final report to the building-development commission fileck,bre ndan p x x x shelo,inc. x x...
TRANSCRIPT
Mecklenburg County Land Use & Environmental Services Code Enforcement Department
Final Report to the Building-Development Commission
Data Customer Focus Group March 20, 2001
Memo Date: February 21, 2001 To: Tom Dooley, BDC chair From: Jim Bartl, Director of Code Enforcement Re: Data Customer Focus Group Final Report CC: All DCFG members, Dick Pacetti, Kari Lanning This memo shall serve as the final report of the Data Customer Focus Group (DCFG) to the Building-Development Commission (BDC). In an effort to identify customer information needs, the DCFG met 12 times between September 20, 2000 and March 7, 2001. Overall, our customer base was well represented through the various meetings, even to the point of holding special small group meetings to assure all sides of the information need issue were taken into account (a summary attendance sheet is attached). Throughout these meetings several exercises were performed to identify what those needs are and how electronic information might best be presented to our customers. The end result of this effort was the development of several mock up reports, which the customers agreed fairly represent both their information needs, and a simple clear method to communicate the information to them. Those reports are attached for your review. The reports are divided into three components in the following order:
A. Legacy System B. Plan Review C. Permitting/Inspection System
In addition, the customers had other concerns, not related to the reports, which they wish the LUES Design Team to address. Those concerns are as follows. 1. Need print buttons on all Internet screens, or anything you see. 2. Subcontractors need some easy, electronic way to verify if a General Contractor on a permit
application is using their name. 3. Must be able to download data in text form so customer can reconfigure, as needed. 4. Want to see the inspector’s comments. 5. Need an exception report on re-review (part of Commercial Process Initiatives). 6. The customer has a concern that failed inspections sometimes do not identify defect codes. 7. Customer still has to retrieve plans from the City in order to get their permit; the one-stop
shop method is not fully effective. 8. There is still some confusion in the facilitation staff on two issues: ETJ and how many sets
does the customer need? 9. Would like to see the website easier to navigate. 10. E-mail when the contractor’s account number shows activity. 11. Links to the other State and Federal agencies impacting their projects.
The issue of integrated information on all jurisdictions is the most critical. The customers need a single source of access for all regulators, which can impact, plan approval, inspections, and/or certificates of occupancy. In one of the closing meetings, the DCFG received a presentation from NuTech Solutions on alternate approaches to developing integrated information systems. The DCFG thought this approach had merit, especially as applied to the problem of coordinating databases between the City, County and 6 Towns. The DCFG strongly encourages the BDC and the Code Enforcement Department to receive a similar presentation from NuTech, focusing on this topic, and identifying the related strategies, costs and time lines. Finally, the customers believe this work should be implemented as expeditiously as possible
Atte
ndan
ce S
um
ma
y
eg
BX
X
r
Nam
eG
rR
epre
sent
ing
DC
09/2
0/00
10
/04/
0010
/18/
0011
/01/
0011
/15/
0011
/29/
0012
/20/
0001
/03/
0101
/10/
0101
/24/
0102
/07/
0102
/21/
0103
/07/
01
Aust
in,
Ayco
ck,B
en
BD
CX
XX
XX
XX
XBa
mbr
ick,
Bre
ndan
Shel
co,I
nc.
XX
XBa
tten-
Bala
s, K
aren
W
ood
Partn
ers
X
Bart,
Jim
E&BS
X
XX
XX
XX
XX
XX
XX
Belk
, Dea
n
Opt
ima,
PAX
XX
XBu
rkha
rd, M
icha
el
E&
BS
XX
XX
XX
Burn
ett,
Alex
E&
BS
X
XC
ase,
Ray
R
aym
ond
R. C
ase
XX
XX
XX
XX
XC
auld
er,W
ill
Rod
gers
Bui
lder
s,In
c.X
XC
ox, T
om
Cou
nty
Com
mis
sion
XD
aign
ault,
Dav
id
W
. B. M
oore
X
XX
XD
aurit
y,Bo
b
R
ylan
d H
omes
XX
XD
oole
y, T
om
X
BD
C
Dre
nnan
, Rob
E&
BSX
XX
XX
XX
XX
Farri
s,R
ay
Tu
scan
Dev
elop
men
tX
XG
arris
on, T
im
R. T
. Doo
ley
Con
stru
ctio
n
XX
XX
XX
Gee
r, Jo
hn
C
ity E
ngin
eerin
g X
Gor
don,
Cha
rles
Ed
ison
Foa
rd,I
nc.
XG
rane
lli, C
hris
M
ulva
ney
Prop
ertie
sX
Grd
ich,
Jim
Stat
e St
reet
Con
stru
ctio
nX
Har
dman
, Gin
a
C
umm
ings
Con
stru
ctio
nX
Hol
lenb
ach,
Mar
k
Pric
e Br
othe
rs
XX
XX
XH
odge
s, C
harle
s
C
ambr
idge
Par
tner
sX
Hon
eycu
tt, B
utch
E&BS
X
Hou
le, M
arc
Yarb
orou
gh &
Ass
soci
ates
Hug
uley
, Pie
rre
Pu
lte H
omes
X
Korte
kaas
, Rog
er
PS
&I
XLa
nnin
g, K
ari
E&BS
XX
XX
XX
XX
XX
XX
Lieb
entri
tt, S
teve
Pu
lte H
omes
XLo
ng,J
im
Fr
ye E
lect
ric
X
XX
McC
ants
, Lin
ette
Sa
ussy
Bur
bank
, Inc
.
XX
XM
cLar
en,L
ee
D
PR A
ssoc
iate
sX
XX
XM
ende
nhal
l, An
na
C
OIS
T
X
Miln
er, S
tuar
t
M
ilner
Airc
oM
orris
on, E
mer
son
CO
IST
X
XPa
cetti
, Dic
k E&
BS
X
X
XX
XX
Park
er, P
hillip
C
umm
ings
Con
stru
ctio
nX
Payt
on, M
icha
el
C
arol
ina
Plac
e X
Pric
e, T
amea
Pr
ice
Brot
hers
XX
XX
XX
XX
Rik
ard,
Jeff
Woo
d Pa
rtner
sX
Row
ell,
Mic
hael
M
cCul
loch
Eng
land
XX
XSa
nche
z,Te
d
C
oleJ
enes
t & S
tone
XX
XX
XX
Sher
rill,
Har
ry
The
FWA
Gro
up
X X
X X
X
X
X Sh
ield
s, B
obbi
e
E&BS
X
Siet
man
,Kim
Sim
pson
Ele
ctric
XSm
ith, A
llen
Free
man
-Whi
teSo
mm
ers,
She
ila
E&
BS
XX
XX
XX
XX
XX
Atte
ndan
ce S
um
ma
y
mm
i c
X
r
Nam
eR
epre
sent
ing
ectri
09
/20/
00
10/0
4/00
10/1
8/00
11/0
1/00
11/1
5/00
11/2
9/00
12/2
0/00
01/0
3/01
01/1
0/01
01/2
4/01
02/0
7/01
02/2
1/01
03/0
7/01
Ta
rlton
, Ta
Sim
pson
El
Ters
igni
, Rob
ert
W. B
. Moo
reX
Turn
er, T
om
ADEP
Arc
hite
cts
XX
XX
Vand
erco
ok, F
red
Pulte
Hom
esX
XX
XX
VanD
usse
n, C
raig
W
. K. D
icks
onX
Wal
ters
, Lar
ry
Gan
tt H
uber
man
XX
XX
XX
XX
XW
atts
, Cha
rley
Wat
ts-L
eaf A
rchi
tect
sX
XX
Willi
ams,
Gre
g
M
ulva
ney
Hom
esX
XX
Zuk,
Elle
n
E&BS
X
XX
XX
Reports Proposed
Under the Legacy System
(Subject to technical feasibility and final cost.)
CER
TIFI
CA
TE O
F O
CC
UPA
NC
Y ST
ATU
S
Perm
it #
____
____
____
____
____
____
__
Addr
ess:
___
____
____
____
____
____
____
____
____
____
____
_ Pr
ojec
t Nam
e: _
____
____
____
____
____
____
____
____
____
____
_
Trad
e Ac
tion
Hol
d Ap
plie
d H
old
Rel
ease
d Bu
ildin
g
H(o
ld)
01/2
1/01
Elec
trica
l
A(pp
rove
d)01
/15/
0101
/21/
01M
echa
nica
l
Plum
bing
Fire
Prot
ectio
n
Zoni
ng
TC
O*
01/1
5/01
CM
UD
Envi
ronm
enta
lHea
lth
CD
OT
C
ityEn
gine
erin
g
Oth
er A
genc
ies
TBD
By c
licki
ng o
n th
e “H
old”
the
user
sho
uld
get
the
pers
on’s
nam
e, e
-mai
l and
pho
ne n
umbe
r w
ho p
lace
d th
e ho
ld, s
o th
at th
ey h
ave
a di
rect
lin
e of
com
mun
icat
ion
to th
e pe
rson
who
pl
aced
the
hold
Not
es:
- Th
is w
ould
be
a ta
ble
that
wou
ld a
llow
the
cont
ract
or to
vie
w a
ll ho
lds
on h
is p
roje
ct.
- Ty
pe in
the
proj
ect n
umbe
r or t
he a
ddre
ss, t
he re
st s
houl
d pr
efill
in.
- Fo
r B, E
, M, a
nd P
, by
clic
king
on
H, i
t sho
uld
take
you
to th
e In
spec
tion
Stat
us s
cree
n.
- U
se T
CO
in a
ctio
n co
lum
n an
d cl
ick
to g
et d
ata
stat
us a
nd re
ason
. -
Cus
tom
er o
nly
wan
ts to
see
the
disc
iplin
es th
at a
ffect
them
. -
Cus
tom
er w
ants
to s
ee o
nly
one
line
for e
ach
trade
. -
*Thi
s w
ould
be
impl
emen
ted
unde
r the
new
per
mitt
ing/
insp
ectio
n sy
stem
, not
und
er th
e Le
gacy
sys
tem
.
INSP
ECTI
ON
STA
TUS
Pe
rmit
Num
ber:
____
____
____
____
____
____
__
Proj
ect N
ame:
___
____
____
____
____
____
____
____
Build
ing,
Plu
mbi
ng,
Mec
hani
cal,
Elec
trica
l, Fi
re
Prot
ectio
n, o
r Zon
ing
Addr
ess:
___
____
____
____
____
____
____
____
_
C
onfir
mat
ion
No.
: ___
____
____
____
____
____
____
_
JOB
HIS
TOR
Y C
onfir
mat
ion
Num
ber
Pi
n #*
In
spec
tion
Type
D
ate
Req
uest
ed
Dat
e Pe
rfor
med
Res
ult
Insp
ecto
r N
umbe
r
This
is a
box
that
will
show
“Fai
led
Cha
rgea
ble,
Fai
led
Not
Cha
rgea
ble
or
Pend
ing.
” W
hen
the
user
clic
ks o
n th
e Fa
ilure
, he
shou
ld g
et th
e co
de d
efec
t tex
tan
d an
y co
mm
ents
the
insp
ecto
r mad
e.
Whe
n yo
u cl
ick
on th
e in
spec
tor’s
num
ber,
you
get h
is/h
er n
ame
and
a m
obile
tele
phon
e nu
mbe
r
By c
licki
ng o
n th
e co
nfirm
atio
n nu
mbe
r, th
e us
er s
houl
d ge
t spe
cific
in
form
atio
n ab
out t
he
parti
cula
r ins
pect
ion
Not
es:
- Th
is s
cree
n sh
ould
allo
w th
e us
er to
find
the
insp
ectio
n st
atus
by
perm
it nu
mbe
r or b
y ad
dres
s, o
r con
firm
atio
n nu
mbe
r, w
hich
ever
the
user
pre
fers
. -
All b
oxes
sho
uld
be c
licka
ble
to o
ffer t
he u
ser a
noth
er le
vel o
f exp
ande
d in
form
atio
n.
- If
the
user
clic
ks o
n ad
dres
s, h
e sh
ould
get
a c
ompl
ete
job
hist
ory.
-
Und
er “P
erm
it N
umbe
r”: if
the
user
use
s th
e m
aste
r per
mit
num
ber,
he s
houl
d ge
t all
the
insp
ectio
ns re
late
d to
that
pro
ject
; lik
ewis
e, if
he
uses
the
sub
perm
it nu
mbe
r, he
sho
uld
get o
nly
the
info
rmat
ion
rela
ted
to th
at p
erm
it.
- *P
in n
umbe
rs a
re v
olun
tary
, allo
win
g cu
stom
ers
to b
reak
dat
a do
wn
by P
M/s
uper
inte
nden
t.
Proposed Reports to be Included
in the Plan Review Module
Plan Review Deficiency Report Building Review:
Issue Code Section
Number of Defects
% of total
Accessibility Requirements Vol. 1-C 92 36% Doors 1012 12 5% Ramps 1013 12 5% Porch 1014 13 5% Guardrail 1015 11 4% Interior Wall Construction Table 704 40 16% Egress widths Table 1004 38 15% Architect/Engineer Seals GS 83-14 37 15% Total All Defects 255
PLAN REVIEW PROJECT SUMMARY Project No.: __________________________________ Project Name: ____________________________________ Date Submitted: ____________________________ Date Entered Into System: __________________________________ Preliminary Review? Yes _______________ No ______________________
By clicking on status, user should get the reviewer’s comments
By clicking on assigned reviewer, user should get his e-mail address and phone number
1st Review
Status Days in System
Reviewer Assigned
Review Complete
Review Picked Up
Building Disapproved 12 P. Granson 01/15/01 Electrical Approved 5 J. Weathers 01/08/01 Mechanical Approved as
Noted 11 T. Pace 01/14/01
Plumbing Fire Protection Zoning City Engineering Urban Forestry Environmental Health 2nd Review
Status Days in System
Reviewer Assigned
Review Complete
Review Picked Up
Building Electrical Mechanical Plumbing Fire Protection Zoning City Engineering Urban Forestry Environmental Health Notes: - User should enter the Project Number – the data should prefill automatically. - The table should only list the affecting disciplines - The user should be able to print the comments of all trades without having to click to get each trades’
comments individually.
CHARLOTTE-MECKLENBURG BUILDING STANDARDS BUILDING PLAN REVIEW SHEET
Project Number: _________________________ Date: ___________________ Project Name: _____________________________ Plan Reviewer: Patrick Granson Review Number: _______________ Received: ____________ Completed: ____________
Sheet No.
Issue
Code
Section
Addressed or
Corrected?
Change And
Location
By clicking on the reviewer’s name, user should get his e-mail and phone number
By clicking on the code section referenced, A/E should get a summary of the code
A/E will note the change and the location for the reviewer
Plan reviewer’s comments go here
A/E will check the box when item is complete; Gatekeeper will ensure all items have been addressed before allowing plans to come back into the system.
Proposed Reports to be Included
in the New
Permitting/Inspection Module
INSP
ECTI
ON
SC
HED
ULI
NG
Acco
unt #
___
____
____
____
____
____
___
Perm
it
Num
ber
Ad
dres
s
G
C/B
uild
er
Nam
e
In
spec
tion
Type
Pi
n N
umbe
r*
Req
uest
ed
Insp
ectio
n D
ate
R
eque
sted
By
C
onfir
mat
ion
Num
ber
Not
es:
- Th
is w
ould
be
a ta
ble
that
wou
ld a
llow
the
cont
ract
or to
sch
edul
e m
ultip
le in
spec
tions
at o
ne ti
me
- Th
e R
eque
ster
wou
ld ta
b an
d fil
l in
the
perm
it nu
mbe
r -
The
addr
ess
and
Build
er N
ame
shou
ld c
ome
up a
utom
atic
ally
-
The
insp
ectio
n ty
pe s
houl
d be
a d
rop
dow
n bo
x -
The
requ
este
r key
s th
e pi
n nu
mbe
r, re
ques
ted
insp
ectio
n da
te, a
nd re
ques
ted
by
- Th
e re
ques
ter t
hen
tabs
to th
e ne
xt li
ne
- O
nce
com
plet
e th
e re
ques
ter s
houl
d hi
t a “S
UBM
IT” b
utto
n, w
hich
wou
ld a
ssig
n th
e co
nfirm
atio
n nu
mbe
r and
pro
vide
a
repo
rt to
the
requ
este
r.
This
wou
ld b
e a
drop
do
wn
box
whi
ch w
ould
va
ry b
y tra
de
- W
/S
- Sl
ab
- R
ough
-
WD
-
Fina
l
- *P
in n
umbe
rs a
re v
olun
tary
, allo
win
g cu
stom
ers
to b
reak
dat
a do
wn
by P
M/s
uper
inte
nden
t.
INSP
ECTI
ON
STA
TUS
BY
CO
NTR
AC
TOR
AC
CO
UN
T
Acco
unt #
___
____
____
____
____
____
___
Activ
e In
spec
tions
Ad
dres
s Pe
rmit
Num
ber
Con
firm
atio
n N
umbe
r Pi
n N
umbe
r*
Insp
ectio
n Ty
pe
Dat
e R
eque
sted
St
atus
Insp
ecto
rN
umbe
r
Pass
ed
insp
ectio
ns w
ill dr
op o
ff an
y pr
evio
us fa
iled
insp
ectio
ns u
nde r
the
perm
it nu
mbe
r
This
is a
box
that
will
show
“Fai
led
Cha
rgea
ble,
Fai
led
Not
cha
rgea
ble
or P
endi
ng.”
Whe
n th
e us
er c
licks
on
the
Failu
re, h
e sh
ould
get
the
code
def
ect t
ext a
nd a
ny
com
men
ts th
e in
spec
tor m
ade.
This
sho
uld
be a
lin
kabl
e bo
x th
at
whe
n yo
u cl
ick
on th
e In
spec
tor’s
nu
mbe
r, yo
u ge
t hi
s/he
r nam
e an
d a
mob
ile
tele
phon
e nu
mbe
r
Not
es:
- Th
is w
ould
be
a ta
ble
that
wou
ld a
llow
the
cont
ract
or to
vie
w a
ll ac
tive
insp
ectio
ns.
- Th
e co
ntra
ctor
key
s hi
s ac
coun
t num
ber a
nd th
e re
st o
f the
pag
e fil
ls in
aut
omat
ical
ly.
- Th
e pr
ojec
t sho
uld
stay
on
the
syst
em u
ntil
the
CO
is is
sued
. -
The
cont
ract
or s
houl
d be
abl
e to
clic
k on
the
colu
mn
title
and
sor
t dat
a by
that
fiel
d na
me.
-
*Pin
num
bers
are
vol
unta
ry, a
llow
ing
cust
omer
s to
bre
ak d
ata
dow
n by
PM
/sup
erin
tend
ent.
Memo Date: March 9, 2001 To: Jim Bartl, Director of Code Enforcement From: Dick Pacetti, Assistant Director - Technology Re: Timeline for Data Customer Focus Group Final Report Items The issues and reports in this document fall into three categories: A. Items that can be accomplished with the current legacy system, depending on value to the
customer and cost B. Items that can be accomplished through the Plan Review sub-project now in progress C. Items that must be deferred until the Permitting and Inspections sub-project replaces the
legacy system A. Legacy Data
• Inspection Status Report Delivery: Not evaluated as of 3/9/01
• Certificate of Occupancy Status Delivery: 4-6 weeks after approval to begin work; will impact Plan Review sub-
project work B. Plan Review sub-project
• Plan Review Project Summary • Building Plan Review Sheet • Plan Review Deficiency Report
Delivery: Production date of LAN-based system awaiting completion of technical design (March 2001); Web enablement to follow
C. New Permitting and Inspection sub-project
• Inspection Scheduling by Account Number • Inspection Status by Account Number
Delivery: No schedule available, will follow Plan Review, and may be purchased system
Filename: Final Report Directory: C:\DOCUME~1\SUSIE~1.TDG\LOCALS~1\Temp Template: C:\Documents and Settings\susie.TDGI\Application
Data\Microsoft\Templates\Normal.dot Title: Subject: Author: Mecklenburg Co. Keywords: Comments: Creation Date: 3/1/2001 9:47 AM Change Number: 10 Last Saved On: 3/12/2001 8:27 AM Last Saved By: Kari L. Lanning Total Editing Time: 117 Minutes Last Printed On: 3/25/2002 11:32 AM As of Last Complete Printing Number of Pages: 16 Number of Words: 1,930 (approx.) Number of Characters: 11,001 (approx.)