Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL TECHNICAL TEAMS FOR THE PREPARATION OF NATIONAL COMMUNICATION INCLUDING GHG INVENTORIES, ON A CONTINUOUS BASIS 4 th CGE Meeting St Mary’s, Antigua and Barbuda, 25. March 2011 Uazamo Kaura, Programme Officer UNFCCC secretariat, Financial and Technical Support Programme

Upload: allison-casey

Post on 04-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Firstname Lastname, Job Title

CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL TECHNICAL TEAMS FOR THE PREPARATION OF NATIONAL COMMUNICATION INCLUDING GHG INVENTORIES, ON A CONTINUOUS BASIS

4th CGE Meeting

St Mary’s, Antigua and Barbuda, 25. March 2011

Uazamo Kaura, Programme Officer

UNFCCC secretariat, Financial and Technical Support Programme

Page 2: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Presentation Outline

PRESENTATION OUTLINE

Introduction

• Survey Design

• Analysis of the Results

a) Respondents

• Responses to survey

b) Sustainability of National Teams

• Institutional Concerns

• Financial Concerns

• GHG Software

• Conclusion

Page 3: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Introduction

INTRODUCTION

•In response to decision 5/CP.15, paragraphs (a-c) of the its terms of reference, the CGE agreed at its first meeting on 29 to 31 March 2010, to collect information on:

•Difficulties, challenges, technical problems, and constraints faced by NAI Parties in preparing their Nat. Com. in using the UNFCCC guidelines (Paragraph 2(a) and 2(b));

•Sustaining the national communication process and maintaining national technical teams (Paragraph 2(c)).

•Presentation on the results of Survey 2: Collection of information on problems related to the sustainability of the national communications process and maintenance of national technical teams for the preparation of national communication including GHG inventories, on a continuous basis

Page 4: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Survey Design

SURVEY

SURVEY DESIGN

The survey contained four parts:

a. Part 1: Background Information;

b. Part 2: Institutional Concerns and solutions;

c. Part 3: Financial concerns and solutions; and

d. Part 4: GHG inventory Software.

Page 5: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results - Respondents

RESPONDENTS

RESPONSES TO THE SURVEY

• Feedback 89.8% NAI Party Country and 10.2% Multilateral or bilateral organizations

• 39 respondents from 25 countries have responded to Survey 2 (as of 22 December 2010)

• 78.6% in the process of preparing SNC; 4.8% preparing the INC and 14.3% preparing NC3.

    Number of States Given:  

Region Total number of states

Over 50% Response Rate

Over80% Response Rate

Number of states responded to Survey 2

Percentage Responded within Region

African States 53 27 42 15 28.3%

Asian States 56 28 45 11 19.6%

Eastern European States 9 5 7 4 44.4%

Latin American and Caribbean States

33 17 26 9 27.3%

Western European States

2 1 2 0 0.0%

Total 153 77 122 39 25.5%

Page 6: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – Institutional Concerns

• 31.4% of the respondents found it moderately difficult to build on their previous experience on

working and reporting their national communication

• 17.1% of the respondents had no difficulties on using their previous experience working on national

communications.

INSTITUTIOAL CONCERNS

BUILDING ON PREVIOUS EXPERIENCE Building on existing procedures and organizational experience from the sections or tasks related to the previous national communications

Page 7: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – Institutional Concerns

INSTITUTIOAL CONCERNS

BUILDING ON PREVIOUS EXPERIENCE Usefulness of types of helpful technical assistance and support

Page 8: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – Institutional Concerns

RECOMMENDATIONS

• Need for Data Base institutional setting for the climate change issues;

• Financial, legal and managerial support;

• Processing the data according to the UNFCCC guidelines;

• Establishment of systematic protocols of data collection, management and sharing among; and

• Integrating climate change into specific work programmes.

INSTITUTIONAL CONCERNS

SUSTAINIBILITY OF NATIONAL TEAMS KEY CHALLENGES

•Coordination of processes between different Ministries;

•Access to activity data;

•Changes in national administration structures;

•Preparing of Nat. Com. project-basis;

•Funding limitation;

•Staff involved in multiple tasks;

•Teams disbanded after concluding nat. com - a different team may be contracted for new one;

•Limited technical capacity;

•Difficult to maintain highly qualified staff due to insufficient incentives; and

•Limited long-term job opportunity.

Page 9: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – Institutional Concerns

INSTITUTIONAL CONCERNS

NATIONAL GHG INVENTORY Building on Level of difficulty/ease in completing the National GHG Inventory section

Page 10: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – Financial Concerns

FINANCIAL CONCERNS

OVERALL RESULTS Potential financial difficulties constraining ability to sustain nat. com. process and/or build and maintain a nat. com. team

Page 11: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – Financial Concerns

FINANCIAL CONCERNS

OVERALL RESULTS Usefulness of technical assistance and support to address financial and funding concerns

Page 12: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – Financial Concerns

RECOMMENDATIONS

• Successive funding of the nat. com. to maintain Technical Teams;

• Delay leaves gap for team to find other work;

• Budget for international consultants needs to be increased and based on current rates;

• Stimulation for the involvement of public servants (apart of independent consultants); and

• Establishment of institutional structures and support mechanisms

FINANCIAL CONCERNSKEY CHALLENGES

•Economic climate;•Government budget cuts;•Delays in disbursement of funds from implementing agencies; •Costs of international consultants;•Exchange rate;•Insufficient funds to pay coordinator and technical advisers;•GEF allocates funds without addressing specific needs and circumstances of countries; and•Co-funding.

Page 13: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Analysis of the Results – GHG Software

• Use UNFCCC GHG inventory software 1.3.2 were 45.9% and 18.9% using earlier version;

• Consultants hired to complete the GHG inventory;

• Difficulty in entering data in software in new software;

• Some NAI Parties observed that the current software was not working well; and there has been no sufficient reason to explain this problem.

GHG SOFTWARE

OVERALL RESULTS

Page 14: Firstname Lastname, Job Title CGE SURVEY RESULTS ON PROBLEMS RELATED TO THE SUSTAINABILITY OF THE NATIONAL COMMUNICATIONS PROCESS AND MAINTENANCE OF NATIONAL

Conclusion

CONCLUSION •Obtaining sufficient and consistent funding for maintaining the NC team was a major concern for

Parties;

•Sustaining national teams require regular funds from GEF and other sources;

•Delays in disbursement of funds from implementing agencies a financial concern;

•Allocation of funds for Nat. Com. preparation was based on top down approach without addressing specific needs and circumstances of a Party;

•The use of GHG software has been a problem for a number of Parties.

•Results obtained can be used to contribute to technical advice to non-Annex parties to facilitate the development and long term sustainability of processes, and establishment and maintenance of national technical teams