five cfs cec
DESCRIPTION
Alan Master's PresentationTRANSCRIPT
CFS-CEC Five Year OutlookPronóstico de Cinco Años
Long-Range Planning Committee
Comité de Planificación
Prepared March 2009/Preparado marzo 2009
Goals of Five Year PlanMetas del Pronóstico
Enrollment – Número de EstudiantesStaff - PersonalPhysical Plant - EdificiosFinances - FinanzasFundraising – Recaudacion de Fondos
Enrollment HistoryHistoria de Número de Estudiantes
Current 2008 EnrollmentNúmero de Estudiantes Actuales
199 local students Locales10 staff students del Personal18 foreign students extranjeros
Enrollment: Full and StableNúmeros: Lleno y Estable
Present 2009/2010 2010/2011 2011/2012 2012/2013 2013/2014Enrollment
K 15 15 15 15 15 15P 18 18 18 18 18 18
1 17 17 17 17 17 17
2 17 17 17 17 17 17
3 15 17 17 17 17 17
4 19 15 17 17 17 17
5 15 19 15 17 17 17
6 21 15 19 15 17 17
7 21 21 15 19 15 17
8 22 21 21 15 19 15
9 21 22 21 21 15 19
10 14 21 22 21 21 15
11 12 14 21 22 21 21
{12} 0 0 0 0 0 0
Foreign 18 20 21 21 18 18
Staff Kids 10 10 10 10 10 10
TOTAL 227 232 235 231 226 222TOTAL Local 199 202 204 200 198 194
Enrollment ProjectionPronóstico de Número de Estudiantes
Staff HistoryHistoria de Personal
Current 2008 StaffPersonal Actual de 2008
26 Teachers Maestros2 EE Educación Ambiental1.5 Special Ed Ed Especial1.25 Art/Music/PE Arte/Musica
8 Administration Administración5 Other (Maintenance, Guards)
Otros (Mantenamiento/Guardas)
Future StaffPersonal Anticipado
Theatre 2009 TeatroFull Time Art and Music 2010
Arte y Musica Tiempo CompletoCurriculum Coordinator 2011
Coordinador del Plan de Estudios
Current 2008 Physical PlantEdificios Actuales de 2008
17 Classrooms Aulas14 Office Spaces Oficinas1 Art Room Aula de Arte1 Library Biblioteca2 Sheds Bodegas2 Greenhouses Invernaderos1 Computer Lab Sala de
Compu(16 buildings) (16 edificios)
Additions to Physical PlantEdificios/Espacios Adicionales
Multipurpose Building 2010 MultiusoLibrary/Tech Building 2013 Biblioteca/TecnHigh School Science Lab 2015 Colegio Ciencias
Building Plans
Road
Greenhouse
1st & 2nd
5th & 6th
Current 1/2
Future CampusFuturo Campus
Cost of Additional SpacesMonto de Edicificios Nuevos
Multipurpose Multiuso $150,000Includes construction of 1st & 2nd classrooms
Library/Tech Center Biblioteca $85,000Science Lab Ciencias $50,000
Operating Budget HistoryHistoria del Presupuesto
Current Operating BudgetPresupuesto Actual
$577,582.00 Total Tuition Parents 58%*
Cuotas de los PadresTotal Fundraising 42% ($242,500)
Fondos Recaudados
*includes foreign family contribution of $50,000 = 8.5% incluye la contribucion de familias extranjeras de $50,000 = 8.5%
Next Year’s Operating BudgetPresupuesto del Proximo Año
$624,947.00Total Tuition Parents 60%*
Cuotas de los PadresTotal Fundraising 40% ($250,000)
Fondos Recaudados
*includes foreign family contribution of $50,000 = 8% incluye la contribucion de familias extranjeras de $50,000 = 8%
Projected BudgetsPronóstico del Presupuesto
Projected FundraisingPronóstico de Recaudación de Fondos
* Plus $150,000 in 2009; $85,000 in 2013 for buildings
Conclusions/Conclusiones
Steady and full enrollment + increasing budget = better quality Número de estudiantes estable + más en el presupuesto = mejor calidad
Increase staff to include the Arts and improve Curriculum Aumentar al personal para incluir los Artes y mejorar curriculum
Finish Basic Buildings Terminar Edificios BásicosFundraising Must Keep Pace (increase by at least
$10,000 per year) Recaudación de fondos debe guardar paso (por lo menos $10,000 anualmente)