FINAL Geotechnical Exploration Al-Bassoni Dam

TRANSCRIPT

  • E

    Februa

    1 1 T

    fo

    th

    W 1 T

    G

    c

    B

    c

    A

    fo

    G

    th

    Enma Group

    ary, 2012

    1. INTRO

    1.1 Author

    This soil in

    or Design

    he Center

    Water Reso 1.2 Site Loc

    The area o

    Governora

    centere of

    Baghdad. A

    constructio

    Audhaem D

    ollowing U

    X Y

    Google ea

    he Al-Bass

    p for Design

    Al-Bass

    DUCTION

    rization

    nvestigatio

    and Engi

    of Studies

    ources.

    cation

    of the pre

    ate in the

    Salah El-D

    An earth d

    on in Al-D

    Dam and

    UTM Coord

    Right B4518

    38247

    rth progra

    soni Dam a

    Fig. (E

    n and Engin

    soni Dam /

    N

    on was car

    ineering C

    s and Engi

    esent study

    north of

    Deen, is lo

    dam, Al-B

    Dour distri

    about 4.0

    dinates:

    Bank 66

    723

    am is use

    as shown i

    1 Al-Basson(Earth Goog

    neering Con

    / Salah El-D

    rried out b

    Consultanc

    ineering D

    y is locate

    Baghdad.

    ocated ab

    Bassoni Da

    ict at abo

    km from

    Mid 451766

    3824662

    d to show

    n Fig. 1.

    ni Dam locagle image)

    nsultancy

    Deen Gover

    by the En

    cy at the

    Designs M

    ed in Sala

    The city

    out 160 km

    am, is pro

    out 3.5 km

    Al-Deloue

    Le4

    3

    w a scale p

    ation

    rnorate 1

    nma Group

    request o

    Ministry o

    ah El-Deen

    of Tikret

    m north o

    oposed for

    m from Al

    eia weir a

    eft Bank 451659

    3824584

    picture for

    1

    p

    f

    f

    n

    ,

    f

    r

    -

    at

    r

  • E

    Februa

    1 T

    s

    c

    m

    a

    p

    d

    p

    a

    1

    2

    3

    4

    5

    2

    2 T

    a

    p

    p

    w

    b

    e

    s

    d

    Enma Group

    ary, 2012

    1.3 Purpos

    The main p

    ubsurface

    conditions

    make engi

    and found

    parameters

    design of

    purposes o

    as follows:

    . To ide

    chemica

    2. To esticompre

    safe and

    3. To sugcapacity

    the foun

    4. To invesupport

    5. To find the cons

    2. FIELD

    2.1 Bore

    The purpos

    and engine

    proposed d

    proposed q

    were drille

    boreholes

    excavated

    and and c

    dam site.

    p for Design

    Al-Bass

    se of Soil In

    purpose o

    e condition

    with respe

    ineering r

    dations. F

    s that ma

    facilities a

    of the exp

    entify the

    al propert

    mate the

    essibility o

    d economi

    ggest the

    y if piles a

    ndation in

    estigate the

    t the propo

    out the su

    struction o

    D EXPLOR

    eholes loc

    se of the p

    eering pro

    dam, also

    quarries. T

    ed. They a

    ranged f

    in site pr

    clay. Figur

    n and Engin

    soni Dam /

    nvestigatio

    of the site

    ns at the

    ect to the p

    recommen

    Furthermo

    ay be use

    at the pro

    ploration p

    e subsoil

    ties up to c

    allowable

    of the soil

    ic foundati

    pile typ

    are found t

    the site.

    e validity

    osed struc

    uitable are

    of embank

    RATION

    cation

    present pr

    operties o

    to investig

    To achiev

    are numbe

    from 20 t

    roposed fo

    re 2 show

    neering Con

    / Salah El-D

    on

    e explorati

    project s

    proposed

    ndations fo

    ore, to o

    d in the

    oject site.

    program c

    engineer

    certain pre

    e bearing

    l for the p

    ion design

    e and to

    to be a sui

    of the site

    cture.

    eas to be u

    kments and

    roject is to

    of the soil

    gate the s

    e this pur

    ered 1 to

    to 25 m.

    or quarries

    ws a layout

    nsultancy

    Deen Gover

    ion is to d

    site, evalu

    constructi

    or site pre

    obtain soi

    civil and

    Consequ

    can be sum

    ring, phy

    edetermin

    g capacity

    purpose of

    n.

    estimate

    itable alter

    e as a fou

    used as qu

    d earth dam

    o find out

    l strata be

    oil proper

    pose, six

    6. The de

    Ten test

    s containin

    t of the ho

    rnorate 2

    determine

    uate these

    ion and to

    eparation,

    il design

    structural

    uently, the

    mmarized

    ysical and

    ned depth.

    y and the

    f the mos

    e the pile

    rnative for

    undation to

    uarries for

    ms.

    the nature

    eneath the

    rties of the

    boreholes

    epth of the

    pits were

    ng gravel

    oles in the

    2

    e

    e

    o

    n

    l

    e

    d

    d

    e

    t

    e

    r

    o

    r

    e

    e

    e

    s

    e

    e

    l,

    e

  • E

    Februa

    Enma Group

    ary, 2012

    Fig

    p for Design

    Al-Bass

    g. 2 Borehol

    n and Engin

    soni Dam /

    les Location

    neering Con

    / Salah El-D

    n with respe

    nsultancy

    Deen Gover

    ect to dam ax

    rnorate 3

    axis

    3

  • E

    Februa

    2 R

    s

    fo

    c

    h

    w

    T

    d

    p

    D

    c

    2

    T

    b

    e

    P

    2 2 P

    A

    a

    p

    p

    is

    In

    d

    b

    th

    u

    Enma Group

    ary, 2012

    2.2 Met

    Rotary driv

    amplers,

    or obtaini

    clayey m

    hydraulica

    were collec

    The Shelby

    disturbed

    placed in w

    Description

    carried ou

    2488.

    The test pit

    both mech

    extracted f

    Photograph

    2.3 Fiel

    2.3.1 Fiel

    Packer Me

    A packer is

    as a means

    packer me

    packer me

    s adopted

    n single p

    depth. The

    bottom of h

    he packer

    under an ap

    p for Design

    Al-Bass

    thod of Dr

    ving was u

    102 mm di

    ng undistu

    material i

    lly jacked

    cted from

    y tubes we

    and und

    wooden bo

    n of soils

    ut in accor

    ts were ex

    hanical an

    from the pi

    hs of field

    ld Tests

    d Permea

    ethod

    s an expan

    s of sealing

    ethods are

    ethods. For

    for perme

    packer me

    e packer

    hole and th

    r. The co

    pplied hea

    n and Engin

    soni Dam /

    rilling an

    used for ad

    iameter (S

    urbed sam

    is encou

    d into the

    the auger

    ere cover

    disturbed

    oxes.

    (Visual - M

    rdance wi

    xcavated to

    nd manu

    its in inter

    work are

    ability tes

    ndable rub

    g of a sect

    e used in

    r the pres

    eability pr

    thod the h

    is fixed a

    he water p

    nstant rat

    ad, H is fou

    neering Con

    / Salah El-D

    d Samplin

    dvancing th

    Shelby tub

    mples of h

    untered.

    e ground.

    r.

    red from b

    samples

    Manual Pr

    ith local c

    o a depth o

    al metho

    rvals of 1 m

    available

    sts

    bber sleev

    tion of bor

    practice,

    ent job sin

    rediction.

    hole is dri

    at a desir

    pumped in

    te of flow

    und.

    nsultancy

    Deen Gover

    ng

    he hole. Th

    bes) were

    high quali

    The tub

    Disturbed

    both ends

    were lab

    rocedure)

    codes and

    of around

    ds. Samp

    m in depth

    in Append

    ve. Packer

    rehole. Tw

    single an

    ngle packe

    lled to the

    ed level a

    nto the sect

    , q that i

    rnorate 4

    Thin walled

    employed

    ity when a

    bes were

    d samples

    with wax

    beled and

    has been

    d ASTM D

    3 m using

    ples were

    h.

    dix (E).

    rs are used

    wo types o

    nd double

    er method

    e required

    above the

    tion below

    is attained

    4

    d

    d

    a

    e

    s

    x;

    d

    n

    D

    g

    e

    d

    f

    e

    d

    d

    e

    w

    d

  • E

    Februa

    T

    th

    w

    T

    p

    P

    A

    w

    2 T

    o

    is1

    5

    b2

    la3

    Enma Group

    ary, 2012

    The coeffic

    he followin

    where k

    q

    r =

    H

    L =

    The table

    permeabili

    Peck.

    Degree o

    M

    V

    Im

    Appendix

    with value

    2.3.2 Stan

    The test is

    on the equ

    s summari1) Driving

    51mm (OD

    bottom of t2) Countin

    ast 305 mm3) Using a 6

    p for Design

    Al-Bass

    cient of pe

    ng equatio

    2 2

    = permea

    = constant

    = internal r

    = differen

    = length o

    below pr

    ity by vari

    of Permea

    High

    Medium

    Low

    Very Low

    mpervious

    (D) presen

    of each de

    ndard Pen

    standardi

    uipment ar

    ized as: the stand

    D) a distan

    he boringg the num

    m (12 in) to63.5 kg (14

    n and Engin

    soni Dam /

    ermeabilit

    ons:

    2

    ability

    t rate of flo

    radius of h

    ntial head o

    of portion o

    resents c

    ious degre

    ability

    nts the fie

    epth and fl

    netration T

    ized as AS

    re availab

    dard spilt-b

    nce of 460

    g using a famber of bl

    o obtain th40 1b) driv

    neering Con

    / Salah El-D

    ty, k is com

    2 . .

    ow into the

    hole

    of water, a

    of the hole

    lassificatio

    ee adopted

    Rang

    Perme

    eld perme

    low case.

    Test (SPT)

    STM D 158

    ble elsewh

    barrel sam

    mm (18in

    alling masslows to dr

    he N numbving mass

    nsultancy

    Deen Gover

    mputed us

    10

    10

    e hole

    and

    tested

    on of the

    d after Ter

    ge Coeffic

    eability , k

    > 10-

    10 -1 10-

    10-3 10-

    10-5 10-

    < 10-7

    ability tes

    )

    86. Techni

    here. The p

    mpler of d

    n) into the

    s. rive the sa

    ber. (or hamm

    rnorate 5

    sing

    range o

    rzaghi and

    cient of

    k, cm/s -3 -3 -5 -7

    sts records

    ical details

    procedure

    dimensions

    soil at the

    ampler the

    mer) falling

    5

    f

    d

    s

    s

    e

    s

    e

    e

    g

  • E

    Februa

    fr

    T

    T

    s

    o

    A 2

    T

    fi

    Enma Group

    ary, 2012

    ree from a

    The boring

    1- 50 b2- 100 b3- 10 su

    The results

    oil proper

    of conven

    America is

    2.4 Standa

    Table (2) p

    ield works

    Practic

    augers

    Explor

    Test m

    and Sp

    Practic

    Sampli

    Practic

    Transp

    Practic

    Identif

    Field p

    boreho

    p for Design

    Al-Bass

    a height of

    g log show

    lows are r

    blows are

    uccessive

    s of this te

    rties. Bowl

    ntional fou

    made usin

    ards

    presents th

    s.

    Table (2)

    Work dece for using

    s for Geote

    ration and

    method for p

    plit-Barrel

    ce for thin

    ing of cohe

    ce of Prese

    porting soi

    ce for desc

    fication of s

    permeabili

    oles

    n and Engin

    soni Dam /

    f 760 mm (3

    ws refusal

    required fo

    obtained.

    blows pro

    est are wid

    les (1996)

    undation

    ng the SPT

    he standard

    ) Standards

    escriptiong hollow s

    echnical

    Sampling

    penetratio

    sampling

    walled tub

    esive soils

    erving and

    il samples

    cription an

    soils

    ity tests in

    neering Con

    / Salah El-D

    30 in).

    and the t

    or any 150

    .

    oduce no a

    dely corre

    reported t

    design in

    T.

    ds that hav

    s for Field E

    n stem

    on Test

    of soil

    be

    s

    d

    nd

    n

    nsultancy

    Deen Gover

    est is halte

    0 mm incr

    advance.

    elated to th

    that 85 to 9

    n North a

    ve been ad

    Exploration

    The St

    ASTM

    ASTM

    ASTM

    ASTM

    ASTM

    Earth Ma

    Designat

    rnorate 6

    ed if

    rement.

    he various

    90 percen

    and South

    dopted for

    n

    tandard

    D-6151

    D-1586

    D-1587

    D-4220

    D-2488

    anual

    tion E-18

    6

    s

    nt

    h

    r

  • E

    Februa

    3 3 T

    r

    c

    s

    c

    P

    (E

    3

    Ls

    Enma Group

    ary, 2012

    3. LABO

    3.1 Types

    The soil t

    equired

    characteris

    trength,

    contents w

    1) Clas - Liq

    - Pla

    -Hy

    - Si

    - W

    2) Cons

    soil)

    3) Shear

    -

    4) Chem

    5) Comp

    Photograph

    E).

    3.2 Standa

    Laboratorytandards g

    NatureUnit WSpecifiLiquid P.L )

    p for Design

    Al-Bass

    ORATORY

    s of Tests

    tests were

    for ade

    stics such

    compress

    ere obtain

    ssification

    quid Limit

    astic Limit

    ydrometer

    eve testing

    Water conte

    solidation (

    r strength t

    - Unconfinegrained

    mical tests - CaCO3 c

    - SO3%

    - Gypsum

    - Total So

    paction tes

    hs of Labo

    ards

    y tests wegiven in Ta

    Table (3) S

    Tesel Moisture

    Weight (wetic Gravity and Plasti

    n and Engin

    soni Dam /

    Y TESTING

    e selecte

    equate d

    as, index

    sibility,

    ned using

    tests

    (L.L) (P.L)

    r testing g

    ent (w) and

    (compress

    tests

    ed compre

    d soil)

    content

    m Content

    oluble Salt

    ts (only fo

    oratory wo

    ere carriedable (3)

    Standards f

    st e Content t , dry ). ( GS) ic Limits (

    neering Con

    / Salah El-D

    G

    ed to cov

    design of

    x propert

    compactio

    the follow

    fine

    d density (

    sibility) te

    essive test

    ts

    or samples

    ork are ava

    d out in a

    for Labora

    T(wc) A

    AA

    L.L , A

    nsultancy

    Deen Gover

    ver the in

    f the d

    ies, gradi

    on and

    ing types

    e- grained

    () determst (for fine

    t (qu) (for f

    from the t

    ailable in A

    accordance

    tory Testin

    The StandaASTM D-24ASTM D-24ASTM D-85

    ASTM D-43

    rnorate 7

    nformation

    dam. Soi

    ing, shear

    chemica

    of testing:

    soil

    mination e-grained

    fine-

    test pits).

    Appendix

    e with the

    ng.

    ard 488 488 54

    318

    7

    n

    il

    r

    al

    x

    e

  • E

    Februa

    3 A

    th

    p

    A

    a

    T

    o

    4 4 T

    (T

    w

    F

    a

    Enma Group

    ary, 2012

    Grain SOne- DConsolUnconfOrganSO3 CO3

    3.3 Presen

    A descripti

    he values

    penetration

    Appendix (

    axis and up

    The test re

    of a data sh

    4. ANALYS

    4.1 Subsur

    The relativ

    Table 4) a

    with the rec

    Table

    No. ofblows p

    30 cm (10-4

    4-10 10-3030-50

    >50

    Figure 2 sh

    axis; where

    p for Design

    Al-Bass

    Size AnalyDimensionlidation (efined Comic content

    ntation of T

    ion of the

    of the me

    n resistan

    (A). A soil

    p to downs

    sults for e

    heet (table

    SIS of RES

    rface Cond

    ve density

    are determ

    commend

    (4) Correla

    Sands f

    per 1 ft)

    RelDe

    Very Lo

    0 Me0 De

    VDe

    hows that

    eas BH5 an

    n and Engin

    soni Dam /

    ysis nal e , cc , cr , Pmpression

    Test Resu

    type of so

    easured p

    nce is giv

    l profile (g

    stream are

    ach boreh

    e) and give

    SULTS

    dition

    y of sand

    mined usin

    dation of Te

    ation of N-

    lative ensity

    Np

    y loose oose edium ense

    Very ense

    BHs 1, 2,

    nd BH6 are

    neering Con

    / Salah El-D

    A

    Pc ) A

    Test AA

    A

    ults

    oil encoun

    ermeabili

    ven in the

    geological

    e also give

    hole are pr

    en in Appe

    and the

    ng SPT re

    erzaghi an

    Values with

    No. of blowper 30 cm

    ft) 0-2 2-4 4-8

    8-15

    15-30

    >30

    3 & 4 are

    e located

    nsultancy

    Deen Gover

    ASTM D-42

    ASTM D-24

    ASTM D-21ASTM D-29

    BS 1377 ASTM D43

    ntered tog

    ty and the

    e Borehol

    l section) a

    en.

    resented i

    endix (B).

    consistenc

    esults in ac

    nd Peck.

    h Soil Prop

    Clays ws (1 Con

    Ve

    M

    Ve

    located o

    in the ups

    rnorate 8

    22

    435

    166 974

    373

    gether with

    e standard

    le Logs o

    along dam

    in the form

    cy of clay

    ccordance

    perties

    nsistency

    ery soft Soft

    Medium Stiff

    ery Stiff

    Hard

    on the dam

    stream and

    8

    h

    d

    f

    m

    m

    y

    e

    m

    d

  • E

    Februa

    d

    A

    c

    (s

    1

    lo

    S

    1

    p

    a

    c

    s

    In

    (

    li

    p

    im

    rd

    c

    T

    v

    T

    th

    w

    A

    in

    u

    d

    T

    o

    4 T

    T

    o

    c

    T

    Enma Group

    ary, 2012

    downstream

    Appendix

    characteriz

    sometimes

    5m. These

    ow plastic

    System. Th

    0-4 to 10-5

    permeabili

    about 15m

    change to

    ands) acco

    njection is

    1974) stat

    ies betwe

    procedure

    mpermeab

    educe thedesigned

    curtain, wi

    The SPT r

    vertical dir

    The values

    he clayey

    whereas th

    A filter sho

    nterceptor

    unsaturated

    dependent

    The water

    of boring (2

    4.2 Test Re

    The tables

    The unified

    of the CL

    classificatio

    The gradin

    p for Design

    Al-Bass

    m area re

    (A) indic

    zed by ho

    s with sand

    e layers ar

    city) accor

    he permea

    cm/s. Acc

    ity occurs

    and to th

    silty fine

    ording to t

    s not enco

    ed "if the

    een abou

    is sati

    ble upstre

    e seepageto length

    ill result in

    esults ref

    rection an

    s of N rang

    y layers a

    he sandy la

    ould be us

    r, keepin

    d state.

    t on the da

    table has

    20-25m).

    esults

    of test res

    d soil class

    L type wi

    on as men

    ng details

    n and Engin

    soni Dam /

    espectively

    cate that

    orizontal

    d) domina

    re classifie

    rding to t

    ability (k),

    cording to

    s in the cl

    he end of b

    sand wh

    the Unified

    ouraged i

    e coefficien

    ut 10-4 an

    isfactory".

    eam blank

    e undernehen the s

    n a partial

    flected a

    nd in all of

    ged betwe

    are of ve

    ayers are o

    sed in the

    ng the

    The use

    am size, he

    not been

    sults are gi

    sification o

    ith some

    ntioned pre

    s are give

    neering Con

    / Salah El-D

    y. The bor

    the soil p

    homogene

    ates the gr

    ed as CL (s

    he Unified

    in genera

    o CP 2004

    ay-silt lam

    boring the

    hich is cla

    d Soil Clas

    in this soi

    nt of perm

    nd 10-6 c

    The em

    et is recom

    eath the seepage p

    reduction

    non unifo

    f the six e

    een 15 and

    ery stiff to

    of medium

    downstre

    downstre

    of a cl

    ead and th

    encounter

    iven in Ap

    of the teste

    substrata

    eviously.

    en in the

    nsultancy

    Deen Gover

    rehole log

    profile is

    eity. The

    round dow

    silty or san

    d Soil Cla

    al, is in the

    : 1972, thi

    minate. De

    e soil profi

    assified as

    ssification

    l media. P

    meability o

    cm/s, no

    mploymen

    mmended

    dam. Anypath, like

    n in under s

    orm streng

    executed b

    d 48, indic

    o hard co

    m to dense

    am end to

    am slop

    ay core

    e detailed

    red down

    pendix (B)

    ed ground

    a revealed

    tables be

    rnorate 9

    gs of

    generally

    silty clay

    wn to abou

    ndy clay o

    assification

    e range o

    is range o

    eeper than

    ile slightly

    s SM (silty

    System..

    Peck et a

    of the soi

    injection

    nt of an

    d to further

    y measuree a grou

    seepage.

    gth in the

    boreholes

    cating tha

    onsistency

    density.

    o act as an

    e in an

    is highly

    d design.

    to the end

    ).

    d is mostly

    d the SM

    esides the

    9

    y

    y

    ut

    f

    n

    f

    f

    n

    y

    y

    al

    il

    n

    n

    r

    e t

    e

    .

    at

    y

    n

    n

    y

    d

    y

    M

    e

  • E

    Februa

    A

    in

    e

    T

    in

    s

    th

    s

    d

    T

    w

    5

    p

    It

    fo

    m

    d

    4 T

    c

    c

    c

    th

    c

    e

    T

    w

    e

    T

    c

    Enma Group

    ary, 2012

    Atterberg l

    n the rang

    expansion

    The carbon

    ndicates t

    oluble sal

    he averag

    light grad

    dam.

    The minim

    whereas th

    5.13%. Thi

    possible to

    t is recom

    oundation

    monitoring

    during the

    4.3 Bearin

    The standa

    considered

    calculate t

    chart of Te

    he clayey

    compressiv

    equation:

    The calcula

    with engin

    existence o

    The value

    capacity is

    whequ

    p for Design

    Al-Bass

    limits. The

    ge 13 to 28

    as recomm

    nate conte

    that the s

    lts are scat

    ge of all b

    dual subs

    mum mea

    he maximu

    is average

    o use an im

    mmended

    work. It

    g system t

    beginning

    ng Capacit

    ard penetr

    d. The va

    the allowa

    rzaghi andy soil is do

    ve streng

    ated value

    neering ju

    of some sa

    of the r

    :

    u q all q re

    q

    u

    a

    a

    n and Engin

    soni Dam /

    e values of

    8 indicatin

    mended in

    ent is gene

    soil is cal

    ttered in t

    boreholes

    idence du

    asured g

    um was 16

    e is consid

    mpervious

    to use s

    t is also

    to record

    g of the se

    ty

    ation resu

    alue of (

    able bear

    d Peck giv

    ominant,

    gth have

    es should

    udgment

    alts.

    recommen

    c unconfinedbea lowable

    neering Con

    / Salah El-D

    f the plasti

    ng a low to

    n Sudhakar

    erally with

    lcareous.

    the range

    s being 5

    uring the

    ypsum c

    6.66% with

    dered as s

    soil blank

    sulphate-re

    recomme

    d the mov

    ervice life.

    ults of all b

    (N) has b

    ring capa

    ven below

    the values

    been con

    be consid

    and takin

    nded net

    compressivcapac aring

    nsultancy

    Deen Gover

    city index

    o medium

    r (2006).

    hin 20 to 3

    Values of

    of 0.52 to

    %. This m

    service l

    ontent w

    h the aver

    light. How

    ket beneath

    esisting c

    nded to

    ements of

    boreholes h

    been emp

    acity (qa)

    w (Fig. 4). A

    s of the u

    nsidered

    dered in co

    ng into ac

    allowable

    strength evcity

    rnorate 1

    x lies

    degree o

    35% which

    f the tota

    11.86 with

    may cause

    life of the

    was 0.41%

    rage being

    wever, it is

    h the dam

    cement for

    employ a

    f the dam

    have been

    ployed to

    using the

    Also, since

    unconfined

    using the

    onjunction

    ccount the

    e bearing

    10

    f

    h

    al

    h

    e

    e

    %

    g

    s

    .

    r

    a

    m

    n

    o

    e

    e

    d

    e

    n

    e

    g

  • E

    Februa

    H

    fo

    m

    fo

    F

    4 S

    p

    c

    I

    b

    s

    p

    d

    I

    d

    o

    s

    s

    Enma Group

    ary, 2012

    However, i

    oundation

    measures

    oundation

    25

    30

    35

    40

    45o

    0 10

    Approximat

    Fig. 4 Corre

    4.4 Soil Co

    SPT results

    possess si

    clayey soil

    It is known

    based on

    settlement

    pressure i

    dissolution

    Immediate

    differentia

    of the str

    settlement

    some buil

    p for Design

    Al-Bass

    qa = 120

    it is also r

    s to be pla

    should be

    s.

    20 30 4

    te relation betwe

    elations for

    ompressib

    s indicate

    ignificantl

    l to mediu

    n that the S

    n settlem

    t will then

    is less than

    n takes pla

    ely after co

    al settleme

    ructure. F

    t primarily

    lding cod

    n and Engin

    soni Dam /

    0 kN/m2 ~

    recommen

    aced below

    e taken t

    40 50 60N

    een N and

    r estimatiofrom

    bility and

    that the su

    ly varied

    um sandy s

    SPT allowa

    ment cons

    n remain l

    n that spe

    ace.

    onstruction

    ent will pri

    For isolat

    y depends

    des specif

    neering Con

    / Salah El-D

    12 Ton/m

    nded for a

    w 1.0 m de

    o ensure

    Relati

    q a

    on of allowam SPT

    Collapsib

    uccessive

    strength

    soil.

    able beari

    siderations

    ess than 2

    ecified in t

    n and app

    imarily de

    ted footin

    s on the ti

    fy the tole

    nsultancy

    Deen Gover

    m2

    all the ma

    epth other

    the rigid

    ionship betweenBearing C

    B

    able bearin

    bility

    encounte

    ranging f

    ng pressu

    s. The i

    25 mm as

    the chart u

    plication of

    pend on th

    ngs the d

    ie beams.

    erable dif

    rnorate 1

    ain shallow

    rwise stric

    dity of the

    n N and AllowaCapacity

    B

    ng capacity

    ered layers

    from hard

    ure chart is

    immediate

    far as the

    unless sal

    f loads the

    he rigidity

    differentia

    However

    fferential 11

    w

    t

    e

    able

    y

    s

    d

    s

    e

    e

    t

    e

    y

    al

    r,

  • E

    Februa

    s

    n

    a

    T

    d

    h

    T

    c

    s

    h

    T

    c

    a

    d

    th

    th

    5

    In

    fo

    c

    T

    p

    H

    s

    S

    c

    c

    d

    c

    r

    m

    e

    d

    r

    Enma Group

    ary, 2012

    settlement

    not prese

    already les

    Time after

    due to leak

    high mainte

    The values

    consolidati

    ettlement

    has no indi

    The collap

    cementing

    arrival of w

    due to the

    he dam m

    he service

    5. QUARRI

    n order to

    or the co

    conducted

    The numbe

    pit was bo

    However,

    ite area.

    Samples w

    conducted

    chemical te

    determine

    content and

    esults are

    may revie

    economica

    dam. Fig.

    espect to t

    p for Design

    Al-Bass

    t as being

    ntly expe

    ss than 25

    construct

    k of water

    enance pe

    s of the c

    ion tests a

    is not exp

    ication of s

    psibility of

    materials

    water. Coll

    low conte

    may be mo

    e life of the

    IES

    o ascertain

    onstruction

    to find ou

    er of quarr

    out 3m. Sa

    Gravelly

    ere extrac

    on all the

    ests have b

    the maxim

    d ascertain

    given in A

    ew this in

    al design a

    5 below

    the Al-Bas

    n and Engin

    soni Dam /

    more than

    ected bec

    mm.

    tion differ

    r from tan

    erformanc

    compressi

    are not hig

    pected to

    significant

    f the soil

    s which

    lapsible b

    ent of gyps

    onitored es

    e dam.

    n the exist

    n of the

    ut the avai

    ries test pi

    andy and

    quarries w

    cted every

    e samples

    been perf

    mum dry d

    n the suita

    Appendix

    nformation

    according

    shows th

    ssoni dam

    neering Con

    / Salah El-D

    n 25 mm. S

    cause the

    rential set

    nks or bro

    e should b

    ion index

    gh; therefo

    be signif

    swelling c

    results fro

    softens o

    behavior m

    sum. How

    specially a

    ence of ne

    dam, an

    ilable qua

    its was ten

    clayey qu

    were not

    y 1m. Grad

    . In additi

    formed on

    density and

    ability of th

    (D). The d

    n in orde

    g to the re

    he locatio

    location.

    nsultancy

    Deen Gover

    Such a valu

    total sett

    ttlement m

    oken pipes

    be provide

    obtained

    re the con

    ficant. Als

    characteri

    om the ex

    r dissolve

    may not be

    ever, mov

    at the beg

    earby raw

    n investig

    arries near

    n. The dep

    uarries we

    found nea

    ding tests h

    on, compa

    n the clay i

    d optimum

    he materia

    designer o

    er to app

    equiremen

    on of test

    rnorate 1

    ue is

    tlement is

    may resul

    s, thereby

    ed.

    d from the

    nsolidation

    so, the soi

    istics.

    xistence o

    es on the

    e expected

    vements o

    ginnings o

    w materials

    gation was

    r the dam

    pth of each

    ere found

    ar the job

    have been

    action and

    in order to

    m moisture

    al. The tes

    of the dam

    proach an

    nts of each

    pits with

    12

    s

    t

    y

    e

    n

    il

    f

    e

    d

    f

    f

    s

    s

    m.

    h

    d.

    b

    n

    d

    o

    e

    t

    m

    n

    h

    h

  • E

    Februa

    Enma Group

    ary, 2012

    Fig. 5 Tes

    p for Design

    Al-Bass

    st Pits Locat

    n and Engin

    soni Dam /

    tion with res

    neering Con

    / Salah El-D

    spect to the

    nsultancy

    Deen Gover

    e Al-Bassoni

    rnorate 1

    i Dam axis

    13

  • TesPitNo

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    E

    Februa

    st t . Nort

    382

    382

    382

    382

    382

    382

    382

    382

    382

    0 382

    5

    T

    c

    A

    o

    d

    e

    C

    in

    d

    n

    s

    e

    s

    e

    Enma Group

    ary, 2012

    Table 5

    Coord

    th (N)

    25119

    25288

    25301

    25469

    25419

    25434

    25512

    25399

    25265

    25046

    5.1 Quarri

    The suita

    constructio

    According

    of fill mat

    dams to fu

    etc;

    Core fill s

    ntermedia

    degree of

    necessary,

    hear stren

    excess of

    ands and

    element in

    p for Design

    Al-Bass

    5: The appr

    inate

    East

    45138

    45139

    045147

    045145

    45150

    45154

    45157

    45181

    45181

    45158

    ies Materi

    ability of

    on may be

    to Novak

    erial are

    ulfill the re

    should hav

    ate to high

    deformat

    and pos

    ngth. The m

    25-30%,

    silts can

    n an emba

    n and Engin

    soni Dam /

    roximate coquantitie

    E

    89

    96

    75

    57

    06

    44 Sil

    78

    18

    15

    82

    ial

    the qu

    e consider

    et al. (200

    necessary

    equiremen

    ve low pe

    h plasticit

    tion witho

    ssibly dis

    most suitab

    e.g. glaci

    also be u

    ankment a

    neering Con

    / Salah El-D

    onstructiones.

    Type of material

    Silty sand

    Silty Sand

    Silty clay

    Silty clay

    Silty clay

    lty sand witclay

    Silty clay

    Silty clay

    Silty clay

    Silty clay

    uarries m

    red accord

    01), three p

    y for ear

    nts for cor

    ermeability

    ty to acco

    out risk of

    advantage

    ble soils h

    ial tills et

    utilized. T

    and the m

    nsultancy

    Deen Gover

    n materials

    Expquant

    6

    5,

    7,

    10

    6,

    th 7,

    20

    25

    30

    6,

    materials

    ding to the

    principal c

    th fill em

    re, should

    y and ide

    ommodate

    f cracking

    eous, to h

    have clay c

    c., althou

    The core i

    most dema

    rnorate 1

    s

    pected tity (m)

    600

    ,000

    ,500

    0,500

    ,800

    ,500

    0,000

    5,000

    0,000

    ,800

    for dam

    e BS 5930

    categories

    mbankmen

    der, filters

    eally be o

    e a limited

    g. It is no

    have high

    contents in

    ugh clayey

    is the key

    anding in 14

    Distancefrom dam

    axis ( km)

    0.592

    0.745

    0.734

    0.902

    0.844

    0.853

    0.928

    0.828

    0.697

    0.459

    m

    .

    s

    nt

    ,

    f

    d

    t

    h

    n

    y

    y

    e m

    )

  • E

    Februa

    te

    p

    te

    c

    s

    R

    p

    s

    S

    p

    s

    h

    w

    s

    d

    b

    w

    s

    D

    li

    g

    s

    d

    s

    A

    g

    W

    A

    c

    1

    d

    te

    q

    th

    m

    F

    Enma Group

    ary, 2012

    erms of m

    properties

    erm wate

    characteris

    uitable for

    Representa

    parameters

    houlders a

    Shoulder f

    permit the

    teepest p

    has relative

    water pre

    pectrum f

    differ little

    be homog

    which are

    houlders.

    Drain/filte

    iable to

    gravels, cr

    uitable,

    determined

    houlder fi

    Accordingl

    general, su

    With respe

    All quarrie

    cohesion re

    & 2 are

    during con

    ests on soi

    requirem

    quarries w

    hat labora

    match the r

    Filter mate

    p for Design

    Al-Bass

    material ch

    of the com

    ertight in

    stics of t

    r rolled co

    ative value

    s of compo

    as approp

    fill requir

    e economi

    ossible sl

    ely high p

    essures. S

    from coars

    from the

    geneous; i

    available

    er materia

    chemical

    rushed ro

    and are

    d by the

    lls.

    ly, all qua

    uitable to b

    ect to the d

    es except

    equiremen

    suitable fo

    nstruction,

    ils from th

    ments of T

    ith soils fr

    atory tests

    requireme

    rials are n

    n and Engin

    soni Dam /

    haracterist

    mpound cl

    ntegrity.

    the more

    ores are su

    es for the

    ound eart

    riate, are

    res suffici

    ic constru

    ope angle

    permeabili

    Suitable m

    se granula

    core mate

    t is custo

    within pre

    al must be

    degradat

    ock and c

    used in

    nature o

    arries exc

    be utilized

    dam should

    t quarries

    nt of Table

    or the sho

    , to condu

    hese two q

    Table 7. M

    rom other

    s are cond

    ents.

    not availab

    neering Con

    / Salah El-D

    tics and u

    lay core b

    The prin

    importan

    ummarized

    more imp

    hfills, to b

    summarize

    iently high

    uction of s

    e. It is pre

    ity to assis

    materials

    ar materia

    erials. The

    omary to u

    edetermin

    e clean, fr

    tion. Proc

    coarse to

    n sequen

    of the adj

    cept quarr

    d in constru

    ders, the r

    1 and 2

    e 7. Prelim

    oulders an

    uct triaxia

    quarries to

    Mixing of s

    quarries i

    ducted to

    ble in the q

    nsultancy

    Deen Gover

    uniformity,

    eing critic

    ncipal pe

    nt groups

    d in Table

    portant en

    be utilized

    ed in Tabl

    h shear s

    stable slop

    eferable th

    t in dissip

    range a

    al to fills w

    e shoulder

    utilize diff

    ned zones

    ree drainin

    cessed fin

    medium

    ces and

    jacent cor

    ries 1 and

    ucting the

    reverse ma

    do not s

    minary, onl

    nd it is en

    al and pe

    o ascertain

    soils from

    s possible

    ensure tha

    quarries. N

    rnorate 1

    the

    cal to long

    erformance

    s of soils

    6.

    ngineering

    in core or

    le 7.

    strength to

    pes of the

    hat the fil

    ating pore

    across the

    which may

    r need no

    ferent fills

    within the

    ng and no

    ne natura

    sands are

    gradings

    re and/or

    d 2 are, in

    core.

    ay be true

    satisfy the

    ly quarries

    ncouraged

    ermeability

    n the k and

    these two

    e provided

    hat the mix

    None of the

    15

    -

    e

    s

    g

    r

    o

    e

    ll

    e

    e

    y

    t

    s

    e

    t

    al

    e

    s

    r

    n

    .

    e

    s

    d,

    y

    d

    o

    d

    x

    e

  • Filltype

    Grave(GWGC)

    Sand(SW-S

    Silt (ML-H

    Crushrock f(2-60

    mm sirange

    l e

    ComcharUnit

    weigh(kNm

    el W-

    ) 18-2

    ds SP)

    16-2

    H)

    16-2

    ed fill 00 ize e)

    17-2

    E

    Februa

    q

    c

    a

    SoDesec

    Verysand

    graveclay (GVery

    sandgraveclay (G

    Low-plclays

    High-pclays

    T

    mpaction racteristicst ht, ,

    m-3)

    WateWopt.

    (%)

    2 5-10

    0 10-20

    1 15-30

    15-30

    1 N/A

    Enma Group

    ary, 2012

    quarries c

    concrete co

    an earth da

    oil cription

    y silty ds or

    els, 6% GM-SM) clayey ds or ls, 20% GC-SC)

    lasticity s (CL)

    plasticity s (CH)

    Table 7: Ind

    s She

    (effe

    er .,

    Cohesn, c

    (kNm

    0 0

    0 0

    0 < 10

    0 < 20

    A 0

    p for Design

    Al-Bass

    contain m

    onstructio

    am.

    Table 6 :

    Crackinresistan

    Low, increwith < a

    PI

    Intermedrepresenta

    Relative

    flexible

    Flexible, resist lar

    deformati

    dicative enfills (core

    ear strengthctive stres

    sio -2)

    Fricti

    (degre

    35-4

    35-4

    0 25-3

    0 20-3

    40-5

    n and Engin

    soni Dam /

    materials

    on; this is o

    : Character

    ng nce

    Ep

    re

    eases and >

    inwith

    diat ative Inte

    ely e

    inc

    can rge ions

    inc

    ngineering re or shouldh ss) Co

    com

    (X1

    ion, ees)

    40

    40

    35

    30

    55

    neering Con

    / Salah El-D

    readily

    one of the

    ristics of co

    Erosion-piping

    esistance

    Low, ncreases h < and

    > PI

    ermediate

    High, rease with

    > High;

    rease with >

    propertiesder as appr

    efficient ompressibilit

    mv 0-4 m2 kN-1

    0.1-1.0

    0.5-1.5

    0.5-2.5

    0.5-3.0

    N/A

    nsultancy

    Deen Gover

    suitable

    reasons to

    ore soils

    Optimcompac

    rolle

    Pneumtyred (2

    t)

    Pneumtyred (2

    t)

    Pneum

    tyred sheeps

    Sheeps

    s for comparopriate)

    f ty,

    1)

    Coefof horperme

    kh (

    10-3

    10-4

    10-5

    10-7

    10-1

    rnorate 1

    for

    o construc

    mum ction er

    Se

    com

    cc

    matic 20-80

    Higb

    matic 20-80

    c

    matic or

    sfoot

    Inttc

    sfoot c

    acted earth

    fficient rizontal eability (ms-1)

    c

    3-10-5

    4-10-6

    5-10-8

    7-10-10

    1-10-2

    16

    t

    ensitivity to

    mpactionwater

    content control

    gh to avoid rittleness

    Low to control uw

    ermediate o high to

    control uw

    High to control uw

    h

    Drainagcharacteri

    (relief of

    Excellen

    Good fa

    Fair-poo

    Very pooimpervio

    Free-drainexcellen

    n

    ge stics uw)

    nt

    air

    or

    or-ous

    ning: nt

  • E

    Februa

    66IrA

    BC

    TtruTEoF

    Enma Group

    ary, 2012

    6. SITE GE6.1 Tectonraq can be

    A THE STAantifoam

    B - THE UNC - THE ZA

    radiola

    These threrend N-S i

    unstable shThe N-S treE-W and Nor genesis.Figure (6) s

    p for Design

    Al-Bass

    EOLOGY nic e divided i

    TABLE SHELms but no

    NSTABLE SHAGROSE SUarian chert

    ee areas in the stabhelf and thend is due

    NE-SW tren. show the t

    Figure

    n and Engin

    soni Dam /

    into three LF with ma surface an

    HELF with sUTURE whit, igneous

    contains

    ble shelf ahe Zagrosee to Paleonds are du

    tectonic m

    e (6) Tecto

    neering Con

    / Salah El-D

    tectonicalajor buriednticline. surface anch compri and metam tectonic

    and the NWe Suture. ozoic tectoue to Creta

    map of Iraq

    onic Map o

    nsultancy

    Deen Gover

    lly differend arches an

    nticline. ises thrustmorphic ro

    subdivisioW-SE or E

    onic movemaceous rec

    .

    of Iraq

    rnorate 1

    nt areas: nd

    t sheets of ocks.

    ons whichE-W in the

    ments .thecent alpine

    17

    h e

    e e

  • E

    Februa

    6

    FimswfaTztrtrT

    6

    IrthfoTzbse

    Enma Group

    ary, 2012

    6.2 System

    Faults weremages, greismic da

    was found ault trends

    The distribones correransversalransverse

    The three m

    6.3 Seismi

    raq has ahe historicollows the

    Tectonicallone at t

    boundarieseismic zon

    especially

    p for Design

    Al-Bass

    m of Fault

    e derived avity and

    ata. The toto be the

    s. bution of espond to l blocks), faults. major fault

    icity

    well-doccal seismi boundarily Iraq is the tectons of the nes can cain the east

    n and Engin

    soni Dam /

    from variomagnetic

    otal horizo most usef

    faults in the NW-S, identifie

    t systems a

    cumentatioicity showies of the m located inically ac

    Arabian ause signitern part o

    neering Con

    / Salah El-D

    ous source gradients

    ontal derivful parame

    the figureSE transvered and b

    are the N-S

    on of seismws a well-dmajor tectoin a relatictive norplate. Ea

    ificant infrof NE Iraq.

    nsultancy

    Deen Gover

    es includin, and a les

    vative of theter for de

    e shows mrsal system

    bounded

    S.

    mic histordefined paonic elemeively activthern andarthquake rastructure

    rnorate 1

    ng satellitesser extenhe gravity

    etermining

    major faulm (5 majorby major

    ry activityattern andents. ve seismicd eastern in thesee damage

    18

    e nt y g

    t r r

    y, d

    c n e ,

  • E

    Februa

    Enma Group

    ary, 2012

    p for Design

    Al-Bass

    n and Engin

    soni Dam /

    neering Con

    / Salah El-D

    nsultancy

    Deen Goverrnorate 1

    19

  • E

    Februa

    6 Tafo

    6 1 TeTguwT Am

    Enma Group

    ary, 2012

    6.4 Al-Bas

    The area oa stratigrapormation,

    6.4.1 Stra

    . THE FAT

    This formaeconomicaThe "Lowegeologist iunits. It comwith limestThe inform

    A. Transitiomudstone

    p for Design

    Al-Bass

    soni Dam

    f the dam phically ramiddle Mi

    tigraphy

    THA (LOW

    tion is oneally importr fars" forin the earmprises anone and m

    mal units co

    on beds nand thin

    n and Engin

    soni Dam /

    m Genera

    site its exange exteiocene to

    WER FARS)

    e of the mtant formatrmation ofrly years nhydrites,

    marl. omprise fro

    normally climestone

    neering Con

    / Salah El-D

    al Geolog

    xposed unending fromquaternar

    FORMATI

    most aerialtions in Iraf Iraq was of explor gypsum a

    om bottom

    comprisinge, the tran

    nsultancy

    Deen Gover

    gy

    nder condim fatha (ly deposits

    ION:

    lly wide spaq. sub dividration intoand salt, in

    m to top:

    g beds of nsition bed

    rnorate 2

    itions havelower fars)s.

    pread and

    ded by oio informanterbeded

    anhydriteds usually

    20

    e )

    d

    il al d

    , y

  • E

    Februa

    owThBoCsDrIn Tcbli(oamlanFth(2rTar

    2

    T

    fa

    d

    fl

    v

    A

    a

    T

    fo

    Enma Group

    ary, 2012

    overlie thewhich is noThis divisihigh. B. Salifereoof siltstoneC. Seepagiltstone, m

    D. Upper relatively fn general

    The lowcomprises basal unit imestone or gypsu

    amount of marl.and acks red m

    new type Fatha as whick for tw220m) anespectivel

    The Upperand red mecrystallis

    2. INJANA

    The injana

    ars) com

    deposits

    luviolacus

    very variab

    A maximum

    area in the

    The lower

    ormation

    p for Design

    Al-Bass

    e So- caow includeon is dom

    ous beds c, mudston

    ge beds mudstone ared beds frequent bthis forma

    wer me a (40m)of organeand anh

    um) with green do

    this mmudstone section well as t

    wo membend (400m)ly. r membermudstone sed shelly

    A (UPPER F

    a (upper

    mprise fin

    initially i

    trine syste

    ble, due to

    m thicknes

    foothill zo

    contact o

    is grada

    n and Engin

    soni Dam /

    alled "Based in the jeminated b

    comprise ane and less

    comprisinand limestcomprise

    beds of limation consi

    ember ) thick

    edetrial hydrite

    minor olomtic

    member in the at Al-

    the all ers are ) thick

    r compriseand gyps

    y limestone

    FARS) FOR

    fars) form

    ne graine

    in coasta

    em. The t

    o subsequ

    ss of 2000

    one.

    of the inja

    ational. Th

    neering Con

    / Salah El-D

    sal fars ceribe formby carbon

    anhydrite s frequent ng anhydtone.

    e red mudmestone an

    ists of two

    es acyclic sum and ae beds.

    RMATION:

    mation (inc

    ed pre-m

    al areas,

    thickness

    uent erosio

    m in the

    ana forma

    he upper

    nsultancy

    Deen Gover

    conglomermation .

    ates on th

    and halite limestonerites with

    dstone, siltd anhydritmembers

    successioafew thin

    cluding th

    molasses

    and la

    of the for

    on over m

    central de

    ation with

    r contact

    rnorate 2

    rate"

    he mousa

    e with bedse beds. h beds o

    tstone andte. :

    on of green oolitic or

    he middle

    sediments

    ater in a

    rmation is

    major folds

    epositiona

    h the fatha

    with the

    21

    al

    s

    f

    d

    n r

    e

    s

    a

    s

    .

    al

    a

    e

  • E

    Februa

    m

    a

    3MF TasfoT2SsaTwTinbaZTe

    7C LthBeInthTwItaqKM

    Enma Group

    ary, 2012

    mukdadiya

    appearanc

    3. THE BAMukdadiyaFormation

    The Bakhtiand uppertrongly dioothill and

    The Mukd2000m of Sandstone trongly cr

    and clay baThe formawhere > 20The Mukdan fluvial

    basin . Thealluvial fanZagros SutuThe Mukdequivalent

    7. GENERACONDITIO

    Lithologicahe spatia

    Bodies (aqenvironmen Iraq fourheir relati

    The surfacewithin Iraqt shows the

    aquifer NoquaternaryKuh range,Mesopotam

    p for Design

    Al-Bass

    a formatio

    e of grave

    AKHTIARI Fa and Bai

    iari formatr Bakhtiariachronus

    d high folddadyia (lo

    fining up and redross bedalls.

    ation is di000m thickadyia (Low

    environme conglomens originature. adiya and to the Plio

    AL FEATUONS IN IR

    al and strual distribuquifers, a

    ent. rteen mainonship to e and nea is shown ie location o. 11 thay alluvial f, of centra

    mian and F

    n and Engin

    soni Dam /

    on is gr

    ely sandsto

    FORMATIOi Hassan

    tion was dri formatio but can b

    ded zones.ower fars)pwards cyd mudstondded and

    istributed k in the Kirwer Bakht

    ment in a eratic Uppted from t

    d Bai Hassocene clas

    URES OF HRAQ-Main

    uctural geoution andaquitards)

    n aquifers/ geologicaar surface in Figure b of the dam

    ats contafans of theal and S IraFoothill zon

    neering Con

    / Salah El-D

    radational

    one.

    ONS (Lower a

    divided inons. The be recogn ) formatioycles of ne. The associated

    mostly inrkuk Embatiari) formrapidly

    per Bakhtiathe high f

    san (Bakhstic of N an

    HYDROGn aquifers

    ological cod extent

    and the

    /aquifer gal formatio distributiobelow. m site (Al-Bin gravel

    e Mukhul, aq ,along nes.

    nsultancy

    Deen Gover

    marked

    nd Upper

    Iraq into two forma

    nized throu

    on comprgravely ssandstoned with cha

    n the Fooayment. ation was subsiding ari was defolded zon

    htiri) formnd NE Syria

    GEOLOGICs

    onditions of hydrog

    eir hydrog

    groups, ideons, can bon of thes

    Bassoni Dal and sanHemrin anthe bound

    rnorate 2

    by

    r Bakhtiri)

    the lowerations areughout the

    rise up tosandstonee is oftenannel lags

    othill zone

    depositedg foredeepeposited inne and the

    mations area.

    CAL

    determinegeologicageologica

    entified bybe definedse aquifers

    am Site) innd of thend Pesh-edary of the

    22

    )

    r e e

    o ,

    n s

    e

    d p n e

    e

    e al al

    y d. s

    n e -e

  • E

    Februa

    Enma Group

    ary, 2012

    p for Design

    Al-Bass

    n and Engin

    soni Dam /

    neering Con

    / Salah El-D

    nsultancy

    Deen Goverrnorate 223

  • E

    Februa

    8

    Enma Group

    ary, 2012

    8. CONCL

    1) Thgr

    wi

    2) Th10

    In

    3) It up

    the

    4) Thbe

    is p

    5) As

    kN

    mm

    6) Varan

    bo

    gy

    wa

    am

    pe

    rec

    da

    se

    so

    7) It ce

    in

    lay

    co

    p for Design

    Al-Bass

    LUSIONS A

    he silty cla

    ound dow

    th depth.

    he permea-4 to 10-5 cm

    most dept

    is recom

    pstream bl

    e upstream

    he net allow

    e taken as

    preferably

    s long as

    N/m2 , the s

    m.

    alues of the

    nge of o.

    oreholes b

    ypsum con

    as 15.7%

    mounts are

    erformance

    commend

    am espec

    rvice life.

    il blanket

    is recom

    ment for f

    contact wi

    yers of ta

    ncrete is p

    n and Engin

    soni Dam /

    AND REC

    ay (sometim

    wn to abo

    ability (k),

    m/s. Soil i

    ths the flow

    mmended

    anket exte

    m side and

    wable bea

    120 kN/m

    y deeper t

    the dam

    settlemen

    e total sol

    .96 to 21

    being 8%

    ntent was 0

    with the a

    e not thou

    e of an

    ded to mo

    cially dur

    Also, it is

    beneath th

    mmended

    foundation

    ith soil ma

    ar coat. Th

    preferably

    neering Con

    / Salah El-D

    COMMEN

    mes with s

    out 15m. S

    in genera

    injection is

    w case is t

    d to use

    ending a s

    d/or a grou

    aring capa

    m2. The de

    than 1.0 m

    m load do

    t is not exp

    uble salts

    .03 with

    %. The m

    0.41% wh

    average b

    ught to sig

    earth da

    onitor the

    ing the

    possible t

    he dam.

    d to use

    n work; the

    ay also be

    he streng

    y not less t

    nsultancy

    Deen Gover

    NDATIONS

    sand) dom

    Soil streng

    al, is in the

    s not recom

    urbulent.

    an imp

    ufficient d

    ut curtain.

    acity of the

    epth of mai

    .

    es not ex

    pected to

    are scatte

    the avera

    minimum

    ereas the

    being 5.10

    gnificantly

    am, howe

    movemen

    beginning

    o use an im

    sulphate

    e shallow f

    protected

    gth (f'c) of

    han 30 MP

    rnorate 2

    S

    minates the

    gth varies

    e range o

    mmended

    permeable

    distance on

    e site may

    in footings

    xceed 120

    exceed 25

    ered in the

    age of al

    measured

    maximum

    0%. These

    affect the

    ever, it is

    nts of the

    gs of the

    mpervious

    e-resisting

    foundation

    d using two

    f the used

    Pa.

    24

    e

    s

    f

    d.

    e

    n

    y

    s

    0

    5

    e

    ll

    d

    m

    e

    e

    s

    e

    e

    s

    g

    n

    o

    d

  • E

    Februa

    Geote Gitath A

    Enma Group

    ary, 2012

    8) Nequ

    no

    9) All

    ge

    co

    us

    10) Prsh

    the

    req

    the

    po

    co

    req

    11) Nocla

    ma

    echnical EA. S. Al-Sha

    p for Design

    Al-Bass

    ear to the

    uarries are

    ot.

    l quarries

    eneral, sui

    re. None

    e in concr

    reliminary

    oulders an

    e constru

    quirement

    ese two qu

    ossible p

    nducted

    quirement

    o significa

    ay quarrie

    aterial be u

    Eng. Garifi Moh

    n and Engin

    soni Dam /

    e site of d

    e found w

    s except

    itable to b

    of the qu

    rete or in d

    y, only qua

    nd a field

    uction stag

    ts given in

    uarries wi

    provided

    to ensur

    ts.

    ant amoun

    es soil. T

    used, as c

    Geotechnichammed H

    neering Con

    / Salah El-D

    dam, claye

    whereas gr

    quarries

    be utilized

    uarries is

    dam filters

    arries 1 & 2

    laboratory

    ges in or

    n Table 7.

    th soils fro

    that lab

    e that th

    nt of gypsu

    Therefore;

    convenient

    cal Eng.

    H. Al-Dahal

    nsultancy

    Deen Gover

    ey and sa

    ravelly qu

    1 and

    d in constr

    readily su

    .

    2 are suita

    y should a

    rder to c

    Mixing of

    om other q

    boratory

    he mix m

    um was fo

    may the

    t.

    Proflki Dr.

    rnorate 2

    andy

    uarries are

    2 are, in

    ructing the

    uitable for

    able for the

    accompany

    check the

    f soils from

    quarries is

    tests are

    match the

    und in the

    e quarries

    f. Geotecn. Raid R. A

    25

    e

    n

    e

    r

    e

    y

    e

    m

    s

    e

    e

    e

    s

    nical Eng. Al-Omari

  • E

    Februa

    9

    Enma Group

    ary, 2012

    9. REFERE

    1. Am1

    2. PeEn

    3. BowEd

    4. LamJo

    5. TeNe

    6. TeEn

    7. ToPit

    10. Si

    and

    Ro

    11. Ea

    Wa

    12. "D

    Gr

    13. S

    Cla

    Re

    Tre

    14. N

    (20

    15. M

    En

    Co

    p for Design

    Al-Bass

    ENCES

    merican S

    989.

    ck, R., Han

    ngineering

    wles, J.E.,

    dition, 1996

    mbe, T.W

    ohn Wiley

    ng,W.C. "

    ew Jersey ,

    rzaghi , K

    ngineering

    mlinson, M

    man, 3rd E

    ngh, B. a

    d Foundat

    okee.

    arth Manua

    ater and P

    Dam Found

    rands. Bds

    Sudhakar,

    assification

    cent Ad

    eatment. T

    ovak, P., M

    001). Hydr

    Murthy, V.

    ngineering

    onsultants,

    n and Engin

    soni Dam /

    Society fo

    nsen, W. a

    g. John Wil

    , Foundat

    6.

    W.and Whit

    & Sons, In

    " Foundat

    , 1974.

    K.and Pec

    g Practice"

    M.J., Found

    Edition, 19

    and Prakas

    tion Engin

    al (1980) U

    ower Reso

    dations" Co

    Haussman

    M. R.

    n of Expa

    dvances

    Taylor & Fr

    Moffat, A.,

    raulic Struc

    . (1989). S

    g. Vol.1

    Bangalore

    neering Con

    / Salah El-D

    or Testing

    and Thorn

    ley & Sons

    ion Analy

    tman, R.V

    nc., 1969.

    ion Desig

    ck , R.,B.

    ,1967

    dation Des

    975.

    sh, S. (19

    neering. N

    U.S. Depart

    ources Ser

    ommission

    nn, 75008

    (2006).

    ansive Soi

    in Cha

    rancis.

    , Nalluri, C

    ctures, Sp

    Soil Mech

    , Sai

    e.

    nsultancy

    Deen Gover

    Materials

    nburn, T. F

    , 1974.

    ysis and D

    ., Soil Me

    gn ", Pren

    ,"Soil Mec

    sign & Con

    70). Soil m

    New Chand

    tment of th

    rvice.

    n Internatio

    Paris, 2000

    Identifica

    ls. Expans

    aracterizat

    C. andNara

    on Press.

    hanics & F

    Kripa

    rnorate 2

    s (ASTM)

    Foundation

    Design, 5th

    echanicals

    ntice Hall

    chanics in

    nstruction

    mechanics

    d and Bros

    he Interior

    onal des

    0.

    ation and

    sive Soils

    tion and

    ayanan, R

    Foundation

    Technica

    26

    ,

    n

    h

    s

    ,

    n

    n,

    s

    s

    r

    d

    -

    d

    R.

    n

    al

  • En

    nma Group

    Februa

    G

    for Design

    ary, 2012

    B

    Geo

    and Engine

    Al-Basso

    AP

    Bore

    olog

    eering Cons

    oni Dam /

    PPEN

    ehol&

    gica

    sultancy

    Salah El-D

    NDIX

    le L& al Se

    Deen Gover

    A

    Logs

    ectio

    rnorate A

    s

    ons

    A1

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-D

    Deen Goverrnorate A

    A2

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA3

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA4

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA5

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA6

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA7

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA8

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA9

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA10

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA11

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA12

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA13

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA14

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA15

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA16

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA17

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA18

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA19

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA20

  • En

    nma Group

    Februa

    for Design

    ary, 2012

    and Engine

    Al-Basso

    eering Cons

    oni Dam /

    sultancy

    Salah El-DDeen Goverrnorate AA21

  • Enma Group for Design and Engineering Consultancy

    1B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    APPENDIX B Tables of Test Results

    (Boreholes & Quarries)

  • Enma Group for Design and Engineering Consultancy

    2B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Borhole No. :1 Depth:20

    Sample Index properties W.C %

    Dry Density kN/m3

    Gs

    Grain size analysis Sieve & Hydrometer Consolidation Test qu

    kN/m2

    Chemicals tests

    No.

    Depth (m) Type

    L.L %

    P.I % USCS

    Grav. %

    Sand %

    Silt %

    Clay % eo Cc Cr

    T.S.S %

    CaCo3 % So3

    Gyp. %

    1 0.0-1.5 DS - - - - - - - - - - - - - - -

    2 1.5-3.0 US 34.16 16.93 CL 9.31 15.16 2.68 0 39.3 43.7 17.0 0.767 0.197 0.032 76 19.87 28.17 7.75 13.01

    3 3.0-4.5 SS 35.68 54.35 16.89 29.24

    CL CH - - - 0

    31.3 14.1

    68.7 85.9 - - - - 21.03 24.04 5.31 13.98

    4 4.5-6.0 US 51.67 26.66 CH 20.13 16.95 2.70 0 7.1 92.9 0.593 0.154 0.054 280 7.84 31.71 2.14 4.11

    5 6.0-7.5 SS 33.74 17.03 CL - - - 0 40.6 59.4 - - - - 13.87 28.76 4.62 8.61

    6 7.5-9.0 SS 48.63 24.08 CL - - - 0 1.7 70.2 28.1 - - - - - - - -

    7 9.0-10.5 DS 47.81 23.88 CL - - - 0 9.5 90.5 - - - - 3.55 32.3 1.05 1.89

    8 10.5-12.0 US 31.33 15.76 CL 16.84 17.11 2.68 0 13.1 62.6 24.3 0.566 0.121 0.028 113 - - - -

    9 12.0-13.5 SS 33.87 17.67 CL - - - 0 18.6 81.4 - - - - - - - -

    10 13.5-15.0 DS 35.87 18.79 CL - - - 0 24.9 75.1 - - - - - - - -

    11 15.0-16.5 DS N.P N.P SM - - 2.66 0 70.0 30.0 - - - - - - - -

    12 16.5-18.0 SS N.P N.P SM - - - 0 50.1 43.7 6.2 - - - - 1.87 33.48 0.24 0.54

    13 18.0-20.0 DS N.P N.P SM - - 2.66 0 58.7 41.3 - - - - - - - -

    SS: Split Spoon Sample UD: Undisturbed Sample (Shelby Tube) . D: Disturbed Sample.

  • Enma Group for Design and Engineering Consultancy

    3B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    B.H. No. 2 Depth: 25m

    Sample Index properties W.C %

    Dry Density kN/m3

    Gs

    Grain size analysis Sieve & Hydrometer Consolidation Test qu

    kN/m2

    Chemicals tests

    No.

    Depth (m) Type

    L.L %

    P.I % USCS

    Grav. %

    Sand %

    Silt %

    Clay % eo Cc Cr

    T.S.S %

    CaCo3 %

    S03 %

    Gyp. %

    1 0.0-1.5 DS - - - - - - - - - - - - - - - - - -

    2 1.5-3.0 US 53.24 28.13 CH 22.48 15.67 2.70 0 5.4 94.6 0.729 0.206 0.056 250 5.29 27.58 2.43 5.23

    3 3.0-4.5 SS 35.96 18.60 CL - - - 0 27.3 48.0 24.7 - - - - - - - -

    4 4.5-6.0 US 55.34 28.45 CH 23.95 15.22 2.71 0 4.5 95.5 0.780 0.228 0.059 230 - - - -

    5 6.0-7.5 SS 39.81 20.84 CL - - - 0 22.8 77.2 - - - - 4.76 32.3 1.57 2.18

    6 7.5-9.0 SS 51.58 26.53 CH - - - 0 6.0 55.5 38.5 - - - - - - - -

    7 9.0-10.5 SS 37.58 18.94 CL - - 2.68 0 15.0 85.0 - - - - - - - -

    8 10.5-12.0 SS 33.89 17.35 CL - - - 0 24.2 75.8 - - - - 3.78 32.89 1.91 4.11

    9 12.0-13.5 DS 36.78 19.77 CL - - - 0 27.5 72.5 - - - - - - - -

    10 13.5-15.0 SS 35.61 18.89 CL - - 2.68 0 22.0 57.7 20.3 - - - - - - - -

    11 15.0-16.5 DS 34.44 18.76 CL - - - 0 27.8 72.2 - - - - - - - -

    12 16.5-18.0 SS 32.23 16.87 CL - - - 0 31.4 68.6 - - - - - - - -

    13 18.0-19.5 DS N.P N.P SM - - 2.66 0 59.7 40.3 - - - - 0.96 23.45 0.19 0.41

    14 19.5-21.0 SS N.P N.P SM - - - 0 55.0 33.7 12.3 - - - - - - - -

    15 21.0-23.0 DS N.P N.P SM - - - 0 71.9 28.1 - - - - - - - -

    16 23.0-25.0 SS N.P N.P SM - - 2.65 0 70.4 29.6 - - - - - - - -

    SS: Split Spoon Sample UD: Undisturbed Sample (Shelby Tube) . D: Disturbed Sample.

  • Enma Group for Design and Engineering Consultancy

    4B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Borhole No. :3 Depth:20

    Sample Index properties W.C %

    Dry Density kN/m3

    Gs

    Grain size analysis Sieve & Hydrometer Consolidation Test qu

    kN/m2

    Chemicals tests

    No.

    Depth (m) Type

    L.L %

    P.I % USCS

    Grav. %

    Sand %

    Silt %

    Clay % eo Cc Cr

    T.S.S %

    CaCo3 %

    S03 %

    Gyp. %

    1 0.0-1.5 DS - - - - - - - - - - - - - - - - - -

    2 1.5-3.0 US 40.64 21.76 CL 14.36 16.60 2.68 0 30.8 69.2 0.614 0.148 0.041 180 15.87 29.5 1.56 12.03

    3 3.0-4.5 US 45.01 22.71 CL 14.49 16.18 2.69 0 10.0 66.6 23.4 0.662 0.171 0.046 135 - - - -

    4 4.5-6.0 US 39.56 19.76 CL 18.03 15.76 2.68 - - - - 0.701 0.180 0.037 - - - - -

    5 6.0-7.5 SS N.P N.P SM - - - 0 84.1 15.9 - - - - 10.32 32.3 0.73 15.70

    6 7.5-9.0 DS 39.65 20.33 CL - - 2.68 0 32.7 67.3 - - - - 12.87 - - 10.76

    7 9.0-10.5 SS 34.36 17.04 CL - - - 0 8.5 64.0 27.5 - - - - - - - -

    8 10.5-12.0 DS N.P N.P SM - - - 0 50.8 49.2 - - - - - - - -

    9 12.0-13.5 SS N.P N.P SM - - 2.67 0 54.6 45.4 - - - - 2.87 32.89 0.57 1.56

    10 13.5-15.0 DS 31.02 15.87 CL - - - 0 45.8 36.9 17.3 - - - - - - - -

    11 15.0-16.5 SS 30.99 14.99 CL - - - 0 49.2 50.8 - - - - - - - -

    12 16.5-18.0 DS 33.01 16.89 CL - - 2.67 0 48.8 51.2 - - - - 13.76 33.48 0.71 9.87

    13 18.0-19.5 SS 33.11 17.01 CL - - - 0 46.1 39.9 14.0 - - - - - - - -

    14 19.5-21.0 DS 31.92 15.22 CL - - - 0 45.9 54.1 - - - - - - - -

    15 21.0-23.0 SS 33.81 16.33 CL - - 2.68 0 33.7 66.3 - - - - - - - -

    16 23.0-25.0 DS 30.65 16.54 CL - - - 0 30.1 58.7 11.2 - - - - - - - -

    SS: Split Spoon Sample UD: Undisturbed Sample (Shelby Tube) . D: Disturbed Sample.

  • Enma Group for Design and Engineering Consultancy

    5B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Borhole No. :4 Depth:20

    Sample Index properties W.C %

    Dry Density kN/m3

    Gs

    Grain size analysis Sieve & Hydrometer Consolidation Test qu

    kN/m2

    Chemicals tests

    No.

    Depth (m) Type

    L.L %

    P.I % USCS

    Grav. %

    Sand %

    Silt %

    Clay % eo Cc Cr

    T.S.S %

    CaCo3 % So3

    Gyp. %

    1 0.0-1.5 DS - - - - - - - - - - - - - -

    2 1.5-3.0 US 40.48 22.25 CL 23.87 15.87 2.67 0 31.72 68.3 0.682 0.175 0.035 - 13.65 22.86 5.92 12.73

    3 3.0-4.5 DS 43.73 22.15 CL - - - 0 34.8 58.7 6.5 - - - - - - - -

    4 4.5-6.0 US 39.41 20.65 CL - - 2.68 0 23.8 76.2 - - - - - - - -

    5 6.0-7.5 SS 32.45 16.67 CL - - - 0 34.7 65.3 - - - - - - - -

    6 7.5-9.0 DS 40.45 21.65 CL - - - 0 32.1 67.9 - - - - 11.86 21.09 6.06 13.03

    7 9.0-10.5 US 36.56 19.45 CL - - - 0 21.0 79.0 - - - - - - - -

    8 10.5-12.0 US 33.43 16.65 CL 29.49 14.01 2.65 0 - - - 0.891 0.224 0.043 65 - - - -

    9 12.0-13.5 SS 30.82 14.45 CL - - - 0 43.8 31.5 24.7 - - - - 1.93 34.07 0.77 1.66

    10 13.5-15.0 DS 30.72 14.65 CL - - - 0 43.2 56.8 - - - - - - - -

    11 15.0-16.5 SS 30.08 15.89 CL - - 2.67 0 48.5 34.3 17.2 - - - - - - - -

    12 16.5-18.0 DS 38.85 18.87 CL - - - 0 36.6 65.4 - - - - 11.16 20.5 5.94 12.77

    13 18.0-20.0 SS 28.87 13.01 CL - - 2.67 0 39.9 41.6 18.5 - - - - - - - -

    SS: Split Spoon Sample UD: Undisturbed Sample (Shelby Tube) . D: Disturbed Sample.

  • Enma Group for Design and Engineering Consultancy

    6B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Borhole No. :5 Depth:20

    Sample Index properties W.C %

    Dry Density kN/m3

    Gs

    Grain size analysis Sieve & Hydrometer Consolidation Test qu

    kN/m2

    Chemicals tests

    No.

    Depth (m) Type

    L.L %

    P.I % USCS

    Grav. %

    Sand %

    Silt %

    Clay % eo Cc Cr

    T.S.S %

    CaCo3 % So3

    Gyp. %

    1 0.0-1.5 DS - - - - - - - - - - - - - - - - - -

    2 1.5-3.0 SS 30.98 14.46 CL - - - 0 17.5 64.3 18.2 - - - - - - - -

    3 3.0-4.5 US 40.59 19.67 CL 13.8 17.78 2.68 0 11.6 88.4 0.507 0.112 0.039 310 2.63 34.66 1.18 2.54

    4 4.5-6.0 SS N.P N.P SM - - - 0 73.4 26.6 - - - - - - - -

    5 6.0-7.5 US 48.92 25.76 CL 20.08 16.84 2.70 0 26.1 57.6 16.3 0.603 0.154 0.051 135 - - - -

    6 7.5-9.0 SS 29.98 13.76 CL - - - 0 48.6 51.4 - - - - 3.76 20.5 1.34 2.88

    7 9.0-10.5 US 39.21 18.76 CL 23.9 14.99 2.69 0 20.1 79.9 0.794 0.215 0.038 79 - - - -

    8 10.5-12.0 SS N.P N.P SM - - - 0 65.4 23.0 11.6 - - - - - - - -

    9 12.0-13.5 DS N.P N.P SM - - 2.66 0 63.5 36.5 - - - - 4.54 31.5 2.01 4.32

    10 13.5-15.0 SS 30.94 14.76 CL - - - 0 37.4 50.1 12.5 - - - - - - - -

    11 15.0-16.5 DS 33.65 17.56 CL - - - 0 33.2 66.8 - - - - 4.89 19.6 1.54 3.31

    12 16.5-18.0 SS N.P N.P SM - - 2.66 0 53.6 46.4 - - - - - - - -

    13 18.0-20.0 DS 29.03 13.76 CL - - - 0 39.2 39.3 21.5 - - - - - - - -

    SS: Split Spoon Sample UD: Undisturbed Sample (Shelby Tube) . D: Disturbed Sample.

  • Enma Group for Design and Engineering Consultancy

    7B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Borhole No. :6 Depth:20

    Sample Index properties W.C %

    Dry Density kN/m3

    Gs

    Grain size analysis Sieve & Hydrometer Consolidation Test qu

    kN/m2

    Chemicals tests

    No.

    Depth (m) Type

    L.L %

    P.I % USCS

    Grav. %

    Sand %

    Silt %

    Clay % eo Cc Cr

    T.S.S %

    CaCo3 % So3

    Gyp. %

    1 0.0-1.5 DS - - - - - - - - - - - - - - - - - -

    2 1.5-3.0 US 48.16 24.67 CL 15.53 16.74 2.70 0 10.8 64.2 25.0 0.613 0.157 0.050 249 - - - -

    3 3.0-4.5 SS 39.98 20.01 CL - - - 0 14.2 85.8 - - - - 16.89 29.35 5.51 10.01

    4 4.5-6.0 US 38.58 18.45 CL 24.91 16.01 2.69 0 10.5 89.5 0.680 0.172 0.038 47 - - - -

    5 6.0-7.5 DS 32.16 15.76 CL - - - 0 25.0 63.1 11.9 - - - - 3.76 27.3 1.14 2.45

    6 7.5-9.0 SS N.P N.P SM - - 2.66 0 62.8 37.2 - - - - - - - -

    7 9.0-10.5 US N.P N.P SM - - - 0 63.8 36.2 - - - - 3.87 31.71 0.98 1.99

    8 10.5-12.0 DS 42.08 22.12 CL - - - 0 23.3 76.7 - - - - - - - -

    9 12.0-13.5 SS 28.20 12.76 CL - - 2.67 0 39.6 44.6 15.7 - - - - - - - -

    10 13.5-15.0 DS 29.95 13.76 CL - - - 0 34.8 65.2 - - - - - - - -

    11 15.0-16.5 DS N.P N.P SM - - - 0 59.8 31.6 8.6 - - - - 2.21 30.53 0.93 2.0

    12 16.5-18.0 SS N.P N.P SM - - 2.66 0 60.3 39.7 - - - - - - - -

    13 18.0-20.0 DS N.P N.P SM - - - 0 61.7 38.3 - - - - - - - -

    SS: Split Spoon Sample UD: Undisturbed Sample (Shelby Tube) . D: Disturbed Sample.

  • Enma Group for Design and Engineering Consultancy

    8B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.1

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L %

    P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS --- --- --- SM 0.0 58.3 41.7

    2 1 -- 2 DS --- --- --- SM 0.0 63.7 36.3

    3 2 -- 3 DS --- --- ---- SM 0.0 68.8 31.2

    Quarry N0.1

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C

    (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS

    2 1 -- 2 DS 5.637 --- 2.102 4.519

    3 2 -- 3 DS

  • Enma Group for Design and Engineering Consultancy

    9B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.2

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L %

    P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS --- --- --- SM --- --- 2.7 59.8 37.5

    2 1 -- 2 DS --- --- --- SM --- --- 1.2 72.1 26.7

    3 2 -- 3 DS --- --- ---- SM --- --- 0.0 64.5 35.5

    Quarry N0.2

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS --- --- --- --- --- --- --- --- --- --- --- ---

    2 1 -- 2 DS --- --- --- --- --- --- --- --- --- --- --- ---

    3 2 -- 3 DS --- --- --- --- --- --- --- --- --- --- --- --

  • Enma Group for Design and Engineering Consultancy

    10B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.3

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L %

    P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS 47.01 23.76 23.25 CL 17.39 18.65 0.0 9.0 56.4 34.6

    2 1 -- 2 DS 35.34 16.87 18.47 CL 17.79 15.33 0.0 23.4 76.4

    3 2 -- 3 DS 54.62 24.19 30.43 CH 17.23 20.43 0.0 3.3 68.4 29.3

    4 0 -- 1 DS Permeability (K) cm/sec = 3.78 x 10-6

    Quarry N0.3

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS 0.552 0.133 0.0397 3.44 8.89 125 6.6 7.891 32.175 4.036 8.677

    2 1 -- 2 DS --- --- --- --- 1.41 4.31 118 8.1 -- --- -- ---

    3 2 -- 3 DS 0.573 0.144 0.027 --- 5.14 10.72 150 2.3 -- --- --- --

  • Enma Group for Design and Engineering Consultancy

    11B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.4

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L %

    P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS 57.01 26.63 30.38 CH 16.45 20.21 0.0 7.2 92.8

    2 1 -- 2 DS 34.41 15.09 19.32 CL 17.78 16.03 0.0 22.5 54.3 23.2

    3 2 -- 3 DS 33.73 15.03 18.7 CL 17.81 15.88 0.0 28.2 71.8

    4 1 -- 2 DS Permeability (K) cm/sec = 1.07 x 10-5

    Quarry N0.4

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS 0.647 0.180 0.0515 236 6.71 12.84 -- - -- -- --- ---

    2 1 -- 2 DS -- --- -- --- 1.24 2.45 114 9.6 4.567 33.325 1.772 3.809

    3 2 -- 3 DS -- --- --- -- -- -- 102 10.5 -- -- --- ---

  • Enma Group for Design and Engineering Consultancy

    12B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.5

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L %

    P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS 46.07 22.88 23.19 CL 17.41 18.55 0.0 11.5 42.7 45.8

    2 1 -- 2 DS 28.50 Non-plastic ML 18.30 15.45 0.0 32.3 67.7

    3 2 -- 3 DS 31.01 Non-plastic ML 17.94 15.81 0.0 34.2 52.0 13.8

    4 2 -- 3 DS Permeability (K) cm/sec = 7.99 x 10-5

    Quarry N0.5

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C

    (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS 0.551 0.132 0.0375 256 3.71 4.63 -- -- -- --- -- ---

    2 1 -- 2 DS -- --- -- --- -- --- 108 12.8 -- --- -- ---

    3 2 -- 3 DS -- --- --- -- --- -- 90 11.6 -- --- --- --

  • Enma Group for Design and Engineering Consultancy

    13B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.6

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L %

    P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS -- -- -- SM -- -- 2.2 59.8 38

    2 1 -- 2 DS 36.45 16.11 20.34 CL 18.10 16.02 0.0 27.7 46.2 26.1

    3 2 -- 3 DS 65.17 29.98 35.19 CH 15.98 22.07 0.0 2.5 43.4 54.1

    4 2 -- 3 DS Permeability (K) cm/sec = 2.18 x 10-7

    Quarry N0.6

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C

    (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS -- --- -- --- -- --- -- --- -- --- -- ---

    2 1 -- 2 DS -- --- --- -- 2.54 2.15 97 10.9 5.657 --- 1.487 3.197

    3 2 -- 3 DS 0.702 0.209 0.0618 336 8.14 12.54 -- --- -- --- -- ---

  • Enma Group for Design and Engineering Consultancy

    14B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.7

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L % P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS 37.28 18.32 18.96 CL 17.72 17.34 0.0 15.5 84.5

    2 1 -- 2 DS 44.60 21.89 22.71 CL 17.64 18.5 0.0 5.7 60.3 44.0

    3 2 -- 3 DS 39.03 19.43 19.6 CL 17.70 17.52 0.0 9.0 54.6 36.4

    4 1 -- 2 DS Permeability (K) cm/sec = 9.76 x 10-7

    Quarry N0.7

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C

    (kpa) T.S.S % CaCo3 % So3 Gyp. % 1 0 -- 1 DS -- --- -- --- -- --- 156 4.6 -- --- -- ---

    2 1 -- 2 DS 0.530 0.122 0.035 296 2.87 3.94 -- --- 7.931 34.475 3.577 7.690

    3 2 -- 3 DS -- --- -- 276 1.52 4.87 -- --- -- --- -- ---

  • Enma Group for Design and Engineering Consultancy

    15B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.8

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L % P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS 28.65 14.81 13.84 CL -- --- 0.0 33.4 66.6

    2 1 -- 2 DS 33.92 15.34 18.58 CL 18.74 13.43 0.0 13.1 64.2 22.7

    3 2 -- 3 DS 30.90 15.10 15.8 CL 17.88 17.03 0.0 19.5 80.5

    4 1 -- 2 DS Permeability (K) cm/sec = 5.89 x 10-6

    Quarry N0.8

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C

    (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS -- --- -- --- -- --- --- --- -- --- -- ---

    2 1 -- 2 DS 0.510 0.102 0.032 --- -- --- 133 5.7 7.345 --- 2.991 6.430

    3 2 -- 3 DS -- --- -- --- -- --- 117 7.2 -- --- -- ---

  • Enma Group for Design and Engineering Consultancy

    16B

    February, 2012 Al-Bassoni Dam / Salah El-Deen Governorate

    Quarry N0.9

    Sample Index properties

    U

    S

    C

    S

    Standard procter Grain size analysis Sieve & Hydrometer Max.Dry

    Density kN/m3

    O.M No Depth (m) Type L.L % P.L %

    P.I % G % S% M% C%

    1 0 -- 1 DS 33.36 15.41 17.95 CL 18.25 14.73 0.0 18.2 81.8

    2 1 -- 2 DS 51.93 24.91 27.02 CH 17.13 19.8 0.0 6.5 45.7 47.8

    3 2 -- 3 DS 47.90 23.03 24.87 CL --- -- 0.0 6.2 93.8

    4 1 -- 2 DS Permeability (K) cm/sec = 7.78 x 10-7

    Quarry N0.9

    Sample Consolidation Test qu kN/m2

    Swelling Char. Traixial - test Chemicals tests

    F.S, % S.P., kPa No Depth (m) Type eo Cc Cr C (kpa) T.S.S % CaCo3 % So3 % Gyp. % 1 0 -- 1 DS -- --- -- --- -- --- 147 6.8 -- --- -- ---

    2 1 -- 2 DS