figure 2.4-1 site safety analysis report early site … · construction areas. legend: seri ......
TRANSCRIPT
2. ST
RU
CT
UR
ES
FO
R G
GN
S U
NIT
2 AR
E F
OR
INF
OR
MA
TIO
N O
NLY
,SIN
CE
CO
NS
TR
UC
TIO
N O
F UN
IT 2 WA
S S
US
PE
ND
ED
ON
8/21/91.
PR
OP
OS
ED
NE
W FA
CILITY
C
ON
ST
RU
CT
ION
AR
EA
S.
LEG
EN
D:
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-10
SU
RF
AC
E D
RA
INA
GE
PLA
N(U
FS
AR
FIG
UR
E 2.4-1)
RE
GIO
NA
L TO
PO
GR
AP
HY
(UF
SA
R F
IGU
RE
2.4-2)
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-20
LOW
ER
MIS
SIS
SIP
PI R
EG
ION
HY
DR
OLO
GIC
BO
UN
DA
RY
(UF
SA
R F
IGU
RE
2.4-3)
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-30
MISSISSIPPI RIVER LEVEES AND NAVIGATION CUTOFFS
SOURCE: ADAPTED FROM U.S. ARMY CORPS OF ENGINEERS
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-3a 0
DR
AIN
AG
E A
RE
AS
OF
TH
E
MIS
SIS
SIP
PI B
AS
IN(U
FS
AR
FIG
UR
E 2.4-4)
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-40
HY
DR
OG
RA
PH
IC D
ETA
ILS O
F THE
MIS
SIS
SIP
PI R
IVE
R A
TG
RA
ND
GU
LF
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-50
WA
TE
R S
UR
FA
CE
PR
OF
ILES
FO
R 1937 H
IGH
F
LOW
AN
D 1993 LO
W W
AT
ER
RE
FE
RE
NC
E
PLA
NE
Source: A
dapted from U
SA
CE
, 2001
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-60
HY
DR
OG
RA
PH
FO
R T
HE
MIS
SIS
SIP
PI
RIV
ER
AT
VIC
KS
BU
RG
, MS
Source: A
dapted from U
.S. A
rmy C
orps of Engineers
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-70
HY
DR
OG
RA
PH
FO
R M
ISS
ISS
IPP
I RIV
ER
AT N
ATC
HE
Z, MS
Source: A
dapted from U
.S. A
rmy C
orps of Engineers
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-80
18601880
19001920
19401960
19802000
DATES: 06/24/1858 to 02/13/1999
500000
1e + 06
1.5e + 06
2e + 06
2.5e + 06
USG
S 07289000 MISSISSIPPI R
IVER AT VICKSBU
RG
, MS
Streamflow, cubic feet per second
Source: U.S.G
.S.
AN
NU
AL M
AX
IMU
M IN
ST
AN
TA
NE
OU
S P
EA
KS
TR
EA
MF
LOW
- MIS
SIS
SIP
PI R
IVE
RU
SG
S S
TA
TIO
N, V
ICK
SB
UR
G, M
S
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIGU
RE
2.4-90
LOC
AL D
RA
INA
GE
BA
SIN
S(U
FS
AR
FIG
UR
E 2.4-8)
LEG
EN
D:
PR
OP
OS
ED
NE
W F
AC
ILITY
C
ON
ST
RU
CT
ION
AR
EA
S
1. GG
NS
UN
IT 1 F
AC
ILITIE
S A
DD
ED
FO
R R
EFE
RE
NC
E.
NO
TE
S:
SE
RI
GR
AN
D G
ULF N
UC
LEA
R S
TATIO
N S
ITEE
AR
LY S
ITE
PE
RM
IT A
PP
LICA
TIO
NS
ITE
SA
FE
TY
AN
ALY
SIS
RE
PO
RT
RE
V.
FIG
UR
E 2.4-10
0
DIMENSIONLESS HYDROGRAPH FORTHE PLANT SITE DRAINAGE BASINS
(UFSAR FIGURE 2.4-9)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-11 0
BASIN A & BHYDROGRAPHS
(UFSAR FIGURE 2.4-10)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-12 0
PLANT DRAINAGE AREASDURING PMP
(UFSAR FIGURE 2.4-7a SH. 1)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-13 SHEET 1 OF 2 0
PLANT DRAINAGE AREASDURING PMP
(UFSAR FIGURE 2.4-7a SH. 2)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-13 SHEET 2 OF 2 0
DESIGN-PROJECT FLOOD FOR THELOWER MISSISSIPPI RIVER
U.S. CORPS OF ENGINEERS 1958(UFSAR FIGURE 2.4-11)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-14 0
DPF HYDROGRAPHS FORMISSISSIPPI RIVER
(UFSAR FIGURE 2.4-12)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-15 0
DISCHARGE-FREQUENCY RELATIONSHIPFOR MISSISSIPPI RIVER FLOODS AT
VICKSBURG(UFSAR FIGURE 2.4-13)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-16 0
PMF HYDROGRAPHS FORMISSISSIPPI RIVER
(UFSAR FIGURE 2.4-14)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-17 0
SITE DRAINAGE PLAN(UFSAR FIGURE 2.4-7)
PROPOSED NEW FACILITY CONSTRUCTION AREAS.
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-18 0
RATING CURVE FOR THE MISSISSIPPIRIVER AT GRAND GULF SITE
(UFSAR FIGURE 2.4-15)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-19 0
ACCESS ROADPLAN AND PROFILE
(UFSAR FIGURE 2.4-7b SH. 1)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-20 SHEET 1 OF 2 0
ACCESS ROADPLAN AND PROFILE
(UFSAR FIGURE 2.4-7b SH. 2)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-20 SHEET 2 OF 2 0
CROSS SECTIONS OF STREAM A(UFSAR FIGURE 2.4-7c)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-21 0
RIPRAP GRADATION CURVE(USAR FIGURE 2.4-16a)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-22 0
CULVERT NO. 1PLAN AND SECTIONS
(UFSAR FIGURE 2.4-7d)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-23 0
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-24 0
PROFILE AND SECTIONSOF PERIPHERAL DRAINAGE
FOR BASIN B(UFSAR FIGURE 2.4-16)
BOUNDARIES OF WATER SURFACE AT EL.103 IN THE SITE REGION(UFSAR FIGURE 2.4-17)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-25 0
(Ref. Figure 2.4-18)
GROUND SURFACE PROFILE OFMISSISSIPPI RIVER FLOOD PLAIN
(UFSAR FIGURE 2.4-18)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-26 0
MAJOR RESERVOIRS INTHE MISSISSIPPI BASIN(UFSAR FIGURE 2.4-19)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-27 0
SEISMIC RISK MAPFOR THE UNITED STATES
(UFSAR FIGURE 2.4-20)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-28 0
SEISMIC ZONE MAPOF THE UNITED STATES
SOURCE: 1997 UNIFORM BUILDING CODE
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-28a 0
SIT
E
DESIGN PROJECT FLOOD ELEVATIONS FROMCAIRO, ILLINOIS TO HEAD OF PASSES
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-29 0
PLAN SHOWING AREAS THAT MAY BESUBMERGED DUE TO A FLOOD RISING TO
EL. 103 MSL AT THE SITE(UFSAR FIGURE 2.4-22)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-30 0
INSTANTANEOUS LOW FLOW INMISSISSIPPI RIVER-TYPICAL GAUGE
RECORD AT VICKSBURG, MISS.SEPTEMBER 18, 19, 20 & 21, 1967
(UFSAR FIGURE 2.4-25)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-31 0
SOLE SOURCE AQUIFER MAP
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-31a 0
LOW FLOWS IN THE MISSISSIPPIRIVER AT VICKSBURG(UFSAR FIGURE 2.4-26)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-32 0
SITE HYROLOGIC FEATURES(NORMAL CONDITIONS)(UFSAR FIGURE 2.4-27)PROPOSED NEW PLANT CONSTRUCTION AREAS.
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-33 0
HYDROGRAPH OF A WELL COMPLETEDIN THE MS RIVER ALLUVIAL AQUIFER,
VICKSBURG, MS
SOURCE: USGS
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-34 0
HYDROGRAPH OF A WELL COMPLETED IN THELOWER CATAHOULA FORMATION,
PORT GIBSON, MS
SOURCE: USGS
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-35 0
DESIGN PROJECT FLOOD ELEVATION (102.1')
MISSISSIPPI RIVERLOW WATER REF. PLANE (37.5')
DESIGN PROJECT FLOOD ELEVATION (102.1')
MISSISSIPPI RIVERLOW WATER REF. PLANE (37.5')
NOTES:1. SEE REF. 1 AND 8 FOR SOURCE DATA & GGNS UFSAR FIGURE 2.4-28.2. CLOUDS INDICATE ESP APPLICATION DATA.
HYDROGEOLOGICCROSS SECTION A-A'
(UFSAR FIGURE 2.4-28)SECTION LOCATION IS SHOWN IN (UFSAR FIGURE 2.4-27) FIGURE 2.4-33
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-36 0
NOTES:1. SEE REF. 1 AND 8 FOR SOURCE DATA.2. CLOUDS INDICATE ESP APPLICATION CHANGES.
APPROXIMATE BOUNDARY OF NEW FACILITY POWER BLOCK CONSTRUCTION AREA
HYDROGEOLOGICCROSS SECTION B-B'
(UFSAR FIGURE 2.4-29)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-37 0
SECTION LOCATION IS SHOWN IN (UFSAR FIGURE 2.4-27) FIGURE 2.4-33
Jefferson Co.
Warren Co.
Claiborne Co.
Adams Co.
GGNS Site
Q
B C
J
M
N
J
F
C
K
G
D
L
H
E
FA
B
A
M
G
N
H
O
J
Q
L
P
K
EDCB
E
LK
F
M
G
O
N
H
D
P AR S
ONM
J LK
EH
D
GF
CBA
COUNTY WELL LOCATION GRID
WELL GRID BOUNDARIESCOUNTY BOUNDARIES
Source: Adapted from Mississippi Industrial and Technological Research Commission, Water Research Bulletin 63-1
LEGEND:
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-38 0
NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).
HYDROGRAPHS OF WELLS ANDPIEZOMETERS
(UFSAR FIGURE 2.4-32, SH.1)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-39 SHEET 1 OF 5 0
NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).
HYDROGRAPHS OF WELLS ANDPIEZOMETERS
(UFSAR FIGURE 2.4-32. SH.2)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-39 SHEET 2 OF 5 0
NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).
HYDROGRAPHS OF REPLACEMENTPIEZOMETERS
(UFSAR FIGURE 2.4-32, SH.3)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-39 SHEET 3 OF 5 0
NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).
HYDROGRAPHS OF WELLS ANDPIEZOMETERS
(UFSAR FIGURE 2.4-32, SH.4)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-39 SHEET 4 OF 5 0
NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).
HYDROGRAPHS OF WELLS ANDPIEZOMETERS
(UFSAR FIGURE 2.4-32, SH.5)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-39 SHEET 5 OF 5 0
NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.
PUMPOUT TESTGROUND WATER LEVEL CONTOURS
(PREPUMPING STATIC LEVELS)AUGUST 7, 1979
(UFSAR FIGURE 2.4-38)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-40 0
NOTES:1. LOCATIONS OF MISSISSIPPI RIVER, HAMILTON & GIN LAKES ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).
HYDROGRAPHS OF MISSISSIPPI RIVER,GIN LAKE, AND HAMILTON LAKE
(UFSAR FIGURE 2.4-33)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-41 0
SITE HYDROLOGIC FEATURESFLOOD CONDITIONS MAY 1973
(UFSAR FIGURE 2.4-34)
NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.
PROPOSED NEW PLANT CONSTRUCTION AREAS.
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-42 0
PLANT SITEWELL PLAN
(UFSAR FIGURE 2.4-35c)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-43 0
HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS
(UFSAR FIGURE 2.4-36, SH.1)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-44 SHEET 1 OF 5 0
HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS
(UFSAR FIGURE 2.4-36, SH.2)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-44 SHEET 2 OF 5 0
HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS
(UFSAR FIGURE 2.4-36, SH.3)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-44 SHEET 3 OF 5 0
HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS
(UFSAR FIGURE 2.4-36, SH.4)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-44 SHEET 4 OF 5 0
HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS
(UFSAR FIGURE 2.4-36, SH.5)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-44 SHEET 5 OF 5 0
NOTES:1. OBSERVATION WELLS MW-1 AND MW-2 WERE DRY FROM SEPT., 1976 TO JAN., 1979.2. OBSERVATION WELL LOCATIONS SHOWN ON FIGURE 2.4-43 (UFSAR FIGURE 2.4-35c).3. TEMPORARY SITE DRAINAGE CAUSES RECHARGE INTO FILL NEAR MW-4. AREA TO BE REGRADED NEAR MW-4 FEB., 1979.
HYDROGRAPHS OF REPLACEMENT OBSERVATION WELLS
MW-3 AND MW-4(UFSAR FIGURE 2.4-36a, SH.1)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-45 SHEET 1 OF 2 0
NOTES:1. OBSERVATION WELL LOCATIONS SHOWN ON FIGURE 2.4-43 (UFSAR FIGURE 2.4-35c).
HYDROGRAPHS OF REPLACEMENT OBSERVATION WELLS
MW-5 AND MW-6(UFSAR FIGURE 2.4-36a, SH.2)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-45 SHEET 2 OF 2 0
NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL EL. 0.0. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.
PUMPOUT TESTGROUND WATER LEVEL CONTOURS
NOVEMBER 6 , 1979(UFSAR FIGURE 2.4-39)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-46 0
NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL EL. 0.0. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.
PUMPOUT TESTGROUND WATER LEVEL CONTOURS
(HIGH RIVER LEVEL)DECEMBER 10 , 1979
(UFSAR FIGURE 2.4-40)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-47 0
HYDROGRAPHS OF MISSISSIPPIRIVER WELLS 3 AND 5DURING PUMP TEST
(UFSAR FIGURE 2.4-41)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-48 0
NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL EL. 0.0. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.
PUMPOUT TESTGROUND WATER LEVEL CONTOURS
(LOW RIVER LEVEL)NOVEMBER 17, 1978
(UFSAR FIGURE 2.4-42)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-49 0
4. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.
CALCULATED GROUNDWATER LEVEL CONTOURS
(LOW RIVER LEVEL)(UFSAR FIGURE 2.4-43)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-50 0
HYDROGRAPHS OF HAMILTON LAKEAND OBSERVATION WELLS
F-4 AND F-6 DURING PUMP TESTS(UFSAR FIGURE 2.4-45)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-51 0
AVERAGEPOST-CONSTRUCTION
GROUND WATER ELEVATIONS(UFSAR FIGURE 2.4-48)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-52 0
DW-8A WATER-LEVEL HYDROGRAPHAND 6-MONTH CUMULATIVE PRECIPITATION
1987-1991(UFSAR FIGURE 2.4-50)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-53 0
GGNS GROUNDWATER LEVEL AND RAINFALL HYDROGRAPHS - 2001
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-54 0
CALCULATED GROUNDWATER LEVEL CONTOURS
(NORMAL RIVER LEVEL)(UFSAR FIGURE 2.4-44)
SERIGRAND GULF NUCLEAR STATION SITE
EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT
REV.FIGURE 2.4-55 0