final national greencentrewater

66
Life blood Life blood of the of the ‘Green’ ‘Green’ industry industry

Upload: kansas-state-univ

Post on 13-Nov-2014

207 views

Category:

Technology


0 download

DESCRIPTION

slide set for irrigation timing

TRANSCRIPT

Page 1: Final national greencentrewater

Life blood of the Life blood of the ‘Green’ industry‘Green’ industry

Page 2: Final national greencentrewater

WaterWaterDr. Ted Bilderback – NC State Univ.Dr. Ted Bilderback – NC State Univ.Water Quality :Managing the Chemistry in your Irrigation Water Supply

Dr. Jim Owen – Oregon State Univ.Dr. Jim Owen – Oregon State Univ.

Dr. Stu Warren – Kansas State Univ.Dr. Stu Warren – Kansas State Univ.

Page 3: Final national greencentrewater

WaterWaterDr. Ted Bilderback – NC State Univ.Dr. Ted Bilderback – NC State Univ.

Dr. Jim Owen – Oregon State Univ.Dr. Jim Owen – Oregon State Univ.Sweat the small stuffSweat the small stuff

Dr. Stu Warren – Kansas State Univ.Dr. Stu Warren – Kansas State Univ.

Page 4: Final national greencentrewater

WaterWaterDr. Ted Bilderback – NC State Univ.Dr. Ted Bilderback – NC State Univ.

Dr. Jim Owen – Oregon State Univ.Dr. Jim Owen – Oregon State Univ.

Dr. Stu Warren – Kansas State Univ.Dr. Stu Warren – Kansas State Univ.Getting more plant per gallonGetting more plant per gallon

Page 5: Final national greencentrewater
Page 6: Final national greencentrewater
Page 7: Final national greencentrewater

The Container System

FERTILIZER

SU

BS

TRA

TEIR

RIG

ATIO

NContainer

Page 8: Final national greencentrewater

Substrates

• 2 Parts• Solids• Pores

• aeration• water

Page 9: Final national greencentrewater

Substrates• Re-wet substrate

• Large pores (air)• Small pores (water)

Page 10: Final national greencentrewater

Let the waters flow Let the waters flow

Page 11: Final national greencentrewater

Irrigation• Traditional irrigation

• Single application• Maybe PM cool down

• How much to apply – inches• Timing

• Pre-dawn/early morning• Limit interference with crew• Minimum wind• Minimize loss to evaporation

Page 12: Final national greencentrewater

Two things changed our thinkingTwo things changed our thinking

• Water only means everything to everything

• T.E. Bilderback

• Water- oil of the 21Water- oil of the 21stst Century Century

Page 13: Final national greencentrewater

Water is the oil of the 21st century

• The United Nations has predicted by 2020, water and not oil will be a source of conflicts in the world

American Farm Bureau Federationin

Water Resources Could Be The Next Energy CrisisBy Stewart Truelsen

http://www.fb.org/views/focus/index.html

Page 14: Final national greencentrewater

Mark Twain said it best

• Whiskey for drinking• Water for fighting

Page 15: Final national greencentrewater

The Container System

FERTILIZER

SU

BS

TRA

TEIR

RIG

ATIO

NContainer

Page 16: Final national greencentrewater

Irrigation – Getting more plant per gallon

Page 17: Final national greencentrewater

Irrigation• To increase water efficiency while

maintaining rate of growth?• Irrigation

• Application efficiency• How much applied stays in container?

• Volume• How much does it take to rewet substrate?

• Time of irrigation• Does it make a difference when we irrigate?

Page 18: Final national greencentrewater

Irrigation application efficiency

• Re-wet substrate

Page 19: Final national greencentrewater

Pathways of water through a container

Channel along edgeChannel along edge

Follow large poresFollow large pores

Held in small poresHeld in small pores

Page 20: Final national greencentrewater

Water application efficiencyWater application efficiency

Page 21: Final national greencentrewater

Water application efficiency

• ‘Pulse’ irrigation – applying water in a series of cycles• El Modena Gardens increased

water retention by 30%(Whitesides,

1989)

Page 22: Final national greencentrewater

Cyclic irrigation

Page 23: Final national greencentrewater

Cyclic Irrigation

Page 24: Final national greencentrewater

Water application efficiency

% increase overSubstrate single application

3 PB : 1 P 34% (Fare et al., 1994)

8 PB : 1 S 27% (Groves et al., 1998)

8 PB : 1 S 27% (Ruter, 1998)

8 PB : 1 S 38% (Tyler et al., 1996)

Average 32%

Page 25: Final national greencentrewater

Substrates• Re-wet substrate

• Large pores (air)• Small pores (water)

Page 26: Final national greencentrewater

Cyclic irrigation and water Cyclic irrigation and water movement in containersmovement in containers

1st irrigation cycle 2nd irrigation cycle 3rd irrigation cycle

Page 27: Final national greencentrewater

Cyclic Irrigation• Advantages

• Need to apply less water• Decreased pump run time• Decrease leachate / Decreased runoff

• Disadvantages• Requires automated Controllers & Valves• Management

Page 28: Final national greencentrewater

Irrigation volumeHow much to apply?Traditional: inches of waterDoes that tell you if the substrate is rehydrated?

Page 29: Final national greencentrewater
Page 30: Final national greencentrewater

Leaching FractionLeaching Fraction = Volume Leached / Volume Applied

Leaching Fraction ~ 0.15 – 0.20

Total Water Applied for container diameter area is measured as “total volume” to calculate leaching fraction

Page 31: Final national greencentrewater

Plastic bags work for leaching fractions

Water Applied Water Leached

Page 32: Final national greencentrewater

Leaching fraction

0

5

10

15

20

25

30

0.1 0.2

Days afterinitiation

3575115

Cu

ma

lativ

e w

ate

r a

pp

lied

(g

al)

Leaching fraction (leached / applied)

7 gal per container

Owen. 2006

Page 33: Final national greencentrewater

Leaching fraction

0

5

10

15

20

25

30

0.1 0.2

Days afterinitiation

3575115

Cu

ma

lativ

e w

ate

r a

pp

lied

(g

al)

Leaching fraction (leached / applied)

7 gal per container90,000 gallons of water

saved per growing acre while maintaining

growth

Owen. 2006

Page 34: Final national greencentrewater

Leaching fraction• Advantages

• Based on plant need• Minimize water applied

• Minimize pump run time

• Disadvantages• Management time

Page 35: Final national greencentrewater

Less than uniform irrigation distribution?

Think Leaching Fraction

Page 36: Final national greencentrewater

Group by:Group by:

Water needsWater needs

Container sizeContainer size

SubstrateSubstrate

Page 37: Final national greencentrewater

Does the architecture of a plant’s canopy affect water application?

Page 38: Final national greencentrewater
Page 39: Final national greencentrewater

Umbrella Architecture

Page 40: Final national greencentrewater

Vase Architecture

Page 41: Final national greencentrewater

Canopy Capture

Williamson et al. 2005. SNA

60

80

100

120

140

160

180

200

220

240

260

33 50 72 92 105

Days

Per

cen

tage

irri

gati

on c

aptu

re CotoneasterGardenia

Cotoneaster dammeriCotoneaster dammeri

‘‘SkogholmSkogholm

Gardenia augustaGardenia augusta ‘Chuck Hayes’‘Chuck Hayes’

Page 42: Final national greencentrewater

0

100

200

300

400

500

600

700

800

900

22 29 32 40 47 49 54 66 73 82 92 99 105

Days After Initiation

Dai

ly v

olum

e ap

plie

d (m

l)

CotoneasterVitex

Irrigation volume to maintain 0.2 LF

Williamson et al. 2005. SNA

Cotoneaster dammeriCotoneaster dammeri ‘Skogholm‘Skogholm

Vitex trifoliaVitex trifolia ‘Variegata’‘Variegata’

Page 43: Final national greencentrewater
Page 44: Final national greencentrewater

Best Management Practices

• BMPs• Getting more plant per gallon

• Cyclic application• Irrigation volume

• 0.2 leaching fraction• Irrigation timing

• predawn to early morning

Page 45: Final national greencentrewater

Does it matter when you irrigate?

Page 46: Final national greencentrewater

• What time of day to irrigate?• Pre-dawn• AM• PM• All day

Irrigation timing

Page 47: Final national greencentrewater

• Irrigation timing treatmentsIrrigation timing treatments• Volume: Volume:

0.2 leaching fraction for each timing0.2 leaching fraction for each timing• Timing:Timing:

0200, 0400, and 0600 HR (predawn)0200, 0400, and 0600 HR (predawn)0600, 0900, and 1200 HR (AM)0600, 0900, and 1200 HR (AM)1200, 1500, and 1800 HR (PM)1200, 1500, and 1800 HR (PM)0600, 1200, and 1800 HR (all day)0600, 1200, and 1800 HR (all day)

Page 48: Final national greencentrewater

Dry weight of Cotoneaster dammeri 'Skogholm'

0

20

40

60

80

100

120

Top (g) Root (g) Total Dry Weight(g)

predawn

AM

PM

all day

Dry

wei

gh

t (g

)

b a a a

c b a b

d c a b

Page 49: Final national greencentrewater

Rainfall

0

10

20

30

40

50

60

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Rainfall

Weeks After Initiation

Rai

nfal

l (m

m)

Page 50: Final national greencentrewater

• Repeated study

Page 51: Final national greencentrewater

Rainfall

0

10

20

30

40

50

60

70

80

90

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Rainfall

Weeks After Initiation

Rai

nfal

l (m

m)

Page 52: Final national greencentrewater

Dry weight of Cotoneaster dammeri 'Skogholm'

0

20

40

60

80

100

120

Top (g) Root (g) Total Dry Weight(g)

predawn

AM

PM

all day

Dry

wei

gh

t (g

)

b a a a

c b a b

d c a b

Page 53: Final national greencentrewater

Photosynthesis

0

1.5

3

4.5

6

7.5

9

11:00 AM 1:30 PM 4:00 PM

predawn

AM

PM

all day

Pho

tosy

nthe

sis

Page 54: Final national greencentrewater

Monitoring Water Use

70

75

80

85

90

95

100

18:0

0

20:0

0

22:0

0

01:0

0

03:0

0

06:0

0

08:0

0

10:0

0

13:0

0

15:0

0

18:0

0

20:0

0

22:0

0

Time

Conta

iner

capacity (

%)

Page 55: Final national greencentrewater

Monitoring Water Use

70

75

80

85

90

95

100

18:0

0

20:0

0

22:0

0

01:0

0

03:0

0

06:0

0

08:0

0

10:0

0

13:0

0

15:0

0

18:0

0

20:0

0

22:0

0

Time

Conta

iner

capacity (

%)

Wat

er

gain

Page 56: Final national greencentrewater

Monitoring Water Use

70

75

80

85

90

95

100

18:0

0

20:0

0

22:0

0

01:0

0

03:0

0

06:0

0

08:0

0

10:0

0

13:0

0

15:0

0

18:0

0

20:0

0

22:0

0

Time

Conta

iner

capacity (

%)

Wat

er

gain

Plant water use

Daylight hrs

Page 57: Final national greencentrewater

Monitoring Water Use

70

75

80

85

90

95

100

00:0

0

06:0

0

12:0

0

18:0

0

00:0

0

06:0

0

12:0

0

18:0

0

00:0

0

06:0

0

12:0

0

18:0

0

00:0

0

06:0

0

12:0

0

18:0

0

00:0

0

06:0

0

12:0

0

18:0

0

00:0

0

06:0

0

12:0

0

18:0

0

00:0

0

Time and date

Conta

iner

capacity (

%)

ClaySand

Aug 23 Aug 24 Aug 25 Aug 26 Aug 27 Aug 28

Amendment

Page 58: Final national greencentrewater

Automated Control

85

90

95

100

AM 0.2 LFPM 0.2 LFPM ReplacementOn-demand

Syst

em

wt. a

t conta

iner

capaci

ty (

%)

Time (24 HR)2400 0400 0800 1200 1600 2000 2400

Page 59: Final national greencentrewater

Automated Control

85

90

95

100

AM 0.2 LFPM 0.2 LFPM ReplacementOn-demand

Syst

em

wt. a

t conta

iner

capaci

ty (

%)

Time (24 HR)2400 0400 0800 1200 1600 2000 2400

Page 60: Final national greencentrewater

Monitoring Water Use

80%

85%

90%

95%

100%

Date and time

Perc

en

t w

eig

ht

at

CC Clay-AM

Clay-PM

Aug 24 Aug 25 Aug 26 Aug 27 Aug 28

Page 61: Final national greencentrewater

20

25

30

35

40

45

50

pre-dawnall daypm

Irrigation timing - overhead

Williamson et al. 2005. SNA

Su

bst

rate

Tem

per

atu

re (

C)

Aug 26 Aug 27

Page 62: Final national greencentrewater

20

25

30

35

40

45

50

pre-dawn

all day

pm

Irrigation timing - overhead

Williamson et al. 2005. SNA

Su

bst

rate

Tem

per

atu

re (

C)

Aug 26 Aug 27

12:0012:00

3:003:00

6:006:00

Pre-DawnPre-Dawn

Page 63: Final national greencentrewater

20

25

30

35

40

45

50pre-dawn

all day

pm

Irrigation timing - overhead

Williamson et al. 2005. SNA

Su

bst

rate

Tem

per

atu

re (

C)

Aug 26 Aug 27

3:00 3:00 AMAM

9:00 9:00 PMPM

Page 64: Final national greencentrewater

Irrigation timing

• Advantages• Increases plant growth • Regulate substrate temperature

• Disadvantages• Automated Controllers & Valves• Interfere with workers• Management

Page 65: Final national greencentrewater

Irrigation Decisions

• Cyclic irrigation• Increase application efficiency- 30%

• How much?• Leaching fraction

• 0.1 to 0.2 • When?

• Time of Day

Page 66: Final national greencentrewater

QuestionsQuestions