first light assembly overview
DESCRIPTION
ÂTRANSCRIPT
1 2 3 4 5 6 7
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
SHEET TITLE
LOT NUMBER:
DRAWN BY:
CHECKED BY:
COPYRIGHT:
CLIENT
U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2011
WWW.SOLARDECATHLON.GOV
TEAM NAME:
ADDRESS:
CONTACT:
TENNENT + BROWN ARCHITECTS
CONSULTANTS
DUNNING THORNTON CONSULTANTS LTD
LEAP AUSTRALASIA LTD
SOUTHERN PERSPECTIVES / SOLAR CITY
FIRST LIGHT
22/0
2/20
11 5
:35:
52 p
.m.
139 VIVIAN STREETTE ARO, WELLINGTON
NEWZEALAND
Z103
3D VIEW
LOT NUMBER
Author
Checker
MARK DATE DESCRIPTION
1 3D VIEW
TIMBER CANOPY
SOLAR PANELS MOUNTED ON CANOPY
TIMBER DECKING SYSTEM
MODULES 1 THROUGH 6 CRANEDONTO FOUNDATION SYSTEM.CLADDING ATTACHED AFTERMODULES ASSEMBLED
PLANTER BOXES
5472
3357
2200
2200
3357
2200
3357
2200
3357
3357
2272
5472
1 2 3 4 5 6 7
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
SHEET TITLE
LOT NUMBER:
DRAWN BY:
CHECKED BY:
COPYRIGHT:
CLIENT
U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2011
WWW.SOLARDECATHLON.GOV
TEAM NAME:
ADDRESS:
CONTACT:
TENNENT + BROWN ARCHITECTS
CONSULTANTS
DUNNING THORNTON CONSULTANTS LTD
LEAP AUSTRALASIA LTD
SOUTHERN PERSPECTIVES / SOLAR CITY
VICTORIA UNIVERSITY
CN 11-01-11 FOR CONSTRUCTION
22/0
2/20
11 5
:11:
54 p
.m.
139 VIVIAN STREETTE ARO, WELLINGTON
NEWZEALAND
A-401
EXPLODED MODULESSCHEMATIC
LOT NUMBER
AUTHOR
CHECKER
FIRSTLIGHT NZ
A1 EXPLODED MODULES ISOMETRIC
GENERAL SHEET NOTES
MARK DATE DESCRIPTION
M6
M5
M4
M3
M2
M1
1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS
2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)
3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))
4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.
1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS
2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)
3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))
4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.
MODULE 3 WILL BE DISASSEMBLED ANDPACKED INTO THE 40 FOOT SHIPPINGCONTAINERS
A1
A-211
C1
A-211
C1
A-212A1
A-212
1 2 3 4 5 6 7
A
C
B
C1A-301
C1A-302
C4A-302
KITCHEN
DININGLIVING STUDY
LAUNDRYBATHROOM
2200 2200 3000 2200 2200 2200
3418
1934
A4A-302
B2A-303
D08A-511
ID02-5
WI05-5
WI0
1-1
M1 M2 M3 M4 M5
M6
A-501D01
A-501D02 A-501
D03
A-501D04
A-533D30
A-531D42
SHED
UTILITIES
JN06
-5
A1
G-201
A1
G-202
C1
G-202
C1
G-201
BUNK
JN05
-4
-
--
-
-
D44A-513
A-513D45
836
A-531D19
A1A-302
A-532D22
A-533D25
A-533D31
1280 895 1305 895 896
1575
713 1442 852 13037702732635
WI02-2 WI04-4 WI06-6
WI03-4
ID01-4
DO
04-6
DO
03-6
DO01-3
DO02-3
C1S-301
SEE DRAWINGS I-110TO I-523 FOR INTERIORFINISHING DETAILS
1 2 3 4 5 6 7
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
SHEET TITLE
LOT NUMBER:
DRAWN BY:
CHECKED BY:
COPYRIGHT:
CLIENT
U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2011
WWW.SOLARDECATHLON.GOV
TEAM NAME:
ADDRESS:
CONTACT:
TENNENT + BROWN ARCHITECTS
CONSULTANTS
DUNNING THORNTON CONSULTANTS LTD
LEAP AUSTRALASIA LTD
SOUTHERN PERSPECTIVES / SOLAR CITY
VICTORIA UNIVERSITY
CN 11-01-11 FOR CONSTRUCTION
14/0
1/20
11 6
:33:
51 p
.m.
139 VIVIAN STREETTE ARO, WELLINGTON
NEWZEALAND
A-111
FLOOR PLAN
LOT NUMBER
AUTHOR
CHECKER
FIRSTLIGHT NZ
GENERAL SHEET NOTES
1 : 50A1 FLOOR PLAN
MARK DATE DESCRIPTION
DOORS DO03-6 AND DO04-6 TO BE RESOLVED
GROUND FLOOR0
GRADE LEVEL-550
1 2 3 4 5 6 7
4°
WI02-2 WI04-4
WI06-6
TOP OF PARAPET2985
SOLAR ENVELOPESHOWN DASHED
EXTERIOR SOLAR SHADINGINSTALLED ON ALL SOUTHFACING WINDOWS.CONSTRUCTION DETAILSTO BE CONFIRMED
PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM. SEE DRAWINGS A-591 TO A598 FORCONSTRUCTION DETAILS
METALCRAFT CORRUGATEDPROFILED AWNING. SEEDRAWING A-533 FORCONSTRUCTION DETAILS
GROUND FLOOR0
GRADE LEVEL-550
1234567
WI05-5
4°
75X19MM CEDAR SLATS @100MMCENTRES
GLUE-LAMINATED COLUMNS
6713 4513
1352
1387
220022003000220022002200
OUTDOOR SHOWER
SOLAR ENVELOPE FORWASHINGTON SITE SHOWNDASHED
WI03-4
SOLAR WATER HEATING PANELS
PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS
TOP OF PARAPET2985
DO01-3
PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM. SEE DRAWINGS A-591TO A598 FOR CONSTRUCTIONDETAILS
TIMBER CANOPY STRUCTURE.CONSTRUCTION DETAILS TO BECONFIRMED
1 2 3 4 5 6 7
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
SHEET TITLE
LOT NUMBER:
DRAWN BY:
CHECKED BY:
COPYRIGHT:
CLIENT
U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2011
WWW.SOLARDECATHLON.GOV
TEAM NAME:
ADDRESS:
CONTACT:
TENNENT + BROWN ARCHITECTS
CONSULTANTS
DUNNING THORNTON CONSULTANTS LTD
LEAP AUSTRALASIA LTD
SOUTHERN PERSPECTIVES / SOLAR CITY
VICTORIA UNIVERSITY
CN 11-01-11 FOR CONSTRUCTION
14/0
1/20
11 6
:34:
03 p
.m.
139 VIVIAN STREETTE ARO, WELLINGTON
NEWZEALAND
A-211
ELEVATIONS
LOT NUMBER
AUTHOR
CHECKER
FIRSTLIGHT NZ
1 : 50A1 SOUTH ELEVATION
1 : 50C1 NORTH ELEVATION
GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS
FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION
MARK DATE DESCRIPTION
DO02-3
GROUND FLOOR0
GRADE LEVEL-550
AC B
GLUE-LAMINATED COLUMNS
DO04-6 DO03-6
PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM
OUTDOOR SHOWER
CUSTOM FABRICATED STEELFOUNDATION SYSTEM. SEEDRAWING S-101 FOR FURTHERDETAILS
75X19MM VERTICAL CEDARSLATS @100MM CRS FIXED TO65X45MM HORIZONTALBATTENS
75X19MM CEDAR SLATS @100MM CRSFIXED TO 65X35MM BATTENS.CONSTRUCTED IN PANELIZED SYSTEMFOR ONSITE ASSEMBLY
TOP OF PARAPET2985
METER HOUSING BOXES
DETAILS FOR DOORS DO03-6& DO04-6 TO BE CONFIRMED
SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED
GROUND FLOOR0
GRADE LEVEL-550
A CB
GLUE-LAMINATED COLUMNS
75X19MM CEDAR SLATS @100MMCENTRES
WI01-1
75X19MM CEDAR SLATS @100MMCENTRES
TOP OF PARAPET2985
PANELIZED HORIZONTAL SHIPLAPHERMAN PACIFIC CEDARWEATHERBOARD SYSTEM.REFER TO DRAWINGS A591 TOA-598 FOR CONSTRUCTIONDETAILS
SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED
PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS
TIMBER CANOPY. CONSTRUCTIONDETAILS TO BE CONFIRMED
1 2 3 4 5 6 7
A
B
C
D
E
1 2 3 4 5 6 7
A
B
C
D
E
SHEET TITLE
LOT NUMBER:
DRAWN BY:
CHECKED BY:
COPYRIGHT:
CLIENT
U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2011
WWW.SOLARDECATHLON.GOV
TEAM NAME:
ADDRESS:
CONTACT:
TENNENT + BROWN ARCHITECTS
CONSULTANTS
DUNNING THORNTON CONSULTANTS LTD
LEAP AUSTRALASIA LTD
SOUTHERN PERSPECTIVES / SOLAR CITY
VICTORIA UNIVERSITY
CN 11-01-11 FOR CONSTRUCTION
14/0
1/20
11 6
:34:
12 p
.m.
139 VIVIAN STREETTE ARO, WELLINGTON
NEWZEALAND
A-212
ELEVATIONS
LOT NUMBER
AUTHOR
CHECKER
FIRSTLIGHT NZ
1 : 50C1 EAST ELEVATION
1 : 50A1 WEST ELEVATION
GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS
FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION
MARK DATE DESCRIPTION