final martin coffee march 4 2010 for posting
DESCRIPTION
Marco Thompson event at Solekai. Martin Caniff\'s Slides on the Expertise available at Solekai in the Digital Video and Smart Grid SpacesTRANSCRIPT
![Page 1: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/1.jpg)
1
Solekai SystemsSoftware engineering services for
Digital Video, Smart Grid, Consumer Electronics
![Page 2: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/2.jpg)
Founded 2002 Software running in 50+ million devicesPedigree from Doctor Design
$10M < Solekai Revenue < $100M FY0975 Employees100% San Diego-based
65 Development EngineersDigital Video, Smart Grid, QA, Testing,
Services, Porting, Proof of Concept, Prototyping
History &Experience
Stats
Engineering
Solekai at a Glance
We sellTime to Market
1500 man-years of
Doing the Impossible
![Page 3: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/3.jpg)
Partial Client Listing
3
![Page 4: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/4.jpg)
4
Engineering Process
■ Requirements Analysis and Capture – Facilitate meetings with customer and partners to document the system requirements.
■ Functional Specification – Draft the functional and technical specifications based on the requirements
■ Test Plan – Draft the test plan and test cases mapped to each of the requirements to insure thorough test coverage. This is also important in defining when the project is “done”
■ Design – Draft the system design and validate it with a review process to insure all requirements are met.
■ Development – Code, document, unit test and integrate the software modules
■ QA/Test – Execute the test plan against the software system
![Page 5: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/5.jpg)
Solekai Confidential 5
Solekai has Domain Knowledge across the Digital Video Industry
Standards & Stuff
Devices
H.264
HD
DVB
AddressableAdvertising
MPEG-4
Chipsets
Infrastructure
![Page 6: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/6.jpg)
Smart Grid
■ Utilities need more Power to satisfy demand – but only a few days a year● Build 1 less Power Plant – save $350M
■ Change consumer behavior● Time of day billing
● Instantaneous feedback to consumers on usage
■ Utility can manage load directly● During times of peak load, the utilities can send commands to
control devices within the home (with prior agreement with consumer)
![Page 7: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/7.jpg)
Smart Grid Integration Challenges
■ Integration Challenges1. From Utility to the Meter
2. From Meter to Smart Appliances (CPE)
7
METER
METER
Wireless
Utility
Smart Appliances
Smart Appliances
1 2
![Page 8: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/8.jpg)
Smart Grid Provides Monitoring & Control
![Page 9: Final Martin Coffee March 4 2010 For Posting](https://reader031.vdocuments.us/reader031/viewer/2022020105/555ade34d8b42a024a8b51c3/html5/thumbnails/9.jpg)
DIGITAL LIVING OVERVIEWQ & A…
9