Fire Station #8 Relocation
– Siting Process
Community Meeting #3
Langston Brown Community Center
July 30, 2015 from 7-9pm
Agenda
Introductions (Doug Sarno- 10 minutes)
Opening Remarks (Carol Mitten, Arlington County
Manger’s Office – 5 minutes)
Recap & Updates to Previously Asked Questions
(Chief Schwartz, ACFD & June Locker DES- 25
minutes)
Review of Site Matrix (June Locker - 10 minutes)
Q&A (60 minutes)
Wrap Up & Next Steps (Doug Sarno– 10 minutes)
2
Community Process
• Tonight– Overview presentation
– Recap
– Respond to key questions heard to date
– Presentation of Preliminary Site Matrix
– Devote more time to Q&A
3
Community Process
• Meeting #4 - September 9th @
Yorktown H.S.– Review process and key issues to date
– Present results of review of additional sites
– Present recommendations to be submitted to
the Board
4
New Data Uploaded to Website
• New Data posted:
– Existing footprint size
– Updated info on lot size requirements
– Socioeconomic Factors and Incidence of Fire
– Acquisition of Current Fire Station land
• http://projects.arlingtonva.us/2015/07/fire-
station-8-future-location-questions-and-
answers/
5
Why Move Fire Station 8?
Replacement identified in 2015-2024 CIP
Part of the overall effort to continuously improve the
system and bring equal levels of service to as much of
the County as possible
reach many more North Arlington properties within the
preferred response time of four minutes
Bring station up to current standards and space
requirements
Part of ongoing improvements, not meant to solve the
total north county gap
6
Site Selection Criteria
Criteria for relocating FS#8 is based on an independent analysis by TriData
and guidance from Arlington County Board:
An increase in the number of households reached in 4-6 minutes
1.5 acre site already owned by the County (or likely to come into the
County's control expeditiously and at a feasible cost)
Proximity to major arterial street(s)
A location that does not adversely affect the distribution of workload
among the system of fire stations.
9
Site Matrix
10
Legend
FIRE DEPT OPERATIONS
IMPROVED RESPONSE NETWORK COMPATIBILITY
SITE Address
Arlington County Salt Dome site 26TH St N & Old Dominion 7.1 a aGlebe & Rock Springs (Country Club Parcels along
Glebe)
Washington Golf and Country
ClubTBD a a
Glebe & Yorktown TBD TBD a a
Wells Fargo Bank (2 parcels) 2213 N. Glebe Road 0.977/0.442 a a
Glebe & Williamsburg TBD TBD a a
Saint Mary’s Episcopal Church Residential Property 0.67 a a
Fire Station #8 4845 Lee Hwy 0.76 b/c a
Fire Station #8 + adjacent properties (3 parcels) Lee Highway & Culpepper St. 0.76/0.2867 b/c aUpper Pimmit Run Park (2 parcels)
3912 N. Dumbarton Street 0.9/1.3 c c
Rock Spring Park 5012 Little Falls Road 1.48 c cMadison Community Center N. Old Glebe Road - Parcel A,
Parcel B8.776 c c
VDOT Site 1 West Glebe Rd & Old Glebe Road Int 2.24 c c
VDOT Site 2 East Glebe Rd & Old Glebe Road Int 1.04 c c
Military Road (Country Club Parcels along Military)Washington Golf and Country
ClubTBD c c
VHC Parcels Lee & George Mason TBD c c
Arlington Presbyterian Church of the Covenant 2666 Military Road TBD c cZachary Taylor Park
Military Road 14.8 c cFederal Bakery
5009 Lee Highway 0.34 c bGulf Run Pumping Station
3611 Military Road 0.5 c c
Taylor Elementary 2600 N. Stuart Street 15.54 c c
Gulf Branch Park 3608 Military Road 29.289 c c
AREA
(ACRES)
FIRE DEPT OPERATIONS
IMPROVED RESPONSE NETWORK COMPATIBILITY
1400+ residences added to 4
min. response and 1600+
residences added to 6 min
response times
response times improved;
less < 1400+ residences added
to 4 min. response and 1600+
residences added to 6 min
no improvement in N
Arlington response times
Minor impact to Response
Times.
Major impact to Response
Times; Units from FS 2 or 3
pulled too far north
No impact to Response Times;
Units from FS2 &3 will not be
impacted
Next Steps
What are we going to do with what we hear?
Staff will continue to review and analyze
suggested sites & criteria.
Share Results and Recommendations to the
Board at Meeting #4, September 9th
Please provide any additional
feedback/suggestions by August 15th
NEW Project Contact – George May; email to
12
Wrap up
Upcoming meetings:
Meeting #4 on September 9th at
Yorktown High School
For latest project updates &
Information:
http://projects.arlingtonva.us/projec
ts/fire-station-8/
Please sign up for email alerts13
Fire Station #8 Program Requirements
14
4 Bay stations
Drive-through arrangement
New program standards
Decontamination & storage
Workforce gender mix
24 hour shift
Model - Fire Station #5
Total Site = 1.5 acres
Building footprint, apron, wrap
around drive aisle, and 12 surface
parking – 0.8 Acres
Site – 0.7 Acres
30 ft setback/buffer