Page 1: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

1 | 31-10-2017

1 | 31-10-2017

Final Design | Campus Fryslân

Renovation ‘Beursgebouw’ Leeuwarden

2 November 2017

Page 2: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

2 | 31-10-2017

Content

• Highlights

• Background

• Final Design

• Continuation

What will the Faculty building of

Campus Fryslân look like?

Page 3: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

3 | 31-10-2017

Highlights:

✔ New function: Faculty building

✔ Enhancing historical character

✔ Technical improvements & more sustainable

Page 4: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

4 | 31-10-2017

New Faculty building for Campus Fryslân in numbers

5,500 m2 GFA, 4 floors

Accommodate 1,000 students (Bachelor’s, Master’s, PhD) and staff

12 project/classrooms

4 medium-sized lecture halls

2 large interconnecting lecture halls

180 work stations for students

32 work stations for PhD students

65 work stations for staff

Page 5: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

5 | 31-10-2017

Enhancing historical character

Floor-length windows on ground floor (similar to the original

windows)

Original entrance restored: middle door will be accessible

Original entrance hall restored: stately staircase leading upstairs

Steel construction (from 1980s) largely removed: provides more

daylight, highlighting the original ornaments (few columns remain to

preserve the architectural history of the building and to reuse materials

sustainably)

Monumental façades will remain intact: new ‘boxes’ (not attached

to façades) will be placed and ‘stacked’ as classrooms and work places

Page 6: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

6 | 31-10-2017

Technical improvements and sustainability

All electric: no use of gas

Improved insulation in floor and ceilings

New HR++ windows on ground floor to prevent energy loss

Underground thermal energy storage with heatpump for heating

and cooling

362 solar panels on the flat roof

Use of energy low LED-lighting

Plug points at each workstation

High capacity of the wireless network (WiFi 802.11 ac)

From energy label G to Energy label C or even B

Page 7: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

7 | 31-10-2017

Background

Page 8: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

8 | 31-10-2017

About the building

For the past few decades the ‘Beursgebouw’ - a former trade centre

designed in 1880 by the famous urban architect Thomas Romein -

has served as a public library. It will soon be transformed into a faculty

building for Campus Fryslân, the new Faculty of the University of

Groningen (UG).

Page 9: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

9 | 31-10-2017

About Campus Fryslân

The Campus Fryslân is composed of three components:

a University College (Bachelor’s level), a Master’s College (Master’s levels), and a

Graduate School (Doctoral level).

The building will provide lecture halls, research facilities and workplaces for a faculty of

around 1,000 Bachelor’s, Master’s and PhD students and staff members.

Page 10: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

10 | 31-10-2017

Inspired by the 17 UN sustainable development goals

The current Library building on Wirdumerdijk will serve as the faculty building for

Campus Fryslân, which will start the new English-taught Master’s degree programme in

Sustainable Entrepreneurship and the new English-taught Bachelor’s degree

programme in Global Responsibility & Leadership (GRL) in September 2018. This

multidisciplinary programme is inspired by the 17 United Nations goals for a

sustainable, fair and safe world.

Page 11: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

11 | 31-10-2017

Final Design

Page 12: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

12 | 31-10-2017

Design Team

Architecture J.O.N.G. architecten Lemmer

Installation consultancy Mul BV Gouda

Construction W2N Engineers BV Drachten

Building Physics

and Fire Safety

Van der Weele Groningen

Kees de Haan Wytze Bouma

Page 13: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

13 | 31-10-2017

Final Design | Outside

Solar Panels on the roof

Use middle door as main entrance

Floor-length windows on ground floor

HR++ windows on ground floor

Page 14: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

14 | 31-10-2017

Final Design | Ground Floor

A

C) Reception Desk

E) Project Rooms

D) Classrooms

B) Original staircase

A) Main entrance

B C

D

D D

E

F

F) Work space for Staff

H

I) Rear entrance / exit

G

I

H) Toilets

G) Study spaces

G

F

Page 15: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

15 | 31-10-2017

Final Design | Original Staircase

Current Original New

B

Page 16: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

16 | 31-10-2017

Final Design | Work Places Staff F

Designed close to

classrooms for maximal

interaction between

students and staff

Page 17: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

17 | 31-10-2017

Final Design | Study area along classrooms

Coffee

Study places

Classrooms

G

Page 18: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

18 | 31-10-2017

Final Design | First Floor

A

C) Living Lab

E) Classroom

D) Classroom/Boardroom

B) Auditorium

A) Main hall

B

C

D

E

F

F) Work places staff/PhD

G

G) Toilets

G

B

F

F

H

I

H) Restaurant

I) Meeting Room

Page 19: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

19 | 31-10-2017

Final Design | Main hall & Restaurant

Restaurant (250 seats)

Classrooms

Main hall

Oak floor

A

Page 20: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

20 | 31-10-2017

Final Design | Study places & Living Lab

Monumental façades will remain intact

Living Lab

Study places at façade

C

Page 21: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

21 | 31-10-2017

Final Design | Second Floor

A

C) Restaurant Seats

E) Student Desk

D) Study Places

B) Classrooms

A) Reading Room

C

D

E

F

F) Staff Area

B

Page 22: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

22 | 31-10-2017

Final Design | Restaurant Seats & Study Places C

250 restaurant seats with

facilities for formal

occasions

Page 23: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

23 | 31-10-2017

Final Design | Third Floor

A

B) Community Lounge

A) Work places PhD’s

B

Page 24: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

24 | 31-10-2017

Final Design | Monumental façades will remain intact

Page 25: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

25 | 31-10-2017

Continuation

Page 26: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

26 | 31-10-2017

How to proceed?

When? What is happening?

2 November 2017 Final Design presented

10 November 2017 Announcing contractor

T.b.a. More details will follow later

Page 27: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

27 | 31-10-2017

Page 28: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

28 | 31-10-2017

Page 29: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

29 | 31-10-2017

Page 30: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

30 | 31-10-2017

Page 31: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

31 | 31-10-2017

Page 32: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

32 | 31-10-2017

Page 33: Final Design | Campus Fryslân - rug.nl · Final Design | Ground Floor A C) Reception Desk E) Project Rooms D) Classrooms B) Original staircase A) Main entrance C B D D D E F F) Work

33 | 31-10-2017