mission

Mission

To provide the highest quality, most relevant and timely Meteorological and Oceanographic (METOC) support to

U.S. and coalition forces.

Page 5: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Recent Accomplishments

Recent Accomplishments

• Achieved Initial Operating Capability (IOC) for the A2 supercomputer system, new host for the FNMOC models Ops Run

• Commenced operational support for the North American Ensemble Forecast System (NAEFS), with NOGAPS Ensemble fields delivered daily to NCEP

• Upgraded the NOGAPS Ensemble with Ensemble Transform (ET) initialization

• Implemented the coupled air-sea version of the GFDN tropical cyclone model

• Took on Submarine Enroute Weather Forecast (SUBWEAX) mission at SECRET and TS/SCI levels

• Hosted and achieved IOC for the Naval Oceanography Portal (NOP), the single unclassified and classified operational Web presence for all CNMOC activities

• Delivered the first spiral of the Automated Optimum Track Ship Routing System (AOTSR)

• Completed A76 source selection process for IT Services resulting in selection of the government’s Most Efficient Organization (MEO) bid as the winning proposal

Page 6: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Overview of OperationsOverview of Operations

Page 7: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

• Operations Center– Manned 24x7 by a team of military and civilian watch standers– Focused on operational mission support, response to requests for special

support and products, and customer liaison for DoD operations worldwide– Joint Task Force capable– The Navy’s Worldwide Meteorology/Oceanography Operations Watch– Operates at UNCLAS, CONFIDENTIAL and SECRET levels– SUBWEAX mission at SECRET level

• Sensitive Compartmented Information Facility (SCIF)– Extension of Ops Center– Operational communications (including secure video teleconferencing),

tasking and processing elevated to the TS/SCI level if needed– Includes significant supercomputer capacity at TS/SCI level– SUBWEAX mission at TS/SCI level

• Ops Run– Scheduled and on-demand 24x7 production– 6 million meteorological observations and 2 million products each day– 15 million lines of code and ~16,000 job executions per day– Highly automated and very reliable

Operations

Operations

Page 8: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Models

Models

• Fleet Numerical operates a highly integrated and cohesive suite of global, regional and local state-of-the-art weather and ocean models:– Navy Operational Global Atmospheric

Prediction System (NOGAPS)

– Coupled Ocean/Atmosphere Mesoscale Prediction System (COAMPS)

– Navy Atmospheric Variational Data Assimilation System (NAVDAS)

– Navy Aerosol Analysis and Prediction System (NAAPS)

– GFDN Tropical Cyclone Model

– WaveWatch 3 (WW3) Ocean Wave Model

– Navy Coupled Ocean Data Assimilation (NCODA) System

– Ensemble Forecast System (EFS)

15 km

0 km

10 km

5 km

60 m s-

1

20 m s-

1

0 m s-1

40 m s-

1

SierraOwensValley

Mountain

Wave

~30 kmObs ~28

km

Cross section of temperature and wind speeds fromCOAMPS showing mountain waves over the Sierras

Surface Pressure and CloudsPredicted by NOGAPS

Page 9: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Satellite ProductsSatellite Products

• SATFOCUS

• SSMI and SSMI/S

• Scatterometer

• Tropical Cyclone Web Page

• Target Area METOC (TAM)

• Tactically Enhanced Satellite Imagery (TESI)

Example SATFOCUS Products

SATFOCUS Dust Enhancement Product

SSM/I Water VaporSSM/I Wind Speed

Page 10: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Overview of POPS and A2Overview of POPS and A2

Page 11: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

• Program of Record (ACAT IAD Program in sustainment)• Provides HPC platforms to run models and applications at

the UNCLAS, SECRET and TS/SCI Levels• Has been traditionally composed of two Subsystems:

– Analysis and Modeling Subsystem (AMS)• Models (NOGAPS, COAMPS, WW3, etc.)• Data Assimilation (NAVDAS, NAVDAS-AR)

– Applications Transactions and Observations Subsystem (ATOS)• Model pre- and post-processing (e.g., observational data prep/QC,

model output formatting, model visualization and verification, etc.) • Full range of satellite processing (e.g., SATFOCUS products, TCWeb

Page, DMSP, TAM, etc.)• Full range of METOC applications and services (e.g., OPARS,

WebSAR, CAGIPS, AREPS, TAWS, APS, ATCF, AOTSR, etc.)• Hosting of NOP Portal (single Web Presence for Naval Oceanography)

Primary OceanographicPrediction System (POPS)Primary Oceanographic

Prediction System (POPS)

Page 12: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Battlespace on Demand (BonD) and Current POPS SubsystemsBattlespace on Demand (BonD) and Current POPS Subsystems

40nm

100 nm

SSN AreaUPDATEDCONOPs

1800 sq nm

MPA Station #1UPDATEDCONOPs

4200 sq nm

MPA Station #2UPDATEDCONOPs

4000 sq nm

100 nm

28-00N

29-40N

60nm

30 nm

074-45W 072-50W

Province “B”

Province “A”“A” “A”

Updated CONOPs

Cumulative Probability of Detecting Both Threat Subs

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

0 5 10 15 20 25 30 35 40

Hour

Cu

mu

lati

ve P

rob

abili

ty

Updated CONOPsUpdated Environment

Original CONOPsUpdated Environment

Original CONOPsHistorical Environment

Forecast Battlespace

Tier 3 – the Decision Layer

Tier 2 – the Performance Layer

Tier 1 – the EnvironmentLayer

Observational DataSatellites

Fleet Data

ATOS

ATOS

AMS

Page 13: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

POPS Architecture StrategyGoing Forward

POPS Architecture StrategyGoing Forward• Drivers:

– Knowledge Centric CONOPS, requiring highly efficient reach-back operations, including low-latency on-demand modeling

– Growing HPC dominance of Linux clusters based on commodity processors and commodity interconnects

– Resource ($) Efficiencies• Solution:

– Combine AMS and ATOS functionality into a single system– Make the system ‘vendor agnostic’– Use Linux-cluster technology based on commodity hardware

• Advantages:– Efficiency for reach-back operations and on-demand modeling

• Shared file system and shared databases• Lower latency for on-demand model response

– Capability to surge capacity back-and-forth among the AMS (BonD Tier 1) and ATOS (BonD Tiers 0, 2, 3) applications as needed

– Cost effectiveness of Linux and commodity hardware vice proprietary operating systems and hardware

– Cost savings by converging to a single operating system [Linux]• We call the combined AMS and ATOS functionality A2

(AMS + ATOS = A2)

Page 14: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

40nm

100 nm

SSN AreaUPDATEDCONOPs

1800 sq nm

MPA Station #1UPDATEDCONOPs

4200 sq nm

MPA Station #2UPDATEDCONOPs

4000 sq nm

100 nm

28-00N

29-40N

60nm

30 nm

074-45W 072-50W

Province “B”

Province “A”“A” “A”

Updated CONOPs

Cumulative Probability of Detecting Both Threat Subs

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

0 5 10 15 20 25 30 35 40

Hour

Cu

mu

lati

ve P

rob

abili

ty

Updated CONOPsUpdated Environment

Original CONOPsUpdated Environment

Original CONOPsHistorical Environment

Forecast Battlespace

Tier 3 – the Decision Layer

Tier 2 – the Performance Layer

Tier 1 – the EnvironmentLayer

Observational DataSatellites

Fleet Data

BonD and Future POPS

BonD and Future POPS

A2

Page 15: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

A2 Hardware SpecificationsA2 Hardware Specifications• A2-0 (Opal) - UNCLAS Linux Cluster

– 232 nodes with 2 Intel Xeon 5100-Series “Woodcrest” dual-core processors per node (928 core processors total)

– 1.86 TB memory (8 GB per node)– 10 TFLOPS peak speed – 35 TB disk space with 2 GB per second throughput– Double Data Rate Infiniband interconnect at 20 Gb per

second– 40 Gb per second connection to external Cisco network– 4 Clearspeed floating point accelerator cards

• A2-1 (Ruby) - SECRET Linux Cluster– 146 nodes with 2 Intel Xeon 5300-Series “Clovertown”

quad-core processors per node (1168 core processors total)

– 1.17 TB memory (8 GB per node)– 12 TFLOPS peak speed– 40 TB disk space with 2 GB per second throughput– Double Data Rate Infiniband interconnect at 20 Gb per

second– 40 Gb per second connection to external Cisco network– 2 GRU floating point accelerator cards

Page 16: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

A2 Hardware SpecificationsA2 Hardware Specifications• A2-S (Topaz) - TS/SCI Linux Cluster

– Add Topaz h/w specs here

Page 17: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

A2 Middleware

A2 Middleware

• Beyond the hardware components, A2 depends on a complicated infrastructure of supporting systems software (i.e., “middleware”):– Suse Enterprise Server Linux Operating System

– GPFS: the Global Parallel File System, commercial software that provides a file system across all of the nodes of the system

– ISIS: Fleet Numerical’s in-house database designed to rapidly ingest and assimilate NWP model output files and external observations

– PBSPro: job scheduling software

– ClusterWorx: System management software

– Various MPI debugging tools, libraries, performance profiling tools, and utilities

– TotalView: FORTRAN/MPI debugging tool

– PGI’s Cluster Development kit, which includes parallel FORTRAN, C, C++ compilers

– Intel Compiler

– VMware ESX server

Page 18: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

A2 High-Level Timeline

A2 High-Level Timeline

• A2-0 (Opal) – UNCLAS System–Procurement started Jun 06

–Full system on-site Jan 07

–Achieved IOC 15 Oct 08

• A2-1 (Ruby) – SECRET System–Procurement started May 07

–System on site Sep 07

–Expect to achieve IOC Feb 09

•A2-S (Topaz) – TS/SCI System–Procurement started ????

–System on site ????

–Expect to achieve IOC ????

Page 19: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

1Used for TS/SCI level modeling in the SCIF. To be replaced in FY09 by A2-S.

2No longer used for running models. Continue to serve as a legacy Cross Domain Solution (CDS), providing transfer of data between classified and unclassified systems.

POPS Computer SystemsPOPS Computer SystemsNAME TYPE #CPUs MEMORY

(GB)PEAK SPEED (TFLOPS)

OS

AMS21 SGI ORIGIN 3800 128 128 0.2 TRIX

AMS32 SGI ORIGIN 3900 256 256 0.7 TRIX

AMS42 SGI ORIGIN 3900 256 256 0.7 TRIX

DC3 IBM p655+ 256 512 1.9 AIX

ATOS2 IBM 1350s/x440s/x345s 438 645 2.2 Linux

CAAPS IBM e1350s 148 272 0.7 Linux

A2-0 (Opal) Linux Cluster 928 1800 10.0 Linux

A2-1 (Ruby) Linux Cluster 1168 1170 12.0 Linux

A2-S (Topaz) Linux Cluster ???? ???? ???? Linux

TOTAL ???? ???? ~??

Page 20: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Cross Domain SolutionsCross Domain Solutions

Page 21: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Cross Domain SolutionsCross Domain Solutions

• In order to perform its mission, FNMOC fundamentally requires a robust, high-bandwidth Cross Domain Solution (CDS) system to allow two-way flow of data between the UNCLAS and SECRET enclaves within its HPC environment

• FNMOC’s existing CDS system is nearing the end of it’s lifecycle– SGI computer hardware (AMS3, AMS4)

– Trusted IRIX (TRIX) multi-level secure operating system

• The DoD Unified Cross Domain Management Office (UCDMO) has recently indicated that all legacy CDS systems must be replaced by one meeting their approval.

• Existing UCDMO solutions do not meet FNMOC’s bandwidth requirements (currently ~1 GB/sec, increasing to ~64 GB/sec by 2013)

Page 22: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

CDS Way AheadCDS Way Ahead

• FNMOC is currently partnered with the National Security Agency (NSA) to achieve an acceptable CDS that meets high-bandwidth requirements– Seeking interim solution based on modification of one or more of

the existing 14 UCDMO approved solutions, allowing phased migration to long-term solution

– Seeking long-term solution based on the NSA High Assurance Platform (HAP) project

– Expect that resulting solution will also meet NAVO’s requirements

• Joint NSA/FNMOC presentation at the Oct 2008 DISN Security Accreditation Working Group (DSAWG) resulted in approval of proposed CDS way ahead described above

Page 23: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

UKMO EngagementUKMO Engagement

Page 24: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Re-Baselining NOGAPS

Re-Baselining NOGAPS

• CNMOC/FNMOC and NRL are exploring the possibility of a partnership agreement with UKMO to obtain the UKMO Unified Model (UM) as a new baseline for development of the Navy’s operational global NWP capability.

• Intended to foster joint NRL/UKMO model development of a new operational global model for FNMOC.

• NRL to retain is global NWP expertise to ensure that resulting new model retains the attributes of NOGAPS that are important to Navy, while building on the advanced dynamics, physics and data assimilation capabilities of the UKMO UM.

• Exploratory discussions between CNMOC (RDML Titley, Steve Payne), NRL (Simon Chang) and UKMO senior leadership took place in Exeter last month.

• NRL has obtained a research license for the UM and is beginning initial testing of the model on the FNMOC computer system.

• Moving toward a go/no-go decision on this course of action in late January.

• Navy remains firmly committed to NUOPC, and sees this as a way to improve the quality of the NUOPC Ensemble.

Page 25: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Current NWP ConfigurationCurrent NWP Configuration

Decoders

QC Programs

NAVDASNAVDAS/AR

NOGAPSForecast Model

Applications/Users

ObservationalData

Page 26: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Possible Phase 1 Transition

Possible Phase 1 Transition

Decoders

QC Programs

NAVDASNAVDAS/AR

Applications/Users

ObservationalData

UMForecast Model

Freeze NOGAPS forecast model development and replace with UM. This will require new output programs to and from the forecast model. A rigorous statistical evaluation for multiple seasons will be performed.

Page 27: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Possible Phase 2 Transition

Possible Phase 2 Transition

NAVDASNAVDAS/AR

Applications/Users

ObservationalData Decoders

QC Programs

UMForecast Model

Freeze QC development and replace with UM QC, and develop decoders for UM QC programs. A rigorous statistical evaluation for multiple seasons will be performed.

Page 28: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Possible Phase 3 Transition

Possible Phase 3 Transition

Decoders

UM QC Programs

UM4D Variational Analysis

UMForecast Model

ObservationalData

Applications/Users

Freeze NAVDAS/AR development and replace with UM 4-D analysis system. A rigorous statistical evaluation for multiple seasons will be performed. Conduct tests to determine impact on downstream products.

Page 29: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

MILCON ProjectMILCON Project

Page 30: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

MILCON Project

MILCON Project

• $9.3M 14351 sq ft expansion/renovation of FNMOC Building 700 (Computer Center Building)– Adds 2500 sq ft to Computer Center for NPOESS IDPS

– Expands Ops Floor from 1550 to 3200 sq ft

– Expands SCIF Ops Floor from 1947 to 3012 sq ft

– Expands SCIF Computer Center from 875 to 2240 sq ft

– Expands Auditorium from 47 seats to 100 seats

• Schedule– Design/Build Contract awarded Sep 2008

– Groundbreaking Jan 2009

– Completion approximately Oct 2010

Page 31: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

FNMOC MILCON Project

FNMOC Building 700 Computer Center

Page 32: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

FY09 ObjectivesFY09 Objectives

Page 33: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Top Five FY09 Objectives

Top Five FY09 Objectives

• Implement the A76 Most Efficient Organization (MEO) as the Information Technology Services Department (ITSD).

• Achieve Full Operational Capability (FOC) for the A2-0 (Opal), A2-1 (Ruby) and A2-S (Topaz) computer systems.

• Achieve and maintain required Information Assurance (IA) accreditations, and implement DoD-approved Cross Domain Solution (CDS) for transferring data between classification levels.

• Design and install satellite processing systems in preparation for launch of NPOESS and NPP.

• Increase skill of METOC model products through implementation of new models, upgrades to existing models, and the assimilation of additional observational data from new sources and sensors.

Page 34: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Additional FY09 Objectives

Additional FY09 Objectives• Execute the Building 700 MILCON Project while maintaining at least 98.5%

uptime for operations.• Maintain excellence in Submarine Enroute Weather Forecast (SUBWEAX)

support.• Achieve FOC for the Automated Optimum Track Ship Routing (AOTSR)

system.• Field and support next generation version of the Naval Oceanography Portal

(NOP).• Meet all requirements for the Weather Reentry-Body Interaction Planner

(WRIP) project.• Meet all requirements for the North American Ensemble Forecast System

(NAEFS) and Joint Ensemble Forecast System (JEFS) projects in preparation for full engagement in the National Unified Operational Prediction Capability (NUOPC) initiative.

• Complete all Cost of War (COW) projects.• Maintain excellence in climatology support through FNMOD Asheville.• Implement Resource Protection Component of the new Weather Delivery

Model.• Develop a robust Continuity of Operations (COOP) plan for key capabilities.• Complete all Primary Oceanographic Prediction System (POPS) Program

Decision Board (PDB) actions.• Achieve Project Management culture aligned to the POPS program.

Page 35: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

SummarySummary

Page 36: Fleet Numerical Update CSABC Meeting 15 April 2009 James A. Vermeulen Data Ingest Team Supervisor FNMOC 7 Grace Hopper Ave., Stop 1 Monterey, CA 93943

Summary

Summary

• Several of our recent accomplishments will be of particular interest to COPC:– Achieved IOC for the A2 supercomputer system, new host for the FNMOC

models Ops Run– Commenced operational support for NAEFS, with NOGAPS Ensemble

fields delivered daily to NCEP– Upgraded the NOGAPS Ensemble with ET initialization– Implemented the coupled air-sea version of the GFDN TC model

• We have embraced Linux-based HPC as we continue to build out our A2 cluster to accomodate the full range of our operational workload

• We are partnered with NSA to achieve a DoD approved Cross Domain Solution capable of meeting our operational throughput requirements

• Along with NRL and CNMOC, we are exploring the possibility of a partnership with UKMO to re-baseline the Navy’s global NWP model

• We will break ground on $9.3M MILCON project in Jan to expand and renovate Building 700 Computer Center

• We have a full plate of FY09 objectives, not the least of which is implementing the MEO resulting from our completed A76 Study