final report (appendixes)
TRANSCRIPT
National Irrigation Administration (NIA) The Republic of the Philippines
PREPARATORY SURVEY ON
MALITUBOG-MARIDAGAO IRRIGATION PROJECT
(PHASE II) IN
THE REPUBLIC OF THE PHILIPPINES
FINAL REPORT (APPENDIXES)
September 2018
Japan International Cooperation Agency (JICA) Sanyu Consultants Inc. (SCI) 1R
JR(先) 18-066
i
CONTENTS
APPENDIXES
I. IMPLEMENTATION ARRANGEMENT .....................................................................I-1 II. METEOROLOGY AND HYDROLOGY .................................................................... II-1 III. AGRICULTURE .......................................................................................................... III-1 IV. IRRIGATION AND DRAINAGE ................................................................................ IV-1 V. ROAD AND BRIDGE .................................................................................................... V-1 VI. FLOOD SIMULATION ................................................................................................ VI-1 VII. ENVIRONMENT ........................................................................................................ VII-1 VIII. INDIGENOUS PEOPLE AND OTHER SOCIAL ISSUES ....................................VIII-1 IX. COST ESTIMATION ................................................................................................... IX-1 X. PROJECT EVALUATION ............................................................................................ X-1 XI. SATELLITE IMAGE ANALYSIS ............................................................................... XI-1 XII. A CATCH-UP PLAN ON HELP FOR CATUBIG AGRICULTURAL ADVANCEMENT PROJECT (HCCAP) .................................................................. XII-1 XIII. TOR AND PERSON-MONTH FOR LOAN CONSULTANT ................................XIII-1
APPENDIX-I
IMPLEMENTATION ARRANGEMENT
APPENDIX I: IMPLEMENTATION ARRANGEMENT OF THE PROJECT
TABLE OF CONTENTS
I.1 JICA Team Members and Counterparts Personnel ............................................................... I-1 I.1.1 JICA Team Members ................................................................................................ I-1 I.1.2 Counterpart Personnel .............................................................................................. I-1
I.2 Person-Month Input for the Survey ...................................................................................... I-2 I.3 Minutes of Meetings Concluded in the Process of the Project ............................................. I-3
Philippines MMIP II
JICA I-1 NIA
APPENDIX I. IMPLEMENTATION ARRANGEMENT
I.1 JICA Team Members and Counterpart Personnel
I.1.1 JICA Team Members
Team Leader/ Irrigation Planning Kosei HASHIGUCHI Irrigation Designing Kosuke HIROTA Agriculture/ Farming Harunobu YOSHINO/Ai NAGINO Institutional Development Hiroko YASHIKI Civil/ Road Design Yoji SAWADA Meteorology/ Hydrology Takayuki OISHI Cost Estimation/ Procurement Yoji SAWADA Economic and Financial Evaluation Ryo INOUE Environmental Consideration Rie KITAO Social Consideration Hiroko YASHIKI Satellite Image Analysis (A) Izumi KATO Satellite Image Analysis (B) Taketo EGUCHI Inundation Analysis (A) Toru NAKAGAWA Inundation Analysis (B) Hajime KITA
I.1.2 Counterpart Personnel
(1) Central Office, National Irrigation Administration (NIA) Mr. Ricardo R. Visaya Administrator Mr. Czar M. Sulaik Deputy Admin for Eng. And Operations Ms. Felipa E. Mascariñas Manager, CMD - Engr. Dept. Ms. Alma S. Villaluna Senior Engineer A, CMD Ms. Andrea P. Pagtulingan Engineer A, CMD Ms. Alfonso delos Reyes Technical Assistant A, CMD Mr. Reynaldo B. Villanera DM PPD- Engineering Dept. Ms. Kit A. Maglangit Senior Exec. Assistant, Office of Senior Deputy Administrator Mr. Josias R. Pacolon DSD, Consultant, DSD Mr. Ernesto G. Collado Technical Assistant A Ms. Lydia S. Esguerra Department Manager Ms. Alma S. Villaluna Senior Engineer A Ms. Andrea Pagtulingan Engineer A Mr. Reynaldo B. Villanera Project Planning Division Manager Mr. Hanziel Nonilon de Guzman Supervising Engineer A
(2) Ministry of Finance Ms. Megan Barte Economist
(3) MMIP Project Management Office (PMO) under NIA Region XII Mr. Reynaldo M. Sarigumba Manager, Engr. Division Mr. Abedin L. Hadjisalik Head Construction Mr. Ali S. Satol RM/APM
(4) NIA Cotabato Irrigation Management Office under NIA Region XII Mr. Saldi P. Serafino Acting Division Manager, CIMO Mr. Saleh P. Kabunto Provincial Engineer A, NIA – MRIS
MMIP II Philippines
NIA I-2 JICA
I.2 Person-Month Input for the Survey
Per
son-
mon
th: P
repa
rato
ry S
urve
y on
Mal
itubo
g-M
arid
agao
Irrig
atio
n P
roej
ct (P
hase
2)
45
67
89
1011
121
23
45
67
89
10In
Phi
lippi
nes
In J
apan
Tot
al
Team
Lea
der/
Irrig
atio
n Pl
anni
ngK
osei
HA
SHIG
UC
HI
SCI
(6)
(60)
(23)
(21)
(7)
3.90
3.90
Irrig
atio
n D
esig
ning
Kos
uke
HIR
OTA
SCI
(56)
(38)
(7)
3.37
3.37
Har
unob
u Y
OSH
INO
SCI*
(45)
1.50
1.50
Ai N
AG
INO
SCI
(30)
1.00
1.00
Inst
itutio
nal D
evel
opm
ent
Hiro
ko Y
ASH
IKI
SCI
(30)
1.00
1.00
Civ
il/ R
oad
Des
ign
Yoj
i SA
WA
DA
SCI
(49)
1.63
1.63
Met
eoro
logy
/ Hyd
rolo
gyTa
kayu
ki O
ISH
ISC
I(4
7)(2
4)2.
372.
37
Cos
t Est
imat
ion/
Pro
cure
men
tY
oji S
AW
AD
ASC
I(4
9)1.
631.
63
Econ
omic
and
Fin
anci
al E
valu
atio
nR
yo IN
OU
ESC
I(7
5)(2
1)3.
203.
20
Envi
ronm
enta
l Con
sider
atio
nR
ie K
ITA
OSC
I(3
7)(4
9)2.
872.
87
Soci
al C
onsid
erat
ion
Hiro
ko Y
ASH
IKI
SCI
(28)
(14)
(14)
1.87
1.87
Sate
llite
Imag
e A
naly
sis (A
)Iz
umi K
ATO
SCI
(30)
1.00
1.00
Sate
llite
Imag
e A
naly
sis (B
)Ta
keto
EG
UC
HI
SCI
(30)
1.00
1.00
Inun
datio
n A
naly
sis (A
)To
ru N
AK
AG
AW
ASC
I(2
6)0.
870.
87
Inun
datio
n A
naly
sis (B
)H
ajim
e K
ITA
SCI
(26)
0.87
0.87
Sub
Tota
l28
.07
28.0
7
Team
Lea
der/
Irrig
atio
n Pl
anni
ngK
osei
HA
SHIG
UC
HI
SCI
(8)
0.40
0.40
Irrig
atio
n D
esig
nK
osuk
e H
IRO
TASC
I(4
)(1
2)0.
800.
80
Met
eoro
logy
/ Hyd
rolo
gyTa
kayu
ki O
ISH
ISC
I(1
9)0.
950.
95
Cos
t Est
imat
ion/
Pro
cure
men
tY
oji S
AW
AD
ASC
I0.
000.
00
Econ
omic
and
Fin
anci
al E
valu
atio
nR
yo IN
OU
ESC
I(4
)0.
200.
20
Sate
llite
Imag
e A
naly
sis (A
)Iz
umi K
ATO
SCI
(14)
(10)
1.20
1.20
Sate
llite
Imag
e A
naly
sis (B
)Ta
keto
EG
UC
HI
SCI
(14)
(24)
1.90
1.90
Inun
datio
n A
naly
sis (A
)To
ru N
AK
AG
AW
ASC
I(1
6)(2
0)(2
0)(8
)(1
0)(1
0)4.
204.
20
Inun
datio
n A
naly
sis (B
)H
ajim
e K
ITA
SCI
(11)
(20)
(14)
2.25
2.25
Sub
Tota
l11
.90
11.9
0
Tota
l28
.07
11.9
039
.97
Legend
In P
hilip
pine
sSC
I:Sa
nyu
Con
sulta
nts
Inc.
, JA
PAN
SCI*
: Rei
nfor
cem
ent (
TASK
Co.
, Ltd
)
In J
apan
IcR:
Ince
ptio
n R
epor
t
ITR:
Inte
rim R
epor
t
DFR
:D
raft
Fina
l Rep
ort
FR
:Fi
nal R
epor
t
Exp
ertis
eN
ame
Firm
2017
Pers
on-M
onth
Mai
n A
ctiv
ities
Con
firm
atio
n of
Exi
stin
g C
ondi
tion,
Prel
imin
ary
Des
ign
Nat
iona
l Con
dtio
ns (
Inun
datio
n an
alys
is, G
eote
chnc
al C
ondi
tion)
, Pro
ject
Out
linin
g, E
valu
atio
n of
Pro
ject
Effe
cts,
Env
iron
. Soc
ial C
onsi
dera
tions
etc
.
2018
Agr
icul
ture
/ Far
min
g
In Philippines In Japan
Rep
ort
△Ic
R▲ IT
R▲ DFR
▲IT
R (2
)
2111
411
242
1811
2411
2111
2411
211
△国内事前準備
▲ FR
Philippines MMIP II
JICA I-3 NIA
I.3 Minutes of Meetings Concluded in the Process of the Project
No. Title Page 1 Minute of Meeting on Inception Report I-4 2 Minute of Meeting on Interim Report I-8
MMIP II Philippines
NIA I-4 JICA
Philippines MMIP II
JICA I-5 NIA
MMIP II Philippines
NIA I-6 JICA
Philippines MMIP II
JICA I-7 NIA
MMIP II Philippines
NIA I-8 JICA
Philippines MMIP II
JICA I-9 NIA
MMIP II Philippines
NIA I-10 JICA
Philippines MMIP II
JICA I-11 NIA
MMIP II Philippines
NIA I-12 JICA