Holbrook Campground Road at Midway RoadIntersection Improvement Project
FINAL PRESENTATION
JULY 27, 2016
![Page 2: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/2.jpg)
PROJECT LOCATION
Source: GIS Cherokee County
![Page 3: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/3.jpg)
EXISTING CONDITIONS
![Page 4: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/4.jpg)
BACKGROUND
• Sight distance
• Midway Road stopped traffic looking left
• Safety• Accident reports
• Congestion
![Page 5: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/5.jpg)
STOP SIGN ALTERNATIVE (1)
![Page 6: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/6.jpg)
STOP SIGN ALTERNATIVE (2)
• Advantages• Solves sight distance issue• Safer approach
• Disadvantages• Little to no benefit for traffic
![Page 7: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/7.jpg)
ROUNDABOUT ALTERNATIVE (1)
• Geometric Design• Inscribed circle
• Lane widths
• Entry, exit, circulatory
![Page 8: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/8.jpg)
ROUNDABOUT ALTERNATIVE (2)
• Geometric Design• Horizontal curves
• 346’
• 362’
![Page 9: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/9.jpg)
ROUNDABOUT ALTERNATIVE (3)
• Advantages• Solves sight distance issue• Safer approach speed• Improved intersection traffic flow and capacity• Cheaper alternative
• Disadvantages• Mainline traffic
![Page 10: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/10.jpg)
TRAFFIC
Northbound Southbound Westbound
2016 AM A B A
2016 PM A A A
2036 AM C A A
2036 PM A A B
![Page 11: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/11.jpg)
DRAINAGE
![Page 12: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/12.jpg)
TYPICAL SECTION
![Page 13: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/13.jpg)
UTILITIES
![Page 14: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/14.jpg)
COST ESTIMATES
• Total Project Costs
• T Intersection: $ 543,748.00
• Roundabout: $ 513,585.00
![Page 15: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/15.jpg)
FUTURE RECOMMENDATIONS
• Fastest Path Analysis
• Speed Control
• Traffic Predictions and Trend
![Page 16: Final Presentation (Intersection Improvement Project)](https://reader031.vdocuments.us/reader031/viewer/2022030316/5875d45c1a28ab8f438b5e57/html5/thumbnails/16.jpg)
CONCLUSION
• Safety• Sight Distance
• Speed
• Congestion• Traffic Flow
• Traffic Capacity
• Cost Effective