    University of SanCarlosGroup 7

    I. COMPANY PROFILE

    Company Name : STL Corporation VISMIN(Not the real name of the company as requested bythe management for confidential

    purposes)

    Location : Mandaue CityContact Person : Arch. Giovanni Francis TabuarPalisocPosition Title : Plant ManagerContact No. : (032)3449915Fax No. : (032)3458227E-mail Address : [email protected] of business : Construction Industry

  • 8/2/2019 Final Output Without Matrix

    2/13

    University of SanCarlosGroup 7

    II. HISTORY

    STL Corporation was established in 19xx. The company set-up the firstgalvanizing plant in the Philippines in answer to the need of the country forgalvanized iron sheets to be used in construction, building and roofing materials.

    The pioneering efforts in sheet galvanizing and establishment of STL notonly contributed to the industrialization program of the Philippine government but

    also saved the country much needed foreign exchange. It was a dollar-savingindustry which boosted the international dollar reserves of the country allowingthe government to utilize the dollar savings in importing other necessary items fornation building. STLs founder received from Philippine President Carlos P. Garciain 1961 the Philippine Legion of Honor Award, for achievements as pioneerindustrialist. The award is the highest decoration the Philippine governmentbestows on its citizen.

    STL is managed by third and fourth generation members of the organizingfamily.

    STL Corporation, in its continued commitment to innovation, hasestablished the first-ever-state-of-the-art continuous galvanizing line. This newplant was allowed the company to offer superior quality galvanized sheet and coilsusing the modern technology of a non-oxidizing furnace.

    The technology of STL Corporation has catapulted the countrys steelgalvanizing industry to a level at par with developed countries such as Korea,

    Taiwan, Japan, United States and Europe. This innovative galvanizing plant has acapacity of 150,000 metric tons/year

  • 8/2/2019 Final Output Without Matrix

    3/13

    University of SanCarlosGroup 7

    STLs non-oxidizing furnace type of galvanizing has definite advantagesover traditional flux-type galvanizing, a technology being utilized by mostgalvanizers in the country. The difference is evident in X (STLs well-known brand)quality in terms of superior corrosion protection, extraordinary formability anddrawability, paintability and excellent weldability. These galvanized products areparticularly suited for applications involving deep drawing, press forming, profilingand multiple severe bending.

    X has able to take the most severe deformation with virtually no crackingor flaking, a world class quality that is now available in the country. This projectwill complement our governments national objective of building a fully integratedsteel production facility by creating downstream demand for raw materials, thushastening its development. The availability of world-class galvanized materialssuch as X supports other local downstream industries particularly housing,

    construction, appliances, AUV/bus bodies, steel fabrication, airconducting andsteel decking and other metal working industries in developing equally high-valuesteel products.

    STLs modernization and expansion project is in response to ourgovernments call for local companies to achieve global competitiveness stature.STLs equipment supplier, who has played a pivotal role in realizing its vision ofrevolutionizing the local steel industry is the worlds leading metallurgicalengineering designer, Cockerill Mechanical Industries or CMI is part of Cockerill-Sambre Group, the largest flatsheet galvanized products manufacturer in Europeand is among the top five galvanizers in the world. This project bring us togethernot only the latest and most modern manufacturing facilities but also the know-

    how and technology to produce world-class galvanized products in the Philippinessuch as X . This project, having been registered by the Board of Investments as apioneer venture because of the manufacturing technology, will receive incentivesand privileges in line with the Iron and Steel Act (R.A. 7103) which has now beenincorporated in the 1995 Investment Priorities Plan.

    VISION

    To be a premier world class manufacturer of coated steel products in thePhilippines and in the Asia pacific region.

    We exist because:

    Customers - are the cornerstones of our business, we shall serve themwith the highest level of care, exerting all efforts to exceed customersatisfaction and focused on delivering superior consumer value.

    Employees - are our greatest assets. We shall provide them theopportunity toHone up their skills, attain career growth and realize their full potential. We

  • 8/2/2019 Final Output Without Matrix

    4/13

    University of SanCarlosGroup 7

    shall build a dynamic organization driven by common goals and values,sharing competencies and practicing sound business ethics.

    Owner- We shall endeavor to attain a profitable planned growth for thecompany ensuring our stock holders a reasonable return for theirinvestments.

    Community - we shall be a responsible corporate citizen cognizant of oursocial responsibilities. We will uphold the principle of respect and cooperation withvested authority. We will be concern with the welfare of the community where welive and conduct business.

    MISSION STATEMENT

    We are committed to deliver the highest quality of coated steel productsand provide best services to our valued customers. We shall endeavor to be adependable supplier for downstream steel industries in term of supply reliability,price competitiveness and service delivery.

    Quality policy

    World class quality through customer satisfaction

    We the management and staff of XYZ Steel Corporation aim to provide productsand services which will satisfy our customer requirements.

    To achieve these objectives, it is our policy to maintain efficient and effective

    quality assurance program, planned and developed in conjunction with thefunction of the organization.

    It is then the responsible of our organization to ensure that this quality assuranceprogram shall be carried out effectively, continuously adequate, well understoodand practiced by all.

    (See attachments in the next page)

  • 8/2/2019 Final Output Without Matrix

    5/13

    University of SanCarlosGroup 7

    *THE PLANT LOCATION

    * THE GEOGRAPHICAL& VICINITY OF THE COMPANY

    XYZ Corporation LocatedArea from

    Philippines map

    where the STL

    Corporation

    Located

    Legend:

  • 8/2/2019 Final Output Without Matrix

    6/13

    University of SanCarlosGroup 7

    III. STL COMPANYS FLOW CHART

  • 8/2/2019 Final Output Without Matrix

    7/13

    RECEIVING TO INVENTORY PROCESS FLOW CHART

    Receiving of Materials Issuance of Materials Delivery of Materials Physical Inventory &Reporting

    SALESDEPARTM

    ENT

    PLANT

    MANAGER

    ACCOUN

    TING

    DEPART

    MENT

    PRODUCTIONDEPARTMENT

    WAREHOUSEDEPARTMENT

    Receive Bill

    of Lading

    Unloading &

    Physical

    Counting

    Preparation

    of MIRR

    Checking of

    Stocks

    Availability

    of Materials

    EDSA

    Production

    Request

    Prepare

    WISS

    Issue WISS

    Production

    Process

    Furnish

    DailyProduction

    Report

    NO

    YES

    Checking of

    ProductionAccomplishment Report

    Approve

    Production

    Accomplish

    ment Report

    Production

    Accomplishment Report

    Production

    Accomplish

    ment Report

    WISS

    MIRR

    Production

    Accomplish

    ment Report

    Record the

    Report as

    reference

    for delivery

    of materials

    Check

    Produced

    materials

    Prepare

    Delivery

    Receipt

    Unloading &Physical

    Counting

    Delivery

    Receipt

    Sign the

    deliveryreceipt

    Delivery

    Receipt

    Sign the

    delivery

    receipt

    Release for

    delivery /

    shipment

    Prepare

    WeeklyInventory

    Report

    Weekly

    Inventory

    Report

    Check /

    Inspect

    Loading ofmaterials

    Facilitate

    delivery

    report

    Delivery

    Receipt

    University of SanCarlosGroup 7

  • 8/2/2019 Final Output Without Matrix

    8/13

    University of SanCarlosGroup 7

  • 8/2/2019 Final Output Without Matrix

    9/13

    University of SanCarlosGroup 7

    IV. THE NARRATIVE

    TABLE OF ENTITIES

    Para Line Text

    1 12345678

    9

    STL Companyuses the following procedures inreceiving the inventory. Warehouse department receivesthe Bill of Lading upon sending the goods. Upon receivingit, they unload and do the physical counting and in turn,leads them to the preparation of the MIRR. Based on thesaid MIRR, they will determine and check the stocks byknowing if there are any availability of materials. If thereare no materials available, they will issue EDSA

    Production Request. Otherwise, they will prepare theWISS and issue a document about it.

    2 101112131415161718

    After the process made in the Warehousedepartment, the production department then will beaccountablein production. After producing it, they willfurnish and producethe daily production report andaccomplishment report.After that, they will send it to theaccounting department for them to double check the saidaccomplishment report. Continuously, they will send it tothe plant manager for the direct approval. Right after theapproval of the plant manager, the sales department will

    record the report as reference for delivery of materials.

    3 1920212223242526272829

    In delivering of materials, the WarehouseDepartment is responsible in releasing thedelivery/shipment. After which, physical inventory andreporting shall be made by preparing the weeklyinventory report. The Accounting Department will signthe delivery receipt followed by the Plant Manager whowill do the same task. Lastly, the Sales Departmentshould check the produced materials and prepare itsdelivery receipt. The unloading and physical countingshould be done immediately and so the checking andinspecting the loading of materials. It will then facilitatethe delivery report by producing the delivery receipt.

  • 8/2/2019 Final Output Without Matrix

    10/13

    University of SanCarlosGroup 7

    RECEIVING AND ISSUANCE OF MATERIAL

    Delivery of Materials, Physical Inventory and Reporting

    Warehouse Department 24569

    -Receive the Bill of Lading-Unloading and Physical Counting-Preparation of MIRR-Checking of Stocks-Prepare WISS *(If there are any availability ofmaterials, proceed to the issuance ofthe WISS).

    Production Process 1112

    -Production Process-Furnish of Daily Production Report*

    Accounting Department 15 -Checking of the ProductionAccomplishment Report

    Plant Manager 16 -Approve Production AccomplishmentReport

    Sales Department 18 -Record the Report as reference for deliveryof materials

    Warehouse Department 2022

    -Release for the delivery orshipment-Prepare weekly inventory report

    Accounting Department 22 -Sign the delivery receipt

    Plant Manager 23 -Sign the delivery receipt

    Sales Department 242526272829

    -Prepare delivery receipt-Check produced materials-Unloading and physical counting-Check and inspect loading of materials-Facilitate delivery report-Delivery Receipt

  • 8/2/2019 Final Output Without Matrix

    11/13

    University of SanCarlosGroup 7

    V. ACKNOWLEDGEMENT

    The AC508 students would like to express their deepest and warmest

    gratitude to the following for their unconditional assistance which have all

    accounted for the completion of this research project.

    To Architect Giovanni Francis T. Palisoc, Plant and Administration

    Manager for the patience and supervision during the production tour even

    for the short notice given and for handing out company papers that will be

    useful for the accomplishment of the project.

    To Mr. Keith A. Ortega, Accounting OIC and Administration Officer for

    information regarding the accounting process of STL Corporation.

    To the management and staff of STL Corporation for the warm

    accommodation and hospitality given to the students during the visit

    conducted.

    To Mrs. Marilyn U. Cortes, CPA, MAIA for the guidance and support

    given to her students.

    ***

    AC 508 (AIS) StudentsMW 1:30 3:00PMA.Y. 2011-2012

  • 8/2/2019 Final Output Without Matrix

    12/13

    University of SanCarlosGroup 7

    VI. BIBLIOGRAPHY

    Operations Management of XYZ Steel Corporation: Basis for

    Improvements (Abella, Karen S., Dejito, Louie G., Lomocs, Kennex Lyn

    B., Matidios, Analyn L., Villegas, Rhea Mae M.)

    http://www.puyatsteel.com

    Cost Accounting, Carter, 14th edition

    Accounting Information System, Gelinas and Dull, 7th edition

    ***

  • 8/2/2019 Final Output Without Matrix

    13/13

    University of SanCarlosGroup 7