Page 1: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Evian summary 124-1-2011

Operational challenges(Feed forward from Evian LHC operation workshop)

7-9 December 2010

Day after last beam

Two nights – 7 sessions

Page 2: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

LHC beam operation: review of 2010 and

setting the scene for 2011

Experiments, efficiency, beam from injectors,

75 & 50 ns, intensity ramp up, RF

Driving the LHC

Turnaround, software, magnetic model,

missing functionality

Beam diagnostics and feedback systems

Bunch by bunch, feedbacks, transverse

damper, BPMs, transverse beam size

Evian – Sessions

24-1-2011 2Evian summary

Page 3: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Machine protection systems

MPS performance, LDBS, abort gap,

minimum beta*, injection protection, the

human factor

Beam losses

Collimation, injection, extraction, UFOs, BLM

thresholds

Luminosity performance & wrap-up

Emittance preservation, the hump, beam-

beam, luminosity optimization, optics, pushing

the limits in 2011, 2011 projections

Evian – Sessions

3Evian summary24-1-2011

Page 4: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Improved machine availability

Turn around optimization

Beam quality and availability from injectors

Machine safety & the human factor

Software and controls

Magnet model

Sessions 1 & 2: Operations

24-1-2011 4Evian summary

For all these: lessons learnt,

improvements being made

2010: pretty good going

Operations bedded in but there is room for improvement

Page 5: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Clear procedures needed (scraping, blow-up etc.)

Preparation in good time, check lists

Must be able to track beam quality through the injectors

Emittances, intensities etc.

LHC request must be clearly communicated in good time

Talk to your suppliers

Nice long list of RF improvements in the SPS

Dedicated LHC filling to be pursued

Beam quality and availability from the injectors

24-1-2011 5Evian summary

Giulia Papotti

Transverse and longitudinal characteristics very important

Page 6: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Go dynamic with b3 compensation at injection

~2 units of decay, as expected by FiDeL, but on much longer

time constant

Measure & deploy dynamic correction.

Rollback decay driven trims before starting each injection

Tune decay at injection

Remove hysteresis handling in squeeze

Ramp-down settings for access to avoid pre-cycle

afterwards

Chromaticity during ramp

Tracked within ±7 units – we can improve the initial part

Magnetic model/cycle and its effects

24-1-2011 6Evian summary

Ezio Todesco

..today we have the most complex and comprehensive field forecast

system ever implemented in a superconducting accelerator

Luca Bottura 2008

Page 7: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

LHC:

5.4 GCHF investment

Around 299 MCF/year P & M budget

Understandable desire to capitalize on investment

Route 1: long operational years

Human factor:

Operations and infrastructure teams with limited manpower

Stretched in some areas - not only the LHC

The human factor

24-1-2011 7Evian summary

Resources

Page 8: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

S3: RF, beam diagnostics and feedback systems

Evian summary 824-1-2011

• Interaction of Q-feedback and TFB

• BPMs in interaction region

• BPM intensity dependence

• Reliable bunch by bunch beam size measurement through the cycle

Key systems have performed with a remarkable degree of maturity –

inevitably some improvements possible:

Beam based feedbacks – tune, orbit

Transverse feedback

RF

Beam instrumentation: BPMs, BLMs, beam size measurement…

Page 9: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Transverse Feedback

Evian summary 924-1-2011

commissioned damper at 450 GeV, during ramp and with colliding beams

nominal damping rate reached and surpased

commissioned operation with bunch train

commissioned damper for ions at 450 GeV and with colliding ion beams

abort gap cleaning and injection slot cleaning successfully used

diagnostics (logging, fixed display, multi-bunch acquisition) available

Lots incoming in 2011

Tune measurement options listed. Strategy to be defined.

Wolfgang Hofle

Page 10: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Feedbacks performed well and facilitated a fast

commissioning

de-facto required during every ramp and squeeze with nominal

beam and expect the same also for next year

additional safety margin to operation provided feed-forward is

performed regularly

Good overall performance with little transmission losses

and minimal hiccups related to Q/Q' instrumentation,

diagnostics and Q/Q' & orbit feedbacks

This year's 1% losses may become more critical in 2011

Tune, Orbit feedbacks

24-1-2011 10Evian summary

Ralph Steinhagen

Page 11: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Tune feedback in the ramp

Evian summary 1124-1-2011

Page 12: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

BBQ versus ADT

Evian summary 1224-1-2011

Effective ADT noise floor and observed bunch-to-

bunch cross-talk hinders reliable operation of LHC's

Q/Q’-diagnostics and related feedbacks

Page 13: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Scenario for gain

Evian summary 1324-1-2011

Page 14: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

The global performance of the system is very good –

97% channel availability

Number of improvements through the year

including temperature calibration/compensation

Synchronous mode 2011

will solve double trigger issue on IR BPMs

Orbit on selected bunches

IR BPMs: cable adapters will be installed this XMAS stop

Pre-flight checks with beam

Testing acquisition and calibration

Intensity dependence cross-over

B1 behavior was caused by a small impedance mismatch at the

input of the intensity module.

Replacing the intensity card by termination card in IRs

BPMs: status, measurement reliability and outlook for 2011

24-1-2011 14Evian summary

Eva Calvo

Page 15: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Wire scanners

Turn and bunch-to-bunch

Reference but take care

BSRT

DC and pulsed mode

Resolution – optics;

Accuracy via x-calibration with WS – correction factors not stable

Absolute calibration and ultimate resolution: still to be studied

Complicated in ramp – change of focusing etc.

Bunch by bunch, turn by turn incoming – fast camera

BGI is in commissioning phase relative accuracy reliable once beam profile quality has been checked

absolute calibration to be studied to complement cross-calibration with bumps

2011: gas inj. remote control, better camera control

Transverse beam size

24-1-2011 15Evian summary

F. Roncarolo

Essential - need bunch by bunch - getting there

Page 16: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

S4: Machine protection

Evian summary 1624-1-2011

Machine protection system has functioned remarkably well – long list of

improvements for 2011

LBDS performing well

Injection protection – some issues

Intensity ramp up strategy in 2010 was well judged

Motherhood statement: continue to take it seriously

Injection protection - injecting unsafe beam into the LHC

Enforcing a more rigorous approach at injection > 500 kJ

Ramping up intensity – clear strategy for 2011 required

Page 17: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

CERNCERN

[email protected] LHC beam commissioning Workshop - Evian

Main challenges during 2010 run (> injection)

SIS (TCDQ Position, missing energy)

Magnet Powering (Orbit Feedback, etc..)

Collimator interlocks during ramp

Magnet Powering (OFB/QFB, QPS sector trip, ..)

Loss Maps, Collimator setup, Fast losses

ATLAS

Magnet Powering (Mostly PC issues + FB, CRYO,..)

Fast losses, loss maps,…

SW Permits (TCDQ position, trip of DOCs)

Loss maps, wire scanner tests, collimators moving…

SW Permits (TCDQ position,…)

Magnet Powering (Mostly PC issues, …)

>> Fast Losses (UFOs)

Magnet Powering (QPS, CRYO, PC,.. )

SW Permit (Orbit, BLM lost in IR7…)

Electrical Perturbations

Beam dumps as a function of beam mode for fills where energy ramp started and main causes of loosing the beams…

17

Page 18: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

MPS system response - summary

Evian summary 1824-1-2011

LHC Machine Protection Systems have been working extremely well during 2010 run thanks to a lot of commitment and rigor of operation crews and MPS

experts

Most failures are captured before effects on beam are seen, still no quenches with circulating beam (with ~ 30MJ per beam and 10mJ for quenching a magnet)

Beam dumps above injection are rigorously analyzed, we can do better at injection (avoiding repetitive tries without identifying the cause)

Still a lot of room for improving tools for more efficient and automated analysis

No evidence of major loopholes or uncovered risks, but bypassing of protection layers was/is still possible -> Follow-up of MPS Review recommendations

Still we have to remain vigilant to maintain current level of dependability of MPS systems, especially when entering longer periods of ‘stable running’

Markus Zerlauth

Page 19: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

LBDS: Faults Occurred During 2010 run

1 energy tracking error at 3.5 TeV due to instabilities of 35 kV

power supplies beam dump (30/03/2010: media day)

Asynchronous beam dump, during energy scan without beam

(due to spark on the outside of the gate turn-off GTO thyristor):

1 at 5 TeV

2 at 7 TeV

4 internal triggers due to vacuum interlocks on the MKB for B2

FALSE vacuum pressure reading – logic now changed to use only VAC

signal

1 Asynchronous beam dump with beam

2 beam dumps induced by TCDQ faults

12/08/2010

Safe margin for 3.5 TeV operation, isolators implemented during technical stops (starting in

January 2011 finished during 2012 TS)

Number of total dump system failures (unacceptable):

1 every 1000000 years Chiara Bracco

Page 20: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

LBDS failures occurrence in agreement and not worse

than requirements and expectations

No damage or quench during synchronous and asynchronous

beam dumps

Leakage to downstream elements within specifications

TCDQ needs TLC – long-term plans to define

Machine protection validation tests, procedures and tests

frequency:

Is this adequate? (too often, too rarely)

Could tests be improved?

Do they really insure machine safety?

LBDS

24-1-2011 20Evian summaryChiara Bracco

Page 21: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

BEAM LOSSES

Evian summary 2124-1-2011

Excellent performance of collimation system - no quenches

BLMs – great job – thresholds always a consideration

Issues at injection with fast losses

Watch extraction losses

UFOs

BLM thresholds at critical locations

Page 22: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

UFOs

Triplet, IRs and arcs

Scaling with total intensity – extrapolations look worrying

Don’t appear to get harder with intensity

Loss duration falls with intensity

Interestingly – hot and cold regions out there

Maximize UFO acceptance by threshold adjustment

BLM hardware failures

Acceptable!

Losses away from collimators: statistics and extrapolation

24-1-2011 22Evian summary

Barbara Holzer

Page 23: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

BLM thresholds

Evian summary 2324-1-2011

Detailed analysis presented by Annika!

Annika Nordt

Correlations between collimator movements, vacuum and beam losses

Page 24: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

LUMINOSITY PERFORMANCE

Excellent performance

Stability and reproducibility: orbit, optics

Intensity and emittance from injectors

Benign beam-beam

Collimation has performed very well – projected limits for beta*

presented. No limits on beam intensity in 2011.

Evian summary 2424-1-2011

Optics – measurement and correction

Emittance preservation through the cycle – the hump

Bunch by bunch diagnostics

Beam quality from injectors: intensity, emittance

Luminosity calibration

Beam-beam

Page 25: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Beating at injection, during squeeze well corrected

3.5 m.

10% achieved!

Slightly worse with LSA… not driving IR3,4,6 and 7

Hysteresis handling – 10% beating at 1.5 m. – we will desist

Excellent long-term stability!

Non-negligible drift 8% observed at injection

Beatings going to get worse, but correctable

IR coupling correction mandatory below 2 m.

Optics

24-1-2011 25Evian summary

Rogelio Tomas Garcia

Page 26: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

The hump affects luminosity performance due to blow-up

(particularly at 450 GeV). In collision it can excite beam-

beam coherent modes or generate tails and therefore

losses

Mitigation: low noise TFB at maximum gain

Since middle of November turn-by-turn/bunch-by-bunch

position with damper pick-up. Ion filling scheme with

basic spacing of 500 ns possibility of determining the

frequency of the hump ±f0+n x 2 MHz with 0<f0<1 MHz

fhump < 10 MHz

The identification (and possibly eradication) of the origin

remain the (challenging) goal of the ongoing analysis

and measurements.

The hump is there all the time

24-1-2011 26Evian summary

Gianluigi Arduini

Page 27: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

The hump is there all the time

Evian summary 2724-1-2011

Page 28: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

2011 INCOMING

Energy?

Squeezing further - minimum beta*

LHCb ”Luminosity leveling”, beta’s at Alice and LHCb

150 vs. 75 vs. 50 ns. - beam from injectors, start-up strategy

Evian summary 2824-1-2011

Electron cloud: heat load, vacuum, scrubbing, monitoring

UFOs

R2E

Beam-beam – pushing the limits

All to be covered in detail at this workshop

Page 29: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Come a phenomenally long way in 9 months

Notable feature - remarkable maturity of some key

systems after just a year

It hasn’t come for free

It’s been years in the preparation

Devil is, as always, in the details, lots to follow-up

Possible improvements, consolidation detailed for all

systems

2011 clearly aims to leverage off of what’s been learnt

this year

With some known problems incoming:

UFOs, electron cloud, R2E…

We’ll be pushing up Ralph’s stored energy plot

LET’S TRY NOT TO BREAK IT!

Conclusions

24-1-2011 29Evian summary

Page 30: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Chairpersons

Roger, Gianluigi, Jorg, Brennan, Ralph, Malika

Scientific secretaries

Giulia, Mirko, Reyes, Alick, Stefano, Verena

Speakers

Lot of hard work at the end of a hard year

Workshop secretariat

Sylvia Dubourg, Flora Meric

Technical support

Pierre Charrue

Brains, organization and determination

Malika Meddahi

Editor of proceedings

Brennan Goddard

Steve and Paul for their support

Acknowledgements

24-1-2011 30Evian summary

Page 31: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

ATLAS: highlights from the first run

Fabiola Gianotti

ALICE: The 2010 LHC Experience

Werner Riegler, on behalf of Jurgen Schukraft

CMS 2010 and Prospects for 2011-12

Tiziano Camporesi, on behalf of Guido Tonelli

Compliments to LHC from LHCb

Andrei Golutvin

Special thanks….

24-1-2011 31Evian summary

Very much appreciated!

Page 32: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Evian summary 3224-1-2011

Thanks to CMS

Page 33: FGC Software Design Review - CERN...abort gap cleaning and injection slot cleaning successfully used diagnostics (logging, fixed display, multi-bunch acquisition) available Lots incoming

Evian summary 3324-1-2011