Schedule Key [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Text Box Tools tab to change the formatting of the pull quote text box.] Product Schedule [] Time Expected [] Time Taken Blog Started Front cover analysis started finished 29.10.08 Front cover Analysi s finishe d Start Two existin g content analysi s finishe Questionn aire stated today began research expected finish date 10.11.08 Questionna ire finished now hand out and gets feedback for final product Begin Prelimin ary Product Expected finish 9.11.08 Finished Prelimin ary Product People being to input results into questionn aire and handed out around 15-20 Publish Preliminar y product questionna ire Letter to media institutes Begin front Cover mock Final mast head chosen Mock up front cover number one complete Begin content mock up NOT COMPLETED Content one and two complet e Ting Tings double page spread complet e Klaxons double page spread complete Kooks double page spread complet e Photograp hy ideas 4 weeks Final Double page spread idea chosen Final mast head chosen First Front Cover mock up 11.12.0 8 Front cover mock up stage two Complete NOT COMPLETED Mock up 3 (front cover) Mock up 4 (front cover) Mock up 1 (conten t) Images for final product need to be thought Final design needs be chosen 4 weeks Develop editing skills and firework s in Content final ideas 1 Inspirat ional Products 2 weeks Existin g Indie bands Fashion 3 days Fashion complet e Existing Bands explore Klaxons Hoosiers etc. 3 days Bands complet e Final content idea chosen and created Take and finish photos for Final front cover complet e Evaluat ion draft complet e and Editing example finishe d complet Photo shoot developme nt complete Inspirati onal product ppt. complete Schedule review Blog Started Final front cover complete and annotated . Final Evaluat ion progres s started Evaluati on Progress complete d and blogged. Final product schedule no March final update due to end of project but On the 28 th of April I updated my project plan for the final time as I added two blogs 1. I added a final post of all my final products to make it clear which documents as my final product which is my final Indiefix front cover, content and exclusive double page spread with Electrom. 2. Then I added my final product schedule of the project to show a clear start and end to the project and its progression.

Upload: jessicasquires

Post on 18-May-2015

222 views

Category:

Entertainment & Humor


1 download

TRANSCRIPT

Page 1: Final Product Scehdule

Schedule Key

[] Time expected

[] Time taken

[Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Text Box Tools tab to change the formatting of the pull quote text box.]

Schedule Key

[] Time expected

[] Time Taken

Product Schedule

[] Time Expected

[] Time Taken

Blog Started

Front cover analysis started finished 29.10.08

Front cover Analysis finished 29.10.09

Start Content analysis

Finish 6.11.09

Two existing content analysis finished and double page

Questionnaire stated today began research expected finish date 10.11.08

Questionnaire finished now hand out and gets feedback for final product

Begin Preliminary Product

Expected finish 9.11.08

Finished Preliminary Product

People being to input results into questionnaire and handed out around 15-20

Publish Preliminary product questionnaire

Letter to media institutes

Begin front Cover mock Ups and mast head explore

Final mast head chosen

Mock up front cover number one complete

Begin content mock up

2 needed 29.11.09

NOT COMPLETED

Content one and two complete

Complete three double pages spreads

1 week

Ting Tings double page spread complete

Klaxons double page spread complete

Kooks double page spread complete

Photography ideas

4 weeks

Final Double page spread idea chosen

Final mast head chosen

First Front Cover mock up

11.12.08

Front cover mock up stage two

Complete

NOT COMPLETED

Mock up 3 (front cover)

Mock up 4 (front cover)

Mock up 1 (content)

Images for final product need to be thought through

4 weeks

Final design needs be chosen

4 weeks

Develop editing skills and fireworks in preparation

4 weeks

Content final ideas

1

Inspirational Products

2 weeks

Existing Indie bands

Fashion

3 days

Fashion complete

Existing Bands explore Klaxons Hoosiers etc.

3 days

Bands complete

Final content idea chosen and created

Take and finish photos for final product

Begin Editing process

3-4 weeks

Final front cover complete

Evaluation draft complete and started.

Editing example finished complete

Photo shoot development complete

Inspirational product ppt. complete

Schedule review

Blog Started

Final front cover complete and annotated .Final content complete and annotated.

Evaluation progress started

Evaluation Progress completed and blogged.

Final product schedule no March final update due to end of project but will be continued if necessary.

On the 28th of April I updated my project plan for the final time as I added two blogs

1. I added a final post of all my final products to make it clear which documents as my final product which is my final Indiefix front cover, content and exclusive double page spread with Electrom.