final presentation for the implication of forcenet …...6/12/2006 1 final presentation for the...
TRANSCRIPT
6/12/2006 1
Final Presentation for the
Implication of FORCEneton Coalition Forces
October 25, 2006
Port Hueneme – COHORT 4Distribution Statement A - This is approved for public release: distribution is unlimited.
6/12/2006 2
Agenda• Purpose• Schedule • Scenario • Modeling and Simulation• Financial Analysis • Conclusion
Supporting Information from previous IPR presentations are available upon request.– Scenario, Flow and Entity Diagrams, Notional Formations, Detection Analysis, SV Diagrams.
6/12/2006 3
Purpose
• The purpose of this presentation is to report the PHD Cohort #4 group analysis of the Implication of FORCEnet on Coalition Forces.
6/12/2006 4
Project Objectives
• To provide analysis and guidance on the technical requirements for coalition maritime warfare interoperability in a FORCEnet construct.
• Develop a high level system architecture to accomplish maritime coalition littoral warfare operations.
• Assess the incremental value of higher levels of FORCEnet interoperability (not fully networked to 100%)
• If it is determined that FORCEnet is a “good thing’ to implementwith coalition navies, then determine what is the cost of entry into the USN version of Network-Centric Warfare.
6/12/2006 5
Schedule
• Project Plan • Initial Capabilities Document (ICD) • Architecture Framework • Modeling & Simulation • Financial Analysis • Capability Development Document
6/12/2006 6Figure A.1. Overall Coalition FORCEnet OV-1
COALITIONESG
AIR STRIKEGROUP
AIRTHREATS
UNDERWATERTHREATS
SURFACETHREATS
FFG / ANZAC
LHD / LPD / LSD
SSN
UAV
AWD / DDG
NH-90 / SH-2G
LCS
MRV
CG
COMS / GPS/ ISRSATELLITE
MPA / P3-K
AWACS / E-2C
6/12/2006 7
Modeling and Simulation
What did we consider and what were the results?
6/12/2006 8
Assets Available
Non-Organic & Organic AssetsActive / Passive
Space / Air / Surface / Sub-Surface
Model snapshots shown here were accomplished using AGI software
6/12/2006 9
Financial Analysis
What did we consider and what were the results?
6/12/2006 10
Financial AnalysisAssumptions
• The dollar amount assigned to each element in the cost model is based on information gathered from comparable systems.
• Procurement Cost includes:– System Integration Cost (R&D)– Acquisition Cost– Installation Cost– Initial Training Cost– Cost of Initial Spares– Administrative and Logistics Cost
• Operation & Support Cost includes:– Ongoing Technical Support Cost– Cost of Replenishment and Spare Parts
6/12/2006 11
Coalition FORCEnet Fielding Plans
• FORCEnet Level I– Spiral 1 Acquisition (Command & Control) (FY2006)
• FORCEnet Level II– Spiral 1 Acquisition (Command & Control) (FY2006)– Spiral 2 Acquisition (Enhanced Tactical Data
Capability) (FY2010)• FORCEnet Level IV
– Spiral 1 Acquisition (Command & Control) (FY2006)– Spiral 2 Acquisition (Enhanced Tactical Data
Capability) (FY2010)– Spiral 3 Acquisition (Shared Engagement Capability)
(FY2014)
6/12/2006 12
Program Implementation
20182007 2011 20172009 2014
Spiral 1
2012 20152008 2010 2013 20162006
Spiral 2
Procure /Install
Budget
Spiral 1 IOC
Procure /InstallBudget
Spiral 3
Procure /InstallBudget
Spiral 2 IOC
Spiral 3 IOC
Spiral 2Tech Refresh
Lessons Learned
Lessons Learned
Spiral 1 =Basic IP Based C2 Integration Spiral 2 = Enhanced Comms / Enhanced Tactical Data Capability Spiral 3 = Enhanced Network / Shared Engagement Capability
6/12/2006 13
Procurement Costs
Note: Costs are estimated based upon existing systems historical costs. Costs are per ship.
Procurement Cost of FORCEnet Levels
0
5
10
15
20
Fn1 Fn2 Fn4
FORCEnet Levels
Pres
ent V
alue
C
ost (
in m
illio
n do
llars
)
Integration Software Hardware Admin & Logistics Installation Initial Training Initial Spares
3.20 5.90
16.80
6/12/2006 14
O&S Costs
Note: Costs are estimated based upon existing systems historical costs. Costs are per ship over 20 years.
O&S Cost among FORCEnet Levels
$39.43
$26.05
$15.86$-
$10.00
$20.00
$30.00
$40.00
$50.00
Fn1 Fn2 Fn4
FORCEnet Levels
Pres
ent V
alue
Cos
t (in
m
illio
n do
llars
)
O&S Cost
6/12/2006 15
Total LCC Costs
Note: Costs are estimated based upon existing systems historical costs. Costs are per ship over 20 years.
Total LCC Cost among FORCEnet Levels
$3.20 $5.90$16.80$15.86
$26.05
$39.43
$-
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
Fn1 Fn2 Fn4
FORCEnet Levels
Pres
ent V
alue
Cos
t (in
m
illio
n do
llars
)
Procurement Cost O&S Cost
$31.95$19.06
$56.23
6/12/2006 16
Sensitivity Analysis
O & S Costs (year 11 - 20 / 2016 - 2025) Sensitivity
0102030405060708090
100
0% 20% 40% 60% 80% 100%
Change
Tota
l Pre
sent
Val
ues
(Dis
coun
ted
Cos
ts -
Mill
ion
dolla
rs)
FORCEnet Level IFORCEnet Level IIFORCEnet Level IV
6/12/2006 17
Conclusion
6/12/2006 18
Conclusion
• FORCEnet Level 4 provides the higher performance
• FORCEnet Level 4 associated costs are higher
• FORCEnet Level 2 provides comparable performance levels at ~ 40% less cost than FORCEnet Level 4.