    Pro ect Pro osal for EPCIC NPro ect Pro osal for EPCIC N--WHP,WHP,

    Associated Pipelines and ReceivingAssociated Pipelines and Receiving

    --

    Presented by Abraham Imam MuttaqinStudent ID : 115151

  • 7/25/2019 Final Exam 81.9020_AIM

    2/23

    Presentation Outlines :Presentation Outlines :

    Key Milestone

    Work Breakdown Structure

    Project Schedule

    Project Cash Flow Analysis

    Conclusion and Way Forward

  • 7/25/2019 Final Exam 81.9020_AIM

    3/23

    Project Name : Pad-Thai Field

    Development Field Location : 100 NM, east of

    ,

    Water Depth : 60 meter

    Type of Contract : Lumpsum

  • 7/25/2019 Final Exam 81.9020_AIM

    4/23

    Key locations which related to project execution activities.

  • 7/25/2019 Final Exam 81.9020_AIM

    5/23

    , ,

    Construction (C), Transportation & Installation (I) and

    Hook-u & Commissionin C for Nick Wellhead

    Platform (N-WHP)

    1) 600 MT Topsides with 16 Slots Conductor

    2) 700 MT Four-Legged Jacket

    3) 1000 MT Piles and Conductors

    Subsea Pipelines : 20 dia x 15 km Long

    Tie-in to existin facilities E-WHP : new i launcher,deck extension and tie-in.

    Primary Steel, Crane and Coated 20 Pipeline will be

    supplied by Client

  • 7/25/2019 Final Exam 81.9020_AIM

    6/23

    Schematic Interface between N-WHP and Existing E-WHP

  • 7/25/2019 Final Exam 81.9020_AIM

    7/23

    -

    Drillin on N-WHP : 1 Se t 30 Oct 2014

    HUC Com letion : 30 Nov 2014

    Total Project Duration : 14 Months

  • 7/25/2019 Final Exam 81.9020_AIM

    8/23

    14 months which is safe, efficient and effective.

    Meet or exceed Company expectations in

    terms of HSE, technical content, quality andschedule.

    Foster and maintain a ood workinrelationship with the Company throughout the

    ro ect.

  • 7/25/2019 Final Exam 81.9020_AIM

    9/23

    Pro ect Execution PlanPro ect Execution Plan Mobilize key-personel within one week after contract

    Set-up Interface Process System among the disciplines (E,

    P, C, I and C)

    Review FEED deliverables and within 2-3 month

    Engineering Team should issue AFC deliverables

    Strong Procurement Team to be set-up at very beginningof the project phase to manage critical long lead items and

    -

    Fabrication Schedule

    -

    Transportation and Installation will be sub-contracted

    - -

    Seek financial funding in month 12 of project execution

  • 7/25/2019 Final Exam 81.9020_AIM

    10/23

    .

    2. Detailed Engineering (Process, Structure,

    3. Procurement (Contractor Supplied and Client

    Su lied

    4. Fabrication (Jacket, Piles & Conductors and Topsides)

    5. Trans ortation Pi eline acket and Pile & Conductor

    Topsides)

    6. Installlation, Hook U & Commissionin Pi eline,Jacket, Piles and Conductors, Topsides and Tie-in to

    Receiving Facilities E-WHP)

  • 7/25/2019 Final Exam 81.9020_AIM

    11/23

    Pro ect Or anization ChartPro ect Or anization Chart ProjectManager

    Interface

    Manager

    ProjectControland

    Risk

    QAManager ProjectEngineer

    HSEManager

    Engineering

    Manager

    Procurement

    Manager

    Fabrication

    Manager

    T&IManager HUCManager

    Structure

    Mechanical/Piping

    Structure

    Mechanical/Piping

    Fieldengineer

    MarineCoordinator

    Buyer

    Procurement

    Hookup Eng

    CommisiongEng

    Electrical/Instrument Electrical/Instrument

    Safety

  • 7/25/2019 Final Exam 81.9020_AIM

    12/23

    Project ScheduleProject ScheduleDuration

    Year 2013 Year 2014

    m m m m m m m m m w w w w w w w w w w w w w w w w w w w w m m m m m1 Contract Award 1d

    2 Detailed Engineering

    Stuctural 6m

    Mechanical/Process 6m

    Electrical 6m

    (month)

    Instrumentation 6m

    3 Procurement

    Client Supplied

    Primary Steel 3m

    Crane 6m

    Coated line pipes & bends 10m

    Contractor Suppli ed

    Low grade steel 1m

    CS piping material 2m

    Duplex piping 6m

    Valves, SP items 6m*

    Vessels, Pump, Tanks 6m

    Safety equipment 3m

    E/I and Telecom equipment 6m*

    an e ecom u s ma er a m

    4 Fabrication

    Topsides incl. deck extension/pig receiver 7mTesting and pre-commissioning for Topsides 1m

    Jacket 6m

    Testing for jacket 1w

    Piles/Conductors 3m

    N-WHP sail awa y

    5 Transportation and Installation

    Transportation

    Pipeline

    Jacket

    TopsidesPiles/Conductors

    Deck Ex tension and pig receiver

    Installation

    Pipeline

    Jacket

    Topsides

    Piles/Conductors

    Installation Completion

    6 Hook-up and Commissioning

    Install Deck extension @ E-WHP

    Install Pig receiver @ E-WHPTie-in to existing E-WHP and commissioning

    HUC Comple tion

    7 Drilling Campaign on N-WHP

    Early FacilityReadiness

  • 7/25/2019 Final Exam 81.9020_AIM

    13/23

    Project Cost EstimationProject Cost EstimationUnit Price Lump Sum

    (USD/unit) PRICE (USD)

    1Project Management (Management,

    Insurances, Services To Company, etc.)17 months 90,000 1,530,000

    2 Engineering Lumpsum 2,000,000

    3 Procurement

    Structural Material 1 LS 600,000 600,000

    Piping Material 1 LS 2,600,000 2,600,000

    Mechanical Material 1 LS 1,700,000 1,700,000

    E&I and Telecom. Material 1 LS 1,400,000 1,400,000

    Procurement Services (Expedite/TPI/FAT) 1 LS 315,000

    , ,

    4 Fabrication

    Topside 137,500 MH 20 2,750,000

    Jacket & Appurtenances 56,000 MH 20 1,120,000

    Piles & Conductor 20,000 MH 20 400,000

    LoadOut & Seafastening 1 LS 300,000 300,000PMT,

    4%Enginee

    rin 6%

    HUC,

    7%, , na ocumen a on ,

    4,670,000

    5 Transportation & Instal la tion

    Mob/Demob

    - DP Vessel 1 time - 6,200,000

    Operations

    Procure

    ment,

    19%

    T and I,

    49%

    - DP Vessel 31.5 Days 300,000 9,450,000

    Barge & Tug

    - Platform (2 nos) 49 Days 18,000 882,000

    - Pipelines 15 Days 18,000 270,000

    Crew Boat 14 Days 10,000 140,000

    Fabricat

    ion, 14%

    16,942,000

    6 Hook-Up and Commissioning

    Flowlines Installation and Well HUC 1 LS

    Header Fab and Installation 1 LS

    Fab and Install Deck Extension 1 LS 2,500,000

    Tie-in and Commissioning to E-WHP 1 LS

    2,500,000GRAND TOTAL (BASE) 34,257,000

    GRAND TOTAL (BIDDING PRICE) 41,108,400

  • 7/25/2019 Final Exam 81.9020_AIM

    14/23

    Project Monthly Performance CostProject Monthly Performance Cost

    Cost

    (x1000 USD) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    1 Project Management 1836 131 131 131 131 131 131 131 131 131 131 131 131 131 131

    2 Engineering 2400 400 400 400 400 400 400

    Project Activity DescriptionNo Month

    3 Procurement (Material)

    Low grade steel 756 756

    CS piping material 756 378 378

    Duplex piping 1008 168 168 168 168 168 168

    Valves, SP items 1512 252 252 252 252 252 252

    Vessels Pum Tanks 1890 315 315 315 315 315 315

    Safety equipment 252 84 84 84

    E/I and Telecom equipment 1386 231 231 231 231 231 231

    E/I and Telecom bulks material 378 94.5 94.5 94.5 94.5

    4 Fabrication 5244 583 583 583 583 583 583 583 583 583

    5 Transportation and Installation 20330 6777 6777 6777

    6 Hook-up and Commissioning (HUC) 3000 3000

    Project's monthly progress cost 41108 531 531 1497 3392 2636 2258 1774 1680 714 714 714 7851 6908 9908

    ro ec cumu a ve mon y progress cos

    Notes :

    1) Projects monthly performance cost will be the basis forClient payment

    2) Monthly equal cost basis is assumed

  • 7/25/2019 Final Exam 81.9020_AIM

    15/23

    Project Cash Flow ForecastingProject Cash Flow Forecasting

    Project Cost

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    1 Cash inflow (incl 20% profit) 531 531 1497 3392 2636 2258 1774 1680 714 714 714 7851 6908 9908

    Project's Monthly CashflowNo Cashflow Forecasting - EPCI Project

    - -

    (based on project's monthly progress)

    2 Cash outflow (incl profit)

    a) Project Management -131 -131 -131 -131 -131 -131 -131 -131 -131 -131 -131 -131 -131 -131

    b) Engineering -400 -400 -400 -400 -400 -400

    c) Material

    -

    CS piping material 756 -756

    Duplex piping 1008 -1008

    Valves, SP items 1512 -454 -605 -454

    Vessels, Pump, Tanks 1890 -567 -756 -567

    Safety equipment 252 -252

    or er, on s te,

    30% commissioning

    One month after

    Pre-Comm

    - . - -

    E/I and Telecom bulks material 378 -76 -189 -113

    d) Fabrication -583 -583 -583 -583 -583 -583 -583 -583 -583

    Loadout and seafastening 360 -360

    e Trans ortation and Installation

    20% order, 50% on site,

    30% commissioning

    DP Vessel 18780 -9390 -9390

    Boat, barge, vessel and tug service 1550 -1550

    f) HUC 3000 -3000

    Monthl Cash Inflow in x1000 USD

    50% mob/demob, 50%

    installation complete

    One month credit

    from Vessel Owner

    Monthly Cash Outflow (in x1000 USD) -531 -1829 -1363 -1870 -1366 -1303 -3776 -714 -714 -2264 -10104 -10104 -2042 -3131

    Net Project Cashflow (in x1000 USD) 0 -1298 134 1523 1271 956 -2001 966 0 -1550 -9390 -2253 4866 6777

  • 7/25/2019 Final Exam 81.9020_AIM

    16/23

    Project Cash Flow ProfileProject Cash Flow Profile

    8000

    4866

    4000

    6000

    0 134

    15231271

    956 966

    00

    2000

    -1298

    -2001-1550

    -2253-2000

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    -6000

    -4000

    -9390-10000

    -8000

    -12000

    Ordinate axis : in thousand USD

  • 7/25/2019 Final Exam 81.9020_AIM

    17/23

    1) Integrity and condition of existing facilities (E-

    WHP)

    2) Sub-standard FEED deliverables from Client3) Inadequate integration between OTM Ltd and

    Sub-Contractors

    e ay n comp e on o e vera es ostart fabrication) and Long Lead items (material

    of Client Supplied Material (i.e primary steel)

    5 Limited resources for man ower and sub-contractors

    6) Lack of cash in month 12 during projectexecution

  • 7/25/2019 Final Exam 81.9020_AIM

    18/23

    EPCIC project based on following proposal :

    1) Proposed project execution plan or method statement

    3) Proposed Project Schedule

    , ,

    5) Twenty (20) percent profit margin

    project cash flow analysis

  • 7/25/2019 Final Exam 81.9020_AIM

    19/23

    Thank YouThank You

  • 7/25/2019 Final Exam 81.9020_AIM

    20/23

    Backu SlidesBacku Slides

  • 7/25/2019 Final Exam 81.9020_AIM

    21/23

    Procurement CostProcurement Cost

    en oren or vsvs en oren orItem Description Price Leadtime Term

    Month(s)

    1 Low

    grade

    steel 600,000 1 CIFFabYard

    2 CSPipingmaterials 600,000 2 CIF

    Fab

    Yard

    3 Duplex

    Piping 800,000 6 CIF

    Fab

    Yard , ,

    5 E&I

    and

    Telecom

    bulks

    materials 300,000 4 CIFFabYard

    6 Vessels,Pumps,Tanks 1,500,000 6 CIF

    Fab

    Yard

    7 Valves,

    SP

    Items 1,000,000 8 CIFFabYard

    8 SafetyEquipment 200,000 3 CIF

    Fab

    Yard

    Total 6,000,000

    Item Description Price Leadtime Term CIF Fab

    Mont s yar r ce

    1 Lowgradesteel 700,000 1 CIF

    Fab

    Yard

    2 CS

    Piping

    materials 700,000 2 CIFFabYard

    3 DuplexPiping 1,000,000 6 CIFFabYard

    , ,6 ExWork 1,100,000

    5 E&IandTelecombulksmaterials 300,000 4 CIF

    Fab

    Yard

    6 Vessels,

    Pumps,

    Tanks

    1,500,000 6 CIFFabYard

    7 Valves,SPItems 1,000,0006 ExWork 1,200,000

    8 SafetyEquipment 200,000 3 CIF

    Fab

    Yard

    Total 6,400,000

  • 7/25/2019 Final Exam 81.9020_AIM

    22/23

    Fabrication CostFabrication Cost

    MT MH/MT MH USD/MH USD

    ops e ee , , ,

    Mech/Piping 150 300 45,000 20 900,000

    E/I 100 400 40,000 20 800,000

    , , ,

    Piles/Conductors 1,000 20 20,000 20 400,000

    2,300 213,500 4,270,000

  • 7/25/2019 Final Exam 81.9020_AIM

    23/23

    T and I CostT and I Cost

    Derrick

    Lay

    Barge

    (DLB)Unit Price (USD) Day USD Remark

    Opt1:8pointmooring,comeswith2AHTs,noSATsystem

    5MMUSDLumpSummob/demob(onto/fromSite) 5,000,000

    250,000USD/dayDayRate 250,000

    PipelayRate:1km/day 15 3,750,000

    JacketInstallation7days 7 1,750,000

    Pile/ConductorInstallation7days 7 1,750,000

    TopsidesInstallation3days 3 750,000

    PostinstalledRiserInstallation4days 4 1,000,000

    PipelineHydrotest

    2days 2 500,000

    DLBs eed3knots 38 14,500,000

    Opt2:DPVessel,withSATsystem

    6.2MMUSDLumpSummob/demob(onto/fromSite) 6,200,000

    300,000USD/dayDayRate 300,000

    PipelayRate:2km/day 7.5 2,250,000

    JacketInstallation6days 6.0 1,800,000

    e on u c or ns a a on ays . , ,

    TopsidesInstallation2days 2.0 600,000

    Postinstalled

    Riser

    Installation

    3days 3.0 900,000

    SubseaTiein2dayseachend 4.0 1,200,000

    PipelineHydrotest2days 2.0 600,000

    DPspeed3knots 32 15,650,000 Selected

    DiverSupportVessel(DSV)DP2,withROVandSATsystem

    2MMUSDLumpSummob/demob(onto/fromSite) 2,000,000

    150,000USD/dayDayRate 150,000

    SubseaTiein4daysbothends 4 600,000

    Pipeline

    Hydrotest

    2

    days 2 300,000, ,

    Barge&TugareonlyavailableinJurong,Singapore

    BareBargeTowSpeed5knots 18,000 15 270,000

    BargewithfullloadTowSpeed3knots 30 540,000

    Dayrateat18,000USD/day 19 342,000

    1,152,000

    Barge for pipeline

    Barge for jacket & piles

    Barge for topsides and deck

    extension

    CrewBoat&SupplyBoatareonlyavailable inSingapore -

    Dayrateat10,000USD/day Supply boat 10,000 14 140,000

    AverageSpeed

    10

    knots

    16,942,000Total Installati on Cost in USD =