final presentation (nangang project)

59

Category:

Documents


1 download

DESCRIPTION

NTPU+TU Delft+KU Leuven+King's College London

TRANSCRIPT

Page 1: FINAL presentation (Nangang project)
Page 2: FINAL presentation (Nangang project)

Social JusticeOpening the Bottle Cap to Discover Nangang

-Social Justice-Opening the Bottle Cap to Discover Nangang

Strategic Study with Local ParticipationGraduate Institute of Urban Planning , National Taipei UniversityGraduate Institute of Urban Planning , National Taipei University

Page 3: FINAL presentation (Nangang project)

1. What’s Urban Regeneration in TPE ?1-1 「URS」- Urban Regeneration Station

2 Strategic Study2. Strategic StudyOur Conceptual metaphor– petri (culture) dish

3. New Urban Regeneration 3-1 Social Justice at Taipei City

3-2 Space of Qualityp Q y

4. Urban Regeneration Six

Page 4: FINAL presentation (Nangang project)

What’s Urban Regeneration gin TPE?

Page 5: FINAL presentation (Nangang project)
Page 6: FINAL presentation (Nangang project)
Page 7: FINAL presentation (Nangang project)

Urban RegenerationUrban Regeneration

Page 8: FINAL presentation (Nangang project)

Urban Environment AnalysisIntroduction

[URS] views the city as a livingi d b lorganism and urban renewal as a

life cycle. It seeks to encourageshort-term reuse of publicly-owned URS127p ybuildings/properties that is vacantor abandoned in the city’s spaces,to build an integrated system of

Di-hua streetDesign Gallery

URS13Nangangto build an integrated system of

relative discussions and activitieswith local participation.

Nangang Bottle Cap Factory

Our planning team using theOur planning team using theregeneration of the old bottle capfactory and the local Nangangi d t i l di t i t th i t f

URS27industrial district as the point ofdeparture, we have set future goalsfor its regeneration. URS21

Huasan Grand Green

gZhongshanCreative Lncubator

Page 9: FINAL presentation (Nangang project)

Urban Environment AnalysisIntroduction

123「Time 12 year3URS127

「Time」

Di-hua streetDesign Gallery

URS13NangangNangang Bottle Cap Factory

URS27

URS21

Huasan Grand Green

「SZhongshanCreative Lncubator

「Space」

Page 10: FINAL presentation (Nangang project)

In the process of development for Taipei City, along this axis ofwest to east .

Page 11: FINAL presentation (Nangang project)

建國啤酒廠

華山酒廠

萬華糖廠松山菸廠

Page 12: FINAL presentation (Nangang project)
Page 13: FINAL presentation (Nangang project)

「小尺度」-創造場所同質化下的異質化

Our research site-Nangang, it enforces the each

[ Single Project ] from this district. .

Page 14: FINAL presentation (Nangang project)

Strategic StudyStrategic Study

Page 15: FINAL presentation (Nangang project)

2 Planning Concept

??

Page 16: FINAL presentation (Nangang project)

1 Planning Concept

We are facing a plural and alternative society.

Our team adopt the strategic studystrategic study, using the old bottle cap factory as a media to explore the potential of Nangang and discover the issues of public concerned.

Page 17: FINAL presentation (Nangang project)

4 Site Background

PeoplePeople

Page 18: FINAL presentation (Nangang project)

We are facing a plural and alternative society.

Our team adopt the strategic studystrategic study, using the old bottle cap factory as a media to explore the potential of Nangang and discover the issues of public concerned.

Page 19: FINAL presentation (Nangang project)

Development driven by economic logic/rationalityg y

Page 20: FINAL presentation (Nangang project)

Take a breath and open an exportTake a breath and open an export W li ht th id t t thi k b t th it th t it i t We enlighten the residents to think about the city - that it is not

all just about “additional development”. The main goal is to let the government slow down and think to look forward to betterthe government slow down and think, to look forward to better planning or orientation.

A place which allows infinite imagination.

Page 21: FINAL presentation (Nangang project)

Residences:“We hope an open space

Faculty of schools: “We hope a sportWe hope water and green”

Faculty of schools: We hope a sport center for children”center for children

The former employee of the factory: p y y“We hope our memory ”

Young couples: “We want a house in Taipei”

Page 22: FINAL presentation (Nangang project)

02 「空間剖析」- 視覺空間感官分析

Page 23: FINAL presentation (Nangang project)

After organizing the surrounding development of Nangangb ttl f t d ll ti th i i f tbottle cap factory and collecting the opinions of governmentofficials, residents and community planners, our planning teamproposed “Petri(Culture) dish” as the future vision for bottleproposed Petri(Culture) dish as the future vision for bottlecap factory.

Page 24: FINAL presentation (Nangang project)

New Urban Regeneration

-Social Justice-Social Justice

Page 25: FINAL presentation (Nangang project)
Page 26: FINAL presentation (Nangang project)

J ti f EnvironmentJustice of EnvironmentRegeneration does not mean to construct more ‘fashionable’ and ‘profitable’ buildings bythe will of market rather it should develop a more livable sustainable and fair environmentthe will of market, rather, it should develop a more livable, sustainable and fair environmentfor citizens. Thus, we reject the pervasive planning concept in Taipei that refers to thelarge-scale, over-crowded and property-led regeneration. Through redesigning this land,

k t id i t ll f i dl d bliwe seek to provide an environmentally friendly, open and public space.

Page 27: FINAL presentation (Nangang project)

Ratio of green8

0.7

The ratio of passengers out of station and green space (all cases are combined with MRT/HSR/TRA stations in 0.4

0.5

0.6

(Taipei) 

0.1

0.2

0.3

Taipei Station0

Taipei Station Banciao Station

Nangang Station

p

Banciao Station

Nangang Station

35

40

45

20

25

30

35

space (ha)

According to the urban planning ACT, public facilities standards for land use regulations, the population of five million people, its space standards should be 1.5 ha / thousand people. 

(current population: 26 874)

5

10

15

green 

(current population: 26,874)

In this project from existing green area was 4.71 hectares,h d d f i bli h ld b 40 31 h 0

Urban Planning ACT current

the standard of its public green space should be 40.31 hectares.

Page 28: FINAL presentation (Nangang project)

Justice of Social serviceJustice of Social serviceRegeneration should care more about the basic need and future of our children and youth,rather than the profits and investments of developers. Too expensive cost of social services,p p p ,such as nursery, leisure and (after-school) childcare center has made many citizens,particularly the common young couple both working for full-time jobs, unaffordable toprovide the appropriate and decent cares for their children We suggest this regenerationprovide the appropriate and decent cares for their children. We suggest this regenerationproject should provide the affordable and public services to the families with less wealth

Page 29: FINAL presentation (Nangang project)

Population age structure in Nangang(1989) Population age structure in Nangang(2008)

M l F l F lM lMale Female FemaleMale

N di i h hNangang district have the tendency of elderly , therefore suitable for the elderly and social welfare issues of public facilities

year 2008 1989City/district Taipei Nangang Taipei Nangang

Dependency rate 38.65% 35.67% 41.57% 40.25%welfare issues of public facilities should be more attention

Dependency rate

Ageing index 79.13% 71.83% 47.34% 38.08%

Page 30: FINAL presentation (Nangang project)

Land useJustice of Land useSpeculation of property and market-led regeneration have made Taipei’s housing tooexpensive the top five within the main cities of East Asia Urban renaissance of Taipeiexpensive – the top five within the main cities of East Asia. Urban renaissance of Taipeishould be for the many, not for the few. Rethinking the social justice of land use is crucialin this neo-liberalist and unjust period. The purpose of regenerating this public land shouldb f th bli lf t f th it li t i t t O i i f thi l d i th t itbe for the public welfare, not for the capitalist interests. Our vision of this land is that itcould be the ‘first’ and ‘social’ experiment of developing social housing in Taipei…

Page 31: FINAL presentation (Nangang project)
Page 32: FINAL presentation (Nangang project)
Page 33: FINAL presentation (Nangang project)
Page 34: FINAL presentation (Nangang project)

Catch the natureCatch the nature.

Page 35: FINAL presentation (Nangang project)

<1km<1kmAnd Nangang exactly is a special site because it has a potentialAnd Nangang exactly is a special site because it has a potentialconnect route for the mountain and water between the shortdistance(Less than 1 km),and we try to make them to be the principledistance(Less than 1 km),and we try to make them to be the principleof network .

Page 36: FINAL presentation (Nangang project)

HH

H

Nangang’sChance

TaipeiTypical communityyp y

This is the typical prototype of community neighborhood ordistrict in Taipei city, where open space is insufficientlyprovided, fragmented, and dispersed.

Page 37: FINAL presentation (Nangang project)

Urban DesignUrban Design

Page 38: FINAL presentation (Nangang project)
Page 39: FINAL presentation (Nangang project)
Page 40: FINAL presentation (Nangang project)
Page 41: FINAL presentation (Nangang project)
Page 42: FINAL presentation (Nangang project)
Page 43: FINAL presentation (Nangang project)
Page 44: FINAL presentation (Nangang project)
Page 45: FINAL presentation (Nangang project)
Page 46: FINAL presentation (Nangang project)
Page 47: FINAL presentation (Nangang project)

9

Page 48: FINAL presentation (Nangang project)

9

Page 49: FINAL presentation (Nangang project)
Page 50: FINAL presentation (Nangang project)

U b R ti SiUrban Regeneration Six

Page 51: FINAL presentation (Nangang project)
Page 52: FINAL presentation (Nangang project)
Page 53: FINAL presentation (Nangang project)

AA

B’

A’B

Page 54: FINAL presentation (Nangang project)

A A’

B B’

Page 55: FINAL presentation (Nangang project)
Page 56: FINAL presentation (Nangang project)

Social HouseSocial House

Childcare CenterChildcare Center

Page 57: FINAL presentation (Nangang project)

NOW PROPOSED FUTURE

Page 58: FINAL presentation (Nangang project)
Page 59: FINAL presentation (Nangang project)

Thank you for your attentionThank you for your attention .