figure 4.1.1 general layout plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and...

35
PRRC LINEAR PARK FS FS FS FS FS FS M U EL LE D E L A I N D U S T R I A P A R K QUINTA MA RKET P AR M A E S T R A N Z A L I N E A R P A R K FO R T S A N T I AG O LI NEA R P A R K L M U E L L E D E L R I O L I N E A R P A R K M U E L L E D E L B A N C O N A C I O N A L L IN E A R P A R K R E P A T Y P E - 0 + 70 5 ( RO X A S B RI DG E ) LPW R A IS E D W A LL REPA IR (TY P E -R3)+ V W S P +VW PROJECT & LOCATION SHEET NO. PASIG-MARIKINA RIVER CHANNEL CHECKED BY: DESIGNED BY: IMPROVEMENT JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN EIJI MOKI STRUCTURAL ENGINEER I TOSHIKI KAWAKAMI THE CHECKER REVIEWED BY: PERFECTO L. ZAPLAN, JR. CHIEF, HYDRAULIC DIVISION, BOD RECOMMENDING APPROVAL : PATRICK B. GATAN PROJECT DIRECTOR PMO - MFCP GILBERTO S. REYES DIRECTOR BOD RAUL C. ASIS UNDERSECRETARY FOR TECHNICAL SERVICES APPROVED BY: ROGELIO L. SINGSON SECRETARY REPUBLIC OF THE PHILIPPINES PROJECT (PHASE III), METRO MANILA SHEET CONTENTS DESCRIPTION DATE APPROVED NO. R E V I S I O N S SUBMITTED BY: SHUJI KAKU TEAM LEADER PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULES AND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS. SHUJI KAKU TEAM LEADER NOTE : SEE COVER SHEET FOR THE SIGNATURE OF THE UNDERSECRETARY SEE COVER SHEET FOR THE SIGNATURE AND APPROVAL OF THE SECRETARY PA S IG R IV E R FERRY STATION/COAST GUARD BOAT/BANCA STATION NOTE : *1 - ALL STATIONS ARE RECKONED AT C OF RIVER L LEGEND: *2 - LENGTHS SHOWN ARE LINEAR METRES UNLESS OTHERWISE SPECIFIED *3 - FIGURES GOVERN OVER SCALED DIMENSIONS GENERAL LAYOUT PLAN LOWER PASIG LP-GE GL 01 PHASE III (SSP) PHASE III (RCF OR REPAIR) PHASE II (COMPLETED) LEGEND: GENERAL LAYOUT PLAN (PASIG RIVER) 2+854 2+392 2+419 2+419 2+694 498,168.582 1,613,830.650 497,885.813 1,614,203.248 497,895.985 1,614,180.182 497,895.822 1,614,179.822 498,055.011 1,613,951.486 LEFT LEFT LEFT 3+400 3+072 3+160 3+300 3+325 498,689.677 1,613,734.302 498,346.750 1,613,688.382 498,473.225 1,613,733.447 498,596.447 1,613,735.624 498,622.030 1,613,735.890 LEFT LEFT 6+249 6+116 6+219 501,108.654 1,614,054.162 500,989.023 1,614,137.842 501,075.465 1,614,091.725 7+444 6+269 6+376 6+482 7+326 501,076.798 1,613,484.213 501,156.448 1,614,026.680 501,216.695 1,614,006.449 501,327.423 1,613,981.970 501,162.766 1,613,561.615 LEFT LEFT 7+580 7+494 500,967.134 1,613,431.357 501,035.746 1,613,461.819 LEFT LEFT LEFT LEFT LEFT LEFT LEFT LEFT LEFT LEFT LEFT LEFT LEFT END POINTS COORDINATES (LOWER PASIG) STATIONS START END EASTING COORDINATES NORTHING BANK 5+046 3+649 3+753 500,026.989 1,614,307.537 498,437.328 1,613,775.480 498,995.495 1,613,800.341 5+639 5+223 5+262 5+414 5+545 500,604.819 1,614,448.615 500,148.794 1,614,386.802 500,193.940 1,614,406.644 500,350.764 1,614,468.906 500,507.260 1,614,481.590 RIGHT 8+222 6+337 6+510 7+516 8+219 500,664.617 1,613,013.612 501,241.701 1,614,121.488 501,379.564 1,614,064.972 501,061.242 1,613,355.923 500,668.321 1,613,017.642 RIGHT 9+947 9+341 9+430 9+792 9+814 502,010.203 1,613,252.770 501,379.752 1,613,189.501 501,468.342 1,613,226.520 501,829.470 1,613,302.654 501,849.505 1,613,313.002 RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT RIGHT 3+492 498,781.160 1,613,633.360 RIGHT 3+410 498,695.900 1,613,611.890 RIGHT C 2+283 498,068.500 1,614,171.570 497,874.700 1,614,345.870 D 3+100 498,129.540 1,614,178.900 498,437.630 1,613,797.800 RIGHT RIGHT RIGHT RIGHT 6+245 6+249 501,086.326 1,614,064.130 501,090.208 1,614,062.051 501,090.951 1,614,063.095 501,109.475 1,614,055.291 6+269 6+323 LEFT LEFT LEFT LEFT Fg 4.1 Figure 4.1.1 General Layout Plan (1/6)

Upload: hahuong

Post on 17-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PRRC LINEAR PARK

FS

FS

FS

FS

FS

FS

MUELLE DELA INDUSTRIA PARK

QUINTA M

ARKET PAR

MAESTRANZA LINEAR PARK

FORT SANTIAGO LINEAR PARK

L

MUELLE DEL RIO LINEAR PARK

MUELLE DEL BANCO NACIONAL LINEAR PARK

REPATYPE-

0 +

705

( RO

XAS

BRID

GE )

LPW

RAISED WALL

REPAIR(TYPE-R3)+VW

SP+VW

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

P ASIG RIVER

FERRY STATION/COAST GUARD

BOAT/BANCA STATION

NOTE :

*1 - ALL STATIONS ARE RECKONED AT C OF RIVERL

LEGEND:

*2 - LENGTHS SHOWN ARE LINEAR METRES UNLESS OTHERWISE SPECIFIED*3 - FIGURES GOVERN OVER SCALED DIMENSIONS

GENERAL LAYOUT PLAN

LOWER PASIG

LP-GE

GL 01

PHASE III (SSP)

PHASE III (RCF OR REPAIR)

PHASE II (COMPLETED)

LEGEND:GENERAL LAYOUT PLAN (PASIG RIVER)

2+854

2+392

2+419

2+419

2+694

498,168.582 1,613,830.650

497,885.813 1,614,203.248

497,895.985 1,614,180.182

497,895.822 1,614,179.822

498,055.011 1,613,951.486

LEFT

LEFT

LEFT

3+400

3+072

3+160

3+300

3+325

498,689.677 1,613,734.302

498,346.750 1,613,688.382

498,473.225 1,613,733.447

498,596.447 1,613,735.624

498,622.030 1,613,735.890

LEFT

LEFT

6+249

6+116

6+219

501,108.654 1,614,054.162

500,989.023 1,614,137.842

501,075.465 1,614,091.725

7+444

6+269

6+376

6+482

7+326

501,076.798 1,613,484.213

501,156.448 1,614,026.680

501,216.695 1,614,006.449

501,327.423 1,613,981.970

501,162.766 1,613,561.615

LEFT

LEFT

7+580

7+494

500,967.134 1,613,431.357

501,035.746 1,613,461.819

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

END POINTS COORDINATES (LOWER PASIG)STATIONS

START END EASTING

COORDINATES

NORTHINGBANK

5+046

3+649

3+753

500,026.989 1,614,307.537

498,437.328 1,613,775.480

498,995.495 1,613,800.341

5+639

5+223

5+262

5+414

5+545

500,604.819 1,614,448.615

500,148.794 1,614,386.802

500,193.940 1,614,406.644

500,350.764 1,614,468.906

500,507.260 1,614,481.590

RIGHT

8+222

6+337

6+510

7+516

8+219

500,664.617 1,613,013.612

501,241.701 1,614,121.488

501,379.564 1,614,064.972

501,061.242 1,613,355.923

500,668.321 1,613,017.642

RIGHT

9+947

9+341

9+430

9+792

9+814

502,010.203 1,613,252.770

501,379.752 1,613,189.501

501,468.342 1,613,226.520

501,829.470 1,613,302.654

501,849.505 1,613,313.002

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

3+492 498,781.160 1,613,633.360 RIGHT

3+410 498,695.900 1,613,611.890 RIGHT

C

2+283

498,068.500 1,614,171.570

497,874.700 1,614,345.870

D

3+100

498,129.540 1,614,178.900

498,437.630 1,613,797.800

RIGHT

RIGHT

RIGHT

RIGHT

6+245

6+249

501,086.326 1,614,064.130

501,090.208 1,614,062.051

501,090.951 1,614,063.095

501,109.475 1,614,055.291

6+269

6+323

LEFT

LEFT

LEFT

LEFT

Fg 4.1

Figure 4.1.1 General Layout Plan (1/6)

Page 2: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PRRC LINEAR PARK

FS

CG

CG

CG

CG

CG

CG

FS

CG

CG

CG

CG

CG

CG

MALACAÑAN

G-PSG LI

NEAR P

ARK

QUINTA M

ARKET PARK

QUINTA-SAN AGUSTINE

LINK PARK

MUELLE DEL RIO

LINEAR PARK

MUELLE DEL RIO

LINEAR PARK

REPAIRTYPE-R4

LPW

RAISED WALL

RAISED WALL

RAISED WALL

PW(TYPE-2)

REPAIR(TYPE-R3)+VW

SP+VW

SP+VW

SP+PW (TYPE-2)SP

REPAIR (TYPE-R4)

SP

REPAIR (TYPE-R4)

P ASIG RIVER

FERRY STATION/COAST GUARD

BOAT/BANCA STATION

LEGEND:

NOTE :

*1 - ALL STATIONS ARE RECKONED AT C OF RIVERL*2 - LENGTHS SHOWN ARE LINEAR METRES UNLESS OTHERWISE SPECIFIED*3 - FIGURES GOVERN OVER SCALED DIMENSIONS

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY GENERAL LAYOUT PLAN

LOWER PASIG

LP-GE

GL 02

PHASE III (SSP)

PHASE III (RCF OR REPAIR)

PHASE II (COMPLETED)

LEGEND:

GENERAL LAYOUT PLAN (PASIG RIVER)

Fg 4.2

Figure 4.1.1 General Layout Plan (2/6)

Page 3: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

P ASIG RIVER

GENERAL LAYOUT PLAN (PASIG RIVER)

FERRY STATION/COAST GUARD

BOAT/BANCA STATION

LEGEND:

NOTE :

*1 - ALL STATIONS ARE RECKONED AT C OF RIVERL*2 - LENGTHS SHOWN ARE LINEAR METRES UNLESS OTHERWISE SPECIFIED*3 - FIGURES GOVERN OVER SCALED DIMENSIONS

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY GENERAL LAYOUT PLAN

LOWER PASIG

LP-GE

GL 03

PHASE III (SSP)

PHASE III (RCF OR REPAIR)

PHASE II (COMPLETED)

LEGEND:

Fg 4.3

Figure 4.1.1 General Layout Plan (3/6)

Page 4: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PASIG RIVER

FERRY STATION/COAST GUARD

BOAT/BANCA STATION

LEGEND:

L

NOTE :

*1 - ALL STATIONS ARE RECKONED AT C OF RIVER*2 - LENGTHS SHOWN ARE LINEAR METRES UNLESS OTHERWISE SPECIFIED*3 - FIGURES GOVERN OVER SCALED DIMENSIONS

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY GENERAL LAYOUT PLAN

UPPER PASIG

UP-GE

GL 01

PHASE III (SSP)

PHASE III (RCF OR REPAIR)

PHASE II (COMPLETED)

LEGEND:

GENERAL LAYOUT PLAN (PASIG RIVER)

13+804-A 504,193.417 1,611,225.734

14+943

14+225-A

14+234-A

14+395-A

14+835

505,340.412 1,611,241.236

504,621.058 1,611,297.548

504,628.922 1,611,296.229

504,789.500 1,611,264.736

505,222.268 1,611,268.083

RIGHT

15+476

14+983

15+075

15+409

15+441

505,788.304 1,610,963.679

505,381.648 1,611,225.513

505,467.694 1,611,183.633

505,738.114 1,610,994.360

505,760.757 1,610,984.044

RIGHT

16+472

15+494

15+494

506,638.408 1,610,494.427

505,807.299 1,610,964.507

505,807.299 1,610,964.507

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

RIGHT

16+843

16+667

16+724

16+760

507,000.226 1,610,401.554

506,814.299 1,610,447.226

506,869.588 1,610,436.758

506,907.212 1,610,429.992

RIGHT

RIGHT

RIGHT

RIGHT

12+024

10+232

10+497

11+500

11+628

502,683.901 1,611,789.319

501,945.431 1,612,984.736

501,800.823 1,612,771.703

502,244.290 1,612,071.030

502,352.780 1,612,002.220

LEFT

LEFT

LEFT

14+440

12+173

13+806

14+272

14+287

504,819.420 1,611,178.480

502,799.641 1,611,697.549

504,201.610 1,611,151.830

504,655.110 1,611,211.690

504,670.640 1,611,208.580

LEFT

LEFT

15+747

15+236

15+424

15+443

15+548

506,031.112 1,610,821.523

505,553.641 1,611,023.103

505,710.439 1,610,909.702

505,729.902 1,610,901.644

505,832.880 1,610,861.622

LEFT

LEFT

10+179

15+870

15+965

16+564

10+140

502,052.100 1,612,993.846

506,131.893 1,610,786.395

506,213.776 1,610,749.279

506,695.226 1,610,383.596

502,068.442 1,613,031.162

LEFT

LEFT

11+263

10+956-A

502,103.379 1,612,287.744

501,848.042 1,612,458.589

11+653

11+610

502,429.374 1,612,076.398

502,398.180 1,612,105.651 RIGHT

RIGHT

RIGHT

LEFT

RIGHT

RIGHT

RIGHT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

LEFT

END POINTS COORDINATES (UPPER PASIG)STATIONS

ENDSTART EASTING NORTHINGBANK

COORDINATES

11+788

11+803-A

13+578

13+801-B

502,541.586 1,611,999.462

502,558.825 1,611,996.566

503,975.019 1,611,164.999

504,188.868 1,611,224.601

RIGHT

RIGHT

RIGHT

RIGHT

501,885.349 1,612,900.879 LEFT

10+405 501,847.442 1,612,850.833 LEFT

10+341

Fg 4.4

Figure 4.1.1 General Layout Plan (4/6)

Page 5: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

FS

FS

BARANGKA ITAAS LINEAR PARKBARANGKA ILAYA LINEAR PARK BUAYANG BATO PARK

GUADALUPE NUEVO PARK

BSBS

BSBS

SP W/ H-BEAM+IW

REPAIR (TYPE-R4)

SP W/ H-BEAM+IW+VW

SP W/ H-BEAM+IW+HANDRAIL

(TYPE-3)

SP +IW+HANDRAIL

(TYPE-3)

SP+IW+RAISED WALLSP+IW+ LPW+ HANDRAIL(TYPE-3)

SP+IW STAIR TYPE

SP+IW+PW (TYPE-3)SP+IW SP W/ H-BEAM+IW

SP W/H-BEAM+VW

PASIG RIVER

FERRY STATION/COAST GUARD

BOAT/BANCA STATION

LEGEND:

L

NOTE :

*1 - ALL STATIONS ARE RECKONED AT C OF RIVER*2 - LENGTHS SHOWN ARE LINEAR METRES UNLESS OTHERWISE SPECIFIED*3 - FIGURES GOVERN OVER SCALED DIMENSIONS

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

GENERAL LAYOUT PLAN

UPPER PASIG

UP-GE

GL 02

PHASE III (SSP)

PHASE III (RCF OR REPAIR)

PHASE II (COMPLETED)

LEGEND:

GENERAL LAYOUT PLAN (PASIG RIVER)

Fg 4.5

Figure 4.1.1 General Layout Plan (5/6)

Page 6: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

FS

RK BUAYANG BATO PARK

GUADALUPE NUEVO PARK

BS

BS

BS

SP W/ H -BEAM+IW +VW+

H ANDRAIL (TYPE-1)

SP W/ H-BEAM+IW+VW

R4)

SP+IW+RAISED WALLSP+IW+ LPW+ HANDRAIL(TYPE-3)

SP+IW+HANDRAIL

(TYPE-3)

SP+IW+VW+

HANDRAIL (TYPE-1)

SP W/H -BEAM+IW+VW+H ANDRAIL (TYPE-1)

SP+IW+VW+ HANDRAIL (TYPE-1)

SP W/ H-BEAM+IW+VW

SP W/H-BEAM+IW+VW

SP+IW+VW+HANDRAIL(TYPE-1)

SP W/H-BEAM+IW SP+IW+LPW

SP+IWSP W/H-BEAM+IWSP W/H-BEAM+IW+VW+

HANDRAIL(TYPE-1)

PW (TYPE-2)W/ STAIRS

W/+VW

PW (TYPE-2)PW (TYPE-2)

PW (TYPE-2)

PW (TYPE-4)

PW (TYPE-2)

PW (TYPE-2)

INSTALLATION OF

TYPE-III FENCE INSTALLATION OF

TYPE-III FENCE

INSTALLATION OFTYPE-III FENCE

P ASIG RIVER

FERRY STATION/COAST GUARD

BOAT/BANCA STATION

L

LEGEND:

NOTE :

*1 - ALL STATIONS ARE RECKONED AT C OF RIVER*2 - LENGTHS SHOWN ARE LINEAR METRES UNLESS OTHERWISE SPECIFIED*3 - FIGURES GOVERN OVER SCALED DIMENSIONS

GENERAL LAYOUT PLAN

UPPER PASIG

UP-GE

GL 03

PHASE III (SSP)

PHASE III (RCF OR REPAIR)

PHASE II (COMPLETED)

LEGEND: GENERAL LAYOUT PLAN (PASIG RIVER)

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

Fg 4.6

Figure 4.1.1 General Layout Plan (6/6)

Page 7: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

³

³

³

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

TYPICAL CROSS SECTIONOF REVETMENT (1/2)

PASIG RIVER

PR-GE

TR 01

STA. 2+416 (LEFT BANK)

STA. 2+654 (LEFT BANK)

STA. 7+400 (LEFT BANK)

STA. 2+800 (RIGHT BANK)

STA. 3+650 (RIGHT BANK)

STA. 7+950 (RIGHT BANK)

Fg 4.7

Figure 4.1.2 Typical C

ross Section of Revetm

ent (1/2)

Page 8: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

³

³

³

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

TYPICAL CROSS SECTIONOF REVETMENT (2/2)

PASIG RIVER

PR-GE

TR 02

STA. 10+477 (LEFT BANK)

STA. 13+937 (LEFT BANK)

STA. 15+965 (LEFT BANK)

STA. 13+743 (RIGHT BANK)

STA 16+825 (RIGHT BANK)

STA. 11+150 (RIGHT BANK)

Fg 4.8

Figure 4.1.2 Typical C

ross Section of Revetm

ent (2/2)

Page 9: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARYPR-GE

SD 01

Fg 4.9

Figure 4.1.3 Standard River Structural D

etails (1/6)

Page 10: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

³

³

TABLES AND DETAILSOF STEEL PILES FOR

REVETMENT

PR-GE

SD 02

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

³

Fg 4.10

Figure 4.1.3 Standard River Structural D

etails (2/6)

Page 11: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

TABLES AND DETAILSOF INCLINED WALL,

WEEPHOLE, PILE CAPS,& EXPANSION JOINT

PR-GE

SD 03

Fg 4.11

Figure 4.1.3 Standard River Structural D

etails (3/6)

Page 12: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

TABLES AND DETAILSOF LPW , LPW-SE AND

U-DITCH

PR-GE

SD 04

Fg 4.12

Figure 4.1.3 Standard River Structural D

etails (4/6)

Page 13: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

TABLES AND DETAILSOF VW AND PW PR-GE

SD 05

Fg 4.13

Figure 4.1.3 Standard River Structural D

etails (5/6)

Page 14: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

PROJECT & LOCATION SHEET NO.

PASIG-MARIKINARIVER CHANNEL

CHECKED BY:DESIGNED BY:

IMPROVEMENT

JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

EIJI MOKISTRUCTURAL ENGINEER I

TOSHIKI KAWAKAMITHE CHECKER

REVIEWED BY:

PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

DIVISION, BOD

RECOMMENDING APPROVAL :

PATRICK B. GATANPROJECT DIRECTOR

PMO - MFCP

GILBERTO S. REYESDIRECTOR

BOD

RAUL C. ASISUNDERSECRETARY

FOR TECHNICAL SERVICES

APPROVED BY:

ROGELIO L. SINGSONSECRETARY

REPUBLIC OF THE PHILIPPINES

PROJECT (PHASE III),METRO MANILA

SHEET CONTENTS

DESCRIPTION DATEAPPROVEDNO.

R E V I S I O N S

SUBMITTED BY:

SHUJI KAKUTEAM LEADER

PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

SHUJI KAKUTEAM LEADER

NOTE :

SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

THE SECRETARY

STATION BANK REMARKS

SCHEDULE OF SHEET PILES END CONNECTION (TYPE-2)

STATION BANK REMARKS

SCHEDULE OF WALL END CONNECTION (RCF)

STATION BANK REMARKS

STATION BANK REMARKS

TABLES & TYPICALSHEET PILE END

LOWER & UPPER PASIG

CONNECTION DETAILSPR-GE

SD 06

QUINTA CHANNEL

QUINTA CHANNEL

SCHEDULE OF SHEET PILES END CONNECTION (TYPE-3)SCHEDULE OF SHEET PILES END CONNECTION (TYPE-1)

Fg 4.14

Figure 4.1.3 Standard River Structural D

etails (6/6)

Page 15: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.1.4 Typical Drawing of Drainage Facility in Pasig River (1/2)

Fg 4.15

Page 16: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.1.5 Typical Drawing of Drainage Facility in Pasig River (1/2) (2/2)

Fg 4.16

Page 17: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.1 General Layout Plan(Lower Marikina River)

Fg 4.17

Page 18: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.2 River Centerline (Horizontal Alignment)

Fg 4.18

Page 19: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.3 Longitudinal Profile

Fg 4.19

Page 20: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.4 Length of SSP Cut off Wall (1/9) (MSL-1)

Figure 4.2.4 Length of SSP Cut off Wall (2/9) (MSL-2)

Fg 4.20

Page 21: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.4 Length of SSP Cut off Wall (3/9) (MSL-3)

Figure 4.2.4 Length of SSP Cut off Wall (4/9) (MSL-4)

Fg 4.21

Page 22: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.4 Length of SSP Cut off Wall (5/9) (MSL-5)

Figure 4.2.4 Length of SSP Cut off Wall (6/9) (MSL-6)

Fg 4.22

Page 23: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.4 Length of SSP Cut off Wall (7/9) (MSR-2)

Figure 4.2.4 Length of SSP Cut off Wall (8/9) (MSR-3)

Fg 4.23

Page 24: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2.4 Length of SSP Cut off Wall (9/9) (MSR-4)

Fg 4.24

Page 25: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 4.2 1 Typical Drawing of Sluiceway in Lower Marikina River

Fg 4.25

Page 26: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

0 100 200 300 400m

GRAPHICSCALEINMETERS

Figure 5.2.1 Sampling Stations of Soil

Fg 5.1

Page 27: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 5.5.1 Institutional Organization for Implementation of Land Acquisition and Resettlement Action Plan

Fg 5.2

Page 28: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Case1 1st Day 2nd Day 3rd Day 4th DayHour

Sandy Soil Ecavation 0000 0571 1142 1765 2388

SS Transport(9.0~11.4km) 0709 1194 1332 1817 1955 2440

SS Unloadding 1056 1679 2302

Fine Soil Excavation 0000 0681 1362 2043 2724

FS Transport(6.0~11.4 km) 0803 1357 1484 2038 2165 2719

FS Unloadding 1235 1916 2597

Case2 1st Day 2nd Day 3rd Day 4th DayHour

Sandy Soil Ecavation 0000 0571 1142 1765 2388

SS Transport(9.0~11.4km) 0709 1194 1332 1817 1955 2440

SS Unloadding 1086 1755 2424

Fine Soil Excavation & Pre0000 o673 0673 1346 2029 2707 3385

FS Transport1(0.0~5.4 km) oo36 0709 1351 2029 2707 3385

FS Pre-Mix(100m3/h) o606 13 1387 19 2065 26 2743 3343421

FS Curing 1 (24 hours) 0709 1315 2315

FS Curing 2 (24 hours) 1387 1993 2993

FS Curing 3 (24 hours) '2065 2671 3671

FS Curing 4 (24 hours) 2743 3349

FS Transport 2 (6.0km) oo81 2805 3483

FS Unloading o409 2315 2724 2993 3402 3671

Case2 1st Day 2nd Day 3rd Day 4th DayHour

Sandy Soil Ecavation 0000 0571 1142 1765 2388

SS Transport(9.0~11.4km) 0709 1194 1332 1817 1955 2440

SS Unloadding 1086 1755 2424

Fine Soil Excavation & Pre0000 0673 1346 2019 2692 3365

FS Curing 1 (24 hours) 1673

FS Curing 2 (24 hours) 2346

FS Curing 3 (24 hours) 3019

FS Curing 4 (24 hours) 3692

FS Transport 2 (6.0~11.4 km) o118 2200 2873 3546

FS Unloading o409 2082 2755 3428

5 6 7 81 2 3 4 69 10 1 2

10

7 8 9 10

6 7 8 92 3 4 5

98 10

5 6 7 8 9 10

5 6 7

1

2 3 4

2 3 4

3 4 5

2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9

4 5

10

1 2 3

1 2 3 4

6 7 10

1 2 3 4 5 6 7

105 6 7

1

1

1

8 9 10

98

8 9

Figure G

Figure 6.4.1 Working Ship Diagram Example

Fg 6.1

Page 29: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 6.4.2 Lambingan Yard Layout Plan

Fg 6.2

Page 30: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 6.4.3 Marikina West Bank Yard Plan

Fg 6.3

Page 31: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 6.4.4 Marikina Middle Bank Yard Plan

Fg 6.4

Page 32: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 6.4.5 Marikina East Bank Yard Plan

Fg 6.5

Page 33: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 6.4.6 Disposal Site Yard Plant Plan

Fg 6.6

Page 34: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 6.5.1 Details of Program for Pasig River

Fg 6.7

Page 35: Figure 4.1.1 General Layout Plan (1/6)open_jicareport.jica.go.jp/pdf/12112678_02.pdf · and regulations of r.a. 9184, approval by the authorized dpwh officials of detailed engineering

Figure 6.5.2 Details of Program for Marikina River

Fg 6.8