final mcfadden thesis presentation 2006...senior capstone project architectural engineering...

16
1 Jason McFadden University Park Construction Management Pennsylvania Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project SIMPLIFYING DESIGN SIMPLIFYING DESIGN TO CONSTRUCTION TO CONSTRUCTIONJason McFadden University Park Construction Management Pennsylvania Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Structural Breadth Senior Capstone Project Analysis Goals Design Intent Alternate Design Cost Analysis Project Overview Technical Analyses Steel Tapered Column Analysis Streamlining Structural Steel Design and Construction Electrical Distribution Analysis Summary and Conclusions Acknowledgements Clarifications & Questions Presentation Outline

Upload: others

Post on 08-Aug-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

1

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

““SIMPLIFYING DESIGN SIMPLIFYING DESIGN TO CONSTRUCTIONTO CONSTRUCTION””

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project Structural BreadthSenior Capstone Project

Analysis Goals Design Intent Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Page 2: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

2

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

“In The Batter’s Box” Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Sports FacilityPenn State Baseball (Big Ten)

State College Spikes (Minor League “A”)

Traditional Project Delivery w/ CM Agent35 Acre Open Field Site

$25.3M Construction Cost

June 2005 – May 2006 Construction Schedule

Project Overview

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation OutlineArchitectural Accolades Project Overview

5,406 Fixed Seating Capacity18 Luxury SuitesSchool Of Journalism Media Observation Area

60’ Tall Entrance Masonry Pylon

18.55’ RF Outfield Fence

Sand Grid Drainage System

44’ Scoreboard Height

Page 3: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

3

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

“Leading Off First” Structural Analysis Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

(1) W14X132

(2) W14X90

120’-6” Above Field Level

HSS Lateral Cross-Bracing

Encased with 1” Plates

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Designed Column Alternative DesignProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Minimal Structural Integrity

Very Labor Intensive with Welding

Water Penetration

Maintenance Concern

Ease of SJO Cable Installation

Design Processstuffstuff

stuffstuff

stuffstuffstuff

Architectural Tapered Plates

Structural Analysis Structural Analysis

15% of Steel Tonnage (86 Tons)28 Days For Structure

SPLICE PLATES

Page 4: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

4

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Project OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Alternative Structural Member

Senior Capstone Project

Goals

Maintain Aesthetic Smooth Appeal

Structural AnalysisGoals Alternative Design

Two Options

Welding Bead

Splice Connection

Structural Analysis

Tapered Steel Tube Constructed with 1” Plate

80 Tons of Steel 1” Steel Plate Column

5/16” Weld

Easier Erection Method

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Designed Column

Senior Capstone Project

Structural Analysis Structural Analysis

Two Options

Welding Bead

Splice Connection

Tapered Steel Tube Constructed with 1” Plate

80 Tons of Steel

Alternative Design

Minimal Structural Integrity

Very Labor Intensive with Welding

Water Penetration

Maintenance Concern

Ease of SJO Cable Installation

Architectural Tapered Plates

15% of Steel Tonnage (86 Tons)28 Days For Structure

Designed Column vs. Proposed Designed Column

1” Steel Plate Column

5/16” Weld

Page 5: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

5

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Designed Column vs. Proposed Designed ColumnCost Summary

Description TotalLabor $59,525.12Material $65,159.20Equipment $98,569.44

Total $223,253.76

Designed Column Cost Estimate Summary

Description TotalLabor $46,266.88Material $60,089.72Equipment $71,712.96

Total $178,069.56

Alternative Column Cost Estimate Summary

Designed Column Structural Analysis

Minimal Structural Integrity

Very Labor Intensive with Welding

Water Penetration

Maintenance Concern

Ease of SJO Cable Installation

Architectural Tapered Plates

15% of Steel Tonnage (86 Tons)28 Days For Structure

Structural AnalysisAlternative Design

($45,184.20)

Two Options

Welding Bead

Splice Connection

Tapered Steel Tube Constructed with 1” Plate

80 Tons of Steel1” Steel Plate Column

5/16” Weld

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Designed Column vs. Proposed Designed Column

Project ImpactsStructural AnalysisAlternative Design

Advantages DisadvantagesErection duration savings of 7 days. Possibly could limit the amount of steel

fabricator’s bidding on project.Overall cost savings of $45,184.20.Heavy equipment (crane) moved off-site quicker.Continuous weld on plates adds extra waterproofing of structural member.Easier ability to run SJO cable to power light fixtures.

Proposed Alternative Column DesignTwo Options

Welding Bead

Splice Connection

Tapered Steel Tube Constructed with 1” Plate

80 Tons of Steel

Minimal Structural Integrity

Very Labor Intensive with Welding

Water Penetration

Maintenance Concern

Ease of SJO Cable Installation

Architectural Tapered Plates

15% of Steel Tonnage (86 Tons)28 Days For Structure

Designed Column Structural Analysis

1” Steel Plate Column

5/16” Weld

Page 6: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

6

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Designed Column vs. Proposed Designed Column

ConclusionDesigned Column Structural Analysis

Minimal Structural IntegrityVery Labor Intensive with Welding

Water PenetrationMaintenance Concern

Ease of SJO Cable Installation

Architectural Tapered Plates

15% of Steel Tonnage (86 Tons)28 Days For Structure

Structural Analysis

Two Options

Welding Bead

Splice Connection

Tapered Steel Tube Constructed with 1” Plate

80 Tons of Steel

Alternative Design

Decreased Steel Tonnage

Same Aesthetic Architectural Appeal

Significant Labor Savings

Easier Erection Method

Proposed Column…

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

“Sliding Into Second” Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Retail Store & Ticket Building

Year Round Use

2000 S.F.

Electrical Analysis

Page 7: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

7

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Project Overview

Streamlining Structural Steel Design and ConstructionSummary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Technical AnalysesSteel Tapered Column AnalysisElectrical Distribution Analysis

Designed System

No U/G Raceways on Documents

Electrical Analysis

All wires through Canopy Structure

Power from room 126 on Main Concourse

Approx. 275’-0”

Alternative Design

Panels Located in Storage Room, 150B

RB-1 480Y/277V , 3F/4W

RB-2 208Y/120V , 3F/4W

1-1/4” Underground PVC Raceway to 480 Panel

Transformer 15kVA

Electrical Analysis

T-RBR

B-2

RB

-1

Storage, 150B100A

50A

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Project Overview

Streamlining Structural Steel Design and ConstructionSummary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Technical AnalysesSteel Tapered Column AnalysisElectrical Distribution Analysis

Senior Capstone Project

Goals Electrical AnalysisGoals

Design Electrical Panel within Retail Building

Provide Cost Data for New Distribution

Alternative Design

Panels Located in Storage Room, 150B

1-1/4” Underground PVC Raceway to 480 Panel

Electrical Analysis

T-RBR

B-2

RB

-1

Storage, 150B

RB-1 480Y/277V , 3F/4W

RB-2 208Y/120V , 3F/4W

Transformer 15kVA

100A

50A

Page 8: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

8

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

No U/G Raceways on Documents

Electrical AnalysisDesigned System

All wires through Canopy Structure

Power from room 126 on Main Concourse

Designed System vs. Proposed Designed System

Panels Located in Storage Room, 150B

RB-1 480Y/277V , 3F/4W

RB-2 208Y/120V , 3F/4W

1-1/4” Underground PVC Raceway to 480 Panel

Transformer 15kVA

Electrical Analysis

100A

50A T-RBR

B-2

RB

-1

Storage, 150B

Alternative Design

Approx. 275’-0”

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Designed System vs. Proposed Designed SystemCost Summary

Description TotalLabor $13,784.28Material $8,857.50

Total $22,641.78

Designed System Cost Estimate Summary

Description TotalLabor $2,348.65Material $11,521.75

Total $13,870.40

Alternative System Cost Estimate Summary($8,771.38)

No U/G Raceways on Documents

Electrical AnalysisDesigned System

All wires through Canopy Structure

Power from room 126 on Main Concourse Panels Located in Storage Room, 150B

1-1/4” Underground PVC Raceway to 480 Panel

Electrical Analysis

T-RBR

B-2

RB

-1

Storage, 150B

Alternative Design

Approx. 275’-0”

RB-1 480Y/277V , 3F/4W

RB-2 208Y/120V , 3F/4W

Transformer 15kVA

100A

50A

Page 9: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

9

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Designed System vs. Proposed Designed System

Project Impacts

Advantages DisadvantagesCost savings of $8,771.38.Ease of electrical system maintenance during owner operation.Decrease in amount of conduit and wire needed (labor savings).Decrease in coordination with other trades for electrical branch conduits installed through main concourse per original design. Ease of expansion.Less voltage drop experienced on branch circuits.

Proposed Alternative System

Panels Located in Storage Room, 150B

RB-1 480Y/277V , 3F/4W

RB-2 208Y/120V , 3F/4W

1-1/4” Underground PVC Raceway to 480 Panel

Transformer 15kVA

Electrical Analysis

100A

50A T-RBR

B-2

RB

-1

Storage, 150B

Alternative Design

Senior Capstone Project

No U/G Raceways on Documents

Electrical AnalysisDesigned System

All wires through Canopy Structure

Power from room 126 on Main Concourse

Approx. 275’-0”

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Designed System Alternative Design

No U/G Raceways on DocumentsPanels Located in Storage Room, 150B

RB-1 � 480Y/277V , 3 /4W

RB-2 � 208Y/120V , 3 /4W

1-1/4” Underground PVC Raceway to 480 Panel

Transformer � 15kVA

Electrical AnalysisDesigned System Electrical Analysis

All wires through Canopy Structure

Power from room 126 on Main Concourse

T-RBR

B-2

RB

-1

Storage, 150B100A

50A

Designed System vs. Proposed Designed System

Conclusion

O&M Value to Owner

Substantial Cost Savings

No Additional Load on Overall System

Proposed Distribution…

Page 10: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

10

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline“Rounding Third” Steel Design & Construction

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

“Rounding Third”Project Overview

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Steel Tapered Column AnalysisTechnical Analyses

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Steel Design & Construction

Technology Savvy IndustryComputer Generated Fabrication Models

Research Questions Steel Design & Construction

Can the construction industry reduce the waste in the steel shop drawing process through implementing building information modeling? What are the challenges to implementing this technology on a project?

How can a project team implement building information modeling on a project, specifically the steel phase?

CNC Equipment

Page 11: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

11

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

“Rounding Third”Project Overview

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Steel Tapered Column AnalysisTechnical Analyses

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Steel Design & Construction

Current Process is Inefficient

Research Questions Steel Design & Construction

Arch. DesignStruct. Design

Fabrication Model

Shop Drawings

Update Fabrication Model

Erection Dwgs.

Big Paper Trail

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

ResearchProject Overview

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Steel Tapered Column AnalysisTechnical Analyses

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Steel Design & Construction

Building Information Modeling (BIM)“Intelligent” 3D Model

Electronic Database of Project

Streamline Structural Steel Design and Construction through Computer Modeling

Research Questions Steel Design & Construction

Mandated by GSA for all future projects (2006)

Reduce Waste

Challenges

Implementation

Research

Page 12: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

12

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Project Overview

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Steel Tapered Column AnalysisTechnical Analyses

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Steel Design & Construction

Current Process is Inefficient

Methodology Steel Design & Construction

Selective Interview Participants

Literature Review of Successful Projects

Case Study

Arch. DesignStruct. Design

Fabrication Model

Shop Drawings

Update Fabrication Model

Erection Dwgs.

Why Steel?

Soldier Field Renovation

Penn State Ballpark

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Project Overview

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Steel Tapered Column AnalysisTechnical Analyses

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Steel Design & Construction

Current Process is InefficientArch. Design

Struct. Design

Fabrication Model

Shop Drawings

Update Fabrication Model

Erection Dwgs.

Why Steel?Hand drawing to Automation Defined Scope with BIM

During DesignModel Maintenance and Discipline

3D Shop Drawing Models linked to CNC Equipment

Model Reviews Instead of Drawing Reviews are Becoming More Common

Architectural Changes During Approval Process

3D Design Model Given to Contractors for Bidding

Models Exported Directly to CNC Equipment

Incomplete Design Documents

Coordination with Architectural Documents

Rarely Direct Contact between Designer and Detailer

Different Way Of Thinking

Attach Screen Shot of Model to Requests for Information (RFI)

Fee Issues with More Design Services

Accuracy of Model Model Review Instead of Paper Drawings

Understanding How BIM Benefits Project Team

Information Exchanged Electronically

Interoperability

Have the development of steel design/shop drawings changed over the past five (5) years?

Has 3D modeling/BIM changed the steel shop drawing development and review process?

Describe some common problems during the development of shop drawings.

Coordinated Team Decisions made instead of delayed Software easily exchange information

Describe the ideal steel shop drawing review process.

What are the barriers to implementing building information modeling (BIM) on a project? (cost, time, legal, etc.)

Describe the communication techniques between the designer and detailer during the shop drawing development process.

? ? ? ? ? ? ? ?

Page 13: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

13

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Project Overview

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Steel Tapered Column AnalysisTechnical Analyses

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Steel Design & Construction Case Study Steel Design & ConstructionResults

Penn State BallparkModel Created in Revit Structure 2Challenges Control Method

Contract LanguageAISC Code of Standard Practice (Chapter 16) assists with correct verbage.Design decisions made sooner.Better design coordination through a design model.Choose up-to-date software with most effective data exchanging capabilities.CIS/2 continues to help with exchanging data between software will become less of a problem.Create an FTP site to post all documents to be exchange electronically.

CommunicationPromotes constant communication and project understanding by project team.3D Model reviewed and approved.Erection Drawings Only.

BIM for Steel Phase on a Project

Design Management

Technology

Paper Drawings

Case Study BIM ModelRevit Structure 2

65 Hours to create BIM.Some areas could not be modeled.Known steel quantities with schedules.

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Project Overview

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Steel Tapered Column AnalysisTechnical Analyses

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Steel Design & Construction Case Study Steel Design & ConstructionResults

RFI’s Model Created in RevitStructure 2

Challenges Control Method

Contract LanguageAISC Code of Standard Practice (Chapter 16) assists with correct verbage.Design decisions made sooner.Better design coordination through a design model.Choose up-to-date software with most effective data exchanging capabilities.CIS/2 continues to help with exchanging data between software will become less of a problem.Create an FTP site to post all documents to be exchange electronically.

CommunicationPromotes constant communication and project understanding by project team.3D Model reviewed and approved.Erection Drawings Only.

BIM for Steel Phase on a Project

Design Management

Technology

Paper Drawings

20% Related to Elevation Discrepancy

No Column ScheduleAutomatically Created with BIM Software

Column Description Quantity Length Base Level Base Offset Top Level Top OffsetW14X90 1 118' - 6" Concourse Level Framing Plan -14' - 6" Roof Level Framing Plan 75' - 0"W14X43 1 15' - 9 1/2" Field Level Foundation Plan -1' - 6" Concourse Level Framing Plan -0' - 8 1/2"W14X132 1 120' - 6" Field Level Foundation Plan -1' - 6" Roof Level Framing Plan 75' - 0"W14X43 1 15' - 8" Field Level Foundation Plan -1' - 6" Concourse Level Framing Plan -0' - 10"W14X90 1 120' - 6" Field Level Foundation Plan -1' - 6" Roof Level Framing Plan 75' - 0"

Penn State BallparkStructural Column Schedule

Page 14: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

14

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Designed System Alternative Design

No U/G Raceways on DocumentsPanels Located in Storage Room, 150B

RB-1 � 480Y/277V , 3 /4W

RB-2 � 208Y/120V , 3 /4W

1-1/4” Underground PVC Raceway to 480 Panel

Transformer � 15kVA

Electrical AnalysisDesigned System Electrical Analysis

All wires through Canopy Structure

Power from room 126 on Main Concourse

T-RBR

B-2

RB

-1

Storage, 150B100A

50A

Effects of Steel Phase Computer Modeling

Challenges Control Method

Contract LanguageAISC Code of Standard Practice (Chapter 16) assists with correct verbage.Design decisions made sooner.Better design coordination through a design model.Choose up-to-date software with most effective data exchanging capabilities.CIS/2 continues to help with exchanging data between software will become less of a problem.Create an FTP site to post all documents to be exchange electronically.

CommunicationPromotes constant communication and project understanding by project team.3D Model reviewed and approved.Erection Drawings Only.

BIM for Steel Phase on a Project

Design Management

Technology

Paper Drawings

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone ProjectSenior Capstone Project

Designed System Alternative Design

No U/G Raceways on DocumentsPanels Located in Storage Room, 150B

RB-1 � 480Y/277V , 3 /4W

RB-2 � 208Y/120V , 3 /4W

1-1/4” Underground PVC Raceway to 480 Panel

Transformer � 15kVA

Electrical AnalysisDesigned System Electrical Analysis

All wires through Canopy Structure

Power from room 126 on Main Concourse

T-RBR

B-2

RB

-1

Storage, 150B100A

50A

Effects of Steel Phase Computer Modeling

On-Going Technology Challenges

Implementation

ConclusionReduced Waste

Page 15: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

15

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

($8,771.38)

“Coming Home” Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation OutlineSummary and Conclusions

Alternative Structural Column

Alternative Electrical Distribution

Streamlined Approach for Structural Steel

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

All-Star Support Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation OutlineAcknowledgements

My friends and family throughout my five-year career at The Pennsylvania State University.Industry & Academic Support:

Bettwy Electric, Ritner Steel, RNR Erection

Page 16: Final McFADDEN Thesis Presentation 2006...Senior Capstone Project Architectural Engineering Architectural Engineering Senior Capstone Project Designed System Alternative Design No

16

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project Structural BreadthSenior Capstone Project

Analysis Goals Design Intent Alternate Design Cost AnalysisProject OverviewTechnical Analyses

Steel Tapered Column Analysis

Streamlining Structural Steel Design and ConstructionElectrical Distribution Analysis

Summary and Conclusions

Acknowledgements

Clarifications & Questions

Presentation Outline

Jason McFaddenUniversity Park

Construction ManagementPennsylvania

Senior Capstone ProjectArchitectural EngineeringArchitectural EngineeringSenior Capstone Project

““SIMPLIFYING DESIGN SIMPLIFYING DESIGN TO CONSTRUCTIONTO CONSTRUCTION””