Final Report on:

PROCESS MONITORING OF

MADHYA PRADESH STATE RURAL LIVELIHOODS MISSION

[ Quarter 3: District SHAHDOL ]

Prepared by

Dr. Kinsuk Mitra

Sunpreet Kaur

Samir Stephan Kujur

Neeraj Shrivastava

Devendra Sahu

N Mohan Reddy

i i

Contents

Executive Summary .......................................................................................................................................................... i

List of Abbreviations ................................................................................................................................................... viii

Chapter 1: Introduction to Madhya Pradesh State Rural Livelihoods Mission (MPSRLM) .. 1

1.1 Background........................................................................................................................................................... 1

1.1.1 Project Goal and Objectives .......................................................................................................... 1

1.1.2 Implementation Architecture ...................................................................................................... 2

1.1.3 Resource Block Strategy ................................................................................................................ 2

1.2 Rationale for Process Monitoring ................................................................................................................ 3

1.2.1 Objectives of the Process Monitoring ....................................................................................... 3

Chapter 2: Methodology ............................................................................................................................... 4

2.1 Approach for Process Monitoring ............................................................................................................... 4

2.1.1 Study Framework ............................................................................................................................. 4

2.1.2 Research Design ................................................................................................................................ 5

2.1.3 Quarterly Process Monitoring Strategy ................................................................................... 5

2.2 Sampling Design ................................................................................................................................................. 6

2.2.1 Sampling Framework ...................................................................................................................... 6

2.3 Themes for Process Monitoring ................................................................................................................... 9

2.4 Data collection and Analysis framework ............................................................................................... 10

2.4.1 Desk review of project reports and documents ................................................................ 10

2.4.2 Study scoping and boundary setting ...................................................................................... 11

2.4.3 Stakeholder mapping ................................................................................................................... 11

2.4.4 Development of survey instruments ..................................................................................... 13

2.4.5 Quarterly Process Monitoring .................................................................................................. 15

2.4.6 Analysis Plan .................................................................................................................................... 15

2.4.7 Documenting Best Practices ...................................................................................................... 17

2.4.8 Short Films on Process Monitoring/Best Practices ......................................................... 18

2.4.9 Presentation of findings and finalisation with MPSRLM team .................................... 18

2.5 Limitations ......................................................................................................................................................... 19

Chapter 3: Training of field team, Field testing, and Data Entry protocols ........................... 20

3.1 Training of field team .................................................................................................................................... 20

3.2 Pre-testing and finalization of study instruments ............................................................................. 21

3.3 Data Entry Protocols ...................................................................................................................................... 22

Chapter 4: Profile of the Study Area ..................................................................................................... 23

4.1 Profile of Madhya Pradesh – the state .................................................................................................... 23

4.1.1 Demographic Profile of Madhya Pradesh ............................................................................ 23

4.2 Profile of Project Area of MPSRLM .......................................................................................................... 23

ii ii

Chapter 5: Sample Profile ......................................................................................................................... 26

5.1 Sample Profile................................................................................................................................................... 26

5.1.1 VO Formation and Strengthening ........................................................................................... 28

5.1.2 Community Mobilization and Identification of Social Capital ..................................... 30

5.1.3 SHG Formation and Strengthening ......................................................................................... 32

Chapter 6: Key Findings, Lessons Learned, Constraints & Challenges, and The Way

forward ............................................................................................................................................. 35

6.1 VO Formation and Strengthening ............................................................................................................. 35

6.1.1 VO Concept Seeding ...................................................................................................................... 35

6.1.2 Formation of VOs ........................................................................................................................... 36

6.1.3 Strengthening of VOs .................................................................................................................... 61

6.2 Community Mobilization ............................................................................................................................. 68

6.2.1 Revival and Strengthening of Old POP SHGs (Target SHGs) ........................................ 69

6.3 Identification of Social Capital ................................................................................................................... 72

6.4 SHG Formation and Strengthening .......................................................................................................... 73

6.5 Establishment of Systems (Norms and Practices)............................................................................. 79

6.5.1 Norms for SHG Grading and MCP appraisal under NRLM ............................................ 79

6.5.2 Types of funds and their disbursement procedure ......................................................... 83

6.5.3 Norms for preparation of documents and Bank Account Opening and Linkages

support ............................................................................................................................................... 86

6.5.4 Training for MCP preparation, MCP Preparation, Submission and Appraisal

System ................................................................................................................................................ 89

6.5.5 SHG Database Management training, updating, uploading and hand-holding

support and services delivered to SHGs ............................................................................... 91

6.5.6 Coordination, support and supervision Mechanism ....................................................... 92

6.6 Strengthening, Services and Payment of honorarium to Social Capital ................................... 93

6.6.1 Strengthening of Social Capital and Honorarium ............................................................. 93

6.6.2 Payment of honorarium to the Social Capital ..................................................................... 97

6.6.3 Services rendered by the Social Capital ................................................................................ 98

6.7 Social Inclusion ............................................................................................................................................. 104

6.7.1 Approval of WBR list in Gram Sabha, display of list in public places and updating

............................................................................................................................................................ 105

6.7.2 Strategies to ensure inclusion of socially excluded sections .................................... 106

6.7.3 Different social groups categorized in the project for finding out shift of HHs

within social groups ................................................................................................................... 107

6.7.4 Major criteria used for defining poverty ........................................................................... 108

6.7.5 Major vulnerability and risk factors .................................................................................... 109

6.7.6 Criteria followed for assessment of vulnerability ......................................................... 109

6.7.7 Special efforts made for vulnerable groups ..................................................................... 110

6.7.8 Exemption / privilege made for vulnerable groups ..................................................... 110

6.7.9 Strategy to bring leftover vulnerable families into SHG fold .................................... 111

6.7.10 Special Efforts made for vulnerable groups ..................................................................... 111

6.7.11 Priority in SHG norms for most vulnerable members ................................................. 112

6.7.12 SHG members’ empowerment visible in their villages ............................................... 112

6.7.13 Improved social affinity after SHG formation ................................................................. 113

6.7.14 Expectation of vulnerable groups / families towards changes required ............. 114

6.7.15 Social Security .............................................................................................................................. 115

6.8 Comparative Analysis of findings from Quarter 1, Quarter 2 and Quarter 3 ...................... 116

iii iii

Chapter 7: Best Practices ........................................................................................................................ 123

7.1 Case study 1: Pashupalan Sakhi Ekta… ................................................................................................ 123

7.2 Case study 2: Radha Bega and her stitching centre….................................................................... 124

7.3 Case study 3: Livelihood source of Jeevika Mahila Mandal… ..................................................... 125

7.4 Case study 4: Gram Sangathan Sakhi Gauri… ................................................................................... 125

7.5 Case study 5: Lakhnauti ka ‘Big Bazaar’… ......................................................................................... 126

7.6 Case study 6: Rooprani Singh: A confident Community Activist!! ........................................... 127

7.7 Case study 7: ‘Lakhpati’ Nanidni didi… ............................................................................................... 128

7.8 Case study 8: Rambai’s group becomes her support!! ................................................................. 129

ANNEXURES

Annexure I: Sample for the Process Monitoring of MPSRLM (Quarter 3: District Shahdol)

Annexure II: Survey Instruments

II(g): VO Formation and Strengthening

Annexure III: Quality Control and Management

iv iv

List of Tables

Table 2.1: Sample distribution .......................................................................................................................................................... 7 Table 2.2: Sampling of Intensive Block in Shahdol ................................................................................................................... 7 Table 2.3: Sampling of Resource Block in Shahdol ................................................................................................................... 8 Table 2.4: Sample distribution in Shahdol ................................................................................................................................... 8 Table 2.5: Sample distribution for Process Monitoring of MPSRLM in Shahdol in Quarter 3 .............................. 8 Table 2.6: Data collection for Process Monitoring of MPSRLM ....................................................................................... 12 Table 3.1: Day-wise schedule of Training and Field testing of survey instruments ............................................... 21 Table 4.1: Area of implementation of NRLP and NRLM in Madhya Pradesh ............................................................. 24 Table 4.2: List of Districts and Blocks of NRLP-Intensive (including resource blocks) in Madhya Pradesh24 Table 4.3: List of Districts and Blocks under Resource Block strategy in MPSRLM ............................................... 25 Table 5.1: Sample Profile for Process Monitoring in Shahdol district .......................................................................... 26 Table 5.2: Sample Profile for Process Monitoring of SHGs in Shahdol district ......................................................... 27 Table 5.3: Sample Profile of respondents at district and PFT level, for Process Monitoring in Shahdol district ....................................................................................................................................................................................................... 27 Table 5.4: Membership profile of sample VOs......................................................................................................................... 28 Table 5.5: Membership profile of sample SHGs ...................................................................................................................... 32 Table 6.1: Number of VOs in the village ..................................................................................................................................... 36 Table 6.2: Number of times EC members have been selected / elected after formation of VO ........................ 42 Table 6.3: Status of recent EC meeting conducted as per the agenda ........................................................................... 45 Table 6.4: Status of all agenda points minutised properly ................................................................................................ 46 Table 6.5: Status of tallying of cash book, ledger and bank pass (Savings and loan account) during EC meeting ..................................................................................................................................................................................................... 46 Table 6.6(a): Tasks undertaken by the SHG Monitoring sub-committee .................................................................... 50 Table 6.6(b): Tasks undertaken by Bank Linkages and Repayment sub-committee............................................. 51 Table 6.6(c): Tasks undertaken by Social Action sub-committee .................................................................................. 51 Table 6.7: Monthly saving deposits per member SHG ......................................................................................................... 54 Table 6.8: Resources used for meeting the monthly operating cost of VO ................................................................. 55 Table 6.9: Status of conflicts in VOs ............................................................................................................................................ 58 Table 6.10: Conflict resolution methods in VOs ..................................................................................................................... 58 Table 6.11: Location of training to VOs by Mission team ................................................................................................... 61 Table 6.12: Number of MCPs rejected / asked for revision by VOs ............................................................................... 63 Table 6.13: Status of SHGs received CIF on rotation ............................................................................................................ 64 Table 6.14: Assessment procedure of SHGs for CIF disbursement ................................................................................ 65 Table 6.15: Assessment procedure of SHGs for VRF disbursement .............................................................................. 65 Table 6.16: Use pattern of fund among member SHGs ........................................................................................................ 66 Table 6.17: Number of NRLM fold SHGs that are now inactive / non-functional / dormant in sample area ...................................................................................................................................................................................................................... 71 Table 6.18: Timing of Savings deposition in SHGs ................................................................................................................ 75 Table 6.19: Prioritization in MCP .................................................................................................................................................. 77 Table 6.20: Norms for SHG Grading and MCP appraisal under NRLM ......................................................................... 79 Table 6.21(a): Grading before disbursement of RF (3-4 months after formation of SHG) - Intensive Block (Sohagpur) .............................................................................................................................................................................................. 80 Table 6.21(b): Grading before disbursement of RF (3-4 months after formation of SHG - Resource Block (Jaisinghnagar) ...................................................................................................................................................................................... 81 Table 6.22(a): Grading / Appraisal before disbursement of VRF (3-6 months after formation of the SHG) - Intensive Block (Sohagpur) ............................................................................................................................................................. 81 Table 6.22 (b): Grading / Appraisal before disbursement of VRF (3-6 months after formation of the SHG) - Resource Block (Jaisinghnagar) ..................................................................................................................................................... 81 Table 6.23(a): Grading / Appraisal before disbursement of CIF (6-9 months after formation of the SHG) - Intensive Block (Sohagpur) ............................................................................................................................................................. 81 Table 6.23(b): Grading / Appraisal before disbursement of CIF (6-9 months after formation of the SHG) - Resource Block (Jaisinghnagar) ..................................................................................................................................................... 81 Table 6.24(a): Grading / appraisal before credit linkage of SHG (1st linkage) (6 months after formation of SHG or before submission of application for credit linkage) - Intensive Block (Sohagpur) ............................... 82

v v

Table 6.24(b): Grading / appraisal before credit linkage of SHG (1st linkage) (6 months after formation of SHG or before submission of application for credit linkage) - Resource Block (Jaisinghnagar) ...................... 82 Table 6.25(a): Grading / Appraisal before credit linkage of SHG (subsequent linkages) (within 2 months of repayment of previous loan or before submission of application for bank loan) - Intensive Block (Sohagpur) .............................................................................................................................................................................................. 82 Table 6.25(b): Grading / Appraisal before credit linkage of SHG (subsequent linkages) - (within 2 months of repayment of previous loan or before submission of application for bank loan) - Resource Block (Jaisinghnagar ........................................................................................................................................................................................ 82 Table 6.26: Norms for different types of funds and disbursement procedure ......................................................... 83 Table 6.27(a): Revolving Fund - Intensive Block (Sohagpur) .......................................................................................... 83 Table 6.27(b): Revolving Fund - Resource Block (Jaisinghnagar) ................................................................................. 84 Table 6.28(a): Vulnerability Reduction Fund - Intensive Block (Sohagpur) ............................................................. 84 Table 6.28(b): Vulnerability Reduction Fund - Resource Block (Jaisinghnagar) .................................................... 84 Table 6.29(a): Community Investment Fund - Intensive Block (Sohagpur) .............................................................. 84 Table 6.29(b): Community Investment Fund - Resource Block (Jaisinghnagar) ..................................................... 84 Table 6.30(a): Bank loan to SHG - Intensive Block (Sohagpur) ....................................................................................... 85 Table 6.30(b): Bank loan to SHG - Resource Block (Jaisinghnagar) .............................................................................. 85 Table 6.31(a): Norms for preparation of documents and Bank Account Opening ................................................. 86 Table 6.31(b): Norms for preparation of documents and credit linkages .................................................................. 87 Table 6.32(a): Training on Preparation of documents for Bank Linkage - Intensive Block (Sohagpur) ...... 87 Table 6.32(b): Training on Preparation of documents for Bank Linkage - Resource Block (Jaisinghnagar) ...................................................................................................................................................................................................................... 87 Table 6.33(a): Bank linkage and providing hand-holding support - Intensive Block (Sohagpur) ................... 88 Table 6.33(b): Bank linkage and providing hand-holding support - Resource Block (Jaisinghnagar) .......... 88 Table 6.34: Norms for MCP Preparation .................................................................................................................................... 89 Table 6.35(a): MCP Preparation Training - Intensive Block (Sohagpur) .................................................................... 89 Table 6.35(b): MCP Preparation Training - Resource Block (Jaisinghnagar) ........................................................... 90 Table 6.36: MCP Preparation .......................................................................................................................................................... 90 Table 6.37(a): SHG Database Management Training - Intensive Block (Sohagpur)............................................... 91 Table 6.37(b): SHG Database Management Training - Resource Block (jaisinghnagar) ...................................... 91 Table 6.38(a): SHG Database updating, uploading and hand-holding support and services delivered to SHGs - Intensive Block (Sohagpur)............................................................................................................................................... 91 Table 6.38(b): SHG Database updating, uploading and hand-holding support and services delivered to SHGs - Resource Block (Jaisinghnagar) ...................................................................................................................................... 92 Table 6.39(a): Coordination, support and supervision Mechanism - Intensive Block .......................................... 92 Table 6.39(b): Coordination, support and supervision Mechanism - Resource Block .......................................... 93 Table 6.40: Types of CB programmes - Book Keepers ......................................................................................................... 93 Table 6.41: Types of CB programmes - Master Book Keepers ......................................................................................... 94 Table 6.42:Types of CB programmes - MCP Trainers .......................................................................................................... 94 Table 6.43: Types of CB programmes - Livelihood Promoters Agriculture/AH ...................................................... 95 Table 6.44: Types of CB programmes - Gender CRPs ........................................................................................................... 96 Table 6.45 Types of CB programmes - Bank Mitra ................................................................................................................ 96 Table 6.46: Types of CB programmes – Community Activist ........................................................................................... 97 Table 6.47(a): Payment of honorarium (planned) ................................................................................................................ 97 Table 6.47(b): Payment of honorarium (actually paid) ...................................................................................................... 98 Table 6.48: Services - Book Keeper .............................................................................................................................................. 98 Table 6.49: Services – Active Women ......................................................................................................................................... 99 Table 6.50: Services – Master Book Keeper ............................................................................................................................. 99 Table 6.51: Services – MCP Trainer............................................................................................................................................ 100 Table 6.52: Services – Livelihood Promoter (Agri/AH) .................................................................................................... 100 Table 6.53: Services – Bank Mitra ............................................................................................................................................... 101 Table 6.54: Services – Community Activist ............................................................................................................................. 101 Table 6.55: Services – PFT .............................................................................................................................................................. 102 Table 6.56: Services – DMMU ........................................................................................................................................................ 103 Table 6.57: Services – Banker ....................................................................................................................................................... 104 Table 6.58: Identification of idle fund ....................................................................................................................................... 104 Table 6.59: Approval of list in Gram Sabha ............................................................................................................................ 105 Table 6.60: Display of list in public space................................................................................................................................ 105

vi vi

Table 6.61: Updating list after being approved .................................................................................................................... 105 Table 6.62: Strategies to ensure inclusion of socially excluded sections .................................................................. 106 Table 6.63(a): Different social groups categorized in the project for finding out shift of HHs within social groups ...................................................................................................................................................................................................... 107 Table 6.63(b): Different social groups categorized in the project for finding out shift of HHs within social groups ...................................................................................................................................................................................................... 108 Table 6.64: Major criteria used for defining poverty ......................................................................................................... 108 Table 6.65: Major vulnerability and risk factors .................................................................................................................. 109 Table 6.66: Criteria followed for assessment of vulnerability ....................................................................................... 109 Table 6.67: Special efforts made for vulnerable groups ................................................................................................... 110 Table 6.68: Exemption(s) / privilege(s) made for the vulnerable groups................................................................ 110 Table 6.69: Strateg(ies) adopted to bring leftover vulnerable families into SHG fold ........................................ 111 Table 6.70: Special efforts made for vulnerable families ................................................................................................. 111 Table 6.71: Priority in SHG norms for most vulnerable members ............................................................................... 112 Table 6.72: SHG members' empowerment visible in their village ............................................................................... 112 Table 6.73: Visibility of improved social affinity .................................................................................................................. 113 Table 6.74: Expectation of vulnerable groups / families towards changes required .......................................... 114 Table 6.75: Ranking of Social Security Schemes .................................................................................................................. 115 Table 6.76: Comparative findings in Shahdol, Sheopur and Mandla Districts ........................................................ 117

List of Figures

Figure 2.1: Project Logic Model ........................................................................................................................................................ 4 Figure 2.2: Sampling Strategy ............................................................................................................................................................ 6 Figure 2.3: Research Design of the Process Monitoring of Madhya Pradesh SRLM ............................................... 11 Figure 2.4: Design of approach for Key Informant Interviews ....................................................................................... 12 Figure 2.5: Snapshot of the survey instrument developed for Process Monitoring of MPSRLM in Shahdol in Quarter 3 .................................................................................................................................................................................................. 14 Figure 2.6: Concept of Triangulation ........................................................................................................................................... 16 Figure 3.1: Snapshot of the Data Entry programme developed for entry of data collected as part of Process Monitoring of MPSRLM in Quarter 3 ........................................................................................................................................... 22 Figure 4.1: Map of study area showing districts of MPSRLM ........................................................................................... 25 Figure 5.1: Age Profile of the Respondents ............................................................................................................................... 28 Figure 5.2: Social Group-wise Distribution of the Respondents ..................................................................................... 29 Figure 5.3: Education Profile of the Respondents ................................................................................................................. 29 Figure 5.4: Livelihood Profile of the Respondents ................................................................................................................ 30 Figure 5.5: Age Profile of the Respondents ............................................................................................................................... 30 Figure 5.6: Gender Profile of the Respondents ....................................................................................................................... 31 Figure 5.7: Social Group-wise Distribution of the Respondents ..................................................................................... 31 Figure 5.8: Education Profile of the Respondents ................................................................................................................. 31 Figure 5.9: Age Profile of the Respondents ............................................................................................................................... 32 Figure 5.10: Social Group-wise Distribution of the Respondents .................................................................................. 33 Figure 5.11: Education Profile of the Respondents............................................................................................................... 33 Figure 5.12: Livelihood Profile of the Respondents .............................................................................................................. 34 Figure 6.1: Exposure visits ............................................................................................................................................................... 35 Figure 6.2: Purpose of VO formation ........................................................................................................................................... 36 Figure 6.3: Criteria followed for formation of VO .................................................................................................................. 37 Figure 6.4: Age of member SHGs ................................................................................................................................................... 37 Figure 6.5: Membership of SHGs in VOs ..................................................................................................................................... 38 Figure 6.6: Some of the reasons why all members of all SHGs are not GB members ............................................. 39 Figure 6.7: Awareness on role and responsibilities of General Body of VO ............................................................... 40 Figure 6.8: Frequency of GB meeting .......................................................................................................................................... 40 Figure 6.9: Number of times GB meeting held since inception of the VO ................................................................... 41 Figure 6.10: Attendance status of GB meeting held in the last 12 months ................................................................. 41 Figure 6.11: Executive Committee members of VO .............................................................................................................. 42 Figure 6.12: Awareness on roles and responsibilities of Executive Committee of VO .......................................... 44 Figure 6.13: Number of times EC meetings held in the last 12 months ....................................................................... 44

vii vii

Figure 6.14: Attendance in EC meetings held in last 12 months ..................................................................................... 45 Figure 6.15: Office Bearers of VO .................................................................................................................................................. 47 Figure 6.16: Type of Bye laws / norms / rules prepared by the VO .............................................................................. 47 Figure 6.17: Process followed for formation of sub-committees of VO ....................................................................... 48 Figure 6.18: Stages of formation of sub-committees ............................................................................................................ 49 Figure 6.19: Types of sub-committees of VO ........................................................................................................................... 49 Figure 6.20: Training status of VO sub-committees ............................................................................................................. 50 Figure 6.21: Functional status of VO sub-committees ......................................................................................................... 50 Figure 6.22: VO members have knowledge of bye laws / rules / norms of VO ........................................................ 52 Figure 6.23: Meeting Process of VO ............................................................................................................................................. 52 Figure 6.24: Main activities of VO ................................................................................................................................................. 53 Figure 6.25: Decision on membership fee for member SHGs ........................................................................................... 54 Figure 6.26: Action taken against member absent in the meeting ................................................................................. 55 Figure 6.27: VO Record / Book keeping done by ................................................................................................................... 56 Figure 6.28: Literacy level of VO Book Keepers...................................................................................................................... 56 Figure 6.29: Literacy level of VO Presidents ............................................................................................................................ 57 Figure 6.30: Literacy level of VO Secretaries ........................................................................................................................... 57 Figure 6.31: Literacy level of VO Treasurers ........................................................................................................................... 57 Figure 6.32: Social issues addressed by the VOs .................................................................................................................... 59 Figure 6.33: Review processes of VOs to their respective member SHGs .................................................................. 59 Figure 6.34: Types of trainings provided by the Mission team to VOs ......................................................................... 61 Figure 6.35: Record keeping status of VOs ............................................................................................................................... 62 Figure 6.36: Types of assistance to member SHGs from VOs ........................................................................................... 62 Figure 6.37: Awareness of VO members towards various types of funds .................................................................. 63 Figure 6.38: Disbursement route of CIF to SHGs .................................................................................................................... 64 Figure 6.39: Principles of good governance followed by VOs .......................................................................................... 66 Figure 6.40: Convergence status of VOs activities ................................................................................................................. 67 Figure 6.41: Number of old SHGs included into SRLM ........................................................................................................ 69 Figure 6.42: Number of old SHGs audited ................................................................................................................................. 70 Figure 6.43: Number of dormant groups revived .................................................................................................................. 70 Figure 6.44: Process followed for revival- group members .............................................................................................. 71 Figure 6.45: Services of Book Keepers........................................................................................................................................ 72 Figure 6.46: Services of Internal CRPs ........................................................................................................................................ 72 Figure 6.47: Services of Active Women ...................................................................................................................................... 73 Figure 6.48: Process of meeting of SHGs.................................................................................................................................... 74 Figure 6.49: Loaning, repayment and punishment system in SHGs .............................................................................. 75 Figure 6.50: Timing of Savings deposition in Banks ............................................................................................................. 76 Figure 6.51: Loan disbursement prioritization ...................................................................................................................... 76 Figure 6.52: Record keeping ........................................................................................................................................................... 77 Figure 6.53: Disbursement route of CIF to SHG ...................................................................................................................... 78 Figure 6.54: Distribution pattern of fund .................................................................................................................................. 78 Figure 6.55: Use pattern of fund .................................................................................................................................................... 79 Figure A3.1: Overview of Quality Control Mechanism during Evaluation ................................................................ 156

List of Plate

Plate 3.1: Classroom training of field survey team at Bhopal on May 14, 2015 ....................................................... 20

i i

Executive Summary

A. Introduction to the Madhya Pradesh State Rural Livelihoods Mission (MPSRLM)

A.1 Project Description

The Swarnjayanti Gram Swarozgar Yojana (SGSY), a centrally sponsored programme of the

Ministry of Rural Development (MORD), Government of India (GOI), has been restructured

and implemented as National Rural Livelihoods Mission (NRLM). It is under implementation

in Madhya Pradesh along with 12 other states with support of the World Bank, known as the

National Rural Livelihoods Project (NRLP). But in terms of strategy and components, NRLP

falls under the overall ambit of NRLM.

A.2 Project Goal and Objectives

The central objective of the Mission is to bring about an increase in the household incomes of

the rural poor through sustained livelihood enhancements and improved access to financial

and non-financial services. The Mission aims at creating efficient and effective institutional

platforms of the poor as mediating institutions.

B. Objectives of Process Monitoring

The objective of the assignment is to conduct process monitoring of State Rural Livelihoods

Mission (SRLM) implementation in Madhya Pradesh. The overall process monitoring will

identify critical gaps and best practices in resource and intensive block strategy

implementation and factors responsible for the same, and facilitate Madhya Pradesh SRLM to

take appropriate decisions to institutionalize the enormous learning outcomes.

C. Approach and Methodology of Process Monitoring

A mix of qualitative & quantitative research techniques was adopted for the process

monitoring study in Shahdol district in quarter 3. The specific objectives of the study spelt

out the need for collation of information at different levels to gauge both effectiveness and

efficiency of various processes of implementation of Madhya Pradesh SRLM Resource Block

strategy and Intensive Block strategy. The methodology included both primary and

secondary research methods.

C.1 Sampling

Multi-stage stratified proportionate random sampling was used in the process

monitoring study, to identify a representative sample of blocks, clusters and villages. In each

quarter, one sample district is being covered for process monitoring, including one resource

block and one intensive block from that district. In this quarter, process monitoring was

conducted in Shahdol district, in the Sohagpur block (intensive) and Jaisinghnagar block

(resource). The detailed sampling design is presented in Chapter 2 of the report.

C.2 Methodology

A mix research design was adopted for the process monitoring study, whereby a mix of

both qualitative and quantitative data was used. The detailed steps followed for the conduct

of the Process Monitoring of MPSRLM included:

ii ii

Desk Review: The team conducted a ‘Desk Review’ of the various project reports and

documents, to understand the strategy of implementation that was to be assessed in the

process monitoring study. This exercise facilitated the team members to understand the

perspective of a variety of project activities. Further, the team also identified additional

secondary data sources and literature useful in the context of the study and reviewed

the same.

Scoping and Boundary Setting: The team conducted a thorough document review of

relevant project documents (such as: SPIP, COM, Project Log-frame, AAP, etc.) to

familiarise themselves with the project objectives, procedures and implementation

framework.

Stakeholder Mapping: Before undertaking the process monitoring study, the team

mapped all the direct and indirect stakeholders associated with MPSRLM to not only

know the different stakeholders in the project but also to identify sample informants for

the study.

Development of Study Instruments (Quantitative & Qualitative): The study team

prepared the data collection tools for the qualitative and quantitative data collection.

The qualitative tools were semi-structured and open-ended, whereas the quantitative

tools focused on determining the conduct of project processes and were targeted at a

representative sample of the direct beneficiaries and key stakeholders.

Quarterly Process Monitoring: The study team undertook field visits to Shahdol

district under the project, as per the sampling for specific site-based assessments. The

field visits focused on collection of specific data to facilitate the determination of status,

extent and impact of the project processes under review, as well as undertaking

discussions with the relevant stakeholders.

Data collection and Analysis plan: The documentation and analysis plan was finalized

in consultation with the MPSRLM team. The result of the analysis plan was to aid in the

review, assessment and documentation of MPSRLM processes and identifying any areas

for adaptation or modification, enabling the project management to improve the

implementation of various project processes in the state.

Documenting best practices: Acknowledging the performance of MPSRLM in Madhya

Pradesh, best practices were identified and documented. The documentation of the best

practices of MPSRLM was taken up for practical suggestions to improve the contribution

of the project towards the most vulnerable groups, including poor villagers, tribals,

women, minorities, migrants, displaced and persons with disabilities.

Short Films on Process Monitoring/Best Practices: The short films on process

monitoring were prepared to highlight positive experience of a particular project

process, execution that is worth narrating, highlighting the best practices observed and

developing knowledge products.

Presentation of findings and finalisation with MPSRLM team: The findings of the

process monitoring of MPSRLM were presented in a consultation meeting with the State

team, after preliminary analysis of the data received from qualitative and quantitative

research. The relevant comments received from the project team were then

incorporated in the final report and analysis.

iii iii

C.3 Training of survey team

A comprehensive general training was provided to the supervisors, interviewers and data

entry operators within the survey team, in order to create a team environment and to allow

for substitution between roles should any team member take a leave of absence due to

illness or other emergency. The classroom training was conducted in Bhopal, followed by

the field testing of the survey instruments in Shahdol district, during May 14-17, 2015.

C.4 Field testing and finalization of study instruments

The study instruments developed and translated by the study team at InsPIRE, were

thoroughly pre-tested in the field before finalization. Pre-testing in similar field situations

enabled the team to touch base with all the areas of inquiry and also give the communities

an opportunity to add on new areas of inquiry to the study if required. The field testing

exercise helped in getting the time plan right for the entire survey, including both

quantitative and qualitative data collection.

C.5 Data collection and Data entry

The data collection and analysis framework was developed on the lines of the ‘Mix Design’

approach, focusing on both the qualitative (based on participatory) and quantitative

methods and analysis. After completion of the field survey, data entry of all the data

collected from the field using various study instruments was undertaken, using a separate

data entry programme for each survey instrument, taking into consideration the depth of

analysis required to be taken up. An interactive data entry programme was developed using

MS Excel.

D. Key findings, Lessons learned, Constraints & challenges and the Way Forward

The key findings and the lessons learned from the process monitoring study in both the

intensive and resource blocks of Shahdol district are summarized here. Further, the

constraints and challenges faced by the Mission team, as identified during the process

monitoring study in both the intensive and resource blocks of Shahdol district, are also

enumerated, along with the way forward for MPSRLM:

In the Intensive and Resource Blocks:

During concept seeding of VOs, the Mission team used mostly orientation / consultation

workshops. The process monitoring team observed that the knowledge and

understanding on overall purpose of VO formation was limited among the members in

the sampled area. The exposure visits to nearby successful VOs and repeated discussion

in SHGs’ meetings about the concept and importance of VOs would be given equal

importance during the process of concept seeding. This will help the members for vision

development of their respective VOs.

In both the sampled blocks, Mission team provided trainings to SHGs for VO formation.

It was reported that 22 percent cases (29% in Intensive Block & 15% in Resource Block)

VOs have been formed with less than 4 SHGs. In addition, 2.5 percent cases (4% in

Intensive Block and 1% Resource Block) the age of member SHGs are less than 3

months. These seem the immature stages to form VOs. It should be ensured that the

iv iv

minimum criteria (as stated in the NRLM Guideline) had been followed during formation

of VOs.

It was reported that all members of the member SHGs are the GB members of their

respective VOs. However, it was also reported that all SHGs are not the members of VO

of their respective villages. The process monitoring survey results depicted the reasons

as (i) Only few SHGs are member of VO in the village (ii) Some SHGs are member of

other VO in the village, and (iii) Some SHGs are member of other VO in other village. It

was done as per the COM, i.e. the number of SHGs in a VO must not be less than 5 and

should not exceed 30. In case there are more than 30 SHGs in the village or hamlet or

Panchayat, the Mission needs to form another VO. However, appropriate steps need to

be taken up so that all eligible SHGs should become the members of VOs.

The knowledge and awareness on role and responsibilities of GBs of VOs are limited

with few members only.. As per VOs rules, the frequency of GB meetings should be on

quarterly basis. However, in the Intensive Block 49 percent cases it was conducted less

than or equal to 2 times, and about 79 percent cases in Resource Block it was conducted

only once since inception of the VOs.

The process monitoring survey data reveals that more than the half of the sampled VOs

the Mission team assisted the VOs in preparing and deciding the GB meeting agenda.

There are a minimum of 10 members in EC of each VO. Initially EC members were

nominated by the SHGs, but now it has been made compulsory for presidents and

secretaries of SHGs to be the EC members of their respective VOs. As per VO rules, EC

members are selected/ elected for a period of 2 years, however most of the cases, the EC

members’ selection have been done only once after formation of VOs.

In both the sampled blocks, the present status of awareness level on role and

responsibilities among EC members are very poor. It was also reported that in about

half of the sampled VOs, Mission team assisted the VOs in preparing the EC meeting

agenda.

In both the sampled blocks, majority of the cases Office Bearers are selected by General

Bodies of the VOs. However, in about 18-22 percent cases, the Office Bearers are

selected by the Executive Committees of the VOs.

There are mainly five types of VO sub committees have been formed in the sampled

area. Sub-committees are formed from the EC of VO. In each sub-committee there are 2-

3 members. It was reported that these sub-committees are formed in half of the sampled

VOs. It was also reported that majority of the VOs in the sampled area do not have Social

Mobilization sub-committees and Employment sub-committees. The responsibilities of

these committees are performed by other existing committees.

The formal training and capacity building activities of VO sub-committees have not been

done in the sampled area properly. In both the Blocks, about 50% sub-committees in the

sampled areas have been left out from formal training programmes. These sub-

committees lack appropriate capacities to perform their role and responsibilities. They

also lack work schedule and learning sharing platform.

The Mission team has mainly provided three types of trainings to VOs viz. (i) VO Concept

and Management, (ii) MCP preparation and appraisal, and (iii) VO Accounts and Book

keeping. The formal training to VOs on following subjects need to be provided- (i) VO

MIS, (ii) Gender and Social Inclusion, (iii) PIP, (iv) Community Procurement, (v) Roles

and Responsibilities of Sub-committees, (vi) SHG Grading and Audit, (vii) Annual

v v

Planning and Budgeting, (viii) Governance and Accountability, (ix) Objective setting of

Exposure visits, and (x) Financial Management.

In the sampled area, the Record and Book keeping status of VOs is picking up slowly.

The Mission team requires more time and effort to introduce them properly. All types of

Books and records need to be introduced properly followed by organizing formal

trainings.

In the sampled area, about 65 percent VOs activities (58% in Intensive Block & 72% in

Resource Block) yet to link them with the existing government programme or schemes.

At VO level they lack the capacity of convergence efforts to be made.

In case VO is formed and the SHG is a member of VO, grading should be undertaken by

VO level sub-committee. In case of VO is not formed, or SHG is not a member of VO,

grading should be done by block / cluster level appraisal committee involving members

from other SHGs facilitated by CRP / Community cadres. However, VOs and SHGs are not

in a position to undertake the various types of grading activities. It is normally

performed by the nodal PFT. The Mission team needs to capacitate and strengthen the

SHGs, VOs and its sub-committees to undertake their assigned activities effectively.

MCP preparation training is initiated after 6 months of formation of SHGs. A

standardized MCP format is available with the Mission team.

Most of the cases, the priorities of the individuals have changed. MCPs need to be

revisited and updated as and when required. The changes made in MCPs should be

recorded in meeting / minutes register for future reference.

As per norms RF, VRF & CIF applications are submitted and disbursement is made to

SHGs. The RF and VRF amounts were Rs. 15000/- each for individual eligible SHG.

However, CIF amount varied from Rs. 50000/- to Rs. 80000/- per SHG. In the case of

Resource Block, due to lack of knowledge and awareness about the VRF among

community members, , VRF is neither applied by the SHGs/VOs nor disbursed by the

Mission.

In most cases, initially the group members equally distributed the funds among

themselves. There is lack of plan for use and utilization pattern of these funds among the

group members. Proper plan and tracking mechanism for fund utilization should be

established at SHG level. Various types of funds received need by SHG to be recorded in

meeting / minutes register (as on date they reflect only in Passbook).

About 50 percent CIF amount is disbursed to VOs against their application. The basic

purpose of this deduction is for rotation of amount among all SHGs of the respective

VOs. However, the timeframe of rotation of fund at SHGs and VO levels need to be

worked out properly for efficient and effective utilization of the fund.

The SHGs have received the 1st dose of bank loan. The 1st dose bank loan amount varied

from Rs. 50000/- to Rs. 100000/-. However, the loan processing time takes 30-45 days

from their application dates. The Mission team should encourage the group members for

repaying the loan amount as per schedule. It’ll increase the credit worthiness of the

group for availing the higher level loans i.e. 2nd dose, 3rd dose, and so on.

There is further clarification and guideline required on Livelihoods / Layering Fund

(LF).

In Intensive Block as well as Resource Block, the database management training was

done at PFT level for PFT members by DM-M&E. There are standard reporting formats,

schedule of reporting interval, availability of proper infrastructure, persons responsible

vi vi

for data updating and uploading at DMMU and PFT level. However, VOs and SHGs lack

the capacity and infrastructure for data updating and uploading.

In Intensive Block as well as Resource Block, no formal training were provided for

preparation of documents for bank linkages. The Mission team assisted the SHGs for

bank linkages and handholding support in terms of coordination and networking with

banks, sensitization of bankers, documents preparation, introduction at banks for

account opening and credit linkages and assists them in timely repayment of loans.

However, most of these activities were restricted to DMMU and PFT levels only.

Mission team is providing coordination, support and supervision assistance at DMMU

and PFT level. These services are in the form of preparation of Annual Action Plan

(AAP), review of AAP, preparation of implementation plan (after approval of AAP),

monitoring of implementation plan throughout the year, identification of deviations

(physical & financial targets), and their rectification procedure. Community level

representatives need to be included at formal structure of coordination, support and

supervision of Mission initiatives.

In the Intensive Block(s):

PFT facilitated for the selection of Office Bearers of VOs. In sampled Intensive Block,

there are five OBs (i.e. President, Vice-president, Secretary, Vice-secretary and

Treasure). The positions of OBs are for two years on rotation basis. However, till date

selection of OBs are done only once / no re-election in the sampled area.

There are two VOs in sampled Intensive Block, where bye laws / rules / norms yet to be

formulated.

In 24 percent cases, the CIF distribution route is direct to SHGs. All VOs need to be

capacitated and strengthened to perform their role and responsibilities, and manage the

community funds efficiently.

MCP preparation training is initiated after 6 months of formation of SHGs. In Intensive

Block, 2-5 days training is organized for PFT level Mission team as well as for CRPs and

VO/SHG representatives. The training was organized 3 days for PFT members, 5 days

for CRPs and 2 days for VO/SHG representatives.

In Intensive Block, MCPs were jointly prepared by SHG, CRP and nodal PFTs. It was

appraised by District core team and approved by the DPM. In first submission of MCPs,

the acceptance rate of all 5 sampled PFTs are between 75-100 percent.

In the Resource Block:

PRP facilitated for the selection of Office Bearers of VOs. In sampled Resource Block

there are three OBs (i.e. President, Secretary and Treasure). The positions of OBs are for

two years on rotation basis. However, till date selection of OBs is done only once / no re-

election in the sampled area.

In almost 96 percent cases, the CIF distribution route in Resource Block is direct to

SHGs. All VOs need to be capacitated and strengthened to perform their role and

responsibilities, and manage the community funds efficiently.

MCP preparation training is initiated after 6 months of formation of SHGs. In Resource

Block, 7 days training was organized for SHG members, CRPs and PFTs at VO/SHG level,

which were facilitated by the Resource Organisation.

vii vii

In the Resource Block, MCPs were prepared by the CRPs and PRPs. It was appraised by

PFT and approved by the DPM. In first submission of MCPs, the acceptance rate of two

sampled PFTs (i.e. Gopalpur and Kanadikhurd) of Resource Block is 100 percent.

However, in remaining 3 sampled PFTs it was between 75-100 percent.

E. Structure of the Process Monitoring Report

The process monitoring report is structured in a manner such that it is easy to comprehend,

as well as provide detailed analysis of data collected from various levels. The chapterization

plan of the report is as follows:

Chapter 1: Introduction to Madhya Pradesh State Rural Livelihoods Mission (MPSRLM)

Chapter 2: Methodology

Chapter 3: Training of Field Team, Field Testing and Data Entry Protocols

Chapter 4: Profile of the Study Area

Chapter 5: Sample Profile

Chapter 6: Key Findings, Lessons Learned, Constraints & Challenges, and The Way

forward

Chapter 7: Best Practices

viii viii

List of Abbreviations

AAP Annual Action Plan

AH Animal Husbandry

APL Above Poverty Line

AW Active Women

BK Book Keeper

BLBC Block level Bankers Committee

BMMU Block Mission Management Unit

BPL Below poverty Line

CBO Community Based Organisation

CLF Cluster Level Federation

COM Community Operational Manual

CRP Community Resource Person

DLCC District Level (Credit Review) Coordination Committee

DMMU District Mission Management Unit

FGD Focussed Group Discussion

GOI Government of India

GoMP Government of Madhya Pradesh

GP Gram Panchayat

HRF Human Rights to Food

IEC Information, Education and Communication

KII Key Informant Interview

LDM Lead District Manager (from the Lead Bank)

MAP Medicinal and Aromatic Plants

M&E Monitoring and Evaluation

MBK Master Book Keeper

MCP Micro Credit Plan

MIP Micro Investment Plan

MIS Management Information System

MoU Memorandum of Understanding

MORD Ministry of Rural Development

MP Madhya Pradesh

MPDPIP Madhya Pradesh District Poverty Initiative Programme

MPRAF Madhya Pradesh Rajya Ajeevika Forum

MPRLP Madhya Pradesh Rural Livelihoods Project

ix ix

MPSRLM Madhya Pradesh State Rural Livelihoods Mission

NGO Non-Government Organisation

NRLM National Rural Livelihoods Mission

NRLP National Rural Livelihood Programme

NRM Natural Resources Management

OB Office Bearer

OBC Other Backward Caste

PFT Project Facilitation Team

PHED Public Health and Engineering Department

PIP Participatory Identification of Poor

PoP Poorest of Poor

PRA Participatory Rural Appraisal

PRI Panchayati Raj Institution

PRP Professional Resource Person

RSBY Rashtriya Swasthya Bima Yojana

SC Scheduled Caste

SERP Society for Elimination of Rural Poverty

SGSY Swarnajayanti Gram Swarozgar Yojana

SHG Self Help Group

SLBC State Level Bankers Committee

SMMU State Mission Management Unit

SPIP State Perspective Implementation Plan

SPTG Special Primitive Tribal Group

ST Scheduled Tribe

ToR Terms of Reference

VO Village Organisation

WBR Well Being Ranking

WR Wealth Ranking

1 1

CHAPTER 1:

Introduction to Madhya Pradesh State Rural Livelihoods Mission (MPSRLM)

This chapter presents an introduction to the National Rural Livelihoods Mission (NRLM),

followed by an introduction to the Madhya Pradesh State Rural Livelihoods Mission

(MPSRLM) and describes its various components, with particular reference to the

Process Monitoring study.

The Swarnjayanti Gram Swarozgar Yojana (SGSY), a centrally sponsored programme of the

Ministry of Rural Development (MORD), Government of India (GOI), has been restructured and

implemented as National Rural Livelihoods Mission (NRLM). The NRLM is implemented on a

cost sharing basis between the Center and the States in the ratio of 75:25.

1.1 Background

National Rural Livelihoods Mission (NRLM) is being implemented since FY 2010-11 to

eliminate rural poverty through innovative implementation strategies involving

mobilization and organization of the rural poor and their financial and economic inclusion.

The NRLM is under implementation in Madhya Pradesh along with 12 other states with

support of the World Bank, known as the National Rural Livelihoods Project (NRLP). But

in terms of strategy and components, NRLP falls under the overall ambit of NRLM.

1.1.1 Project Goal and Objectives

The central objective of the Mission is to bring about an increase in the household

incomes of the rural poor through sustained livelihood enhancements and improved

access to financial and non-financial services. The Mission aims at creating efficient and

effective institutional platforms of the poor as mediating institutions.

The three key inter-related components of the Mission are: (i) social inclusion; (ii)

financial inclusion; and (iii) economic inclusion. The three components are posited on the

Community Based Organizations (CBOs) of the poor, which if promoted, capacitated,

nurtured and funded initially, are expected to promote and sustain livelihoods of the

rural poor. Thus, the NRLM aims at mobilizing all the rural poor households into SHGs

and their federations viz., Village Organizations, Cluster/Block Level Federations and

use these institutional platforms to promote the livelihoods of the poor.

The Mission seeks to promote access of the CBOs of the poor to financial and technical

services as well as economic support services and enable them to diversify and improve

their livelihoods. Towards this end, the Mission intends to promote organic financial and

non-financial relations between the SHGs and their federations. In addition, the poor

would be facilitated to achieve increased access to their rights, entitlements and public

services, diversified risk and better social indicators of empowerment. The NRLM also

aims at harnessing the innate capabilities of the poor and seeks to complement them

2 2

with their capacities (information, knowledge, skills, tools, finance and collectivization)

to deal with the rapidly changing external world.

In addition to this, the Mission will promote job opportunities for the rural youth through

supporting training and bridge training in self-employment and salary/wage employment

skills. The Mission will also organize job fairs to facilitate easy interface between the

potential employers and the trained youth. The Mission will work with select professional

institutions to promote training and placement support for the youth.

1.1.2 Implementation Architecture

At the national level, a National Mission Management Unit (NMMU) was created to

implement the Mission, comprising of several thematic groups and professional experts,

under the Rural Livelihoods (RL) Division of the MORD.

In Madhya Pradesh, a state level autonomous society was established and designated as

Madhya Pradesh Rajya Ajeevika Forum (MPRAF). As part of rolling-out SRLM, the state

government has:

(i) set-up governance and accountability systems;

(ii) established dedicated Mission implementation units at the State (SMMU), District

(DMMU), and Sub-Block Units (Cluster Level);

(iii) recruited, inducted, trained and positioned multidisciplinary professionals at all

levels; and

(iv) established adequate management, finance, procurement, MIS and M&E systems.

In Madhya Pradesh, NRLM is implemented through Madhya Pradesh Rajya Ajeevika

Forum (MPRAF). The Mission will gradually scale up this program to cover 313 blocks

and 51 districts in the state.

The National Rural Livelihoods Mission (NRLM) in Madhya Pradesh has developed its

mission statement that ‘Poor women and their families in rural Madhya Pradesh through

their own institutions attain socio-economic empowerment to become an agent of change

for promoting equitable and sustainable development of the society’.

1.1.3 Resource Block Strategy

The framework of NRLM is designed on the Resource block strategy which involves: (i)

development of effective models of social mobilization, institution building, financial

inclusion and livelihoods promotion in select blocks as proof of the concept; and

(ii) facilitating adoption of the models in the rest of the state, in a phased manner.

The strategy entails intensive use of human resources and technical support drawn from

Resource Organizations (RO)/states in select resource blocks of NRLM states. The

MPSRLM has an agreement with the Society for Elimination of Rural Poverty (SERP) in

Andhra Pradesh. The partnership was done with the purpose of replicating successful

models in select blocks, which apart from acting as ‘proof of concept’ would provide a

learning and training ground for the community and the Mission staff from other blocks.

Thus, in a phased manner, the resource block strategy is expected to create sufficient

local resources (social and human) in the state to support scaling-up of the intensive

3 3

NRLM strategies to all districts and blocks. The whole strategy hinges on building

quality community institutions, which would effectively mobilize financial and economic

resources from public and private institutions.

A process intensive strategy was designed for rolling out the resource block strategy by:

i. Mobilize the vulnerable and poor household members into new SHGs;

ii. Scan and revive the dormant and defunct SHGs into functional SHGs;

iii. Strengthen pre-existing SHGs through a process of participatory training and learning;

iv. Institute Pancha Sutras in all SHGs;

v. Identify and train potential bookkeepers for SHGs;

vi. Facilitate preparation of micro-plan which would enable the SHGs to access bank

loans and other external sources of finance;

vii. Developing and supporting the SRLM in creation of a community cadre of “Bank

Mitra”.

viii. Institute community MIS system and facilitate self-monitoring by the SHGs;

ix. Promote village level federations of SHGs and institute democratic and financial

norms in them;

x. Identify and train potential Community Resource Persons (CRPs) who could

nurture and guide the SHGs and Village Organisations (VOs);

xi. Promote formation of livelihoods collectives; and

xii. Facilitate introduction of e-bookkeeping and knowledge management systems in

the SHGs and their federations.

1.2 Rationale for Process Monitoring

The implementation strategy of MPSRLM is very process intensive and is crucial for the

overall success of the Mission. Therefore, the “Process Monitoring study of the Madhya

Pradesh State Rural Livelihoods Mission” was taken up.

As part of the process monitoring study, a quarterly process monitoring of the resource

and intensive blocks was conducted, apart from the other tasks of developing process

monitoring manual, training community monitors and preparing short films on the

process monitoring themes.

1.2.1 Objectives of the Process Monitoring

The objective of the assignment is to conduct process monitoring of State Rural Livelihood

Mission (SRLM) implementation in Madhya Pradesh. The overall process monitoring will

identify critical gaps and best practices in resource and intensive block strategy

implementation and factors responsible for the same, and facilitate Madhya Pradesh SRLM

to take appropriate decisions to institutionalize the enormous learning outcomes.

The specific objectives of the study include:

Conduct Process Monitoring in selected sample resource and intensive blocks from

four districts in Madhya Pradesh during the first year

Identify issues critical to the Resource Block Strategy and Intensive Block strategy

Identify best practices emerging from the strategy

Suggest strategic changes required to improve effectiveness of the strategy

4 4

CHAPTER 2:

Methodology

The conceptual approach followed for various tasks under the study is elaborated in this

chapter, including a detailed note on the study framework, research design, sampling

design, sample distribution, data collection and analysis framework, etc.

A quarterly monitoring approach is being followed for the process monitoring study, whereby a

new district is taken up for monitoring in each of the respective quarters, in consultation with

the MPSRLM State team.

2.1 Approach for Process Monitoring

The research design for the study was aligned to the study objective and specific tasks as

outlined in the ToR. As described in the subsequent sections, the study adopted a mix of

qualitative & quantitative research techniques. The specific objectives of the study

spelt out the need for collation of information at different levels to gauge both

effectiveness and efficiency of various processes of implementation of Madhya Pradesh

SRLM Resource Block strategy and Intensive Block strategy, focusing on an in-depth

analysis of planning and monitoring processes at different levels, i.e. from the State to

the Village level.

The methodology included both primary and secondary research methods. The

comprehensive process monitoring focused on the status, outcomes and impacts of the

project implementation in the project areas. The boundary of evaluation was defined in

line with the scope of evaluation. However, before developing the methodology for this

process monitoring study, an attempt was made to understand and list down the broad

and specific components that are to be assessed in the Study Framework.

2.1.1 Study Framework

The overarching framework that guided the “Process Monitoring of State Rural

Livelihoods Mission” study is illustrated in figure 2.1. This is in cognizance of the fact that

the project was designed using the Logical Framework Approach, central to which is the

logic model. However, the comprehensive process monitoring exercise has gone beyond

the Project Planning Matrix (log frame) in analyzing impacts incident to the project.

Figure 2.1: Project Logic Model

Intermediate States

Impacts

Contribution to

project goal, other

programs and key

learnings

Assumption(s)

Impact

Drivers

Input

Relevance

Processes

Efficiency and

effective delivery

Outputs

Attainment of envisaged

project outputs

Outcomes

Contribution of the outputs

to and attainment of project

purpose along with other

indirect outcomes Baseline

Evaluation Monitoring and Mid-Term Assessments

5 5

The comprehensive process monitoring is focusing on the status, outcomes and impacts

of the project implementation in the project areas. The boundary of evaluation was

defined in line with the scope of evaluation as discussed above. The methodology

adopted for the study is elaborated in the ensuing paragraphs.

2.1.2 Research Design1

A mix research design was adopted for the process monitoring study. The specific

objectives of the study clearly spelt out the need for collation of information at different

levels to gauge both effectiveness and efficiency of various processes of implementation

of MPSRLM in Madhya Pradesh, focusing on an in-depth analysis of planning and

implementation at different levels, i.e. from the State to the village level.

To establish the best practices in MPSRLM implementation, the process monitoring

largely relied on secondary data, institutional information from State government and

various levels of PRIs, as well as primary data through key informant interviews,

household and village surveys, semi-structured interviews, focus group discussions with

SHGs, VOs, CRPs, Community Mobilizers (Active Women), Book keepers, SRLM project

officials, PFTs, PRI members, rural community members, etc. Participant observations,

case studies and other similar research methods and methodologies were also adopted.

For integrating the analysis horizontally (across the blocks, clusters and villages) as well

as vertically (intra-blocks and clusters), the information collected on various aspects of

the project was not only kept on the ordinal and nominal scales but also on ratio or

interval scales. Using a best-fit mix of qualitative & quantitative methodologies, it helped

ensure the integration of horizontal and vertical aspects of analysis.

The methodology adopted for the study was aligned to the study objective and specific

tasks outlined in the ToR. As described in the subsequent sections, the village surveys

and semi-structured interviews had both open- and close-ended questions. A blend of

close-ended questions enabled the analysis team to capture all the relevant information

with regards to both how good practices are happening in the project districts, blocks

and clusters; and how these efforts led to the success of project implementation at all

levels (State/District/Block/Cluster).

2.1.3 Quarterly Process Monitoring Strategy

The Process Monitoring of MPSRLM is being conducted on a quarterly basis, whereby

the team has undertaken quarterly field visits to cover four districts (one Resource

Block and one Intensive Block of one district per quarter) during the first year, as

specified in the ToR. The field visits focused on collection of specific data to facilitate the

determination of status, extent and impact of the various project processes under

review, as well as undertaking discussions with the relevant stakeholders.

1 Fowler, F. J., Jr. Survey Research Methods, 2nd ed. Newbury Park, CA: Sage, 1993

6 6

2.2 Sampling Design

The sample design and distribution adopted for the process monitoring study is

presented in this section. The final sampling plan was finalized in consultation with the

MPSRLM team. The methodology adopted for sample selection is illustrated in the

section below along with the criteria for selection.

2.2.1 Sampling Framework

There is no standard precision to use when planning a survey, as it depends on the

standard deviation and heterogeneity among the samples, however, an attempt was

made to maintain statistical rigor using advanced techniques. The design effect (DEFF)

has been considered during the sample design and a “correction factor” to account for

the heterogeneity between clusters has been incorporated. The figure below pictorially

describes the sampling strategy.

Figure 2.2: Sampling Strategy

As stated in the figure above, multi-stage stratified proportionate random sampling

was used in the process monitoring study, to identify a representative sample of blocks,

clusters and villages. In each quarter, one sample district will be covered for process

monitoring, including one resource block and one intensive block from that district.

At the inception of the process monitoring study, the four districts to be covered in the

first year were identified in consultation with the MPSRLM team, viz. Mandla, Sheopur,

Shahdol and Dhar. Following the finalization of districts for process monitoring, detailed

MIS data was collected for the four districts, and the sample intensive blocks were

selected from each of the four districts. The resource blocks were already identified by

the SMMU.

Focal Themes

•Participatory Identification of Poor, Community Mobilization, Capacity Building, Financial Inclusion and Other demand driven services

Sample Technique

•Multi Stage Stratified Proportionate Random Sampling

• Avoid Design Effect

Sample Size

•Four Districts (First Year)

•One Resorce Block

•One Intensive Block

•Selection of Clusters in discussion with SRLM team

•10% Physical cover of SHGs

Sample Plan will be finalized in

consultation with MPSRLM team

Multi-sStage stratified

proportionate random sampling

Continuous monitoring of the

selected Villages

Statistical rigour of the study

7 7

Table 2.1: Sample distribution

District

No. of Sample Villages to be covered in Year 1 (selecting districts in a phased manner) Total sample villages

to be covered in Year 1 No. of Sample Resource Block(s)

No. of Sample Intensive Block(s)

Mandla 1 1

To be sampled proportionately

Sheopur 1 1

Shahdol 1 1

Dhar 1 1

Total 4 4

No. of Sample villages 240 240 480

► Selection of Sample Blocks

Multiple criteria were used for identification of intensive blocks in the four sampled

districts for process monitoring in year 1.

Model block

Coverage of villages in first year of NRLM implementation, i.e. 2012-13

At least 20% of the sampled villages to be covered per sampled PFT

Using the above-mentioned criteria, one intensive block was selected from each of the

sampled districts.

In Shahdol district, Burhar block was not selected as the sample intensive block as

with six PFTs, it did not meet the criteria of at least 20% of the sample villages being

there from each sampled PFT. For Gohparu block, again the number of villages

covered during the year 2012-13 is lesser than the required number of sample

villages, hence, making it infeasible to select this block as the sample intensive block.

Amongst the two remaining blocks, Sohagpur and Beohri, Sohagpur was selected as

the sample intensive block since it had more number of villages covered under the

Mission as compared to Beohri.

In line with this, the table below presents details of the intensive block of Shahdol

district such as no. of PFTs, total no. of villages etc. As elaborated in the above

paragraphs, the intensive blocks were selected using the multi-stage stratified

proportionate sampling.

Table 2.2: Sampling of Intensive Block in Shahdol

SN District Intensive Block(s)

Model block

No. of PFTs

Total No. of

villages

No. of villages covered in Year

2012-13

No. of villages covered in Year

2013-14

No. of villages covered in Year

2014-15

Total no. of

villages covered

No. of villages not yet

covered

3 Shahdol

Beohri No 4 136 46 78 12 136 0

Burhar No 6 195 96 84 15 195 0

Gohparu No 4 124 84 32 8 124 0

Sohagpur No 5 163 56 93 14 163 0

8 8

The table below summarizes the key details of the resource block of Shahdol district.

Table 2.3: Sampling of Resource Block in Shahdol

SN District Resource Block(s)

No. of PFTs

Total No. of

villages

villages covered in Year

2012-13

villages covered in Year

2013-14

villages covered in Year

2014-15

Total no. of

villages covered

No. of villages not yet

covered

3 Shahdol Jainsinghnagar 6 197 69 111 17 197 0

► Selection of Sample PFTs

As per the sampling strategy discussed above, 100 percent representation of PFTs up to

a maximum of five in each selected block was to be provided. In line with the multi-stage

stratified proportionate random sampling design, the following table presents the

sample distribution for the two sampled blocks of Shahdol district, i.e. Sohagpur

(intensive block) and Jaisinghnagar (resource block). The maximum number of sample

PFTs was limited to five as any further increase will lower the number of villages per

PFT for process monitoring to below 20% of the total sample.

Table 2.4: Sample distribution in Shahdol

SN District Block Block Type

No. of PFTs

covered

No. of sampled

PFTs

Total no. of villages covered

Total no. of sample villages

1 Shahdol

Jainsinghnagar Resource 3 3 197 60

2 Sohagpur Intensive 5 5 163 77

Total

1255 137

Resource 638 240

Intensive 617 240

The final sample for the process monitoring study of MPSRLM in Shahdol district for

quarter 3 is presented in the table below, while the detailed sample with the list of

villages from each of the sampled PFT is presented in Annexure I.

Table 2.5: Sample distribution for Process Monitoring of MPSRLM in Shahdol in Quarter 3

SN District Block PFT No. of

villages No. of sample

villages

No. of sample SHGs

New SHGs Old SHGs

3 Shahdol

Sohagpur

Chhatwai 33 16 8 0

Hardi No. 32 31 14 6 0

Karkati 33 15 7 0

Lalpur 32 15 3 0

Pachgaon 34 17 7 0

TOTAL 163 77 31 0

Jaisinghnagar

Aamdih 30 10 8 0

Amjhor 34 13 7 0

Gopalpur 35 11 7 1

Kanadikhurd 31 11 7 0

Sidhi 33 15 7 1

TOTAL 163 60 36 2

326 137 67 2

9 9

► Selection of Sample Villages

Selection of villages was based on secondary data, primary consultations with district

and block SRLM staff and MIS data analysis. The sample villages were selected randomly

from each of the sampled blocks and PFTs, such that each stratification criteria was

significantly representative.

2.3 Themes for Process Monitoring

A different set of thematic areas are identified for each of the respective quarter for the

process monitoring study. However, the themes for a particular quarter will also be

monitored in the subsequent quarter as well, apart from the additional theme for that

particular quarter. For example: The themes of process monitoring for Quarter 1 and 2

were carried forward to the district where monitoring was conducted in Quarter 3,

apart from the additional themes decided for that particular quarter.

Thematic areas identified for process monitoring of MPSRLM for Quarter 3 included

(apart from repeating the five themes of Quarter 1 and 2):

► Themes for Quarter 3

1. VO Formation and Strengthening

A. Formation of VOs

VO Concept Seeding

Criteria followed for formation of VOs

Induction, orientation and capacity building

Assessment of process of working/meetings of VOs

Rules/norms of VOs – How were these made?, Awareness, etc.

Functions of VOs – Meetings, Savings, Loan disbursements,

repayments

Roles and responsibilities of office bearers

Roles and responsibilities of VO members

Decision-making (rules, loan processes)

Management of funds – CIF

Working of EC, GB

Sub-committees of VOs – formation, working, activities, etc.

Mobilization / hand holding support from the DMMU/ PFT teams

Understanding of community dynamics

B. Strengthening of VOs

Training of VOs

Participatory training and learning process of VOs

Identification and training of book keepers for VOs (by CRPs)

Record keeping by BKs

Review/Study of books of accounts maintained by SHGs

Hand-holding support by CRPs

Hand-holding from the DMMU/PFT teams

Grading of SHGs

Appraisal of MCPs

10 10

Bank linkage

Convergence

The themes of process monitoring repeated from Quarter 2 included:

Social Inclusion

Establishment of Systems (Norms and Practices)

The themes of process monitoring repeated from Quarter 1 included:

Community Mobilization

SHG Formation and Strengthening

Identification of Social Capital

In line with the identified themes, draft checklists were prepared, identifying the various

inherent processes proposed to be reviewed under each of the themes. These were

finalized in consultation with the SRLM team.

Following the finalization of the checklists, draft survey instruments were prepared.

These were then presented to the SMMU, and feedback received. After incorporation of

the feedback received from the State Unit, the revised survey instruments were then

shared with the NMMU, for their feedback. After incorporation of this feedback, the

survey instruments were then finalized, and translated into Hindi. These were then

shared with the SMMU for approval.

2.4 Data collection and Analysis framework

The data collection process was based on the scope of the assignment. The data

collection and analysis framework was developed on the lines of the ‘Mix Design’

approach as discussed above, and the study team focused on both the qualitative (based

on participatory) and quantitative methods and analysis.

Multi-stakeholder consultations were an integral part of methodology and also fed into

the qualitative analysis of document review. The team also validated the qualitative

findings with quantitative data. Interactions were held with a cross-section of

beneficiaries, interacting mainly with their representatives. The steps followed for the

process monitoring study are elaborated in the ensuing paragraphs.

2.4.1 Desk review of project reports and documents

To start with, the team carried out a detailed desk review of all the project documents

and data sheets. All the relevant secondary data was collected from MPSRLM to know

the progress made by the project against set results. The project document, Annual

Action Plan (AAP), project reports, training reports, manuals, guidelines, etc. were

reviewed as part of the process. The purpose was to not only get all the relevant

secondary data but also to prepare the appropriate methodology for the study according

to the project requirements. This process facilitated the team members to understand

the perspective of a variety of project processes and activities. Further, the team also

11 11

identified additional secondary data sources and literature useful in the context of the

study and reviewed the same. At the same time, the team conducted an exhaustive

review of the MIS data as well. In addition to desk review, the secondary information

was also collected from other stakeholders including the training institutions.

Figure 2.3: Research Design of the Process Monitoring of Madhya Pradesh SRLM

2.4.2 Study scoping and boundary setting

After the document review process, the process monitoring study prepared a

‘Framework of Process Monitoring’, identifying the project processes that were to be

reviewed as a part of the study. The team developed a list of indicators and guiding

questions focusing on the objective of process monitoring, which led to the development

of study scoping and boundary setting, thereby enabling the project management to

learn how to better shape and implement the project activities and processes.

The processes identified were in relation with the indicators mentioned in the Results

Framework (Logical Framework Analysis) of the project, and – more critically – with the

project principles and processes detailed in the Community Operational Manual (COM).

MIS data also provided the clues and directives towards identification of project

processes for review.

2.4.3 Stakeholder mapping

Before undertaking the process monitoring study, it was important to know the

different stakeholders who directly and indirectly play a role under the project.

Therefore, the team mapped all the direct and indirect stakeholders associated under

the project. This exercise was undertaken in consultation with the State team of

MPSRLM. The purpose of mapping the stakeholders was to not only know the different

stakeholders in the project but also to identify sample informants for the study.

Desk review of project reports and documents

Study Scoping & Boundary Setting

Stakeholder Mapping

Development of Survey Instruments

Quarterly Process Monitoring

Analysis Plan

Documenting Best Practices

Short Films on Process Monitoring/Best Practices

Presentation of findings and finalisation with MPSRLM team

•Selection of Sample Stakeholders

•Designing of Survey instruments

•Team brief on Survey instruments for Data Collection

•Data Collection

•Data Entry and Analysis

•Short Films on Process Monitoring

Quaterly Monitoring

Process

Resource & Intensive Block

Strategy Process

Quarterly Process Monitoring

12 12

Table 2.6: Data collection for Process Monitoring of MPSRLM

Mix Design Approach

Qualitative Quantitative

A. Key Informant Interviews, in-depth discussions,

Semi-structured interviews with project beneficiaries,

SHG members, VO members, PFT members, District level

officials and State level officials. Other research

methods and techniques such as participant

observations, case studies etc. were also utilized.

B. Focus Group Discussions (FGDs) and Shared

Learning Dialogues (SLDs) at village level

a. To list and assess the efficacies of project

processes

b. To substantiate quantitative information

C. In-depth Discussions with PFT members, State &

district level project functionaries, etc.

D. Identification and development of best practices and

documenting case studies

E. Identification and Analysis of areas for adaptation and

modification, identification of impediments to

MPSRLM implementation (such as caste and gender

considerations, discrimination in beneficiary

identification, etc.)

A. Primary Survey at Village level:

a. Sampling the SHGs for the survey

B. Secondary Data Collection though:

a. Historical and institutional information

from State, district and project staff

b. Review of records and other project

documents

C. Village and institutional profiling for SHGs,

VOs, etc.

D. Review of MIS

a. To assess beneficiary identification, fund

disbursement, activity selection pattern,

fund management utilization pattern, etc.

► Identification of key

stakeholders

Sampling for the process

monitoring study included

selection of key informants

from State SRLM Project Team,

Resource Organization (SERP),

District/Block/Cluster level

teams of MPSRLM, new and old

SHGs, Community Resource

Persons (CRPs), Professional

Resource Persons (PRPs), PRI

functionaries in the project

areas, etc.

At the state level, the key

informants were selected in

consultation with the SMMU.

The number of key informants

was finalized after discussion

with the State team.

Figure 2.4: Design of approach for Key Informant Interviews

However, efforts were made to cover all important stakeholders for understanding the

impact of the project. In the Resource and Intensive Blocks, MPSRLM MIS was used to

Key Informant Interview Plan

- Identification of stakeholders who will be involved

- Identification of what information is needed and from whom

- Preparation of a list of stakeholders to be interviewed (Key

stakeholder groups from national, facility and beneficiary levels and

then identify individuals within those groups)

Development of Instrument

- Evaluation Team will follow a pre-defined protocol to ensure

consistency between interviews and to maintain the reliability of the

findings

- Evaluation Team will follow the interview guides developed in

consultation with the MPRRDA State Office

Collection of Data

- Evaluation Team will explain the purpose of the interview and the

expected duration to the concerned stakeholder

- Qualitative data based on the open-ended and semi-structured

schedules will be collected

Analyze Data

- Summarization of key data to facilitate the qualitative analysis

- Data collected in the interview process will be verified through

triangulation

- Identification of patterns/themes among participants

13 13

locate the project activities, implementation agencies and relevant stakeholders to be

covered under the process monitoring study.

The team identified at least 20-30 relevant stakeholders from each village during the survey,

apart from the sampled SHGs to be surveyed from each of the sampled villages. Key

Informant Interviews (KIIs) with a wide variety of stakeholders were useful to provide

context to the secondary data, offering a more complete picture of how the various project

processes were outlined to be carried out and how these were actually conducted. The key

informant interviews were based on both open- and close-ended questions categorized, in a

semi-structured schedule, to identify the information on involvement in the various project

processes under review, efficiency of implementation, relevance and results.

To achieve the objective of the interview process, focused and specific questions were

incorporated in semi-structured interview schedules. The identification of key

stakeholders was in a participatory and consultative manner.

2.4.4 Development of survey instruments

The study team prepared the data collection tools for the qualitative and quantitative

data collection. The qualitative tools were semi-structured and open-ended, whereas the

quantitative tools focussed on determining the conduct of project processes and were

targeted at a representative sample of the direct beneficiaries and key stakeholders.

Since there are different categories of stakeholders, each operating at different levels,

the team used a mix of different study methods, tools and techniques for collecting the

required data and information for the process monitoring study.

A participatory approach was adopted for qualitative data collection. The qualitative

data was collected through Focus group discussions2 (FGDs), Shared learning dialogues3

(SLDs), Key Informant Interviews and In-depth discussions with various stakeholders.

The qualitative aspect of the study focused on data collection from the primary and

secondary stakeholders through the conduction of focus group discussions and key

informant interviews. FGDs focused on intensive interactions with various institutions

such as PFTs, SHGs, VOs, etc.

To substantiate the qualitative data collection and its findings, quantitative data was

also collected. This data was collected with the help of structured survey instruments

(village and institutional level) and interview schedules. These study instruments were

designed after preliminary discussions with various stakeholders.

2 A focus group is a form of qualitative research in which a group of people are asked about their perceptions, opinions, beliefs, and attitudes towards the programme or intervention being monitored. 3 The SLD process is not simply a series of meetings but rather a semi-structured, dynamic, and strategically facilitated succession of interactions. The structure and composition of and SLD process can be highly adaptable to meet the needs of the organizers as well as the social context, and the facilitator may choose to use any number of tools and techniques to generate discussion and interaction.

14 14

One set of additional survey instrument was developed for the process monitoring of

MPSRLM for quarter 3, in line with the thematic area finalised for this quarter. This

included:

Survey Instrument – VO Formation and Strengthening

This survey instrument is appended at Annexure II of this report.

Figure 2.5: Snapshot of the survey instrument developed for Process Monitoring of

MPSRLM in Shahdol in Quarter 3

Apart from these, the six sets of survey instruments developed earlier in quarter 1 and 2

were also used:

Survey Instrument – Community Mobilisation

Survey Instrument – SHG Formation and Strengthening

Survey Instrument – Identification of Social Capital

Survey Instrument – PFT-level schedule

Survey Instrument – Social Inclusion

Survey Instrument – Establishment of Systems (Norms and Practices)

Field testing of various survey instruments for data collection was also carried out

before the initiation of the process monitoring survey. These were pilot tested in one

PFT and further improved upon. The approach helped in identifying the gaps and

learning from mistakes in the research tools developed, and taking immediate action for

modification of the survey tools in consultation with the client.

► Pre-testing and finalization of study instruments

The study instruments were thoroughly pre-tested in the field before finalization. The

pre-testing exercise served the following three purposes:

Finalization of the areas of inquiry: Pre-testing in similar field situations enabled the

team to touch base with all the areas of inquiry and also give the communities an

opportunity to add on new areas of inquiry to the study.

Finalization of activity schedule: The pre-testing exercise helped in getting the time

plan right for the institutional and community level processes. A number of project

15 15

processes were identified, which are to be reviewed during the course of fieldwork in a

village. Hence, pre-testing also enabled scheduling the activities at the village level.

Finalization of Analysis format: As the pre-testing exercise was a prototype of the

actual fieldwork, it was proposed that the information generated was transcribed and

then analyzed in the most appropriate format. This process enabled to have the final

analysis format best-fit to the research objectives.

Pre-testing: Pre-testing was done in one project villages. The pre-test findings led to

the finalization of study instruments. Pre-testing was carried out by researchers along

with the field team members.

2.4.5 Quarterly Process Monitoring

The study team undertook field visits to Shahdol district under the project, as per the

sampling for specific site-based assessments. The field visits focused on collection of

specific data to facilitate the determination of status, extent and impact of the project

processes under review, as well as undertaking discussions with the relevant

stakeholders.

Field Visit Guide – A field visit guide was developed to maintain consistency in all the

field visits and to collect data in a structured manner. Based on the desk review and

stakeholder consultation, a check list (project-specific) was prepared to facilitate the

experts to focus on the key information and collect data in an effective and efficient

manner.

► Monitoring Data Collection Activities

The process monitoring study team ensured the high quality of the survey and that it is

conducted in accordance with the field plan approved by the project. The team also

ensured that the location of field work was correctly identified, conducted timely and

random quality checks to ensure proper administration of field work and

implementation of field protocols. The detailed quality control and management

framework adopted for the study is appended at Annexure III.

2.4.6 Analysis Plan

The documentation and analysis / tabulation plan was finalized in consultation with the

MPSRLM team. The result of the analysis plan was to aid in the review, assessment and

documentation of MPSRLM processes and identifying any areas for adaptation or

modification, enabling the project management to improve the implementation of

various project processes in the state.

The documentation of the best practices of MPSRLM was taken up for practical

suggestions to improve the contribution of the project towards the most vulnerable

groups, including poor villagers, tribals, women, minorities, migrants, displaced and

persons with disabilities.

16 16

Triangulation

When doing any study, the researcher must be aware of bias. If a study is biased, it means that the results do not reflect the reality because one situation or perspective was favored. Triangulation is one of the principles that tries to ensure that the results of a study are as accurate and unbiased as possible. Triangulation implies looking at any problem from as many perspectives as possible, but at least three.

When undertaking a study, triangulation works at three levels (District, Cluster and Village level in this case):

1. Triangulation of the perspectives of the team by having at least three people with different points of analysis, validation and verification.

2. Triangulation of the perspectives of informants by ensuring that a wide range of people are interviewed and all information is verified by at least three different sources, at least three levels district, cluster and village level.

3. Triangulation of information gathering methods by addressing the same issue using several different tools (Secondary review, MIS data, primary data collection tools (qualitative and quantitative), site visits, etc.)

► Documentation

A process-oriented approach was used for the documentation of various project

activities as they occur and feed the information back to the respective stakeholders and

decision makers to help them in

understanding the working of the project

better. The Process Monitoring of

MPSRLM aimed to identify areas for

adaptation or modification, thereby

enabling the project management to learn

how to better shape and implement the

project processes for further

implementation of MPSRLM.

► Triangulation

The study team undertook triangulation

of collected information and evidence

from various sources, tools and methods.

The ‘monitoring matrix’ and

‘triangulation analysis matrix’ was

prepared. The study team finalized the

format and systematic presentation of

monitoring matrix and triangulation in

consultation with MPSRLM team.

Triangulation was used with a view to

double (or triple) checking of results.

Triangulation facilitated the data

verification (both quantitative and qualitative) through more than two sources. Finally,

the empirical evidence was cross-checked through three major research areas –

Perception, Validation and Documentation, as per the concept of ‘triangulation’, as

illustrated in the figure below.

Figure 2.6: Concept of Triangulation

Interviews with stakeholders (project and government staff,

beneficiaries, NGOs, etc.)

Perception

Documentation Validation

Basic documentation (programming documents) Monitoring reports, progress reports Documentation on perceived success in reports Programme maps/analysis

Existing documentation from external sources

Statistical analysis of data and indicators Field visits, direct observation In-depth thematic studies Stakeholder meetings, focus group interviews

Quantitative assessment of trends using secondary data sources Results &

Positioning

Per

cept

ion

Val

idat

ion

Doc

umen

tatio

n

17 17

► Success stories Framework

Success stories were documented to showcase and highlight a very positive experience

of a particular project process execution that is worth narrating. By nature, these case

studies are very short. The documentation is for the context (Where, who, when), the

experience (what was done) and the positive outcomes (what happened). As is the

objective, the language is eulogistic / positive backed by photographs and a catchy title

capturing the gist of the success stories.

Based on the above aspects, the methodology for the study, thus, comprised of the

following broad aspects:

Synthesis of Secondary data and MIS information

Historical and Institutional information from MPSRLM at state level

Primary data collection and analysis: Quantitative (Village survey) and Qualitative

(FGDs, PRA, Key Informant Interviews, Semi-structured interviews)

For the assessment of different processes of MPSRLM implementation at various levels,

both quantitative and qualitative data was required. Synthesis of information from

secondary sources and MIS was one of the primary methods adopted for identification

of the processes of good practices, institutional processes, livelihood promotion

processes, etc. at various procedural levels of the project. Further, the assessment was

qualified with Key Informant Interviews, In-depth Discussions and Stakeholder

Consultations with key stakeholders of the project at different levels.

Thus, the tools employed for the assessing the functioning and performance of various

project processes of MPSRLM included:

Synthesis of MIS information

Primary Interviews

Field surveys and Observations

2.4.7 Documenting Best Practices

Acknowledging the performance of MPSRLM in Madhya Pradesh, best practices were

identified and documented.

► Identification and documentation of Best practices

The identification of best practices was done through the desk review of secondary data

sources and State / District level consultations. The next step was of documentation of

the best practices at various levels such as the project beneficiaries, SHG members, VO

members, Community Resource Persons (CRPs), Panchayat functionaries, PFT members,

PFT, DMMU and SMMU officials.

As the name suggests, the documentation was focused towards identification of the best

practices in terms of the various project activities such as beneficiary identification;

institutional development; gender & tribal inclusion; Institutional management processes

(conduction of meetings, participation of members in meetings, saving, internal lending,

loan prioritization, inter-loaning, fund disbursement, etc.); SHG Micro Investment Plan

(MIP) preparation; inclusiveness in planning, execution & benefits sharing; Project

infrastructure utilization;; convergence; MIP proposal appraisal processes; fund

18 18

disbursement; social accountability / information disclosure plan; CRP selection;

identification of rural youth for skill training & job placement; post placement efforts; etc.

2.4.8 Short Films on Process Monitoring/Best Practices

The short films on process monitoring were prepared to highlight positive experience of

a particular project process execution that is worth narrating, highlighting the best

practices observed and developing knowledge products. During each quarter, five short

films of 2 to 3 min each, for a variety of five processes or best practices/case studies

were prepared.

As regards the content of the documentation, firstly the context was detailed followed by the

process. For the processes that involve addressing a problem or the issue emerging during

implementation, the problem / issue was discussed first. This was followed by detailing the

thought process behind development of the practice and then the actual process. Finally,

what the best practice has facilitated and achieved was elaborated. Furthermore, any best

practice locally replicated, may be with some adaptation / modification, was also included.

This was essential for establishing the best practice as a ‘best practice’. Thus, the contents

were supplemented by quoting a few examples of such adoption. It was concluded with a

way forward i.e. how it can be planned to adopt the practice in further implementation of

the MPSRLM, including suggestions to improve the contribution of the project towards the

most vulnerable community, i.e. the rural poor.

This exercise was conducted for institutional development; gender & tribal inclusion;

Institutional management processes (Participatory Identification of Poor, Community

Mobilization, Capacity Building, Financial Inclusion and Other demand driven services etc.

In the implementation context, SHG members, Community Resource Persons (CRPs),

Panchayat functionaries, district & state level officials, process innovations and

institutional innovations, demand and supply processes, transparency and accountability

processes, process for resolution of cultural blocks and impediments to MPSRLM

implementation, monitoring and verification systems, etc. were also documented.

Based on the above plan, the study team produced five short films (successful cases)

showcasing the identified project processes from Shahdol district, each of duration of 2-

3 minutes highlighting best practices observed during the study. These short films

showcase the following cases from the respective villages:

Village Mithi: Rooprani: Mithi ki ‘Hoshiyar Mahila’

Village Lapri: Lapri ki ‘Lakhpati’ Nandini

Village Kalyanpur: Murgiyon ki Kahani, Ekta ki Zubani…

Village Lakhnauti: Lakhnauti ka ‘Big Bazaar’…

Village Jamudi: One for All, All for One…

2.4.9 Presentation of findings and finalisation with MPSRLM team

State-level Stakeholder Consultation Meeting – The findings of the process

monitoring of MPSRLM were presented in a consultation meeting with the State team,

after preliminary analysis of the data received from qualitative and quantitative

19 19

research. The relevant comments received from the project team were then

incorporated in the final report and analysis.

2.5 Limitations

During the process monitoring study, a few limitations were encountered, as are

enumerated here:

The process monitoring study is focused on identification of critical processes within

the identified themes for each quarter. The scope of the study is not inclusive of an

assessment of the results or impacts of the Mission activities. Instead, the focus of

the process monitoring study is on monitoring the means used to implement the

Mission activities.

A number of the sample VOs surveyed under the process monitoring study were

loose VOs, in both the intensive and resource blocks. This is elaborated in detail in

Chapter 5 of this report.

In terms of the introduction of books of records, a number of registers were

observed to have been distributed a few days prior to the survey. Only the name of

the VO had been mentioned on these registers (or books of records), while no

entries were observed in such registers. For the purpose of recording responses,

such registers were considered to have been “Introduced, but not updated (partially

or fully)”.

20 20

CHAPTER 3:

Training of field team, Field testing, and Data Entry protocols

The present chapter provides details on the training of field team and testing of the survey

instruments in Shahdol district of Madhya Pradesh. The data entry programme developed

for the process monitoring study is also documented here.

3.1 Training of field team

The core study team consisting of experienced professionals in InsPIRE Network for

Environment developed the training curriculum and study materials for survey

instruments of Process Monitoring of MPSRLM, in consultation with the State team. All

the training materials and field manuals were translated to Hindi. A comprehensive

general training was provided to the supervisors, interviewers and data entry operators

in order to create a team environment and to allow for substitution between roles

should any team member take a leave of absence due to illness or other emergency. The

class room training was conducted in Bhopal, followed by the field testing of the survey

instruments in Shahdol district, during May 14-17, 2015.

Plate 3.1: Classroom training of field survey team at Bhopal on May 14, 2015

The training served as a screening process for skilled interviewers and data entry

agents. The training was scheduled for a period of 4 days, and was considered complete

only when the field team members demonstrated mastery of the designated tasks and

had successfully completed the assigned work as a part of a pilot testing.

The training program included:

Theoretical training: Overall review of each of the survey instruments and each

question in order to fully understand the objective of each question. Standard

quantitative interviewing techniques and field protocols were also discussed in detail.

Classroom practice: Individual and group exercises were conducted along with the

practice of asking and filling questionnaires. This included class demonstrations, where

21 21

the survey instruments were projected and each interviewer completed the

questionnaire in front of the classroom. The training also used vignettes, where the

agency designed case scenarios based on typical households and had the interviewers

complete the questionnaire based on the vignette. Finally, the trainees conducted pilot

interviews on the same subject, and had the interviewers fill in a questionnaire for the

interview to test consistency across the interviewers.

Field testing: After the theoretical and classroom practices, the interviewers were

taken to the field to administer the full survey instruments to a village (outside the

study sample), as a pilot. It served as a test of the computer assisted field entry for data

entry agents. Field exercises and pilot was conducted for 1 day.

The table 3.1 below presents the training schedule, day-wise, from May 14-17, 2015.

Table 3.1: Day-wise schedule of Training and Field testing of survey instruments

Day 1 Classroom training

Day 2 Field testing of the survey instruments

Day 3 De-briefing

Day 4 Classroom training (Mock interviews)

3.2 Pre-testing and finalization of study instruments

The study instruments developed and translated by the core team at InsPIRE, were

thoroughly pre-tested in the field before finalization. The pre-testing exercise served the

following three purposes:

Finalization of the areas of inquiry: Pre-testing in similar field situations enabled

the team to touch base with all the areas of inquiry and also give the communities an

opportunity to add on new areas of inquiry to the study if required. It gave the

interviewers an opportunity to develop the skill of asking relevant questions and

make corrections in the questionnaire if needed

Finalization of activity schedule: The pre-testing exercise helped in getting the

time plan right for the entire survey including both quantitative and qualitative. This

exercise helped in identifying many tools, which are to be applied during the course

of fieldwork in a village. Hence pre-testing enable scheduling of the activities at the

village level.

Finalization of Analysis format: As the pre-testing exercise was a prototype of the

actual fieldwork, the information generated has been transcribed and then analyzed

in the most appropriate format. This process helped to have the final analysis format

best-fit to the research objectives.

The pre-test findings led to finalization of the study instruments. The core study team of

InsPIRE was involved in pre-testing, along with the field team members.

Once the training was completed, interviewers, supervisors and data entry operators were

evaluated based on their understanding of the questionnaire and their ability to correctly

record data using the same test scenarios as used in the classroom practice.

22 22

3.3 Data Entry Protocols

After completion of the field survey, data entry of all the data collected from the field

using various study instruments was undertaken. For ease of analysis, a separate data

entry programme for each survey instrument was developed, taking into consideration

the depth of analysis required to be taken up. The interactive data entry programme was

developed using MS Excel.

Figure 3.1: Snapshot of the Data Entry programme developed for entry of data collected as

part of Process Monitoring of MPSRLM in Quarter 3

23 23

CHAPTER 4:

Profile of the Study Area

This chapter presents a profile of the study area for the Process Monitoring of MPSRLM,

along with a brief of the project area in which the project was implemented.

4.1 Profile of Madhya Pradesh – the state

Madhya Pradesh (MP) is a state in central India, with its capital at Bhopal. Nicknamed

the "heart of India" due to its geographical location in India, Madhya Pradesh is the

second largest state in the country by area. With over 75 million inhabitants, it is the

sixth largest state in India by population. It borders the states of Uttar Pradesh to the

north-east, Chhattisgarh to the south-east, Maharashtra to the south, Gujarat to the west,

and Rajasthan to the northwest.

Literally meaning the "Central Province", Madhya Pradesh is located in the geographic

heart of India, between latitude 21.2°N-26.87°N and longitude 74°02'-82°49' E. The

state straddles the Narmada river, which runs east and west between the Vindhya and

Satpura ranges. These ranges and the Narmada are the traditional boundary between

the north and south of India.

4.1.1 Demographic Profile of Madhya Pradesh

The population of Madhya Pradesh consists of a number of ethnic groups and tribes,

castes and communities, including the indigenous tribals and relatively more recent

migrants from other states. The scheduled castes and the scheduled tribes constitute a

significant portion of the population of the State. The main tribal groups in Madhya

Pradesh are Gond, Bhil, Baiga, Korku, Bhadia (or Bhariya), Halba, Kaul, Mariya, Malto and

Sahariya. Dhar, Jhabua and Mandla districts have more than 50 percent tribal

population.

In Khargone, Chhindwara, Seoni, Sidhi and Shahdol districts 30–50 percent population is

of tribes. According to the 2001 census, the population of the tribals in Madhya Pradesh

was 12,233,000, constituting 20.27% of the total population. There were 46 recognised

Scheduled Tribes and three of them have been identified as ‘Special Primitive Tribal

Groups’ in the State.

4.2 Profile of Project Area of MPSRLM

National Rural Livelihoods Mission (NRLM) became effective in Madhya Pradesh from

July 2012. The state is implementing the Mission with intensive approach in about

10,500 villages of 99 blocks (46 NRLP and 53 DPIP) in 25 districts. In the remaining

area, the Mission is being implemented with non-intensive Approach. There are 313

blocks in 51 districts in the state.

24 24

The NRLM in Madhya Pradesh has a four-tier structure with a State Mission

Management Unit (SMMU) from first year itself. There shall be 51 District Management

Mission Units (DMMU), 313 Block Mission Management Units (BMMU) and 378 Project

facilitation Teams (PFT). It may be noted that the offices shall be established in phased

manner. The PFTs will be the moving offices once the area is saturated they will be

shifted to other areas as per the phasing strategy. This will help to utilise the services of

the well-trained staff in optimum and cost efficient manner.

In order to have an optimum utilization of resources in time bound manner the

following phasing strategy will be adopted:

Table 4.1: Area of implementation of NRLP and NRLM in Madhya Pradesh

SN Level Unit

2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 Grand

Total

NR

LP

NR

LM

NR

LP

NR

LM

NR

LP

NR

LM

NR

LP

NR

LM

NR

LP

NR

LM

NR

LP

NR

LM

NR

LP

NR

LM

NR

LP

1 State No. 1 1 1 1 1 1 1 1

2 District No. 25 0 0 25 25 25 25 25 25 25 25 25 25 50

3 Block No. 99 0 99 0 99 30 99 30 99 154 99 154 99 154 313

4 PFTs No. 324 54 324 54 324 54 324 54 0 0 0 0 0 0 378

5 Villages No. 11095 1799 0 0 0 6000 0 6000 0 27223 0 0 0 0 52117

Source: MPSRLM SPIP

Up to July 2013, the Mission had mobilized 1,43,075 households into 7,140 new SHGs,

besides reviving and strengthening 5,742 pre-existing SHGs scattered over 46 blocks of

10 NRLP districts. Eventually, the Mission will be implemented in 52,117 villages,

23,010 of Gram Panchayats, scattered over 313 blocks of 51 districts in the state.

Table 4.2: List of Districts and Blocks of NRLP-Intensive (including resource blocks) in

Madhya Pradesh

SN Districts No. of Blocks No. of Clusters No. of Villages

1 Mandla 5 22 759

2 Shahdol 5 25 815

3 Sheopur 3 14 535

4 Dhar 5 19 664

5 Jhabua 6 21 778

6 Alirajpur 6 13 544

7 Anuppur 4 14 580

8 Barwani 5 14 513

9 Dindori 5 17 603

10 Balaghat 2 5 184

Total 46 164 5975

Source: MPSRLM SMMU

25 25

The map below highlights the area under implementation of the project.

Figure 4.1: Map of study area showing districts of MPSRLM

The following 10 blocks in 10 districts were selected to be developed as resource blocks:

Table 4.3: List of Districts and Blocks under Resource Block strategy in MPSRLM

SN Districts Blocks No. of Clusters No. of Villages

1 Mandla Niwas 3 96

2 Shahdol Jaisinghnagar 6 204

3 Sheopur Sheopur 5 232

4 Dhar Manawar 3 94

5 Jhabua Petlawad 8 210

6 Alirajpur Sondwa 3 134

7 Anuppur Pushparajgarh 7 271

8 Rewa Sirmaur 7 264

9 Narsimhpur Narsimhpur 7 203

10 Rajgarh Biaora 7 198

Total 10 56 1906

Source: MPSRLM SMMU

26 26

CHAPTER 5:

Sample Profile

This chapter presents the sample profile and profile of the respondents covered during

the survey of the Process Monitoring of MPSRLM in district Shahdol. The sample profile

covers all categories of respondents of the survey conducted at various levels, i.e. at the

district, PFT, village, VO and SHG level.

5.1 Sample Profile

The table 5.1 below summarizes the details of the study area, consisting of two blocks;

i.e. Sohagpur (intensive block) and Jaisinghnagar (resource block) in Shahdol district.

Five PFTs each were selected as sample area for Sohagpur and Jaisinghnagar blocks.

The theme of process monitoring for quarter 3 in Shahdol district viz. ‘VO Formation and

Strengthening’ was monitored at the village level, in addition to the themes of quarter 1.

A total of 55 Gram Panchayats and 77 villages were surveyed in Sohagpur block, while

the corresponding figures for Jaisinghnagar block are 48 and 60.

Of the sample VOs surveyed for process monitoring, 57 VOs in Sohagpur block and 40

VOs in Jaisinghnagar block were functional, while the remaining were loose VOs.

Table 5.1: Sample Profile for Process Monitoring in Shahdol district

SN District Block PFT No. of

villages

No. of sample

villages

No. of sample VOs

VOs Loose VOs*

3 Shahdol

Sohagpur

(Intensive)

Chhatwai 33 16 12 4

Hardi No. 32 31 14 6 8

Karkati 33 15 15 0

Lalpur 32 15 11 4

Pachgaon 34 17 13 4

TOTAL 163 77 57 20

Jaisinghnagar

(Resource)

Aamdih 30 10 7 3

Amjhor 34 13 10 3

Gopalpur 35 11 9 2

Kanadikhurd 31 11 5 6

Sidhi 33 15 9 6

TOTAL 163 60 40 20

326 137 87 40

* Loose VOs: The VOs where SHGs have been federeated to form the VO recently, but the VO is not yet active

and operational. The bank account may or may not have been opened yet.

The process monitoring of the themes of quarter 1 was conducted at the village level (i.e.

with the community in general), as well as at the SHG level. A total of 69 sample SHGs

were surveyed, including 38 from the intensive block and 31 from the resource block.

27 27

Table 5.2: Sample Profile for Process Monitoring of SHGs in Shahdol district

SN District Block PFT No. of

villages

No. of sample

villages

No. of sample SHGs

New SHGs Old SHGs

3 Shahdol

Sohagpur

(Intensive)

Chhatwai 33 16 8 0

Hardi No. 32 31 14 6 0

Karkati 33 15 7 0

Lalpur 32 15 3 0

Pachgaon 34 17 7 0

TOTAL 163 77 31 0

Jaisinghnagar

(Resource)

Aamdih 30 11 8 0

Amjhor 34 13 7 0

Gopalpur 35 11 7 1

Kanadikhurd 31 11 7 0

Sidhi 33 15 7 1

TOTAL 163 60 36 2

326 137 67 2

Meanwhile, the themes for quarter 2 were monitored at the district and PFT levels. At

the district level, seven team members were interviewed. In the two sample blocks, all

the PFTs were interviewed as part of the process monitoring, whereby a total of 22 team

members from five PFTs were interviewed in Sohagpur block, and 20 team members

were interviewed from five PFTs in Jaisinghnagar block.

Table 5.3: Sample Profile of respondents at district and PFT level, for Process Monitoring in

Shahdol district

SN Block PFT No. of respondents

1

Sohagpur

Chhatwai 5

2 Hardi No. 32 3

3 Karkati 5

4 Lalpur 5

5 Pachgaon 4

Sub-total 22

1

Jaisinghnagar

Aamdih 2

2 Amjhor 4

3 Gopalpur 3

4 Kanadikhurd 6

5 Sidhi 5

Sub-total 20

TOTAL 42

The profile of the respondents for the FGDs conducted for the different themes of

process monitoring, is presented in the following sections.

28 28

5.1.1 VO Formation and Strengthening

► Membership Profile of the Sample VOs

The table below presents a profile of the members of sample VOs in Shahdol district that

were surveyed for the Process Monitoring study in this quarter.

Table 5.4: Membership profile of sample VOs

SN Block PFT No. of

sample VOs

No. of member

SHGs

Distribution of member

SHGs across categories

A B C D

1

Sohagpur

(Intensive)

Chhatwai 10 74 64 10 0 0

2 Hardi No. 32 13 133 118 15 0 0

3 Karkati 11 87 80 7 0 0

4 Lalpur 11 86 85 1 0 0

5 Pachgaon 15 133 124 9 0 0

Sub-total 60 513 471 42 0 0

1

Jaisinghnagar

(Resource)

Aamdih 16 116 99 12 5 0

2 Amjhor 14 115 46 33 32 4

3 Gopalpur 15 104 68 36 0 0

4 Kanadikhurd 15 131 83 18 25 5

5 Sidhi 17 115 70 45 0 0

Sub-total 77 581 366 144 62 9

TOTAL 137 1094 837 186 62 9

► Age Profile of the Respondents

Out of the total respondents of 2925, close to 85 percent are in the age group 18-45

years, which constitutes largely the working population. Around 15 percent of the

respondents fall under the age group of 45-60 years and less than a percent are senior

citizens.

84.75%

15.18%

0.07%

18-45 yrs.

45-60 yrs.

> 60 yrs.

N = 2925

Figure 5.1: Age Profile of the Respondents

► Distribution of the Respondents across Social Groups

63 percent of the sample respondents of 2925 belong to the category of scheduled

Tribes (ST), followed by 26 percent respondents belonging to Other Backward Classes

(OBC). Another nine percent of the respondents belong to Schedules Castes (SC). Slightly

less than three percent belong to the General category.

29 29

9.07%

63.00%

25.47%

2.47%

SC

ST

OBC

General

N = 2925

Figure 5.2: Social Group-wise Distribution of the Respondents

► Gender Profile of the Respondents

All 2925 of the respondents for the survey on the theme of VO formation and

strengthening were females, which are the target audience of the project.

► Education Profile of the Respondents

Referring to the figure 5.3, almost 11 percent of the sample respondents were illiterate,

while almost 42 percent can read and write though without any formal schooling.

Almost 15 percent of the respondents have had primary schooling and alsmot 18

percent have had schooling till middle school. Another 10 percent of the respondents

have had schooling till secondary school.

10.70%

41.61%

14.87%

17.98%

10.02%

3.97% 0.79% 0.07%

Illiterate

Knows how to read and write

Primary School

Middle School

High School

Higher Secondary

Graduate

Post Graduate

N = 2925

Figure 5.3: Education Profile of the Respondents

► Livelihood Profile of the Respondents

Referring to the figure 5.4 below, almost 53 percent of the respondents are involved in

agriculture, while another 27 percent are involved in local labour. The distribution of

respondents across other types of livelihood activities is presented in the figure below.

30 30

9.44%

52.85%

0.27%

26.80%

0.07%

1.03%1.06%

0.44%

0.27%

5.57%

0.31%1.37% 0.17%

0.34% No economic activity

Agriculture / Horticulture / Floriculture

Other land based activities

Local labour

Migrant labour

Traditional work / artisans

Livestock rearing / Dairy

Government service

Private service

Pensioner

Small business / Petty shop

Microenterprise

Skilled wage labour

Forest produce (NTFP/MAP)

Others

N = 2925

Figure 5.4: Livelihood Profile of the Respondents

5.1.2 Community Mobilization and Identification of Social Capital

► Age Profile of the Respondents

Figure 5.5 below presents the age wise distribution of the respondents for the survey on

the themes of community mobilisation and identification of social capital. It was

observed that around 79 percent of the respondents belong to the relatively young and

working age group of 18-45 years, followed by 17 percent in the mid age group of 45-60

years. Almost four percent of the respondents consisted of senior citizens over 60 years

old.

78.85%

16.82%

4.33%

18-45 yrs.

45-60 yrs.

> 60 yrs.

N = 785

Figure 5.5: Age Profile of the Respondents

► Gender Profile of the Respondents

Figure 5.6 below presents the gender profile of the respondents. Out of the total

respondents of 785, almost all consisted of females, which are also the target audience

of the project.

31 31

0.25%

99.75%

Male

Female

N = 785

Figure 5.6: Gender Profile of the Respondents

► Distribution of Respondents across Social Groups

Out of the total respondents of 785, around 69 percent belong to Scheduled Tribes (ST),

followed by 19 percent from the Other Backward Classes (OBC) and nine percent from

the Scheduled Castes (SC). Less than five percent consisted of General category.

8.15%

68.66%

18.60%

4.59%

SC

ST

OBC

General

N = 785

Figure 5.7: Social Group-wise Distribution of the Respondents

► Education Profile of the Respondents

Referring to the figure 5.8 below, almost 18 percent of the total 785 respondents are

illiterate, while almost 46 percent can read or write but do not have a formal education.

Only 10 percent of the respondents have attended primary schooling, while almost 17

percent have had schooling till middle level. Around seven percent are educated till high

school and almost three percent till higher secondary.

17.07%

45.35%

10.70%

16.69%

7.13%

2.68% 0.13%0.25%

Illiterate

Knows how to read and write

Primary School

Middle School

High School

Higher Secondary

Graduate

Post Graduate

N = 785

Figure 5.8: Education Profile of the Respondents

32 32

5.1.3 SHG Formation and Strengthening

► Membership Profile of the Sample SHGs

The table below presents a profile of the members of sample SHGs in Shahdol district

that were surveyed for the Process Monitoring study.

Table 5.5: Membership profile of sample SHGs

SN Block PFT

No. of

sample

villages

No. of

sample

SHGs

No. of

members in

sample SHGs

Distribution of members

in sample SHGs

SC ST OBC GEN

1

Sohagpur

(Intensive)

Chhatwai 8 8 87 4 51 23 9

2 Hardi No. 32 6 6 70 0 49 19 2

3 Karkati 7 7 74 13 35 15 11

4 Lalpur 3 3 34 0 31 3 0

5 Pachgaon 7 7 110 31 60 13 6

Sub-total 31 31 375 48 226 73 28

1

Jaisinghnagar

(Resource)

Aamdih 8 8 91 6 63 22 0

2 Amjhor 7 7 85 0 47 25 13

3 Gopalpur 8 8 95 0 47 42 6

4 Kanadikhurd 7 7 77 0 34 41 2

5 Sidhi 8 8 85 5 73 7 0

Sub-total 38 36 433 11 264 137 21

TOTAL 69 67 808 59 490 210 49

► Age Profile of the Respondents

Out of the total respondents of 573, close to 85 percent are in the age group 18-45 years,

which constitutes largely the working population. Around 15 percent of the respondents

fall under the age group of 45-60 years and less than a percent are senior citizens.

84.64%

15.01%

0.35%

18-45 yrs.

45-60 yrs.

> 60 yrs.

N = 573

Figure 5.9: Age Profile of the Respondents

► Distribution of the Respondents across Social Groups

Around 60 percent of the sample respondents of 573 belong to the category of

scheduled Tribes (ST), followed by 28 percent respondents belonging to Other

Backward Classes (OBC). Another six percent of the respondents belong to Scheduled

Castes (SC). Slightly over six percent belong to the General category.

33 33

5.24%

60.21%

28.10%

6.46%

SC

ST

OBC

General

N = 573

Figure 5.10: Social Group-wise Distribution of the Respondents

► Gender Profile of the Respondents

All 573 of the respondents for the survey on the theme of SHG formation and

strengthening were females, which are the target audience of the project.

► Education Profile of the Respondents

Referring to the figure 5.11, 14 percent of the sample respondents were illiterate, while

almost 50 percent can read and write though without any formal schooling. Almost 12

percent have had primary schooling and 10 percent have had schooling till middle

school.

15.53%

49.21%

12.91%

10.82%

6.63%3.84% 1.05%

Illiterate

Knows how to read and write

Primary School

Middle School

High School

Higher Secondary

Graduate

Post Graduate

N = 573

Figure 5.11: Education Profile of the Respondents

► Livelihood Profile of the Respondents

Referring to the figure 5.12 below, almost 57 percent of the respondents are involved in

agriculture, while another 30 percent are involved in local labour. The distribution of

respondents across other types of livelihood activities is presented in the figure below.

34 34

7.85%

56.72%

0.70%

29.67%

0.00%

0.52%

0.35%

2.62%

0.70%3.14%

No economic activity

Agriculture / Horticulture / Floriculture

Other land based activities

Local labour

Migrant labour

Traditional work / artisans

Livestock rearing / Dairy

Government service

Private service

Pensioner

Small business / Petty shop

Microenterprise

Skilled wage labour

Forest produce (NTFP/MAP)

Others

N = 573

Figure 5.12: Livelihood Profile of the Respondents

35 35

CHAPTER 6:

Key Findings, Lessons Learned, Constraints & Challenges, and The Way forward

This chapter presents the key findings of the Process Monitoring of MPSRLM in Shahdol.

Structuring theme-wise, the key findings emanating from the study are discussed in

detail, followed up with a discussion on the major constraints and challenges faced, as

well as the lessons learned with regard to the various processes, in the resource and

intensive blocks during the course of the project implementation. Deriving from the

findings, the lessons learned, and the constraints & challenges, the way forward for the

Mission is suggested.

6.1 VO Formation and Strengthening

The findings pertaining to the processes related to concept seeding of VO, formation of

VOs and their strengthening are discussed in the ensuing sections.

6.1.1 VO Concept Seeding

In almost all sampled villages of the felt need of VO formation among SHGs were made

by the efforts of MPSRLM mission team. In the sampled areas, three methods viz. (i)

discussion in SHGs, (ii) orientation / consultation workshops, and (iii) training

programmes were used for concept seeding of VO formation.

Figure 6.1: Exposure visits

In both the sampled Blocks, the team used mostly orientation / consultation workshops

(in almost 97-98% sampled villages) followed by discussion in SHGs (in 30-47%

sampled villages) and training programmes (in 16-30% sampled villages) for the same.

0%

67%

33%

67%

50% 50%

0% 0% 0%

20%

40%

60%

80%

100%

Within the samedistrict

Outside the district Outside the State Others

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 3, N(Sohagpur) = 2

36 36

Figure 6.2: Purpose of VO formation

The purpose of VO formation was spelt as:

To increase the scope of learning and sphere of influence

To increase the bargaining power

To increase the pool of human resources and capacities

To make viable to hire services or leverage

To intensify the mutuality and peer pressure

To create a platform to access the rights-based entitlements

Lessons learned, Constraints & Challenges and the Way Forward

During concept seeding of VOs, the Mission team used mostly orientation /

consultation workshops. It was reported that the clarity on purpose of VO formation

was lacking among the members in the sampled area. The exposure visits to nearby

successful VOs and repeated discussion in SHGs’ meetings about the concept and

importance of VOs would be given equal importance during the process of concept

seeding. This will help the members for vision development of their respective VOs.

6.1.2 Formation of VOs

In both the sampled blocks, almost each village has one VO. However, in Lapur PFT one

village has more than one VO.

Table 6.1: Number of VOs in the village

SN Block PFT One More than one TOTAL

1

Jaisinghnagar

Aamdih 10 0 10

2 Amjhor 13 0 13

3 Gopalpur 11 0 11

4 Kanadikhurd 11 0 11

5 Sidhi 15 0 15

Sub-total 60 0 60

1

Sohagpur

Chhatwai 16 0 16

2 Hardi No. 32 14 0 14

3 Karkati 15 0 15

4 Lalpur 14 1 15

52%

23%

35%

18% 27%

12%

63% 61%

14%

27% 25% 29% 13%

84%

0%

20%

40%

60%

80%

100%

To in

crea

seth

e sc

op

e o

fle

arn

ing

and

spe

her

e o

f…

To in

crea

seth

eb

arga

inin

gp

ow

er

To in

crea

seth

e p

oo

l of

hu

man

reso

urc

es…

To m

ake

viab

le t

oh

ire

serv

ice

so

r le

vera

ge

To in

ten

sify

the

mu

tual

ity

and

pe

er…

To c

reat

e a

pla

tfo

rm t

oac

cess

th

eri

ghts

-…

Oth

ers

% o

f sa

mp

le V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 60, N(Sohagpur) = 77

37 37

SN Block PFT One More than one TOTAL

5 Pachgaon 17 0 17

Sub-total 76 1 77

Grand Total 136 1 137

About 97-98 percent sampled villages VO of their village belonged to same village.

Figure 6.3: Criteria followed for formation of VO

In both the sampled blocks, the Mission team provided trainings to SHGs for VO

formation. In the Intensive Block, 4 to 6 months’ old SHGs have been included into the

VO (as per the COM). However, in the Resource Block, a minimum of 6 months old SHGs

were included into the VO. In the Intensive Block, about 29 percent SHGs have age of

less than 6 months, which are included in VOs. However, in the Resource Block, almost

all SHGs have age of more than 6 months, which are included in VOs.

Figure 6.4: Age of member SHGs

15% 18%

62%

97%

33%

62% 58%

29% 22%

42%

92%

49%

70%

6%

0%

20%

40%

60%

80%

100%

At least 3SHGs in a

village

At least 4SHGs in a

village

At least 5SHGs in a

village

SHGsfollowing

Panchasutra

SHGs with aminimum ageof 3-4 months

All SHGmembers are

willing to formthe VO

Others

% o

f sa

mp

le V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 60, N(Sohagpur) = 77

1% 0% 7%

18%

74%

4%

25% 26%

16%

29%

0%

20%

40%

60%

80%

100%

Less than 3months

Between 3 to 6months

Between 6 to 9months

Between 9 to 12months

More than 12months

% o

f m

em

be

r SH

Gs

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 513, N(Sohagpur) = 581

38 38

Almost all members have the awareness about the name of their respective VOs. All

members of the member SHGs are the GB member of their respective VOs. The role and

responsibilities of the GB are:

Selection / Election of Executive Committee Members,

Approval of Annual Action Plan / Budget prepared by the Executive Committee

Approval and amendments of Byelaws and norms of VO

Approval of Vision Document and Strategic Plan of VO

Discussion and approval of selection of empanelled auditor and audited statements

of the VO, and

Review of annual expenditure and approval

Figure 6.5: Membership of SHGs inVOs

Some of the reasons why all members of all SHGs are not the GB members in their

respective villages are presented in figure 6.6. Here, the option “Some SHGs are member

of other VO in the village” implies that in bigger villages where the number of SHGs are

higher in number, more than one VO may exist. Further, the other option “Some SHGs

are member of other VO in other village” implies that in small villages or where there

are less than 3 SHGs, they are included into the VOs of nearby villages.

20%

80%

0%

47% 51%

3%

0%

20%

40%

60%

80%

100%

All members of all SHGsin the village

All members of a fewSHGs in the village

Others

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

39 39

Figure 6.6: Some of the reasons why all members of all SHGs are not GB members

The status of awareness level among GB members about their role and responsibilities

is given in the Figure 6.7.

The awareness level of GB members was assessed based on the knowledge and

understanding of their roles and responsibilities, as given below:

(i) Selection / Election of Executive Committee Members, (ii) Approval of Annual Action

Plan / Budget prepared by the Executive Committee (iii) Approval and amendments of

Byelaws and norms of VO (iv) Approval of Vision Document and Strategic Plan of VO (v)

Discussion and approval of selection of empanelled auditor and audited statements of

the VO (vi) Review of annual expenditure and approval.

The assessment of level of awareness was assessed based on the number of roles and

responsibilities that the GB members were aware of, as per the code pre-defined. [Code:

Awareness of more than 5 roles & responsibilities=1 (i.e. very good); Between 4-5

roles & responsibilities=2 (i.e. good); Between 3-4 roles & responsibilities=3 (i.e.

average); Between 2-3 roles & responsibilities=4 (i.e. poor); less than 2 roles &

responsibilities=5 (i.e. very poor)]

98%

2% 0% 0%

97%

3% 0% 0% 0%

20%

40%

60%

80%

100%

Only few SHGs aremember of VO in the

village

Some SHGs aremember of other VO

in the village

Some SHGs aremember of other VO

in other village

Others

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 48, N(Sohagpur) = 39

40 40

Figure 6.7: Awareness on role and responsibilities of General Body of VO

Most of the cases (about 78-88%) the frequency of GB meeting was on a quarterly basis.

Figure 6.8: Frequency of GB meeting

The status of GB meeting held since inception of the VO is given in figure 6.9 In Intensive

Block about 51 percent cases it was conducted more than 2 times, however in Resource

Block about 79 percent cases it was conducted only once since inception of the VOs.

0% 3% 3%

12%

82%

0% 3%

14% 17%

66%

0%

20%

40%

60%

80%

100%

Very Good Good Average Poor Very Poor

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

2% 0%

78%

5% 3% 12%

6% 1%

88%

0% 0% 4%

0%

20%

40%

60%

80%

100%

None Monthly Quarterly Half yearly Yearly Others

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

41 41

Figure 6.9: Number of times GB meeting held since inception of the VO

In most cases, Office Bearers called the GB meetings; however some cases Mission team

facilitated the VOs for organizing the EC meetings. It was also reported that about 64.50

percent (58% in Intensive Block & 71% in Resource Block) cases, Mission team assisted

the VOs in preparing and deciding the GB meeting agenda. The survey revealed that 90

percent (86% in Intensive Block and 94% in Resource Block) cases recent GB meetings

were held as per the agenda.

Figure 6.10: Attendance status of GB meeting held in the last 12 months

In most of the cases, the venues of the GB meeting were selected either at community

halls / buildings (e.g. schools, anganwadis, health centres, panchayat Bhawans, etc.) or

in one of the houses of Office Bearers.

A minimum of 10 EC members will be selected from the member SHGs. All member

SHGs presidents and secretaries shall be the EC members of their respective VOs. The

role and responsibilities of EC will be:

79%

5% 5% 10%

28%

8%

51%

13%

0%

20%

40%

60%

80%

100%

Once Twice More than 2 times Others

% o

f sa

mp

le V

Os

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 58,

N(Sohagpur) = 76

4%

75%

17%

4% 0%

11%

59%

20%

9% 2%

0%

20%

40%

60%

80%

100%

100% Between 80%to 100%

Between 60%to 80%

Between 40%to 60%

Less than 40%

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 52, N(Sohagpur) = 66

42 42

To enroll new member(s) and /or terminate the membership of SHG members,

To define objectives of VO and setting up strategic plan to achieve it,

Grading of SHGs on half yearly and/or yearly basis and promote self-grading in

SHGs,

To review and evaluate the financial transactions, budget and programs of VO on a

regular basis and performance of office bearers,

To run VO as per administrative rules and ethical norms,

To undertake fund mobilization & management,

To decide membership fees/donation/contribution to be given by SHGs,

To form and reorganize the sub-committees as per requirement and dissolution of

the sub-committees or removal or any member,

To authorize office bearers for signing in legal documents and account related

matters,

To nominate representatives as per the requirement

To prepare Annual Action Plan and recommend to GB for approval, and

Annual Audit of VO by empanelled CA and get approval by GB.

Figure 6.11: Executive Committee members of VO

Most of the cases, the EC members’ selection have been done only once after formation

of VOs (refer the status presented in the table 6.2).

Table 6.2: Number of times EC members have been selected / elected after formation of VO

SN Block PFT Once Twice Thrice Four times More than four

times TOTAL

1

Jaisinghnagar

Aamdih 10 0 0 0 0 10

2 Amjhor 13 0 0 0 0 13

3 Gopalpur 11 0 0 0 0 11

4 Kanadikhurd 11 0 0 0 0 11

5 Sidhi 15 0 0 0 0 15

Sub-total 60 0 0 0 0 60

1 Sohagpur

Chhatwai 14 1 0 0 0 15

2 Hardi No. 32 13 0 0 0 0 13

98% 98%

0% 2%

86% 83%

9% 10%

0%

20%

40%

60%

80%

100%

Presidents of all SHGsin the village

Secretaries of all SHGsin the village

Any two nominatedrepresentatives fromall SHGs in the village

Others

% o

f sa

mp

le V

Os Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

43 43

SN Block PFT Once Twice Thrice Four times More than four

times TOTAL

3 Karkati 15 0 0 0 0 15

4 Lalpur 14 0 0 0 1 15

5 Pachgaon 15 1 0 0 0 16

Sub-total 71 2 0 0 1 74

Grand Total 131 2 0 0 1 134

In both the sampled blocks, the present status of awareness level on role and

responsibilities among EC members are very poor (refer figure 6.12).

The awareness level of EC members was assessed based on the knowledge and

understanding of their role and responsibilities as given below:

(i) To enrol new member(s) and /or terminate the membership of SHG members, (ii) To

define objectives of VO and setting up strategic plan to achieve it, (iii) Grading of SHGs

on half yearly and/or yearly basis and promote self-grading in SHGs, (iv) To review and

evaluate the financial transactions, budget and programs of VO on a regular basis and

performance of office bearers, (v) To run VO as per administrative rules and ethical

norms, (vi) To undertake fund mobilization & management, (vii) To decide membership

fees/donation/contribution to be given by SHGs, (viii) To form and reorganize the sub-

committees as per requirement and dissolution of the sub-committees or removal or

any member, (ix) To authorize office bearers for signing in legal documents and account

related matters, (x) To nominate representatives as per the requirement (xi) To prepare

Annual Action Plan and recommend to GB for approval, (xii) Annual Audit of VO by

empanelled CA and get approval by GB.

The assessment of level of awareness was assessed based on the number of roles and

responsibilities that the EC members were aware of, as per the code pre-defined. [Code:

Awareness of more than 10 roles & responsibilities=1 (i.e. very good); Between 7-

10 roles & responsibilities=2 (i.e. good); Between 5-7 roles & responsibilities=3

(i.e. average); Between 3-5 roles & responsibilities=4 I.e. poor); Less than 3 roles

& responsibilities=5 (i.e. very poor)]

44 44

Figure 6.12: Awareness on roles and responsibilities of Executive Committee of VO

In almost all cases, the frequency of EC meetings was fixed on fortnightly basis. In the

Intensive Block, in about 64 percent cases the EC meetings were held more than four

times in the last 12 months (refer figure 6.13).

Figure 6.13: Number of times EC meetings held in the last 12 months

In most of the cases, the venues of the EC meeting were either at community halls /

buildings (e.g. schools, anganwadis, health centres, panchayat Bhawans, etc.) or in one of

the houses of Office Bearers.

0% 0% 7%

22%

72%

0% 4%

16%

26%

54%

0%

20%

40%

60%

80%

100%

Very Good Good Average Poor Very Poor

% o

f sa

mp

le V

Os

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 60,

N(Sohagpur) = 76

33%

23% 18%

8% 10% 7%

12%

4% 8% 5%

64%

7%

0%

20%

40%

60%

80%

100%

Once Twice Thrice Four times More thanfour times

Others

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 76

45 45

Figure 6.14: Attendance in EC meetings held in last 12 months

In most cases, Office Bearers called the EC meetings. However, in some cases, the

Mission team facilitated the VOs for organizing the EC meetings. It was also reported

that in about 58-63 percent cases, Mission team assisted the VOs in preparing the EC

meeting agenda.

Table 6.3: Status of recent EC meeting conducted as per the agenda

SN Block PFT Yes No TOTAL

1

Jaisinghnagar

Aamdih 10 0 10

2 Amjhor 10 0 10

3 Gopalpur 9 1 10

4 Kanadikhurd 11 0 11

5 Sidhi 14 0 14

Sub-total 54 1 55

1

Sohagpur

Chhatwai 12 3 15

2 Hardi No. 32 13 0 13

3 Karkati 11 4 15

4 Lalpur 14 1 15

5 Pachgaon 11 4 15

Sub-total 61 12 73

Grand Total 115 13 128

The status of recent EC meeting agenda points minutised is presented in the table 6.4.

23%

73%

4% 0% 0%

17%

69%

13%

1% 0% 0%

20%

40%

60%

80%

100%

100% Between 80%to 100%

Between 60%to 80%

Between 40%to 60%

Less than 40%

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 56, N(Sohagpur) = 71

46 46

Table 6.4: Status of all agenda points minutised properly

SN Block PFT Yes No TOTAL

1

Jaisinghnagar

Aamdih 10 0 10

2 Amjhor 9 1 10

3 Gopalpur 9 1 10

4 Kanadikhurd 11 0 11

5 Sidhi 14 0 14

Sub-total 53 2 55

1

Sohagpur

Chhatwai 12 3 15

2 Hardi No. 32 12 1 13

3 Karkati 12 3 15

4 Lalpur 13 2 15

5 Pachgaon 9 6 15

Sub-total 58 15 73

Grand Total 111 17 128

The status of recent EC meeting tallying of cash book, ledger and pass book is presented

in the table 6.5.

Table 6.5: Status of tallying of cash book, ledger and bank pass (Savings and loan account)

during EC meeting

SN Block PFT Yes No TOTAL

1

Jaisinghnagar

Aamdih 9 1 10

2 Amjhor 9 1 10

3 Gopalpur 7 3 10

4 Kanadikhurd 10 1 11

5 Sidhi 10 4 14

Sub-total 45 10 55

1

Sohagpur

Chhatwai 10 5 15

2 Hardi No. 32 9 4 13

3 Karkati 13 2 15

4 Lalpur 13 2 15

5 Pachgaon 10 5 15

Sub-total 55 18 73

Grand Total 100 28 128

In almost 90-100 percent cases, the presidents, secretaries and treasures of the SHGs

are included as office bearers of the VOs. However, in very few cases (2% in Resource

Block and 32-36% in Intensive Block), vice-presidents and joint secretaries of SHGs are

also included as office bearers.

47 47

Figure 6.15: Office Bearers of VO

In both the sampled blocks, about 81-82 percent office bearers are selected by General

Bodies of the VOs. However, about 18-22 percent cases Office Bearers are selected by

the Executive Committees of the VOs. The satisfaction with the selection process of

Office Bearers is 84 percent (Intensive Block) and 100 percent (in Resource Block) in

the sampled blocks.

There are two VOs in sampled Intensive Block, where bye laws / rules / norms yet to be

formulated. However, in sampled Resource Block, 100 percent VOs have formulated the

bye laws / rules / norms for their respective VOs.

Figure 6.16: Type of Bye laws / norms / rules prepared by the VO

100%

2%

98%

2%

98% 99%

36%

99%

32%

90%

0%

20%

40%

60%

80%

100%

President Vice-President Secretary Joint Secretary Treasurer

% o

f sa

mp

el V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 60, N(Sohagpur) = 77

47%

87%

23%

78% 85%

27% 22%

55%

68%

25%

75%

86%

40%

23%

0%

20%

40%

60%

80%

100%

Form

atio

n /

Inco

rpo

rati

on

,fu

nct

ion

s, e

tc. o

fth

e V

O

Me

mb

ers

hip

det

ail,

elig

ibili

ty c

rite

ria,

fee,

etc

.

Stru

ctu

re o

f th

e V

O

Off

ice

Bea

rers

,te

nu

re, s

ele

ctio

n /

elec

tio

n p

roce

ss,

role

an

dre

spo

nsi

bili

ties

, etc

.

Me

etin

gs, r

eco

rdke

ep

ing

of

min

ute

so

f th

e m

eeti

ngs

,et

c.

Mai

nte

nan

ce o

fB

oo

ks o

f A

cco

un

tsan

d F

inan

cial

Man

age

me

nt

Syst

em

Oth

ers

% o

f sa

mp

le V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 60, N(Sohagpur) = 77

48 48

There are mainly five types of VO sub committees have been formed in the sampled

area:

SHG monitoring Sub Committee: The role and responsibilities of this sub-committee

is (i) To ensure that all our SHGs are following the Panchsutras and also monitor

their activities, (ii) To ensure that SHGs are utilizing the loan amount for the

activities mentioned in the MCP, (iii) Conduct training need assessment for the SHGs.

Bank Linkages & Repayment Sub Committee: The role and responsibilities of this sub-

committee is (i) To act as an interface between the SHGs and the banks, (ii) Resolves

issues related to bank linkages, account opening/management, bank loan and CIF

repayment.

Social Mobilization Sub Committee: The role and responsibilities of this sub-

committee is (i) To Identify and mobilize the left out poor families, (ii) progressing

towards saturation of the village and (iii) organizes necessary training programmes

for the members.

Social Action Sub Committee: The role and responsibilities of this sub-committee is

(i) To take initiatives to address social discrimination in villages, (ii) Diagnose social

problems and take suitable measures to resolve the issues, (iii) Assesses issues

related to women and publishes an annual Gender Status Report of village.

Employment Sub-Committee: The role and responsibilities of this sub-committee is

to looking at the employment opportunities in the area.

These sub-committee members are formed from the EC of VO.

The present status of formation of sub-committees in the sampled area is about 57.70

percent (sub-comittees formed in 65% VOs in Intensive Block and 50% in Resource

Block).

Figure 6.17: Process followed for formation of sub-committees of VO

In 72 percent cases (84% in Intensive Block and 60% in Resource Block), the sub-

committees were formed at the time of VO strengthening (refer figure 6.18.)

93% 97% 87%

53%

94% 96%

50%

36%

0%

20%

40%

60%

80%

100%

Discussion with VOregarding need

Selection of members ofsub-committees

Defining activities ofsub-committees

Defining reportingsystem of sub-

committees of VO

% o

f sa

mp

le V

Os

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 30,

N(Sohagpur) = 50

49 49

Figure 6.18: Stages of formation of sub-committees

In almost all cases the triggers for formation of sub-committees of VOs in the sampled

area were facilitated and professed by the Mission team.

Figure 6.19: Types of sub-committees of VO

Three types of sub-committees viz. SHG Monitoring sub-committee, Bank Linkages sub-

committee and Social Action sub-committee of VO have been formed in almost all

sampled VOs in the Intensive Block. It was reported that majority of the VOs in the

sampled area do not have Social Mobilization sub-committee and Employment sub-

committee.

40%

60%

16%

84%

0%

20%

40%

60%

80%

100%

At the time of VOformation

At the time of VOstrengthening

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 30, N(Sohagpur) = 50

100% 100%

0%

100% 100% 96% 100%

0%

98% 98%

0%

20%

40%

60%

80%

100%

SHG Monitoringsub-committee

Bank Linkages andRepayment sub-

committee

Social Mobilizationsub-committee

Social Action sub-committee

Employment sub-committee

% o

f sa

mp

le V

Os

wit

h s

ub

-co

mm

itte

es

Presence of types of sub-committees

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 30, N(Sohagpur) = 50

50 50

Figure 6.20: Training status of VO sub-committees

The training and capacity building activities of VO sub-committees have not been done

properly. In both the Blocks, about 29-40% sub-committees in the sampled areas have

been left out from formal training programmes.

Figure 6.21: Functional status of VO sub-committees

The role and responsibilities of SHG Monitoring Sub Committee are:

To ensure that all our SHGs are following the Panchsutras and also monitor their

activities.

To ensure that SHGs are utilizing the loan amount for the activities mentioned in the

MCP.

Conduct training need assessment for the SHGs.

Table 6.6(a): Tasks undertaken by the SHG Monitoring sub-committee

SN Block (i) only (ii) only (iii) only (i) & (ii) (ii) & (iii) (i) & (iii) All

1 Jaisinghnagar 5 0 0 7 1

2 Sohagpur 6 1 0 18 4

Grand Total 11 1 0 25 0 0 5

60% 60%

0%

63% 60% 71% 71%

0%

69% 67%

0%

20%

40%

60%

80%

100%

SHG Monitoringsub-committee

Bank Linkages andRepayment sub-

committee

Social Mobilizationsub-committee

Social Action sub-committee

Employment sub-committee

% o

f sa

mp

le V

Os

wit

h s

ub

-co

mm

itte

es

Training of sub-committees

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 30, N(Sohagpur) = 50

43% 40%

0%

50% 43%

60% 56%

0%

56% 58%

0%

20%

40%

60%

80%

100%

SHG Monitoringsub-committee

Bank Linkages andRepayment sub-

committee

Social Mobilizationsub-committee

Social Action sub-committee

Employment sub-committee

% o

f sa

mp

le V

Os

wit

h s

ub

-co

mm

itte

es

Functional status of sub-committees

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 30, N(Sohagpur) = 50

51 51

The role and responsibilities of Bank Linkages & Repayment Sub Committee are:

To act as an interface between the SHGs and the banks.

Resolves issues related to bank linkages, account opening/management, bank loan

and CIF repayment.

Table 6.6(b): Tasks undertaken by Bank Linkages and Repayment sub-committee

SN Block (i) only (ii) only (i) & (ii)

1 Jaisinghnagar 7 0 5

2 Sohagpur 4 1 22

Grand Total 11 1 27

The role and responsibilities of Social Mobilization Sub Committee are:

To Identify and mobilize the left out poor families.

Progressing towards saturation of the village.

Organizing necessary training programmes for the members.

The role and responsibilities of Social Action Sub Committee are:

To take initiatives to address social discrimination in villages.

Diagnose social problems and take suitable measures to resolve the issues.

Assesse issues related to women and publish an annual Gender Status Report of

village.

Table 6.6(c): Tasks undertaken by Social Action sub-committee

SN Block (i) only (ii) only (iii) only (i) & (ii) (ii) & (iii) (i) & (iii) All

1 Jaisinghnagar 8 3 0 4 0 0 0

2 Sohagpur 3 6 0 17 1 0 0

Grand Total 11 9 0 21 1 0 0

The Employment sub-committees have performed the following activities in the

sampled area:

Preparation of the list of unemployed youth.

Sending unemployed youth to Rozgar Mela.

The knowledge of bye laws / rules / norms of VOs by their respective members are

given in figure 6.22.

52 52

Figure 6.22: VO members have knowledge of bye laws / rules / norms of VO

In both the sampled blocks, 79-83 percent responded that bye laws / norms / rules of

the VOs were jointly formulated by the Mission team and VO members (including office

bearers), however in 12-13 percent cases it was formulated by the Mission team only.

Figure 6.23: Meeting Process of VO

Meeting process of VOs in terms of (i) Fixed type of sitting arrangement, (ii) Group

prayer, (iii) Introduction by each member, (iv) Attendance, (v) Review of previous

meeting, (vi) Confirmation of next meeting, and (vii) Closing of the meeting were better

in both the sampled blocks. However, there is requirement of improvement in:

6%

31%

100%

50%

3%

29%

100%

66%

0%

20%

40%

60%

80%

100%

None Only Office Bearers Only Office Bearers anda few members

All VO members (OfficeBearers and other

members)

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

0% 20% 40% 60% 80% 100%

Fixed type of siting arrangement

Group Prayer

Introduction by each member

Attendance

Review of previous meeting

Monthly savings by SHGs

CIF repayment

Review of SHG based on their monthly report

Review of SHG bank repayment

Review of work of BK

Review of sub-committee

Loan recommendation to SHGs based on MCP

Review of Income/Expenditure and Receipt/Payment

Discussion on other Social issues, govt. schemes, convergence

Convergence

Confirmation of next meeting date, venue and time

Closing of the meeting

Others

% of sample VOs

Sohagpur Jaisinghnagar

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

53 53

Monthly savings of SHGs

CIF repayment

Review of SHG based on their monthly reports

Review of SHG bank repayments

Review of work of book keeper

Review of sub-committees

Loan recommendation to SHGs based on MCP

Review of income / expenditure and receipt / payments

Discussion on other social issues, govt. schemes, convergence, etc.

Convergence

Figure 6.24: Main activities of VO

The main activities performed by VOs in both the sampled block are not satisfactory.

The status of main activities performed by VOs is presented in the figure 6.25.

68%

47%

17%

35%

20%

13%

38%

22%

10%

10%

56%

48%

14%

26%

42%

19%

29%

23%

10%

16%

0% 10% 20% 30% 40% 50% 60% 70% 80%

Formation of new SHGs and inclusion of left outpoor

Facilitate for SHG Bank linkages through liaisonand establishing coordination with bank…

To provide linkage with Social security, Foodsecurity, Health schemes, Livelihood to SHG…

Creating awareness of the SHG members onvarious social issues, their legal rights &…

To resolve the conflicts at SHGs and ensuresmooth functioning

To improve quality of SHGs, monitoring keyactivities (meeting, savings, book-keeping etc.),…

To increase participation of SHG members inGram Sabha and establish linkages with PRI

Identification and orientation to CommunityFacilitators and Book Keepers

To mentor and strengthen (through orientation,training, exposure, information dissemination,…

No activity

% of sample VOs

Sohagpur

Jaisinghnagar

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

54 54

Figure 6.25: Decision on membership fee for member SHGs

There were three major ways by which the decision on membership fee for member

SHGs decided:

By the consent of all VO members (including Office Bearers) As per the capacity of PoP SHG By the facilitation of MPSRLM team

Table 6.7: Monthly saving deposits per member SHG

SN Block PFT INR 10-25 INR 26 - 50 INR 51 - 100 More than

INR 100 TOTAL

1

Jaisinghnagar

Aamdih 0 0 0 0 0

2 Amjhor 0 0 0 0 0

3 Gopalpur 0 0 1 0 1

4 Kanadikhurd 0 0 0 0 0

5 Sidhi 0 0 0 0 0

Sub-total 0 0 1 0 1

1

Sohagpur

Chhatwai 0 1 0 0 1

2 Hardi No. 32 0 2 6 1 9

3 Karkati 0 0 2 0 2

4 Lalpur 1 2 1 1 5

5 Pachgaon 0 1 1 1 3

Sub-total 1 6 10 3 20

Grand Total 1 6 11 3 21

In both the sampled blocks, decision on monthly savings for member SHGs are decided

by (i) the consent of all VO members (including OBs), and (ii) as per the capacity of the

PoP SHG.

3%

60% 53%

37%

2%

12%

40% 44% 43%

10%

0%

10%

20%

30%

40%

50%

60%

70%

By VO OfficeBearers

By the consentof all VO

members (incl.Office Bearers)

As per thecapacity ofPOP SHG

By thefacilitation of

MPSRLM Team

Others

% o

f sa

mp

le V

Os

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 60, N(Sohagpur) = 77

55 55

Figure 6.26: Action taken against member absent in the meeting

The average of 82.5 percent (75% in Intensive Block and 90% in Resource Block) VOs

are in practice of no action / punishment, if prior information provided. However, 46.50

percent (35% in Intensive Block and 58% in Resource Block) charge fine from members

for being absent in the meeting. Three types of actions can be taken by VOs if repayment

is not done as per schedule:

Explanation sought from member SHG Warning but no action, and Fine from SHG

However, till date none of SHGs against which action has been taken for non-repayment

as per the schedule.

Table 6.8: Resources used for meeting the monthly operating cost of VO

SN Block PFT From the VO

resources Support from

MPSRLM TOTAL

1

Jaisinghnagar

Aamdih 9 0 9

2 Amjhor 5 0 5

3 Gopalpur 8 0 8

4 Kanadikhurd 8 0 8

5 Sidhi 5 0 5

Sub-total 35 0 35

1

Sohagpur

Chhatwai 7 0 7

2 Hardi No. 32 7 0 7

3 Karkati 11 0 11

4 Lalpur 10 0 10

5 Pachgaon 10 0 10

Sub-total 45 0 45

Grand Total 80 0 80

90%

30%

3% 10%

58%

23%

75%

9% 13% 14%

35%

14%

0%

20%

40%

60%

80%

100%

No action /punishment, if

priorinformation

Explanationsought frommember SHG

Warning butno action

Fine frommember SHG

Fine frommember

Others

% o

f sa

mp

le V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 60, N(Sohagpur) = 77

56 56

Almost all VOs in the sampled area using their own resources for meeting the monthly

operating cost of VOs by themselves.

Figure 6.27: VO Record / Book keeping done by

The status of VO record / book keeping done by is presented in figure 6.28. It is mostly

done by the females. Few cases males are involved, who belong to the family members

or relatives of VOs.

Figure 6.28: Literacy level of VO Book Keepers

In most of the cases, VO Book Keepers assisted the process of opening of VO bank

account. It was done in facilitation of the PFT level Mission team. About 81-83 percent

VOs responded that they have the knowledge of bank account opening, deposit and

withdrawal process.

The literacy level of VO Presidents in the sample area is presented in the figure 6.29.

38% 30%

7%

20%

3% 2% 3%

77%

6% 1% 4%

9%

0%

20%

40%

60%

80%

100%

VO BookKeeper

EC members Outsider(Non-VOmember)

CommunityActivist

Not identifiedyet

Others

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

0% 7%

47% 40%

5% 2% 1%

23%

37%

25%

14%

0% 0%

20%

40%

60%

80%

100%

Up to PrimarySchool

Up to MiddleSchool

Up toSecondary

School

Up to SeniorSecondary

School

Graduate Post Graduate

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 58, N(Sohagpur) = 73

57 57

Figure 6.29: Literacy level of VO Presidents

The literacy level of VO Secretaries in the sample area is presented in the figure 6.30.

Figure 6.30: Literacy level of VO Secretaries

The literacy level of VO Treasurers in the sample area is presented in the figure 6.31.

Figure 6.31: Literacy level of VO Treasurers

18%

52%

22%

5% 3% 0%

17%

26% 34%

11% 11%

1% 0%

20%

40%

60%

80%

100%

Illiterate Up to PrimarySchool

Up to MiddleSchool

Up toSecondary

School

Up to SeniorSecondary

School

Above SeniorSecondary

School

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 76

17%

37%

20% 18% 7%

0% 4% 14%

30% 28%

13% 11%

0%

20%

40%

60%

80%

100%

Illiterate Up to PrimarySchool

Up to MiddleSchool

Up toSecondary

School

Up to SeniorSecondary

School

Above SeniorSecondary

School

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 59, N(Sohagpur) = 76

5%

18%

43%

27%

7% 0%

5% 11%

30% 26%

16%

3%

0%

20%

40%

60%

80%

100%

Illiterate Up to PrimarySchool

Up to MiddleSchool

Up toSecondary

School

Up to SeniorSecondary

School

Above SeniorSecondary

School

% o

f sa

mp

le V

os

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 60,

N(Sohagpur) = 69

58 58

The status of conflict within VOs is presented in the table 6.9.

Table 6.9: Status of conflicts in VOs

SN Block PFT Yes No TOTAL

1

Jaisinghnagar

Aamdih 2 9 11

2 Amjhor 0 12 12

3 Gopalpur 0 11 11

4 Kanadikhurd 0 11 11

5 Sidhi 0 15 15

Sub-total 2 58 60

1

Sohagpur

Chhatwai 1 15 16

2 Hardi No. 32 0 14 14

3 Karkati 0 15 15

4 Lalpur 0 15 15

5 Pachgaon 2 15 17

Sub-total 3 74 77

Grand Total 5 132 137

The conflict resolution methods followed by the VOs are given in table 6.10.

Table 6.10: Conflict resolution methods in VOs

SN Block PFT By the GB members

themselves

By the EC members

themselves

By the Office

Bearers

1

Jaisinghnagar

Aamdih 1

2 Amjhor

3 Gopalpur

4 Kanadikhurd

5 Sidhi

Sub-total 1 0 0

1

Sohagpur

Chhatwai

2 Hardi No. 32

3 Karkati

4 Lalpur

1

5 Pachgaon 1 1 1

Sub-total 1 2 1

Grand Total 2 2 1

The social issues addressed by the VOs in the sampled area are presented in the figure

6.32.

59 59

Figure 6.32: Social issues addressed by the VOs

The review processes of VOs to their respective member SHGs are presented in the

figure 6.33.

Figure 6.33: Review processes of VOs to their respective member SHGs

Lessons learned, Constraints & Challenges and the Way Forward

In both the sampled blocks, the Mission team provided trainings to SHGs for VO

formation. It was reported that 22 percent cases (29% in Intensive Block & 15%

in Resource Block) VOs have been formed with less than 4 SHGs. In addition, 2.5

percent cases (4% in Intensive Block and 1% Resource Block) the age of member

SHGs are less than 3 months. These seem the immature stages to form VOs. It

should be ensured that the minimum criteria (as stated in the NRLM Guideline)

had been followed in formation of VOs.

It was reported that all members of the member SHGs are the GB members of

their respective VOs. However, it was also reported that all SHGs’ members are

not the members of VO of their respective villages. The process monitoring

survey results depicted the reasons as (i) Only few SHGs are member of VO in

the village (ii) Some SHGs are member of other VO in the village, and (iii) Some

SHGs are member of other VO in other village. Appropriate steps need to be

30% 25%

13%

3% 3% 8%

53%

21%

44%

17% 14% 6% 8%

45%

0%

20%

40%

60%

80%

100%

Health Water andSanitation

Education Alcoholism Dowry Superstition Others

% o

f sa

mp

le V

Os

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 60,

N(Sohagpur) = 77

89%

54%

25%

43% 32%

14% 25%

14% 7%

94%

55%

40% 32%

23% 23% 30%

36% 42%

0%

20%

40%

60%

80%

100%

FollowingPanchasutra

Use of loanas per

disbursementprocedure

Loanrepayment

rate

Prioritizationpreferencesfor POP, etc.

SHGaddressing

social issues

Followingdecisions

taken by SHG

Conflictresolution

Financialtransparencyand discipline

Transparencyin decision

makingprocess

% o

f sa

mp

le V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 28, N(Sohagpur) = 53

60 60

taken so that the members of eligible SHGs should become the GB members of

VOs.

The awareness on role and responsibilities of GBs of VOs are very poor. As per

VOs rules, the frequency of GB meetings should be on quarterly basis. However,

In Intensive Block 49 percent cases it was conducted less than or equal to 2

times, and about 79 percent cases in Resource Block it was conducted only once

since inception of the VOs.

It was also reported more than the half of the sampled VOs the Mission team

assisted the VOs in preparing and deciding the GB meeting agenda.

There are a minimum of 10 members in EC of each VO. Initially, EC members

were nominated by the SHGs, but now it has been made compulsory for

presidents and secretaries of SHGs to be the EC members of their respective VOs.

As per VO rules, EC members are selected/ elected for a period of 2 years,

however most of the cases, the EC members’ selection have been done only once

after formation of VOs.

In both the sampled blocks, the present status of awareness level on role and

responsibilities among EC members are very poor. It was also reported that in about

half of the sampled VOs, Mission team assisted the VOs in preparing the EC meeting

agenda.

PFT (in Intensive Block) and PRP (in Resource Block) facilitate the selection of

Office Bearers of VOs. In sampled Intensive Block, there are five OBs (i.e.

President, Vice-president, Secretary, Vice-secretary and Treasurer), whereas in

sampled Resource Block there are three OBs (i.e. President, Secretary and

Treasure). The positions of OBs are for two years on rotation basis. However, till

date selection of OBs is done only once / no reelection in the sampled area.

In both the sampled blocks, in a majority of the cases, Office Bearers are selected

by General Bodies of the VOs. However, in about 18-22 percent cases, Office

Bearers are selected by the Executive Committees of the VOs. There are two VOs

in sampled Intensive Block, where bye laws / rules / norms yet to be formulated.

There are mainly five types of VO sub committees have been formed in the

sampled area. Sub-committees are formed from the EC of VO. In each sub-

committee there are 2-3 members. It was reported that these sub-committees

are formed in half of the sampled VOs. It was also reported that majority of the

VOs in the sampled area do not have Social Mobilization sub-committees and

Employment sub-committees.

The training and capacity building activities of VO sub-committees have not been

done properly. In both the Blocks, about 50percent sub-committees in the

sampled areas have been left out from formal training programmes. These sub-

committees lack appropriate capacities to perform their roles and

responsibilities. They also lack work schedule and learning sharing platform.

61 61

6.1.3 Strengthening of VOs

The location of training provided to VO by the Mission team is presented in the table

6.11.

Table 6.11: Location of training to VOs by Mission team

SN Block PFT No training

provided Within the

same district Outside the

district Outside

the State

1

Jaisinghnagar

Aamdih 1 9

2 Amjhor

11 2

3 Gopalpur

11

4 Kanadikhurd 2 8 1

5 Sidhi

15

Sub-total 3 54 3 0

1

Sohagpur

Chhatwai 1 15

2 Hardi No. 32 2 12

3 Karkati

15

4 Lalpur 1 13 1

5 Pachgaon 3 13 1

Sub-total 7 68 2 0

Grand Total 10 122 5 0

In both the sampled blocks, the training on GB/EC meeting process and norms,

maintenance of books of accounts and MCP were provided by the Mission team. The

various types of training provided by the Mission team to VOs are presented in the

figure 6.34.

Figure 6.34: Types of trainings provided by the Mission team to VOs

82%

44% 47%

2% 0%

16%

2%

26% 28%

2% 4% 0% 4%

21%

83%

59% 60%

17%

3%

17%

0%

41% 34%

7% 14%

0%

17% 17%

0%

20%

40%

60%

80%

100%

% o

f sa

mp

le V

Os

that

hav

e r

ece

ive

d

trai

nin

g

Jaisinghnagar Sohagpur

N(Jaisinghnagar) = 57, N(Sohagpur) = 70

62 62

The record keeping status of VOs in the sampled area is presented in the figure 6.35.

Figure 6.35: Record keeping status of VOs

It was reported that mostly the frequency of updating of records / books of accounts by

Book Keepers are done on a monthly basis.

Figure 6.36: Types of assistance to member SHGs from VOs

0%

20%

40%

60%

80%

100%

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

Minutesbook

Cash book GeneralLedger

LoanLedger

MemberPass Book

Saving cumattendance

register

MonthlyReport

AnnualAction Planand Annual

Budget

MonthlyMIS andProgressReport

Staffingdetails with

Bio-data

% o

f sa

mp

le V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 60, N(Sohagpur) = 77

58%

19% 28%

14%

30% 35%

12%

69%

25% 24%

44%

27%

41%

15%

0%

20%

40%

60%

80%

100%

Facilitate for banklinkages through liaison

and establishingcoordination with bank

branches, and timelyrepayment

To provide linkage withSocial Security, FoodSecurity and Health

schemes, Livelihood toSHG members

Creating awareness ofSHG members on varioussocial issues, their legalrights and entitlements

Resolve conflicts of SHGsand ensure smooth

functioning

Improve quality of SHGs,monitoring key activities(meeting, savings, book-keeping, etc.), promotingself-grading and audit of

SHGs

Increase participation ofSHGs in Gram Sabha andestablish linkages with

PRI

Mentor and strengthen(through orientation,

training, exposure,information

dissemination, on-sitesupport, etc.) the

capacity in differentaspects (book-keeping,accounting, advocacy,

bank-linkage, accessinggovernment schemes,

etc.)

% o

f sa

mp

le V

Os

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 43, N(Sohagpur) = 59

63 63

The awareness level of VO members towards different types of funds is presented in the

figure 6.37.

Figure 6.37: Awareness of VO members towards various types of funds

The status of MCPs rejected / asked for revision by VOs is presented in the table 6.12.

Table 6.12: Number of MCPs rejected / asked for revision by VOs

SN Block PFT Number of MCPs

1

Jaisinghnagar

Aamdih 0

2 Amjhor 0

3 Gopalpur 0

4 Kanadikhurd 0

5 Sidhi 0

Sub-total 0

1

Sohagpur

Chhatwai 0

2 Hardi No. 32 0

3 Karkati 5

4 Lalpur 0

5 Pachgaon 1

Sub-total 6

Grand Total 6

100%

88% 82%

15%

57%

100%

84%

48%

12%

55%

0%

20%

40%

60%

80%

100%

Savings RF CIF VRF Bank Loan

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

64 64

The disbursement route of CIF to SHGs is presented in the figure 6.38.

Figure 6.38: Disbursement route of CIF to SHGs

The status of SHGs that have received CIF through rotation basis is presented in the

table 6.13.

Table 6.13: Status of SHGs received CIF on rotation

SN Block PFT Number of SHGs

1

Jaisinghnagar

Aamdih 0

2 Amjhor 0

3 Gopalpur 0

4 Kanadikhurd 0

5 Sidhi 0

Sub-total 0

1

Sohagpur

Chhatwai 3

2 Hardi No. 32 26

3 Karkati 22

4 Lalpur 43

5 Pachgaon 17

Sub-total 111

Grand Total 111

96%

4% 0%

24%

76%

0% 0%

20%

40%

60%

80%

100%

Direct to SHGs Through VO Through CLF

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 49, N(Sohagpur) = 50

65 65

Assessment procedure of SHGs for CIF disbursement is presented in the table 6.14.

Table 6.14: Assessment procedure of SHGs for CIF disbursement

SN Block PFT Following

Panchasutra Grading of SHGs

Prioritization of activities in MCP

NA TOTAL

1

Jaisinghnagar

Aamdih 0 0 0 6 0

2 Amjhor 0 0 0 6 0

3 Gopalpur 1 0 1 4 2

4 Kanadikhurd 0 1 0 6 1

5 Sidhi 0 0 0 7 0

Sub-total 1 1 1 29 3

1

Sohagpur

Chhatwai 0 1 3 5 4

2 Hardi No. 32 1 0 6 6 7

3 Karkati 1 3 5 5 9

4 Lalpur 1 0 8 5 9

5 Pachgaon 0 1 10 4 11

Sub-total 3 5 32 25 40

Grand Total 4 6 33 54 43

Assessment procedure of SHGs for VRF disbursement is presented in the table 6.15.

Table 6.15: Assessment procedure of SHGs for VRF disbursement

SN Block PFT Type of SHG

category (A/B/C/D)

Category of SHG members

(A/B/C/D)

Presence of vulnerable members (widow, disabled, etc.) in families of SHG

members

TOTAL

1

Jaisinghnagar

Aamdih 0 0 0 0

2 Amjhor 0 0 0 0

3 Gopalpur 0 0 0 0

4 Kanadikhurd 0 0 0 0

5 Sidhi 0 0 0 0

Sub-total 0 0 0 0

1

Sohagpur

Chhatwai 0 1 1 2

2 Hardi No. 32 1 0 3 4

3 Karkati 0 0 6 6

4 Lalpur 0 2 2 4

5 Pachgaon 1 0 1 2

Sub-total 2 3 13 18

Grand Total 2 3 13 18

66 66

The use pattern of fund among member SHGs is given is presented in the table 6.16.

Table 6.16: Use pattern of fund among member SHGs

SN Block PFT Used by all

member SHGs

Distributed as per the urgency and

prioritization of needs of the member SHGs

As per the MCP

Others TOTAL

1

Jaisinghnagar

Aamdih 0 0 0 0 0

2 Amjhor 0 0 0 0 0

3 Gopalpur 0 0 0 0 0

4 Kanadikhurd 0 0 0 0 0

5 Sidhi 0 0 0 0 0

Sub-total 0 0 0 0 0

1

Sohagpur

Chhatwai 1 0 0 1 2

2 Hardi No. 32 1 5 1 0 7

3 Karkati 0 2 4 0 6

4 Lalpur 0 5 4 0 9

5 Pachgaon 1 5 4 0 10

Sub-total 3 17 13 1 34

Grand Total 3 17 13 1 34

The principles of good governance of VOs are presented in the figure 6.39.

Figure 6.39: Principles of good governance followed by VOs

57% 53%

30%

43% 43%

20%

77%

61%

21%

51% 44%

12%

0%

20%

40%

60%

80%

100%

Participatorydecision-making

by all ECmembers

Participatorydecision-making

by all GBmembers

Functioning inaccordance with

principles,objectives and

values

Transparency infund

management

Responsiblefunctioning ofoffice bearers,

community cadre,community

professionals andmembers

Others

% o

f sa

mp

le V

Os

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 60, N(Sohagpur) = 77

67 67

Social Audit of VOs was not observed to have been undertaken in any of the sample VOs

monitored.

The convergence status of VOs activities in the sampled area is presented in the figure

6.40.

Figure 6.40: Convergence status of VOs activities

Lessons learned, Constraints & Challenges and the Way Forward

The Mission team has mainly provided three types of trainings to VOs viz. (i) VO

Concept and Management, (ii) MCP preparation and appraisal, and (iii) VO

Accounts and Book keeping. A formal training to VOs on following subjects needs

to be provided: (i) VO MIS, (ii) Gender and Social Inclusion, (iii) PIP, (iv)

Community Procurement, (v) Roles and Responsibilities of Sub-committees, (vi)

SHG Grading and Audit, (vii) Annual Planning and Budgeting, (viii) Governance

and Accountability, (ix) Objective setting of Exposure visits, and (x) Financial

Management.

In the sampled area, the Record and Book keeping status of VOs is very poor.

Most of them are not introduced yet. All types of Books and records need to be

introduced properly followed by organizing formal trainings.

Almost 96 percent cases the CIF distribution route in Resource Block is direct to

SHGs (in case of Intensive Block it is 24%). All VOs need to be capacitated and

strengthened to perform their role and responsibilities, and manage the

community funds efficiently.

In sampled area, about 65 percent VOs activities (58% in Intensive Block & 72%

in Resource Block) could not linked them with any of the government

programme or schemes. At the VO level, they lack the capacity of convergence

efforts to be made.

72%

0% 8%

3%

58%

6%

17% 18%

0%

20%

40%

60%

80%

100%

None Health sector Education sector Livelihood sector (e.g.Agriculture, Animal

Husbandry, etc.)

% o

f sa

mp

le V

Os

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 60, N(Sohagpur) = 77

68 68

6.2 Community Mobilization

As mentioned before, the findings pertaining to the various processes related to the

theme “Community Mobilization” were presented and discussed in detail in the first

quarter. However, key findings relating to some aspects of community mobilization, for

Shahdol district, are discussed in the ensuing paragraphs.

The community mobilization process was more or less similar to the Mandla and

Sheopur districts. Initial mobilization drives in the mission areas (i.e. the areas with high

poverty ratio with larger population of vulnerable communities) were conducted by the

Mission team (including external CRPs in the Resource block). Before conducting the

extensive Participatory Identification of the Poor (PIP) exercise, the Mission team

performed the environment building as well as awareness raising activities. The village

entry and environment building exercises were conducted by the Mission PFT teams,

including up to the PIP process, in both intensive as well as resource blocks. The Mission

team of Resource Organisation (RO) was involved after completion of the PIP process.

Prior to the Mission initiation, the Mission team visited each of these villages for

community mobilization activities. During this period, the Mission team organized

meetings, consultations and discussions with Panchayati Raj Institution (PRI)

representatives, Community leaders and Service providers of the villages. In terms of

communication tools, they used pamphlets / display materials, wall painting / writing,

story / case studies, audio-visual shows, Nukkad Nataks (street plays), songs, etc. for

environment building.

The Mission team conducted PIP for every tola/hamlet within the village. In some

villages (where the population was less), PIP was conducted for the entire village at

once. At the given day, time and venue, the PIP exercise was conducted. It was ensured

that representatives of Gram Panchayat as well as communities were present for the

exercise. The Mission team facilitated the process, observed and documented it. The

team prepared socio-economic profiles of all households in the village. The profile

captured basic information such as family size, occupation, family income/expenditure,

education status, etc.

In most of the villages, the team conducted Participatory Rural Appraisal (PRA) exercise.

They facilitated the community for drawing social and resource maps of their village.

The mapping of natural resources, common resources, private resources, government

facilities, etc. was also done. The Mission team facilitated the entire village to participate

in the PRA exercise. The preference was given to have this exercise at common places.

They used easily available materials like seeds, fruits, leaves, Rangoli powder, rice

powder, pen, drawing charts, etc. for the PRA exercise. Following the PRA, an

information card was made for each household. The card consisted of details such as

number of members in the household, income & expenditure, assets, number of aged

persons, Persons with Disabilities (PwDs) or widows / single women, etc.

The Mission team conducted Well-being Ranking / Wealth Ranking (WBR / WR) exercise

for all the households in the village. The team discussed with the households in groups

of 12-15. After all the households were covered, the households were ranked into

categories viz. Poorest of Poor, Poor, Medium and Well-off. The categorization was done

69 69

based on indicators such as community’s perceptions on the standard of living, sources

of income, liabilities, and vulnerability aspects (woman-headed households, widows,

differently-abled people, beggars, chronically ill and internally displaced persons due to

civil strife). The WBR helped the Mission team in identifying the location of poor

households and preparing the list of all poor and vulnerable households in the village.

The list was read out and any changes suggested by the villagers were made. The list of

households was discussed in the Gram Sabha for its approval. Participatory WBR/WR

was an effective tool to identify the poor and improve the quality of the list of target

households, rather than making use of the existing BPL list. Similarly, a public review of

the WBR/WR-based list of target households and approval by the Gram Sabha

minimized controversies.

Following completion of all the above processes, the Mission team of RO was deployed

in the Resource block for taking further the tasks of community mobilization, SHG

concept seeding, formation and strengthening of SHGs. The RO team was handed over

the final approved list of target households, along with all the other relevant documents,

for each of the project villages.

6.2.1 Revival and Strengthening of Old POP SHGs (Target SHGs)

As part of mobilization, the Mission team had undertaken a comprehensive scanning of

the pre-existing SHGs promoted by line departments and NGOs. The eligible SHGs were

identified for inclusion into the NRLM fold. The Mission team took measures to include

these SHGs in the NRLM institutional architecture. However, some pre-existing SHGs

required additional capacity building or funds to make them properly functional.

Figure 6.41: Number of old SHGs included into SRLM

56%

38%

6% 0% 0%

68%

5%

21%

0% 5%

0%

10%

20%

30%

40%

50%

60%

70%

80%

None One group Two groups Three groups More than threegroups

% o

f sa

mp

le v

illag

es

Jaisinghnagar SohagpurN(Jaisinghnagar) = 16, N(Sohagpur) = 19

70 70

Revival of pre-existing PoP SHG (target SHGs) was done on the basis of:

Pre-existing SHGs that had at least 70 percent poor and vulnerable women members

were included in NRLM institutions.

Pre-existing SHGs that were following the Panchsutra (minimum requirement) were

included in NRLM institutional architecture.

Pre-existing SHGs were audited before including them into NRLM fold. They were

audited by review of (i) Books of accounts, (ii) Savings & internal lending process,

(iii) meeting process & records, and (iv) membership status.

Figure 6.42: Number of old SHGs audited

It was also reported that dormant groups were revived in the sampled villages. The

process followed for revival of dormant groups was done at two levels. Initially, the

Mission team had group level interaction and one-to-one interactions.

Figure 6.43: Number of dormant groups revived

0%

86%

14%

0% 0% 0%

17%

67%

0%

17%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

None One group Two groups Three groups More than threegroups

% o

f sa

mp

le v

illag

es

Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 7, N(Sohagpur) = 6

69%

25%

6% 0% 0%

79%

0%

21%

0% 0% 0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

None One group Two groups Three groups More thanthree groups

% o

f sa

mp

le v

illag

es Jaisinghnagar

Sohagpur

N(Jaisinghnagar) = 16, N(Sohagpur) = 19

71 71

The Mission team revived the SHGs either with same group members, or with

replacement of some group members.

Included pre-existing SHGs also received the same benefits and support as the new one.

They were also included in the higher level federated institutions (provided they fulfil

the criteria) with equal rights as a member and to participate in the NRLM activities.

Figure 6.44: Process followed for revival- group members

About 21 NRLM fold SHGs (9 SHGs in Intensive Block and 12 SHGs in Resource Block)

have become non-active or dormant in the sample area. They need to be revived using

the strategy as mentioned for revival and strengthening of pre-existing PoP SHGs for

revival process.

Table 6.17: Number of NRLM fold SHGs that are now inactive / non-functional / dormant in

sample area

SN Block PFT No. of groups

1

Jaisinghnagar

Aamdih 4

2 Amjhor 3

3 Gopalpur 2

4 Kanadikhurd 1

5 Sidhi 2

Sub-total 12

1

Sohagpur

Chhatwai 3

2 Hardi No. 32

3 Karkati 3

4 Lalpur 1

5 Pachgaon 2

Sub-total 9

Grand Total 21

0% 20% 40% 60% 80% 100%

Revival with same groupmembers

Revival with replacement ofsome group members

% of sample villages

Sohagpur Jaisinghnagar

N(Jaisinghnagar) = 5, N(Sohagpur) = 4

72 72

6.3 Identification of Social Capital

As mentioned before, the findings pertaining to the various processes related to the

theme of “Identification of Social Capital” were presented and discussed in detail in the

first quarter. However, key findings relating to some aspects of community mobilization,

for Shahdol district, are discussed in the ensuing paragraphs.

The service status of Book Keepers in the sampled area is presented in the figure 6.45.

Figure 6.45: Services of Book Keepers

The service status of Internal CRPs in the sampled area is presented in the figure 6.46.

Figure 6.46: Services of Internal CRPs

The service status of Active Women in the sampled area is presented in the figure 6.47.

94% 100%

69%

50% 56%

25%

79% 95%

79%

21%

42%

16%

0%

20%

40%

60%

80%

100%

SHGAccounting

Regularmaintenanceof books of

accounts

Facilitate SHGloan

repayment

Facilitatepaperwork for

CCL

Ensureaccounting

relatedtransparency

Prepare VOreport

% o

f vi

llage

s

JaisinghnagarSohagpur

N(Jaisinghnagar) = 16, N(Sohagpur) = 19

94% 81%

44% 38%

84%

63%

21% 16%

0%

20%

40%

60%

80%

100%

Facilitate mobilizationof poor women into

SHGs

Teach the illiteratewomen to read and

write

Mintain paperwork Assess the needs ofSHG members

% o

f vi

llage

s

Jaisinghnagar

SohagpurN(Jaisinghnagar) = 16,

N(Sohagpur) =19

73 73

Figure 6.47: Services of Active Women

6.4 SHG Formation and Strengthening

As mentioned before, the findings pertaining to the various processes related to the

theme “SHG Formation and Strengthening” were presented and discussed in detail in the

first quarter. However, key findings relating to some aspects of formation and

strengthening of SHGs, for Shahdol district, are discussed in the ensuing paragraphs.

As mentioned before, the findings pertaining to the various processes related to the theme

“SHG Formation and Strengthening” were presented and discussed in detail in the

previous quarter. However, key findings relating to some aspects of formation and

strengthening of SHGs, for Shahdol district, are discussed in the ensuing paragraphs.

Initially, the CRPs were trained to target only the poor and motivate them to join the SHGs.

With the help of CRPs, the Mission team mobilized the poor women in sample villages into

SHGs. In the Resource Block, the visiting external CRPs started with a rapport building

with the community, following it up with the formation and strengthening of SHGs in two

rounds of CRP drive, each spanning 15 days per village. During the first CRP drive, the

initial 4-5 days are spent towards familiarization with the village and the community

(mostly focusing on the target households as per the final approved list) and building a

rapport with them, through door-to-door visits along with the Mission PFT team. From the

6th day onwards, SHG formation is initiated, following it up with their strengthening that

included facilitation of at least the first three meetings of each of the groups formed. In

addition, basic training was also provided to the group members.

The Mission team and CRPs have conducted various types of trainings for SHG leaders

and members, to capacitate and strengthen the SHGs. Trainings provided on SHG

meeting process, norms, maintenance of books of accounts and MCP preparation, were

provided by the Mission team or community cadres to SHGs members. SHGs were

provided trainings related to: (i) SHG Bank Linkage, (ii) SHG Record / Book keeping (iii)

SHG MIS (iv) Leadership (v) CRP role and responsibility (vi) Environment and Sanitation

(vii) Gender and Social Protection (viii) MCP preparation (ix) Microfinance (RF, CIF,

VRF) (x) Food Security and HRF (xi) Financial Literacy (xii) Social Security Scheme,

RSBY and other entitlement(s) (xiii) Entrepreneurship and Income Generation Activities

100% 94%

56% 50%

79%

63%

42% 32%

0%

20%

40%

60%

80%

100%

Explain SHG relatedprocesses to

members

Ensure meetingprocess is properly

followed

Conflict resolution Building a positiveenvironment

% o

f sa

mp

le v

illag

es

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 16, N(Sohagpur) = 19

74 74

(xiv) VO Concept and Management. In all SHGs, seven types of books of records are

introduced viz. (i) Minutes book (ii) Cash book (iii) General ledger (iv) Loan ledger (v)

Member passbook (vi) Saving cum attendance register and (vii) Monthly report. During

the second round of CRP drive, refresher training on various subjects is organized for

the existing group members, while new groups formed in between the two rounds are

also strengthened.

The Mission team has promoted the process of SHG meeting as: (i) Fixed type of siting

arrangement, (ii) Group Prayer, (iii) Introduction by each member, (iv) Attendance by

Book Keeper, (v) Reading of agenda of the day’s meeting, (vi) Nomination of working

Chairperson for the meeting, (vii) Reading of action taken report of the previous

meeting, (viii) Savings amount deposited by members, (ix) Inter-loaning and loan

repayments, (x) Process of recording and checking of entries by the BK, (xi) Book

Keeper provides information regarding the available fund (in the box and in the

account), and (xii) Reading of proceedings of the day’s meeting.

The figure below presents the process of meeting of SHGs in the sampled area.

Figure 6.48: Process of meeting of SHGs

The process of meeting of SHGs in both the sampled Blocks had better results in terms of

fixed type of siting arrangement, group prayer, introduction by each member,

attendance by book keeper and savings amount deposited by members. However, there

are requirement for improvements on following:

Reading of agenda of the day’s meeting

Nomination of working chairperson for the meeting

Reading of action taken report of the previous meeting

Process of recording and checking of entries by the chairperson

Book Keeper provides information regarding the available fund, and

Reading of proceedings of the day’s meeting

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Fixed type of sitting arrangement

Group prayer

Introduction by each member

Attendance by Book Keeper

Reading of agenda of the day's meeting

Nomination of working chairperson for the…

Reading of action taken report of the previous…

Savings amount deposited by members

Process of recording and checking of entries by…

BK provides information regarding the available…

Reading of proceedings of the day's meeting

% of sample SHGs

Sohagpur Jaisinghnagar

N(Jaisinghnagar) = 31, N(Sohagpur) = 38

75 75

The status of loaning, repayment and punishment system in SHGs in the sampled area is

presented in the figure below.

Figure 6.49: Loaning, repayment and punishment system in SHGs

The results of (i) chairperson asking the group members about their loan requirement,

and (ii) prioritization of loan requirement through consensus are better in both the

sampled Blocks. However, the Mission team needs to revisit to SHGs and strengthen the

following processes:

Members availing loan appraising group regarding their repayment plan

Book Keeper notes down loan repayment plan as suggested by the member

Loan repayment and punishment process, and

Briefing members about repayment of loan due on the next meeting

The status of timing of savings deposition in SHGs in the sampled area is presented in

table below.

Table 6.18: Timing of Savings deposition in SHGs

Block During the

meeting itself Collected in

subsequent meetings Collected from

individual houses Others

Jaisinghnagar 90.91% 3.03% 3.03% 3.03%

Sohagpur 100.00% 0.00% 0.00% 0.00%

The SHGs of both the sampled Blocks (Resource as well as Intensive Blocks) are

depositing their savings at SHGs level on weekly basis. However, in most of the cases,

timing of savings deposition in Banks goes beyond a month (figure 6.50). The status of

timing of savings deposition in Banks in the sampled area is presented in the figure

below.

87% 100%

55% 61%

35%

58%

0%

79% 92%

58% 55%

8%

24%

0% 0%

20%

40%

60%

80%

100%

Chairperson askingthe group members

about their loanrequirement

Prioritization ofloan requirement

through consensus

Members availaingloan apprising

group regardingtheir repayment

plan

BK notes down loanrepayment plan assuggested by the

member

Loan repaymentand punishment

process

Briefing membersabout repayment of

loan due on thenext meeting

Others

% o

f sa

mp

le S

HG

s

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 31, N(Sohagpur) = 38

76 76

Figure 6.50: Timing of Savings deposition in Banks

The status of loan disbursement prioritization in the sampled area is presented in the

figure below.

Figure 6.51: Loan disbursement prioritization

It was shared that emergency comes first in the loan disbursement prioritization. It applies to both the sampled Blocks.

The status of record keeping in the sampled area is presented in the figure below.

16%

0% 0%

10%

74%

11%

0% 0%

8%

82%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Not deposited Within a week Within afortnight

Within a month After more thana month

% o

f sa

mp

le S

HG

s Jaisinghnagar Sohagpur

N(Jaisinghnagar) = 31, N(Sohagpur) = 38

97%

35%

97%

34%

0%

20%

40%

60%

80%

100%

Emergency Loan taken and repaymenthistory of the member

% o

f sa

mp

le S

HG

s

Jaisinghnagar Sohagpur

N(Jaisinghnagar) = 31, N(Sohagpur) = 38

77 77

Figure 6.52: Record keeping

The Mission team needs to revisit to record keeping of SHGs, especially for cash book, general ledger and monthly report in both the sampled blocks. However, other SHG level records are poorer in the case of Intensive Block than Resource Block.

The status of prioritization in MCPs in the sampled area is presented in the table below.

Table 6.19: Prioritization in MCP

Block % of SHGs

Jaisinghnagar 86.67%

Sohagpur 64.86%

It was reported that the prioritization in MCPs is being done in both the sample blocks. However, there is need to revisit the MCPs for updating the prioritization as per current requirements.

The status of disbursement route of CIF to SHG in the sampled area is presented in the

figure below.

0%

13%

87%

16%

29%

55%

19% 29%

52%

6%

32%

61%

3%

19%

77%

3% 10%

87% 81%

13% 6% 8% 11%

82% 71%

18% 11%

58%

34%

8%

34% 32%

34%

18% 13%

68%

24% 18%

58%

79%

16%

5% 0%

10%20%30%40%50%60%70%80%90%

100%

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

No

t in

tro

du

ced

Intr

od

uce

d b

ut

par

tly

up

dat

ed

Intr

od

uce

d a

nd

up

to

dat

e

Minutes book Cash book General Ledger Loan Ledger Member PassBook

Saving cumattendance

register

MonthlyReport

% o

f sa

mp

le S

HG

s JaisinghnagarN(Jaisinghnagar) = 31,

N(Sohagpur) = 38

78 78

Figure 6.53: Disbursement route of CIF to SHG

Majority of the cases, the VOs in sampled Blocks, the disbursement route of CIF is direct

to SHGs. Although the distribution of funds is done as per the MCP, however there is a

need for updating the priorities in MCP. The immediate preferences of members have

changed over time. It was also reported that the VOs in sampled Resource Block are in

loose form which is one of the reasons of the disbursement route of CIF is direct to SHGs.

The status of distribution pattern of fund in the sampled area is presented in the figure

below.

Figure 6.54: Distribution pattern of fund

The status of use pattern of fund in the sampled area is presented in the figure below.

7%

93%

75%

0%

20%

40%

60%

80%

100%

Through VO Direct to SHG

% o

f sa

mp

le S

HG

s re

ceiv

ing

CIF

Jaisinghnagar SohagpurN(Jaisinghnagar) = 28,

N(Sohagpur) = 36

96%

4%

100%

0% 0%

20%

40%

60%

80%

100%

120%

Distributed and used as per MCP/MIP Equally distributed amongst allmembers

% o

f sa

mp

le S

HG

s re

ceiv

ing

CIF

JaisnighnagarSohagpur

N(Jaisinghnagar) = 25, N(Sohagpur) = 10

79 79

Figure 6.55: Use pattern of fund

6.5 Establishment of Systems (Norms and Practices)

As mentioned before, the findings pertaining to the various processes related to the

theme “Establishment of Systems (Norms add Pracices)” were presented and discussed

in detail in the second quarter. However, key findings relating to some aspects of this

theme, for Shahdol district, are discussed in the ensuing paragraphs.

6.5.1 Norms for SHG Grading and MCP appraisal under NRLM

In the ensuing paragraphs, the norms for SHG grading and MCP appraisal under the

ambit of NRLM are discussed, along with the deviations observed. Further, the best

practices emanating from these processes in the two blocks surveyed are also discussed.

Table 6.20: Norms for SHG Grading and MCP appraisal under NRLM

SHG Life-Cycle Stage

Purpose of Grading

Grading Parameters Who will Grade / Appraise?

Before disbursement of RF (3-4 months after formation of SHG)

For judging readiness / eligibility of SHG to receive RF

Panchasutra Regular meeting Regular savings Internal loaning Timely repayment Proper book keeping

In case VO is formed and the SHG is a member of VO, grading will be done by VO (i.e. VO level Bank Linkage sub-committee)

In case of VO is not formed, or SHG is not a member of VO, grading will be done by an informal village level committee involving members from other SHGs facilitated by CRP / Community cadres

Before disbursement of VRF (3-6 months after formation of the SHG)

For judging readiness / eligibility of SHG to receive VRF

MCP Prepared (including work plan for vulnerability reduction)

Panchasutra Regular meeting Regular savings Internal loaning Timely repayment Proper book keeping

In case VO is formed and the SHG is a member of VO, grading should be done by VO

In case of VO is not formed, or SHG is not a member of VO, grading will be done by an informal village level committee involving members from other SHGs facilitated by CRP / Community cadres

4% 0%

96%

0% 0%

100%

0%

20%

40%

60%

80%

100%

120%

Used by all members Used by only a fewmembers

Distributed as per urgencyand prioritization of needs

of members

% o

f sa

mp

le S

HG

s re

ceiv

ing

CIF

Jaisinghnagar Sohagpur N(Jaisinghnagar) = 25, N(Sohagpur) = 10

80 80

SHG Life-Cycle Stage

Purpose of Grading

Grading Parameters Who will Grade / Appraise?

Inclusion of vulnerable in SHG

Before disbursement of CIF (6-9 months after formation of the SHG)

For judging readiness / eligibility of SHG to receive CIF

MCP Prepared Panchasutra Regular meeting Regular savings Internal loaning Timely repayment Proper book keeping

In case VO is formed and the SHG is a member of VO, grading should be undertaken by VO level sub-committee

In case of VO is not formed, or SHG is not a member of VO, grading should be done by block / cluster level appraisal committee involving members from other SHGs facilitated by CRP / Community cadres

Before credit linkage of SHG (1st linkage) (6 months after formation of SHG or before submission of application for credit linkage)

For judging readiness / eligibility of SHG to receive Bank Credit

MCP Prepared (not mandatory till 2nd linkage)

Panchasutra Regular meeting Regular savings Internal loaning Timely repayment Proper book keeping

In case VO is formed and the SHG is a member of VO, grading should be done by VO

In case of VO is not formed, or SHG is not a member of VO, grading should be done by an informal village level committee involving members from other SHGs facilitated by CRP / Community cadres

Branch Official / Authorised representatives of banks may also be involved for grading

Before credit linkage of SHG (subsequent linkages) (within 2 months of repayment of previous loan or before submission of application for bank loan)

For judging readiness / eligibility of SHG to receive Bank Credit

MCP Prepared (Mandatory from 2nd linkage onwards)

Panchasutra Regular meeting Regular savings Internal loaning Timely repayment Proper book keeping

Other parameters Repayment to bank

In case VO is formed and the SHG is a member of VO, grading should be done by VO

In case of VO is not formed, or SHG is not a member of VO, grading should be done by an informal village level committee involving members from other SHGs facilitated by CRP / Community cadres

Branch Official / Authorised representatives of banks may also be involved for grading

Table 6.21(a): Grading before disbursement of RF (3-4 months after formation of SHG) -

Intensive Block (Sohagpur)

Grading Parameters Who Grades?

3 months after formation of SHG

Panchasutra

Bank Account

The above parameters are followed in all 5 sampled

PFTs (i.e. Chhatwai, Hardi No.32, Karkati, Lalpur

and Pachgaon)

Nodal Project Facilitation Team (PFT)

It is applicable in all 5 sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati, Lalpur and Pachgaon)

81 81

Table 6.21(b): Grading before disbursement of RF (3-4 months after formation of SHG -

Resource Block (Jaisinghnagar)

Grading Parameters Who Grades?

3 months after formation of SHG

Panchasutra

Bank Account

The above parameters are followed in all 5 sampled

PFTs (i.e. Aamdih, Amjhor, Gopalpur, Kanadikhurd

and Sidhi)

Nodal Project Facilitation Team (PFT)

It is applicable in all 5 sampled PFTs (i.e. Aamdih,

Amjhor, Gopalpur, Kanadikhurd and Sidhi)

Table 6.22(a): Grading / Appraisal before disbursement of VRF (3-6 months after formation

of the SHG) - Intensive Block (Sohagpur)

Grading / Appraisal Parameters Who Grades / Appraises?

Inclusion of vulnerable groups in Chhatwai

and Pachgaon PFTs

6 months after formation of SHG and inclusion

of vulnerable groups in Hardi No.32, Karkati

and Lalpur PFTs

VO and Nodal Project Facilitation Team (PFT)

It is applicable in all 5 sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati, Lalpur and Pachgaon)

Table 6.22 (b): Grading / Appraisal before disbursement of VRF (3-6 months after formation

of the SHG) - Resource Block (Jaisinghnagar)

Grading / Appraisal Parameters Who Grades / Appraises?

Not distributed

The above parameters are followed in all 5 sampled PFTs

(i.e. Aamdih, Amjhor, Gopalpur, Kanadikhurd and

Sidhi)

Not distributed

It is applicable in all 5 sampled PFTs (i.e.

Aamdih, Amjhor, Gopalpur, Kanadikhurd

and Sidhi)

Table 6.23(a): Grading / Appraisal before disbursement of CIF (6-9 months after formation of

the SHG) - Intensive Block (Sohagpur)

Grading / Appraisal Parameters Who Grades / Appraises?

6 months after formation of SHG

Use of RF

SHG inclusion with VO & Need

The above parameters are followed in all 5 sampled PFTs (i.e.

Chhatwai, Hardi No.32, Karkati, Lalpur and Pachgaon)

VO and Nodal Project Facilitation Team

(PFT) in Chhatwai, Hardi No.32,

Karkati, Lalpur PFT

VO in Pachgaon PFT

Table 6.23(b): Grading / Appraisal before disbursement of CIF (6-9 months after formation of

the SHG) - Resource Block (Jaisinghnagar)

Grading / Appraisal Parameters Who Grades / Appraises?

6 months after formation of SHG

Need & Use of RF

The above parameters are followed in all 5 sampled PFTs

(i.e. Aamdih, Amjhor, Gopalpur, Kanadikhurd and Sidhi)

VO and Nodal Project Facilitation Team

(PFT) in Aamdih, Amjhor, Kanadikhurd

and Sidhi PFT

VO, Nodal PFT and CRP in Gopalpur PFT

82 82

Table 6.24(a): Grading / appraisal before credit linkage of SHG (1st linkage) (6 months after

formation of SHG or before submission of application for credit linkage) - Intensive Block

(Sohagpur)

Grading Parameters Who Grades?

6 months after formation of SHG in Chhatwai,

Hardi No.32, Karkati and Lalpur PFTs

6 months after formation of SHG, inter-loaning,

repayment rate in Pachgaon PFT

Bankers and Nodal PFT in Chhatwai, Hardi

No.32, Karkati and Lalpur PFTs

Bankers in Pachgaon PFTs

Table 6.24(b): Grading / appraisal before credit linkage of SHG (1st linkage) (6 months after

formation of SHG or before submission of application for credit linkage) - Resource Block

(Jaisinghnagar)

Grading Parameters Who Grades?

6 months after formation of SHG and

repayment status of RF & CF in Aamdih,

Gopalpur, Kanadikhurd and Sidhi PFTs

9 months after formation of SHG, repayment

status of RF & CIF in Amjhor PFT

Nodal Project Facilitation Team (PFT)

It is applicable in all 5 sampled PFTs (i.e. Aamdih,

Amjhor, Gopalpur, Kanadikhurd and Sidhi)

Table 6.25(a): Grading / Appraisal before credit linkage of SHG (subsequent linkages)

(within 2 months of repayment of previous loan or before submission of application for

bank loan) - Intensive Block (Sohagpur)

Grading Parameters Who Grades?

Repayment of 1st Dose loan and subsequent loans

The above parameters are followed in all 5 sampled

PFTs (i.e. Chhatwai, Hardi No.32, Karkati, Lalpur and

Pachgaon)

Bankers in Chhatwai and Pachgaon PFTs

Nodal Project Facilitation Team (PFT) in

Hardi No.32, Karkati and Lalpur PFTs

Table 6.25(b): Grading / Appraisal before credit linkage of SHG (subsequent linkages) -

(within 2 months of repayment of previous loan or before submission of application for

bank loan) - Resource Block (Jaisinghnagar

Grading Parameters Who Grades?

12 months after formation of SHGs

The above parameters are followed in all 5 sampled

PFTs (i.e. Aamdih, Amjhor, Gopalpur, Kanadikhurd

and Sidhi)

Nodal Project Facilitation Team (PFT)

It is applicable in all 5 sampled PFTs (i.e. Aamdih,

Amjhor, Gopalpur, Kanadikhurd and Sidhi)

Lessons learned, Constraints & Challenges and the Way Forward

In case VO is formed and the SHG is a member of VO, grading should be

undertaken by VO level sub-committee. In case of VO is not formed, or SHG is not

a member of VO, grading should be done by block / cluster level appraisal

committee involving members from other SHGs facilitated by CRP / Community

cadres. However, VOs and SHGs are not in a position to undertake the various

types of grading activities. It is normally performed by the nodal PFT.

The mission team needs to capacitate and strengthen the SHGs, VOs and its sub-

committees to undertake their assigned activities effectively.

83 83

6.5.2 Types of funds and their disbursement procedure

In the ensuing paragraphs, the norms for availability and disbursement of different

types of funds under the ambit of NRLM are discussed, along with the deviations

observed. Further, the best practices emanating from these processes in the two blocks

surveyed are also discussed.

Table 6.26: Norms for different types of funds and disbursement procedure

Type of Funds Period Purpose of Fund

Revolving Fund (RF)

3-4 months after formation of SHG

It is a corpus amount for SHGs to meet the members’ credit needs directly and as catalytic capital for leveraging repeat bank finance. The purpose of RF is to strengthen their institutional and financial management capacity and build a good credit history within the group. Only eligible SHGs (such SHGs that have not received any RF earlier) are provided with RF, as corpus of Rs. 10,000 to Rs. 15,000 per SHG.

Vulnerability Reduction Fund

(VRF)

6 months after formation of the

SHG

Provided to the village level primary federation of SHGs (VO) to address vulnerabilities like food insecurity, malnutrition, health risk, high cost debts, emergencies, etc., and to meet the special needs of the vulnerable people in the village.

Community Investment Fund (CIF)

6-9 months after formation of the

SHG

Provided Seed Capital to SHG Federations at Village / Cluster level to meet the credit needs of the members through the Village Organizations / SHGs and to meet the working capital needs of the collective activities at various levels. The CIF is used, by the Federations, to advance loans to the VOs / SHGs.

Bank loan to SHG (1st Dose)

6 months after formation of SHG

or before submission of application for credit linkage

Mission provides only catalytic capital support to the community institutions, it is expected that the banks provide the major chunk of funds required for meeting the entire gamut of credit needs for the rural poor households. The Mission therefore expects that the SHGs leverage significant amount of bank credit. 4-8 times to the proposed corpus during the year or Rs. 50, 000 whichever is higher.

Bank loan to SHG

(subsequent linkages-loans)

within 2 months of repayment of previous loan or

before submission of application for

bank loan

Second Dose: 5-10 times of existing corpus and proposed saving during the next twelve months or Rs. 1 lakhs, whichever is higher. Third Dose: Minimum of Rs. 2 lakhs, based on the Micro credit plan prepared by the SHGs and appraised by the Federations/Support agency and the previous credit history Fourth & Subsequent Doses: Loan amount can be between Rs. 5-10 lakhs for fourth dose and/or higher in subsequent doses. The loan amount will be based on the Micro Credit Plans of the SHGs and their members.

Livelihoods / Layering Fund

(LF) n.d.

To the SHGs / SHG Federations and other collectives to support the deficit, if any, in the funding clear feasible and viable business plan. This include, scaling up certain key Livelihood Interventions related to farm and non-farm sector

Table 6.27(a): Revolving Fund - Intensive Block (Sohagpur)

Proposal (Time & Amount) Disbursement (Time & Amount)

3-4 months after formation of SHGs

Rs. 15000/- per SHG

The above parameters are followed in all 5

sampled PFTs (i.e. Chhatwai, Hardi No.32,

Karkati, Lalpur and Pachgaon)

3-4 months after formation of SHGs

Rs. 15000/- per SHG

It is applicable in all 5 sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati, Lalpur and Pachgaon)

84 84

Table 6.27(b): Revolving Fund - Resource Block (Jaisinghnagar)

Proposal (Time & Amount) Disbursement (Time & Amount)

3-4 months after formation of SHGs

Rs. 15000/- per SHG

The above parameters are followed in all 5

sampled PFTs (i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

3-4 months after formation of SHGs

Rs. 15000/- per SHG

It is applicable in all 5 sampled PFTs (i.e. Aamdih,

Amjhor, Gopalpur, Kanadikhurd and Sidhi)

Table 6.28(a): Vulnerability Reduction Fund - Intensive Block (Sohagpur)

Proposal (Time & Amount) Disbursement (Time & Amount)

6 months after formation of SHGs

Rs. 15000/- per eligible SHG

The above parameters are followed in all 5

sampled PFTs (i.e. Chhatwai, Hardi No.32,

Karkati, Lalpur and Pachgaon)

6-7 months after formation of SHGs

Rs. 15000/- per SHG

It is applicable in all 5 sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati, Lalpur and Pachgaon)

Table 6.28(b): Vulnerability Reduction Fund - Resource Block (Jaisinghnagar)

Proposal (Time & Amount) Disbursement (Time & Amount)

Time not known

Rs. 15000/- per SHG

The above parameters are followed in all 5

sampled PFTs (i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

Not disbursed

The above parameters are followed in all 5 sampled

PFTs (i.e. Aamdih, Amjhor, Gopalpur, Kanadikhurd

and Sidhi)

Table 6.29(a): Community Investment Fund - Intensive Block (Sohagpur)

Proposal (Time & Amount) Disbursement (Time & Amount)

6 months after formation of SHGs in Lalpur and

Pachgaon PFTs

6-7 months after formation of SHGs in Chhatwai, and

Hardi No.32 PFTs

6-8 months after formation of SHGs in Chhatwai PFT

Rs. 60000- 80000 per SHG in Lalpur PFT

Rs. 50000-80000 in Chhatwai, Hardi No.32 and

Karkati PFTs

Rs. 80000 per SHG in Pachgaon

6 -7months after formation of SHGs

Rs. 50000-80000 per SHG in Chhatwai,

Hardi No.32, Karkati PFTs)

Rs. 60000-80000 per SHG in Lalpur

PFT

Rs. 80000/- per SHG in Pachgaon PFT

Table 6.29(b): Community Investment Fund - Resource Block (Jaisinghnagar)

Proposal (Time & Amount) Disbursement (Time & Amount)

6 months after formation of SHGs in all 5

sampled PFTs (i.e. Aamdih, Amjhor,

Gopalpur, Kanadikhurd and Sidhi)

Rs. 50000- 80000/- per SHG in 2 sampled PFTs

(i.e. Aamdih and Kanadikhurd)

Rs. 80000/- per SHG in 3 sampled PFTs (i.e.

Amjhor, Gopalpur and Sidhi)

6 -7 months after formation of SHGs in all 5

sampled PFTs (i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

Rs. 50000- 80000/- per SHG in 3 sampled PFTs

(i.e. Aamdih, Kanadikhurd and Sidhi)

Rs. 80000/- per SHG in 2 sampled PFTs (i.e.

Amjhor and Gopalpur)

85 85

Table 6.30(a): Bank loan to SHG - Intensive Block (Sohagpur)

Dose Proposal (Time & Amount) Disbursement (Time & Amount)

1st Dose 6 months after formation of SHGs in all 4

sampled PFTs (i.e. Chhatwai, Hardi

No.32, Karkati and Lalpur)

7-8 months after formation of SHGs in

Pachgaonsampled PFTs

Rs. 50000/- or 4 times of savings per SHG

in Chhatwai, Hardi No.32 PFTs

Rs. 100000/- or 4 times of saving of SHGs

in Karkati, Lalpur and Pachgaon PFTs

6 -12months after formation of SHGs in

Chhatwai and Hardi No.32 PFTs

8-12 months after formation of SHGs in

Karkati, Lalpur PFTs

12 months after formation of SHGs in

Pachgaon PFT

30-45 days processing time in all 5 sampled

PFTs (i.e. Chhatwai, Hardi No.32, Karkati,

Lalpur and Pachgaon )

Rs. 50000/- per SHG in Chhatwai, Hardi

No.32, Karkati, Lalpur PFTs

Rs. 100000/- per SHG in Lalpur PFT)

2nd Dose After 12 months of 1st dose in Chhatwai

and Hardi No.32 PFTs

12-24 months of 1st dose in Karkati,

Lalpur and Pachgaon PFT

No application in Chhatwai, Hardi

No.32, Karkati, Lalpur and Pachgaon

PFTs

No disbursement of 2nd dose loan in all 5

sampled PFTs (i.e. Chhatwai, Hardi No.32,

Karkati, Lalpur and Pachgaon)

3rd Dose NA NA

4th Dose NA NA

Table 6.30(b): Bank loan to SHG - Resource Block (Jaisinghnagar)

Dose Proposal (Time & Amount) Disbursement (Time & Amount)

1st Dose 6-8 months after formation of SHGs in

Aamdih, Kanadikhurd and Sidhi PFTs

9 months after formation of SHGs in

Amjhor PFT

6-12 months after formation of SHGs in

Gopalpur PFT

Rs. 50000-100000/- Aamdih, Amjhor,

Gopalpur, Kanadikhurd and Sidhi PFTs

6-12 months after formation of SHGs in

Aamdih, Amjhor, Gopalpur, Kanadikhurd

and Sidhi PFTs

Rs. 50000/- per SHG in Aamdih PFT

Rs. 30000-100000/- per SHG in Amjhor

PFT

Rs. 50000-100000/- per SHG in Gopalpur,

Kanadikhurd and Sidhi PFTs

2nd Dose After 12 months of 1st dose in all 5

sampled PFTs (i.e. Aamdih, Amjhor,

Gopalpur, Kanadikhurd and Sidhi)

8 times of savings in Amjhor, Gopalpur,

Kanadikhurd PFTs

In remaining sampled PFTs i.e.

Chandpura, Aamdih and Sidhi, no

application for 2nd dose bank loan.

No disbursement of 2nd dose loan in all 5

sampled PFTs (i.e. Aamdih, Amjhor,

Gopalpur, Kanadikhurd and Sidhi)

3rd Dose NA NA

4th Dose NA NA

Lessons learned, Constraints & Challenges and the Way Forward

As per norms RF, VRF & CIF applications submitted and disbursement made to

SHGs. The RF & VRF amounts were Rs. 15000/- each for individual eligible SHG.

However, CIF amount varied from Rs. 50000/- to Rs. 80000/- per SHG. However,

in the case of Resource Block VRF is neither applied by the SHGs/VOs nor

disbursed by the Mission.

86 86

In most cases, initially the group members equally distributed the funds among

themselves. There is lack of plan for use and utilization pattern of these funds

among the group members. Proper plan and tracking mechanism for fund

utilization should be established at SHG level. Various types of funds received

need by SHG to be recorded in meeting / minutes register (as on date they

reflect only in Passbook).

About 50 per cent CIF amount is disbursed to VOs against their application. The

basic purpose of this deduction is for rotation of amount among all SHGs of the

respective VOs. However, the timeframe of rotation of fund at SHGs and VO

levels need to be worked out properly for efficient and effective utilization of the

fund.

The SHGs have received the 1st dose of bank loan. The 1st dose bank loan amount

varied from Rs. 50000/- to Rs. 100000/-. However, the loan processing time

takes 30-45 days from their application dates. The Mission team should

encourage the group members for repaying the loan amount as per schedule. It’ll

increase the credit worthiness of the group for availing the higher level loans i.e.

2nd dose, 3rd dose, and so on.

There is further clarification and guideline required on Livelihoods / Layering

Fund (LF).

6.5.3 Norms for preparation of documents and Bank Account Opening and Linkages support

SHG need to open a SB A/c with the nearest Bank branch, ideally within two months of

formation of the Group. The norms vs. practices with respect to the process of

preparation of documents for opening of bank account, the process of opening of bank

account, as well as the bank linkage support, are discussed.

Table 6.31(a): Norms for preparation of documents and Bank Account Opening

Steps Particular

Step-1: SHG Resolution Passing of a resolution by SHG to open a bank account in the service area bank branch / nearest bank branch. All members should subscribe their signatures to the resolution.

Step-2: Office Bearers / Bank Signatories

As part of the resolution, the SHG should authorize three Office Bearers / Bank Signatories to operate the saving bank account with a condition that any two of them can transact with the bank.

Step-3: Application for Opening of Bank Account

Application to the branch manager with a request to open a savings bank a/c at the branch. The application should be signed by office bearers / bank signatories of the SHG.

Step-4: SHG Seal and Photographs of OBs / BSs

Each SHG gets a stamp (seal) made. Arrange photographs of 3 Office Bearers / Bank Signatories (passport size-3 copies each). Photocopies of the supporting identity and address proof documents of Office Bearers / Bank Signatories as part of the KYC norms.

Step-5: Visit to the Bank SHG members visit the bank branch along with copy of resolution, application, photocopies of documents related to identity proof, address proof (including original documents for verification), colour photographs and seal of SHG.

Step-6: Opening Form Fill in the requisite SB account opening form and attach all supporting documents correctly.

Step-7: No-Frill Account Open ‘no-frill a/c’ with ‘zero balance’ or may deposit some amount if they choose.

Step-8: Regular Banking Regularly transact with the bank to maintain good rapport with the bank officials.

87 87

Preparation for credit linkage of SHG should ideally start in the fifth month of formation

of SHG. All necessary steps needs for preparing the documents required for SHG credit

linkages should be followed.

Table 6.31(b): Norms for preparation of documents and credit linkages

Steps Particular

Step-1: Verify annual SHG-bank linkage target and identify SHGs which need to be graded.

Step-2: Grading of SHGs as per the suggested process

Step-3: SHG graded ‘A’ – ascertain credit requirements for recently prepared MCP. In case MCP for the

SHG has not been prepared, credit requirement of members should be determined in the meeting.

Step-4: Passage of resolution, authorizing sending of application for bank loan. Resolution to be signed by

all members.

Step-5: Prepare loan application, signed by Office Bearers / Bank Signatories

Step-6: Preparation of ‘inter-se agreement’ and ‘loan agreement form’

Step-7: Ensure that all signatories / OBs have their photographs (colour and passport size-3 copies each)

and a seal for the SHG is available.

Step-8:

Visit the bank branch for completion of documentation formalities (only signatories / OBs are

required to visit the bank branch with necessary books of accounts, passbook and application

form)

Table 6.32(a): Training on Preparation of documents for Bank Linkage - Intensive Block

(Sohagpur)

Level of staff / members

Time (days) Training Content

Who attended?

Who provided training?

DMMU Level NA NA NA NA

PFT Level No formal training in all sampled PFTs (i.e. Chhatwai, Hardi No.32, Karkati, Lalpur and Pachgaon)

NA NA NA

CRP Level No formal training in all sampled PFTs (i.e. Chhatwai, Hardi No.32, Karkati, Lalpur and Pachgaon)

NA NA NA

VO / SHG level No formal training in all sampled PFTs (i.e. Chhatwai, Hardi No.32, Karkati, Lalpur and Pachgaon)

NA NA NA

The Mission team assists in bank linkage and providing handholding support, which

includes coordination and networking with Banks (e.g. DLBC, BLBC, etc.); sensitization

of bankers; documents preparation; introduction at Banks for account opening and

credit linkages; and assist in timely repayment of loan. However, most of these activities

are restricted to DMMU and PFT levels only.

Table 6.32(b): Training on Preparation of documents for Bank Linkage - Resource Block

(Jaisinghnagar)

Level of staff /

members Time (days)

Training

Content

Who

attended?

Who provided

training?

DMMU Level NA NA NA NA

PFT Level

No formal training in all sampled PFTs

(i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

NA NA NA

88 88

Level of staff /

members Time (days)

Training

Content

Who

attended?

Who provided

training?

CRP Level

No formal training in all sampled PFTs

(i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

NA NA NA

VO / SHG level

No formal training in all sampled PFTs

(i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

NA NA NA

The Mission team assists in bank linkage and providing handholding support, which

includes coordination and networking with Banks (e.g. DLBC, BLBC, etc.); sensitization

of bankers; documents preparation; introduction at Banks for account opening and

credit linkages; and assist in timely repayment of loan. However, most of these activities

are restricted to DMMU and PFT levels only.

Table 6.33(a): Bank linkage and providing hand-holding support - Intensive Block

(Sohagpur)

Type of supports DMMU Level PFT Level VO / SHG level

Coordination and Networking

with Banks

Yes, in all 5 sampled

PFTs

Yes, in all 5 sampled

PFTs

Yes, in all 5 sampled

PFTs

Sensitization of bankers Yes, in all 5 sampled PFTs

Yes, in all 5 sampled PFTs

Yes, in all 5 sampled

PFTs

Documents preparation Yes, in all 5 sampled PFTs

Yes, in all 5 sampled PFTs

No, in none of the 5

sampled PFTs

Introduction at Banks for account

opening and credit linkages

Yes, in all 5 sampled PFTs

Yes, in all 5 sampled PFTs

No, in none of the 5 sampled PFTs

Assist in timely repayment of loan Yes, in all 5 sampled PFTs

Yes, in all 5 sampled PFTs

No, in none of the 5 sampled PFTs

Table 6.33(b): Bank linkage and providing hand-holding support - Resource Block

(Jaisinghnagar)

Type of supports DMMU Level PFT Level VO / SHG level

Coordination and Networking

with Banks

Yes, in all 5 sampled PFTs

Yes, in all 5 sampled PFTs

Yes, in all 5 sampled

PFTs

Sensitization of bankers

Yes, in all 5 sampled PFTs

Yes, in all 5 sampled PFTs

Yes, in 4 sampled

PFTs, except Amjhor

PFT

Documents preparation No, in none of the 5 sampled PFTs

No, in none of the 5 sampled PFTs

No, in none of the 5 sampled PFTs

Introduction at Banks for account

opening and credit linkages

No, in none of the 5 sampled PFTs

Yes, in all 5 sampled PFTs

No, in none of the 5 sampled PFTs

Assist in timely repayment of loan No, in none of the 5 sampled PFTs

Yes, in all 5 sampled PFTs

No, in none of the 5 sampled PFTs

Lessons learned, Constraints & Challenges and the Way Forward

In Intensive Block as well as Resource Block, no formal training were provided

for preparation of documents for bank linkages.

The Mission team assisted the SHGs for bank linkages and handholding support

in terms of coordination and networking with banks, sensitization of bankers,

89 89

documents preparation, introduction at banks for account opening and credit

linkages and assists them in timely repayment of loans. However, most of these

activities were restricted to DMMU and PFT levels only.

6.5.4 Training for MCP preparation, MCP Preparation, Submission and Appraisal System

In the ensuing paragraphs, the norms for training for MCP preparation, the process of

preparation of MCPs and the MCP submission and appraisal system are discussed, along

with the deviations observed. Further, the best practices emanating from these

processes in the two blocks surveyed are also discussed.

Table 6.34: Norms for MCP Preparation

Steps Particular

Step-1: Comprehensive profile of SHG - Includes details about SHG (name, village, no. of members, bank

account no.,), particulars of savings and loans and status of practicing of Panchasutra

Step-2: Socio-economic profiles of all the members - Includes age, caste, occupation, members of family,

details of assets (like type of house, land, livestock and other assets) and poverty status

Step-3: Member wise statement of household incomes and expenditures

Step-4:

Member wise portfolios of opportunities identified by them along with costs and repayment

schedules - Activities identified, investment cost, sources of funds (margin, loan, subsidy, etc.),

calculation of ability of repayment based on household income and expenditure and loan

installment

Step-5: Prioritization plan for the members from the poorest of the poor category - Loan needs

prioritized, finalized and appraised. Prioritization based on seasonality of the activity besides the

poverty ranking. Priority ranking should take into account emergencies.

Step-6: Rotation for the remaining members and terms of the partnerships of the group - The terms

include Panchasutra, terms for utilization of loan, asset verification by non-loanee members, etc.

Step-7: Terms of Partnerships between members and SHG, between SHG and their federations -

Panchasutra, terms for utilization of loan, asset verification by non-loanee members, criteria and

grading of SHGs for sanction & release of loans, etc.

Table 6.35(a): MCP Preparation Training - Intensive Block (Sohagpur)

Level of staff /

members

Time

(days)

Training

Content Who attended? Who provided training?

DMMU Level NA NA NA NA

PFT Level 3 days 7 steps of MCP PFT members DM in Chhatwai, Hardi

No.32 and Karkati PFTs

DPM & DM in Lalpur and

Pachgaon PFTs

CRP Level 5 days Concept of MCP

as per guideline

CRPs in all 5 sampled PFTs

(i.e. Chhatwai, Hardi No.32,

Karkati, Lalpur and

Pachgaon)

Core Team

VO / SHG level 2 days Concept of MCP

as per guideline

SHG members and BK in all 5

sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati,

Lalpur and Pachgaon)

CRPs and Nodal PFT

90 90

Table 6.35(b): MCP Preparation Training - Resource Block (Jaisinghnagar)

Level of staff /

members

Time (days) Training Content Who attended? Who provided

training?

DMMU Level NA NA NA NA

PFT Level NA NA NA NA

CRP Level NA NA NA NA

VO / SHG level 7 days in Aamdih,

Gopalpur and

Kanadikhurd PFTs

7 steps of MCP in

Aamdih, Gopalpur

and Kanadikhurd

PFTs

SHG members, CRPs

and PFTs of Aamdih,

Gopalpur and

Kanadikhurd PFTs

CRPs of Resource

Agency

Table 6.36: MCP Preparation

Particulars Intensive Block Resource Block

Availability of

Standard Format

- Yes available in all 5 sampled PFTs

(i.e. Chhatwai, Hardi No.32,

Karkati, Lalpur and Pachgaon)

Yes available in all 5 sampled PFTs

(i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

Who prepares? SHG, CRP and Nodal PFT in all 5

sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati, Lalpur and

Pachgaon)

CRPs and PRP in Aamdih PFT

CRPs in all 4 sampled PFTs (i.e.

Amjhor, Gopalpur, Kanadikhurd

and Sidhi)

Time (in months) After 6 months of SHG formation in

all 5 sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati, Lalpur and

Pachgaon)

After 6 months of SHG formation in

all 5 sampled PFTs (i.e. Aamdih,

Amjhor, Gopalpur, Kanadikhurd

and Sidhi)

Who appraises MCPs? District Core team in all 5 sampled

PFTs (i.e. Chhatwai, Hardi No.32,

Karkati, Lalpur and Pachgaon)

Nodal PFTs in all 5 sampled PFTs

(i.e. Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

Who approves MCPs? DPM in all 5 sampled PFTs (i.e.

Chhatwai, Hardi No.32, Karkati,

Lalpur and Pachgaon)

DPM in all 5 sampled PFTs (i.e.

Aamdih, Amjhor, Gopalpur,

Kanadikhurd and Sidhi)

Acceptance rate in 1st

time submission

75-100% in all 5 sampled PFTs (i.e.

Chhatwai, Hardi No.32, Karkati,

Lalpur and Pachgaon)

75-100% in 3 sampled PFTs -.(i.e.

Aamdih, Amjhor and Sidhi)

100% in Gopalpur, and

Kanadikhurd PFTs

Lessons learned, Constraints & Challenges and the Way Forward

MCP preparation training is initiated after 6 months of formation of SHGs. In

Intensive Block, 2-5 days training is organized for PFT level Mission team as well

as for CRPs and VO/SHG representatives. The training was organized 3 days for

PFT members, 5 days for CRPs and 2 days for VO/SHG representatives. In

Resource Block, 7 days training was organized for SHG members, CRPs and PFTs

at VO/SHG level, which were facilitated by the Resource Organisation.

A standardized MCP format is available with the Mission team. In Intensive

Block, MCPs are jointly prepared by SHG, CRP and nodal PFTs. It is appraised by

District core team and approved by the DPM. In first submission of MCPs, the

acceptance rate of all 5 sampled PFTs are between 75-100 per cent. In Resource

Block, MCPs are prepared by the CRPs and PRPs. It is appraised by PFT and

approved by the DPM. In first submission of MCPs, the acceptance rate of 2

91 91

sampled PFTs (i.e. Gopalpur and Kanadikhurd) of Resource Block is 100 per

cent. However, in remaining 3 sampled PFTs it is between 75-100 per cent.

Most of the cases, the priorities of the individuals have changed. MCPs need to be

revisited and updated as and when required. The changes made in MCPs should

be recorded in meeting / minutes register for future references.

6.5.5 SHG Database Management training, updating, uploading and hand-holding support and services delivered to SHGs

In the ensuing paragraphs, the norms for providing training on the SHG Database

Management, its updation, uploading on the MIS as well as the hand-holding support

and services delivered to the SHGs are discussed, along with the deviations observed.

Further, the best practices emanating from these processes in the two blocks surveyed

are also discussed.

Table 6.37(a): SHG Database Management Training - Intensive Block (Sohagpur)

Level of staff /

members

Time

(days) Training Content Who attended?

Who provided

training?

DMMU Level NA NA NA NA

PFT Level 2 day Need based in Chhatwai and

Hardi No. 32 PFTs and MIS

Based in Karkati, Lalpur and

Pachgaon PFTs

PFT members of all 5

sampled PFTs (i.e. Chhatwai,

Hardi No.32, Karkati,

Lalpur and Pachgaon)

DM-M&E

CRP Level NA NA NA NA

VO / SHG level NA NA NA NA

Table 6.37(b): SHG Database Management Training - Resource Block (jaisinghnagar)

Level of staff / members

Time (days)

Training Content Who attended? Who provided

training?

DMMU Level NA NA NA NA

PFT Level 2 day workshop

MIS based PFT members of all 5 sampled PFTs (i.e. Aamdih, Amjhor, Gopalpur, Kanadikhurd and Sidhi)

DM-M&E

CRP Level NA NA NA NA

VO / SHG level NA NA NA NA

Table 6.38(a): SHG Database updating, uploading and hand-holding support and services

delivered to SHGs - Intensive Block (Sohagpur)

Level of staff / members

Availability of proper

Infrastructure

Availability of standard reporting formats

Regular Schedule of reporting

Person responsible for data updation

Person responsible for data uploading

Frequency of data

review and validation

DMMU Level Yes Yes Yes M&E DM MIS Monthly

PFT Level Yes Yes Yes PFT Coordinator Nodal PFT Monthly

VO / SHG level No Yes Yes Computer CRP / Nodal PFT

Book Keeper / Computer CRP / Nodal PFT

Monthly

92 92

Table 6.38(b): SHG Database updating, uploading and hand-holding support and services

delivered to SHGs - Resource Block (Jaisinghnagar)

Level of staff / members

Availability of proper

Infrastructure

Availability of standard reporting formats

Regular Schedule of reporting

Person responsible for data updation

Person responsible for data uploading

Frequency of data

review and validation

DMMU Level Yes Yes Yes M&E DM MIS Monthly

PFT Level Yes Yes Yes Nodal PFT / Coordinator

PFT member Monthly

VO / SHG level No Yes Yes Nodal PFT Book Keeper / Computer CRP / Nodal PFT

Monthly

Lessons learned, Constraints & Challenges and the Way Forward

In Intensive Block as well as Resource Block, the database management training

was done at PFT level for PFT members by DM-M&E.

There are standard reporting formats, schedule of reporting interval, availability

of proper infrastructure, persons responsible for data updating and uploading at

DMMU and PFT level.

VOs and SHGs lack the capacity and infrastructure for data updating and

uploading.

6.5.6 Coordination, support and supervision Mechanism

The processes of coordination, support and supervision mechanism at the DMMU and

PFT level are discussed in the ensuing paragraphs, whereby the norms vs. practices for

the same are presented.

Table 6.39(a): Coordination, support and supervision Mechanism - Intensive Block

Type of coordination, support and

supervision mechanism DMMU Level PFT Level

Preparation of Annual Action Plan (AAP) DMMU Team for all 5 sampled PFTs Nodal PFT

Review of AAP DPM for all 5 sampled PFTs PFT Coordinator

Prep. of implementation plan (after

approval of AAP)

DM (subject wise) for all 5 sampled

PFTs

Nodal PFT

Monitoring of implementation plan

through the year

M&E DM for all 5 sampled PFTs Nodal DM & PFT

Coordinator

Monitoring frequency Monthly Monthly

Identification of deviations (physical

targets)

M&E DM for all 5 sampled PFTs Nodal DM / PFT

Coordinator

Identification of deviations (financial

targets)

Finance DM for all 5 sampled PFTs Nodal DM / PFT

Coordinator

How are the deviations addressed? Review Reports Based on Field

observation & Account verification

MIS, Review Reports

& Appraisal meeting

93 93

Table 6.39(b): Coordination, support and supervision Mechanism - Resource Block

Type of coordination, support and

supervision mechanism DMMU Level PFT Level

Preparation of Annual Action Plan (AAP) Nodal DM in consultation with

PFT

PFT

Review of AAP DPM for all 5 sampled PFTs DPM

Prep. of implementation plan (after approval

of AAP)

DM for all 5 sampled PFTs PFT

Monitoring of implementation plan through

the year

M&E DM for all 5 sampled PFTs DM

Monitoring frequency Monthly Monthly

Identification of deviations (physical targets) MIS & DM Review Reports for

all 5 sampled PFTs

PFT Coordinator&

Nodal DM

Identification of deviations (financial targets) Finance DM for all 5 sampled

PFTs

PFT Coordinator&

DM

How are the deviations addressed? MIS and Financial Status Monthly Reports

Lessons learned, Constraints & Challenges and the Way Forward

Mission team is providing coordination, support and supervision assistance at

DMMU and PFT level. These services are in the form of preparation of Annual

Action Plan (AAP), review of AAP, preparation of implementation plan (after

approval of AAP), monitoring of implementation plan throughout the year,

identification of deviations (physical & financial targets), and their rectification

procedure.

Community level representatives need to be included at formal structure of

coordination, support and supervision of Mission initiatives.

6.6 Strengthening, Services and Payment of honorarium to Social Capital

As with the previous section, key findings relating to some aspects of this theme, for

Shahdol district, are discussed in the ensuing paragraphs.

6.6.1 Strengthening of Social Capital and Honorarium

The table below presents the types of capacity building programmes planned and

executed for Book Keepers:

Table 6.40: Types of CB programmes - Book Keepers

SN Block PFT Exposure Visits

Induction /

Orientation Training Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

District SHAHDOL

1

Jaisinghnagar

Aamdih 220 180

2 Amjhor 260 260

3 Gopalpur 245 190

4 Kanadikhurd 303 285

5 Sidhi 230 230

Sub-total 0 0 0 0 1258 1145 0 0

94 94

SN Block PFT Exposure Visits

Induction /

Orientation Training Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

1

Sohagpur

Chhatwai 135 100

2 Hardi No. 32 210 140

3 Karkati 130 120

4 Lalpur 90 40

5 Pachgaon 112 112

Sub-total 0 0 0 0 677 512 0 0

Grand Total 0 0 0 0 1935 1657 0 0

The table below presents the types of capacity building programmes planned and

executed for Master Book Keepers:

Table 6.41: Types of CB programmes - Master Book Keepers

SN Block PFT Exposure Visits

Induction /

Orientation

Training

Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

District SHAHDOL

1

Jaisinghnagar

Aamdih 20 20

2 Amjhor 20 20

3 Gopalpur 20 20

4 Kanadikhurd 20 20

5 Sidhi 27 27

Sub-total 0 0 0 0 107 107 0 0

1

Sohagpur

Chhatwai 11 11 11 11

2 Hardi No. 32 4 4

3 Karkati 3 5

4 Lalpur 3 3 10 10

5 Pachgaon 100 100 100 100 100 100

Sub-total 103 103 111 111 128 130 0 0

Grand Total 103 103 111 111 235 237 0 0

The table below presents the types of capacity building programmes planned and

executed for MCP Trainer:

Table 6.42: Types of CB programmes - MCP Trainers

SN Block PFT Exposure Visits

Induction /

Orientation Training Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

District SHAHDOL

1

Jaisinghnagar

Aamdih 2 2

2 Amjhor 15 5

3 Gopalpur 2 2

4 Kanadikhurd 3 3

95 95

SN Block PFT Exposure Visits

Induction /

Orientation Training Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

5 Sidhi 15 2

Sub-total 0 0 0 0 37 14 0 0

1

Sohagpur

Chhatwai 3 3 3 3

2 Hardi No. 32 26 0

3 Karkati 20

4 Lalpur 5 5

5 Pachgaon 10 10 10 10 10

Sub-total 10 0 13 13 64 18 0 0

Grand Total 10 0 13 13 101 32 0 0

The table below presents the types of capacity building programmes planned and

executed for Livelihood Promoters (Agriculture / AH):

Table 6.43: Types of CB programmes - Livelihood Promoters Agriculture/AH

SN Block PFT

Exposure Visits Induction / Orientation

Training Thematic Training Workshop

Planned Executed Planned Executed Planned Execute

d

Planne

d

Execut

ed

District SHAHDOL

1

Jaisinghnagar

Aamdih 12 / 7 12 / 7

2 Amjhor 12 / 5 12 / 5

3 Gopalpur 34 / 5 34 / 5

4 Kanadikhurd 13 / 4 13 / 4

5 Sidhi 17 / 20 17 / 20

Sub-total 0 0 0 0 88 / 41 88 / 41 0 0

1

Sohagpur

Chhatwai 5 / 6 11 / 15 11 / 15 11 / 15 11 / 15

2 Hardi No. 32 18 / 11 18 / 11

3 Karkati 7 / 7 7 / 7

4 Lalpur 6 / 6 6 / 6

5 Pachgaon 250 / 150 203 / 150 250 / 150 203 / 150 250 /

150

203 /

150

Sub-total 250 / 150 208 / 156 261 / 165 214 / 165 292 /

189

245 /

189 0 0

Grand Total 250 / 150 208 / 156 261 / 165 214 / 165 380 /

330

333 /

330 0 0

The table below presents the types of capacity building programmes planned and

executed for Gender CRPs:

96 96

Table 6.44: Types of CB programmes - Gender CRPs

S

N Block PFT

Exposure Visits Induction /

Orientation Training Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

District SHAHDOL

1

Jaisinghnagar

Aamdih

2 Amjhor

3 Gopalpur

4 Kanadikhurd

5 Sidhi

Sub-total 0 0 0 0 0 0 0 0

1

Sohagpur

Chhatwai 31 28 31 28

2 Hardi No. 32

3 Karkati

4 Lalpur

5 Pachgaon 450 425 450 425 450 425

Sub-total 450 425 481 453 481 453 0 0

Grand Total 450 425 481 453 481 453 0 0

The table below presents the types of CB programmes planned and actually executed for

Bank Mitra:

Table 6.45 Types of CB programmes - Bank Mitra

S

N Block PFT

Exposure Visits Induction /

Orientation Training Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

District SHAHDOL

1

Jaisingh-

nagar

Aamdih

2 Amjhor

3 Gopalpur

4 Kanadikhurd 1

5 Sidhi 1

Sub-total 0 0 0 0 2 0 0 0

1

Sohagpur

Chhatwai

2 Hardi No. 32 1 1

3 Karkati 3

4 Lalpur 1 1

5 Pachgaon 11 11 11 11 11 11

Sub-total 11 11 11 11 16 13 0 0

Grand Total 11 11 11 11 18 13 0 0

97 97

The table below presents the types of CB programmes planned and actually executed for

Community Activists:

Table 6.46: Types of CB programmes – Community Activist

SN Block PFT Exposure Visits

Induction /

Orientation Training Thematic Training Workshop

Planned Executed Planned Executed Planned Executed Planned Executed

District SHAHDOL

1

Jaisingh-

nagar

Aamdih 10 6

2 Amjhor 13 6

3 Gopalpur 11 9

4 Kanadikhurd 11

5 Sidhi 15

Sub-total 0 0 0 0 60 21 0 0

1

Sohagpur

Chhatwai 11 11 11 11

2 Hardi No. 32 25

3 Karkati 7

4 Lalpur 12 8

5 Pachgaon 250 203 250 203 250 203

Sub-total 250 203 261 214 305 222 0 0

Grand Total 250 203 261 214 365 243 0 0

6.6.2 Payment of honorarium to the Social Capital

The table below presents the status of payment of honorarium planned and actually

paid to social capital:

Table 6.47(a): Payment of honorarium (planned)

SN Block PFT Book Keepers Active Women

Master Book

Keppers MCP Trainers

Planned Actual Planned Actual Planned Actual Planned Actual

District SHAHDOL SHGs SHGs VOs VOs Mission VOs Mission

1

Jaisinghnagar

Aamdih SHGs SHGs VOs Mission VOs Mission VOs Mission

2 Amjhor SHGs SHGs VOs VOs Mission VOs Mission

3 Gopalpur SHGs VOs Mission VOs Mission VOs Mission

Kanadikhurd SHGs SHGs VOs Mission VOs Mission VOs Mission

4 Sidhi VOs Mission VOs Mission VOs Mission

1

Sohagpur

Chhatwai VOs Mission VOs Mission VOs Mission VOs Mission

2 Hardi No. 32 VOs Mission VOs Mission VOs Mission VOs Mission

3 Karkati VOs Mission VOs Mission VOs Mission

4 Lalpur VOs Mission VOs Mission VOs Mission VOs Mission

5 Pachgaon SHGs SHGs VOs Mission VOs Mission VOs Mission

98 98

Table 6.47(b): Payment of honorarium (actually paid)

SN Block PFT

Livelihood Promoters

(Agri/AH) Gender CRPs Bank Mitra

Community

Activist

Planned Actual Planned Actual Planned Actual Planned Actual

District SHAHDOL VOs Mission VOs VOs

1

Jaisinghnagar

Aamdih VOs Mission VOs VOs

2 Amjhor VOs Mission VOs VOs

3 Gopalpur VOs Mission VOs

Kanadikhurd VOs Mission VOs VOs

4 Sidhi VOs Mission VOs Mission VOs

1

Sohagpur

Chhatwai VOs Mission VOs VOs Mission

2 Hardi No. 32 VOs Mission VOs VOs Mission

3 Karkati VOs Mission VOs Mission VOs

4 Lalpur VOs Mission VOs VOs Mission

5 Pachgaon VOs Mission VOs Mission VOs Mission

6.6.3 Services rendered by the Social Capital

The table below presents the services rendered by the Book Keeper to community

institutions - SHGs and VOs:

Table 6.48: Services - Book Keeper

SN Block PFT SHG

Accounting

Regular

maintenance of

books of

accounts

Facilitate

SHG loan

repayment

Facilitate

the

paperwork

for CCL

Ensure

accounting

related

transparency

Preparation

of VO

report

District SHAHDOL Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes Yes

2 Amjhor Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes Yes Yes Yes

4 Kanadikhurd Yes Yes Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes Yes

3 Karkati

4 Lalpur Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes Yes

99 99

The table below presents the services rendered by Active Women to community

institutions - SHGs and VOs:

Table 6.49: Services – Active Women

SN Block PFT

Fa

cili

tate

mo

bil

iza

tio

n o

f

po

or

wo

me

n i

nto

SH

Gs

Ex

pla

in S

HG

re

late

d

pro

cess

es

to m

em

be

rs

En

sure

me

eti

ng

pro

cess

is p

rop

erl

y f

oll

ow

ed

Te

ach

th

e i

llit

era

te

wo

me

n t

o r

ea

d a

nd

wri

te

Ma

inta

in p

ap

erw

ork

Ass

ess

ne

ed

s o

f S

HG

me

mb

ers

(tr

ain

ing

rela

ted

, fin

an

ce r

ela

ted

,

etc

.)

Bu

ild

ing

a p

osi

tiv

e

en

vir

on

me

nt

Co

nfl

ict

reso

luti

on

District SHAHDOL Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes Yes

2 Amjhor Yes Yes Yes

3 Gopalpur Yes Yes Yes

4 Kanadikhurd Yes Yes Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes

3 Karkati Yes Yes Yes Yes Yes Yes

4 Lalpur Yes Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes Yes

The table below presents the services rendered by the Master Book Keeper to

community institutions - SHGs and VOs:

Table 6.50: Services – Master Book Keeper

SN Block PFT Training of Book

Keepers

Hand-holding support

to BKs

District SHAHDOL Yes Yes

1

Jaisinghnagar

Aamdih

2 Amjhor Yes Yes

3 Gopalpur Yes Yes

4 Kanadikhurd Yes Yes

5 Sidhi Yes Yes

1

Sohagpur

Chhatwai Yes Yes

2 Hardi No. 32 Yes Yes

3 Karkati Yes Yes

4 Lalpur Yes Yes

5 Pachgaon Yes Yes

100 100

The table below presents the services rendered by the MCP Trainer to community

institutions - SHGs and VOs:

Table 6.51: Services – MCP Trainer

SN Block PFT Training for MCP

preparation

Hand-holding support

for MCP preparation

Support to MCP

appraisal and

approval process

District SHAHDOL Yes Yes

1

Jaisinghnagar

Aamdih Yes

2 Amjhor Yes Yes

3 Gopalpur Yes

4 Kanadikhurd Yes Yes

5 Sidhi Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes

2 Hardi No. 32 Yes Yes

3 Karkati Yes Yes Yes

4 Lalpur Yes Yes

5 Pachgaon Yes Yes

The table below presents the services rendered by the Livelihood Promotors (Agri/AH)

to community institutions - SHGs and VOs:

Table 6.52: Services – Livelihood Promoter (Agri/AH)

SN Block PFT Identification of relevant

livelihood options

Hand-holding support to

SHG members for IGA

District SHAHDOL Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes

2 Amjhor Yes Yes

3 Gopalpur Yes Yes

4 Kanadikhurd Yes

5 Sidhi Yes Yes

1

Sohagpur

Chhatwai Yes Yes

2 Hardi No. 32 Yes Yes

3 Karkati Yes Yes

4 Lalpur Yes Yes

5 Pachgaon Yes

101 101

The table below presents the services rendered by the Bank Mitra to community

institutions - SHGs and VOs:

Table 6.53: Services – Bank Mitra

SN Block PFT Liaise with

banks

Hand-holding

support to SHGs for

bank linkage

Support to SHGs for

documentation /

paperwork

District SHAHDOL

1

Jaisinghnagar

Aamdih Yes

2 Amjhor

3 Gopalpur

4 Kanadikhurd

5 Sidhi Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes

2 Hardi No. 32 Yes Yes

3 Karkati Yes Yes Yes

4 Lalpur Yes

5 Pachgaon Yes

The table below presents the services rendered by the Community Activist to

community institutions - SHGs and VOs:

Table 6.54: Services – Community Activist

SN Block PFT Book keeping

support to VOs

Capacity

building of VOs

Hand-holding

support to VOs

Monitoring of

VO activities

District SHAHDOL Yes

1

Jaisinghnagar

Aamdih Yes Yes

2 Amjhor Yes

3 Gopalpur Yes

4 Kanadikhurd Yes Yes

5 Sidhi Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes

3 Karkati Yes Yes

4 Lalpur Yes Yes Yes

5 Pachgaon Yes

102

The table below presents the services rendered by the PFT:

Table 6.55: Services – PFT

SN Block PFT

Mo

bil

iza

tio

n a

nd

co

nce

pt

see

din

g o

f S

HG

SH

G F

orm

ati

on

an

d

Str

en

gth

en

ing

Fo

rmu

lati

on

of

rule

s /

no

rms

/ b

ase

do

cum

en

ts o

f

SH

Gs

Bo

ok

ke

ep

ing

an

d

do

cum

en

tati

on

su

pp

ort

to

SH

Gs

Ide

nti

fica

tio

n, a

ud

it a

nd

rev

iva

l o

f n

on

-

act

ive

/d

efu

nct

SH

Gs

SH

Gs

Ba

nk

an

d C

red

it

Lin

ka

ge

s

Up

da

tin

g S

HG

Da

tab

ase

Pe

rfo

rma

nce

Ap

pra

isa

l /

ev

alu

ati

on

of

Bo

ok

Ke

ep

er

an

d p

ay

me

nt

syst

em

Ca

pa

city

bu

ild

ing

of

SH

G

incl

ud

ing

ha

nd

ho

ldin

g

tra

inin

g, e

xp

osu

re v

isit

s, e

tc.

Se

lect

ion

of

go

od

SH

Gs

for

form

ati

on

of

fed

era

tio

ns

(vil

lag

e o

rga

nis

ati

on

s)

Ad

dre

ssin

g o

f so

cia

l is

sue

s

by

SH

Gs

Co

nfl

ict

/ p

rob

lem

reso

luti

on

District SHAHDOL Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

2 Amjhor Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

4 Kanadikhurd Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes Yes Yes Yes

3 Karkati Yes Yes Yes Yes Yes Yes Yes Yes Yes

4 Lalpur Yes Yes Yes Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes Yes Yes Yes

103

The table below presents the services rendered by the DMMU:

Table 6.56: Services – DMMU

SN

Blo

ck

PF

T

Gra

din

g o

f S

HG

Fin

an

cia

l li

tera

cy

Mic

ro P

lan

nin

g (

MC

P/

MIP

Pre

pa

rati

on

)

En

tre

pre

ne

urs

hip

an

d

Inco

me

Ge

ne

rati

on

Act

ivit

ies

of

SH

Gs

Bu

sin

ess

De

ve

lop

me

nt

&

Ma

rke

t L

ink

ag

es

Dis

bu

rse

me

nt

an

d

ma

na

ge

me

nt

of

RF

, CIF

an

d V

RF

De

ve

lop

me

nt

of

self

-

mo

nit

ori

ng

sy

ste

m

Re

vie

w o

f re

cord

s /

bo

ok

s

of

acc

ou

nts

Ph

ysi

cal

an

d F

ina

nci

al

Mo

nit

ori

ng

an

d

Ev

alu

ati

on

Le

ad

ers

hip

an

d G

en

de

r

Ma

inst

rea

min

g

Ma

inte

na

nce

of

SH

G M

IS

Co

nfl

ict

/ p

rob

lem

reso

luti

on

District SHAHDOL Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

2 Amjhor Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes Yes Yes Yes Yes Yes Yes

4 Kanadikhurd Yes Yes Yes Yes Yes Yes Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes Yes Yes

3 Karkati Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

4 Lalpur Yes Yes Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes Yes Yes Yes Yes Yes

104

The table below presents the services rendered by the Bankers:

Table 6.57: Services – Banker

SN Block PFT Opening of Bank Account

Financial Literacy

Preparation of financial documents

Fixing the CCL

Grading of SHGs

Loan disbursement

Loan Recovery

District SHAHDOL Yes Yes Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes

2 Amjhor Yes Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes Yes

4 Kanadikhurd Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes Yes

3 Karkati Yes Yes Yes Yes Yes Yes

4 Lalpur Yes Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes Yes

The table below presents the status of Identification of idle fund:

Table 6.58: Identification of idle fund

SN Block PFT By regular

monitoring of Saving account

By regular monitoring of

cash box

By regular monitoring of inter-

loaning system

By regular monitoring of

loan repayment

District SHAHDOL Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes

2 Amjhor Yes Yes Yes

3 Gopalpur Yes Yes

4 Kanadikhurd Yes Yes Yes

5 Sidhi Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes

3 Karkati Yes Yes Yes

4 Lalpur Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes

6.7 Social Inclusion

As mentioned before, the findings pertaining to the various processes related to the

theme “Social inclusion” were presented and discussed in detail in the second quarter.

However, key findings relating to some aspects of this theme, for Shahdol district, are

discussed in the ensuing paragraphs.

105

6.7.1 Approval of WBR list in Gram Sabha, display of list in public places and updating

The status of approval of WBR list in Gram Sabha of Mission area is as follows:

Table 6.59: Approval of list in Gram Sabha

SN Block PFT Approval of WBR list

in Gram Sabha District SHAHDOL Yes

1

Jaisinghnagar

Aamdih Yes 2 Amjhor Yes 3 Gopalpur Yes 4 Kanadikhurd Yes 5 Sidhi Yes 1

Sohagpur

Chhatwai Yes 2 Hardi No. 32 Yes 3 Karkati Yes 4 Lalpur Yes 5 Pachgaon Yes

The status of display of list of beneficiaries in public places is as follows:

Table 6.60: Display of list in public space

SN Block PFT Display of WBR list in

public place

District SHAHDOL No

1

Jaisinghnagar

Aamdih No

2 Amjhor No

3 Gopalpur No

4 Kanadikhurd No

5 Sidhi No

1

Sohagpur

Chhatwai No

2 Hardi No. 32 No

3 Karkati No

4 Lalpur No

5 Pachgaon No

The status of updating WBR list after being approved as follows:

Table 6.61: Updating list after being approved

SN Block PFT Updation of WBR list after

being approved

District SHAHDOL No

1

Jaisinghnagar

Aamdih No

2 Amjhor No

3 Gopalpur No

4 Kanadikhurd No

5 Sidhi No

1

Sohagpur

Chhatwai No

2 Hardi No. 32 No

3 Karkati No

4 Lalpur No

5 Pachgaon No

106

6.7.2 Strategies to ensure inclusion of socially excluded sections

The table below presents a comparative overview of the strategies adopted to ensure inclusion of socially excluded sections in the sampled

blocks of Shahdol district:

Table 6.62: Strategies to ensure inclusion of socially excluded sections

SN Block PFT Spatial and

Geographical targeting

Social group

targeting

Economic or

occupation based

targeting

Focus on marginalized women and other vulnerable groups (widows, women headed HHs, old

persons, people with disabilities, etc.)

Focus on people involved in hazardous

occupations (mining, stone crushing, wood

carving, etc.)

Covering areas with

poor infrastructur

e and poor connectivity

Covering disaster

prone remote areas

Special initiatives in conflict

prone interior pockets

Special thrust on socially

invisible groups (e.g.

PVTGs)

District SHAHDOL Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes

2 Amjhor Yes Yes Yes Yes

3 Gopalpur Yes Yes

4 Kanadikhurd Yes Yes

5 Sidhi Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes

2 Hardi No. 32 Yes Yes

3 Karkati Yes Yes Yes

4 Lalpur Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes Yes

107

6.7.3 Different social groups categorized in the project for finding out shift of HHs within social groups

The different social groups categorized in the project for finding out shift of households within social groups were as follows:

Table 6.63(a): Different social groups categorized in the project for finding out shift of HHs within social groups

SN Block PFT

Segment of societies/ communities especially SC, ST, PTGs, Nomadic

Tribes, De-notified Tribes, Isolated/neglected communities

Disadvantaged groups (orphans, widows, old-

aged, people with disabilities, etc.)

Low income

Low standard of living

Manual Scavengers

Bonded labourers

People working in hazardous

occupations

District SHAHDOL Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes

2 Amjhor Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes

4 Kanadikhurd Yes Yes Yes

5 Sidhi Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes

3 Karkati Yes Yes Yes Yes Yes Yes

4 Lalpur Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes

108

Table 6.63(b): Different social groups categorized in the project for finding out shift of HHs

within social groups

SN Block PFT

Communities affected by/displaced by natural

calamities/developmental projects

Daily wage /

labourers

Marginalised groups (due to poor

infrastructure and facilities/services)

District SHAHDOL

1

Jaisinghnagar

Aamdih Yes

2 Amjhor Yes

3 Gopalpur Yes 4 Kanadikhurd Yes 5 Sidhi Yes Yes 1

Sohagpur

Chhatwai

2 Hardi No. 32 Yes

3 Karkati 4 Lalpur Yes

5 Pachgaon Yes Yes

6.7.4 Major criteria used for defining poverty

The major criteria used for defining poverty were as follows:

Table 6.64: Major criteria used for defining poverty

SN Block PFT Criteria 1 Criteria 2 Criteria 3 Criteria 4 Criteria 5 Criteria 6 Criteria 7

District SHAHDOL Physical

Condition Landless

Resource Availability

Women Headed Family

Irrigation Facility

Number of Earning

Members

Type of Livelihood

1

Jaisinghnagar

Aamdih Land Resource Type of

livelihood Status of

Home

Number of

earnining member

Critical disease

Food security

2 Amjhor Land Resource Food

insecurity

Number Of Earning member

Status of living

Number of Family

member

3 Gopalpur Land Income Source

Type of Livelihood

Status of house

irrigation facility

other Resource availbility

4 Kanadikhurd Type of

Land Land

Availbility Status of

House Type of

Livelihood

Number of earning members

Other Resourses

Food Security

5 Sidhi Land

Availability Resource

Availability Physical fitness

Livelihood Source

Women Headed family

Irrigation facility

Number of Family

member

1

Sohagpur

Chhatwai Land

Availability Resource

Availability Health Status

Number of Family

Members

Number of earning members

Irrigation Facility

Type of Livelihood

2 Hardi No. 32 Landless Resource

less Type of

livelihood Physical

Condition

Number of earning members.

Health status

(Critical disease)

Irrigation facility

3 Karkati Landless Resource

availability Livestock

Number of family

member

Type of Livelihood

4 Lalpur Age Factor Health Factor

Landless Employment

Status Type of

Livelihood

Number of earning

members

Resource availability

5 Pachgaon Land Irrigation

facility

Number of Earning

members

Type of livelihood

Type of house

Type of Resource

Transportation mode

109

6.7.5 Major vulnerability and risk factors

The major vulnerability and risk factors considered during identification of vulnerable

households were as follows:

Table 6.65: Major vulnerability and risk factors

SN Block PFT Lack of

sustainable LH sources

Shocks

Seasonal varieties in weather /

climate

Man-made

disasters

Cultural practices / Traditional

customs

Lack of social security system at community

level

District SHAHDOL Yes Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes Yes

2 Amjhor Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes Yes

4 Kanadikhurd Yes Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes

3 Karkati Yes Yes Yes Yes

4 Lalpur Yes Yes

5 Pachgaon Yes Yes Yes Yes Yes

6.7.6 Criteria followed for assessment of vulnerability

The criteria followed for assessment of vulnerability in the Mission area were as follows:

Table 6.66: Criteria followed for assessment of vulnerability

SN Block PFT

Areas/regions/ villages suffering

from physical segregation

Do not have access to

basic rights and

entitlements

High presence of vulnerable groups (orphans, widoes, old-aged, people with disabilities,

etc.)

Exclusion occurs due

to migration

Others

District SHAHDOL Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes

2 Amjhor Yes Yes

3 Gopalpur Yes Yes

4 Kanadikhurd Yes Yes

5 Sidhi Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes

2 Hardi No. 32 Yes Yes

3 Karkati Yes Yes

4 Lalpur Yes Yes Yes (Irrigation

problem)

5 Pachgaon Yes Yes

110

6.7.7 Special efforts made for vulnerable groups

The special efforts made for vulnerable groups were as follows:

Table 6.67: Special efforts made for vulnerable groups

SN Block PFT Effort 1 Effort 2 Effort 3 Effort 4

District SHAHDOL VRF Social Protection

Schemes Loan Prioritization

Coverage

Prioritization

1

Jaisinghnagar

Aamdih No major effort

2 Amjhor Convergence VRF Social Protection Scheme

3 Gopalpur No major effort

4 Kanadikhurd Convergence

5 Sidhi Convergence VRF Priority in coverage

1

Sohagpur

Chhatwai VRF Support through

Convergence

Facilitation for social

protection Schemes

Priority in

Coverage

2 Hardi No. 32 VRF Social Protection

Scheme

Prioritization in coverage

and inter-loaning

Support through

Convergence

3 Karkati VRF Convergence Priority in inter-loaning

4 Lalpur VRF Priority for CIF Insurance Support of social

security schemes

5 Pachgaon

Support for Social

Security through

Convergence

Priority in coverage Priority in inter-loaning Awareness

Generation

6.7.8 Exemption / privilege made for vulnerable groups

In all the sampled PFTs of both the blocks – Resource and Intensive – exemptions or

privileges are being provided to the vulnerable groups, as presented below.

Table 6.68: Exemption(s) / privilege(s) made for the vulnerable groups

SN Block PFT Priority in

coverage (SHG membership)

Priority in inter-loaning

Priority in improving access to govt.

schemes

District SHAHDOL Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes

2 Amjhor Yes Yes Yes

3 Gopalpur Yes Yes

4 Kanadikhurd Yes Yes

5 Sidhi Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes

2 Hardi No. 32 Yes Yes Yes

3 Karkati Yes

4 Lalpur Yes Yes

5 Pachgaon Yes Yes Yes

111

6.7.9 Strategy to bring leftover vulnerable families into SHG fold

The strategies to bring leftover vulnerable families into the SHG fold were as follows:

Table 6.69: Strateg(ies) adopted to bring leftover vulnerable families into SHG fold

SN Block PFT Regular follow-

up by PFT members

Regular interactions by internal CRPs

Exposure visits

Sharing of case studies

/ caselets

District SHAHDOL Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes

2 Amjhor Yes Yes Yes

3 Gopalpur Yes Yes Yes

4 Kanadikhurd Yes

5 Sidhi Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes

2 Hardi No. 32

3 Karkati Yes

4 Lalpur Yes Yes

5 Pachgaon Yes Yes Yes

6.7.10 Special Efforts made for vulnerable groups

The table below presents special efforts made for vulnerable groups in the sampled

Mission areas:

Table 6.70: Special efforts made for vulnerable families

SN Block PFT

A B C D E F G H

So

cia

l p

rote

ctio

n

sch

em

es

Fin

an

cia

l in

clu

sio

n

sch

em

es

Av

ail

ab

ilit

y o

f

alt

ern

ate

LH

op

tio

ns

Ass

et

bu

ild

ing

fo

r

foo

d s

ecu

rity

Av

ail

ab

ilit

y o

f

Em

erg

en

cy F

un

d

Be

ne

fits

of

he

alt

h-

sup

po

rtiv

e s

che

me

s

Be

ne

fits

of

nu

trit

ion

-

sup

po

rtiv

e s

che

me

s

Vu

lne

rab

ilit

y R

eli

ef

Fu

nd

District SHAHDOL Yes Yes No No Yes Yes No Yes

1

Jaisinghnagar

Aamdih Yes Yes No No No No No No

2 Amjhor Yes Yes Yes Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes No No No No No No

4 Kanadikhurd Yes Yes No No No No No No

5 Sidhi Yes Yes Yes Yes Yes No No Yes

1

Sohagpur

Chhatwai Yes Yes Yes No No No No Yes

2 Hardi No. 32 Yes Yes No No No No No Yes

3 Karkati Yes Yes No No No No No Yes

4 Lalpur Yes Yes No No No No Yes Yes

5 Pachgaon Yes Yes No No No No No No

112

6.7.11 Priority in SHG norms for most vulnerable members

The priority provided in SHG norms for most vulnerable members were as follows:

Table 6.71: Priority in SHG norms for most vulnerable members

SN Block PFT

Priority in government

scheme benefits

Priority in

coverage

Priority in MCP

preparation

Priority in inter-loaning

Priority in distribution of RF/CIF/bank

loan/etc.

District SHAHDOL Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes

2 Amjhor Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes

4 Kanadikhurd Yes Yes Yes

5 Sidhi Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes

3 Karkati Yes Yes Yes

4 Lalpur Yes Yes

5 Pachgaon Yes Yes Yes Yes

6.7.12 SHG members’ empowerment visible in their villages

As on date, the SHG members’ empowerment is visible in their respective villages as

follows:

Table 6.72: SHG members' empowerment visible in their village

SN Block PFT

Th

rou

gh

in

cre

ase

d a

wa

ren

ess

le

ve

l

Th

rou

gh

in

cre

ase

d l

ite

racy

le

ve

l

Th

rou

gh

in

cre

ase

d s

elf

-co

nfi

de

nce

le

ve

l

Th

rou

gh

in

cre

ase

d p

art

icip

ati

on

in

d

eci

sio

n-m

ak

ing

at

HH

le

ve

l

Th

rou

gh

in

cre

ase

d p

art

icip

ati

on

an

d

de

cisi

on

-ma

kin

g a

t co

mm

un

ity

le

ve

l (G

ram

Sa

bh

a, o

the

r fo

rum

s, e

tc.)

Th

rou

gh

im

pro

ve

d l

ink

ag

e w

ith

oth

er

sta

ke

ho

lde

rs

Th

rou

gh

be

tte

r a

cce

ssib

ilit

y o

f o

the

r g

ov

ern

me

nt

sch

em

es

Th

rou

gh

co

mm

un

ity

in

itia

tiv

es

for

soci

al

cha

ng

e a

nd

rig

hts

/e

nti

tle

me

nts

Th

rou

gh

co

mm

un

ity

mo

nit

ori

ng

of

go

ve

rnm

en

t sc

he

me

s b

y S

HG

/V

O

Th

rou

gh

in

cre

ase

d a

tte

nd

an

ce o

f ch

ild

ren

in

sch

oo

ls

Th

rou

gh

im

pro

ve

d i

nco

me

/ f

ina

nci

al

sta

tus

District SHAHDOL Yes Yes Yes Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes Yes Yes 2 Amjhor Yes Yes Yes Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes Yes Yes Yes

4 Kanadikhurd Yes Yes Yes Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes Yes Yes Yes 1

Sohagpur

Chhatwai Yes Yes Yes Yes Yes Yes Yes 2 Hardi No. 32 Yes Yes Yes Yes Yes Yes Yes 3 Karkati Yes Yes Yes Yes Yes Yes 4 Lalpur Yes Yes Yes Yes 5 Pachgaon Yes Yes Yes Yes Yes

113

6.7.13 Improved social affinity after SHG formation

All the sampled PFTs reported improved social affinity after SHG formation. As on date,

the visibility of improved social affinity is as follows:

Table 6.73: Visibility of improved social affinity

SN Block PFT

United action against social evils

(alcoholism, dowry, child

marriage, etc.)

Joint efforts against village

issues / problems

Dispute resolution (property,

etc.)

Helping vulnerables

(orphans, disabled, old-

aged, etc.)

District SHAHDOL Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes

2 Amjhor Yes Yes

3 Gopalpur Yes Yes

4 Kanadikhurd Yes Yes

5 Sidhi Yes Yes

1

Sohagpur

Chhatwai Yes Yes

2 Hardi No. 32 Yes Yes

3 Karkati Yes Yes Yes

4 Lalpur Yes Yes

5 Pachgaon Yes Yes

114

6.7.14 Expectation of vulnerable groups / families towards changes required

As on date, the expectation of vulnerable groups / families towards changes required are as follows:

Table 6.74: Expectation of vulnerable groups / families towards changes required

SN Block PFT Increased

savings

Increased skills /

knowledge

Increased source of income

Increased number of LH

sources / diversification

Food security

Asset building

Decreased expenditure

on health

Increased say in SHG meetings /

Gram Sabha

Access to government

schemes

Access to rights and entitlements

District SHAHDOL Yes Yes Yes Yes Yes

1

Jaisinghnagar

Aamdih Yes Yes Yes Yes

2 Amjhor Yes Yes Yes Yes Yes

3 Gopalpur Yes Yes Yes Yes

4 Kanadikhurd Yes Yes Yes Yes

5 Sidhi Yes Yes Yes Yes Yes Yes

1

Sohagpur

Chhatwai Yes Yes Yes Yes

2 Hardi No. 32 Yes Yes Yes Yes Yes Yes

3 Karkati Yes Yes Yes Yes

4 Lalpur Yes Yes Yes Yes Yes

5 Pachgaon Yes Yes Yes

115

6.7.15 Social Security

As on date, the women of sampled area have ranked their social security preferences as follows:

Table 6.75: Ranking of Social Security Schemes

SN Block PFT Rank 1 Rank 2 Rank 3 Rank 4 Rank 5 Rank 6 Rank 7

District SHAHDOL Old-age pension Widow pension Disability pension Ladli Laxmi

Yojana Janani Suraksha

Yojana CM Kanyadaan

Yojana Indira Awas

Yojana

1

Jaisinghnagar

Aamdih Janani Suraksha

Yojana Ladli Laxmi Yojana Disability pension

Widow pension

Old-age pension CM Kanyadaan

Yojana Indira Awas

Yojana

2 Amjhor Janani Suraksha

Yojana Ladli Laxmi Yojana Old-age pension

Widow pension

Disability pension CM Kanyadaan

Yojana Indira Awas

Yojana

3 Gopalpur Janani Suraksha

Yojana Ladli Laxmi Yojana Old-age pension

Widow pension

Disability pension CM Kanyadaan

Yojana Indira Awas

Yojana

4 Kanadikhurd Janani Suraksha

Yojana Ladli Laxmi Yojana Old-age pension

Widow pension

Disability pension CM Kanyadaan

Yojana Indira Awas

Yojana

5 Sidhi Ladli Laxmi

Yojana Janani Suraksha

Yojana Old-age pension

Widow pension

Disability pension CM Kanyadaan

Yojana Indira Awas

Yojana

1

Sohagpur

Chhatwai Old-age pension Widow pension Disability pension Ladli Laxmi

Yojana Janani Suraksha

Yojana CM Kanyadaan

Yojana Indira Awas

Yojana

2 Hardi No. 32 Janani Suraksha

Yojana Old-age pension Widow pension

Disability pension

Ladli Laxmi Yojana

CM Kanyadaan Yojana

Indira Awas Yojana

3 Karkati Ladli Laxmi

Yojana Janani Suraksha

Yojana Disability pension

Old-age pension

Widow pension CM Kanyadaan

Yojana Indira Awas

Yojana

4 Lalpur Ladli Laxmi

Yojana CM Kanyadaan

Yojana Janani Suraksha

Yojana Widow pension

Old-age pension Disability pension Indira Awas

Yojana

5 Pachgaon Ladli Laxmi

Yojana Janani Suraksha

Yojana Disability pension

Old-age pension

Widow pension CM Kanyadaan

Yojana Indira Awas

Yojana

116

6.8 Comparative Analysis of findings from Quarter 1, Quarter 2 and Quarter 3

As mentioned before, the themes of Process Monitoring during Quarter 1 nd 2were

repeated during this quarter as well. In this section, a comparative analysis of the

findings on the themes of Community Mobilization; SHG Formation and Strengthening;

and Establishment of Systems (Norms and Practices), is presented for the three districts

covered during the first three quarters, i.e. Shahdol, Sheopur and Mandla districts. The

comparative analysis is presented in the following table.

117

Table 6.76: Comparative findings in Shahdol, Sheopur and Mandla Districts

Theme / Activities Observations from Mandla district Observations from Sheopur district Observations from Shahdol district

Community Mobilization and Identification of Social Capital

The village entry and environment building exercises were conducted by the Mission PFT teams, including up to the PIP process, in both intensive as well as resource blocks. The Mission team of Resource Organisation (RO) was involved after completion of the PIP process.

Same as in Mandla District Same as in Mandla and Sheopur Districts

Intensive Block: In 64 of the 80 sample villages, pre-existing SHGs (active and non-active) were included in the NRLM fold. Resource Block: in 25 of the 31 sample villages, old SHGs (active and non-active) were included in the NRLM fold.

Intensive Block: In 28 of the 45 sample villages, pre-existing SHGs (active and non-active) were included in the NRLM fold. Resource Block: In 41 of the 64 sample villages, old SHGs (active and non-active) were included in the NRLM fold.

Intensive Block: in 6 of the 19 sample villages (for SHG study), pre-existing SHGs (active and non-active) were included in the NRLM fold. Resource Block: in 7 of the 16 sample villages (for SHG study), old SHGs (active and non-active) were included in the NRLM fold.

Intensive Block: In 98 per cent of the villages, old SHGs (active and non-active) were audited before including them in the NRLM fold. Resource Block: In almost all the villages, pre-existing SHGs (active and non-active) were audited before including them in the NRLM fold.

In Intensive Block as well as Resource Block, almost all the villages, pre-existing SHGs (active and non-active) were audited before including them in the NRLM fold.

In Intensive Block as well as Resource Block almost all the villages, pre-existing SHGs (active and non-active) were audited before including them in the NRLM fold.

Although audio-visual shows, nukkad nataks, and songs were determined to be effective tools of communication, they were used in a few villages only. In the absence of standard guidelines and proper orientation or training, the team was not able to make use of appropriate communication tools and techniques.

Same as in Mandla District Same as in Mandla and Sheopur Districts

At times, the literate women available in the villages are not interested in taking up the position of Book Keeper, as they are apprehensive of going to the other members’ houses, due to the existing social barriers.

In Sheopur district, it was observed that preference is given to male BKs, even if literate females are available, due to security issues for women in the area.

118

Theme / Activities Observations from Mandla district Observations from Sheopur district Observations from Shahdol district

Revival and Strengthening of Old POP SHGs (Target SHGs)

Intensive Block: In 56 of the 80 sample villages, dormant and defunct groups were revived. Resource Block: In 18 of the 31 sample villages, dormant and defunct groups were revived.

Intensive Block: In 23 of the 45 sample villages, dormant and defunct groups were revived. Resource Block: In 26 of the 64 sample villages, dormant and defunct groups were revived.

Intensive Block: in 4 of the 19 sample villages (for SHG study), dormant and defunct groups were revived. Resource Block: in 5 of the 16 sample villages (for SHG study), dormant and defunct groups were revived.

SHG Formation and Strengthening

The Mission team has included 67.5 per cent (61.12% of 9277 target households in Mandla block and 85.64% of 3267 target households in Niwas block) of the target households into NRLM fold.

The Mission team has included 80.34 per cent (78.92% of 18818 target households in Intensive block and 81.75% of 21038 target households in Resource block) of the target households into NRLM fold.

In the intensive block, in less than 20 per cent sample SHGs, the funds were either distributed and used as per the MCP, or equally distributed amongst all members. However, in the resource block, in less than 15 per cent sample SHGs, the funds were either distributed and used as per the MCP, or equally distributed amongst all members.

In the intensive block, 96 per cent sample SHGs, the funds were either distributed and used as per the MCP, or equally distributed amongst all members. However, in the resource block, 100 per cent sample SHGs, the funds were either distributed and used as per the MCP, or equally distributed amongst all members.

In the intensive block, 100 per cent sample SHGs, the funds were either distributed and used as per the MCP, or equally distributed amongst all members. However, in the resource block, 96 per cent sample SHGs, the funds were either distributed and used as per the MCP, or equally distributed amongst all members.

In the intensive block, the SHGs are receiving CIF through the VOs in 96 per cent of sample SHGs, whereas in the resource block, the CIF is disbursed directly to the SHGs as most of the VOs are loose VOs.

In the intensive block, the SHGs are receiving CIF through the VOs in 92 per cent of sample SHGs, whereas in the resource block, the CIF is disbursed directly to the SHGs to 93 per cent, as most of the VOs are loose VOs.

In the intensive block, the SHGs are receiving CIF through the VOs in 25 per cent of sample SHGs, whereas in the resource block, the CIF is disbursed through VOs is 7 per cent of sample SHGs. In resource block most of the VOs are loose VOs.

In Intensive Block 48 groups in NRLM fold that are now inactive, non-functional or dormant. However, in Resource Block 8 groups in NRLM fold those are now inactive, non-functional or dormant.

In Intensive Block 20 groups in NRLM fold that are now inactive, non-functional or dormant. However, in Resource Block 13 groups in NRLM fold those are now inactive, non-functional or dormant.

About 21 NRLM fold SHGs (9 SHGs in Intensive Block and 12 SHGs in Resource Block) have become non-active or dormant in the sample area.

119

Theme / Activities Observations from Mandla district Observations from Sheopur district Observations from Shahdol district

Establishment of Systems (Norms and Practices)

In the sampled area, VOs and SHGs were not observed to be in a position to undertake the various types of grading activities. It is being performed by the nodal PFTs.

Same as in Sheopur District

It was observed that initially the group members equally distributed the funds among themselves. At present, there is a lack of effective planning for use and utilization of these funds among the group members.

Same as in Sheopur District

Actual amount and date of receipt of various types of funds received need by SHG to be recorded in meeting / minutes register (as on date they reflect only in Passbook).

Same as in Sheopur District

About 50 per cent of the CIF amount is disbursed to VOs against their application. The basic purpose of this deduction is to inculcate rotation of amount among all SHGs of the respective VOs. As per norms, the CIF amount is to be disbursed to 50 per cent of the prioritized SHGs, from amongst the applicants of each VO.

Same as in Sheopur District

The SHGs have received the 1st dose of bank loan. The 1st dose bank loan amount varied from Rs. 50000/- to Rs. 60000/-.

The SHGs have received the 1st dose of bank loan. The 1st dose bank loan amount varied from Rs. 50000/- to Rs. 100000/-. However, the loan processing time takes 30-45 days from their application dates.

On an average, disbursement of RF takes 10 months from the date of formation of groups in the intensive block and 9 months from the date of formation of groups in the resource block. Similarly, the disbursement of CIF takes 23 months from the date of formation of groups in the intensive block and 12 months from the date of formation of groups in the resource block.

As per norms RF, VRF & CIF applications submitted and disbursement made to SHGs. The RF & VRF amounts were Rs. 15000/- each for individual eligible SHG. However, CIF amount varied from Rs. 50000/- to Rs. 80000/- per SHG. However, in the case of Resource Block VRF is neither applied by the SHGs/VOs nor disbursed by the Mission.

There is further clarification and guideline required on the Livelihoods / Layering Fund (LF).

Same as in Sheopur District

120

Theme / Activities Observations from Mandla district Observations from Sheopur district Observations from Shahdol district

In the Intensive Block, training on preparation of documents for bank linkages was provided at two levels viz. 3 days PFT level training by SIRD. However, in the Resource Block, it was provided by PFT members to community (VO/SHG) only.

In Intensive Block as well as Resource Block, no formal training were provided for preparation of documents for bank linkages.

The Mission team assisted the SHGs for bank linkages and handholding support in terms of coordination and networking with banks, sensitization of bankers, documents preparation, introduction at banks for account opening and credit linkages and assists them in timely repayment of loans.

Same as in Sheopur District However, most of these activities were restricted to DMMU and PFT levels only.

MCP preparation training is initiated after 6 months of formation of SHGs. In the Intensive Block, 3-4 days training is organized for district and PFT level Mission team as well as for CRPs and VO/SHG representatives. The training is organized at the district level and facilitated by the DMMU and PFT jointly. In the Resource Block, two-and a-half day training is organized for CRPs. The training is organized at district level and facilitated by PFT.

MCP preparation training is initiated after 6 months of formation of SHGs. In Intensive Block, 2-5 days training is organized for PFT level Mission team as well as for CRPs and VO/SHG representatives. The training was organized 3 days for PFT members, 5 days for CRPs and 2 days for VO/SHG representatives. In Resource Block, 7 days training was organized for SHG members, CRPs and PFTs at VO/SHG level, which were facilitated by the RO.

A standardized MCP format is available with the Mission team. In Intensive Block, MCPs are prepared by nodal PFTs. It is appraised by DM-Micro Finance and approved by the DPM. In first submission of MCP, the acceptance rate of Bargawan and Karahal PFTs are about 50 per cent. In Resource Block, MCPs are prepared by the CRPs. It is appraised by DM and approved by the DPM. In first submission of MCPs, the acceptance rate of all 5 sampled PFTs of Resource Block is 100 per cent.

A standardized MCP format is available with the Mission team. In Intensive Block, MCPs are jointly prepared by SHG, CRP and nodal PFTs. It is appraised by District core team and approved by the DPM. In first submission of MCPs, the acceptance rate of all 5 sampled PFTs are between 75-100 per cent. In Resource Block, MCPs are prepared by the CRPs and PRPs. It is appraised by PFT and approved by the DPM. In first submission of MCPs, the acceptance rate of 2 sampled PFTs (i.e. Gopalpur and Kanadikhurd) of Resource Block is 100 per cent. However, in remaining 3 sampled PFTs it is between 75-100 per cent.

121

Theme / Activities Observations from Mandla district Observations from Sheopur district Observations from Shahdol district

The priorities of the individuals change during the time lag between preparation of MCP and receipt of CIF, at the SHG level. MCPs need to be revisited and updated as and when required. The changes made in MCPs should be recorded in meeting / minutes register for future reference.

Same as in Sheopur District

In the Intensive Block, the database management training was done at two levels. The first was done at the PFT level for PFT members by DM-M&E. The second was done at community level for Book Keepers by PFT and MBKs. However, in the Resource Block, it was done only at the PFT level for PFT members by DM-M&E.

In Intensive Block as well as Resource Block, the database management training was done at PFT level for PFT members by DM-M&E.

There are standard reporting formats, schedule of reporting interval, availability of proper infrastructure, persons responsible for data updating and uploading at DMMU and PFT level. VOs and SHGs lack the capacity and infrastructure for data updating and uploading.

Same as in Sheopur District

The Mission team is providing coordination, support and supervision assistance at the DMMU and PFT levels. These services are in the form of preparation of Annual Action Plan (AAP), review of AAP, preparation of implementation plan (after approval of AAP), monitoring of implementation plan throughout the year, identification of deviations (physical & financial targets), and their rectification procedure.

Same as in Sheopur District

The formal structure of coordination, support and supervision needs to include community level representatives.

Same as in Sheopur District

A number of Gender CRPs were identified and trained in Sheopur district (esp. in Sesaipura PFT within the UN-WOMEN project). It was observed to be an effective strategy and may be up-scaled and replicated in other project areas as well.

122

Theme / Activities Observations from Mandla district Observations from Sheopur district Observations from Shahdol district

The literacy rate of Sheopur district is generally low, as compared to the other project areas. Audio-visual ICT materials may be more effective in delivering the intended message in such areas.

Sheopur district is fraught with migration round the year. A focused strategy may be developed to address the issue of migration. There is a need to identify the migrating HHs during the WBR process itself, and marking them in the WBR list as well.

It was observed that 50 per cent of the sampled SHGs had been formed with only 10 members. Such groups have a higher tendency of break-down in case of migration. The minimum number of members per SHG may be considered to be increased.

123

CHAPTER 7:

Best Practices

This chapter presents the various success stories identified during the course of the process

monitoring study in Shahdol district, detailing the role played by the Mission in ensuring

each of these cases are a success.

7.1 Case study 1: Pashupalan Sakhi Ekta…

District Block PFT Panchayat Village

Shahdol Sohagpur Lalpur Kalyanpur Kalyanpur

Like the slogan “Hum do Hamare do”, the family of Ekta Upadhyay is a small and happy

family. She is a member of Nirala self-help group in her village. Apart from being a

skilled entrepreneur, she plays an active role as Pashupalan Sakhi within her Sadhna

village organization.

Ekta mentioned that earlier when she

was working as an ASHA worker, she

was able to fulfil the basic needs of the

family. So she wanted to do more. With

the implementation of Ajeevika Mission

in her village, she started working to

fulfil her wishes. She joined the group

and then started working to improve

her livelihood and do more for her

family. She started taking small loans.

After repaying the amount on time she

started taking bigger loans. Initially,

she took a loan of Rs 10,000 to start

her beauty parlour and returned the

loan on time. Then she took the loan of Rs. 30,000 with 10 months’ installments, for

poultry farming which she returned within 7 months. To further expand her poultry

business, she took loan of Rs 50,000

with 10 installments for making the

shed and increasing the number of

poultry. Like this, after joining

group she has taken a cumulative

loan of Rs. 98,000, getting more and

more benefits and set an example

for others.

Ekta, with her past experience as an

ASHA worker and poultry farmer,

went for 35 days training as

124

Pashupalan Sakhi under the Ajeevika Mission to grow her business and help in the

growth of other people. During the training program, she learnt about the rearing of

animals and their vaccination. Now, she gives information to other people regarding the

vaccination of poultry, dairy farms, pig rearing, goat rearing and construction of farms.

She is also receiving honorarium for her services.

Presently, she is earning Rs. 120-180 as net profit from the poultry business. Being a

Pashupalan Sakhi, she earns Rs. 5 and Rs. 2 from other villagers for each vaccination of

cattle and poultry, respectively.

7.2 Case study 2: Radha Bega and her stitching centre…

District Block PFT Panchayat Village

Shahdol Sohagpur Pachgaon Kathotiya Kathotiya

Radha Bega, a resident of the village Kathotiya is a skilled entrepreneur and an active

member of her Village Organization as well.

In their village, the groups in

compliance with Panchsutras formed

the Nari Shakti Village Organization,

from five village groups which helped

in fulfilment of needs. Along with

this, as per directions from village

organization and the Ajeevika

Mission, a sub-committee was also

formed. She mentioned that girls like

her, met new way of living through

the employment sub-committee. This

employment sub-committee of her

VO selected her and five more people

for 30 days training through R.SETI

on new sources of livelihood. After

completing the training, they

received loan from the Central Bank

to buy a sewing machine and other

stuff. Each woman is presently re-

paying the loan in installments of

Rs. 450 per month. They have

already returned Rs. 10,000. They

pay the amount earned through the

profits from the stitching work,

which is approx. Rs. 500-600. She is

thankful to the Ajeevika Mission for

this.

125

7.3 Case study 3: Livelihood source of Jeevika Mahila Mandal…

District Block PFT Panchayat Village

Shahdol Sohagpur Karkati Archula Garuraha

The five groups of Jeevika Mahila Mandal of village Garuraha has constituted the village

organization. The two main

functions are: providing and

returning loans. All the members of

the group have taken small or big

loans for agricultural activities.

There is discussion on loans and

returning of loan by the members in

the meetings. Earlier, most of the

people did subsistence agriculture

and very few went for selling the

product. But now, most of the

members of the group practice

vegetable sale business.

Presently, all members of the groups

for agriculture take 80-90% loan, which varies from Rs. 20,000 to Rs. 30,000.

7.4 Case study 4: Gram Sangathan Sakhi Gauri…

District Block PFT Panchayat Village

Shahdol Sohagpur Chhatwai Kotma Kotma

The Gauri village organization of

village Kotma is formed from

nine groups. The executive

meeting of village organization is

conducted once a year at a

specific date. The meeting is

attended by the presidents and

secretaries of all the groups. The

main aim of the meeting is to

discuss the problems and their

resolution. The secretary of

Gauri village organization is

Chandravati Yadav. She also

maintains the books of the VO.

Before joining her group, she was simple housewife and was on daily wages. But now,

she not only she maintains registers of her group, but also writes the bookd of records

for her village organization. Besides this, she also supervises all groups of the village.

Considering her work, the Ajeevika Mission and women of the village have given her the

126

responsibility of Gram Sangathan Sakhi, whereby she is responsible for providing

training on group meetings, to investigate that group is working in compliance with the

Panchasutras, etc..

She is trained on:

Book keeping

Preparation of CCL application

Preparation of group MCP

Conducting meeting of village organization

Keeping book of village organization

MIS of group

One month of Computer training

Three days training on Leadership quality in Bhopal.

As Gram Sangthan Sakhi, she has to write the books of the village organization, properly

conduct meetings, supervision of all the groups of village, help the book keepers of all

groups, prepare the MCP of groups and help in preparing documents for CCL, etc.

7.5 Case study 5: Lakhnauti ka ‘Big Bazaar’…

District Block PFT Panchayat Village

Shahdol Jaisinghnagar Gopalpur Lakhnauti Lakhnauti

According to the members of Maa

Varanasi SHG, they work in compliance

with the Panchsutras. There are regular

meetings and transaction of loan on

timely basis. Giving and taking loans as

per requirements is a regular affair.

Savita Yadav, a member of this group,

has also taken the loan for her

livelihood. She proposed to open a

grocery shop in weekly group meeting

which was approved.

Savita has small family, with one son

and three daughters. Her husband is a

labourer and with his meagre income,

it was becoming increasingly difficult

to sustain the family. She had to do

more for her family and thus, joined

the group. From the group, she learned

that she can get the loan to start her

new business. She followed the

Panchsutras and after 12 months, took

127

a loan of Rs. 15,000. She repaid the amount in 10 installments. For the growth of her

shop, the group has approved her loans from time-to-time viz.

Loan of Rs. 15,000 with 10 installments and only four are left.

Loan of Rs. 10,000 with 10 installments and only three are left.

Loan of Rs. 5,000 with 5 installments.

Every day, she sells products of worth Rs. 400-500. Now they need not go outside for

work. Besides being a member of the group, Savita is the Community Activist for her VO,

for which she earns honorarium as well.

7.6 Case study 6: Rooprani Singh: A confident Community Activist!!

District Block PFT Panchayat Village

Shahdol Jaisinghnagar Amjhor Mithi Mithi

Of the total 18 Self Help Groups

(SHGs) of village Mithi, 14 joined to

constitute the Pratigya village

organization. The organization has

positions of the President,

secretary and treasurer. Regular

meetings of the group have been

started. The work of account

maintenance is done by Rooprani

Singh. She not only maintains the

accounts, but also successfully

undertakes the other duties of the

village organization. Keeping in

view her dedication towards her

work, she is selected as community activist. There were various reasons for selecting

her viz. her highest educational qualification being senior secondary, she does book

keeping work very efficiently, she has also completed 7 days training on book keeping

and now guides others on keeping and maintaining books, she possesses the knowledge

of preparation of MCP of other group members, she completed 7 days training on

preparation of MCP under the Ajeevika

Mission, she knows the work of

health check-up and knows the

entire working of the VO.

Rooprani disclosed that earlier she

was simply a homemaker. Since she

has completed her senior secondary,

she wanted to do something. At that

time, the team from Ajeevika mission

inspired them and they formed the

Saraswati SHG. With help of the

128

Mission team, she is now able to do work. She also takes part in training programs that

helps her to work efficiently. Presently she has undergone 7 days training on book

keeping organized by the Ajeevika Mission, which included training of preparation and

maintenance of 14 types of registers. For the book keeping work, she is getting an

honorarium of Rs. 300 per meeting. She is getting Rs. 300 for preparation of her group’s

MCP. Apart from this, she also gives information regarding group formation in other

villages and trains them on book keeping, against which she gets honorarium of Rs. 146.

She is grateful to the Ajeevika Mission for selecting her for this work. She gives training

on:

Account maintenance of group - 7 days

Account maintenance of village organization - 7 days

Formation of village organization - 3days

Preparation of MCP - 7 days

According to Rooprani, there is discussion on social works in the meeting of Mithi village

organization. They also help the poor and needy women.

7.7 Case study 7: ‘Lakhpati’ Nanidni didi…

District Block PFT Panchayat Village

Shahdol Jaisinghnagar Amjhor Lapri Lapri

There are 15 SHGs in Lapri village

organization that work in compliance

with Panchsutras. The village

organization disclosed that four

women of Lapri village have joined

the Lakhpati club. Nandani Rautaiya

has also joined the club. She has a

happy and small family of four

members with a son and a daughter.

She disclosed that she had 1.5 acre of

barren land. She needed money to

improve the fertility of land,

construction of bore well and raising the

crop. After seeing the benefits, she joined the group. She took a loan of Rs. 25,000 to

construct a bore well, in order to improve the fertility of land. After returning the loan,

she lent another loan of Rs. 30,000 for an irrigation pump, which was approved by the

members of the group. She repaid the amount and took another loan of Rs. 35,000 for

electricity to operationalize the irrigation pump and to buy crop seeds.

Nandani was benefited with Rs. 25,000 from selling vegetables within 3 months. She

earned profits of Rs. 40,000-45,000 by selling vegetables worth Rs. 1,00,000 within eight

months. In the near future, she plans to fence her agricultural field, so as to enable her to

take crops round the year, which will give her profits of more than a lac per year.

129

7.8 Case study 8: Rambai’s group becomes her support!!

District Block PFT Panchayat Village

Shahdol Jaisinghnagar Sidhi Jamudi Jamudi

Jamudi village is located in the thick jungle and partial Naxalite territory of Shahdol

district. The Vandana self-help group of Jamudi village has given the primary importance

to savings and social work. The group has inducted the destitute and helpless Rambai

Yadav, as one of its members.

She is blessed with six sons and

their responsibility is entirely

on her as her husband, Babulal

Yadav, was murdered on 1

January, 2013 by some

unknown assailants. Her

children are pursuing their

primary education.

According to members of the

Vandana SHG, they have

modified the rules of their

group, in accordance with

Rambai’s needs. The first

change is in weekly deposits i.e. while nine members of the group deposit Rs. 15 per

meeting, while Rambai deposits only Rs. 5. The second modification is related to loans

viz. every member has to return the loan with interest of Rs. 2, whereas Rambai is

eligible to return the loan without any interest.

Apart from this, after death of her husband, she was not allowed by the school teachers

to cook mid-day meal. With the help, discussion and support of the group, she is now

allowed to cook the mid-day meal. Today, from this work, she earns Rs. 1,000 per

month. With a large family to look after, Rambai always remains economically helpless.

To overcome this, members of her group help her from time-to-time, by providing rice

and clothes.

Vandana group of village Jamudi takes interest in regular meetings and transactions. In

this way, the Vandana SHG is a blessing in disguise for women like Rambai.

130

Annexure I

Sample for the Process Monitoring of MPSRLM (Quarter 3: District Shahdol)

SN District Block PFT Gram Panchayat Village

Sample

VO

surveyed

No. of

SHGs

No. of

sample SHGs

surveyed

1 Shahdol Sohagpur Chhatwai Baruka Nipaniya Yes 12

2 Shahdol Sohagpur Chhatwai Baruka Baruka Yes 7 1

3 Shahdol Sohagpur Chhatwai Bijauri Bijauri Yes 9

4 Shahdol Sohagpur Chhatwai Bijauri Bagaiha Yes 6 1

5 Shahdol Sohagpur Chhatwai Chanpa Kudri Yes 11 1

6 Shahdol Sohagpur Chhatwai Chhatwai Chhatwai Yes 26

7 Shahdol Sohagpur Chhatwai Kotma Kotma Yes 19

8 Shahdol Sohagpur Chhatwai Maiki Maiki Yes 14

9 Shahdol Sohagpur Chhatwai Nawalpur Nawalpur Yes 11 1

10 Shahdol Sohagpur Chhatwai Patasi Patasi Yes 12 1

11 Shahdol Sohagpur Chhatwai Pipariya Pipariya Yes 14

12 Shahdol Sohagpur Chhatwai Narwar Kunwarseja Yes 14

13 Shahdol Sohagpur Chhatwai Pongari Pongari Yes 17

14 Shahdol Sohagpur Chhatwai Sinduribharri Sinduri Yes 0 1

15 Shahdol Sohagpur Chhatwai Shyamdih Khurd Jarha Yes 5 1

16 Shahdol Sohagpur Chhatwai Shyamdih Khurd Shayamdih No 1 Yes 5 1

17 Shahdol Sohagpur Hardi No 32 Kathotiya Kathotiya Yes 25

18 Shahdol Sohagpur Hardi No 32 Kathotiya Amhatola Yes 14

19 Shahdol Sohagpur Hardi No 32 Bhamarha Bhamarha Yes 21

20 Shahdol Sohagpur Hardi No 32 Patkhai Patkhai Yes 22

21 Shahdol Sohagpur Hardi No 32 Khairha Khairha Yes 10

22 Shahdol Sohagpur Hardi No 32 Bhanpur Bhanpur Yes 7 1

23 Shahdol Sohagpur Hardi No 32 Bhanpur Dubha Yes 6 1

24 Shahdol Sohagpur Hardi No 32 Karuatal Nipaniya Yes 8 1

25 Shahdol Sohagpur Hardi No 32 Karuatal Sigudi Yes 7 1

26 Shahdol Sohagpur Hardi No 32 Keraha Keraha Yes 10 1

27 Shahdol Sohagpur Hardi No 32 Hardi 32 Hardi Yes 9 1

28 Shahdol Sohagpur Hardi No 32 Samatpur Kodwar Kala Yes 11

29 Shahdol Sohagpur Hardi No 32 Samatpur Kodwar Khurd Yes 4 1

30 Shahdol Sohagpur Hardi No 32 Samatpur Samatpur Yes 21

31 Shahdol Sohagpur Pachgaon Khamhariyakala Khamhariyakala Yes 9 1

32 Shahdol Sohagpur Pachgaon Khamhariyakala Khauhai Yes 3

33 Shahdol Sohagpur Pachgaon Majhgawan Majhgawan Yes 8 1

34 Shahdol Sohagpur Pachgaon Jugwari Jugwari Yes 13

131

SN District Block PFT Gram Panchayat Village

Sample

VO

surveyed

No. of

SHGs

No. of

sample SHGs

surveyed

35 Shahdol Sohagpur Pachgaon Jugwari Birhuliya Yes 4 1

36 Shahdol Sohagpur Pachgaon Bandhwabada Bandhwabada Yes 11

37 Shahdol Sohagpur Pachgaon Bandhwabada Chandaniya Khurd Yes 9 1

38 Shahdol Sohagpur Pachgaon Entajhar Entajhar Yes 7 1

39 Shahdol Sohagpur Pachgaon Entajhar Fatehpur Yes 7

40 Shahdol Sohagpur Pachgaon Padmaniya Khurd Padmaniya Khurd Yes 15

41 Shahdol Sohagpur Pachgaon Jodhpur Jodhpur Yes 10 1

42 Shahdol Sohagpur Pachgaon Chuniya Kathautiya Yes 15

43 Shahdol Sohagpur Pachgaon Kholhad Kholhad Yes 5 1

44 Shahdol Sohagpur Pachgaon Harratola Harratola Yes 7 1

45 Shahdol Sohagpur Pachgaon Harratola Chataha Yes 3

46 Shahdol Sohagpur Pachgaon Sinduri Chuniya Sinduri Yes 0

47 Shahdol Sohagpur Pachgaon Kelmaniya Kelmaniya Yes 21

48 Shahdol Sohagpur Lalpur Bodari Bodari Yes 16

49 Shahdol Sohagpur Lalpur Chhata Pipartara Yes 13

50 Shahdol Sohagpur Lalpur Dhanpura Dhanpura Yes 6 1

51 Shahdol Sohagpur Lalpur Dhanpura Dhanpuri Yes 12 1

52 Shahdol Sohagpur Lalpur Dhanpura Chauradih Yes 8 1

53 Shahdol Sohagpur Lalpur Gortara Gortara Yes 17 1

54 Shahdol Sohagpur Lalpur Gortara Jamua Yes 15

55 Shahdol Sohagpur Lalpur Harri Harri Yes 15

56 Shahdol Sohagpur Lalpur Harri Raipur Yes 5 1

57 Shahdol Sohagpur Lalpur Kalyanpur Kalyanpur Yes 13

58 Shahdol Sohagpur Lalpur Kalyanpur Koilari Yes 4 1

59 Shahdol Sohagpur Lalpur Jamui Jamui Yes 35

60 Shahdol Sohagpur Lalpur Udhiya Udhiya Yes 19

61 Shahdol Sohagpur Lalpur Padmaniya Kala Padmaniya Kala Yes 9 1

62 Shahdol Sohagpur Lalpur Nargi Nargi Yes 15

63 Shahdol Sohagpur Karkati Bartara Bartara Yes 25

64 Shahdol Sohagpur Karkati Dhamnikala Dhamnikala Yes 10

65 Shahdol Sohagpur Karkati Dhamnikala Dhamni Khurd Yes 5 1

66 Shahdol Sohagpur Karkati Dhamnikala Jawari Yes 13

67 Shahdol Sohagpur Karkati Lakhbariya Kudri Yes 11

68 Shahdol Sohagpur Karkati Arjhula Garruha Yes 8 1

69 Shahdol Sohagpur Karkati Dhanaura Turri Yes 5 1

70 Shahdol Sohagpur Karkati Bandikhurd Bandikhurd Yes 6 1

71 Shahdol Sohagpur Karkati Bandikhurd Baigin Yes 6 1

72 Shahdol Sohagpur Karkati Bamhauri Bamhauri Yes 12

73 Shahdol Sohagpur Karkati Bamhauri Garfandiya Yes 6

132

SN District Block PFT Gram Panchayat Village

Sample

VO

surveyed

No. of

SHGs

No. of

sample SHGs

surveyed

74 Shahdol Sohagpur Karkati Devgawan New Deogai Yes 8 1

75 Shahdol Sohagpur Karkati Gopalpur Ahigawan Yes 0

76 Shahdol Sohagpur Karkati Saraikanpa Saraikanpa Yes 13 1

77 Shahdol Sohagpur Karkati Karkati Karkati Yes 24 1

78 Shahdol Jaisinghnagar Aamdih Balaudi West Balaudi West Yes 9 1

79 Shahdol Jaisinghnagar Aamdih Bataudi Malouti Yes 8 1

80 Shahdol Jaisinghnagar Aamdih Bataudi Umar Khouhai Yes 8 1

81 Shahdol Jaisinghnagar Aamdih Chhuda Baherha Yes 9 1

82 Shahdol Jaisinghnagar Aamdih Chhuda Chhuda Yes 17

83 Shahdol Jaisinghnagar Aamdih Giruikhurd Bhattu Yes 6 1

84 Shahdol Jaisinghnagar Aamdih Jhiriya Jhiriya Yes 6 1

85 Shahdol Jaisinghnagar Aamdih Nagnaudi Nagnaudi Yes 15

86 Shahdol Jaisinghnagar Aamdih Pipri Pipri Yes 8 1

87 Shahdol Jaisinghnagar Aamdih Semra Semra Yes 13

88 Shahdol Jaisinghnagar Gopalpur Barna Nigai Yes 14

89 Shahdol Jaisinghnagar Gopalpur Barna Barna Yes 9 1

90 Shahdol Jaisinghnagar Gopalpur Basohara Basohara Yes 10 1

91 Shahdol Jaisinghnagar Gopalpur Gopalpur Gopalpur Yes 13

92 Shahdol Jaisinghnagar Gopalpur Jamuniha Naugai Yes 14

93 Shahdol Jaisinghnagar Gopalpur Jamuniha Jamuniha Yes 7 1

94 Shahdol Jaisinghnagar Gopalpur Jhara Jhara Yes 11 1

95 Shahdol Jaisinghnagar Gopalpur Lakhnauti Lakhnauti Yes 7 1

96 Shahdol Jaisinghnagar Gopalpur Lakhnauti Duari Yes 11 1

97 Shahdol Jaisinghnagar Gopalpur Masiyari Masiyari Yes 10 1

98 Shahdol Jaisinghnagar Gopalpur Mohni Mohni Yes 26

99 Shahdol Jaisinghnagar Amjhor Bhatigawan Khurd Bhatigawan Khurd Yes 11 1

100 Shahdol Jaisinghnagar Amjhor Bhatigawan Khurd Bhatigawa Kala Yes 8 1

101 Shahdol Jaisinghnagar Amjhor Chitrao Chitrao Yes 20

102 Shahdol Jaisinghnagar Amjhor Darain Darain Yes 11 1

103 Shahdol Jaisinghnagar Amjhor Daraudi Daraudi Yes 19

104 Shahdol Jaisinghnagar Amjhor Gajani Gajani Yes 12

105 Shahdol Jaisinghnagar Amjhor Gajwahi Keet Yes 9 1

106 Shahdol Jaisinghnagar Amjhor Gandhiya Gandhiya Yes 16

107 Shahdol Jaisinghnagar Amjhor Jagada Jagada Yes 10 1

108 Shahdol Jaisinghnagar Amjhor Mithi Mithi Yes 18

109 Shahdol Jaisinghnagar Amjhor Uchehra Naudhiya Yes 5 1

110 Shahdol Jaisinghnagar Amjhor Uchehra Uchehra Yes 2

111 Shahdol Jaisinghnagar Amjhor Lapri Lapri Yes 22

112 Shahdol Jaisinghnagar Kanadikhurd Binaika Basnagari Yes 16

133

SN District Block PFT Gram Panchayat Village

Sample

VO

surveyed

No. of

SHGs

No. of

sample SHGs

surveyed

113 Shahdol Jaisinghnagar Kanadikhurd Binaika Binaika Yes 18

114 Shahdol Jaisinghnagar Kanadikhurd Deori Deori Yes 13

115 Shahdol Jaisinghnagar Kanadikhurd Deori Barihai Yes 6 1

116 Shahdol Jaisinghnagar Kanadikhurd Girui Badi Girui Badi Yes 16

117 Shahdol Jaisinghnagar Kanadikhurd Kanadi Kala Kanadi Kala Yes 19

118 Shahdol Jaisinghnagar Kanadikhurd Kanadi Khurd Kanadi Khurd Yes 17 1

119 Shahdol Jaisinghnagar Kanadikhurd Kothigarh Nandana Yes 16

120 Shahdol Jaisinghnagar Kanadikhurd Tetka Bhurka Yes 6 1

121 Shahdol Jaisinghnagar Kanadikhurd Tetka Tetka Yes 16

122 Shahdol Jaisinghnagar Kanadikhurd Thengarha Thengarha Yes 18

123 Shahdol Jaisinghnagar Sidhi Podi Podi Yes 21

124 Shahdol Jaisinghnagar Sidhi Bansukli Bansukli Yes 18

125 Shahdol Jaisinghnagar Sidhi Bharri Bharri Yes 11 1

126 Shahdol Jaisinghnagar Sidhi Chhakta Chhakta Yes 9 1

127 Shahdol Jaisinghnagar Sidhi Chhaparatola Kudratola Yes 8 1

128 Shahdol Jaisinghnagar Sidhi Chhaparatola Chhaparatola Yes 14

129 Shahdol Jaisinghnagar Sidhi Jamudi Jamudi Yes 7 1

130 Shahdol Jaisinghnagar Sidhi Kudri 3 Kudri Yes 19

131 Shahdol Jaisinghnagar Sidhi Mahuatola Mahuatola Yes 12

132 Shahdol Jaisinghnagar Sidhi Mudariyatola Domhar Yes 10 1

133 Shahdol Jaisinghnagar Sidhi Mudariyatola Mudariyatola Yes 13

134 Shahdol Jaisinghnagar Sidhi Pahadiya Pahadiya Yes 11 1

135 Shahdol Jaisinghnagar Sidhi Rimar Rimar Yes 20

136 Shahdol Jaisinghnagar Sidhi Sidhi Sidhi Yes 17

137 Shahdol Jaisinghnagar Sidhi Nawatola Chandaura Yes 10 1

134

Annexure II

Survey Instruments

Annexure II (g) : Survey Instrument – VO Formation and Strengthening

135

Annexure II (G)

MPSRLM: PROCESS MONITORING – VO FORMATION AND STRENGTHENING

A. GENERAL INFORMATION lkekU; tkudkjh

A.1 Particulars fooj.k Name uke

i. District ftyk

ii. Block Cy‚d @ fodkl [k.M

iii. PFT ih ,Q Vh

iv. Gram Panchayat xzke iapk;r

v. Village xzke

vi. Name of VO Ogh- vks- dk uke

vii. Number of SHG membership in VO (in no)

Ogh- vks- esa ,l-,p-th- lnL;rk dh la[;k

Total_____ (a) A category_____ (b) B category_____

(c) C category_____ (d) D category_____

viii. GB Members in VO Ogh- vks- esa th-ch- lnL; Total ___ (a) SC___ (b) ST___ (c) OBC___ (d) Others___

ix. EC Members in VO Ogh- vks- esa bZ-lh- lnL; Total ___ (a) SC___ (b) ST___ (c) OBC___ (d) Others___

x. Date of Formation xBu fnukad dd /mm/yyyy

xi. Registration No. (if any)

A.2 Survey Date loZs fnukad dd /mm/yyyy

Start Time: Finish Time:

A.3 Survey Team loZs Vhe Name

i. Moderator / Facilitator

B. MEMBERS OF GROUP INTERVIEW B.1 Please fill up details of the members present in the FGD:

SN Name Name of SHG Position Age Sex

Social Group

Education Main

Occupation

CODE 1 CODE 2 M=1, F=2 CODE 3 CODE 4 CODE 5

1 2 3 4 5 6 7 8 9

01 02 03 04 05 06 07 08 09 10

CODE 1: VO President=1, VO Vice President=2, VO Secretary=3, VO Joint Secretary=4, VO Treasurer=5, VO Member=6, Other (specify___________________)=7

CODE 2: 18-45 yrs. = 1, 45-60 yrs. = 2, >60 yrs. = 3 CODE 3: SC=1, ST=2, OBC=3, General=4 CODE 4: Illiterate = 1, Knows how to read and write = 2, Primary School (1-5th) = 3, Middle School (6-8th) =

4, High School (9th/10th) = 5, Higher Secondary (11th/12th) = 6, Graduate = 7, Post Graduate = 8 CODE 5: No economic Activity = 1, Agriculture/Horticulture/Floriculture = 2, Other land based activities

(collection of honey, lac production, pisciculture) = 3, Local labour = 4, Migrant labour = 5, Traditional work/artisans = 6, Livestock rearing/Dairy = 7, Government Service = 8, Private Service = 9, Pensioner = 10, Small Business/Petty shop = 11, Microenterprise= 12, Skilled wage labour = 13, Forest produce (NTFP/MFP) = 14, Other (Specify_________________)=15

136

C. VO CONCEPT SEEDING xzke laxBu dh vo/kkj.kk dk chtjksi.k

SN Question Options Code SKIP

C.1 What need did you feel for VO formation?

Ogh- vks- ds xBu ds fy, vkius D;k vko’;drk

eglwl dh Fkh\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

C.2 How was the concept of VO seeded by

MPSRLM Team?

e/; çns’k jkT; xzkeh.k vkthfodk fe’ku ¼,e-ih-

,l-vkj-,y-,e-½ ny }kjk Ogh- vks- dh fopkj/kkjk

dk çR;kjksi.k dSls fd;k x;k Fkk\

[Multiple Response]

Note: Probe only, do not prompt

¼,d ls vf/kd mRrj laHko gSa½

uksV& ÑIk;k lgtrk ls iwNsa] çcq) u djsa

C.3* What was the purpose of VO formation? Ogh- vks- ds xBu dk D;k mn~ns’; Fkk\

[Multiple Response] ¼,d ls vf/kd mRrj laHko gSa½

C.4 Where did you have exposure visits to

understand the concept of VO?

Ogh- vks- dh fopkj/kkjk dks le>us ds fy, vkius

dgk ¡ ,Dlikstj foftV fd;k\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

,Dlikstj foftV ugha djk;k x;k No exposure visits conducted

1

ftys ds vUnj Within the same district 2

ftys ds ckgj Outside the district 3

jkT; ds ckgj Outside the State 4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

137

D. FORMATION OF VO xzke laxBu dk xBu

SN Question Options Code SKIP

D.1 What is the number of VOs that exist in

your village?

vkids xk¡o esa fdrus Ogh- vks- gSa\

dksbZ ughaa None 1

,d One 2

,d ls vf/kd More than one 3

D.2 VO of your village belongs to:

vkidk Ogh- vks- fdl xk¡o ls lacfU/kr gS\

mlh xk¡o ls Same village 1

vU; xk¡o ls Other village 2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

D.3 What were the criteria followed

for formation of VO in your

village?

vkids xk¡o esa Ogh- vks- dk xBu fdl

vk/kkj ij gqvk\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

,d xk¡o esa de lss de 3 ,l-,p-th gksa At least with 3 SHGs in a village

1

,d xk¡o esa de lss de 4 ,l-,p-th gksa At least with 4 SHGs in a village

2

,d xk¡o esa de lss de 5 ,l-,p-th gksa

At least with 5 SHGs in a village

3

,l-,p-th- iaplw= dk ikyu dj jgs gksa SHGs are following Panch Sutra

4

,l-,p-th dh vk;q de ls de 3&4 ekg gks SHGs with minimum age of 3-4 months

5

lHkh ,l-,p-th lnL; Ogh- vks- cukus dh bPNk j[krs gksa All SHG members are willing to form VO

6

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

7

D.4 Who provided the training for VO

formation?

Ogh- vks- ds xBu ds fy, fdlus çf’k{k.k çnk;

fd;k\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

lh vkj ih jkmUM deZpkjh CRP round staff 1

lkeqnkf;d dkMj Community cadres 2

fe’ku Vhe Mission team 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.6 Are you aware of the name of your VO?

D;k vki vius Ogh- vks- dk uke tkurs gSa\

gk ¡a Yes 1

Ukgha No 2

D.7 Who are the Office Bearers of VO?

Ogh- vks- ds inkf/kdkjh dkSu gSa\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

v/;{k President 1

mik/;{k Vice President 2

lfpo Secretary 3

Lak;qDr lfpo Joint secretary 4

dks"kk/;{k Treasurer 5

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

6

D.8 Who did the selection of Office Bearers of

VO?

Ogh- vks- ds inkf/kdkfj;ksa dk p;u fdlus fd;k\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

dk;Zdkfj.kh lfefr Executive Committee 1

vke lHkk General Body 2

,e-ih-,l-vkj-,y-,e- ny MPSRLM Team 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

138

SN Question Options Code SKIP

D.9 Satisfaction with the selection process of Office Bearers inkf/kdkfj;ksa dh p;u çfØ;k ds çfr larq"Vrk

¼ ¼25%½ lnL;ksa ls de Less than ¼ (25%) members

1

¼ ¼25%½ lnL;ksa ls ½ ¼50%½ lnL;ksa ds e/;

Between ¼ (25%) to ½ (50%) members

2

½ ¼50%½ lnL;ksa ls ¾ ¼75%½ lnL;ksa ds e/;

Between ½ (50%) to ¾ (75%) members

3

¾ ¼75%½ lnL;ksa ls yxHkx leLr lnL;

Between ¾ (75%) to almost all members

4

leLr lnL; ¼100%½

All 100% members

5

D.10 Has your VO formulated any Bye laws / rules / norms?

D;k vkids Ogh- vks- us dksbZ fu;e@dkuwu@ekud cuk, gSa\

gk ¡a Yes 1

Ukgha No 2 Go to D.14

D.11 Type of Bye laws / rules

/ norms prepared by

the VO

Ogh- vks- ds }kjk cuk, x,

fu;e@dkuwu@ekudksa ds

çdkj

[Multiple Response]

Note: Probe only, do

not prompt

¼,d ls vf/kd mRrj laHko

gSa½

uksV& ÑIk;k lgtrk ls

iwNsa] çcq) u djsa

Ogh- vks- xBu@fuxeu ,oa dk;ksZa] bR;kfn ds laca/k esa

Formation / Incorporation, functions, etc. of the VO

1

lnL;rk fooj.k] ;ksX;rk ekin.M] ’kqYd] bR;kfn

Membership detail, eligibility criteria, fee, etc.

2

Ogh- vks- dh lajpuk Structure of the VO 3

inkf/kdkjh;ksa dk dk;Zdky] p;u@pquko çfØ;k] Hkwfedk ,oa

ftEesnkfj;k ¡] bR;kfn Office Bearers, tenure, selection / election

process, role and responsibilities, etc.

4

cSBd] cSBd dk;Zokgh fooj.k la/kkj.k] bR;kfn

Meetings, record keeping of minutes of the meetings, etc.

5

Yks[kk iqLrdksa dk la/kkj.k ,oa fofRr; çca/ku ç.kkyh Maintenance

of Books of Accounts and Financial Management System

6

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

7

D.12 Specify whether the VO

members are aware of Bye

laws / rules / norms?

Li"V djsa fd D;k Ogh- vks- ds

lnL;ksa dks dkuwu@fu;e@ekudksa

dh tkudkjh gS\

fdlh dks ughaa None 1

dsoy inkf/kdkfj;ksa dks Only Office Bearers 2

inkf/kdkfj;ksa ,oa dqN lnL;ksa dks

Office Bearers and a few members

3

leLr Ogh- vks- lnL;ksa dks ¼inkf/kdkjh lfEefyr½

All VO members (Office Bearers and other members)

4

D.13 Who formulated the Bye

laws / rules / norms of

VO?

Ogh- vks- ds dkuwu @ fu;e

@ ekud fdlus cuk,\

[Multiple Response]

¼,d ls vf/kd mRrj laHko

gSa½

dsoy fe’ku Vhe us Only Mission team 1

dsoy inkf/kdkfj;ksa us Only Office Bearers 2

inkf/kdkjh ,oa dqN Ogh- vks- lnL;ksa us Office Bearers and a few VO members

3

leLr Ogh- vks- lnL;ksa us ¼inkf/kdkjh lfEefyr½ All VO members (Office Bearers and other members)

4

dsoy fe’ku deZpkjh ,oa inkf/kdkfj;ksa us

Mission staff and Office Bearers

5

fe’ku deZpkjh ,oa leLr Ogh- vks- lnL;ksa us ¼inkf/kdkjh lfEefyr½ Mission staff and all VO members (incl. Office Bearers)

6

D.14* What are the main activities of VO?

Ogh- vks- dh eq[; xfrfof/k;k ¡ D;k gS\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

139

SN Question Options Code SKIP

D.15* What is the Meeting Process of VO?

Ogh- vks- dh cSBd çfØ;k D;k gS\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

D.19 Action taken against the member

absent in the meeting?

cSBd esa vuqifLFkr lnL; ds fo#/n

D;k dk;Zokgh dh tkrh gS\

;fn iwoZ esa tkudkjh nh gks rks dksbZ dk;Zokgh ugha

No action / punishment, if prior information

1

lnL; Lo lgk;rk lewg ls Li"Vhdj.k

Explanation sought from member SHG

2

lrdZ djrs gS Ikj dksbZ dk;Zokgh ugha djrs Warning but no action

3

Lo lgk;rk lewg ls tqekZuk fy;k tkrk gS

Fine from SHG

4

lnL; ls tqekZuk fy;k tkrk gS Fine from Member 5

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

6

D.20 Loan disbursement prioritization of SHGs?

+lewgksa dks _.k forj.k çkFkfedhdj.k dSls gksrk

gS\

,e lh ih vuqefr ds vk/kkj ij

Based on MCP approval

1

cxSj ,e lh ih vuqefr ds vk/kkj ij

Based on without MCP approval

2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

D.21 Loan repayment decided by?

_.k okilh dkSu r; djrk gS\

lnL; Lo lgk;rk lewg ds }kjk

By the member SHG (Taking the loan)

1

dk;Zdkfj.kh lfefr }kjk By EC members 2

cqd dhij }kjk By Book Keeper 3

fe’ku ny }kjk By Mission team 4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

D.22 Action taken by VO if repayment is not

done as per schedule

’ksM;wy ds vuq#i vnk;xh u gksus ij Ogh- vks-

}kjk D;k dk;Zokgh dh tkrh gS\

lnL; Lo lgk;rk lewg ls Li"Vhdj.k

Explanation sought from member SHG

1

lrdZ djrs gS Ikj dksbZ dk;Zokgh ugha djrs Warning but no action

2

Lo lgk;rk lewg ls tqekZuk fy;k tkrk gS

Fine from SHG

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.25 Monthly Operating cost of VO:

Ogh- vks- dk ekfld lapkyu O;;

Cost head Amount jkf’k

A fdjk;k Rent

B ekuns; Honorarium

C ys[ku lkexzh Stationery

D ;k=k HkRRkk Conveyance

E Any other (Specify______________)

vU; ¼Li"V djsa -----------------------------------------------½

F Any other (Specify______________)

vU; ¼Li"V djsa -----------------------------------------------½

G Any other (Specify______________)

vU; ¼Li"V djsa -----------------------------------------------½

140

SN Question Options Code SKIP

D.26 How is the monthly operating cost

of VO met?

Ogh- vks- dk ekfld lapkyu O;; dSls

iwjk fd;k tkrk gS\

Ogh- vks- dh iwath ls

From the VO resources 1

,e-ih-,l-vkj-,y-,e- ls

Support from MPSRLM 2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½ 3

D.27 What is the annual interest

rate of loan charged by VO

from SHGs?

Ogh- vks- }kjk _.k ij D;k okf"kZd

C;kt nj lewgksa ls yh tkrh gS\

Interest rate C;kt nj

A CIF

B VRF

C Any other (Specify___________)

vU; ¼Li"V djsa ---------------------------------------½

D.28 Satisfaction with the loan interest rate?

+_.k C;kt nj ls larqf"V

gk ¡a Yes 1

Ukgha No 2

D.29 Who decided the interest rate

of VO?

Ogh- vks- dk C;kt nj dkSu r;

djrk gS\

Ogh- vks- cqd dhij VO Book Keeper 1

dk;Zdkfj.kh lfefr lnL; EC members 2

Ckkgjh lnL; Outsider (Non-VO member) 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.30 In the last 12 months,

loan repayment being

done as:

+fiNys 12 ekg esa _.k

okilh dSls gqbZ gS\

No. of SHGs

lewgksa dh la[;k

fu/kkZfjr ’ksM;wy ds vuqlkj As per the schedule decided

lnL; Lo lgk;rk lewgksa ds ikl miyC/k Q.M ds vuqlkj

As per availability of funds with the member SHG

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

D.31 Record / Book keeping done by?

fjdkMZ la/kkj.k@cqd dhfiax dk;Z dkSu djrk gS\

Ogh- vks- cqd dhij VO Book Keeper 1

dk;Zdkfj.kh lfefr lnL; EC members 2

Ckkgjh lnL; Outsider (Non-VO member) 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.32 Specify gender of the Book keeper

cqd dhij efgyk gS ;k iq#"k Li"V djsa

iq#"k Male 1

Ekfgyk Female 2

D.33 Specify literacy level of the Book Keeper?

cqd dhij dk ’kS{kf.kd Lrj Li"V djsa

çkFkfed Ldwy rd ¼1yh ls 5oha rd½

Up to Primary school (1st – 5th)

1

fefMy Ldwy rd ¼6oha ls 8oha rd½

Up to middle school (6th – 8th )

2

Lksds.Mjh Ldwy rd ¼9oha ls 10oha rd½

Up to secondary school (9th – 10th)

3

lhfu;j Lksds.Mjh Ldwy rd ¼11ohsa ls 12oha rd½

Up to senior secondary (11th – 12th)

4

Lukrd Graduate 5

LukrdksRrj Post graduate 6

D.34 Accounting system followed by the VO?

Ogh- vks- }kjk viukbZ tkus okyh ys[kk ç.kkyh

dkSu lh gS\

,dy ys[kk ç.kkyh Single Entry System 1

nksgjh ys[kk ç.kkyh Double Entry System 2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

141

SN Question Options Code SKIP

D.35 Who assisted the process for opening of

VO bank account?

Ogh- vks- ds cSad [kkrk [kskyus dh çfØ;k esa

fdlus lgk;rk çnk; dh\

fe’ku ny Mission team 1

Lkh-vkj-ih-@cqd dhij CRP / Book Keeper 2

Ogh-vks ds inkf/kdkjh VO Office Bearers 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.36 Knowledge of bank account

opening, deposit and withdrawal

process?

cSad [kkrk [kskyus] jkf’k tek ,oa fudklh

djus dh çfØ;k dh tkudkjh\

dsoy inkf/kdkfj;ksa dks Only office bearers 1

dk;Zdkfj.kh lfefr ds lnL;ksa dks ¼inkf/kdkjh lfEefyr½

All EC members (incl. office bearers)

2

dsoy fe’ku ny dks Only Mission Team 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.40 Awareness on roles and responsibilities of

Executive Committee of VO:

Ogh- vks- dh dk;Zdkfj.kh lfefr dh Hkwfedk ,oa

ftEesnkfj;ksa ds lacU/k esa tkx#drk

Ckgqr vPNk Very Good 1

vPNk Good 2

vkSlr lkekU; Average 3

vlarks"ktud Poor 4

vR;Ur vlarks"ktud Very Poor 5 ¼1½ u, lnL;ksa dks 'kkfey djuk ;k lewg lnL; dh lnL;rk jn~n djuk ¼2½ Ogh- vks- ds mn~ns'; ifjHkkf"kr djuk ,oa bUgs iwjk djus

gsrq j.kuhfr ;qDr ;kstuk cukuk ¼3½ v/kZokf"kZd vFkok@,oa okf"kZd vk/kkj ij lewgksa dh xzsfMax rFkk lewgksa esa Lo;a xzsfMax dh çfØ;k

çksRlkfgr djuk ¼4½ Ogh- vks- ds fofRr; ysunsu] CktV] dk;ZØe ,oa inkf/kdkfj;ksa dh miyfC/k;ksa dk fu;fer #i ls leh{kk o eqY;kadu

djuk ¼5½ Ogh- vks- dks ç'kklfud fu;e o uSfrd ekudrkvksa ds vk/kkj ij lapkfyr djuk ¼6½ foRr ykecUn,oa çcU/ku djuk ¼7½ lewg

}kjk fn, tkus okys 'kqYd@Mksus'ku@lgHkkfxrk r; djuk ¼8½ vko';drk ds vuq#i milfefr;ksa dk fuekZ.k] iquZlaxBu djuk rFkk

lq/kkj ,oa lnL; ifjorZu djuk ¼9½ inkf/kdkfj;ksa dks dkuwuh MkdqesUV ,oa fofRr; eqn~nks ij gLrk{kj dk vf/kdkj çnk; djuk

¼10½ vko';drk ds vuq#i çfrfuf/k ukekafdr djuk ¼11½ okf"kZd dk;Z;kstuk cukuk ,oa vuqdksnu gsrq vke lHkk dks vf/kÑr djuk

¼12½ lwphc/n pkVZsM vdkmVasV ls okf"kZd vkfMV djokdj vke lHkk ls vuqeksnu

(i) To enroll new member(s) and /or terminate the membership of SHG members, (ii) To define objectives of VO and

setting up strategic plan to achieve it, (iii) Grading of SHGs on half yearly and/or yearly basis and promote self-grading

in SHGs, (iv) To review and evaluate the financial transactions, budget and programs of VO on a regular basis and

performance of office bearers, (v) To run VO as per administrative rules and ethical norms, (vi) To undertake fund

mobilization & management, (vii) To decide membership fees/donation/contribution to be given by SHGs, (viii) To form

and reorganize the sub-committees as per requirement and dissolution of the sub-committees or removal or any

member, (ix) To authorize office bearers for signing in legal documents and account related matters, (x) To nominate

representatives as per the requirement (xi) To prepare Annual Action Plan and recommend to GB for approval, (xii)

Annual Audit of VO by empanelled CA and get approval by GB.

Code: Awareness of more than 10 roles & responsibilities=1; Between 7-10 roles & responsibilities=2; Between 5-7

roles & responsibilities=3; Between 3-5 roles & responsibilities=4; Less than 3 roles & responsibilities=5

D.52* Specify reason why all members of all SHGs in

the village are not GB members?

Xkk ¡o ds leLr Lo lgk;rk lewgkas ds leLr lnL; Ogh-

vks- ds vke lHkk lnL; D;ks ughaa gS\ dkj.k Li"V djsa

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

142

SN Question Options Code SKIP

D.53 Awareness on roles and responsibilities of

General Body of VO:

Ogh- vks- ds vke lHkk lnL; dh Hkwfedk ,oa

ftEesnkfj;ksa ds lacU/k esa tkx#drk

Ckgqr vPNk Very Good 1

vPNk Good 2

vkSlr lkekU; Average 3

vlarks"ktud Poor 4

vR;Ur vlarks"ktud Very Poor 5

¼1½ dk;Zdkfj.kh lfefr ds lnL;ksa dk p;u@pquko ¼2½ dk;Zdkfj.kh lfefr }kjk rS;kj okf"kZd dk;Z;kstuk@ctV dk vuqeksnu ¼3½ Ogh-

vks- ds fu;e o dkuwuksa esa la'kks/ku ,oa vuqeksnu ¼4½ Ogh- vks- dh fufrxr ;kstuk ,oa fotu nLrkost dk vuqeksnu ¼5½ lwphc/n vkMhVj

ds p;u ,oa vkfMV çfrosnu ij ppkZ ,oa vuqeksnu ¼6½ okf"kZd O;; dk iquZfufj{k.k ,oa vuqeksnu

(i) Selection / Election of Executive Committee Members, (ii) Approval of Annual Action Plan / Budget prepared by the

Executive Committee (iii) Approval and amendments of Byelaws and norms of VO (iv) Approval of Vision Document and

Strategic Plan of VO (v) Discussion and approval of selection of empanelled auditor and audited statements of the VO

(vi) Review of annual expenditure and approval

Code: Awareness of more than 5 roles & responsibilities=1; Between 4-5 roles & responsibilities=2; Between 3-4

roles & responsibilities=3; Between 2-3 roles & responsibilities=4; less than 2 roles & responsibilities=5

D.61 Have there been any sub-committees formed in your VO?

D;k vkids Ogh- vks- esa dksbZ milfefr;k ¡ cukbZ xbZ gSa\

gk ¡a Yes 1

Ukgha No 2 Go to D.66

D.62 How are the Sub Committees

of VO formed?

Ogh- vks- dh milfefr;k¡ dSls cukbZ

xbZ\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Ogh- vks- esa milfefr;ksa dh t+#jr ij ppkZ

Discussion within VO regarding the need

1

milfefr;ksa ds lnL;ksa dk p;u

Selection of members of sub-committees

2

milfefr;ksa dh xfrfof/k;ksa dks ifjHkkf’kr djuk

Defining activities of sub-committees

3

milfefr;ksa dh Ogh- vks- dks fjiksfVax ç.kkyh dks ifjHkkf’kr

djuk

Defining reporting system of sub-committees to VO

4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

D.63 At what stage are sub-committees

formed?

fdl Lrj ij milfefr;k ¡ cukbZ xbZ\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Ogh- vks- dh vo/kkj.kk ds chtjksi.k ds le; ij At the time of VO Concept Seeding

1

Ogh- vks- ds xBu ds le; ij At the time of VO formation

2

Ogh- vks- ds l’kfDrdj.k ds le; ij At the time of VO Strengthening

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.64 What were the triggers for formation of

sub-committees of VO?

Ogh- vks- dh milfefr;k ¡ cukus ds ewy dkj.k

D;k Fks\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

vko’;drk eglwl dh xbZ Felt need 1 ,e-ih-,l-vkj-,y-,e- ny }kjk vfuok;Z

Professed by MPSRLM team 2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

143

SN Question Options Code SKIP

D.65 Description

of different

types of Sub

Committees

of VO:

Ogh- vks- dh

fofHkUu

milfefr;ksa

dk fooj.k

Types of sub-committees

milfefr;ksa ds çdkj Y=1, N=2

gk a

ugha

Training

(Y=1, N=2)

çf’k{k.k

gk a ugha

Functional

(Y=1, N=2)

gk a ugha

Tasks

Undertaken*

fd, x, dk;Z*

SHG monitoring Sub Committee ,l-,p-th e‚uhVfjax milfefr

Bank Linkages & Repayment Sub Committee cSad fyadst ,oa _.k olwyh milfefr

Social Mobilization Sub Committee Lkkekftd ykecanh milfefr

Social Action Sub Committee Lkkekftd dk;Z milfefr

Any other (Specify___________)

vU; ¼Li"V djsa ----------------------------------------½

* ,l ,p th e uhVfjax milfefr & ¼1½ ;g lqfuf’pr djuk fd vius lHkh lewg iaplw= dk ikyu djsa vkSj mudh xfrfof/k;ksa dks

e‚uhVj djuk ¼2½ ;g lqfuf’pr djuk fd lewg }kjk _.k jkf’k dk mi;ksx ,e-lh-ih- esa ftØ dh xbZ xfrfof/k;ksa ds fy, gks jgk gS ¼3½

lewg ds fy, çf’k{k.k vko’;drk vkadyu

cSad fyadst ,oa _.k olwyh milfefr & ¼1½ lewg ,oa cSad ds e/; lsrq dk dk;Z djuk ¼2½ cSad fyadst] cSad [kkrk [kskyus ,oa çcaf/kr

djus] lh vkbZ ,Q o cSad _.k okilh lacf/kr eqn~nksa dks lqy>kuk

lkekftd ykecanh milfefr & ¼1½ NwV x, xjhcksa dh igpku dj mUgs ekscykbt djuk ¼2½ xk¡o ds y{; ifjiw.kZ djus gsrq ç;kljr

jguk ¼3½ lnL;ksa gsrq vko’;d çf’k{k.k dk;ZØe vk;ksftr djuk

lkekftd dk;Z milfefr & ¼1½ xk¡o esa lkekftd fo'kerk ij dk;Z dh igy djuk ¼2½ lkekftd leL;kvksa ds lek/kku ds fy, eqn~ns

dks lqy>kus gsrq leqfpr ç;kl ¼3½ efgykvksa ls lacf/kr eqnnksa dk vkdyu ,oa xk¡o dh okf"kZd ts.Mj LVsVl fjiksVZ çdkf’kr djuk

* SHG monitoring Sub Committee: (i) To ensure that all our SHGs are following the Panchsutras and also monitor their

activities, (ii) To ensure that SHGs are utilizing the loan amount for the activities mentioned in the MCP, (iii) Conduct

training need assessment for the SHGs.

Bank Linkages & Repayment Sub Committee: (i) Acts as an interface between the SHGs and the banks, (ii) Resolves

issues related to bank linkages, account opening/management, bank loan and CIF repayment.

Social Mobilization Sub Committee: (i) Identifies and mobilizes the left out poor families, (ii) progressing towards

saturation of the village and (iii) organizes necessary training programmes for the members.

Social Action Sub Committee: (i) Takes initiatives to address social discrimination in villages, (ii) Diagnose social

problems and take suitable measures to resolve the issues, (iii) Assesses issues related to women and publishes an

annual Gender Status Report of village.

D.66 Literacy level of the VO President?

Ogh- vks- v/;{k dk ’kS{kf.kd Lrj\

vf’kf{kr Illiterate 1

çkFkfed Ldwy rd ¼1yh ls 5oha rd½

Up to Primary school (1st – 5th)

2

fefMy Ldwy rd ¼6oha ls 8oha rd½

Up to middle school (6th – 8th )

3

Lksds.Mjh Ldwy rd ¼9oha ls 10oha rd½

Up to secondary school (9th – 10th)

4

lhfu;j Lksds.Mjh Ldwy rd ¼11ohsa ls 12oha rd½

Up to senior secondary (11th – 12th)

5

lhfu;j Lksds.Mjh Ldwy ls vf/kd

Above senior secondary

6

144

SN Question Options Code SKIP

D.67 Literacy level of the VO Secretary?

Ogh- vks- lfpo dk ’kS{kf.kd Lrj\

vf’kf{kr Illiterate 1

çkFkfed Ldwy rd ¼1yh ls 5oha rd½

Up to Primary school (1st – 5th)

2

fefMy Ldwy rd ¼6oha ls 8oha rd½

Up to middle school (6th – 8th )

3

Lksds.Mjh Ldwy rd ¼9oha ls 10oha rd½

Up to secondary school (9th – 10th)

4

lhfu;j Lksds.Mjh Ldwy rd ¼11ohsa ls 12oha rd½

Up to senior secondary (11th – 12th)

5

lhfu;j Lksds.Mjh Ldwy ls vf/kd

Above senior secondary

6

D.68 Literacy level of the VO Treasurer?

Ogh- vks- dks"kk?;{k dk ’kS{kf.kd Lrj\

vf’kf{kr Illiterate 1

çkFkfed Ldwy rd ¼1yh ls 5oha rd½

Up to Primary school (1st – 5th)

2

fefMy Ldwy rd ¼6oha ls 8oha rd½

Up to middle school (6th – 8th )

3

Lksds.Mjh Ldwy rd ¼9oha ls 10oha rd½

Up to secondary school (9th – 10th)

4

lhfu;j Lksds.Mjh Ldwy rd ¼11ohsa ls 12oha rd½

Up to senior secondary (11th – 12th)

5

lhfu;j Lksds.Mjh Ldwy ls vf/kd

Above senior secondary

6

D.69 Has any conflict occurred within your VO?

D;k vkids Ogh- vks- esa dksbZ fookn gqvk\

gk ¡a Yes 1

Ukgha No 2 Go to D.71

D.70 How are conflicts within the VO resolved?

vkids Ogh- vks- esa okn&fookn dk fuiVkjk dSls

gksrk gS\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Lo;a vke lHkk lnL; }kjk

By the GB members themselves

1

Lo;a dk;Zdkfj.kh lfefr lnL; }kjk

By the EC members themselves

2

inkf/kdkfj;ksa }kjk By the Office Bearers 3

fe’ku ny }kjk By the Mission Team 4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

D.71 Social issues addressed by VO:

Ogh-vks- }kjk fdu lkekftd eqn~nks ij dk;Z

fd;k tk jgk gS\

LokLFk; ds eqn~ns ij Health 1

ikuh ,oa LkkQ&LkQkbZ ds eqn~nksa ij

Water and Sanitation

2

f’k{kk ds eqn~ns ij Education 3

'kjkc dh yr ds eqn~ns ij Alcoholism 4

ngst ds eqn~ns ij Dowry 5

va/kfo'okl ds eqn~ns ij Superstition 6

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

7

145

SN Question Options Code SKIP

D.72 What are the different aspects of

Member SHGs reviewed by VO?

Ogh- vks- }kjk lnL; Lo lgk;rk lewgksa ds

dkSu ls fofHkUu igyqvksa dk iquZfufj{k.k

fd;k tkrk gS\ [Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Ikaplw=ksa dk ikyu

Following Panchsutra 1

forj.k mn~ns’; ds vuq#i _.k dk mi;ksx Use of loan as per disbursement purpose

2

_.k okilh nj

Loan repayment rate 3

vfr xjhc lnL;ksa gsrq çkFkfedhdj.k dks egRRo nsuk

Prioritization preferences for POP, etc. 4

Lo lgk;rk lewg }kjk lkekftd eqnnks ij dk;Z

SHG addressing social issues 5

Lo lgk;rk lewg }kjk fy, x, fu.kZ;ksa dk vuqlj.k Following decisions taken by SHG

6

vUrjfookn fuiVkjk Conflict resolution

7

fofRr; vuq’kklu ,oa ikjnf’kZrk Financial transparency and discipline

8

fu.kZ; çfØ;k esa ikjnf’kZrk Transparency in decision making process

9

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

10

146

E. STRENGTHENING OF VO xzke laxBu dk l’kfDrdj.k

SN Question Options Code SKIP

E.1 Where was the training provided to

the VO by MPSRLM team?

,e-ih-,l-vkj-,y-,e- }kjk Ogh- vks- dks dgk ¡

çf’k{k.k fn;k x;k Fkk\ [Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

dksbZ çf’k{k.k çnk; ugha fd;k x;k

No training provided

1 Go to E.4

ftys ds vUnj Within the same district 2

ftys ds ckgj Outside the district 3

jkT; ds ckgj Outside the State 4

E.2 Who provided the training on GB/EC meeting

process and norms, maintenance of books of

accounts and MCP?

vke lHkk@dk;Zdkfj.kh lfefr ds cSBd çfØ;k ,oa

ukElZ] ,elhih o ys[kk la/kkj.k fo"k; ij fdlus

çf’k{k.k çnk; fd;k\ [Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Lkh vkj ih vfHk;ku deZpkjh

CRP round staff

1

lkeqnkf;d dkMj Community cadres 2

fe’ku ny Mission team 3

Any other (Specify_______________)

vU; ¼Li"V djsa -----------------------------------------------½

4

E.3 Types of training provided by

MPSRLM team to strengthen VO?

Ogh- vks- dks etcwr djus gsrq ,e-ih-,l-

vkj-,y-,e- }kjk fdl çdkj dk çf’k{k.k

çnk; fd;k x;k\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Ogh- vks- ladYiuk ,oa çca/ku VO concept and management

1

,e-lh-ih- fuekZ.k ,oa vkadyu

MCP preparation and appraisal 2

Ogh- vks- ds [kkrksa ,oa ys[kk dk la/kkj.k VO Accounts and Book Keeping

3

Ogh- vks- ,e vkbZ ,l

VO MIS 4

Tsk.Mj ,oa lkekftd lekos’k Gender and Social Inclusion

5

ih vkbZ ih

PIP 6

Lkkeqnkf;d Hk.Mkj.k

Community Procurement 7

milfefr dh Hkwfedk ,oa ftEesnkfj;k ¡

Roles and responsibilities of Sub Committees 8

,l-,p-th- xzsfMax ,oa vkfMV SHG Grading and audit

9

okf"kZd Iykfuax ,oa ctfVax Annual planning and budgeting

10

xousZl ,oa tokcnsgh Governance and Accountability

11

,Dlikstj foftV dk mn~ns’; fu/kkZj.k Objective setting of Exposure visits

12

fofRr; çca/ku Financial Management

13

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

14

E.8* Type of assistance to member SHGs from VO for?

lnL; Lolgk;rk lewgksa dks Ogh- vks- fdl çdkj dh

lgk;rk çnku djrk gS\ [Multiple Response] ¼,d ls vf/kd mRrj laHko gSa½

147

SN Question Options Code SKIP

E.9 Awareness of VO members towards:

fuEu ds lanHkZ esa Ogh-vks- lnL;ksa dh tkx#drk

Yes

gk¡

No

ughaa

A Savings cpr 1 2

B RF 1 2

C CIF 1 2

D VRF 1 2

E Bank Loan cSad _.k 1 2

E.14 Assessment of SHGs for CIF

Lkh vkbZ ,Q ds fy, ,l-,p-th- dk

vkadyu

Ikaplw=ksa dk ikyu

Following Panchsutra 1

lewgksa dh xzsfMax

Grading of SHGs

2

,e lh ih esa xfrfof/k;ksa dk çkFkfefddj.k

Prioritization of activities in MCP

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

E.15 Assessment of SHGs for VRF

oh vkj ,Q ds fy, ,l-,p-th- dk

vkadyu

lewg dh Js.kh ¼A/B/C/D½

Type of SHG category (A/B/C/D) 1

lewg lnL;ksa dh dh Js.kh ¼A/B/C/D½

Category of SHG members

2

lewg lnL;ksa ds ifjokjksa esa Hksn ~; ¼fo/kok] fodykax]

bR;kfn½ lnL;ksa dh mifLFfr

Presence of vulnerable members (widow,

disabled, etc.) in families of SHG members

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

E.16 Distribution pattern of fund among

member SHGs?

lnL; Lolgk;rk lewgksa ds e/; jkf’k

forj.k dk D;k rjhdk gS\

,elhih ds vuqlkj mi;ksx ,oa forj.k

Distributed and used as per the MCP

1

leLr lnL;ksa ds e/; leku #i ls forfjr

Equally distributed amongst all members (SHGs)

2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

E.17 Use pattern of fund among member

SHGs?

lnL; Lolgk;rk lewgksa ds e/; jkf’k

mi;ksx djus dk D;k rjhdk gS\

leLr lnL; Lolgk;rk lewgksa ds }kjk mi;ksx

Used by all member SHGs

1

Dsoy dqN lnL; Lolgk;rk lewgksa ds }kjk mi;ksx

Used by only a few member SHGs

2

lnL; Lolgk;rk lewgksa dh vko’;drk] vkdfLed

t#jr o çkFkfedhdj.k ds vuq#i forj.k

Distributed as per the urgency and

prioritization of needs of the member SHGs

3

,elhih ds vuqlkj As per MCP 4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

148

SN Question Options Code SKIP

E.20 What are the Principles of Good Governance of VO? Ogh- vks- ds lq’kklu dk

fl/nkUr D;k gS\ [Multiple Response] Note: Probe only, do not prompt ¼,d ls vf/kd mRrj laHko gSa½

uksV& ÑIk;k lgtrk ls iwNsa]

çcq) u djsa

leLr dk;Zdkfj.kh lfefr lnL;ksa }kjk lgHkkxh fu.kZ; ysuk

Participatory decision making by all EC members 1

leLr vke lHkk lnL;ksa }kjk lgHkkxh fu.kZ; ysuk

Participatory decision making by all GB members 2

fl/nkUr mn~ns’; ,oa ewY;ksa ds vuq#i dk;Z djuk

Functioning in accordance with principles, objectives and value

3

iwath ;k dks"k çca/ku esa ikjnf’kZrk Transparency in fund management

4

Iknkf/kdkfj;ksa] lkeqnkf;d dkMj] lnL;ksa o çksQs’kuyksa dh

ftEesnkjh iw.kZ dk;Z ç.kkyh Responsible functioning of office bearers, community

cadre, community professionals and members

5

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

6

E.21 Social Audit of VO done by:

Ogh- vks- dk lks’ky vkfMV fdlds }kjk

fd;k x;k\

,e ih ,l vkj ,y ,e ny MPSRLM Team 1

dk;Zdkfj.kh lfefr lnL; EC Members 2

vke lfefr lnL; GB Members 3

ckgjh ,tsUlh External Agency 4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

E.22 Convergence of VO activities in:

D;k Ogh- vks- dh xfrfof/k;ksa esa

dUotsZUl fd;k x;k\

[Multiple Response] ¼,d ls vf/kd mRrj laHko gSa½

dksbZ ughaa None 1

LokLFk; {ks= Health Sector

f’k{kk {ks= Education Sector 2

vkthfodk {ks= ¼mnkgj.kr% Ñf’k] Ik'kqikyu] bR;kfn½

Livelihood Sector (e.g. Agriculture, Animal

Husbandry, etc.)

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

149

Responses to the following questions are to be recorded following observation and review of the

VO records:

SN Question Options Code SKIP

D.5 What was the age of

member SHGs on formation

date of VO?

Ogh- vks- dh xBu fnukad dks

lnL; lewgksa dh vk;q fdruh

Fkh\

Options No. of SHGs

lewgksa dh la[;k

3 ekg ls de Less than 3 months

3 ls 6 ekg ds e/; Between 3 to 6 months

6 ls 9 ekg ds e/; Between 6 to 9 months

9 ls 12 ekg ds e/; Between 9 to 12 months

12 ekg ls vf/kd More than 12 months

D.16 How the membership fee of

member SHGs decided?

Ogh- vks- ds lnL; lewgksa dk

lnL;rk ’kqYd dSls r; fd;k

tkrk gS\

dsoy Ogh- vks- inkf/kdkfj;ksa }kjk By VO Office Bearers 1

leLr Ogh- vks- lnL;ksa ¼inkf/kdkjh lfEefyr½ dh lgefr ls By the consent of all VO members (incl. Office Bearers)

2

vfr xjhc lnL; ,l-,p-th- dh {kerk ds vuqlkj

As per capacity of POP SHG

3

,e-ih-,l-vkj-,y-,e- ny }kjk By MPSRLM team 4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

D.17 Monthly saving deposits per member

SHG?

çR;sd lnL; Lo lgk;rk lewg Ogh- vks- esa

fdruh ekfld cpr tek djrk gS\

INR 10-25 10&25 #i, 1

INR 26-50 26&50 #i, 2

INR 51-100 51&100 #i, 3

More than INR 100 100 #i, ls vf/kd 4

D.18 How are the monthly savings

from member SHGs

decided?

Ogh- vks- ds lnL; lewgksa dh

ekfld cpr dSls r; dh tkrh

gS\

dsoy Ogh- vks- inkf/kdkfj;ksa }kjk By VO Office Bearers 1

leLr Ogh- vks- lnL;ksa ¼inkf/kdkjh lfEefyr½ dh lgefr ls By the consent of all VO members (incl. Office Bearers)

2

vfr xjhc lnL; ,l-,p-th- dh {kerk ds vuqlkj

As per capacity of POP SHG

3

,e-ih-,l-vkj-,y-,e-ny }kjk By MPSRLM team 4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

D.23 Number of SHGs against which action has been taken

for repayment in not done as per schedule

,l ,p th dh la[;k ftuds’ksM;wy ds vuq#i vnk;xh u gksus

ij fdrus lewgksa ds fo#) dk;Zokgh dh xbZ\

No. of SHGs____________

lewgksa dh la[;k --------------------

D.24 Amount with VO: Ogh- vks- dh jkf’k Amount jkf’k

A uxn Cash-in-hand

B cSad [kkrs esa In Bank A/c

D.37 Who are the Executive

Committee members of

VO?

Ogh- vks- dh dk;Zdkfj.kh lfefr

ds lnL; dkSu gSa\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Xkk ¡o ds leLr lewgksa ds v/;{k

Presidents of all SHGs in the village

1

Xkk ¡o ds leLr lewgksa ds lfpo

Secretaries of all SHGs in the village

2

Xkk ¡o ds leLr lewgksa ds nks ukfer lnL; Any two

nominated representatives from all SHGs in village

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

150

SN Question Options Code SKIP

D.38 Tenure of Executive Committee members?

dk;Zdkfj.kh lfefr lnL;ksa dk dk;Zdky\

1 Year 1 o"kZ 1

2 Years 2 o"kZ 2

3 Years 3 o"kZ 3

4 Years 4 o"kZ 4

5 Years 5 o"kZ 5

More than 5 Years 5 o"kZ ls vf/kd 6

D.39 How many times have the EC members

been selected / elected after formation of

VO?

Ogh- vks- ds xBu ds Ik’pkr fdruh ckj dk;Zdkfj.kh

lfefr lnL;ksa dk p;u@pquko gks pqdk gS\

,d ckj Once 1

nks ckj Twice 2

Rkhu ckj Thrice 3

Pkkj ckj Four times 4

Pkkj ckj ls vf/kd More than Five Times 5

D.41 What is the frequency of meeting of

Executive Committee?

dk;Zdkfj.kh lfefr dh cSBd dk vUrjky D;k

gS\

15 fnol ds vUrjky ij Fortnightly 1

ekfld Monthly 2

=Sekfld Quarterly 3

N%ekfld Half yearly 4

D.42 How many times was the Executive

Committee meeting held in the last 12

months?

foxr 12 ekg esa fdruh ckj dk;Zdkfj.kh lfefr

dh cSBd gqbZ gS\

,d ckj Once 1

nks ckj Twice 2

Rkhu ckj Thrice 3

Pkkj ckj Four times 4

Pkkj ckj ls vf/kd More than four Times 5

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

6

D.43 Attendance of EC meetings held in last 12

months:

fiNys 12 ekg esa laiUu dk;Zdkfj.kh lfefr

cSBdksa esa mifLFkfr\

100% 1

Between 80-100% 80%&100% ds e/; 2

Between 60-80% 60%&80% ds e/; 3

Between 40-60% 40%&60% ds e/; 4

Less than 40% 40% lss de 5

D.44 Venue for conduct of EC

meeting?

dk;Zdkfj.kh lfefr dh cSBd dk

LFky\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Ogh- vks- dk;kZy; VO office 1

cqd dhij ds ?kj ij House of Book Keeper 2

Go to D.46

inkf/kdkjh;ksa ds ?kj ij House of Office Bearers 3

Lkkeqnkf;d gky@Hkou ¼Ldwy] vkaxuokM+h] LokLF; dsUnz]

iapk;r Hkou] bR;kfn½

Community Halls / Buildings (e.g. School, Anganwadi,

Health Centre, Panchayat Bhawan, etc.)

4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

D.45 What is the type VO Office? Ogh- vks- dk;kZy; fdl çdkj dk

gS

dk;kZy; gsrq fdjk;k Ogh- vks- vnk djrk gS

Rented house (rent paid by the VO) 1

dk;kZy; gsrq fdjk;k Ikfj;kstuk vnk djrh gS

Rented house (rent paid by the Project) 2

Lkkeqnkf;d Hkou] ’kkldh; foHkkx }kjk çnk; fd;k x;k

Community Building (provided by Govt. Department) 3

Lkkeqnkf;d Hkou] xzkeh.kksa }kjk çnk; fd;k x;k Community Building (provided by villagers)

4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

151

SN Question Options Code SKIP

D.46 Who calls the EC meeting?

dk;Zdkfj.kh lfefr dh cSBd dkSu cqykrk gS\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

inkf/kdkjh Office Bearers 1

Lkh vkj ih CRPs 2

,e-ih-,l-vkj-,y-,e- ny MPSRLM team 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.47 How is the agenda of EC meeting

decided?

dk;Zdkfj.kh lfefr dh cSBd dk ,tsUMk dSls

r; fd;k tkrk gS\ [Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Ogh- vks- }kjk By the VO itself 1

Lkh vkj ih }kjk By the CRPs 2

,e-ih-,l-vkj-,y-,e-ny }kjk

By MPSRLM team

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.48 Was the recent Executive Committee meeting conducted as

per the agenda?

D;k fiNyh dk;Zdkfj.kh lfefr dh cSBd dk lapkyu ,tsUMk ds

vuq#i gqvk Fkk\

gk ¡a Yes 1

Ukgha No 2

D.49 Are all the agenda points minutised properly?

D;k ,tsUMk ds leLr fcUnqvksa dks dk;Zokgh fooj.k esa leqfpr rjhds

ls la/kkfjr fd;k tkrk gS\

gk ¡a Yes 1

Ukgha No 2

D.50 Is tallying of cash book, ledger and bank pass book (Savings

and loan account) taken up during the EC meeting?

D;k dk;Zdkfj.kh lfefr dh cSBd ds nkSjku dS’k cqd ystj ,oa cSad

ikl cqd ¼cpr ,oa _.k [kkrk½ dk fglkc fdrkc fy;k tkrk gS\

gk ¡a Yes 1

Ukgha No 2

D.51 Who are the General Body members of VO?

Ogh- vks- ds vke lHkk lnL; dkSu gS\ Xkka¡o ds leLr lewgksa ds leLr lnL;

All members of all SHGs in village

1 Go to D.53

Xkk ¡o ds dqN lewgksa ds leLr lnL;

All members of few SHGs in village

2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

D.54 What is the frequency of General Body

meeting?

vke lHkk dh cSBd fdl vUrjky ij gksrh gS\

dHkh ughaa None 1

ekfld Monthly 2

=Sekfld Quarterly 3

v/kZ okf"kZd Half yearly 4

okf"kZd Yearly 5

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

6

D.55 How many times has the General Body

meeting been held since the inception of

the VO?

Ogh- vks- dh ’kq#okr ls vc rd fdruh ckj vke

lHkk cSBd gks pqdh gS\

,d ckj Once 1

nks ckj Twice 2

nks ckj ls vf/kd More than 2 times 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

D.56 Who decides the GB agenda?

vke lHkk cSBd dk ,tsUMk dkSu r; djrk gS\

Lo;a Ogh- vks- }kjk By the VO itself 1

Lkh-vkj-ih- }kjk By the CRPs 2

,e-ih-,l-vkj-,y-,e- ny }kjk

By MPSRLM team

3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

152

SN Question Options Code SKIP

D.57 Was the recent General Body meeting conducted as per the agenda?

fiNyh vke lHkk cSBd dk lapkyu D;k ,tsUMk ds vuq#i gqvk Fkk\

gk ¡a Yes 1

Ukgha No 2

D.58 Are all the agenda points minutised properly?

D;k ,tsUMk ds leLr fcUnqvksa dk dk;Zokgh fooj.k esa leqfpr rjhds ls la/kkj.k

fd;k tkrk gS\

gk ¡a Yes 1

Ukgha No 2

D.59 Attendance of GB meetings held in last 12

months

fiNys 12 ekg esa laiUu vke lHkk cSBdksa esa

mifLFkfr\

100% 1

Between 80-100% 80%&100% ds e/; 2

Between 60-80% 60%&80% ds e/; 3

Between 40-60% 40%&60% ds e/; 4

Less than 40% 40% lss de 5

D.60 Venue for conduct of GB

meeting?

vke lHkk cSBd dk LFky\

[Multiple Response]

¼,d ls vf/kd mRrj laHko gSa½

Ogh- vks- dk;kZy; VO office 1

cqd dhij ds ?kj ij House of Book Keeper 2

inkf/kdkjh;ksa ds ?kj ij House of Office Bearers 3

Lkkeqnkf;d gky@Hkou ¼Ldwy] vkaxuokM+h] LokLF; dsUnz] iapk;r

Hkou] bR;kfn½

Community Halls / Buildings (e.g. School, Anganwadi,

Health Centre, Panchayat Bhawan, etc.)

4

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

5

153

SN Question Options Code SKIP

E.4 Specify regarding introduction of the

following:

uhps fn, x, vfHkys[kksa ds ifjp; ds lanHkZ esa

Li"Vhdj.k

Not

introduced

Ikfjfpr ugha

Introduced but

partly updated

Ikfjfpr fdUrq

vkaf’kd #i ls

viMsV

Introduced

and up to date

Ikfjfpr ,oa iw.kZ

#i ls vi Vw MsV

A Meeting registers of GB and EC

dk;Zdkfj.kh lfefr ,oa vke lfefr ds cSBd

jftLVj

1 2 3

B Cash Book dS’k cqd 1 2 3

C General Ledger ystj cqd 1 2 3

D Stock Register LVkd jftLVj 1 2 3

G Membership register and details of

share purchased by members

lnL;rk jftLVj ,oa lnL;ksa }kjk Ø; fd,

x, ’ks;j dk fooj.k

1 2 3

H Annual Progress Report

okf"kZd çxfr çfrosnu

1 2 3

J Annual Audit Report

okf"kZd vkfMV fjiksVZ

1 2 3

K Annual Action Plan and Annual Budget

okf"kZd dk;Z ;kstuk ,oa okf"kZd ctV

1 2 3

L Monthly MIS and Progress Report

ekfld ,e vkb ,l ,oa çxfr çfrosnu

1 2 3

M Staffing details with Bio-data

deZpkjh fooj.k ,oa ck;ksMkVk

1 2 3

N Other relevant documents, vouchers,

registers, etc. (Specify_____________)

vU; lacfU/kr MkdqesUV okmpj ,oa jftLVj

¼Li"V djsa -----------------------------------------------½

1 2 3

E.5 Frequency of update of records /

books of accounts by Book Keeper?

Ckqd dhij }kjk fjdkMZ ,oa ys[kk iqLrdksa dks

viMsV djus fd vkof̀Rr\

viMsV ugha djrs Not updated 1

iUnzg fnol ds vUnj Fortnightly 2

ekfld Monthly 3

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

4

E.6 When are the records / books of

accounts updated?

fjdkMZ ,oa ys[kk iqLrdksa dks viMsV dc

fd;k tkrk gS\

cSBd ds nkSjku During the meeting 1

cSBd ds Ik’pkr After the meeting 2

Any other (Specify________________)

vU; ¼Li"V djsa -----------------------------------------------½

3

E.7 Frequency of review records / books of accounts by:

fuEu ds }kjk fjdkMZ ,oa ys[kk iqLrdksa ds iquZfufj{k.k dh vkof̀Rr

Frequency*

vkof̀Rr*

A Office Bearers and EC of VO Ogh-vks ds inkf/kdkjh ,oa dk;Zdkfj.kh lfefr

B Master Book Keepers ekLVj Ckqd dhij

C Mission team fe’ku ny

D Any other vU; (Specify Li"V djsa ______________________)

* Not updated = 1, Fortnightly = 2, Monthly = 3, Quarterly = 4, Half Yearly = 5, Annually = 6 Any other

(Specify_____________________) = 7

viMsV ugha djrs¾1] iUnzg fnol ds vUnj¾2] ekfld¾3] =Sekfld¾4] v/kZokf’kZd¾5] okf’kZd¾6] vU; ¼Li"V djsa -----------

------------------------------------½¾7

154

SN Question Options Code SKIP

E.10 Dates of MCP:

,e lh ih dh fnukad

Option Date

Dose 1 Dose 2 Dose 3

A ,l ,p th ls çkIr Received from SHG

B ih ,Q Vh dks Hksth xbZ Sent to PFT

C vuqeksfnr Approved

E.11 Number of MCPs rejected / asked for revision by VOs

Ogh- vks- }kjk fujLr@iquZlq/kkj djus gsrq,e-lh-ih- dh la[;k

la[;k-----------------------

Number___________

E.12 Disbursement route of CIF?

CIF dk Hkqxrku fdl ek/;e ls gksrk gS\

Lolgk;rk lewgksa dks çR;{k #i ls Direct to SHGs 1

Ogh- vks- }kjk Through VO 2

lh-,y-,Q- }kjk Through CLF 3

E.13 How many SHGs have received CIF through rotation?

fdrus lewgksa us jksVslu ds ek/;e ls lh vkbZ ,Q çkIr fd;k gS\

la[;k-----------------------

Number___________

E.18 Current status various VO

funds:

Ogh- vks- dh iwaft;ksa dh orZeku

fLFkfr

Amount

Received

from Mission

fe’ku ls çkIr

jkf’k

Amount

Disbursed

to SHGs

lewgksa dks

forfjr jkf’k

Due receivable

till date from

SHGs

lewgksa ls orZeku

frfFk rd çkIr

gksus ;ksX; jkf’k

Due received till

date from SHGs

lewgksa ls orZeku

frfFk rd çkIr gks

pqdh jkf’k

Amount

outstanding

’ks"k jkf’k

A CIF Lkh vkbZ ,Q

B VRF oh vkj ,Q

C VO Start-up fund

Ogh- vks- LVkVZ&vi Q.M

D Any other vU; (Specify

Li"V djsa ___________)

E.19 Dates and fund / amount Requested vkosfnr Sanctioned

vuqeksfnr

Disbursed to SHGs

lewgksa dks forfjr

Date

fnukad

Amount

jkf’k

Date

fnukad

Amount

jkf’k

Date

fnukad

Amount

jkf’k

A CIF 1st Dose

Lkh vkbZ ,Q 1yh Mkst+

B CIF 2nd Dose

Lkh vkbZ ,Q 2jh Mkst+

C CIF 3rd Dose

Lkh vkbZ ,Q 3jh Mkst+

D VRF 1st Dose

oh vkj ,Q 1yh Mkst+

E VRF 2nd Dose

oh vkj ,Q 2jh Mkst+

F VRF 3rd Dose

oh vkj ,Q 3jh Mkst+

G VO Start-up fund

Ogh- vks- LVkVZ&vi Q.M

H Any other vU; (Specify

Li"V djsa ___________)

155

Annexure III

Quality Control and Management This section presents the framework adopted for quality control and management of the

deliverables prepared as part of the Process Monitoring of MPSRLM.

A3.1 Framework for Quality Management of deliverables

InsPIRE has an in-house quality control management framework ‘ANTARA4’ and a

‘Project Management Unit (PMU)’ to keep a check and control on timely submission of

all project deliverables. The communication and data management team provided direct

support for quality check for all project processes. Also, the Project Management Unit

circulated the deliverables for internal scrutiny, and this exercise helped to maintain the

quality of all deliverables such as reports, success stories and policy documents.

Apart from this, the team developed “Qualitative and Quantitative Review Protocols”

and followed these to maintain consistency and follow an evidence-based approach to

identify the findings on a factual basis.

A3.2 Qualitative Survey Protocols

During the process of qualitative data collection, the following steps of the protocol were

adopted for quality control on the data collection process.

Careful note taking during an interview is critical. Hence, a person was dedicated only to

note taking. Note taking was undertaken in a format finalized in consultation with the

client, so that the flow of the notes is same across all the interviews / stakeholders. Each

interview and focus group discussion was individually written up, and contained

identifying information including the time and place of the interview, the subjects covered,

the persons providing information, the field team members conducting and documenting

that interview, and other relevant information. Formats which can assist in this

documentation process as well as to support data analysis and synthesis were also

developed.

The documentation expert set aside time immediately after every activity to review

what they had written as this was likely needed to be edited, expanded or explanatory

comments added. If too much time passes before the notes are reviewed and refined, it

will become more difficult to make sense of or follow up on any partial, confusing or

contradictory information and valuable information will be lost forever. Hence, it was

also recommended that after going back from the field, the team will dedicate quality

time for sharing notes and give feedback on important findings that seem to be

emerging and the additional questions that the team needs to ask to better understand

these findings. The team was also guided to discuss what has gone well and what is

missing.

4 Through ANTARA, a team of professionals and communication experts from the PMU manages day-to-day project activities and project deliverables (including technical and financial reports). It has significant contribution for managing key documents which InsPIRE produces as deliverables of projects funded by the Government, bi-laterals and multi-laterals.

156

While taking notes, the documentation expert focused first and foremost on

documenting the key points being made, using as much of the informant’s own language

as possible. It may have become necessary to paraphrase especially long responses, but

endeavour was made to capture in full quotes and the most important statements made

by the informant. The expert also indicated in the notes the topics where there was an

especially heated discussion or strong agreement or disagreement.

The analysis of qualitative information did not only look for the major themes that cut

across groups, but also at the key insights that might have been shared by only one

person. While analyzing, different aspects and contextual themes were considered to

build theories around the broad areas of: Context, Internal Consistency, Frequency,

Extensiveness, Intensity and Specificity.

A3.3 Quantitative Data Collection Protocols

During the process of quantitative data collection, the following steps of the protocol

were adopted for quality control on the data collection process:

Data Editing – After field editing, questionnaires were returned to the main survey

office for data processing. The processing operation consists of office editing, coding

of ‘other’ category – open ended questions, data entry, and editing inconsistencies

identified by the computer programs.

Figure A3.1: Overview of Quality Control Mechanism during Evaluation

Data Scrutiny – The office scrutiny was done by a team which included the

investigators who had participated in training. While in scrutiny, an attempt was

made to scrutinize schedules in a manner to make it easy to be entered as per the

programme.

Initiating Evaluation work Adherence to Research / Sampling Design

During Field work

Spot Check and Observation

Back Check

Re interviews

During/After Field work

Data Editing

Data Scrutiny

Data Coding

After Field work

Data Entry

Data cleaning

50 %

20 %

As required

Data Validation

Ensuring 99.98% accuracy

- Validity check - Range check Submission of cleaned data set

157

Data Entry – The data entry and validation work of the survey was handled by

either using MS Excel.

Data Cleaning – Once the data was stored in the computer, the next task was to

eliminate the more obvious errors that may have occurred during the data

collection, coding and input stages. An edit program was specified, with a set of

instructions for the computer package used that automatically examined, and drew

attention to, any record that appeared to have an error in it.

Data Analysis Plan – The data analysis / tabulation plan was prepared by the team

members, in consultation with the advisory etam. The tabulation plan was finalized

in consultation with the client. The required tables for quantitative data collected

were then generated using the latest version of analysis software. A content analysis

format was developed for interviews and qualitative components of the study. This

process eventually helped in integrating the report at project level.

Ensuring Data Check – It was ensured that all data checks i.e. a) validation check, b)

range check and c) consistency checks were in place to provide accurate, complete

and consistent information.

Validity check: Validity check ensured that the record identifiers, invalid

characters, and values have been accounted for; essential fields have been

completed (e.g.: no quantity field is left blank where a number is required).

Range checks: All data was tested for range check to ensure that all data fields

containing information fall within a specified range.

Consistency checks: The data entry programme was developed in such a way

that it had built-in checks to ensure data consistency. These checks may not have

eliminated all the errors introduced during the data collection, coding and data

input phases, but certainly minimized the errors.