ENG450 – Engineering Internship
Brad Smith – 30331929 1 of 70
22/04/2009
Final Year Engineering
Internship Report
Murdoch Engineering
Faculty of Minerals and Energy
ENG450 – Engineering Internship
Prepared By: Brad Smith
Academic Supervisor : Associate Professor Graeme Cole
ENG450 – Engineering Internship
Brad Smith – 30331929 2 of 70
22/04/2009
ENG450 – Engineering Internship
Brad Smith – 30331929 3 of 70
22/04/2009
Table of Contents
1.0 DISCLAIMER................................................................................................................................................. 7
2.0 INTRODUCTION ........................................................................................................................................... 8
2.1 OBJECTIVES................................................................................................................................................... 8
2.2 REPORT FOCUS .............................................................................................................................................. 8
2.3 COMPANY INFORMATION .............................................................................................................................. 8
3.0 LIST OF ABBREVIATIONS......................................................................................................................... 9
4.0 PROJECT OUTLINE..................................................................................................................................... 9
4.1 FUNCTIONAL SEQUENCE – HEMATITE ......................................................................................................... 10
4.1.1 Train Unloading and Stockpiling........................................................................................................... 10
4.1.2 Reclaiming and Ship Loading................................................................................................................ 11
4.2 FUNCTIONAL SEQUENCE – MAGNETITE....................................................................................................... 11
4.2.1 Train Unloading and Stockpiling........................................................................................................... 11
4.2.2 Reclaiming and Ship Loading................................................................................................................ 11
4.3 STORAGE FACILITY DESIGN PARAMETERS .................................................................................................. 12
5.0 CONVEYOR DESIGN ................................................................................................................................. 14
5.1 FUNCTION.................................................................................................................................................... 14
5.2 SAFETY........................................................................................................................................................ 14
5.3 CONVEYOR DESIGN..................................................................................................................................... 14
5.4 TRIPPER DESIGN .......................................................................................................................................... 15
6.0 SAFE CONVEYOR DESIGN ...................................................................................................................... 16
6.1 CONVEYOR STOPPING ................................................................................................................................. 16
6.1.1 Belt Drift Switch..................................................................................................................................... 17
6.1.2 Belt Rip Detector ................................................................................................................................... 17
6.1.3 Blocked Chute Switch ............................................................................................................................ 17
6.1.4 Speed Sensing Element .......................................................................................................................... 17
6.2 EMERGENCY STOPS ..................................................................................................................................... 18
6.2.1 Pull Wire Switch .................................................................................................................................... 18
6.2.2 E/Stop..................................................................................................................................................... 19
6.2.3 Emergency Push Button (EPB).............................................................................................................. 19
6.3 START-STOP CONTROLS .............................................................................................................................. 19
6.3.1 Local Control Panel............................................................................................................................... 19
6.3.2 Start Up Warning................................................................................................................................... 20
6.4 ISOLATING................................................................................................................................................... 20
6.5 TRIPPER CONTROLS..................................................................................................................................... 21
ENG450 – Engineering Internship
Brad Smith – 30331929 4 of 70
22/04/2009
6.5.1 Local Control Panel............................................................................................................................... 21
6.5.2 Remote Control Panel............................................................................................................................ 21
6.5.3 Tripper Position Sensor ......................................................................................................................... 22
6.5.4 Tripper Travel Limit .............................................................................................................................. 22
6.5.5 Ultrasonic Level Sensor......................................................................................................................... 23
6.5.6 Catenary Snag Sensor............................................................................................................................ 24
6.6 DUST SUPPRESSION ..................................................................................................................................... 24
6.6.1 Dry Dust Controller............................................................................................................................... 24
6.6.2 Wet Dust Controller............................................................................................................................... 25
7.0 ELECTRICAL DESIGN .............................................................................................................................. 26
7.1 HIGH VOLTAGE ........................................................................................................................................... 26
7.2 SINGLE LINE DIAGRAMS ............................................................................................................................. 27
7.2.1 Updating the Single Line Diagram ........................................................................................................ 27
7.2.2 Cable Sizing ........................................................................................................................................... 29
7.3 SWITCHROOM .............................................................................................................................................. 30
7.3.1 Schematic............................................................................................................................................... 31
7.4 INSTRUMENTATION AND CONTROL PACK.................................................................................................... 34
7.4.1 Instrumentation and Controls Layout .................................................................................................... 35
7.4.2 Connection diagram .............................................................................................................................. 36
7.4.3 Schematic............................................................................................................................................... 41
8.0 LIGHTING DESIGN .................................................................................................................................... 42
8.1 CONVEYOR GALLERIES ............................................................................................................................... 43
8.2 TRANSFER TOWERS ..................................................................................................................................... 47
8.3 MCC AND TRANSFORMER COMPOUND ........................................................................................................ 49
8.4 STORAGE SHED ........................................................................................................................................... 51
8.5 STAIRS AND HANDRAIL ............................................................................................................................... 51
8.6 EMERGENCY LIGHTING................................................................................................................................ 51
8.7 DESIGN RESULTS......................................................................................................................................... 51
8.8 LIGHTING AND SMALL POWER DRAWINGS .................................................................................................. 52
9.0 PLC DESIGN................................................................................................................................................. 56
9.1 ETHERNET ................................................................................................................................................... 56
9.2 DEVICENET.................................................................................................................................................. 57
9.3 MODBUS...................................................................................................................................................... 58
9.4 CONTROLNET.............................................................................................................................................. 58
9.5 INTERNSHIP CONTRIBUTION ........................................................................................................................ 59
10.0 REFERENCES .............................................................................................................................................. 60
ENG450 – Engineering Internship
Brad Smith – 30331929 5 of 70
22/04/2009
11.0 BIBLIOGRAPHY ......................................................................................................................................... 61
12.0 APPENDIX A – KIOP ELECTRICAL DRAWINGS................................................................................ 62
13.0 APPENDIX B – GPA DRAWINGS ............................................................................................................. 63
14.0 APPENDIX C – SAFE-T-DRIFT DATA SHEET ...................................................................................... 64
15.0 APPENDIX D – SAFE-T-RIP DATA SHEET............................................................................................ 65
16.0 APPENDIX E – NHP PULL WIRE SWITCH DATA SHEET................................................................. 66
17.0 APPENDIX F – IFM DATA SHEET........................................................................................................... 67
18.0 APPENDIX G – START UP WARNING DATA SHEET ......................................................................... 68
19.0 APPENDIX H – CABLE CALCULATION EXAMPLES......................................................................... 69
20.0 APPENDIX F – 3D MODEL SCREENSHOTS.......................................................................................... 70
ENG450 – Engineering Internship
Brad Smith – 30331929 6 of 70
22/04/2009
Table of Figures and Tables
FIGURE 1: STARTUP WARNING SIREN.............................................................................................................. 21
FIGURE 2: REMOTE CONTROL PANEL RECEIVER ....................................................................................... 23
FIGURE 3: ULTRASONIC LEVEL SENSOR......................................................................................................... 26
TABLE 1: SINGLE LINE DRAWING LIST............................................................................................................ 30
TABLE 2: VSD SCHEMATICS DRAWING LIST.................................................................................................. 38
TABLE 3: DOL SCHEMATIC DRAWING LIST ................................................................................................... 40
TABLE 4: EXAMPLE OF INSTRUMENTATION AND CONTROLS PACK DRAWINGS............................. 41
TABLE 5: INSTRUMENTATION AND CONTROLS DRAWING LIST ............................................................ 42
TABLE 6: CONNECTION DIAGRAM DRAWINGS............................................................................................. 50
TABLE 7: LIGHTING LEVELS FROM AS1680.................................................................................................... 54
FIGURE 4: STANDARD CONVEYOR LIGHTING DESIGN PLAN................................................................... 56
FIGURE 5: STANDARD CONVEYOR LIGHTING DESIGN ISOMETRIC ...................................................... 56
FIGURE 6: STANDARD CONVEYOR LIGHTING DESIGN RENDERED MODEL ....................................... 57
FIGURE 7: CONVEYOR CV520 LIGHTING DESIGN PLAN ............................................................................. 58
FIGURE 8: CONVEYOR CV520 LIGHTING DESIGN ISOMETRIC................................................................. 58
FIGURE 9: CONVEYOR CV520 LIGHTING DESIGN RENDERED MODEL.................................................. 59
FIGURE 10: TRANSFER TOWER LIGHTING DESIGN PLAN ......................................................................... 60
FIGURE 11: TRANSFER TOWER LIGHTING DESIGN ISOMETRIC............................................................. 60
FIGURE 12: TRANSFER TOWER LIGHTING DESIGN RENDERED MODEL.............................................. 61
FIGURE 13: SWITCHROOM LIGHTING DESIGN PLAN.................................................................................. 62
FIGURE 14: SWITCHROOM LIGHTING DESIGN ISOMETRIC ..................................................................... 62
FIGURE 15: SWITCHROOM LIGHTING DESIGN RENDERED MODEL ...................................................... 63
TABLE 8: LIGHTING DESIGN RESULTS............................................................................................................. 64
TABLE 9: POWER DESIGN REQUIREMENTS ................................................................................................... 66
TABLE 10: LIGHTING AND SMALL POWER DRAWING LIST ...................................................................... 67
FIGURE 16: ETHERNET NETWORK .................................................................................................................... 70
FIGURE 17: CONTROLNET NETWORK.............................................................................................................. 72
ENG450 – Engineering Internship
Brad Smith – 30331929 7 of 70
22/04/2009
1.0 Disclaimer
Confidentiality is required for this document as stipulated in the Internship Contract.
ENG450 – Engineering Internship
Brad Smith – 30331929 8 of 70
22/04/2009
2.0 Introduction
2.1 Objectives
The purpose of this report is to demonstrate that the intern actively participated and
learnt while conducting the engineering internship.
2.2 Report Focus
The focus of this report is the Karara Iron Ore Project. The report details the electrical
engineering design of the new storage shed and associated facilities. Special attention is
given to safe design to prevent injury to personnel or damage to equipment. The report
will discuss theory of the electrical design and identify what the intern’s contribution was
on the Karara Iron Ore Project.
2.3 Company Information
Maunsell AECOM is an engineering design firm that has expertise in the following fields:
Buildings; Environment, Water & Civil Infrastructure; Minerals & Industry; Power &
Energy and Transport. With a large parent company AECOM, Maunsell has been able to
draw on a global pool of talent to become an industry leader in engineering design.
ENG450 – Engineering Internship
Brad Smith – 30331929 9 of 70
22/04/2009
3.0 List of Abbreviations
AS Australian Standards
BF Belt Feeder
CV Conveyor
DWT Dual Wagon Tipper
GPA Geraldton Port Authority
KIOP Karara Iron Ore Project
MGI Mount Gibson Iron Ore
4.0 Project Outline
Maunsell AECOM was selected to produce the detailed design for a new minerals
handling and storage facility in Geraldton. The minerals will be stored in 2 sheds to be
located at the Geraldton port on the Geraldton Port Authority’s (GPA) premises. The
minerals will be transported into the GPA from the Mid West region of WA by rail. The
Karara mine site is located approximately 320km North-North-East of Perth and 215km
East-South-East of Geraldton in the shire of Perenjori.
The GPA currently has an existing network of conveyors that move minerals from the
train unloader to the storage sheds, then to the available ship loaders. Most of the
conveyors are owned and operated by the GPA. However, Mount Gibson Iron (MGI) has
a storage facility also located on the GPA premises that has associated conveyors.
ENG450 – Engineering Internship
Brad Smith – 30331929 10 of 70
22/04/2009
Maunsell will be designing both the Hematite and Magnetite storage sheds, the Dual
Wagon Tipper (DWT), Berth 7 Ship Loader and all associated conveyors. Stage1
includes only the Hematite shed and the associated conveyors. Stage 2 works will
complete the outstanding tasks.
4.1 Functional Sequence – Hematite
4.1.1 Train Unloading and Stockpiling
Hematite minerals may be supplied by two different train unloaders, the GPA train
unloader or the Dual Wagon Tipper (DWT). The GPA train unloader uses bottom
discharge cars to release the minerals onto the conveyor system that will move the
minerals to conveyors CV702 via CV601. The DWT uses flat bottom cars that are tipped
to release the minerals onto feeders that transfer the minerals onto CV701 which
transfers the minerals onto CV702. Please refer to Appendix F – 3D Model Screenshots
while reading the following section.
CV702 is used in both unloading systems and therefore only one unloader may be used
at a time.
CV702 moves the minerals approximately 357m and transfers the minerals using gravity
onto CV703.
CV703 is 94m long and transfers minerals using gravity onto CV704. The transfer point
for CV703 and CV704 is located inside the Hematite shed.
CV704 is a shuttle conveyor that will change position in order to be used to direct the
minerals to either the Hematite or Magnetite sheds. In the “Hematite” position the
minerals from CV703 lands onto CV704 and is carried for 12 m and transferred using
gravity onto CV705.
Tripper conveyor CV705 runs the full length of the storage shed (166m) and will be able
to transfer (using gravity) the minerals at discrete locations along CV705.
ENG450 – Engineering Internship
Brad Smith – 30331929 11 of 70
22/04/2009
4.1.2 Reclaiming and Ship Loading
The stored minerals will be reclaimed by front-end loaders and tipped onto the feeders.
Two of the three feeders will be operational at one time, and will transfer the minerals
using gravity onto CV520.
The feeders are approximately 12m long and transfer the minerals onto CV520 using
gravity.
CV520 will move the minerals approximately 135m and transfer the minerals onto CV521
using gravity.
CV521 travels approximately 82m to transfer the minerals onto CV522 using gravity.
CV522 will move the minerals 166m to CV523 and transfer the minerals using gravity.
CV523 will move the minerals 45m and transfer the minerals using gravity onto CV503
an existing GPA conveyor that feeds the Berth 5 shiploader.
4.2 Functional Sequence – Magnetite
4.2.1 Train Unloading and Stockpiling
The magnetite minerals will only be available via the DWT. The minerals will follow the
same path as the Hematite unloaded from the DWT until it reaches the end of CV703.
The Hematite then transfers onto CV704 in the “Hematite” position, the Magnetite will
transfer onto tripper conveyor CV706. This is possible because CV704 in the “Magnetite”
position will align the CV704 bypass chute with tripper conveyor CV706.
CV706 will run into the Magnetite shed covering the full length of the shed. The minerals
will be discharged at discrete locations using gravity into stockpiles for storage in the
Magnetite shed.
4.2.2 Reclaiming and Ship Loading
Minerals from the Magnetite shed will be reclaimed using a drag-chain reclaimer that will
transfer the minerals onto CV708.
ENG450 – Engineering Internship
Brad Smith – 30331929 12 of 70
22/04/2009
The magnetite may be transferred directly to the ship loader without being stored.
CV706 will be able to transfer minerals onto CV707 bypass conveyor that would transfer
the minerals directly to CV708.
CV708 will transfer the minerals onto CV730 using gravity.
As mentioned previously, Hematite may be transferred onto CV730 for ship loading to
Berth 7.
CV730 will transfer minerals onto CV731 using gravity.
CV731 will transfer minerals onto the Berth 7 ship loader boom conveyor.
4.3 Storage Facility Design Parameters
The storage facility houses mined and processed minerals while until they are able to be
loaded onto the transport ships. The storage shed and conveyors have a minimum
specification as shown below:
ENG450 – Engineering Internship
Brad Smith – 30331929 13 of 70
22/04/2009
Hematite Storage Facility
Material: Hematite Iron Minerals – Lumps & Fine Particles
Storage Capacity: 170,000 tonnes
Facility Inloading Rate: 5,000 tph (design)
Facility Outloading Rate: 5,000 tph (design)
Magnetite Storage Facility
Material: Magnetite Concentrate
Storage Capacity: 170,000 tonnes
Facility Inloading Rate: 5,000 tph (design)
Facility Outloading Rate: 5,000 tph (design)
ENG450 – Engineering Internship
Brad Smith – 30331929 14 of 70
22/04/2009
5.0 Conveyor Design
5.1 Function
The conveyors are put in place to move the minerals from point A to point B at a
designated rate. The reason for this is to minimise the time taken to move the minerals.
Conveyors are also the lowest operating cost method of moving large quantities of bulk
minerals.
The main function of the tripper conveyor is to convey minerals from the feeding
conveyor so that it may be stockpiled within the storage shed to be later reclaimed for
ship loading. The tripper is a short upward incline portion of the conveyor, elevating and
discharging the minerals while maintaining the continuity of the belt. The tripper needs to
be a mobile wheel driven unit that can travel along the storage shed to allow for even and
selective transferring of the minerals. In order to take advantage of gravity and the
maximum storage capacity of the shed, the conveyor and tripper are located at the apex
of the shed.
5.2 Safety
The conveyor and tripper are required by Australian standards to be designed
manufactured, commissioned, tested and maintained by Australian Standards and other
statutory regulations. AS1755 Conveyors – Safety Requirements, outlines safe practices
for conveyor and conveyor systems design and refers to other appropriate standards.
The mines safety act and the WA mining regulations are statutory regulations that detail
further mandatory requirements.
5.3 Conveyor Design
For the KIOP project there are a few challenges for the design team. The project location
is on a “brown fields” site, meaning that the storage shed is being designed for an
existing site. The brown fields site provides restrictions on where new equipment and
structures can be placed as they need to co-exist within an existing facility and
infrastructure.
ENG450 – Engineering Internship
Brad Smith – 30331929 15 of 70
22/04/2009
Additionally, the conveyor system needs to be designed to accommodate two different
minerals: Hematite and Magnetite. In order to correctly design power requirements two
sets of calculations are required to determine the worst case scenario. Other
considerations revolve around different material characteristics which may require
different transfer point geometries and chute materials appropriate to both minerals.
5.4 Tripper Design
The purpose of the tripper is to discharge the conveyed material into the storage stock
pile. The tripper is also required to discharge the materials at specific locations to
regulate the stockpile level. A simple yet effective design is employed by Maunsell’s
design engineers. This design also reduces the cost to the customer. Refer to drawing
1681-EL-DRG-1287 in Appendix A – KIOP Electrical Drawings. The tripper needs to be
light and durable to maximise the loads imparted by the tripper onto the shed steel
structure and maintain an economic structural solution.
ENG450 – Engineering Internship
Brad Smith – 30331929 16 of 70
22/04/2009
6.0 Safe Conveyor Design
The main purpose of the instrumentation when designing a conveyor system is to make
the system safe for people and machinery while it is being used, maintained or repaired.
Instrumentation also provides a greater level of control over the system which can lead to
greater operating efficiency therefore saving money.
When designing such a system there is a risk of over designing. A responsible engineer
should design a functional system within the bounds of the available budget and overall
project philosophy. This approach is generally more difficult to achieve than the
“standard solution” but the end result will be more suitable for the application.
The minimum safety requirements for designing a conveyor will be discussed below and
can also be found in AS1755, WA mines regulation and the mines safety act.
6.1 Conveyor Stopping
When a conveyor is stopped for any reason, it should stop in the shortest time possible
and remain stopped until started again (AS1755, 2000). Conveyor stops may occur as
operational, protective or emergency stops. In each case AS1755 outlines the design
criteria.
Operational stopping is straight forward. The shut down sequence is activated and the
conveyor is brought to a stop by the VSD reducing the current output to the motor. When
the power is disconnected, the conveyor should remain stationary. This is achieved by a
gearbox locking system that is called a “hold back”. Gravity prevents the conveyor from
moving forward (as it is generally designed with an incline) and the hold back prevents
the conveyor from moving backwards.
Protective stops occur in a situation where damage or injury is likely to occur to
equipment or persons in the near vicinity. AS1755 (section 1.6, pg.7) describes a
protective stop as
“A stop control provided for the protection of the conveyor or personnel from a
hazard which, when activated, stops the conveyor and includes emergency stop
controls.”
ENG450 – Engineering Internship
Brad Smith – 30331929 17 of 70
22/04/2009
On KIOP protective stop controls include:
Belt drift switches (BDS)Belt rip detector (BRD)Blocked chute switch (BCS)Speed sensing element (SSE)Catenary Snag Switch (CSS)
A brief description of each is given below.
6.1.1 Belt Drift Switch
Belt drift switches are located on the side of the conveyor with the primary function to
indicate when the conveyor is drifting off the conveyor idler supports. A signal is sent to
the PLC that will activate a timer and after the timer, a fault condition is initiated and the
conveyor stops the drifting belt before it causes damage or injury. Refer to Appendix C –
Safe-T-Drift Data Sheet.
6.1.2 Belt Rip Detector
Belt rip detectors are used to signal to the PLC when the conveyor belt has been
damaged or ripped. Therefore the BRD’s are generally located a few meters after the
transfer point on a conveyor. This location is chosen because, the place where the belt
is most likely to rip is at the transfer point, and therefore the rip is detected soon after
occurring, and therefore any damage to equipment is minimised. This location is also
where to objects are most likely to stab through the belt. See Appendix D – Safe-T-Rip
Data Sheet
6.1.3 Blocked Chute Switch
The blocked chute switch becomes activated when the transfer chute from one conveyor
to another becomes full and runs the risk of overflowing. This creates an alarm that will
stop the conveyor. The protective stop will prevent spilling that could cause damage to
equipment or injury to personnel.
6.1.4 Speed Sensing Element
The speed sensing element is used to indicate to the PLC that the conveyor is travelling
too slowly. However, the PLC does not look for the under speed immediately at startup.
ENG450 – Engineering Internship
Brad Smith – 30331929 18 of 70
22/04/2009
A time delay (blanking interval) is allowed for the conveyor to start, once the timer runs
out the flag is set. If the under speed sensor is activated another timer starts and at the
end of this timer a fault condition is initiated and the conveyor is stopped. See Appendix
F – IFM Data Sheet.
6.2 Emergency Stops
The definition of an emergency stop is defined by AS1755 (section 1.6, pg.6) as:
“A manual or automatically operated system designed to stop a conveyor system
in the shortest practicable time in an emergency.”
Devices used to provide sufficient emergency stop capabilities are:
Pull-wire switch (PWS)E/Stop on the Local Control Panel (LCP)Emergency push button (EPB)
6.2.1 Pull Wire Switch
The pull wire switches are located on walkways that run adjacent to the conveyor and
each pull wire section may be spaced up to 100m, (i.e. a double-sided pull wire switch
can operate up to 200m). AS1755 also specifies where the pull wire switch is to be
mounted along the conveyor. For grounded conveyors the pull wire switch should be
mounted between 900mm and 1500mm above ground level. For elevated conveyors the
height limit may be exceeded as long as the pull wire switch is below the sheer point of
the conveyor (AS1755). In the event of an emergency, the pull wire is pulled, thereby
disconnecting the hardwire electrical circuit to the VSD. When the hardwire circuit is
interupted three different actions occur to stop the conveyor.
First the main contactor that feeds power to the VSD is opened completely, thereby
removing power to the VSD. Second, the PLC will receive the fault message from the
pull wire switch via the digital input and then send a message to the VSD to stop
operating. Third an internal hardwire that allows the Insulated Gate Bipolar Transistors
(IGBT) to fire is broken, physically stopping the VSD operations even if the first two
operations fail. For more information refer to Appendix E – NHP Pull Wire Switch Data
Sheet
ENG450 – Engineering Internship
Brad Smith – 30331929 19 of 70
22/04/2009
6.2.2 E/Stop
Each conveyor has a local control panel that has an E/Stop button that is wired up to the
same hardwire circuit as the pull wire switch. Therefore, if the E/Stop is pressed then the
process to stop the conveyor is the same as the pull wire switch.
6.2.3 Emergency Push Button (EPB)
The emergency push button has only been used in one location, on CV704. The
emergency push button functions in the very same manner as the E/Stop and pull wire
switch. The emergency push button is generally located where there is some dangerous
moving equipment that may require an immediate stop to prevent injury or damage to
equipment.
6.3 Start-Stop Controls
In order for the storage facility to operate safely, sequential control of the conveyors is
required for starting and stopping operations. The starts and stops can be operated via
the PC control panel or operated at the local control panel (LCP) of each conveyor. In
most operational circumstances the PC control panel will be used to start all the
conveyors in the correct sequential order. The local control panel would be used when
testing the conveyor or under special circumstances.
6.3.1 Local Control Panel
All conveyors have a local control panel (LCP) that is located at the head (drive) of the
conveyor. The local control panel is one of the devices used to control the conveyor. A
normal local control panel has two push buttons, one 2-position switch and an E/Stop
push button. The two push buttons are used for start and stop operations. The 2-
position switch is used to select local or auto control and the E/Stop has been discussed
previously. In some circumstance where the conveyor is reversible, a second switch is
available to select forward or reverse.
Conveyors are not the only devices to have local control panels, the direct online devices
also have local control panel. These devices are generally smaller motors such as dust
collectors or water pumps. Normally, the DOL local control panel has one push button,
ENG450 – Engineering Internship
Brad Smith – 30331929 20 of 70
22/04/2009
one 2-position switch and one E/Stop. The push button is used as the start and the 2-
position switch is used for the local and auto selection option.
6.3.2 Start Up Warning
AS1755 also requires that a prestart warning be given that a conveyor is about to
operate. This requirement is met by installing a start up warning (SUW) unit that is
controlled by the PLC digital output card. The start up warning is a siren accompanied by
a flashing light to effectively warn nearby personnel that the conveyor is about to start.
Refer to Appendix G – Start Up Warning Data Sheet.
Figure 1: Startup Warning Siren
6.4 Isolating
For safety during repairs and maintenance, an isolating device is connected in series
between the source and the load (in most cases a motor). The isolator’s purpose is to
totally remove power to the device. AS1755 clearly states that at least one form of
isolation is to be installed for every conveyor drive and that device should be lockable in
the open (isolated) position. The isolator should not be lockable in the closed position
and is to be manually operated.
The Mines Safety and Inspection Regulations1995 section 5.29 states that all electrical
equipment on the mine site is provided with an isolating device. This means that
isolating devices are included for all other motors such as those for dust collector sand
ENG450 – Engineering Internship
Brad Smith – 30331929 21 of 70
22/04/2009
water pumps. In most cases 2 such isolators have been provided per device; one at the
motor control centre and the other a field isolator.
The above standards don’t specify the location of the isolating device. In most cases the
device will be isolated at the MCC. However, only authorised personnel have access to
the switchroom. In order to provide a best practice design, Maunsell includes a second
standalone isolator that is located very near to the device. This allows added safety for
the person who is working on the equipment by providing a visual confirmation that the
device is isolated.
6.5 Tripper Controls
As previously discussed, the tripper allows a cost effective manner to discharge the
minerals into the storage shed. To provide this function the tripper needs to be controlled
in such a way as to maintain the safety standards set out in AS1755. A list of specific
tripper controls and switches is given below:
Local Control Panel (LCP)Remote Control Panel (RCP)Tripper Position Switch (TPS)Tripper Travel Limit (TTL)Level Sensor (LS)
6.5.1 Local Control Panel
Much like a normal conveyor the tripper has a local control panel, however because the
tripper is reversible it has an extended local control panel as mentioned previously.
6.5.2 Remote Control Panel
The remote control panel is not a standard feature for conveyors. For specific
operational requirements Karara has requested that remote control be incorporated into
the design of the tripper. This will allow the operators to move the tripper into position
manually before discharging the minerals.
The remote control system comprises of a remote control transmitter and a receiver. The
receiver is connected to the digital inputs so that it may relay the required commands
back to the PLC. The E/Stop is also hardwired from the remote control receiver into the
ENG450 – Engineering Internship
Brad Smith – 30331929 22 of 70
22/04/2009
hardwire circuit. The remote control receiver does not have the local/auto selection
because that control is on the local control panel. When the remote is being used the
local control panel 2-position switch will be set to local control and when it is not being
used the tripper will function on auto.
Figure 2: Remote Control Panel Receiver
6.5.3 Tripper Position Sensor
In order for the tripper to position itself to discharge the minerals it uses a tripper position
sensor. The reason for positional discharge is to prevent discharge of minerals onto the
structural frame supporting the tripper.
The tripper position sensor is a magnetic proximity sensor that is attached to the tripper.
Metal flags are mounted to the conveyor so that the tripper position sensors send a
signal when aligned with the flags. The tripper position flags are shown in drawing 1681-
EL-DRG-1283 in Appendix A – KIOP Electrical Drawings.
6.5.4 Tripper Travel Limit
The tripper travel limit is a protective stop control although not every tripper travel limit will
stop the conveyor. The majority of the tripper travel limits are used as a signal of position
to the PLC. This is required to convert any progressive position errors which would
otherwise occur with the tripper position sensor system. The application of tripper travel
ENG450 – Engineering Internship
Brad Smith – 30331929 23 of 70
22/04/2009
limits at each end is different because one end of the conveyor will have a service bay for
the tripper and the other will not. For the Following sections please refer to drawing
1681-EL-DRG-1283 in Appendix A – KIOP Electrical Drawings.
At the head end of the conveyor there are three tripper travel limits; one provides a signal
that the tripper has entered the service area (TTL3), another to indicate the tripper is in
position to be serviced (TTL2) and the final is a protective stop tripper travel limit to
indicate that the tripper has travelled too far and should be stopped immediately (TTL1).
TTL4 is located half way along the conveyor to indicate to the PLC when the tripper has
passed the halfway mark of the conveyor. This is a precautionary measure that is used
in conjunction with the tripper position sensor to confirm the trippers exact position.
At the tail end of the conveyor TTL5 indicates to the PLC that the tripper has reached the
end of the conveyor and that it should stop. If the tripper does not stop TTL6 will be
tripped and will disengage the tripper. TTL1 and TTL6 are part of the hardwired circuit to
physically stop the motor.
6.5.5 Ultrasonic Level Sensor
The ultrasonic level sensor (ULS) is used to measure the height of the minerals stockpile.
Two ULS devices are attached to the tripper and communicate via Modbus back to the
PLC. DeviceNet was considered but the length of cable is limited at the required data
rate.
ENG450 – Engineering Internship
Brad Smith – 30331929 24 of 70
22/04/2009
Figure 3: Ultrasonic Level Sensor
6.5.6 Catenary Snag Sensor
The catenary snag switch is a sensor that indicates to the PLC that the catenary has
been snagged while in motion. The Tripper will then be stopped to prevent any damage
to the catenary or the cable running through it. The catenary snag sensor will be vendor
supplied with the catenary.
6.6 Dust Suppression
AS1755 also covers the requirements of dust suppression around conveyors. The
transfer points are of particular interest as this is where most dust is generated. Transfer
points include conveyor to conveyor and tripper to stockpile. The dust suppression
methods are different for each.
6.6.1 Dry Dust Controller
Dust suppression at the conveyor to conveyor transfer points consists of dust extraction
fans that remove and collect the dust. The dust extraction fans may range from 30kW to
200kW in size depending on the area where extraction is required. The dust controllers
have a local control panel and isolator much like the other equipment on the premises.
ENG450 – Engineering Internship
Brad Smith – 30331929 25 of 70
22/04/2009
6.6.2 Wet Dust Controller
Wet dust controllers are used at the tripper to limit the amount of dust created during
material transfer. The following instruments and controls are used:
Master Catenary Water Supply Solenoid (CSV)Dust Suppression Solenoid (DSS)Water Spray Sensor (WSS)
6.6.2.1 Master Catenary Water Supply Solenoid
The master catenary water supply solenoid controls the water supply to the tripper. In
the event of a burst pipe the master catenary water supply solenoid will shut off the
water.
6.6.2.2 Dust Suppression Solenoid
The dust suppression solenoid activates the water supply to the foggers that create a fine
mist spray that is used to reduce the excess dust created by the material discharge. The
tripper has two fogger sets, one on the front and one at the rear.
6.6.2.3 Water Spray Sensor
The Water spray sensor is a magnetic proximity sensor that is used in the same manner
are the tripper position sensor. Flags indicate that the tripper has reached the position
where the DSS needs to be turned off to prevent excess water collecting on the structural
framework.
ENG450 – Engineering Internship
Brad Smith – 30331929 26 of 70
22/04/2009
7.0 Electrical Design
The electrical design team on the KIOP project is considered a supporting discipline; their
role is to provide the necessary electrical design to complement the overall structural and
mechanical design. The mechanical department produces much of the information
required in electrical design. Good examples of this are the motor sizes required for the
conveyors, where the mechanical department will size the motor and give that
information to the electrical department to fill in the rest of the electrical design.
Different areas of concern to the electrical engineers are:
High Voltage SupplyTransformerLow Voltage Distribution
These aspects are discussed in the following sections.
7.1 High Voltage
The high voltage design consists of a feed from the Western Power incomer that
connects to two transformers (each 2MVA). Power from these transformers will supply
almost all of the stage 1 design. Conveyor CV702 will be the exception, due to the large
distance between the transformers and the CV702 motor. CV702 will be fed from
existing infrastructure.
The transformer sizes were determined by the maximum demand calculation that
estimates the total load on the electrical system. The loads are determined by a
schedule that specifies what equipment will be active. The loads are then totalled so that
the schedule will indicate which operating process will determine the maximum demand.
Unfortunately, the intern played no part in designing the HV system although there was
an opportunity to review the documents in order to become familiar with the project as a
whole.
ENG450 – Engineering Internship
Brad Smith – 30331929 27 of 70
22/04/2009
7.2 Single Line Diagrams
The single line diagram provides a summary of all the electrical equipment that is
connected to the motor control centres. The large equipment have individual
connections whereas distribution boards (DB) feed the smaller equipment.
The motor control centre (MCC) manufacturers generally use the information shown on
the single line diagram as it indicates: the number of connections, busbar size, fault
levels, cable sizes (to allow for proper termination) and circuit breaker sizes that are
required.
The intern was involved in many but not all of the aspects of the single line diagram
design. The relevant aspects are listed below:
Updating the single line diagram with load informationCable sizingCircuit breaker sizingLoad balancing
Aspects that were designed without the intern’s involvement are listed below:
Busbar sizingFault calculations
The following sections discuss the intern’s involvement in designing the single line
diagram.
7.2.1 Updating the Single Line Diagram
To update the single line diagram, the load information was retrieved and was marked up
on the single line diagram; specifying the load type (motor or DB), current requirement
and connection type from the MCC to the load. Refer to the drawings listed in Table 1:
Single Line Drawing List in Appendix A – KIOP Electrical Drawings.
ENG450 – Engineering Internship
Brad Smith – 30331929 28 of 70
22/04/2009
Table 1: Single Line Drawing List
Drawing Number Drawing Title1681-EL-DRG-1342 Hematite Shed - MCC - HEM001; Single Line Diagram; Sheet 1 of 41681-EL-DRG-1343 Hematite Shed - MCC - HEM001; Single Line Diagram; Sheet 2 of 41681-EL-DRG-1344 Hematite Shed - MCC - HEM001; Single Line Diagram; Sheet 3 of 41681-EL-DRG-1345 Hematite Shed - MCC - HEM001; Single Line Diagram; Sheet 4 of 4
The connection could be one of four types on KIOP:
Variable speed drive (VSD)Direct online (DOL)Feeder Module (ELR)
7.2.1.1 VSD
A VSD is a method of controlling the power delivered to a motor and therefore controlling
the motor. The VSDs used on KIOP are Telemecanique Altivar 71 devices that range
from 2.2kW to 280kW. A VSD is used for its ability to ramp up the current upon starting
to prevent large motor starting currents. The ability to reduce power output for stopping
the motor is also an attractive function.
A function that is not being used is that of precise speed control. There has been no
encoder type feedback control mechanism provided, although it would be possible to
incorporate this function in future upgrades.
Upstream from the VSD is a circuit breaker that has a magnetic trip that is designed to
protect against cable fault conditions. The circuit breaker is an Allen-Bradley 140M type
and all technical information is taken from the Allen-Bradley website.
7.2.1.2 Direct Online
The DOL is a starting technique that applies either the full power, or no power. There are
no ramp times. The DOL has an electronic overload (EOL) module that monitors the
circuit and load integrity. The electronic overload is also connected to the PLC and is
able to send signals reporting errors over Devicenet. The DOL can also be controlled via
the electronic overload as shown in drawing 1681-EL-DRG-1696 in Appendix A – KIOP
Electrical Drawings.
ENG450 – Engineering Internship
Brad Smith – 30331929 29 of 70
22/04/2009
The circuit breaker used for the DOL devices has a thermal and magnetic trip. This
allows the circuit breaker to protect in a fault and in overload conditions. The circuit
breaker is an Allen-Bradley 140UE type.
7.2.1.3 Feeder Module
The earth leakage relay uses a current transformer (CT) that measures the residual
current across the active and neutral conductors. The ELR allows the current level and
the time delay to be set, therefore reducing the need to size the cables for earth loop
impedance (discussed in section 6.2.2).
7.2.2 Cable Sizing
Cable selection is based on 3 main criteria; current carrying capacity, voltage drop and
short circuit conditions. AS3008 sets out the method of selecting cables by these criteria
for cables below 1kV. AS3000 introduces an earth parameter, namely earth fault-loop
impedance.
As part of the internship, there was a need to create all the cable calculations for the
single line diagram using the AS3008 and AS3000 standard design. The cable sizes are
shown on the single line diagram listed in Table 1: Single Line Drawing List. Examples of
the cable calculations are given in Appendix H – Cable Calculation Examples.
The cable calculation sheet that was used, was created by the intern to make the tedious
task of cable calculation quicker and to reduce errors in the calculations. The power of
the calculation sheet comes from the calculations being executed by visual basic for
applications (VBA).
7.2.2.1 Current Carrying Capacity
Selection of cables based on current takes into account the external conditions and the
installation of the cables. Focus is primarily on the thermal rating of the cable.
Depending on the type of installation, ambient temperature and number of circuits a
derating factor is applied to the current required by the load. The derated current is then
used to select the cable size.
ENG450 – Engineering Internship
Brad Smith – 30331929 30 of 70
22/04/2009
7.2.2.2 Voltage Drop
This section in AS3008 is a result of the AS3000 requirement that the voltage not drop
more than 5% at the source of the low voltage supply, (i.e. from the transformer to the
motor, the volt drop cannot be more than 5%).
The voltage drop can be calculated using the AS3008 procedure of calculating the mV
drop per A.meter and finding the corresponding table on standard cable volt drops. The
volt drop can also be calculated using first principles V=I*R.
7.2.2.3 Short Circuit
The short circuit calculation determines the maximum allowable let through energyduring
a fault. The cable should not be damaged due to the let through energy. The short
circuit is based on the fault current and the time taken for the circuit breaker to trip.
7.2.2.4 Earth Fault-Loop Impedance
Earth fault-loop impedance is found in AS3000 and should be considered in the
calculation of cable sizes. Essentially the larger the conductor the smaller the resistance
and therefore the larger the current in the event of an earth fault. If the earth loop
resistance is too large then the fault current will not be as large and may cause the circuit
breaker not to trip quickly enough.
The size of the conductors involved will determine the maximum earth loop length and
therefore limit the total length from the source to the load. The calculation for the earth
loop can be found in Annexure B of AS3000.
7.3 Switchroom
The switchroom houses the MCC, VSD panels and the PLC tier. The MCC has incomers
from the transformers that connect to busbars that are used to connect to all the other
equipment. As mentioned previously the MCC manufacturers will use the single line
diagram to determine the requirements for the MCC panel. Refer to drawing 7539405-
50402 in Appendix B – GPA Drawings
The VSD panels house all the VSDs that are fed from the MCC and one rack for the
associated PLC. Each VSD size plays a part in the design of the VSD panel as there are
ENG450 – Engineering Internship
Brad Smith – 30331929 31 of 70
22/04/2009
standard modular racks and the VSDs are arranged to achieve the smallest possible
VSD panel. It is also required that additional space is allowed for future expansions,
normally 20% extra space.
Internal to each rack are the VSD and associated equipment. Refer to the general
arrangement drawing from GPA 7539405-50414 of the VSD rack from the GPA in
Appendix B – GPA Drawings.
7.3.1 Schematic
The schematic diagram is produced to provide information about the VSD or DOL to the
electrical installers and MCC switchboard manufacturers. The intern was asked to
maintain, update and check the schematics. Below are the VSD and DOL schematics
and the relevant points on each. Refer to drawing 1681-EL-DRG-1371 for the VSD
schematic and 1681-EL-DRG-1696 for the DOL in Appendix A – KIOP Electrical
Drawings.
The right hand side of the schematic drawing shows a summary of the instrumentation
that is associated with that piece of equipment. This part of the schematic is normally
used when the PLC is being coded (discussed in section 6.4.3).
7.3.1.1 VSD Connections
The example of CV703 is used to show what is done when the conveyor has more than
one associated VSD. The VSD operates in much the same manner except that one VSD
is the master and the other the slave. This allows for the VSDs to work together with
more efficiency.
The information on the left hand side of the schematics shows: the incoming three phase
active conductors, neutral and earth, circuit breaker, contactor, VSD or electronic
overload device, isolator and then the connection to the load. The schematic also shows
the connections available on the VSD/DOL device and where they are connected.
The VSD is supplied with 24V DC from the 24V DC distribution single line. This 24V is
used to power the indicator lights and small relays. The 24V also connects to the
hardwire circuit that connects to: the local control panel E/Stop, ISO and the pull wire
ENG450 – Engineering Internship
Brad Smith – 30331929 32 of 70
22/04/2009
switch. Any additional hardwire requirements are wired in series to these devices. 24V
DC is used, due to its safe operating voltage, for personnel safety.
Once the drive has received the “get ready” command from the PLC relay R2 closes.
This supplies power to K27 relay. Once K27 is active the secondary relay K27-1 closes
which, provided the circuit breaker is closed, provides power to the K15 relay that closes
the contactor supplying power to the VSD (K127 is the second motor relay, this would not
normally be shown for a single VSD). At this stage the R1 relay is closed to indicate that
the VSD is ready to start to output power to the motor. In the event of a fault the R1 relay
will become de-activated. This will also deactivate the R2 relay because the R1 and R2
relays share a software variable and therefore are “interlocked”.
K15 also has a secondary contact that is used as an input to the VSD to signal that the
main contactor has been closed. The main circuit breaker also has a secondary auxiliary
contact that is connected to an input into the VSD to confirm that there is power available
to the VSD.
While the motor is not running the motor heaters are active to prevent condensation. The
K35-1 relay is a normally closed relay that draws power upstream from the VSD
contactor. When the VSD is ready and starts to output power to the motor, relay LO4 is
activated thereby indicating that the VSD drive is now running and simultaneously
activating the K35 contactor to de-energise the motor heater (K135 is the second motor
relay, this would not normally be shown for a single VSD).
There are also motor temperature alarm and trip inputs (thermistor) to the VSD (TH1 and
TH2). When the alarm thermistor is activated a signal is sent to the PLC to indicate the
temperature. Then the trip thermistor is activated then the VSD will cease operation to
prevent damage to the motor.
At the bottom of the schematic the connection to Devicenet with a future connection to
Modbus is available.
The intern’s role in regards to the schematics was to become familiar with the VSDs by
reading the VSD programming manual. This manual outlines the capable functions of
the VSD. Once familiar with the VSDs the intern then moved on to check all the
ENG450 – Engineering Internship
Brad Smith – 30331929 33 of 70
22/04/2009
schematics to ensure that they were correct and that the hardwire circuit was correct. A
list of drawings that were checked and updated where necessary are given in Table 2:
VSD Schematics Drawing List and can be found in Appendix A – KIOP Electrical
Drawings.
Table 2: VSD Schematics Drawing List
Drawing Number Drawing Title1681-EL-DRG-1362 Conveyor CV702; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1363 Conveyor CV702; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1371 Conveyor CV703; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1372 Conveyor CV703; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1382 Conveyor CV704; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1383 Conveyor CV704; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1586 Conveyor CV704 Shuttle; Schematic Diagram - VSD1681-EL-DRG-1392 Conveyor CV705; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1393 Conveyor CV705; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1401 Tripper TP705; Schematic Diagram - VSD; Sheet 1 of 31681-EL-DRG-1604 Tripper TP705; Schematic Diagram - VSD; Sheet 2 of 31681-EL-DRG-1402 Tripper TP705; Schematic Diagram - VSD; Sheet 3 of 31681-EL-DRG-1414 Belt Feeder BF517; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1415 Feeder BF517; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1421 Feeder FE518; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1422 Feeder FE518; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1428 Feeder FE519; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1429 Feeder FE519; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1434 Conveyor CV520; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1435 Conveyor CV520; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1443 Conveyor CV521; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1444 Conveyor CV521; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1452 Conveyor CV522; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1453 Conveyor CV522; Schematic Diagram - VSD; Sheet 2 of 21681-EL-DRG-1461 Conveyor CV523; Schematic Diagram - VSD; Sheet 1 of 21681-EL-DRG-1462 Conveyor CV523; Schematic Diagram - VSD; Sheet 2 of 2
7.3.1.2 DOL Connections
The direct online schematic is very similar to the VSD schematic, however instead of a
VSD there is an electronic overload device. The power is supplied in much the same
manner: through the circuit breaker, contactor, electronic overload, isolator and then the
ENG450 – Engineering Internship
Brad Smith – 30331929 34 of 70
22/04/2009
motor. The hardwire circuit is also the same, 24V supplied from the 24V distribution
through the E/Stop and isolator.
The “trip” relay internal to the direct online device will be normally closed and therefore
when there is no fault the drive ready light will be active as well as supplying the “out-A”
relay with 24V DC which is used to close the activate the relay K27 that activates the
main contactor K16. Once K16 has been activated power will be supplied to the motor.
The direct online device also uses the relay “out-B” to indicate a fault condition that will
deactivate the “out-A” relay.
The direct online device also takes three input signals that indicate: circuit breaker status,
main contactor status and 24V supply status. There is also a connection to Devicenet.
The intern’s duties with the DOL schematics was the same as the VSD schematics. A list
of direct online schematics is given in Table 3: DOL Schematic Drawing List and can be
found in Appendix A – KIOP Electrical Drawings.
Table 3: DOL Schematic Drawing List
Drawing Number Drawing Title1681-EL-DRG-1408 Hematite Storage Shed; Ventilation Scrubber Unit 1 SB705A; Schematic Diagram - VSD1681-EL-DRG-1410 Hematite Storage Shed; Ventilation Scrubber Unit 2 SB705B; Schematic Diagram - VSD1681-EL-DRG-1412 Dust Collector - DC503; DOL Schematic Diagram1681-EL-DRG-1696 Dust Collector - DC521; DOL Schematic Diagram1681-EL-DRG-1706 Dust Collector - DC522; DOL Schematic Diagram
7.4 Instrumentation and Control Pack
The instrumentation and controls pack is made up of four parts; instrumentation and
controls layouts, connection diagrams, hardwire drawings and the left hand side of the
schematic. A list of example drawings are given in Table 4: Example of instrumentation
and controls Pack Drawings from Appendix A – KIOP Electrical Drawings and will be
used in the following sections.
ENG450 – Engineering Internship
Brad Smith – 30331929 35 of 70
22/04/2009
Table 4: Example of instrumentation and controls Pack Drawings
Drawing Number Drawing Title1681-EL-DRG-1375 Junction Box CV703-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1376 Junction Box CV703-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1377 Junction Box CV703-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1378 Junction Box CV703-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1379 Junction Box CV703-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1380 Junction Box CV703-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1275 Conveyor CV703; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1276 Conveyor CV703; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1381 Conveyor CV703; Hardwired Connection Diagram
7.4.1 Instrumentation and Controls Layout
The instrumentation and controls layouts are created to provide the instrumentation
installers with an overall view of the conveyor and its associated equipment. The layout
also provides the approximate locations of the instrumentation, although the locations are
not exact. Refer to drawings 1681-EL-DRG-1275 and 1681-EL-DRG-1276 in Appendix A
– KIOP Electrical Drawings.
In order to show the locations of the instrumentation two views are needed of the
conveyor; plan and elevation. The plan and elevation are created by taking a “cut” of the
3D model. The 3D model is created by the structural and mechanical designers, who
produce a scale model of the entire project.
Once the drawings have been created the instrumentation can be added. In order to
keep track of all the instruments for each conveyor a register was created. The register
was then used to help populate the plan and elevation drawings. As well as to ensure
sufficient inputs and outputs are available.
The intern’s role in the instrumentation and controls layout was to populate all the
instrumentation layouts. The intern was not required to become acquainted with the
instrumentation nor provide a design. For example, the pull wire switches are required to
be spaced 100m from the main device to an end support. In some instances the
distance was decreased because the length to be covered was too long and therefore
required more pull wire switches.
ENG450 – Engineering Internship
Brad Smith – 30331929 36 of 70
22/04/2009
The intern was also required to provide intelligent placement of the equipment so that the
access way was not reduced to a width smaller than that allowed by the standard
(600mm). Some conveyors only had personnel access to one side of the conveyor and
therefore did not require a pull wire switch on the non-accessible side (AS1755).
The drawings that populated in the intern, as part of the instrumentation and controls
layout pack are listed below in Table 5: Instrumentation and Controls Drawing List
Table 5: Instrumentation and Controls Drawing List
Drawing Number Drawing Title1681-EL-DRG-1271 Conveyor CV702; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1272 Conveyor CV702; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1275 Conveyor CV703; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1276 Conveyor CV703; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1279 Conveyor CV704; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1280 Conveyor CV704; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1283 Conveyor CV705; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1284 Conveyor CV705; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1287 Tripper TP705; Instrumentation & Controls; General Arrangement1681-EL-DRG-1288 Belt Feeder BF517; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1289 Belt Feeder BF517; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1292 Belt Feeder BF518; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1293 Belt Feeder BF518; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1296 Belt Feeder BF519; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1297 Belt Feeder BF519; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1317 Conveyor CV520; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1318 Conveyor CV520; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1325 Conveyor CV521; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1326 Conveyor CV521; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1329 Conveyor CV522; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1330 Conveyor CV522; Instrumentation & Controls; General Arrangement Elevation1681-EL-DRG-1333 Conveyor CV523; Instrumentation & Controls; General Arrangement Plan1681-EL-DRG-1334 Conveyor CV523; Instrumentation & Controls; General Arrangement Elevation
7.4.2 Connection diagram
The connection diagrams serve three purposes: show the contents of the junction box
(JB), show the physical wiring of the equipment in the JB and assist the controls system
integrators to tag all equipment so the communications network operates correctly.
ENG450 – Engineering Internship
Brad Smith – 30331929 37 of 70
22/04/2009
There are four types of connection diagrams currently used on KIOP, digital inputs, digital
outputs, pulse counters and analog outputs.
7.4.2.1 Digital Input
The digital input diagrams generally have two drawings to show all the connections. This
is because the digital input cards have 32 inputs and it is very difficult to fit 32
instruments onto one A3 page. Though the digital input diagrams are generally very
similar, there are some exceptions. One such exception is that of the tripper. Because
the conveyor and the tripper both have a JB, the emergency instrumentation from either
is required to stop the other and vice versa. Refer to drawings 1681-EL-DRG-1403 and
1681-EL-DRG-1404 in Appendix A – KIOP Electrical Drawings.
The digital input diagram is broken up into two parts, the junction box and the field.
These sections are self explanatory but it should be noted that the digital input diagrams
do not give any indication of required cable lengths. That information can be obtained
from the instrumentation and controls layouts.
At the top left of the diagram is the power supplied by the 240V distribution network. The
240V feeds a terminal strip, then a power supply converts the 240V into a 24V DC
supply. The 24V DC supplies a terminal strip called “internal connections” which is used
to supply the rest of the JB. Each 24V supply from the internal connection terminal strip
has a small circuit breaker to isolate the faulty device to allow the rest of the JB to
operate. The “internal connections” terminal strip supplies power to the digital input
module (Allen-Bradley 1794-IB32), digital output module (1794-OB8EP), ControlNet
adapter (1794-ACN15) and the terminal block DI.
The terminal block DI has four separate power supplies to the terminal block DI, this is to
prevent losing all the digital inputs if a fault occurs. This configuration will allow 24 inputs
to remain if there is a fault on a single group of 8 inputs.
At this point the digital input is the same for most of the conveyors. Devices that are
unique to the tripper are the pull wire switch relay, remote control panel and the bypass
relay.
ENG450 – Engineering Internship
Brad Smith – 30331929 38 of 70
22/04/2009
The pull wire switch relay has been added to comply with the safety requirements of
AS1755. If there is an emergency and a pull wire switch is pulled then both the conveyor
and the tripper need to stop. So the pull wire relay monitors both hard wire circuits and
will trip both VSDs if either circuit is interrupted. This is evident on the tripper and CV705
schematic drawings 1681-EL-DRG-1392 and 1681-EL-DRG-1401 in Appendix A – KIOP
Electrical Drawings.
The bypass relay has been designed so that the inputs from the remote control receiver
are not received when the conveyor is set to automatic control. This is to prevent any
unintentional stops or disruptions to the conveyor. The bypass relay is controlled by the
digital output module, which sets the status of the relay. The relay then acts as a
gateway for digital input and digital output signals.
The field side of the connection diagram has the symbols of the instruments that are
connected in the field. The instruments are connected to the right hand side of the
terminal block DI which is connected to the digital input module. In some cases the
instruments are not shown on the diagram because they have connections to other
modules. The remote control panel is an example of this, it is connected to the digital
input but is shown on the digital output diagram. In this situation a reference is given to
the appropriate drawing.
7.4.2.2 Digital Output
The digital output module has many of the characteristics of the digital input diagrams.
The output module is supplied with power from the same power supply, has 8 outputs
and sends digital output signals to a similar terminal strip. Refer to drawing 1681-EL-
DRG-1405 in Appendix A – KIOP Electrical Drawings.
7.4.2.3 Pulse counter
The pulse counter module is used for the belt feeders only. The other conveyors have an
under-speed relay that signals the under speed, but the pulse counter reads the speed of
the belt continuously. The power for the pulse counter is supplied from a separate power
supply to prevent any interference from the other modules. Refer to drawing 1681-EL-
DRG-1419 in Appendix A – KIOP Electrical Drawings.
ENG450 – Engineering Internship
Brad Smith – 30331929 39 of 70
22/04/2009
7.4.2.4 Analog Output
The analog output is used to display the outloading rate of the conveyor system to the
front end loaders. Each feeder is allocated a digital display unit that receives an analog
signal from the analog output unit 1749-OF41. Refer to drawing 1681-EL-DRG-1448 in
Appendix A – KIOP Electrical Drawings.
7.4.2.5 Internship Contribution
The intern was asked to become familiar with the above mentioned drawings and to
populate the drawings with all the instruments for each conveyor. In some circumstance
the quantity of instrumentation associated with a conveyor is minimal therefore there is
wasted space in the JB. In these cases the instrumentation from one conveyor had been
included on another connection diagram. This can be seen in drawing 1681-EL-DRG-
1448 in Appendix A – KIOP Electrical Drawings, that show the tail end instrumentation for
CV521 and the head end instrumentation of CV520 in the same digital input drawings.
As well as populating the instrumentation on the drawings, the intern was required to
revise the electrical design of the connection diagrams to ensure that they met the design
requirements given to Maunsell. A list of the connection diagram drawings is given in
Table 6: Connection Diagram Drawings and the drawing are given in Appendix A – KIOP
Electrical Drawings.
Table 6: Connection Diagram Drawings
Drawing Number Drawing Title1681-EL-DRG-1364 Junction Box CV702-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1365 Junction Box CV702-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1366 Junction Box CV702-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1367 Junction Box CV702-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1368 Junction Box CV702-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1369 Junction Box CV702-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1375 Junction Box CV703-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1376 Junction Box CV703-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1377 Junction Box CV703-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1378 Junction Box CV703-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1379 Junction Box CV703-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1380 Junction Box CV703-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1384 Junction Box CV704-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1385 Junction Box CV704-JBT; Digital Input Module; Connection Diagram Sheet 2 of 2
ENG450 – Engineering Internship
Brad Smith – 30331929 40 of 70
22/04/2009
1681-EL-DRG-1386 Junction Box CV704-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1394 Junction Box CV705-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1395 Junction Box CV705-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1396 Junction Box CV705-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1397 Junction Box CV705-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1398 Junction Box CV705-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1399 Junction Box CV705-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1403 Junction Box TP705-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1404 Junction Box TP705-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1405 Junction Box TP705-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1406 Junction Boxes TP705; Connection Hardwired Diagram1681-EL-DRG-1416 Junction Box FE517-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1417 Junction Box FE517-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1418 Junction Box FE517-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1419 Junction Box FE517-JBH; Pulse Counter Module; Connection Diagram1681-EL-DRG-1423 Junction Box FE518-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1424 Junction Box FE518-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1425 Junction Box FE518-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1426 Junction Box FE518-JBH; Pulse Counter Module; Connection Diagram1681-EL-DRG-1625 Junction Box BF518-JBH; Analog Output Module; Connection Diagram1681-EL-DRG-1430 Junction Box FE519-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1431 Junction Box FE519-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1432 Junction Box FE519-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1433 Junction Box FE519-JBH; Pulse Counter Module; Connection Diagram1681-EL-DRG-1439 Junction Box CV520-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1440 Junction Box CV520-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1441 Junction Box CV520-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1445 Junction Box CV521-JBH; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1446 Junction Box CV521-JBH; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1447 Junction Box CV521-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1448 Junction Box CV521-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1449 Junction Box CV521-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1450 Junction Box CV521-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1457 Junction Box CV522-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1458 Junction Box CV522-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1459 Junction Box CV522-JBT; Digital Output Module; Connection Diagram1681-EL-DRG-1463 Junction Box CV523-JBH; Digital Input Module; Connection Diagram - Sheet 1 of 21681-EL-DRG-1464 Junction Box CV523-JBH; Digital Input Module; Connection Diagram - Sheet 2 of 21681-EL-DRG-1465 Junction Box CV523-JBH; Digital Output Module; Connection Diagram1681-EL-DRG-1466 Junction Box CV523-JBT; Digital Input Module; Connection Diagram Sheet 1 of 21681-EL-DRG-1467 Junction Box CV523-JBT; Digital Input Module; Connection Diagram Sheet 2 of 21681-EL-DRG-1468 Junction Box CV523-JBT; Digital Output Module; Connection Diagram
ENG450 – Engineering Internship
Brad Smith – 30331929 41 of 70
22/04/2009
7.4.3 Schematic
The schematics also provide information about the instrumentation and controls pack.
Each device will have associated instrumentation which is summarised in the right hand
side of the schematic drawing.
7.4.3.1 Right Hand Side
The right side of the schematic shows the source, terminals, instrument symbol and then
the digital input or output. This information is normally used by the PLC programmers so
that the correct instrumentation is associated with the correct device. Almost all the
information shown on the connection diagrams are shown in the schematic summary.
Refer to drawing 1681-EL-DRG-1696 in Appendix A – KIOP Electrical Drawings.
7.4.3.2 Tripper
The tripper is slightly different because there is instrumentation on the tripper itself and
therefore has a terminal box on the tripper to connect the instrumentation to the JB.
Referring to drawing 1681-EL-DRG-1604 in Appendix A – KIOP Electrical Drawings.
This schematic shows the summary of the instrumentation that is attached to the tripper
physically. In order to run the cables to the tripper, the cables enter JB1 and then run
along the catenary to JB2 then to the instrumentation and return through JB2 and JB1.
7.4.3.3 Internship Contribution
Once the connection diagrams were updated, the schematic instrumentation summary
could be populated. The schematics were populated with all the instrumentation as listed
in Table 2: VSD Schematics Drawing List.
The tripper schematic 1681-EL-DRG-1604 was created using a previous project drawing
as a template, which the intern modified it to suit the KIOP project.
ENG450 – Engineering Internship
Brad Smith – 30331929 42 of 70
22/04/2009
8.0 Lighting Design
The main priority for the lighting is to provide the required luminance to all working areas
so that normal work, maintenance and repairs can be performed. The lighting should
also provide safe egress from the buildings in the event of an emergency (AS1755).
AS1755 refers to AS1680 Interior and Workplace Lighting to provide the benchmark for
the lighting in and around conveyor systems.
AS1680 is specific about the minimum level of light (lux) and the uniformity of the light
required over an area to perform different tasks. Uniformity of light is defined as the ratio
of the minimum lighting level and the average lighting level for a set surface area
(AS1680.0, 1998). A summary of the main benchmark data used in the lighting design is
given below in Table 7: Lighting Levels from AS1680.
Table 7: Lighting Levels from AS1680
Minimum illuminance 20 lux AS1680.0Minimum illuminance uniformity 0.3 AS1680.0Minerals Handling
Conveyor gantries 40 lux AS1680.2.4 Transfer houses 80 lux AS1680.2.4
Switch room 160 lux AS1680.2.1
The intern was asked to produce the lighting design pack for KIOP stage 1. The lighting
design for stage 1 includes internal and external lighting for:
All conveyor gallery lighting
The storage shed
The MCC and transformer compound
All transfer towers and take-up towers
The first stage in the design process was to produce some computer simulated models
that would give standard distribution of light fittings that would provide the required
amount of light for safe functionality. The lighting modelling was done on a program
called AGI32 and four models were produced as templates; switchroom, CV520, TT523
ENG450 – Engineering Internship
Brad Smith – 30331929 43 of 70
22/04/2009
and CV702 (standard conveyor gallery). General areas where lighting is required are
discussed below.
8.1 Conveyor Galleries
The conveyor gallery, was simply modelled as a rectangular room with a rectangular
column running horizontally to simulate the conveyor. The reason a solid column was
used is that AS1680 calls for the lighting to be on access ways. Once the room and
objects have been setup the light fixtures are added. This process was trial and error for
the intern because there is little restriction on design laid down by AS1680 except the
minimum requirement.
First, the intern modelled the lighting with single tube fittings and it was found that the
required spacing was quite close and the number of fixtures quite high. This was not
desirable because the extra fittings would cost more money and because the time taken
to install them would use extra man-hours (increasing cost). There was also opportunity
to have too much light therefore more light fixtures than required, which required more
cable to supply power. More power requires a bigger distribution board, larger quantity of
cables, higher energy bills and ultimately cost more money. Therefore meeting the
required standard will not only provide a safe working environment but also minimise
costs.
In order to reduce the number of light fixtures placed along the galleries a double fitting
was used in the simulation. This provided a larger spacing between the light fixtures
therefore requiring few fixtures and still met the requirements of AS1680.
An advantage of the layout of the galleries is that the conveyor galleries are a standard
design and therefore only require one model to determine the fixture spacing needed.
Once the spacing is determined it can be applied to all the galleries. See Figure 4:
Standard Conveyor Lighting Design Plan, Figure 5: Standard Conveyor Lighting Design
Isometric and Figure 6: Standard Conveyor Lighting Design Rendered Model below of
the lighting model for the conveyor galleries.
ENG450 – Engineering Internship
Brad Smith – 30331929 44 of 70
22/04/2009
Figure 4: Standard Conveyor Lighting Design Plan
Figure 5: Standard Conveyor Lighting Design Isometric
ENG450 – Engineering Internship
Brad Smith – 30331929 45 of 70
22/04/2009
Figure 6: Standard Conveyor Lighting Design Rendered Model
While most of the conveyors are very similar a few are different. In particular, conveyor
CV520 does not have an enclosed gallery around it because it is located inside the shed.
A factor that increases the complexity of design is the structural steel located to one side
of the walk way, protruding from the walls. This poses a problem for wall mounted light
as the steel will block the light from reaching all areas.
The computer model does not of the whole conveyor but a section, in order to gather
spacing information to be applied to the whole conveyor. During the design process Iit
was discovered that some dark corners were created by the steel structures and this led
to increasing the number of fixtures along the walls to provide the required lighting level.
See Figure 7: Conveyor CV520 Lighting Design Plan, Figure 8: Conveyor CV520 Lighting
Design Isometric and Figure 9: Conveyor CV520 Lighting Design Rendered Model below
of the lighting model for conveyor CV520.
ENG450 – Engineering Internship
Brad Smith – 30331929 46 of 70
22/04/2009
Figure 7: Conveyor CV520 Lighting Design Plan
Figure 8: Conveyor CV520 Lighting Design Isometric
ENG450 – Engineering Internship
Brad Smith – 30331929 47 of 70
22/04/2009
Figure 9: Conveyor CV520 Lighting Design Rendered Model
8.2 Transfer Towers
The model for the transfer towers was produced after completing the conveyor gallery
design and therefore progressed straight to the double fitting. The transfer towers are all
different and therefore would require a separate model for each to model the lighting
exactly. However, while using the lighting simulator the intern was able to see the
lighting levels around the fixtures and use that information to design the lighting for the
different transfer towers without running a simulated model for each. See TT523 Figure
10: Transfer Tower Lighting Design Plan, Figure 11: Transfer Tower Lighting Design
Isometric and Figure 12: Transfer Tower Lighting Design Rendered Model below of the
lighting model for the transfer tower.
ENG450 – Engineering Internship
Brad Smith – 30331929 48 of 70
22/04/2009
Figure 10: Transfer Tower Lighting Design Plan
Figure 11: Transfer Tower Lighting Design Isometric
ENG450 – Engineering Internship
Brad Smith – 30331929 49 of 70
22/04/2009
Figure 12: Transfer Tower Lighting Design Rendered Model
8.3 MCC and transformer compound
The lighting requirements for the switch room were much the same as the previous
lighting designs but with an added requirement; that the lighting levels should be taken
into account where the work would be conducted. In the case of the switch room, the
lighting levels on the face of the MCC and VSD panels should be at the required lux level
(AS1680). A similar design process to the transfer tower design was used for the switch
room. Lighting for external areas of the shed and the transformer compound have been
designed using a previous project (Mount Gibson Iron) drawings as templates. See
Figure 13: Switchroom Lighting Design Plan, Figure 14: Switchroom Lighting Design
Isometric and Figure 15: Switchroom Lighting Design Rendered Model below of the
lighting model for the Switch room.
ENG450 – Engineering Internship
Brad Smith – 30331929 50 of 70
22/04/2009
Figure 13: Switchroom Lighting Design Plan
Figure 14: Switchroom Lighting Design Isometric
ENG450 – Engineering Internship
Brad Smith – 30331929 51 of 70
22/04/2009
Figure 15: Switchroom Lighting Design Rendered Model
8.4 Storage Shed
The internal lighting for the storage shed will be designed by the lighting contractor as
part of the tender package.
8.5 Stairs and Handrail
The lighting design for the stairs and handrail has been taken from the MGI project. The
design has been previously approved and therefore can be used for KIOP.
8.6 Emergency lighting
To comply with AS1755, emergency lighting needs to be provided to any persons within
the structures in the event of an emergency in order for them to use a path to the exit of
that building. The design will be taken from the MGI lighting design.
8.7 Design Results
The modelling of the different areas provided results listed in Table 8: Lighting Design
Results.
ENG450 – Engineering Internship
Brad Smith – 30331929 52 of 70
22/04/2009
Table 8: Lighting Design Results
Area Result of simulation
Switchroom
In order to meet the requirements of AS1680 lights need to be
double globe XXX ceiling fixtures mounted parallel to the
MCC/VSD panels.
Conveyor galleriesSingle tube light fixtures mounted perpendicular to the conveyor
at 5m spacing to provide the required light on the walkway.
Conveyor CV520
All lighting is to be double globe and wall mounted parallel to the
conveyor. Spacing is to be XXX from the steel structure. Lights
below access ways are to be ceiling mounted with similar
spacing.
Transfer TowersLighting in the transfer towers is to be double globe and wall
mounted in most cases spaced by approximately 4m
StairsUsing MGI approved drawings, pole mounted lighting is to be
placed at the top and bottom of stairs.
Handrail Mounts All hand rail mountings to be single globe and spaced 3m.
Emergency lighting
All pole mounted light fixtures at stairs are to be emergency.
The general design theory is to make every second light fixture
(wall or ceiling) an emergency fixture. However descression is
used in areas that are not standard areas. Emergency exit
fixtures are also to be mounted in such a way that they indicate
the closest exit.
8.8 Lighting and Small Power Drawings
Lighting drawings are produced to aid the lighting installers during installation. The
drawings are not intended to be exact and therefore the installer requires the approval of
the site superintendent before final locations are determined. The other component to
these drawings is that the small power is included in the drawings. Small power
ENG450 – Engineering Internship
Brad Smith – 30331929 53 of 70
22/04/2009
components include: general power outlets, welding outlets, three phase outlets, switch
locations and more. The Design requirements are given in Table 9: Power Design
Requirements and to see the symbols and descriptions please refer to the General
Legend in Appendix A – KIOP Electrical Drawings.
Table 9: Power Design Requirements
Equipment Design Requirements
General Power Outlet (GPO)The GPO’s will be spaced 60m. This limitation is in place to
allow the use of a standard 30m extension cable.
Welding Outlet
The welding outlets are to be located at both ends of conveyors
and anywhere else large 3-phase portable machinery is likely to
be used.
Switched OutletThe locations of the switched outlet are where more outlets may
required.
Drawings are required for every location that will require a light fitting or small power. A
complete list of drawing for stage 1 is given in Table 10: Lighting and Small Power
Drawing List, and drawings can be found in Appendix A – KIOP Electrical Drawings:
Table 10: Lighting and Small Power Drawing List
Drawing Number Drawing Title1600-EL-DRG-1076 General Legend; Lighting and Power1681-EL-DRG-1246 Hematite Storage Shed; Internal & External Lighting; General Arrangement Plan1681-EL-DRG-1247 Hematite Storage Shed; Internal & External Lighting; General Arrangement Elevation1681-EL-DRG-1339 Switchroom SR-HEM Lighting, General Power & Communication; General Layout1681-EL-DRG-1273 Conveyor CV702; Lighting & Power; General Arrangement Plan1681-EL-DRG-1274 Conveyor CV702; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1277 Conveyor CV703; Lighting & Power; General Arrangement Plan1681-EL-DRG-1278 Conveyor CV703; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1560 Take-Up Tower TU703; Lighting & Power; General Arrangement Plan1681-EL-DRG-1561 Take-Up Tower TU703; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1281 Conveyor CV704; Lighting & Power; General Arrangement Plan1681-EL-DRG-1282 Conveyor CV704; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1285 Conveyor CV705; Lighting & Power; General Arrangement Plan
ENG450 – Engineering Internship
Brad Smith – 30331929 54 of 70
22/04/2009
1681-EL-DRG-1286 Conveyor CV705; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1290 Belt Feeder BF517; Lighting & Power; General Arrangement Plan1681-EL-DRG-1291 Belt Feeder BF517; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1295 Belt Feeder BF518; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1294 Belt Feeder BF518; Lighting & Power; General Arrangement Plan1681-EL-DRG-1298 Belt Feeder BF519; Lighting & Power; General Arrangement Plan1681-EL-DRG-1299 Belt Feeder BF519; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1319 Conveyor CV520; Lighting & Power; General Arrangement Plan1681-EL-DRG-1320 Conveyor CV520; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1327 Conveyor CV521; Lighting & Power; General Arrangement Plan1681-EL-DRG-1328 Conveyor CV521; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1331 Conveyor CV522; Lighting & Power; General Arrangement Plan1681-EL-DRG-1332 Conveyor CV522; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1335 Conveyor CV523; Lighting & Power; General Arrangement Plan1681-EL-DRG-1336 Conveyor CV523; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1321 Tower TT503; Lighting & Power; General Arrangement Plan1681-EL-DRG-1716 Tower TT503; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1322 Transfer Tower TT521; Lighting & Power; General Arrangement Plan1681-EL-DRG-1725 Transfer Tower TT521; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1323 Transfer Tower TT522; Lighting & Power; General Arrangement Plan Sheet 1 of 21681-EL-DRG-1726 Transfer Tower TT522; Lighting & Power; General Arrangement Elevation1681-EL-DRG-1728 Transfer Tower TT522; Lighting & Power; General Arrangement Plan Sheet 2 of 21681-EL-DRG-1324 Transfer Tower TT523; Lighting & Power; General Arrangement Plan1681-EL-DRG-1727 Transfer Tower TT523; Lighting & Power; General Arrangement Elevation
In all cases the lighting general arrangement comes in pairs, a plan and an elevation.
The plan view will show all the levels of the structure as a different section and this may
lead to more than one plan drawing as in the case of transfer tower TT522. The
elevations show a side view of the structure and may sometimes show the internal
lighting and sometimes show only the external lighting. What is shown on the drawings
is dependent on how cluttered they are because the drawings are not useful if they are
not readable. A good example of this is transfer tower TT523 elevation.
The intern’s role during the lighting design process was to firstly model the lighting to get
nominal spacing for different areas. Then to advise the drafting department of all the
“cuts” that were needed. The “cuts” are taken from the 3D model to show the relevant
structures in the area where the lighting is to be installed. Once the cuts were returned,
they were populated as per all the above mentioned drawings with the required lighting
ENG450 – Engineering Internship
Brad Smith – 30331929 55 of 70
22/04/2009
and small power. Once the pack (plan and elevation of each cut) markup was complete
the drawings were returned to the drafting department to be drafted. The drawings were
then returned for checking and when the intern was satisfied, the drawings progressed
for approval to the electrical engineer.
ENG450 – Engineering Internship
Brad Smith – 30331929 56 of 70
22/04/2009
9.0 PLC Design
For safety and operational efficiency the Karara storage facilities will be controlled by a
PLC. Automation generally provides time saving which leads to money saving. This PLC
will be responsible for monitoring the field instruments for faults and operational
conditions, sending signals to field instruments to indicate the diagnosed fault, startup
and shutdown processes and communicating with the existing GPA port PLC.
In order for the PLC to collect all the required data it will need to interface with multiple
communication media: Ethernet, Devicenet, Modbus and ControlNet. The PLC will also
be required to communicate with different areas of the GPA. For these reasons the
same equipment will be used to allow minimal interfacing and commissioning
complications as well as leveraging a commonality of spare parts. Equipment currently
used by the GPA and MGI are in the Allen-Bradley industrial communications range.
The PLC selected for KIOP is the Allen-Bradley 1756-PA72/C. This PLC was selected
primarily for its large memory capacity and its strong performance capabilities. This
allows Karara to upgrade and expand without upgrading the PLC. In the sections to
follow, the different networks and general setup of the communications will be explored
9.1 Ethernet
All the port facilities PLC’s are connected to an Ethernet backbone communications
network that passes status tags to each other to start and stop operational processes.
This approach will be used for the Karara Iron Ore Project (KIOP) but will have a private
network for Karara’s communications and have an interface between the private network
and the GPA backbone network. The interface between the two networks will be through
a firewall to minimise the security risks. This dual network approach will allow Karara to
communicate with their equipment without adding traffic to the Ethernet backbone. A
simple graphical representation of the network is shown below in Figure 16: Ethernet
Network.
ENG450 – Engineering Internship
Brad Smith – 30331929 57 of 70
22/04/2009
Figure 16: Ethernet Network
9.2 Devicenet
Devicenet is the communications protocol used for communications between the PLC
and the MCC and VSD panels. Devicenet was not the first choice for the communication
medium but the selected VSD’s (Schneider Altivar 71) do not have the capability to
communicate via ControlNet.
Each unit contained in the MCC and VSD panels is connected to the PLC so that the
PLC may send signals to start and stop devices such as the variable speed drives (VSD),
soft starters (SS) or direct online drives (DOL). The network also allows for status
information to be sent back to the PLC from the drives within the MCC. The primary
function of this network is to control the start and stop sequences as well as controlling
the running speed of the conveyors. In most cases the conveyors are run at a set speed
(80% of capability) and seldom change their speed. There is one conveyor type that has
a more active speed controller and that is the Feeder conveyor. The Devicenet
communications will also be used in the event of an emergency to stop the conveyors.
ENG450 – Engineering Internship
Brad Smith – 30331929 58 of 70
22/04/2009
9.3 Modbus
Modbus has been is used on limited applications where specific equipment is required
and communicates via Modbus. The two devices that currently use Modbus are the
ultrasonic level sensors (ULS) and the Micrologic 6.0H power analysers. The Micrologic
6.0H is a sophisticated power analyser that can monitor frequency, power factor, circuit
breakers and much more at the low voltage incomer level. This information is then sent
back to the PLC.
9.4 ControlNet
All the field instruments require to be connected to the PLC in order for the PLC to gather
all the relevant information to operate the storage facilities in a safe and efficient manner.
ControlNet is specifically designed to be used in field instrument applications. It is
capable of transferring information at high speeds and over long distances.
Each conveyor’s junction box (generally two JB’s per conveyor) has a Flex I/O module
that communicates with the PLC Flex I/O module. Each Flex I/O has a back plane that
allows for different types of instrumentation modules to be connected. These modules
include digital input, digital output, analog input, analog output, pulse counter modules
and more. This allows for a very large variety of field instrumentation to be connected to
the Flex I/O module that collects all the data and communicates back to the PLC via
Controlnet. An example network is shown below in Figure 17: ControlNet Network.
ENG450 – Engineering Internship
Brad Smith – 30331929 59 of 70
22/04/2009
Figure 17: ControlNet Network
The devices shown in Figure 17: ControlNet Network are listed below (Allen-Bradley-A,
2004):
1756-PA72/C Allen-Bradley Processor1794-ACN Allen-Bradley Flex I/O Module1786-RPA Allen-Bradley Repeater Adapter1786-RPCD Allen-Bradley Repeater Module
In order for the ControlNet network to function correctly, it cannot have more than 121 s
delay throughout the network. Each device on the network provides a delay and
therefore the sum of these delays cannot be more than 121 s (Allen-Bradley-A, 2004).
For example the 1786-RPCD repeater module has a delay time of 100ns, the 1786-RPA
repeater adapter has a delay time of 901ns and fiber cable has a delay time of
5.01ns/m(Allen-Bradley-A, 2004).
9.5 Internship Contribution
During my internship I have been able to participate in the design of the communications
network. Specifically, I have been involved in:
Investigation of Network types and applicationsInvestigation of equipment requiredCreation of the network block diagram (Appendix A – KIOP Electrical Drawings –1681-EL-DRG-1353)Updating Schematics and Connection diagrams with communication networkinformation
ENG450 – Engineering Internship
Brad Smith – 30331929 60 of 70
22/04/2009
10.0 References
Allen-Bradley-A, (2004), ControlNet Fiber Media Planning and Installation Guide:
1786 Series, Rockwell Automation.
AS1680, (1998) Interior Lighting: Safe Movement, Standards Australia
AS1755, (2000), Conveyor – Safety Requirements: Third Edition, Standards:
Australia
AS3000, (2007), Wiring Rules: Fifth Edition, Standards Australia.
AS3008, (1998), Electrical Installations – Selection of Cable: Third Edition,
Standards Australia.
Data sheets provided as appendices are also references
ENG450 – Engineering Internship
Brad Smith – 30331929 61 of 70
22/04/2009
11.0 Bibliography
Merlin Gerin, (2006) LV Circuit Breakers and Switch Disconnectors: Compact NS,
Schneider Electric.
NHP, (2007) Price List Catalogue: Part B, NHP Electrical Engineering Specialists.
Telemecanique, (2007) Variable Speed Drives: Altivar 71 Catalogue, Schneider
Electric.
Telemecanique, (2007) Variable Speed Drives: Altivar 71 Programming Manual,
Schneider Electric.
Toshiba, (2008) Premium Efficiency Electric Motors, Toshiba.