finland : the dissemination of caf in the assessment processes for the quality conferences
DESCRIPTION
Finland : The dissemination of CAF in the assessment processes for the Quality Conferences. Dr. Kirsi Levä, TUKES. TUKES SAFETY TECHNOLOGY AUTHORITY FINLAND. TUKES maintains and promotes technical safety in order to protect people, property, and the environment. development. supervision. - PowerPoint PPT PresentationTRANSCRIPT
TUKESSAFETY TECHNOLOGY AUTHORITY
Finland : The dissemination of CAF in
the assessment processes for the Quality Conferences
Dr. Kirsi Levä, TUKES
TUKESSAFETY TECHNOLOGY AUTHORITY
TUKES maintains and promotes technical safetyin order to protect
people, property, and the environment.
TUKES
supervision development
communication
TUKESSAFETY TECHNOLOGY AUTHORITY
FINLAND
TUKESSAFETY TECHNOLOGY AUTHORITY
Lisbon
• Choosing BPs
Copenhagen
• Choosing BPs
• Making good use of the process at the national level
Rotterdam
• Choosing BPs
• Making good use of the process national level
• Closer linkage to development areas: personnel policy, e-government and output/outcome –orientation (efficiency)
Goals set for the process
TUKESSAFETY TECHNOLOGY AUTHORITY
Lisbon
1. Project group
2. AssessmentGroup (partlyfrom Ministryof Finance and Minstry of Interior)
3. Selectioncommittee
Copenhagen
1. Project Group
2. AssessmentGroup (outsidersincl. last timeBP’s)
3. SelectionCommittee
Rotterdam
1. Project Group (e-gov +HRM)
2. AssessmentGroup (outsiders incllast time BP’se-gov + HRM)
3. Selectioncommittee
Developing assessment process
TUKESSAFETY TECHNOLOGY AUTHORITY
Lisbon
• EFQM
Copenhagen
• CAF I
Rotterdam
• CAF II
+ focus (e-gov, HRM, productivity, impact/ outcomes)
Evaluation criteria
TUKESSAFETY TECHNOLOGY AUTHORITY
The organisations participating in the process
• the process is supported by training• participants prepare an application according to
CAF (20 pages)• extra focus to personnel policy, e-government or
output/outcome orientation and continuous improvement
• assessment group prepare a feedback report
TUKESSAFETY TECHNOLOGY AUTHORITY
Schedule• 12.12.2003: Applications to Ministry of Finance and publishing the list of participants
• 12.12.2003 -26.1.2004: Assessment Group carries out its work
• 3.2.2004: Selection and awarding of the BPs
• March 2004: Sending the feedback report for the participants
• April to August 2004: Preparing the presentations to the Rotterdam conference, RoadShows
• 15.-17.9.2004: EU BPs Conference in Rotterdam
• November 2004: Feedback and future development, meeting between Ministry and BPs
• Presentations (national)
• Two years later (2005): Joining the Assessment Group
TUKESSAFETY TECHNOLOGY AUTHORITY
Challenges
• Inspire organisations to participate• Criteria: EFQM – CAF• Timetable
• Directors and politicians attention