figure 3-a - san diego · figure 2-c.2 september 2009 barrio logan community plan update n ... thor...

6
Figure 2-C.2 September 2009 Barrio Logan Community Plan Update N LEGEND 2 28th Street Freeway Access Improvements - Option B - between Main St and National Ave Construct new I-5 southbound on-ramp along 28th Street. 4 Widen east side of 28th St to accomodate third NB through lane. 3 Convert eastbound and westbound left-turn phasing from permissive to protective left-turns at Main Street and 28th Street intersection. 5 Convert Boston Ave from 28th Street to 29th Street to a Commercial Local Street with diagonal parking along both sides. 1 3 4 5 3 Remove I-5 southbound on-ramp along Boston Avenue. 2 Install linear park between Boston Avenue and Interstate 5 with Class I bike facility. 6 6 7 Convert Boston Avenue between 29th Street to 32nd Street to a low volume residential local street with 30 feet of curb to curb width. 7 see Figure X for proposed improvement along this segment MAIN ST ALLEY 28TH ST I-5 NATIONAL AVE NEWTON AVE BOSTON AVE

Upload: others

Post on 23-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Figure 3-A - San Diego · Figure 2-C.2 September 2009 Barrio Logan Community Plan Update N ... Thor 06th ompkins oft 07th Doyle Eniwetok Siva Paunack dsley Boston 05th 29th d 31st

Figure 2-C.2September 2009

Barrio Logan Community Plan Update

N

LEGEND

2

28th Street Freeway Access Improvements - Option B - between Main St and National Ave

Construct new I-5 southbound on-ramp along 28th Street. 4

Widen east side of 28th St to accomodate third NB through lane.3 Convert eastbound and westbound left-turn phasing from permissive to protectiveleft-turns at Main Street and 28th Street intersection.

5Convert Boston Ave from 28th Street to 29th Street to a Commercial Local Street with diagonal parking along both sides.

1

3

4

5

3

Remove I-5 southbound on-ramp along Boston Avenue.2 Install linear park between Boston Avenue and Interstate 5 with Class I bike facility.6

6

7

Convert Boston Avenue between 29th Street to 32nd Street to a lowvolume residential local street with 30 feet of curb to curb width.

7

see Figure X forproposed improvementalong this segment

MA

IN S

T

ALL

EY

28TH ST

I-5

NAT

ION

AL

AVE

NEW

TON

AVE

BOST

ON

AVE

Page 2: Figure 3-A - San Diego · Figure 2-C.2 September 2009 Barrio Logan Community Plan Update N ... Thor 06th ompkins oft 07th Doyle Eniwetok Siva Paunack dsley Boston 05th 29th d 31st

C E N T R E C I T YC O M M U N I T Y P L A N

A R E A

S O U T H E A S T E R NS A N D I E G O

C O M M U N I T Y P L A N A R E A

B A R R I O L O G A NC O M M U N I T Y P L A N

A R E A

Logan HeightsMountain View

Southcrest

Shel l town

East Vi l lage

Barr io Logan

I-5 Sb

Main

32nd

28th

Irving

02nd

03rd

05th

Sam

pson

Newton

26th

27th

Dewey

Cesar

E C

have

z

Attu04th

Hoover

Sigs

bee

Inchon

Una

Tara

wa

Thor

06th Tompkins

Ravenscroft

07th

Doyle

Eniwetok

Siva

Paun

ack

Bear

dsle

y

Boston

05th

29th

Sica

rd

31st

Newton

Logan

Wod

en

06th

04th

30th

Privat

e Mc C

andless

Privat

e

Newton

A

Logan

Evan

s

32nd

Cumm

ings

Cesar

E C

have

z

Attu

Roosevelt

Woden04th

Hoover

Inchon

Bougain

ville

Vesta

Tara

wa

06th Tompkins12th

Rio

Ravenscroft07

th

Gilette

Eniwetok

05th

04th

Gilette

I-5 Sb On

Vest

a

Privat

e Mc C

andless

Privat

e

Harbor

28th

National

Main

Belt

Commercial

National National

Dalbergia

Rige

l

Main

National

National

Logan

Logan

Ocean View

17th

19th

Boston

Ocean View

Imperial

Alpha

Logan

National

Sam

pson

Sica

rd

Evan

s

Una

Wod

en

Vest

a

Boston

Newton

35th

40th

36th

37th

38th

39th

41st

30th

31st

32nd

Main

Harbor

Julian

22th 25

th

Commercial

N AT I O N A L C I T YS A N D I E G O

San Diego Bay

Cesar Chavez

Park

To City of Coronado

Memorial Park

Recreation Center

Chicano Park

Barrio LoganStation

HarborsideStation

Las C

holla

s C

reek

S. Las Chollas Creek

La Poleta Creek

Memorial Academy

LoganPreschool

EmersonElementary

PerkinsElementary

School

12th and Imperial MTS Transit Center

Tenth Avenue Marine Terminal

25th and Commercial Station

32nd and Commercial Station

Pacific FleetStation

P O R T O FS A N D I E G O

ChavezElementary

School

BalboaElementary

School

St. JudeAcademy

Burbank Elementary

School

To Downtown

N AVA L S TAT I O NS A N D I E G O

po5

75

15

po5

Community Plan Area February 2009

Barrio Logan Community Plan Update

0 500 1000 2000 feet

N

THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS, FOR A PARTICULAR PURPOSE. Copyright SanGIS. All Rights Reserved.

This product may contain information from the SANDAG Regional Information System which cannot be reproduced without written permission of SANDAG.

This product may contain information which has been reproduced with permission granted by Thomas Bros. Maps.

LEGEND

School

Park/Open Space

SDMTS Trolley and Station

Freeway/RampBarrio Logan CommunityPlan Area

City Boundary

Port District*

*The Port District is not within the jurisdiction of the City but the existing plan shows it within its boundaries.

Figure 3-A.1Recommended Bicycle NetworkClass 3 Bikeway

Class 1 Bikeway

Class 2 Bikeway

Outside Barrio Logan ( Existing or Recommended under the City of San Diego’s Bicycle Masterplan (May 2002):

Class 3 Bikeway

Class 1 Bikeway

Class 2 Bikeway

Within Barrio Logan:

Page 3: Figure 3-A - San Diego · Figure 2-C.2 September 2009 Barrio Logan Community Plan Update N ... Thor 06th ompkins oft 07th Doyle Eniwetok Siva Paunack dsley Boston 05th 29th d 31st

September 2009

Barrio Logan Community Plan Update

N

LEGEND

Beardsley St Improvements - between National Avenue and Logan Avenue

Convert segment to one directional tra�c only (northbound)

Remove WB left-turn lane from Logan Avenue to Beardsley Street2 Provide diagonal parking (15-18 spaces).44

Add striping marking to indicate change in directional tra�c.31

1

2

3

3

44

LOG

AN

AVE

ALL

EY

NAT

ION

AL

AVE

BEARDSLEY ST

Figure 4-A.1

Page 4: Figure 3-A - San Diego · Figure 2-C.2 September 2009 Barrio Logan Community Plan Update N ... Thor 06th ompkins oft 07th Doyle Eniwetok Siva Paunack dsley Boston 05th 29th d 31st

September 2009

Barrio Logan Community Plan Update

N

LEGEND

Harbor Drive improvements - at Sigsbee Street and Beardsley Street

Extend raised median along Harbor Drive and restrict Beardsley Street toright-in/right-out only movements.

Provide roadway improvements to Sigsbee Street (curb, gutter and sidewalks).2 Landscape raised median.4

Install tra�c signal at Harbor Drive and Sigsbee Street intersection.31

1

2

34

4

Figure 4-A.2

HARBOR DR

BEA

RDSL

EY S

T

SIG

SBEE

ST

Page 5: Figure 3-A - San Diego · Figure 2-C.2 September 2009 Barrio Logan Community Plan Update N ... Thor 06th ompkins oft 07th Doyle Eniwetok Siva Paunack dsley Boston 05th 29th d 31st

September 2009

Barrio Logan Community Plan Update

N

LEGEND

28th Street Freeway Access Improvements - Option A- between Harbor Drive and Main Street

Modify raised median along Harbor Drive to accomodate second EB left-turnlane from Harbor Drive to 28th Street to improve truck turning from Harbor Drive.

Add second SB left-turn lane from 28th Street to Harbor Drive.3

Modify median along 28th Street between Harbor Drive and Main Street.2 Add third NB through lane along 28th Street between Harbor Drive andMain Street, extend NB lane through intersection of Boston Avenue.

5Add exclusive NB right-turn lane.8

Remove parking along east side of 28th Street between Main Street and Harbor Drive. Widen roadway 6’ to the east to accomodate proposedimprovements. Reconstruct driveways and curb ramps (10-12 fewer parking spaces.)

7

Remove parking along west side of 28th Street between Main Street and Harbor Drive. Widen roadway 4’ to the west to accomodate proposedimprovements. Reconstruct driveways and curb ramps (8-10 fewer parking spaces).

6Add raised median to channelize SB left-turn movement ontoNaval Base.

41

2

2

3

8

77

5

6

5

4

2

1

Figure 5-A.1

HAR

BOR

DR

28TH ST

MA

IN S

T

Page 6: Figure 3-A - San Diego · Figure 2-C.2 September 2009 Barrio Logan Community Plan Update N ... Thor 06th ompkins oft 07th Doyle Eniwetok Siva Paunack dsley Boston 05th 29th d 31st

September 2009

Barrio Logan Community Plan Update

N

LEGEND

28th Street Freeway Access Improvements - Option B- between Harbor Drive and Main Street

Modify raised median along Harbor Drive to accomodate second EB left-turnlane from Harbor Drive to 28th Street to improve truck turning from Harbor Drive.

Add second SB left-turn lane from 28th Street to Harbor Drive.3

Modify median along 28th Street between Harbor Drive and Main Street.2 Add third NB through lane along 28th Street between Harbor Drive andMain Street.

5Remove parking along east side of 28th Street between Main Street and Harbor Drive. Widen roadway 6’ to the east to accomodate proposedimprovements. Reconstruct driveways and curb ramps (8-10 fewer parking spaces).

7

Remove parking along west side of 28th Street between Main Street and Harbor Drive. Widen roadway 4’ to the west to accomodate proposedimprovements. Reconstruct driveways and curb ramps (8-10 fewer parking spaces).

6Add raised median to channelize SB left-turn movement ontoNaval Base.

41

2

2

3

77

5

6

5

4

2

1

Figure 5-B.1

HAR

BOR

DR

28TH ST

MA

IN S

T