final project- pgdm, sem- iv (2011-13)

6
N E W D E L H I I N S T I T U T E O F M A N A G E M E N T PGDM (2011 – 2013) (Semester- IV) THE STUDENTS ARE HEREBY NOTIFIED THAT THE FOLLOWING SCHEDULE MUST BE STRICTLY FOLLOWED WITH REGARD TO PAPER ON PROJECT STUDIES (404) (Calendar for Paper Code: - 404) S.No . ITEMS Latest By 01. Submission of the Synopsis of Final Project 19-12-2012* 02. Mid-term review of progress with regard to the project 16-01-2013 to 23-01- 2013 03. Submission of two copies (1 Spiral & 1 Bound) of the project study along with soft copy of the project report on a CD- Rom. 22/02/2013** (Last Date) 04. Project Viva by External Examiner 08-04-2013 (onwards) Details to be announced Note : 1. Each student is required to do his / her own project individually. 2. Academic guidance for each individual student will be available from Project Guide / any Faculty Members. For such guidance (Area Wise Project Guide are being notified separately), it is desirable that prior appointment is made. Each student is required to use tools and techniques of RESEARCH METHODOLOGY / MARKET RESEARCH / O.R. / STATISTICS / ANY OTHER INSTRUMENT etc. to process the field data. ………………………………………………………………………… 3. For preparing Project Synopsis, follow the suggested format enclosed.

Upload: gaurav-pathak

Post on 13-Apr-2015

15 views

Category:

Documents


1 download

TRANSCRIPT

N E W D E L H I I N S T I T U T E O F M A N A G E M E N TPGDM (2011 – 2013)

(Semester- IV)

THE STUDENTS ARE HEREBY NOTIFIED THAT THE FOLLOWING SCHEDULE MUST BE STRICTLY FOLLOWED WITH REGARD TO PAPER ON PROJECT STUDIES (404)

(Calendar for Paper Code: - 404)

S.No. ITEMS Latest By01. Submission of the Synopsis of Final Project 19-12-2012*

02. Mid-term review of progress with regard to the project 16-01-2013 to 23-01-2013

03. Submission of two copies (1 Spiral & 1 Bound) of the project study along with soft copy of the project report on a CD-Rom.

22/02/2013** (Last Date)

04. Project Viva by External Examiner 08-04-2013 (onwards) Details to be announced

Note :

1. Each student is required to do his / her own project individually.

2. Academic guidance for each individual student will be available from

Project Guide / any Faculty Members. For such guidance (Area Wise Project

Guide are being notified separately), it is desirable that prior appointment is

made. Each student is required to use tools and techniques of RESEARCH

METHODOLOGY / MARKET RESEARCH / O.R. / STATISTICS / ANY

OTHER INSTRUMENT etc. to process the field data.

…………………………………………………………………………

3. For preparing Project Synopsis, follow the suggested format enclosed.

4. Note for Final Project Study

1. Internal Evaluation 30%

2. External Evaluation 70%

5. The project evaluation will be done as per the following weightage.

i) Project report --------- 60%

ii) VIVA --------40%

6. The Project study should be duly certified by the internal project guide and

by the corporate supervisor, if any.

* Any late submission will require Rs. 200/- fine till the 1st week and Rs. 300/-

fine during the second week.

** Any late submission will require Rs. 300/- fine till 1st week and Rs. 600/- fine

during the second seek; thereafter the evaluation, even with fine for backlog paper, will

be conducted next year.

Note : The Project Guide may kindly see that the above schedule is strictly adhered to.

N E W D E L H I I N S T I T U T E O F M A N A G E M E N T

PAPER – 404PGDM – PROJECT STUDY PROPOSAL

SYNOPSIS FORMAT

1. Name of the Student :

2. Roll No. :

3. Major Area of Specialisation :

4. Title of the Project :(in Major Area)

5. Structure / Chapter*Design / Layout

6. Organisation / Industry etc. under reference

7. Methodology**to be followed

8. Sources of Data

9. Bibliographical References

10. Any other matter

* One page detail should be annexed

** It is mandatory that each student follows the technique of RESEARCH METHODOLOGY / MARKET RESEARCH /

O.R. / STATISTICS etc. to process the field data, and integrate the same with Management Theory and concepts.

____________________ __________________ ______________________(Signature of the Student) (Signature of the Guide) (Signature of the Director/Registrar) with date:- with date:- with date:-

N E W D E L H I I N S T I T U T E O F M A N A G E M E N T

PROJECT STUDY

Ref. No.:………………….. Date :……………….

The PGDM, Semester – IV are hereby notified that the while submitting their Project Study (Bound Copy), they must sure that their Project Study contains :-

AT FRONT

1. Title Page

2. Certificate Page

3. Acknowledgement Page

4. Table of Contents (Index Page)

5. Executive Summary

AT END

1. Bibliography / References

2. Bio – data of the Project Author / Study

Please Note : MENTION THE PAGE NO. ON EACH PAGE OF THE PROJECT STUDY.

NEW DELHI INSTITUTE OF MANAGEMENTNOTICE FOR

PGDM, SEMESTER – IV STUDENTSSECTION: A, B, C, D & E (BATCH 2011 – 2013)

Date: 26.11.2012Following faculty members have been requested to act as project guide for paper for 404. The students are advised to seek guidance from the following faculties as per their choice for preparing the project proposal. No outside guide is acceptable:

AREA –MARKETING

S. No. Name of Faculty members No. of project to be evaluated

1. Dr. Gauri Modwel 152. Dr. Gajendra Sharma 373. Prof. Anita Saxena 374. Prof. V. K. Mahajan 375. Dr. Ritu Talwar 376. Prof. B. K. Dhup 087. Prof. Teena Singh 20

AREA –FINANCE

S. No. Name of Faculty members No. of project to be evaluated

1. Dr. Arti Basu 322. Dr. Chand Tandon 403. Prof. Sanjay K Tomar 40

AREA –HRDS. No. Name of Faculty members No. of project to be evaluated

1. Prof. B. K. Dhup 092. Prof. Teena Singh 09

Guidelines for evaluation of project are forwarded herewith for information & necessary action.

(Dr. R. K. Bharadwaj) Director

CC : Concerned faculty