SITE N WARWICK TOWNSHIP, LANCASTER COUNTY, PA MICHAEL PALASZ FINAL LAND DEVELOPMENT PLAN in OWNER / DEVELOPER: SOURCE OF TITLE: ZONING DATA: SITE DATA: INDEX OF SHEETS: for REVISIONS: WAIVERS: LOCATION MAP 15 Toll Gate Road, Lititz, PA 17543 P: 717.626.0175 F: 717.626.5021 www.diehmandsons.com Surveying & Mapping Civil Engineering Land Planning DIEHM Experience Trust Solutions & SONS PA ONE CALL INFORMATION: Know what's below. Call before you dig. ® CERTIFICATES: NOTES : WATER AND SEWER NOTES: POST-CONSTRUCTION STORMWATER MANAGEMENT OPERATION & MAINTENANCE SCHEDULE x x x x ZONING ACTION: MUNICI BOUND ARROW EL NEW POR RO MEM LINC SN YD ER HIL D O U S C I S C SH PLA T G C O C R BRO OKFI L A BAR BRU NNE W CO VE F U R N A C Existing Use: Vacant Vacant Proposed Use: Record Storage/Automotive Garage Record Storage/Automotive Garage No. Lots/Units: 1/1 1/1 No. Acres: 0.37 Ac. 0.37 Ac. Density: 2.7 Units/Ac. 2.7 Units/ Ac. Source of Sewer: Public Public Source of Water: Public Public Proposed SHEET TITLE TITLE TITLE 1. COVER SHEET COVER SHEET 2. FINAL LAND DEVELOPMENT PLAN FINAL LAND DEVELOPMENT PLAN 3. POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN POST-CONSTRUCTION STORMWATER MANAGEMENT PLAN 4. GRADING AND UTILITY PLAN GRADING AND UTILITY PLAN 5. EROSION AND SEDIMENTATION CONTROL PLAN EROSION AND SEDIMENTATION CONTROL PLAN 6. DETAILSDETAILS Diehm & Sons, Inc. hereby states that, pursuant to the provisions of & Sons, Inc. hereby states that, pursuant to the provisions of & Sons, Inc. hereby states that, pursuant to the provisions of Sons, Inc. hereby states that, pursuant to the provisions of Sons, Inc. hereby states that, pursuant to the provisions of Inc. hereby states that, pursuant to the provisions of Inc. hereby states that, pursuant to the provisions of hereby states that, pursuant to the provisions of hereby states that, pursuant to the provisions of states that, pursuant to the provisions of states that, pursuant to the provisions of that, pursuant to the provisions of that, pursuant to the provisions of pursuant to the provisions of pursuant to the provisions of to the provisions of to the provisions of the provisions of the provisions of provisions of provisions of of of Act No. 287 of December 10, 1974, as amended by Act No. 121 of No. 287 of December 10, 1974, as amended by Act No. 121 of No. 287 of December 10, 1974, as amended by Act No. 121 of 287 of December 10, 1974, as amended by Act No. 121 of 287 of December 10, WARWICK TOWNSHIP FINAL PLAN APPROVAL CERTIFICATE At a meeting held on _______, 20__, the Board of Supervisors of Warwick Township approved this project, including the complete set of plans and information which are filed with the Township in File No. __________, based upon its conformity with the standards of the Warwick Township Subdivision and Land Development Ordinance. WARWICK TOWNSHIP PLANNING COMMISSION FINAL PLAN REVIEW CERTIFICATE At a meeting held on _________,20__ the Warwick Township Planning Commission reviewed this plan. CERTIFICATION OF ACCURACY (SURVEY AND PLAN) I hereby certify that, to the best of my knowledge, the survey and plan shown and described hereon, is true and correct to the accuracy required by the Warwick Township Subdivision and Land Development Ordinance. Date: Timothy D. Diehm, P.L.S. STORM DRAINAGE PLAN CERTIFICATION I hereby certify that, to the best of my knowledge, the storm drainage facilities shown and described hereon are designed in conformance with the Warwick Township Stormwater Management Ordinance. Date: Kevin Varner, P.E. CERTIFICATE OF OWNERSHIP, ACKNOWLEDGMENT OF PLAN AND OFFER OF DEDICATION, COUNTY OF LANCASTER, COMMONWEALTH OF PENNSYLVANIA On this, the _____ day of _______________, 20___, before me, the this, the _____ day of _______________, 20___, before me, the this, the _____ day of _______________, 20___, before me, the the _____ day of _______________, 20___, before me, the the _____ day of _______________, 20___, before me, the _____ day of _______________, 20___, before me, the _____ day of _______________, 20___, before me, the day of _______________, 20___, before me, the day of _______________, 20___, before me, the of _______________, 20___, before me, the of _______________, 20___, before me, the _______________, 20___, CARBONATE GEOLOGY CERTIFICATION I hereby certify that the proposed stormwater detention facilities are underlain by carbonate geology. Date: C J Conapitski, P.G. 1. Benchmark: Fire Hydrant Bonnet Bolt over main outlet, Elevation = 417.81. Benchmark: Fire Hydrant Bonnet Bolt over main outlet, Elevation = 417.81. 2. Warwick Township is not responsible for the construction or maintenance of any area not specifically dedicated Warwick Township is not responsible for the construction or maintenance of any area not specifically dedicated Township is not responsible for the construction or maintenance of any area not specifically dedicated Township is not responsible for the construction or maintenance of any area not specifically dedicated is not responsible for the construction or maintenance of any area not specifically dedicated is not responsible for the construction or maintenance of any area not specifically dedicated not responsible for the construction or maintenance of any area not specifically dedicated not responsible for the construction or maintenance of any area not specifically dedicated responsible for the construction or maintenance of any area not specifically dedicated responsible for the construction or maintenance of any area not specifically dedicated for the construction or maintenance of any area not specifically dedicated for the construction or maintenance of any area not specifically dedicated the construction or maintenance of any area not specifically dedicated the construction or maintenance of any area not specifically dedicated construction or maintenance of any area not specifically dedicated construction or maintenance of any area not specifically dedicated or maintenance of any area not specifically dedicated or maintenance of any area not specifically dedicated maintenance of any area not specifically dedicated maintenance of any area not specifically dedicated of any area not specifically dedicated of any area not specifically dedicated any area not specifically dedicated any area not specifically dedicated area not specifically dedicated area not specifically dedicated not specifically dedicated not specifically dedicated specifically dedicated specifically dedicated dedicated dedicated to the public use. There are no site facilities proposed for dedication to the Township. 3. There shall be provided and maintained a clear sight triangle easement as shown on the plan. No structures, There shall be provided and maintained a clear sight triangle easement as shown on the plan. No structures, shall be provided and maintained a clear sight triangle easement as shown on the plan. No structures, shall be provided and maintained a clear sight triangle easement as shown on the plan. No structures, be provided and maintained a clear sight triangle easement as shown on the plan. No structures, be provided and maintained a clear sight triangle easement as shown on the plan. No structures, provided and maintained a clear sight triangle easement as shown on the plan. No structures, 1. The project proposes to install the parking area and associated improvements as part of phase I. The proposed The project proposes to install the parking area and associated improvements as part of phase I. The proposed project proposes to install the parking area and associated improvements as part of phase I. The proposed project proposes to install the parking area and associated improvements as part of phase I. The proposed proposes to install the parking area and associated improvements as part of phase I. The proposed proposes to install the parking area and associated improvements as part of phase I. The proposed to install the parking area and associated improvements as part of phase I. The proposed to install the parking area and associated improvements as part of phase I. The proposed install the parking area and associated improvements as part of phase I. The proposed install the parking area and associated improvements as part of phase I. The proposed the parking area and associated improvements as part of phase I. The 1. The property owner shall own, maintain and be responsible for all storm water management facilities that are The property owner shall own, maintain and be responsible for all storm water management facilities that are proposed on the Storm Water Management Plan. 2. The owner shall conduct a visual inspection of all stormwater management facilities at least once every year for The owner shall conduct a visual inspection of all stormwater management facilities at least once every year for the first 5 years, once every 3 years thereafter, and immediately after storm events exceeding 4 inches in depth. Such visual examination shall at least involve a surface examination of the stormwater facilities for debris deposition, for soil and structural settlement, depressions, sinkholes, seeps, structural cracking, animal burrows, excessive vegetation, clogging, erosion and foundation movement. Two copies of the inspection report shall be provided to the Township within 60 days of completion of the inspection. 3. At a minimum, maintenance shall include maintaining good vegetative cover in lawn areas, the removal of debris At a minimum, maintenance shall include maintaining good vegetative cover in lawn areas, the removal of debris from the stormwater facility, conveyance systems including roof gutters, and replacing dead vegetation within rain garden. 4. The owner shall repair any damage to the storm water management facilities. Repairs shall be made using The owner shall repair any damage to the storm water management facilities. Repairs shall be made using material that meets or exceeds the specifications provided on the Stormwater Plan. The owner shall immediately notify Warwick At a meeting on _______________, 20___, the Warwick Township Board of Supervisors approved the following waivers/modifications of the Warwick Township Subdivision and Land Development Ordinance (§285) and Stormwater Management Ordinance (§270): §285-7.C Submission of Preliminary Plan Submission of Preliminary Plan §285-27.J.(3) Improvements to existing streets Improvements to existing streets §285-28.B.(1) Sidewalks Sidewalks §285-28.C. Curbs Curbs §285-27.K(6) Access Drive Intersection Radii to be 20' Minimum Access Drive At a meeting on June 10, 2015, in case no. 818, the Warwick Township Zoning Hearing Board granted variances of the a meeting on June 10, 2015, in case no. 818, the Warwick Township Zoning Hearing Board granted variances of the a meeting on June 10, 2015, in case no. 818, the Warwick Township Zoning Hearing Board granted variances of the meeting on June 10, 2015, in case no. 818, the Warwick Township Zoning Hearing Board granted variances of the meeting on June 10, 2015, in case LANCASTER COUNTY PLANNING COMMISSION'S REVIEW CERTIFICATE The Lancaster County Planning Commission, as required by the Pennsylvania Municipalities Planning Code, Act 247 of 1968, as amended, reviewed this plan on ___________ __, 2017, and a copy of the review is on file at the office of the Planning Commission in LCPC File No. ________ This certificate does not indicate approval or disapproval of the plan by the Lancaster County Planning Commission, and the commission does not represent nor guarantee that this plan STORMWATER FACILITIES ACKNOWLEDGMENT We hereby acknowledge the stormwater management facilities to be permanent fixtures that cannot be altered or removed unless a revised plan is approved by the Township. _________________________ Michael V. Palasz

Upload: others

Post on 16-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINAL LAND DEVELOPMENT PLAN MICHAEL PALASZ

SITE

N

WA

RW

ICK

TO

WN

SHIP

, L

AN

CA

STER

C

OU

NTY

, P

A

MIC

HA

EL

PA

LA

SZ

FIN

AL

LA

ND

DE

VE

LO

PME

NT

PL

AN

in

OW

NER

/ D

EVEL

OPE

R:

SOU

RC

E O

F T

ITLE

:

ZON

ING

DA

TA:

SITE

DA

TA:

IND

EX O

F S

HEE

TS:

for

REV

ISIO

NS:

WA

IVER

S:

LOC

ATI

ON

MA

P

15 To

ll Gat

e Ro

ad, L

ititz

, PA

175

43

P:

717

.626

.017

5

F: 7

17.6

26.5

021

ww

w.d

iehm

ands

ons.c

om

Surv

eyin

g &

Map

ping

C

ivil E

ngin

eerin

g

Lan

d Pl

anni

ng

DIEHM

Expe

rienc

e

Trust

So

lutio

ns

& S

ON

S

PA O

NE

CA

LL I

NFO

RMA

TIO

N:

Know

wha

t'sbe

low

.Ca

llbe

fore

you

dig

.

®

CER

TIFI

CA

TES:

NO

TES

:

WA

TER

AN

D S

EWER

NO

TES:

POST

-CO

NST

RU

CTI

ON

STO

RM

WA

TER

MA

NA

GEM

ENT

OPE

RA

TIO

N &

MA

INTE

NA

NC

E S

CH

EDU

LE

x x x xZON

ING

AC

TIO

N:

MU

NIC

IBO

UN

D

ARR

OW

ELN

EWPO

R

RO

MEM

LINC

SNYDER

HIL

DOUS

CISC

SH

PLA T G

CO CR

BRO

OKFI

LABAR

BRU

NN

E

WC

OVE

FURNAC

Existing Use:

Vacant Vacant Proposed U

se:Record Storage/Autom

otive Garage

Record Storage/Autom

otive Garage N

o. Lots/U

nits: 1/1 1/1 N

o. Acres:0.37 Ac. 0.37 Ac. D

ensity:2.7 U

nits/Ac. 2.7 Units/

Ac. Source of Sewer:

Public Public Source of W

ater:Public Public Proposed

SHEET

TITLE TITLE TITLE 1.

CO

VER SH

EET CO

VER

SHEET 2.FIN

AL LAND

DEVELO

PMEN

T PLAN FIN

AL LAND

D

EVELOPM

ENT PLAN

3.PO

ST-CO

NSTR

UC

TION

STO

RM

WATER

MAN

AGEM

ENT PLAN

POST-C

ON

STRU

CTIO

N

STOR

MW

ATER M

ANAG

EMEN

T PLAN 4.

GR

ADIN

G AN

D

UTILITY PLAN

GR

ADIN

G AN

D U

TILITY PLAN 5.

ERO

SION

AND

SED

IMEN

TATION

CO

NTR

OL PLAN

ERO

SION

AND

SED

IMEN

TATION

CO

NTR

OL PLAN

6.D

ETAILSDETAILS

Diehm

& Sons, Inc. hereby states that, pursuant to the provisions of & Sons, Inc. hereby states that, pursuant to the provisions of & Sons, Inc. hereby states that, pursuant to the provisions of Sons, Inc. hereby states that, pursuant to the provisions of Sons, Inc. hereby states that, pursuant to the provisions of Inc. hereby states that, pursuant to the provisions of Inc. hereby states that, pursuant to the provisions of hereby states that, pursuant to the provisions of hereby states that, pursuant to the provisions of states that, pursuant to the provisions of states that, pursuant to the provisions of that, pursuant to the provisions of that, pursuant to the provisions of pursuant to the provisions of pursuant to the provisions of to the provisions of to the provisions of the provisions of the provisions of provisions of provisions of of of Act N

o. 287 of Decem

ber 10, 1974, as am

ended by Act No. 121 of N

o. 287 of Decem

ber 10, 1974, as am

ended by Act No. 121 of N

o. 287 of Decem

ber 10, 1974, as am

ended by Act No. 121 of 287 of D

ecember 10,

1974, as amended by Act N

o. 121 of 287 of Decem

ber 10,

WARW

ICK TO

WN

SHIP FIN

AL PLAN APPR

OVAL C

ERTIFICATE At

a meeting held on _______, 20__, the Board of Supervisors of

Warw

ick Township approved this project, including the com

plete set of plans and inform

ation which are filed w

ith the Township in File N

o. __________, based upon its conform

ity with the standards of the

Warw

ick Township Subdivision and Land D

evelopment O

rdinance.

WARW

ICK TO

WN

SHIP PLAN

NIN

G C

OM

MISSIO

N FIN

AL PLAN

REVIEW

CERTIFIC

ATE At a meeting held on _________,20__

the Warw

ick Township Planning C

omm

ission reviewed this plan.

CERTIFIC

ATION

OF AC

CU

RAC

Y (SURVEY AN

D PLAN

) I hereby certify that, to the best of m

y knowledge, the survey and

plan shown and described hereon, is true and correct to the

accuracy required by the Warw

ick Township Subdivision and

Land Developm

ent Ordinance. D

ate: Tim

othy D

. Diehm

, P.L.S.

STOR

M D

RAIN

AGE PLAN

CERTIFIC

ATION

I hereby certify that, to the best of m

y knowledge, the storm

drainage facilities show

n and described hereon are designed in conform

ance with the W

arwick Tow

nship Stormw

ater M

anagement O

rdinance. Date:

Kevin Varner, P.E.

CERTIFIC

ATE OF O

WN

ERSH

IP, ACKN

OW

LEDG

MEN

T OF PLAN

AN

D O

FFER O

F DED

ICATIO

N, C

OU

NTY O

F LANC

ASTER,

CO

MM

ON

WEALTH

OF PEN

NSYLVAN

IA On this, the _____ day of

_______________, 20___, before me, the this, the _____ day of

_______________, 20___, before me, the this, the _____ day of

_______________, 20___, before me, the the _____ day of

_______________, 20___, before me, the the _____ day of

_______________, 20___, before me, the _____ day of

_______________, 20___, before me, the _____ day of

_______________, 20___, before me, the day of _______________,

20___, before me, the day of _______________, 20___, before m

e, the of _______________, 20___, before m

e, the of _______________, 20___, before m

e, the _______________, 20___,

CAR

BON

ATE GEO

LOG

Y CERTIFIC

ATION

I hereby certify that the proposed storm

water detention facilities are

underlain by carbonate geology. Date:

C J

Conapitski, P.G

.

1.Benchm

ark: Fire Hydrant Bonnet Bolt over m

ain outlet, Elevation = 417.81. Benchmark: Fire

Hydrant Bonnet Bolt over m

ain outlet, Elevation = 417.81. 2.W

arwick Tow

nship is not responsible for the construction or m

aintenance of any area not specifically dedicated Warw

ick Township is not

responsible for the construction or maintenance of any area not specifically dedicated Tow

nship is not responsible for the construction or m

aintenance of any area not specifically dedicated Township

is not responsible for the construction or maintenance of any area not specifically dedicated is not

responsible for the construction or maintenance of any area not specifically dedicated is not

responsible for the construction or maintenance of any area not specifically dedicated not

responsible for the construction or maintenance of any area not specifically dedicated not

responsible for the construction or maintenance of any area not specifically dedicated responsible

for the construction or maintenance of any area not specifically dedicated responsible for the

construction or maintenance of any area not specifically dedicated for the construction or

maintenance of any area not specifically dedicated for the construction or m

aintenance of any area not specifically dedicated the construction or m

aintenance of any area not specifically dedicated the construction or m

aintenance of any area not specifically dedicated construction or maintenance of

any area not specifically dedicated construction or maintenance of any area not specifically

dedicated or maintenance of any area not specifically dedicated or m

aintenance of any area not specifically dedicated m

aintenance of any area not specifically dedicated maintenance of any area

not specifically dedicated of any area not specifically dedicated of any area not specifically dedicated any area not specifically dedicated any area not specifically dedicated area not specifically dedicated area not specifically dedicated not specifically dedicated not specifically dedicated specifically dedicated specifically dedicated dedicated dedicated to the public use. There are no site facilities proposed for dedication to the Tow

nship. 3.There shall be provided and m

aintained a clear sight triangle easem

ent as shown on the plan. N

o structures, There shall be provided and m

aintained a clear sight triangle easement as show

n on the plan. No structures, shall be provided

and maintained a clear sight triangle easem

ent as shown on the plan. N

o structures, shall be provided and m

aintained a clear sight triangle easement as show

n on the plan. No structures, be

provided and maintained a clear sight triangle easem

ent as shown on the plan. N

o structures, be provided and m

aintained a clear sight triangle easement as show

n on the plan. No structures,

provided and maintained a clear sight triangle easem

ent as shown on the plan. N

o structures,

1.The project proposes to install the parking area and associated im

provements as part of phase I.

The proposed The project proposes to install the parking area and associated improvem

ents as part of phase I. The proposed project proposes to install the parking area and associated im

provements as

part of phase I. The proposed project proposes to install the parking area and associated im

provements as part of phase I. The proposed proposes to install the parking area and associated

improvem

ents as part of phase I. The proposed proposes to install the parking area and associated im

provements as part of phase I. The proposed to install the parking area and associated

improvem

ents as part of phase I. The proposed to install the parking area and associated im

provements as part of phase I. The proposed install the parking area and associated im

provements

as part of phase I. The proposed install the parking area and associated improvem

ents as part of phase I. The proposed the parking area and associated im

provements as part of phase I. The

1.The property ow

ner shall own, m

aintain and be responsible for all storm w

ater managem

ent facilities that are The property ow

ner shall own, m

aintain and be responsible for all storm w

ater m

anagement facilities that are proposed on the Storm

Water M

anagement Plan. 2.

The owner shall conduct a visual inspection of all storm

water m

anagement facilities at least

once every year for The owner shall conduct a visual inspection of all storm

water m

anagement

facilities at least once every year for the first 5 years, once every 3 years thereafter, and imm

ediately after storm

events exceeding 4 inches in depth. Such visual examination shall at least involve a

surface examination of the storm

water facilities for debris deposition, for soil and structural

settlement, depressions, sinkholes, seeps, structural cracking, anim

al burrows, excessive vegetation,

clogging, erosion and foundation movem

ent. Two copies of the inspection report shall be provided to

the Township w

ithin 60 days of completion of the inspection. 3.At a m

inimum

, maintenance shall

include maintaining good vegetative cover in law

n areas, the removal of debris At a m

inimum

, m

aintenance shall include maintaining good vegetative cover in law

n areas, the removal of debris

from the storm

water facility, conveyance system

s including roof gutters, and replacing dead vegetation w

ithin rain garden. 4.The ow

ner shall repair any damage to the storm

water

managem

ent facilities. Repairs shall be m

ade using The owner shall repair any dam

age to the storm

water m

anagement facilities. R

epairs shall be made using m

aterial that meets or exceeds the

specifications provided on the Stormw

ater Plan. The owner shall im

mediately notify W

arwick

At a meeting on _______________, 20___, the W

arwick Tow

nship Board of Supervisors approved the follow

ing waivers/m

odifications of the Warw

ick Tow

nship Subdivision and Land Developm

ent Ordinance (§285) and

Stormw

ater Managem

ent Ordinance (§270): §285-7.C

Submission of

Preliminary Plan Subm

ission of Preliminary Plan §285-27.J.(3)Im

provements

to existing streets Improvem

ents to existing streets §285-28.B.(1)Sidew

alks Sidewalks §285-28.C

.C

urbs Curbs §285-27.K(6)

Access Drive Intersection R

adii to be 20' Minim

um Access D

rive

At a meeting on June 10, 2015, in case no. 818, the W

arwick Tow

nship Zoning Hearing Board granted

variances of the a meeting on June 10, 2015, in case no. 818, the W

arwick Tow

nship Zoning Hearing

Board granted variances of the a meeting on June 10, 2015, in case no. 818, the W

arwick Tow

nship Zoning H

earing Board granted variances of the meeting on June 10, 2015, in case no. 818, the

Warw

ick Township Zoning H

earing Board granted variances of the meeting on June 10, 2015, in case

LANC

ASTER C

OU

NTY PLAN

NIN

G C

OM

MISSIO

N'S R

EVIEW

CERTIFIC

ATE The Lancaster County Planning C

omm

ission, as required by the Pennsylvania M

unicipalities Planning Code, Act 247 of

1968, as amended, review

ed this plan on ___________ __, 2017, and a copy of the review

is on file at the office of the Planning Com

mission in

LCPC

File No. ________ This certificate does not indicate approval or

disapproval of the plan by the Lancaster County Planning C

omm

ission, and the com

mission does not represent nor guarantee that this plan

STOR

MW

ATER FAC

ILITIES ACKN

OW

LEDG

MEN

T We hereby

acknowledge the storm

water m

anagement facilities to be perm

anent fixtures that cannot be altered or rem

oved unless a revised plan is approved by the Tow

nship. _________________________ Michael V.

Palasz

Page 2: FINAL LAND DEVELOPMENT PLAN MICHAEL PALASZ

TOLL

GA

TE R

OA

D (

T-65

5)

PRO

POSE

DB

UIL

DIN

G

FINAL LAND DEVELOPMENTPLAN

GR

APH

IC S

CA

LE:

1 in

ch =

20

ft.

MICHAEL PALASZ

IN

WARWICK TOWNSHIP , LANCASTER COUNTY , PA

15 Toll Gate RoadLititz, PA 17543P: 717.626.0175F: 717.626.5021

www.diehmandsons.com

Surveying & Mapping Civil Engineering

Land Planning

DIEHMExperience Trust Solutions

& SONS

LEG

END

SANITARY SEW

ER &

6'W X 2.2'H

BO

X CU

LVERT

INV=4

SANITARY SEW

ER &

DR

AINAG

E EASEMEN

T

EX.

EX. SAN

ITARY SEWER

EASEM

E

EX. 150' CLEAR

SIG

HT TR

IANG

LE

EX. 150' CLEAR

EX.

APPRO

X. LOC

ATION

O

F 8" WATER

LINE

LAN

S74°56'0 N75°28'3

M SD

EX.

9 EX.

5 EX.

4 EX.

MIN

. BUILD

ING

SETBAC

K LINE

EX.

MIN

. PARKIN

G

SETBACK LIN

E

EXIST. 249'

REQ

UIR

ED

249'LEFT: 0%

%

SIGH

T D

ISTANC

E

FOR

PRO

P. DR

IVE (35 M

PH ASSU

MED

)

RIG

HT:

-1%R

EQU

IRE

D 252'EXIST. 252'

PRO

P. C

LEAR

SIGH

T ESM

T.

10

S14°31'

EX. LAN

DSCAP

EX. EDG

E OF

EX. EDG

E OF

EX. RIG

HT-

EX. RIG

HT-

5 PRO

P. PARKIN

G

SPACES

3 PRO

P. PARKIN

G

UN

UN

GD

ELEC. & C

ABLE (APP

EX.

EX. U

TILITY EASEM

E

(AP APPRO

X. LO

CATI

ON

SAN

ITARY SEW

ER

PRESSU

RE LIN

E

EX. SAN

ITARY

PRO

P. EDG

E

MIN

. BLDG

. M

IN. BLD

G.

MIN

. PARKIN

G

EX. SAN

ITARY SEWER

EASEM

E

N

EX. ED

GE

OF

MAC

AD

AM

PARKI

NG

LO

T

U/

G

APPROX

. LOCA

TION

EX. 2"

3/4" W

ATER

APPROX.

LOCA

TION

SAN

ITARY SE

N/F Joseph E Estes

N/F Bill L. W

hittaker & C

hristine M. R

unnels

N/F D

ove Christian

Fellowship D

eed

N/F Tim

othy D.

Diehm

Deed

N/F John A. G

arman &

Steven L. Garm

an Deed

N/F C

ornerstone Real Estate

Michael V. Palasz

Deed 5384-94 Account

600-96241-00000 SPB

PRO

POSED

EX. WATER

LATER

AL

PRO

POSED

4' WID

E LAN

DSC

APE BED EX. INLET

T.G.=415.

74

15" SLC

P

EX

Pro She

Page 3: FINAL LAND DEVELOPMENT PLAN MICHAEL PALASZ

FURNACE HILLS PIKE (SR 0501)

TOLL

GA

TE R

OA

D (

T-65

5)

PRO

POSE

D

BUIL

DIN

G

DET

AIN

EDD

RA

INA

GE

AR

EAU

ND

ETA

INED

DR

AIN

AG

E A

REA

FURNACE HILLS PIKE (SR 0501)

TOLL

GA

TE R

OA

D (

T-65

5)

DR

AIN

AG

EA

REA

POST - CONSTRUCTION STORMWATER MANAGEMENT PLAN

GR

APH

IC S

CA

LE:

1 in

ch =

20

ft.

MICHAEL PALASZ

IN

WARWICK TOWNSHIP , LANCASTER COUNTY , PA

15 Toll Gate RoadLititz, PA 17543P: 717.626.0175F: 717.626.5021

www.diehmandsons.com

Surveying & Mapping Civil Engineering

Land Planning

DIEHMExperience Trust Solutions

& SONS

PRE-

DEV

ELO

PMEN

T

POST

-DEV

ELO

PMEN

T

BENC

HSAN

ITARY SEWER

& D

RAIN

AGE

EASEMEN

T

6'W X 2.2'H

BO

X C

ULVERT

INV=

WITH

EX.

T.G.=4

INV=4

INV=4

S30

SANITARY

SEWER

IN

V=4R

IM=4

PRESS

SANITAR

OF

APPRO

X.

EX. SANI

EX.

2450 sq. ft EX.

5 EX4 EX

EX.

F.F.=420.

EX. LA

EX.

CLE

UN

UNGD ELE

EX. U

TILITY EASEMEN

T

APPRO

X. LO

CATIO

N O

F EX. 10" W

ATER

LINE

APPRO

X.

(A

APPRO

X. LO

CATIO

N O

F

APPROX. LOCAT

OF

SANITAR

EX. EX. SAN

ITARY LATER

EX. PAIN

T

EX. 4" YELLO

EX. 4" W

HI

TE

EX. C

ON

C.

EX. C

ON

C.

EX. SANI

EX. 18"

POST

ED

SPEED

LIM

IT = 45 M

PH

EX.

EX. EDGE OF

U/

3/4" WATER

A

EX. TYPE

EX. 4" YELLO

FFE=418PR

OPO

SED

4" RO

OF

LEADER

@

PRO

POS

ED

OU

TLETPR

OPO

SED

CO

NC

RETE PAD

EX. WATER

SA

EX. INLET

T.G.=415.74

15"

4

414.415.

SANITARY SEW

ER &

DR

AINAG

E EASEM

ENT

6'W X 2.2'H

BO

X C

ULVERT

INV=

WITH

EX.

T.G.=4

INV=4

INV=4

S30

SANITARY

SEWER

IN

V=4R

IM=4

PRESS

SANITAR

OF

APPRO

X.

EX. SANI

EX.

2450 sq. ft EX.

5 EX4 EX

EX.

F.F.=420.

EX. LA

EX.

CLE

UN

UNGD ELEC

EX. U

TILITY EASEMEN

T

APPRO

X. LO

CATIO

N O

F EX. 10" W

ATER

LINE

APPRO

X.

(A

APPRO

X. LO

CATIO

N O

F

APPROX. LOCAT

LOC

OF

SANITAR

EX. EX. SAN

ITARY LATER

DbB

DbA

DbB

DbB

DbB

EX. PAIN

T

EX. 4" YELLO

EX. 4" W

HI

TE

EX. C

ON

C.

EX. C

ON

C.

EX. SANI

EX.

POST

ED

SPEED

LIM

IT = 45 M

PH

EX.

EX. EDGE OF

U/

3/4" WATER

A

EX. TYPE

EX. 4" YELLO

EX. WATER

SA

EX. INLET

T.G.=415.74

15"

Pro She

Page 4: FINAL LAND DEVELOPMENT PLAN MICHAEL PALASZ

TOLL

GA

TE R

OA

D (

T-65

5)

PRO

POSE

DB

UIL

DIN

G

GRADING AND UTILITY PLAN

GR

APH

IC S

CA

LE:

1 in

ch =

20

ft.

MICHAEL PALASZ

IN

WARWICK TOWNSHIP , LANCASTER COUNTY , PA

15 Toll Gate RoadLititz, PA 17543P: 717.626.0175F: 717.626.5021

www.diehmandsons.com

Surveying & Mapping Civil Engineering

Land Planning

DIEHMExperience Trust Solutions

& SONS

LEG

END

SANITARY SEW

ER &

6'W X 2.2'H

BO

X CU

LVERT

INV=4

SANITARY SEW

ER &

DR

AINAG

E EASEMEN

T

EX.

EX. SAN

ITARY SEWER

EASEM

E

EX.

APPRO

X. LOC

ATION

O

F 8" WATER

LINE

LAN

M SD

EX.

9 EX.

5 EX.

4 EX.

EX.

EX. LAN

DSCAP

EX. EDG

E OF

EX. EDG

E OF

EX. RIG

HT-

EX. RIG

HT-

UN

UN

GD

ELEC. & C

ABLE (APP

EX.

EX. U

TILITY EASEM

E

(AP APPRO

X. LO

CATI

ON

SAN

ITARY SEW

ER

PRESSU

RE LIN

E

EX. SAN

ITARY

PRO

P. EDG

E EX. SAN

ITARY SEWER

EASEM

E

N

EX. ED

GE

OF

MAC

AD

AM

PARKI

NG

LO

T

U/

G

APPROX

. LOCA

TION

EX. 2"

3/4" W

ATER

APPROX.

LOCA

TION

SAN

ITARY SE

N/F Joseph E Estes

N/F Bill L. W

hittaker & C

hristine M. R

unnels

N/F D

ove Christian

Fellowship D

eed

N/F Tim

othy D.

Diehm

Deed

N/F John A. G

arman &

Steven L. Garm

an Deed

N/F C

ornerstone Real Estate

Michael V. Palasz

Deed 5384-94 Account

600-96241-00000 SPB

PRO

PO4" R

OO

F

PRO

POSE

D O

UTLET

PRO

POSED

EX. WATER

LATER

AL

EX. INLET

T.G.=415.

74

15" SLC

P

EX

4

Pro She

Page 5: FINAL LAND DEVELOPMENT PLAN MICHAEL PALASZ

TOLL

GA

TE R

OA

D (

T-65

5)

X

PRO

POSE

DB

UIL

DIN

G

STA

BIL

IZED

CO

NST

RU

CTI

ON

ENTR

AN

CE

STO

NE

FILT

ERB

ERM

18"

SILT

FEN

CE

XX

X

X

X

XX

XX

LIM

IT O

FD

ISTU

RB

AN

CE

0.35

AC

RES

TSP

N.A

.G. S

75 E

RO

SIO

NC

ON

TRO

L M

ATT

ING

18"

SILT

FEN

CE

INLE

TPR

OTE

CTI

ON

EROSION AND SEDIMENTATIONCONTROL PLAN

GR

APH

IC S

CA

LE:

1 in

ch =

20

ft.

MICHAEL PALASZ

IN

WARWICK TOWNSHIP , LANCASTER COUNTY , PA

15 Toll Gate RoadLititz, PA 17543P: 717.626.0175F: 717.626.5021

www.diehmandsons.com

Surveying & Mapping Civil Engineering

Land Planning

DIEHMExperience Trust Solutions

& SONS

ERO

SIO

N &

SED

IMEN

TATI

ON

CO

NTR

OL

LEG

END

:

XX

XX

T S

P

LEG

END

SANITARY SEW

ER &

6'W X 2.2'H

BO

X CU

LVERT

INV=4

SANITARY SEW

ER &

DR

AINAG

E EASEMEN

T

EX.

EX. SAN

ITARY SEWER

EASEM

E

EX.

APPRO

X. LOC

ATION

O

F 8" WATER

LINE

LAN

MSE D

EX.

9 EX.

4 EX.

EX.

EX. LAN

DSCAP

UN

UN

GD

ELEC. & C

ABLE (APP

EX. U

TILITY EASEM

E

(AP APPRO

X. LO

CATI

ON

SAN

ITARY SEW

ER

PRESSU

RE LIN

E

EX. SAN

ITARY

SOILS

BOU

ND

ARY

SOIL

S BOU

ND

ARY

PRO

P. EDG

E EX. SAN

ITARY SEWER

EASEM

E

N

U/

G

APPROX

. LOCA

TION

EX. 2"

3/4" W

ATER

APPROX.

LOCA

TION

SAN

ITARY SE

Michael V. Palasz

Deed 5384-94 Account

600-96241-00000 SPB

PRO

PO4" R

OO

F

PRO

POSE

D O

UTLET

PRO

POSED

EX. WATER

LATER

AL

EX. INLET

T.G.=415.

74

15" SLC

P

EX

4

Pro She

* IND

ICATES PR

IME

ERO

SION

AND

SEDIM

ENTATIO

N C

ON

TRO

L NAR

RATIVE A.

GEN

ERAL

STATEMEN

T OF TH

E PRO

JECT G

ENER

AL STATEMEN

T OF TH

E PRO

JECT 1.

Michael Palasz operates Lititz O

rthodontics at 4 Toll Gate R

oad and owns a

vacant lot to Michael Palasz operates Lititz O

rthodontics at 4 Toll Gate R

oad and owns

a vacant lot to the west of the business. D

r. Palasz proposes to construct a 2,000 square foot building for storage of records, storage of autom

obiles, and parking on the vacant lot. The vacant lot is currently law

n with a sw

ale located to the north conveying flow

s to a box culvert under Toll Gate R

oad. 2.Storm

water m

anagement w

ill be accom

plished by a rain garden. Storm w

ater managem

ent will be accom

plished by a rain garden. 3.

The Lancaster County C

onservation District shall be contacted at least

seven (7) days prior The Lancaster County C

onservation District shall be contacted at

least seven (7) days prior to initiation of earthmoving activities on the site. 4.

Per the requirements of Pa. C

ode Title 25 Chapter 102, a copy of the erosion and

Per the requirements of Pa. C

ode Title 25 Chapter 102, a copy of the erosion and

sedimentation control plan and its accom

panying staging narrative shall be available at the site during construction until all areas have been stabilized. 5.

Accelerated erosion and sedimentation shall be lim

ited by the stabilization of disturbed areas Accelerated erosion and sedim

entation shall be limited by the

stabilization of disturbed areas as soon as possible (See Section D., STAG

ING

OF

EARTH M

OVIN

G AC

TIVITIES). 6.All disturbed areas to be law

n shall be seeded and m

aintained imm

ediately. All disturbed areas to be lawn shall be seeded and

maintained im

mediately. 7.

Construction should begin in the Spring of 2018.

Construction should begin in the Spring of 2018. B.

TOPO

GR

APHIC

FEATUR

ES OF

THE PR

OJEC

T TOPO

GR

APHIC

FEATUR

ES OF TH

E PRO

JECT 1.

The location of the site, contours, property lines, acreage and all other physical features are The location of the site, contours, property lines, acreage and all other physical features are show

n on the plan. C.

SOILS IN

FOR

MATIO

N SO

ILS IN

FOR

MATIO

N 1.

Following is a list of soil types w

ithin the disturbed areas: Follow

ing is a list of soil types within the disturbed areas: D

bA - Duffield Silt Loam

, 0 to 3 percent slopes. D

bB - Duffield Silt Loam

, 3 to 8 percent slopes. 2.Soil type use lim

itations per Lancaster County Soil Survey: Soil type use

limitations per Lancaster C

ounty Soil Survey: Following is a list of potential soil type

use limitations specific to these soil types that w

ould apply to this development: a.

Severe slope: Proper erosion control measures shall be taken. G

rading shall be done in Severe slope: Proper erosion control m

easures shall be taken. Grading shall

be done in such a manner as to not have a negative im

pact on structures and surrounding areas. b.

Depth to bedrock: D

ue to the potential presence of shallow

bedrock, blasting may be D

epth to bedrock: Due to the potential presence of shallow

bedrock, blasting m

ay be necessary to assist in excavation. Blasting shall be kept to a m

inimum

. c.Low

strength: The strength of the on-site soils shall be taken into account in the Low

strength: The strength of the on-site soils shall be taken into account in the design and construction of the on-site facilities and structures. If necessary, special m

easures shall be incorporated to mitigate the strength of the soils,

such as the installation of geo-textile fabrics or mem

branes. d.Shrink-sw

ell potential: This shall be taken into consideration for footing design and Shrink-sw

ell potential: This shall be taken into consideration for footing design and installation, and all load bearing im

provements. e.Area reclaim

: Proper topsoil placement, liners, m

ulch, and erosion control m

easures shall Area reclaim: Proper topsoil placem

ent, liners, mulch,

and erosion control measures shall be utilized to reestablish vegetation. f.

Hard to pack: Fill m

aterial shall be laid in layers thin enough to allow for sufficient

Hard to pack: Fill m

aterial shall be laid in layers thin enough to allow for sufficient

compaction. D

.STAGIN

G O

F EARTH M

OVIN

G AC

TIVITIES STAGIN

G O

F EARTH

MO

VING

ACTIVITIES 1.

1.C

ontact the Lancaster County C

onservation District at

least 7 days in advance of the 1.C

ontact the Lancaster County C

onservation D

istrict at least 7 days in advance of the Contact the Lancaster C

ounty Conservation

District at least 7 days in advance of the start of earthm

oving (717) 299-5361, extension 5. 2.

Install stabilized construction entrance at location shown on the plan.

All construction Install stabilized construction entrance at location shown on the plan.

All construction vehicles shall enter and leave the site at this location. 3.Install inlet protection and silt fence below

all areas to be disturbed as shown.

Install inlet protection and silt fence below all areas to be disturbed as show

n. 4.Strip topsoil from

the storm w

ater facility area. Stockpile topsoil at the location show

n on Strip topsoil from the storm

water facility area. Stockpile topsoil at the

location shown on the plan. Stockpiles w

hich are to remain shall be seeded per

temporary seeding schedule and m

ulched. 5.Begin installation of storm

water facility.

Install the outlet structure and basin discharge Begin installation of storm w

ater facility. Install the outlet structure and basin discharge pipe, along w

ith the rip-rap apron. Install the stone filter berm

on the outlet structure as shown on the plan and in the

construction details. Imm

ediately seed and stabilize the storm w

ater detention basin and any associated disturbed areas in accordance w

ith the permanent control

measures. 6.

Strip topsoil from the drivew

ay, parking, and building area. Stockpile topsoil at location Strip topsoil from

the driveway, parking, and building area. Stockpile

topsoil at location shown on the plan. 7.

Rough grade the proposed areas and install

stone base imm

ediately in order to provide Rough grade the proposed areas and install

stone base imm

ediately in order to provide stabilization. 8.U

pon stabilization to rain garden, convert rain garden from

erosion control to storm w

ater Upon stabilization

to rain garden, convert rain garden from erosion control to storm

water facility. 9.

Imm

ediately seed and mulch all areas to becom

e lawn and encourage

stabilization as quickly Imm

ediately seed and mulch all areas to becom

e lawn and

encourage stabilization as quickly as possible. 10.Tem

porary erosion and sedim

entation controls shall remain in place until building construction Tem

porary erosion and sedim

entation controls shall remain in place until building construction has

been completed and site has reached a m

inimum

of 70% stabilization. 11.

Upon a m

inimum

of 70% stabilization of all areas, tem

porary sediment control

facilities may U

pon a minim

um of 70%

stabilization of all areas, temporary sedim

ent control facilities m

ay be removed. E.TEM

POR

ARY CO

NTR

OL M

EASUR

ES AND

FAC

ILITIES TEMPO

RARY C

ON

TRO

L MEASU

RES AN

D FAC

ILITIES 1.Topsoil Stockpiles Topsoil Stockpiles a.

Stockpiles shall be used to contain all stripped topsoil in a lim

ited area in order to keep Stockpiles shall be used to contain all stripped topsoil in a lim

ited area in order to keep the disturbed are to a minim

um. b.

Stockpiles shall be stabilized with a tem

porary cover crop of annual ryegrass (1 lb./1000 Stockpiles shall be stabilized w

ith a temporary cover crop of annual ryegrass

(1 lb./1000 square feet) or winter rye (3.5 lb./1000 square feet) in accordance w

ith accepted seeding practices. c.In the event that excess topsoil or excavated m

aterial m

ust be removed from

the site, In the event that excess topsoil or excavated material

must be rem

oved from the site, an erosion & sedim

entation control plan for all off-site disposal areas w

ill be required. 2.Stabilized C

onstruction Entrance Stabilized C

onstruction Entrance a.This entrance protection facility shall be used to keep storm

water from

flowing This entrance protection facility shall be used to keep storm

water

from flow

ing unchecked from the site and to collect sedim

ent off of construction vehicles. b.

All construction vehicles shall enter and leave the site at this point. All construction vehicles shall enter and leave the site at this point. 3.

Silt Fence Silt Fence a.Silt fence shall be located as show

n on the plan to slow

runoff from drainage w

ays and Silt fence shall be located as shown on the plan to slow

runoff from

drainage ways and exposed banks and to prevent sedim

ent from flow

ing

F.PER

MAN

ENT C

ON

TRO

L MEASU

RES PER

MAN

ENT C

ON

TRO

L M

EASUR

ES 1.Permanent G

rass or Legume C

over Permanent G

rass or Legum

e Cover a.

All disturbed areas that are not to be paved shall be covered w

ith grass or a All disturbed areas that are not to be paved shall be covered w

ith grass or a legume in order to m

inimize erosion. b.Perm

anent cover shall be applied per the follow

ing seeding schedule, as per Permanent

cover shall be applied per the following seeding schedule, as per Penn D

OT's

Publication #408, Section 804, and manufacture's seeding rate

recomm

endations: Seed Type %

by Wt

Seeding Dates

% by W

tSeeding D

ates % by W

tSeeding D

ates Seeding Dates

Formula A C

rownvetch

100%N

ov 1 to Aug 31 100%N

ov 1 to Aug 31 N

ov 1 to Aug 31 (Coronilla varia, var. Penngift) Form

ula B Redtop

5%M

ar 1 to June 1 5%M

ar 1 to June 1 Mar 1 to June 1 (Agrostis alba)

Fescue, Pennlawn R

ed45%

Aug 1 to Oct 1 45%

Aug 1 to Oct 1 Aug 1 to

Oct 1 (Festuca rubra, Pennlaw

n) Bluegrass, Kentucky50%

50% (Poa

pratensis) (Choose any tw

o of these certified varieties for a total of 50%) D

elta25%

25% Kenblue

25% 25%

New

port25%

25% Park

25% 25%

South D

akota Certified

25% 25%

Formula C

Crow

nvetch45%

Nov 1 to Aug 31 45%

Nov 1 to Aug 31 N

ov 1 to Aug 31 (Coronilla

varia, var. Penngift) R

yegrass, Annual55%

55%

(Lolium m

ultiflorum) Form

ula D Fescue, Kentucky 31, Tall80%

Mar 1 to June

1 80%M

ar 1 to June 1 Mar 1 to June 1 (Festuca arundinacea var

Aug 1 to Oct 1 Aug 1 to O

ct 1 Kentucky 31) Fescue, Pennlawn R

ed20%

20% (festuca rubra var. Pennlaw

n) 2.M

ulch Mulch a.

Straw m

ulch shall be applied to seeding areas to help establish a perm

anent Straw m

ulch shall be applied to seeding areas to help establish a perm

anent grass cover and to prevent erosion. b.It shall be applied at a

rate of 3 tons per acre. It shall be applied at a rate of 3 tons per acre. c.M

ulch shall be applied as a means of achieving perm

anent site stabilization of M

ulch shall be applied as a means of achieving perm

anent site stabilization of disturbance areas in non-germ

inating seasons. 3.Lim

e and Fertilizer Lime and Fertilizer a.

Lime and fertilizer shall be

applied as required to obtain a uniform erosion Lim

e and fertilizer shall be applied as required to obtain a uniform

erosion resistant perennial vegetative coverage or density of 70%

across all disturbed areas. b.Apply 1 ton of

agricultural limestone per acre plus fertilizer at the rate of Apply 1 ton of

agricultural limestone per acre plus fertilizer at the rate of 50-50-50 fertilizer

mix per acre, and w

ork in where possible, is recom

mended. Secure a soil test

before making a perm

anent seeding. 4.M

ulch with m

ulch control netting or erosion control blankets m

ust be installed on Mulch w

ith mulch control netting

or erosion control blankets must be installed on all slopes 3:1 and steeper. 5.

In areas where stabilization is found to be difficult, developer m

ay install sod. Sod In areas w

here stabilization is found to be difficult, developer may

install sod. Sod material and installation shall conform

to "Guideline

Specification to Sodding" by the American Sod Producer Association. G

.M

AINTEN

ANC

E MAIN

TENAN

CE 1.

All sediment and erosion

control facilities shall be checked for damage on a w

eekly All sediment and

erosion control facilities shall be checked for damage on a w

eekly basis and after each storm

. All facilities that are damaged, clogged or can no longer do

the job they were designed for, shall be repaired or replaced to ensure

effective and efficient operation. 2.Any perm

anent seeded areas that becom

e eroded shall have the topsoil replaced, Any permanent seeded areas

that become eroded shall have the topsoil replaced, the grass seed re-sow

n and m

ulch reapplied, or, at the direction of the developer, sod may be installed.

H.

WASTE D

ISPOSAL W

ASTE DISPO

SAL 1.All building m

aterials and w

astes must be rem

oved from the site and recycled or All building m

aterials and w

astes must be rem

oved from the site and recycled or disposed in

accordance with the D

epartment's Solid W

aste Managem

ent Regulations at 25

Pa. Code 260.1 et. Seq., Sec. 271.1 et. Sq., and Sec. 287.1 et. Seq. N

o building m

aterial or wastes or unused building m

aterials shall be buried, dum

ped, or discharged at the site. I.OW

NER

/DEVELO

PER O

WN

ER/

DEVELO

PER (Party responsible for im

plementation and m

aintenance of erosion and sedim

entation control facilities.) Individual Lot Ow

ner at Time of

Disturbance

Page 6: FINAL LAND DEVELOPMENT PLAN MICHAEL PALASZ

DETAIL SHEETMICHAEL PALASZ

IN

WARWICK TOWNSHIP , LANCASTER COUNTY , PA

15 Toll Gate RoadLititz, PA 17543P: 717.626.0175F: 717.626.5021

www.diehmandsons.com

Surveying & Mapping Civil Engineering

Land Planning

DIEHMExperience Trust Solutions

& SONS

RA

IN

GA

RD

EN

DET

AIL

STO

NE

FIL

TER

AT

OU

TLET

RIP

- R

AP

SC

HED

ULE

BIT

UM

INO

US

PA

VIN

G S

ECTI

ON

END

WA

LL A

ND

RIP

-RA

P D

ETA

ILR

OO

F L

EAD

ER A

ND

RA

IN G

AR

DEN

STO

NE

FIL

TER

BER

M D

ETA

IL

STA

BIL

IZED

C

ON

STR

UC

TIO

N

ENTR

AN

CE

STA

ND

AR

D

FILT

ER

FAB

RIC

FE

NC

E (

18"

H

IGH

)ST

EEL

OR

IFIC

E P

LATE

FILT

ER

BA

G

INLE

T P

RO

TEC

TIO

N

DET

AIL

Pro She

2" LAYER O

F SH

RED

DED

MU

LCH

, LEAF C

OM

POST, O

R

SOIL M

IX SHALL BE

AASHTO

CLEAN

BASI

EN

12" DEPTH

SOIL M

IX. MIX

LIGH

T CO

MPAC

TION

O

F SOIL M

IX BY HAN

D

EDG

E TO

THO

RO

U

2 1/2" BITUM

INO

US

NO

TES: 1.TH

IS IS A MIN

IMU

M STAN

DAR

D AN

D

18

M

3

BOTTO

M AR

EAS OF TH

E BASIN SH

ALL BE PLANTED

WITH

"TU

RF PER

FECT LO

W M

AINTEN

ANC

E" SEEDIN

G W

HIC

H IS

CO

MPR

ISED O

F THE FO

LLOW

ING

: 34% STO

NEH

ENG

E H

ARD

FESCU

E 33% G

IBRALTAR

CR

EEPING

RED

FESCU

E 33%

MAG

IC C

HEW

ING

S FESCU

E THIS SEED

MIX IS

AVAILABLE FRO

M R

OH

RER

SEEDS, P.O

. BOX 250, 2472 O

LD

PHILAD

ELPHIA PIKE, SM

OKETO

WN

PA 17576; PH. (717)

299-2571 PERM

ANEN

T AND

FULL ESTABLISH

MEN

T OF TH

E SPEC

IFIED BM

P SEED M

IXTUR

E (OR

APPRO

VED EQ

UAL) IS