FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, NORTHERN TERRITORY FOR THE PERIOD 23 SEPTEMBER 2017 - 15 June 2018 TENEMENT HOLDER: ELEMENT 92 PTY LTD Pine Creek SD52-08 1:250,000 Geological Map Sheet Pine Creek 5270 1:100,000 Geological Map Sheet McKinley River 5271 1:100,000 Geological Map Sheet TARGET COMMODITIES: Uranium, Base Metals, Gold, Graphite Date: July 2018 Authors: Zia Bajwah ([email protected]) Costica Vieru Distribution: NT Department of Primary Industry and Resources Element 92 Pty Ltd (Thundelarra Ltd)

Upload: others

Post on 06-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

FINAL AND ANNUAL REPORT ON

EL 24549

PINE CREEK, NORTHERN TERRITORY

FOR THE PERIOD

23 SEPTEMBER 2017 - 15 June 2018

TENEMENT HOLDER: ELEMENT 92 PTY LTD

Pine Creek SD52-08 1:250,000 Geological Map Sheet

Pine Creek 5270 1:100,000 Geological Map Sheet

McKinley River 5271 1:100,000 Geological Map Sheet

TARGET COMMODITIES: Uranium, Base Metals, Gold, Graphite

Date: July 2018

Authors: Zia Bajwah ([email protected])

Costica Vieru

Distribution: NT Department of Primary Industry and Resources

Element 92 Pty Ltd (Thundelarra Ltd)

Page 2: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

1

Copyright Statement as per Regulation 126 of the Mineral Titles Act

This document and its content are the copyright of Thundelarra Limited. The document has

been written by Zia Bajwah and Costica Vieru for submission to the Northern Territory

Department of Mines and Energy as part of the tenement reporting requirements as per

Regulation 78(1) of the Minerals Titles Act.

Any information included in the report that originates from historical reports or other sources

is listed in the "References" section at the end of the document.

We authorise the department to copy and distribute the report and associated data.

Page 3: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

2

SUMMARY

Exploration Licence 24549 is located about 30 km NE of Pine Creek, Northern Territory. The

Licence was granted on 23/09/2005 to Imperial Granite and Minerals Pty Ltd and was

expected to expire on 22/09/2018. However, due to lack of mineral potential, the tenement

was surrendered on 15 June 2018. Originally, It had 136 blocks and after successive

reductions now the EL consists of 18 blocks. Element 92 Pty Limited (a wholly owned

subsidiary of Thundelarra Limited) purchased the Licence from Atom Energy Limited/Excelsior

Gold Limited in 2012.

The project area is located within the central part of the Pine Creek Orogen (PCO) which is a

tightly folded sequence of Paleoproterozoic rocks, 10km to 14km in thickness, laid down on a

rifted granitic Archaean basement during the interval ~2.2-1.87Ga. In the project area, rocks

of the Masson Formation, Mundogie Sandstone, Mount Bonnie Formation along with

members of Cullen Batholith (Allamber Springs, Frances Creek, McCarthy’s and Minglo

granites) are exposed. During the Top End Orogeny (1870 – 1780 Ma), the sequence was

tightly folded and pervasively altered with metamorphic grades averaging greenschist facies

to phyllite.

Exploration work undertaken by Thundelarra Limited/Element 92 during the reporting period

consisted of comprehensive geological, structural and lithostratigraphic assessment of the

previous data. This exercise downgraded the mineral potential of the project area. During the

term of the License, the project area was explored by collecting and interpreting historical

exploration data, which identified mineral potential for uranium, base metals and graphite

mineralisation. The project area was explored by geological mapping, geochemical sampling,

airborne and ground geophysical surveys, several campaigns of drilling, data processing and

interpretation. In the final year of the tenure, assessment of the project area downgraded the

potential for finding any economic size mineral deposit for mining. As a result, EL 24549 was

surrendered on 15 June 2018. Rehabilitation was completed for previous and current drill

holes. They were plugged and the drill pads and access roads (total approximate length of

1.7km) were ripped by a grader.

Page 4: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

3

CONTENTS Copyright Statement as per Regulation 126 of the Mineral Titles Act……………………..1

SUMMARY……………………………………………………………………………………….2

2. LOCATION AND ACCESS………………………………………………………………….4

3 TENEMEN DETAILS…………………………………………………………………………4

4. GEOLOGICALSETTING…………………………………………………………………….6

5. PREVIOUS EXPLORATION HISTORY…………………………………………………...8

6. EXPLORATION DURING THE TERM OF THE LICENCE……………………………...9

7. CONCLUSIONS AND RECOMMENDATIONS………………………………………….21

8. REFERENCES………………………………………………………………………………21

Table of Figures

Figure 1: Location of Project Area, remaining EL24549 (EL illustrated in black). ................... 5

Figure 2: Geological setting of the project area (EL illustrated in black). ............................... 7

Figure 3: Possible style o fmineralisation in the project area……………………………………10

Figure 4: Geological setting of the Cleo’s uranium project area (from Lennartz, 2008)……...11

Figure 5: Ground Radiometrics (CPS) of the project area……………………………………….13

Figure 6: EL24549 2010 Radiometric Survey (preliminary data). U_NW Shade_L…………14

Figure 7: Geological mapping of Allamber Embayment area with collar location……………16

Figure 8: Location of RC drill hole (red) drilled during 2012 – 13 reporting period……………17

Figure 9: Location of drill holes with in EL 24549…………………………………………………18

Figure 10: Location of the 6 RC holes drilled during 2014 – 2015 reporting period…………..19

LIST OF TABLE

Table 1: Cleo’s Uranium project Inferred Resource estimate……………………………………12

Page 5: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

4

1. INTRODUCTION

Exploration Licence 24549 is located approximately 30 km NE of Pine Creek, Northern

Territory (Figure 1). Element 92 Pty Limited (a wholly owned subsidiary of Thundelarra

Limited) purchased the Licence from Atom Energy Limited/Excelsior Gold Limited in 2012. EL

24549 was granted on 23/09/2005 and after successive renewals it was expected to expire

on 23/09/2018. However, due to lack of mineral potential the tenement was surrendered on

15 June 2018. This is the final and annual report for EL 24549.

2. LOCATION AND ACCESS

EL 24549 is located approximately 175 km SSE of Darwin and approximately 30 km NE of

Pine Creek (Figure 1). The tenement can be approached by roads and tracks leading off the

Kakadu Highway. It can also be accessed from the Mary River Homestead Road which leads

off from the Kakadu Highway. Vehicle access within the tenement is possible by station tracks

which may be impassable during wet season.

3. TENEMENT DETAILS

EL 24549 was applied for by Imperial Granite and Minerals Pty Limited on 17 January 2005, and

was granted on 22 September 2005 for a period of 6 years. It originally had 136 graticular blocks

with an area of approximately 451.7 km2. The tenement changed hands in 2008 and was purchased

by Excelsior Gold Limited/Atom Energy Limited. In 2009, Element 92 Pty Ltd, acquired uranium

exploration rights. In 2012, Element 92 purchased the tenement along with other assets in the

Allamber area. The licence has been subjected to several reductions and now has only 18 blocks.

Page 6: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

5

Figure 1: Location of Project Area, current EL24549

Page 7: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

6

4. GEOLOGICAL SETTING

The project area is located within the central part of the Pine Creek Orogen (PCO) which is a

tightly folded sequence of Paleoproterozoic rocks, 10km to 14km in thickness, laid down on a

rifted granitic Archaean basement during the interval ~2.2-1.87Ga (Ahmad et al. 1993). The

sequence is dominated by pelitic and psammitic (continental shelf shallow marine) sediments

with minor inter-layered tuff units. Pre-orogenic mafic sills of the Zamu Dolerite intruded the

sequence prior to regional metamorphism and deformation.

During the Top End Orogeny (1870 – 1780 Ma), the sequence was tightly folded and

pervasively altered with metamorphic grade averaging greenschist facies to phyllite. The

Cullen intrusive event introduced a suite of fractionated calc-alkaline granitic magma into the

sequence in the period ~1.85-1.78Ma. These high temperature I-type intrusives induced

strong contact metamorphic aureoles ranging up to (garnet) amphibolite facies to more

extensive biotite and andalusite hornfels facies.

Figure 2 shows geology of the project area where lithologies of Namoona Group (Masson

Formation), Mount Partridge (Wildman Siltstone, Mundogie Sandstone), South Alligator Group

(Koolpin Formation, Gerowie Tuff and Mt Bonnie Formation) and Finniss River Group (Burrell

Creek Formation) are exposed. These meta-sedimentary sequences have been intruded by

members of the Cullen Batholith and Zamu Dolerite at places (Bajwah, 1994).

The Masson Formation is the oldest rock unit which is exposed in the NE corner of EL 24549,

and has been intruded by the Minglo Granite. It is a thick sequence of carbonaceous phyllite,

slate, siltstone and dolomite. The dolomitic sediments are exposed towards the base of the

formation. Some massive ironstone and muscovite-tremolite marble horizons are also

present. The Masson Formation hosts significant uranium mineralisation in the south at Cleo’s,

Twin and Dam. In addition, it also contains some occurrences of base metals mineralisation,

including malachite-bearing schist at Hatrick.

Much of the relinquished part of the project area has at least 2 members of the Cullen

Batholith. These are Minglo Granite and Frances Creek Granite (Figure 2).

The Paleoproterozoic Allamber Springs Granite is one of the significant plutonic bodies,

genetically related to gold, uranium and base metals mineralisation in the adjacent contact

zone (Bajwah 1994). It is mainly massive and largely homogenous and even-grained,

although porphyritic marginal variants occur in several restricted localities. Mafic inclusions in

low abundances occur particularly towards the margin of the pluton. It crops out as expanses

of bare rock, boulders and tors separated by alluvial flats.

Page 8: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

7

Figure 2: Geological setting of the project area (EL illustrated in black)

Cleo/Dam

Twin

Page 9: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

8

5. PREVIOUS EXPLORATION HISTORY

The project area has been explored since 1960’s when first edition geological map of the Pine

Creek was produced, documenting the geology and mineral potential of the project area.

Between 1987 – 1993, metallogenic study of the Pine Creek (1: 250,000) sheet was

undertaken (Ahmad et al.,1993) which provided detail geological and geochemical

investigations of part of the project area. Bajwah (1994) published a report on the Cullen

Batholith which investigated details of petrological and geochemical characters of the

members of the Cullen Batholith and its relation with gold, base metals and uranium

mineralisation in the adjacent meta-sediments.

Total Mining Australia (formerly Minatome Aust Pty Ltd) carried out a reconnaissance survey

of the Pine Creek Orogen in 1981-82, covering part of the project area. Anomalous radiation

in the area led to the discovery of Cleo’s uranium deposits. The Cleo’s group of uranium

deposits/prospects (Figure 2) are located in the central of EL24549. EL4414, covering the

anomaly and surrounding area, was applied for on 12 August 1983 and subsequently granted

in January 1984.

Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture

with PNC (Australia) Pty Ltd was formed and in 1988 the joint venture applied for Exploration

Retention Lease 84 to cover the known uranium mineralisation at the Cleo, Dam and Twin

prospects. This licence was granted on 16 December 1988 for a period of 5 years. The area

of the licence was 300 hectares and it was granted on the grounds that ERL 84 contained an

anomalous zone of possible economic importance.

The Twin and Dam uranium deposits were discovered in the mid 1980’s by Total Mining. From

1984 to 1988 Total Mining carried out an extensive exploration program which included

geological mapping, ground radiometric surveys, soil radon (Alphacard) determinations,

ground magnetic surveys, EM conductivity surveys, a stream sediment orientation survey,

trenching and drilling. A total of 15,369m of drilling was completed in 367 holes and included

682m of auger drilling, 13,569m of percussion drilling and 1,118m of diamond drilling. Based

on this drilling, Total Mining estimated the two deposits contained pre-resource mineralisation

of 740 tonnes of U3O8.

Exploration activity was suspended when Total Mining’s French parent company withdrew

from exploration in Australia and no uranium exploration has been carried out on the project

since the late 1980’s.

Page 10: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

9

Other anomalies, including Cleo’s East, Lunch Creek, Cliff, Theatre, Theatre East, Mercedes,

Twin South, Dam North and Dam South anomalies were located by geophysical prospecting

methods. Preliminary drilling to test these anomalies encountered only minor mineralisation,

with hole ALL-P-353 intersecting 0.10m of 0.119% U3O8 at a depth of 20.2m.

In April 2007 Atom Energy Ltd (‘Atom’) acquired the tenement from Imperial granite and

Minerals Pty Ltd and Robert Bruce Cleaver. Atom raised $10 million dollars and listed on the

ASX on 26 June 2007. During 2007-8, Atom Energy Ltd carried out 5,291m of reverse

circulation drilling in 88 holes. Of this 3,356m in 56 holes were drilled at the Twin Prospect

and 1,192m in 32 holes were drilled at the Dam project. A further 580m in 9 holes were drilled

at the Hill 20 (Cliff) prospect area, some 350m to the north of Twin. A second stage of drilling

conducted in late 2008 comprised one diamond drill hole for 236m, located on the eastern

margin of the Twin prospect.

6. EXPLORATION ACTIVITY DURING THE TERM OF THE LICENCE

Exploration work undertaken by Thundelarra Limited/Element 92 during the reporting period

consisted of comprehensive geological, structural and lithostratigraphic assessment of the

previous data. This exercise downgraded the mineral potential of the project area. During the

term of the License, the project area was explored by collecting and interpreting historical

exploration data which identified mineral potential for uranium, base metals, gold and graphite

mineralisation. The project area was explored by geological mapping, geochemical sampling,

airborne and ground geophysical surveys, several campaigns of drilling, data processing and

interpretation. Rehabilitation was completed for previous and current drill holes. They were

plugged and the drill pads and access roads (total approximate length of 1.7km) were ripped

by a grader.

2005 – 2006

In the first reporting period, a desktop study was undertaken to assess the mineral potential

of the project area (Benger, 2006). A field trip was undertaken along with a consultant

geologist for ground checking and assessing uranium potential of the project area. Previous

investigations undertaken by Total Australia indicated narrow, sub-vertical zones of uranium

mineralisation within an arcuate N-S to NW-SE trending, steeply dipping zone of brecciated

siliceous dolomite and black shale (Figure 3). Some planning for drilling was also undertaken.

2006 – 2007

Atom Energy Limited acquire the rights to explore the project area and commenced mineral

assessment of the tenement (Hackett, 2007). Exploration activities within the tenement

included:

Page 11: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

10

• Compilation of historical data into database

• Validation of historical assays and logs

• Digitising and translation of historical downhole gamma logs into digital format for

use in resource estimation.

• Surveying of existing historical drill holes for inclusion in database

• Generation of targets for RC drilling program comprising some estimated 90

holes to be targeted in the Twin and Dam areas.

Figure 3: Possible style of mineralisation in the project area (Benger, 2006)

Page 12: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

11

2007 – 2008

During the year under review, Atom Energy Limited commenced drilling program at Cleo’s

project area located within EL 24549 covering Dam and Twins prospects. It included 88 RC

drill holes for 5291 m. Of which 56 holes for 3356 m were drilled at the Twin prospect and 32

holes for 1,192m were drilled at the Dam Prospect. Figure 4 shows the location of the Cleo’s

uranium project with local geology. A further 580m in 9 holes were drilled at Hill 20, some

350m to the north of Twin. All the data are given in (Lennartz, 2008).

Figure 4: Geological setting of the Cleo’s uranium project area (from Lennartz, 2008)

Based on this drilling program, Coffee Mining was commissioned to conduct uranium resource

estimate for the Cleo’ project area (Twins and Dam prospects). Table 1 represent the Total

Resource to 100 ppm U3O8 lower cut-off for the mineralisation of the Cleo’s Project (Twins

and Dam prospects).

Page 13: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

12

Table 1: Cleo’s Uranium project Inferred Resource estimate

2008 – 2009

During this period, Element 92 Pty Ltd, a wholly owned subsidiary of Thundelarra Limited took

control of EL 24549 and commenced exploration program under JV agreement. This program

focused on identifying new uranium anomalies and targets. Geological reconnaissance and

mapping was complimented by geophysical surveying (ground magnetics and radiometrics,

and airborne Tempest EM), to provide a basis for future exploration within the tenement.

During ground magnetic survey, a total of 130 line kilometre data were capture. Ground

radiometric survey identified a number of anomalous areas (Figure 5), including the known

Twin, Dam and Hill 20 (Cliff) prospects (Atwell, 2009). A number of anomalous areas around

the Cleo’s prospect were also identified.

2009 – 2010

After a technical review of all available data, Element 92 Pty Ltd conducted a dedicated

exploration program to test the mineral potential of the project area. It included

geological mapping, petrography, RC drilling and a detailed airborne radiometric/magnetic

survey. During geological mapping around the Twin prospect, a sequence of

metasedimentary ridges (arenite, schist, silicified dolomite) and north‐

south striking fault zones (marked by cockscomb texture quartz or quartz breccia with

iron matrix) appear to be offset by north-easterly trending faults.

These faults, together with late stage microgranite intrusions (which crop out near the

western sediment/granite contact) are thought to play an important role in controlling

uranium mineralisation. Slickensides were noted on the western contact of the meta-

sediments with the Allamber Springs Granite, while hornfels was noted near the

eastern contact (De Kever, 2010).

Page 14: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

13

A magnetic/radiometric airborne survey was completed in August 2010 over some of

the most prospective areas of the Allamber Project, including the Cleo’s area.

Figure 5: Ground Radiometrics (CPS) of the project area

Page 15: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

14

The survey was designed to improve the Company’s understanding of the geology

including structures controlling uranium mineralisation and to identify new uranium targets.

Figure 6 display radiometric image of the project area.

Figure 6: EL24549 2010 Radiometric Survey (preliminary data). U_NW Shade_L.

The Cleo’s, Dam, Hill 20 / Cliff, Twin and Big Buff prospects were selected for drill

testing and a reverse circulation (RC) drill program commenced in September 2009.

Drilling was carried out by Johannsen Drilling from Darwin, and 15 holes for 1519m

were completed. Several holes were abandoned due to difficulty in drilling through highly

weathered magnesium clays after dolomite. Further drill testing in these areas may require

diamond drilling technique.

Page 16: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

15

2010 – 2011

Thundelarra Limited/Element 92 Pty Ltd continued exploring the tenement for uranium and

base metal mineralisation during the reporting period. Main activities included detailed

geological mapping, geochemical sampling, RC drilling and high resolution geophysical

survey (radiometric and magnetic), together with historical data compilation. Detail mapping

of Twin and Dam prospects revealed a southerly plunging anticline contrary to the previous

interpretation which indicated presence of syncline with most drilling angled at perpendicular

to the interpreted bedding. A number of fault zones consisting of brecciated quartz veins (+/-

cockscombe texture quartz infilling vughs) were identified (Figure 7). These outcrops were

previously identified by Total as silicified dolomite lenses (Bajwah and de Kever, 2011).

In the light of the significant copper intersection returned from TAL024RC, a detailed soil

sampling program (100m x 25m and 100m x 50m) was conducted in June 2011 over the Twin-

Dam (Cleo’s project) area. Sampling was completed on EW lines in order to identify

mineralisation which may have moved along NE trending structures, in addition to NS and NW

trending lithological contacts and faults. A total of 716 samples were collected and assayed

for uranium and base metals mineralisation. In the project area, a total of 18 RC holes were

drilled for 1667 m (Figure 7). A number of intersections returned significant uranium and

copper mineralisation (Bajwah and de Kever, 2011). Thundelarra Limited/Element 92 also

undertook rehabilitation of approximately 90 drill pads which were constructed during drilling

undertaken by Atom Energy Limited as previously reported.

2011 – 2012

During the year under review, a dedicated exploration program was undertaken to test the

mineral potential of the project area, with specific focus on minerals systems along the

contacts with the granitic bodies. Exploration program involved geological mapping, high

resolution geophysical survey, soil/rock chip sampling, drilling and assaying. A total of 23

reverse-circulation (RC) holes for 2,877 metres were drilled within EL 24549 and around

Hatrick Prospect in the north, and Dam, Cleo’s, Cliff, South Cliff, Twin and Lucas Prospects to

the south. All data are given in Bajwah and Mill (2012). Geological mapping was undertaken

at Hatrick and South Cliff Prospects. Ground geophysical surveys (magnetic, radiometric and

gravity) were completed at various prospects within this EL.

Drilling at Hatrick intersected significant copper mineralisation in several holes within the

prospect with a peak intercept of 19 metres at 1.94% copper. Drilling at Cliff South intersected

ore-grade uranium mineralisation in several holes with a peak intercept of 8 metres at 1579

ppm U3O8 (Bajwah and Mill (2012). At Cliff South, apparently significant graphite

mineralisation was also encountered.

Page 17: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

16

Figure 7: Geological mapping of Allamber Embayment area with collar location

Page 18: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

17

2012 – 2013

During the reporting period exploration consisted of soil sampling, auger soil sampling,

prospect mapping, rock chip sampling, down-hole geophysical surveys and RC drilling. 20

conventional soil samples were collected at The Lead Prospect, 96 Auger soil samples at

Hatrick Prospect and 13 rock-chip samples were collected in The Allamber Embayment.

Down-hole EM was undertaken in one hole at Cleo’s Prospect (Mees, 2013). In addition,

down-hole gamma logging was completed or attempted in 17 holes in the Cliff South and

Lucas prospect areas. 7 RC holes for 889m and 251 samples were collected for assaying from

Cliff South, Lucas and The Lead Prospect (Figure 8). Significant uranium mineralisation was

intersected at Cliff South prospect.

Figure 8: Location of RC drill hole (red) drilled during 2012 – 13 reporting period

Page 19: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

18

2013 - 2014

The main activities during the reporting year included appraisal of available data, prospect

scale mapping and modelling and drill-testing of exploration targets. It involved drilling of 6 RC

holes for 552 m at Hatrick and Cliff South prospects (Figure 9). Much of the exploration efforts

in this report have been directed at Hatrick and South Cliff prospects to identify new uranium

and copper resources. Drilling at South Cliff and Hatrick intersected new areas of uranium and

copper with 49 m at 787 ppm (1.17 lb/t) U3O8 from 58 m to 107 m; including 17 m at 1286 ppm

(2.8 lb/t) U3O8 and 0.06% Cu from 78 m to 95 m in drillhole TAL107RC.

Figure 9: Location of drill holes with in EL 24549

Page 20: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

19

To date, exploration programs undertaken in the Allamber Project area has shown significant

potential for base metals, gold and uranium mineralisation. EL 24549 has returned good

intersections of uranium and Cu mineralisation, and appraisal of exploration data

demonstrates that mineralisation is open along strike and with depth. Geological, geochemical

and geophysical data support the mineral potential of the project area. Therefore, it was

recommended that company continues exploring EL 24549 to define new areas of uranium

and base metals mineralisation.

2014 – 2015

Exploration work undertaken by Element 92 during the reporting period consisted of

comprehensive geological, structural and lithostratigraphic assessment of the previous data.

Existing petrology, geochemistry and geophysical data sets were also used to delineate

potential graphite targets along the granite contact within metapelitic units.

Six reverse circulation holes were drilled at Hatrick and Cliff South during the reporting period.

All drill holes details are shown in Figure 10. Drilling was targeted base metals mineralisation

at Hatrick and uranium at Cliff South.

Figure 10: Location of the 6 RC holes drilled during 2014 – 2015 reporting period

Page 21: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

20

The best intersect was 3m at 1.56% Cu from 204-207m at Hatrick downgrading its economic

mineralisation potential (Petrella et al., 2015). Uranium have been intersected at Cliff South

but not in economic quantities. A review of existing geological, structural, lithostratigraphic,

petrological and geochemical data was undertaken in order to define graphite targets for

potential drilling in the next reporting period. Holes TAL132-135RC were drilled at Hatrick to

test the potential for copper/silver in inferred cross-cutting veins within the graphitic schists

hosting the known secondary copper mineralisation. Although numerous granitic dykes and

veins associated with quartz veining were intercepted, copper values were low. Again, no

magnetite and alteration is present. The highest intersection recorded was 3m at 1.56% Cu

from 204-207m in TAL135RC. The magnetic mineral is pyrrhotite, formed during the contact

metamorphic process. High arsenic values are present on the selvages of the quartz veins,

but gold appears to be absent in the system.

2015 - 2016

Exploration work undertaken by Element 92 during the reporting period has consisted of

comprehensive geological, structural and lithostratigraphic assessment of the previous data.

Access on the ground was constantly denied by the station owner due to the interference with

the hunting activities which are the core of his business. Consequently, only rehabilitation was

undertaken towards the end of the hunting season when the site access was allowed.

Rehabilitation was completed for all previous 56 holes. They were plugged and the drill pads

and access roads (total approximate length of 1.7km) were ripped by a grader (Petrella and

Costica, 2016).

2016 – 2017

During the period under review, Thundelarra Limited/Element 92 undertook the

reinterpretation of the existing geological data. Element 92 believes that the tenement has

potential for graphite mineralisation along the contact between the Masson Formation and

Frances Creek Leucogranite. The future exploration will be directed to delineate potential high

grade graphitic units around the granitic contact and the extension of the current uranium

resource and extension of the base metals mineralisation, along with graphite mineralisation

within the project area (Petrella and Vieru, 2016). In addition, some rehabilitation activities

were undertaken.

2017 – 2018

In the final year of the EL 24549, Thundelarra Limited/Element 92 Pty Ltd undertook a

thorough review of comprehensive geological, structural and lithostratigraphic assessment of

the project area, whether further renewal of EL 24549 is feasible for the discovery of any

economic mineral deposit of sufficient size to warrant further exploration. After careful data

review management reached to the conclusion that it is no more feasible to continue exploring

Page 22: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

21

EL 24549 and the possibility of finding any economic mineral deposit remained remote. As a

result of that EL 24549 was surrendered on 15 June 2018.

7. CONCLUSIONS AND RECOMMENDATIONS

Exploration work undertaken by Thundelarra Limited/Element 92 during the term of the

Licence consisted of comprehensive geological, structural and lithostratigraphic assessment

of the previous data. In addition, the project area was explored by collecting and interpreting

historical exploration data which identified mineral potential for uranium, base metals, gold

and graphite mineralisation. EL 24549 was explored by geological mapping, geochemical

sampling, airborne and ground geophysical surveys, several campaigns of drilling, data

processing and interpretation. In the final year of the tenure, assessment of the project area

downgraded the potential for finding any economic size mineral deposit for mining. As a result,

EL 24549 was surrendered on 15 June 2018. Rehabilitation was completed for previous and

current drill holes.

8. REFERENCES

Ahmad, M., Wygralak, A.S., Ferenczi, P.A., and Bajwah, Z.U. 1993. Explanatory Notes

andMineral Deposit Data Sheets. 1:250,000 Metallogenic Map Series, Department of

Mines and Energy, Northern Territory Geological Survey.

Attwell, S., 2009. Annual Report on Cleo’s Project, EL 24549, Pine Creek, for the period 23

September 2008 - 22 September 2009. Element 92 Pty Ltd Limited, Annual Report

to NT Dept. of Primary Industry, Fisheries and Mines, Darwin.

Bajwah, Z.U. 1994. A contribution of geology, petrology and geochemistry to the Cullen

Batholith and related hydrothermal activity responsible for mineralisation, Pine Creek

Geosyncline, Northern Territory. Northern Territory Geological Survey Report 8.

Bajwah, Z.U., and De Kever, N., 2011. Annual combined report on (GR 201-11) EL 24549, EL

25477 and EL 25479 Allamber Project NT, 26 JUne 2010 to 25 June 2011.

Thundelarra Exploration Limited Annual Report to NT Dept of Resources.

Page 23: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

22

Bajwah, Z.U., and Mill, P., 2012. Annual combined report on (GR 201-11) EL 24549, EL 25477

and EL 25479 Allamber Project NT, 26 June 2011 to 25 June 2012. Thundelarra

Exploration Limited Annual Report to NT Dept of Resources.

Bajwah, Z.U., and Vieru, C., 2014. Annual technical report on EL 24549, Allamber Project NT,

for the period 23 September 2013 to 22 September 2014. Thundelarra Limited Annual

Report to NT Dept of Mines and Energy.

Benger, J.W., 2006. EL 24549, Nellie Creek (Cleo’s) 1st Annual report year ending 22

September 2006. Imperial Granite and Minerals Pty Ltd Annual Report to NT Dept.

of Primary Industry, Fisheries and Mines, Darwin.

Cotton, B., 2011, Photogeological Mapping at 1:40 000 Scale of the Pine Creek Regional Area

2, Northern Territory. Consultant Report for Element 92 Pty Ltd.

De Kever, N., 2010. Annual technical report on EL 24549 (Cleo’s Area), Pine Creek NT, 23

September 2009 to 22 September 2010. Element 92 Pty Limited Annual Report to

NT Dept of Resources.

Lennartz, R., 2008. EL 24549, ‘Cleo Prospect’ Annual Report for the period 21st September

2007 – 22nd September 2008. Atom Energy Limited, Annual Report to NT Dept. of

Primary Industry, Fisheries and Mines, Darwin.

Hackett, R., 2007. EL 24549 Annual Report for the period ending 22 September 2007. Atom

Energy Limited, Annual Report to NT Dept. of Primary Industry, Fisheries and Mines,

Darwin.

Mees, H., 2013. Annual technical report on EL 24549, Allamber Project NT, for the period 26

June 2012 to 22 September 2013. Thundelarra Limited Annual Report to NT Dept of

Mines and Energy.

Needham, R.S and Stuart-Smith, P.G., 1984. Geology of the Pine Creek Geosyncline,

Northern Territory – 1:500,000 scale map. Bureau of Mineral Resources, Australia.

Needham, R.S., Stuart-Smith, P.G., and Page, R.W., 1988. Tectonic evolution of thePine

Creek Inlier, Northern Territory. Precambrian Research 40/41, pp 543-564.

Petrella, L., Bajwah, Z.U., and Vieru, C., 2015. Annual report on EL 24549, Allamber 1, Pine

Creek, NT, for the period 23 September 2014 to 22 September 2015. Thundelarra

Limited Annual Report to NT Dept of Resources.

Page 24: FINAL AND ANNUAL REPORT ON EL 24549 PINE CREEK, …...Total Mining Australia commenced exploration on EL4414 in 1984. In 1987/88 a joint venture with PNC (Australia) Pty Ltd was formed

Final and Annual Technical Report EL24549 July 2018

23

Petrella, L., and Vieru, C., 2016. Annual report on EL 24549, Allamber 1, Pine Creek, NT, for

the period 23 September 2015 to 22 September 2016. Thundelarra Limited Annual

Report to NT Dept of Resources.

Stuart-Smith, PG., Needham, RS., Wallace, DA., and Roarty 1986, McKinlay River, Northern

Territory, 1:100 000 geological map and explanatory notes. Bureau of Mineral

Resources, Australia and Northern Territory Geological Survey.

Vieru, C., 2010., Annual Report for Exploration Licence 25477 for the year ending 25/06/2010.

Thundelarra Exploration Limited Annual Report to NT Dept of Resources.