firstratetm generator cost - powerworld · scott r. dahman, p.e. [email protected] 2001 south...

29
Scott R. Dahman, P.E. [email protected] http://www.powerworld.com 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 FirstRate TM Generator Cost Models PowerWorld Client Conference February 23, 2016

Upload: others

Post on 07-Oct-2019

3 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

Scott R. Dahman, [email protected]://www.powerworld.com

2001 South First StreetChampaign, Illinois  61820+1 (217) 384.6330

FirstRateTM Generator Cost Models

PowerWorld Client ConferenceFebruary 23, 2016

Page 2: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

2© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Motivation and Background• FirstRateTM Cost Model Source Data• FirstRateTM Limitations• Demo

Outline

Page 3: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

3© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Automatic Generation Control (AGC) is a Simulator feature with several variants:– Participation Factor– Injection Group– Optimal Power Flow– Economic Dispatch– Area Slack

• Most of these can be applied to an Area, Super Area, or entire Island

Motivation and Background

Page 4: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

4© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Power flow assumes constant frequency and balance between load and generation

• The key role of AGC (as a software feature) is to satisfy the Area Control Error (ACE) constraint for Islands, Areas, or Super Areas

• ACE = Generation – (Load + Losses + Scheduled Exports)

• Ideally ACE = 0 for all Areas and Super Areas on control

• ACE must be zero for all Islands (Island Slack or “Swing Bus” enforces this constraint)

AGC

Page 5: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

5© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Defined with the power flow case• Every bus, generator, and load is assigned to exactly 1 area– Generators and loads are typically assigned to the same area as their terminal buses, but may differ

• Every Area on AGC has 1 ACE constraint

Areas

Page 6: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

6© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Simulator object for aggregating Areas• Each Area can belong to at most one Super Area• Useful for ISO modeling• ACE constraints for individual Areas that are part of a Super Area are ignored– Replaced with a single ACE constraint for the Super Area

– Transactions (imports/exports) between Areas that are part of the Super Area and external Areas or Super Areas are aggregated

Super Areas

Page 7: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

7© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Area Slack is commonly used in other software, but often degenerates to manual control

• If you make an adjustment to the case that affects ACE and the Area Slack generator moves too much, you manually adjust one or more other generators

• With other AGC methods, the software typically adjusts multiple generators and enforces limits

Area Slack Control

Page 8: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

8© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Participation Factor Control is a means of allowing many generators in an Area, Super Area, or Island, to adjust to maintain ACE

• Individual units must have AGC=YES and a non‐zero participation factor to contribute

• ERCOT Example: transfer 200 MW from area 905 to area 908 (CPS Energy → AEP Texas Central Company)

Participation Factor Control

Page 9: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

9© 2016 PowerWorld CorporationFirstRate Generator Cost Models

Difference Flows:200 MW Transfer

Page 10: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

10© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Optimal Power Flow (OPF) seeks to meet ACE with minimal cost, subject to transmission constraints

• Can be applied to Area or Super Area• Most significant cost component is usually generation cost

• Generator Cost Models are needed as OPF inputs• PowerWorld can provide basic cost model parameters from public sources, formatted to import directly to FERC 715 planning models– Sold as “FirstRate” subscription service through Energy Visuals, Inc. (a PowerWorld affiliate)

– http://www.energyvisuals.com/products/firstrate.html

Optimal Power Flow

Page 11: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

11© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Updated monthly with issue of US Energy Information Administration (EIA) generator data– Survey‐Level Detailed Data Files at http://www.eia.gov/electricity/data/detail‐data.html

• Formats for use with PowerWorld Simulator– Microsoft Excel spreadsheet– Simulator auxiliary file format

• Source Data mapped to power system key fields– Bus Number + Generator ID– Bus Name_NominalKV + Generator ID (not a strict key)

FirstRate Cost Models

Page 12: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

12© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Form 923– Average heat rate– Cost and quantity of fuels

• Electric Power Monthly– Summary‐level information to help estimate withheld cost information

– Planned additions and retirements• Form 860

– Unit‐level fuel and prime mover– Geo‐coordinates

EIA Sources

Page 13: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

13© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Total generator operating cost is modeled using cubic function

Ci(Pgi) = Fi + (Ai + BiPgi + Ci(Pgi)2+Di(Pgi)3) * fc + VOMPgi

Generator Cost Model: Cubic

Units are$ / hour

Variable O&M (VOM)Fuel cost (fc)

Page 14: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

14© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Formulated like bids, with one or more breakpoints and associated costs

Generator Cost Model:Piecewise Linear

Linear cost curve breakpoints and costs

Page 15: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

15© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Uses Simulator’s Cubic form, with only the linear term populated

• Fuel Cost and Variable O&M are also includedCi(Pgi) = (Bi * fc + VOM) * Pgi

FirstRate Sample Model

Average Heat Rate(MBtu/MWh)

Fuel Cost ($/MBtu)

Variable O&M($/MWh)

Page 16: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

16© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Oklaunion Unit 1, Wilbarger County, TX

• Average Heat Rate: 10.34 MBtu/MWh

• Other Cubic Model terms are zero

• Fuel Cost and Variable O&M

FirstRate Sample Model

Page 17: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

17© 2016 PowerWorld CorporationFirstRate Generator Cost Models

Other FirstRate Information

Plant Name and Operator, Fuel Type, and Unit (prime mover) Type

Page 18: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

18© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Oklaunion coal purchases in January 2015, from the EIA source spreadsheet:

• FirstRate incorporates the last 12 months of available data (rolling, with each update)

EIA Form 923: Fuel Cost

Page 19: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

19© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Oklaunion fuel consumption and MWh output

• FirstRate incorporates the last calendar year of available data

EIA Form 923: Heat Rate

Page 20: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

20© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Fuel consumption and net generation are generally available

• Cost of fuels is not publicly available– FirstRate compiles averages from the most complete set of comparable characteristics for each: fuel type, prime mover, plant state, fuel source state, mine type, purchase type (contract vs. spot market), etc.

– If these are not available, use state, regional, or national average by broad fuel class (coal, natural gas, petroleum, etc.)

Non‐Regulated Plants

Page 21: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

21© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Provides broad national, state, and regional‐level averages for utility and non‐utility plants

EIA Electric Power Monthly

Page 22: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

22© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Martin Lake Unit 1– Sub‐bituminous purchased from WY on contract– Lignite purchased from TX on contract and spot market

• Compare to average price paid by Texas utility plants with similar source characteristics:

Non‐Regulated Plant Example

Page 23: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

23© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Also incorporate ratio of average non‐utility price paid to utility price paid to estimate

• Compute weighted average cost of all types of coal purchases

• Distillate fuel oil is a secondary source– Used for les that 1% of MWh output– Ignored by FirstRate

Non‐Regulated Plant Example

Page 24: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

24© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Removal of statistical outliers– Could be caused by data entry errors, misplaced decimals, wrong units, etc.

– Averages and standard deviations are considered for each fuel and prime mover type, and within each plant

Data Processing

Page 25: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

25© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Wind, solar, and hydro units– do not have fuel costs or heat rates– Cost Model field is set to “None” in FirstRate

• Combined cycle units have uniform figures for all components– Simulator does not have algorithm to coordinate dispatch of 

combustion turbine and steam units– Key result for OPF is total output of all units

• No explicit source for plant‐level Variable O&M in public EIA databases– Could be partially estimated from emissions– FirstRate uses industry averages

• Generally available only for FERC 715 planning models; maintenance challenges with other models– No persistent key fields– Generator information obscured or redacted

Limitations

Page 26: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

26© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• 15DSA_2016_WIN1_TPIT_Final_10152014 (2016 Winter Peak)

• OPF solutions without and with contingency constraints

Demo: ERCOT Model

Page 27: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

27© 2016 PowerWorld CorporationFirstRate Generator Cost Models

OPF Solution: Base

Page 28: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

28© 2016 PowerWorld CorporationFirstRate Generator Cost Models

OPF Solution:Contingency Constraints

Page 29: FirstRateTM Generator Cost - PowerWorld · Scott R. Dahman, P.E. scott@powerworld.com  2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330

29© 2016 PowerWorld CorporationFirstRate Generator Cost Models

• Download sample files and other documentation at http://www.powerworld.com/services/generator‐cost‐models

More Information