final project morocco holiday center group number 6 members: alexanders weiss andrei agape darius...

Download Final project Morocco Holiday Center Group number 6 Members: Alexanders Weiss Andrei Agape Darius Micu Gabriel Razvan

If you can't read please download the document

Upload: scot-clark

Post on 06-Jan-2018

214 views

Category:

Documents


0 download

DESCRIPTION

ITIO  Business Plan  Problem/Solution examination – Business Case  Deployment Initiatives

TRANSCRIPT

Final project Morocco Holiday Center Group number 6 Members: Alexanders Weiss Andrei Agape Darius Micu Gabriel Razvan Page 1 Introduction ITIO Inception Phase System Vision / Design Inception/Elaboration Phase Construction Phase Quality Assurance - Testing Conclusion ITIO Business Plan Problem/Solution examination Business Case Deployment Initiatives Page 4 Business Plan Mission statement: Become the number one 5 star resort of choice with visitors to Rabat Strategy and Implementation: We developed strategies to implement our objectives; 44% average room occupancy rate; Business Case Page 5 Deployment Initiatives Change management plan IT Security Appraisal Page 6 System Vision More detailed examination of problem and solution Link between feasibility study and system design Page 7 System Design Use Case Descriptions & Prioritisation Domain Model Creation Mapping Database Relational Model Detailed Main Use Case Analysis & Design Page 8 System Design Customer wants to make a reservation. The receptionist logs into the IT booking system from the Login User Interface The system logs in the receptionist and the main reservation booking screen appears. The receptionist searches for room availability for the given period based on the date and the number of nights. The system checks the reservation details and returns the rooms available for that period. Page 9 System Design Page 10 Construction Architecture & Approach Data structures Construction choices complexity vs easy user interface Page 11 Quality Assurance Tests Testing done in iterative manner at all stages Written test cases Dynamic Junit tests Pilot Tests Page 12 Conclusion