Final FED Progress Report CMS Tracker Week 9th April 2003. FED FED-PMCs Status. Production of additional 40 FED-PMCs for Module Test setups. Identical to previous Mk3 cards. Some components on last time buy (Xilinx 4036 FPGAs.) PCBs are manufactured. Assembly is in progress. - PowerPoint PPT PresentationTRANSCRIPT
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
Final FED
Progress Report
CMS Tracker Week
9th April 2003
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDFED-PMCs Status
•Production of additional 40 FED-PMCs for Module Test setups.
•Identical to previous Mk3 cards.
•Some components on last time buy (Xilinx 4036 FPGAs.)
•PCBs are manufactured.
•Assembly is in progress.
•Test and deliver in batches of 6-10.
•Expect to Start deliveries in June.
•Expect to Complete deliveries in July.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDFinal FED
“Primary” Side
2 PCBs assembled& now under test:
ser001 at Imperialser002 at RAL
“OptoRx”
CFlash
VME64x
34 xFPGAs
Analogue
TTC
9U FEDv1
FE Module
Power
Memories
96 channels
JTAG
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDFE Module
• N.B. OptoRx is a mechanical sample & not soldered...• N.B. OptoRx is a mechanical sample & not soldered...
Front-End Module = 12 channels
DualADCs
OpAmps
DelayFPGAs
Duplicated onSecondary Side
“OptoRx”
“Primary” Side
TestConnector
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Progress up to end Q1/03...
2 FEDv1 pcbs were assembled in January (without OptoRx).
Started with following preliminary tests done at RAL:
•Power sequencing.
•JTAG Boundary Scan (automated IC connection tests ; passed ok.)
•FPGA Configuration (>30 devices) from cable and System ACE Compact-Flash card.
•FE Module analogue Electrical tests using Electrical Cross-Point switch card.
(NB no VME readout yet, so data is captured in FPGA using Xilinx Chip-Scope embedded logic analysers read out via cable.)
•Digital tests with simple “Test Firmware” loaded in FPGAs.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Cross-Point Switch Electrical Test card
Cross Point Switch (AD8116) “plug on” test cardElectrical tests onlyMulti-channelNeeds external signal generator(s)Sits over OptoRx location (pre OptoRx assembly.)
16 x 16
12 Outputs
AD8116
ProgramFED TestConnector
3 Inputs
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Early Electrical Data in FEDv1
0
200
400
600
800
1000
1200
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89
Series1
Series2
Series3
Series4
Series5
Series6
Series7
Series8
Series9
Series10
Series11
Series12
Chip-Scope logic analyser capture10 bit-raw data on 12 channels in FE FPGA
sine input (1 MHz) via Cross-Point Switch test card to 12 channels
first 100 (of 4k) samples @ 40 MHz
ADC count
preliminary
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Progress up to end Q1/03...
2 OptoRx assembled on ser 001 in March
•Ser 001 now at Imperial for detailed characterisation studies of FED with Optical inputs (using Opto Test card Mk1).
•Ser 002 kept at RAL for Firmware development / Digital tests.
• Collaborative effort in UK between RAL and Imperial (with assistance from Brunel.)
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Opto-Test card Mk1
VME interface logic
Analogue section
Sequence control logic
Sequence storage
DACAmplification+cmAnalogue opto-tx
Opto Test Card Mk1max 3 channelspattern generator(see 96 channel Mk2 card)
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Opto Test Setup at Imperial
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED First Optical Data in FEDv1
Chip-Scope logic analyser capture10 bit-raw data
“APV frame” pattern on single channel
samples @ 40 MHz
0
200
400
600
800
1000
1200
1 29 57 85 113 141 169 197 225 253 281 309 337 365 393 421 449 477
Series1
Series2
Series3
Series4
Series5
Series6
Series7
Series8
Series9
Series10
Series11
Series12
ADC count
unsynchronised clocks
preliminary
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Progress up to end Q1/03...
2 OptoRx assembled on ser 001 in March
•Ser 001 just arrived at Imperial for FED detailed characterisation studies with Optical inputs.
•Ser 002 kept at RAL for Digital function / Firmware tests.
• Collaborative effort in UK between RAL and Imperial (with assistance from Brunel.)
•FEDv1 Testing is progressing well…
No “show stoppers” yet for using FEDv1 pcb for Large Scale Assembly tests.
...but still a lot more to do.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED Project Targets
•FED Project aiming to satisfy 2 targets in next 12 months:
I) FEDs for Large Scale Assembly (LSA) tests:
“July ‘03 (2?) / end ‘03 (2) / beg ‘04 (2) / mid ‘04 (6)”
96 chan Opto FED essential
only need to provide restricted FED functionality
assumes we can use existing design FEDv1 pcbs
II) FED Pre-Production Manufacture: Q1-2/04
to stay on final CMS installation schedule
need to demonstrate full FED functionality
assumes new design iteration FEDv2 pcbs
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDLarge Scale Assembly Test Requirements 2003
Paraphrasing from note of Piero Verdini...
“To Readout Virgin Raw Data formatted as DAQ events via VME in response to TTC trigger and clock.”
Need 96 OptoRx chans. Trigger & Readout rates are not critical.
Functionality
Does require:
•Scope Mode and Software Triggers for set up.
•Controls from VME for run mode, clock source, clock skew, OptoRx offsets (with readback.)
•VME Event buffer with standard DAQ events. Counters for triggers & errors.
•System ACE loading, Clock/Trig/Resets on TTC Chan A, Hardware throttle output.
•FED delivered as a Package including Software Library to drive the Firmware.
Does not require:
S-LINK readout, Clustering mode, Spy Channel, TTC chan B, TCS (but maybe simple throttle), DAC control, pedestal/threshold data, System ACE interface, VME64x config EPROM…, VME Interrupts, Temp chip control…
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDPre-Production FEDv2
Does require :
S-LINK readout, Clustering mode, Spy Channel, TTC chan B, TCS (but maybe simple throttle), DAC control, pedestal/threshold data, System ACE control and in situ-programming, VME64x config EPROM…, VME Interrupts, Temp chip control…
Tested with up to 20 FEDs in a crate.
All operating at target Trigger Rate of 100 kHz!
… FEDv1 has been designed for this.
•Assumption: have to demonstrate full functionality before pre-production FEDv2 (Q1-2/2004.)
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
CMS Tracker FED Schedule
•FED x 450 installation at CERN expected to start Q3 2005
Design TestProduction& InstallationPre-Pro
FEDv3 (500)FEDv2 (20)FEDv1 (20)
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDFirmware
Status:
Ready to start installing Final Designs on FED...
Delay FPGA: Final version synthesised and under test.
FE FPGA: Final version synthesised and “ready” for test.
BE FPGA: Data path up to QDR filling synthesised and ready for test. TTC chan A interface implemented. Read path to VME in progress incl DAQ formatting.
VME FPGA: External VME cycles tested. Serial comms to BE close to test. To do... parallel link to BE incl. readout interface.
Steps towards providing Module Test functionality...
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FED FPGAs
Delay x 24 FE x 8
BE x 1
VME x 1
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
Clocks
Data
FEDv1 Firmware Subtasks
SerialComms
VMELINK
VMEBus
VMESystemSystemACEACE
SystemACE
Clocks
EPROMEPROM
EPROM
TTCrxQDR Write
QDRs
QDR Read
SerialComms
Headers
TTCchanA
VME LinkRegs
S-LINKS-LINK S-LINK
Clocks
Data
SerialComms
ScopeMode
HeaderMode
FIFOs
Input
Regs
SerialComms
ScopeMode
HeaderMode
Output
Input
Regs
Opto Rx DACOpto Rx DAC
DELAY FPGA x 3 x 8
FE FPGA x 8
BE FPGA
VME FPGA
ADCADC
Simulated
Tested on FED
Not needed tilll FEDv2Not needed tilll FEDv2
Control
Data
Control
Throttle TriggerInput
ClusterClusterModeMode
EdEd
SaeedSaeed
Bill / IvanBill / Ivan
EdEd
Ed, John, MattEd, John, Matt
Saeed, Ivan, EmlynSaeed, Ivan, EmlynChan BChan B
I2CI2C
Temp
Implementation in progress
ExternalDevices
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDFirmware Tasks in Q2/03
• Load Final Delay FPGA design. Test DDR to FE FPGA using ChipScope.
• Test Serial Comms and Readback: From VME -> BE -> FE -> Delay FPGA
Tests OptoRx controls, ADC clock skew. Requires software.
VME end nearly ready. BE take receiver block from FE design. Provide simple register map and test with software. (Later extend to other controls eg to test clock skewing.) NB Uses Final design of FE, Delay and VME. Test design in BE.
• Load Final FE FPGA design. Test DDR inputs, Scope Mode and FIFO outputs.
• Meanwhile Test Final BE design writing to QDR. Inputs from FE FPGA in Scope Mode.
• Extend BE to test QDR readout to VME.
• Add Event/Header formatting for readout.
• Test parallel link from BE to VME and readout protocol. Readout via CPU.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDFirmware Tasks in Q2/03
•Test Readout interface to CPU, poll on VME buffer with register for event length. Software needed.
•Use TTC to provide ext clock and trigger. Mostly implemented. But need TTC VME cards to do this test. Need clock and trigger select logic.
•Test Final FE Virgin Raw data mode (header finding.) Need APV frame generator (OptoTest Card?) Add synch clock and trigger inputs (TTC or backplane?). Need clock and trigger select logic.
•Add Control registers & Counters for nr triggers, (resets), errors…. In BE read by VME.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDDelivery Schedule ‘03
• We have 18 OptoRx in hand. Lots more coming in June?
• We have 4 extra pcbs in hand. We have necessary components in hand.
• Put 8 OptoRx on ser001 in May.
• Put 2 OptoRx on ser002 in May.
• Assemble another 4 PCBs without OptoRx in May.
• We are on schedule to deliver 1 FED (ser001) for LSA Tests by beginning of September.
• Delivery of 2nd FED (ser002) Q4 2003?
• Then further FEDv1’s according to schedule provided... “end ‘03 (2) / beg ‘04 (2) / mid ‘04 (6)”
• Availability of LHC crates in UK. (May?)
• Other Critical tests for FEDv2 Q3-4…
E.g. S-LINK “direct” tests with FED Kit.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDLarge Scale Assembly Setup Assumptions
Assumptions:
• Use 9U VME64x crates (LHC crates available for UK tests in May.)
• Clock and Trigger arrives on standard TTC Opto cable (on TTC chanA.)
• Sync/Bx counters Reset by ‘101’ on chanA.
• Hardware Throttle signal level on back-plane pin?
Comments:
• Caution should be exercised when using a FED that may not be fully characterised to make detailed measurements of other electronics systems.
• Basic FED training to be provided (in UK).
• Need well defined points of contact between LSA Testers and UK.
• Other FED related projects are being undertaken in UK.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDOther Projects in UK…
DACs
Fibre reels
8-way MU optical connectors
Clk & Control
Analogue Optical Hybrids (AOHs)
Cross-point switches
A 96 channel optical driver to test the FED has been designed at Imperial and is now in layout.
It is consists of four 9U VME cards running in parallel, each with 8 AOHs driving 24 optical fibres.
The 24 analogue inputs to the opto hybrids are fed from an analogue cross-point switch. The latter allows an AOH to receive a signal from any one of the three digital to analogue converters or an external source.
A temperature of the AOHs is maintained to ~0.2 °C to keep the laser output stable.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDv1 FEDv1 Provisional Memory Map
Reserved
Restrictions in 2003:
•A32 Slave only
•D32 access only.
•Single Access and Block Transfers (no BT to C&S regs)
•No Interrupts
Control & Status
Serial Commands
Test Memory
Serial Read Back
VME Buffer
Reserved
Reserved
Block RAMs
Read Only ID
8 x 8 KB blocks
Using a “poor man’s” Geographic Addressing scheme...Base Address: Bits 21-16 = Slot numberE.g. $0011’0000 - 0011’ffff for slot 17(Nb Doesn’t use VME64x CSR space.)
Offset
0000
2000
4000
6000
8000
A000
C000
E000
Currently FEDv1 has 64 KB in A32 address space
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDTest Software
Software:
Up to now only peek & poke program to VME from Linux.
Good enough for really basic firmware tests.
But need to integrate FED software into the XDAQ system.
And we would like some easy (GUI driven) to use compatible test software.
Need FED Application Programming Interface API. A list of software functions FED responds to.
API to shield users from Basic low level code needed to...
1. Serial string commands to load and read back FE/Delay FPGA registers as described by Bill.
Still to add similar commands for BE FPGA registers.
2. Readout routine.
Need register map/list.
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDv1 Event Readout Protocol
DAQ Trailer
FormattedFED Data
DAQ Header
Tracker Header
Readout (via VME) Formatted Events identical to those sent to S-LINK
•Load Parameters e.g. Peds, Clock skews
•Set run mode
•Select clock and trigger source
•Start Run and enable Triggers/Frames
•Poll on VME buffer status
•Get length of event
•Readout the event (in FPGA buffer sized chunks)
(Raw events > FPGA buffer size)
•Reset VME buffer status
•Repeat until Run stop
•Periodically look at local status registers and counters to check everything is OK
Event Formats:
Virgin Raw Data. Raw APV frames.
*Scope Mode or Software Trigger
Both are fixed event sizes within a Run.
(*Empty Tracker Header.)
9th April 2003Tracker WeekJohn Coughlan et. al. FED-UK Group
FEDTest Equipment
• Cross-Point cards available for electrical inputs. Most useful in Scope modes.
• Second Opto Test card Mk1 for RAL (after Easter). Most convenient for APV patterns. Needed for Raw Data (header finding) readout tests with FE FPGA.
• Have TTC VME cards in hand at IC and RAL.
• FED Kits for S-LINK in hand at IC and RAL.
• New PC/VME Interface (SBS optical link card) by Easter?
• Standard LHC VME64x Crates in UK by May.
• Large number of OptoRx in UK by June.