Page 1: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

FIDIC-ITA Task Group 10

Page 2: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Presentation of Task Group 10, Contract Form for Tunnelling and Underground Works

• Two votes• Why a specific Contract Form?• Which aspects require particular attention?• What is ITA-AITES?• Who is Task Group 10?• When will the Contract Form be ready?

Page 3: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

World Urban Population 1950 (UNICEF)red: >75% urban, yellow: >50% urban, blue: >25% urban

Page 4: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

World Urban Population 2000 (UNICEF)

Page 5: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

World Urban Population 2050 (UNICEF)From 1950 to 2050 the world’s population will grow from 3 to 9 billion.

In the same time, urban population will grow from 1 to 7 billion!

Page 6: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Why a specific Form of contract for Underground Works?

• Underground is a growing market:– Energy– Transportation– Urban infrastructure– Space shortage in cities

Page 7: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Risk allocation

R := Ee x pe

R=Risk; Ee= Effect of an event; pe=probability of the event

Page 8: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Risk allocation

• R := De x pe

• Bid requires an estimate of the risk

• Underground works are related to risks that are difficult, if not impossible, to estimate

• In order to cover all risks reasonably, the price and therefore the cost of investment will inevitably rise.

• The allocation of risk to one party is uneconomic.

Page 9: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Risk allocation

100% Employer 100% Contractorfair = economic

Cost

Page 10: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Why a specific Form of contract for Underground Works?

• Underground is a growing market:– Energy– Transportation– Urban infrastructure– Space shortage in cities

• Underground is different from other works in terms of risk management and allocation

Page 11: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Which aspects require particular attention?

1. Each risk shall be allocated to the party that is fittest to control it, in order to get best value for money.

2. Information to contractors on ground conditions (careful investigation, full disclosure).

3. Production cost depends on ground behaviour during excavation, not on physical characteristics of the ground.

4. Construction time may vary according to ground conditions. To be considered in the definition of time for completion.

5. Expensive equipment means high investment by the contractor and therefore high time related costs.

6. Best practice!

Page 12: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

(ita-aites.org)

• International Tunnelling and Underground Space Association• Founded in 1974, today 71 member Nations and 310 affiliate

or corporate members• Recognized by the UN• Structured +/- like FIDIC (though smaller)• Working Group 03, “Contractual Practices”• Contacts with FIDIC since the 1990’s• Agreement reached on a joint objective• Next World Tunnel Congress: Dubrovnik, Croatia, 22.-28.5.15

Page 13: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Task Group 10 “Contract Form for Tunnelling and Underground Works”

• 3 members from FIDIC:– Jim Maclure (United Kingdom)– Gösta Ericson (Sweden)– Hannes Ertl (Austria)

• 4 members from ITA-AITES:– Andres Marulanda (Colombia)– Charles Nairac (France)– Matthias Neuenschwander (Switzerland), Chair– Martin Smith (United Kingdom/Corea)

• FIDIC CC tutor: Zoltan Zahonyi

Page 14: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Task Group 10 time line (subject to verification)

• Kick-off meeting: 9/30/2014• Proposal of approach to FIDIC/ITA: January 2015• Limited Review Draft: Autumn 2016• Final Review Draft: 6 months after receiving comments• Legal review commissioned by FIDIC CC• Test Edition• First Edition (2 years after test edition): approx. 2019• User’s Guide

Page 15: FIDIC-ITA Task Group 10 -  · PDF filePresentation of Task Group 10, Contract Form for Tunnelling and Underground Works

Thank you for your kind attention and for contributions to the work of TG10!