first light assembly overview

105
1 2 3 4 5 6 7 A B C D E 1 2 3 4 5 6 7 A B C D E SHEET TITLE LOT NUMBER: DRAWN BY: CHECKED BY: COPYRIGHT: CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 WWW.SOLARDECATHLON.GOV TEAM NAME: ADDRESS: CONTACT: TENNENT + BROWN ARCHITECTS CONSULTANTS DUNNING THORNTON CONSULTANTS LTD LEAP AUSTRALASIA LTD SOUTHERN PERSPECTIVES / SOLAR CITY FIRST LIGHT [email protected] WWW.FIRSTLIGHTHOUSE.AC.NZ 22/02/2011 5:35:52 p.m. 139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND Z103 3D VIEW LOT NUMBER Author Checker MARK DATE DESCRIPTION 1 3D VIEW TIMBER CANOPY SOLAR PANELS MOUNTED ON CANOPY TIMBER DECKING SYSTEM MODULES 1 THROUGH 6 CRANED ONTO FOUNDATION SYSTEM. CLADDING ATTACHED AFTER MODULES ASSEMBLED PLANTER BOXES

Upload: brendan-laurence

Post on 24-Mar-2016

216 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

FIRST LIGHT

[email protected]

22/0

2/20

11 5

:35:

52 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

Z103

3D VIEW

LOT NUMBER

Author

Checker

MARK DATE DESCRIPTION

1 3D VIEW

TIMBER CANOPY

SOLAR PANELS MOUNTED ON CANOPY

TIMBER DECKING SYSTEM

MODULES 1 THROUGH 6 CRANEDONTO FOUNDATION SYSTEM.CLADDING ATTACHED AFTERMODULES ASSEMBLED

PLANTER BOXES

5472

3357

2200

2200

3357

2200

3357

2200

3357

3357

2272

5472

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

22/0

2/20

11 5

:11:

54 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-401

EXPLODED MODULESSCHEMATIC

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

A1 EXPLODED MODULES ISOMETRIC

GENERAL SHEET NOTES

MARK DATE DESCRIPTION

M6

M5

M4

M3

M2

M1

1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS

2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)

3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))

4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.

1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS

2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)

3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))

4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.

MODULE 3 WILL BE DISASSEMBLED ANDPACKED INTO THE 40 FOOT SHIPPINGCONTAINERS

A1

A-211

C1

A-211

C1

A-212A1

A-212

1 2 3 4 5 6 7

A

C

B

C1A-301

C1A-302

C4A-302

KITCHEN

DININGLIVING STUDY

LAUNDRYBATHROOM

2200 2200 3000 2200 2200 2200

3418

1934

A4A-302

B2A-303

D08A-511

ID02-5

WI05-5

WI0

1-1

M1 M2 M3 M4 M5

M6

A-501D01

A-501D02 A-501

D03

A-501D04

A-533D30

A-531D42

SHED

UTILITIES

JN06

-5

A1

G-201

A1

G-202

C1

G-202

C1

G-201

BUNK

JN05

-4

-

--

-

-

D44A-513

A-513D45

836

A-531D19

A1A-302

A-532D22

A-533D25

A-533D31

1280 895 1305 895 896

1575

713 1442 852 13037702732635

WI02-2 WI04-4 WI06-6

WI03-4

ID01-4

DO

04-6

DO

03-6

DO01-3

DO02-3

C1S-301

SEE DRAWINGS I-110TO I-523 FOR INTERIORFINISHING DETAILS

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

14/0

1/20

11 6

:33:

51 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-111

FLOOR PLAN

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

GENERAL SHEET NOTES

1 : 50A1 FLOOR PLAN

MARK DATE DESCRIPTION

DOORS DO03-6 AND DO04-6 TO BE RESOLVED

GROUND FLOOR0

GRADE LEVEL-550

1 2 3 4 5 6 7

WI02-2 WI04-4

WI06-6

TOP OF PARAPET2985

SOLAR ENVELOPESHOWN DASHED

EXTERIOR SOLAR SHADINGINSTALLED ON ALL SOUTHFACING WINDOWS.CONSTRUCTION DETAILSTO BE CONFIRMED

PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM. SEE DRAWINGS A-591 TO A598 FORCONSTRUCTION DETAILS

METALCRAFT CORRUGATEDPROFILED AWNING. SEEDRAWING A-533 FORCONSTRUCTION DETAILS

GROUND FLOOR0

GRADE LEVEL-550

1234567

WI05-5

75X19MM CEDAR SLATS @100MMCENTRES

GLUE-LAMINATED COLUMNS

6713 4513

1352

1387

220022003000220022002200

OUTDOOR SHOWER

SOLAR ENVELOPE FORWASHINGTON SITE SHOWNDASHED

WI03-4

SOLAR WATER HEATING PANELS

PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS

TOP OF PARAPET2985

DO01-3

PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM. SEE DRAWINGS A-591TO A598 FOR CONSTRUCTIONDETAILS

TIMBER CANOPY STRUCTURE.CONSTRUCTION DETAILS TO BECONFIRMED

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

14/0

1/20

11 6

:34:

03 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-211

ELEVATIONS

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

1 : 50A1 SOUTH ELEVATION

1 : 50C1 NORTH ELEVATION

GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS

FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION

MARK DATE DESCRIPTION

DO02-3

GROUND FLOOR0

GRADE LEVEL-550

AC B

GLUE-LAMINATED COLUMNS

DO04-6 DO03-6

PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM

OUTDOOR SHOWER

CUSTOM FABRICATED STEELFOUNDATION SYSTEM. SEEDRAWING S-101 FOR FURTHERDETAILS

75X19MM VERTICAL CEDARSLATS @100MM CRS FIXED TO65X45MM HORIZONTALBATTENS

75X19MM CEDAR SLATS @100MM CRSFIXED TO 65X35MM BATTENS.CONSTRUCTED IN PANELIZED SYSTEMFOR ONSITE ASSEMBLY

TOP OF PARAPET2985

METER HOUSING BOXES

DETAILS FOR DOORS DO03-6& DO04-6 TO BE CONFIRMED

SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED

GROUND FLOOR0

GRADE LEVEL-550

A CB

GLUE-LAMINATED COLUMNS

75X19MM CEDAR SLATS @100MMCENTRES

WI01-1

75X19MM CEDAR SLATS @100MMCENTRES

TOP OF PARAPET2985

PANELIZED HORIZONTAL SHIPLAPHERMAN PACIFIC CEDARWEATHERBOARD SYSTEM.REFER TO DRAWINGS A591 TOA-598 FOR CONSTRUCTIONDETAILS

SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED

PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS

TIMBER CANOPY. CONSTRUCTIONDETAILS TO BE CONFIRMED

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

14/0

1/20

11 6

:34:

12 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-212

ELEVATIONS

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

1 : 50C1 EAST ELEVATION

1 : 50A1 WEST ELEVATION

GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS

FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION

MARK DATE DESCRIPTION