FFY 18-27 STIP Project Application Status ReportAIPC
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Island Bicycle Wayfinding Signage Project
1481 Island-wide NA Non-BridgeNA
Transportation Alternatives West Main Road Bicycle Crossing Safety Project
1482 Mill Lane to Stringham Rd NA Non-BridgeNA
Transportation Alternatives Mount Hope Bay Bikeway/Two Bridges Trail Shared Use Path
5163 Newport Secondary Rail Corridor (Sakonnet River Bridge to Pheasant Drive coastal acess site)
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportBarrington
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Rt 103, Willet Ave (Bullocks Point Ave to Wampanoag Ave)
1298 Bullocks Point Ave to Wamponoag Ave 2024 Non-Bridge2023
Transportation Alternatives New Meadow Road Sidewalk - Deep Meadow Rd to Christine Dr.
1473 Christine Drive to Deep Run Road 2026 Non-BridgeNA
Transportation Alternatives Massasoit Avenue Sidewalk - Martin Ave to Arvin Ave.
1474 Woodward Ave to Arvin Ave 2026 Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportBonnet Shores Fire District Land Trust
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Bonnet Shores Pedestrian Walkway1475 Allagash/Bonnet Pt Rd intersection to Bonnet Shores Beach Club entrance
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportBristol
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Route 114 Hope Street from Constitution Street south to Metacom at RWU
1299 Metacom Ave at RWU to Constitution St
2021 Non-Bridge2021
Pavement Capital Program Route 114 Hope Street from Washington Street to Dyer Ave
1300 Washington St to Dyer Ave 2022 Non-Bridge2019
Pavement Capital Program Design of Metacom Ave, Route 136 Corridor Improvements
1301 Warren T/L to Ferry Road 2023 Non-Bridge2023
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportBurrillville
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Oakland Bike Path1483 Off-road area from Victory Highway to Branch River
NA Non-BridgeNA
Transportation Alternatives Spring Lake Bike Path1486 Spring Lake Road, from south of Cherry Farm road to the park entrance. Also, along the unnamed ROW in the Black Hut Management Area from Spring Lake Road to Ironmine Rd. Also, Along Ironmine Rd from the unnamed ROW to Joslin Rd
NA Non-BridgeNA
Pavement Capital Program Mapleville Main Street 5009 Sand Hill Rd to Cooper Hill Rd NA Non-BridgeNA
Traffic Safety Capital Program
Black Hut Road5010 Cherry Farm Rd to Spring Lake Rd NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportCentral Falls
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Pine Street Bicycle Blvd 1487 Rand St to Crossman St NA Non-BridgeNA
Pavement Capital Program Dexter Street-Contract 22001 School St to Lonsdale Ave NA Non-BridgeNA
Transit Operations - RIDOT Pawtucket Central Falls Transit Center (Merged with Pawtucket/Central falls TOD Municipal Improvements)
7112 Pawtucket Train Station area streets including Barton St, Goff Ave, Dexter St, Pine St, Garden St, Main St, Church St, Weeden St, Conant St, Lonsdale Ave
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportCharlestown
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Drainage Capital Program Route 2 Drainage Improvements 5015 north of Jonathan Drive to south of Charlestown Town Hall
NA Non-BridgeNA
Transportation Alternatives Old Post Road Multiuse Path Feasibility Study
5016 Chamber of Commerce @ Route 1 to Post office or location @SK line
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportCoventry
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Sandy Bottom Road Streetscape5018 Route 117/Sandy Bottom Rd to Route 3/Sandy Bottom Road
2026 Non-BridgeNA
Pavement Capital Program Tiogue Avenue and Nooseneck Hill Road Streetscape/Pavement
5019 Tiogue Ave continues as Nooseneck Hill Rd. South Main Street to Harkney Hill Rd
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportCranston
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Park Ave Rehabilitation1282 Broad St to Cranston St NA Non-BridgeNA
Traffic Safety Capital Program
Sockanosset Crossroad / Pontiac Ave5022 Sockanosset Cross Rd to Rt 37 NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportCumberland
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Drainage Capital Program Marshall Ave Drainage Improvements5032 Garden Street to Mendon Rd NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportFamily Service of RI
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Walking School Bus for 3 years at 7 schools (SRTS non-infrastructure)
1477 Various NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportFoster
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Resurfacing Anan Wade Rd (Rt 101 to Snake Hill Road)
1327 Rt 101 to Snake Hill Rd NA Non-BridgeNA
Traffic Safety Capital Program
Intersection/Segment Improvements. US6 Danielson Pike
5052 Scituate to Anthony Rd NA Non-BridgeNA
Traffic Safety Capital Program
Signalization Improvement at Cucumber Hill Road & US 6 Danielson
5056 Intersection of Cucumber Hill Rd and Danielson Pike
NA Non-BridgeNA
Bridge Capital Program Old Danielson Pike Bridge at Ponagansett River
6701 NA None IndicatedNA
Bridge Capital Program Anthony Road Bridge at Hemlock Brook 6702 NA None IndicatedNA
Bridge Capital Program Pine Tree Road Bridge at Hemlock Brook (Bridge ID 103201)
6703 NA None IndicatedNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportGlocester
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Route 94, Reynolds Road1329 Foster T/L to US-44 2022 Non-Bridge2019
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportHopkinton
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Chase Hill Road Project1288 Main St (Rt 3) to Ashaway Rd NA Non-BridgeNA
Pavement Capital Program Resurfacing Laurel and Maxon1334 Maxson St (Laurel St to Rt 3) and Laurel St (Potter Hill Rd to Rt 216
2020 Non-Bridge2020
Transportation Alternatives Main Street ADA sidewalks 5058 Highview Avenue to Spring Street (Rt 138)
2026 Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportJamestown
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Conanicus Avenue-raise remaining portion of sea wall due to sea level rise
1278 Boat Ramp near Knowles Court to End of Sea Wall near Bay View Dr.
NA Non-BridgeNA
Transportation Alternatives Ice Road Bike Path 5062 Across town owned land between North Rd and Eldred Ave
NA Non-BridgeNA
Transportation Alternatives Sidewalk and curbing replacement on Walcott Avenue from Hamilton Ave to Ft. Wetherill
5063 Hamilton to Fort Wetherill State Park NA Non-BridgeNA
Planning - Program Development
Beavertail Road at Mackerel Cove-Sea Level Rise Impacts-planning
6174 Hamilton Ave to Ft. Getty Rd NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportLittle Compton
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Sakonnet Point Road Seawall/Road Restoration
1396 Sakonnet Point Yacht Club entrance to approx 210 ft sse along Sakonnet Point Rd
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportNarragansett
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Boston Neck Road - Widening & Restriping (S. Ferry Rd to Mettatuxet Rd)
1310 South Ferry Rd to Mettatuxet Rd NA Non-BridgeNA
Pavement Capital Program Point Judith Road - Restriping (Barton Way to Westmoreland Street)
1312 Barton Way to Westmoreland St NA Non-BridgeNA
Transportation Alternatives William C. O'Neill Bike Path Sec 4B - (Elem School to Narragansett Town Beach)
5089 Mumford Road, Narr. Elementary School (rear of site) to Narragansett Town Beach
2018 Non-Bridge2017
Pavement Capital Program Bonnet Point Road Causeway reconstruction - (Allagash Trail to BSBC)
5090 Allagash Trail to Bonnet Shores Beach Club
NA Non-BridgeNA
Transportation Alternatives Ocean Road Beautification Phase 1&2 (Beach Street to South Pier Road)
5093 Beach St to South Pier Rd 2026 Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportNew Shoreham
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Corn Neck Road sidewalk5097 Ocean Ave. (Bridge Gate Sq) to Beach Avenue
2026 Non-BridgeNA
Pavement Capital Program Chapel Street sidewalk 5098 Weldon's Way to Old Town Road 2026 Non-BridgeNA
Pavement Capital Program Ocean Ave pavement 5099 Beach Avenue to West Side Road NA Non-BridgeNA
Pavement Capital Program Cooneymus Road pavement 5100 West Side Road to Isaac's Corner NA Non-BridgeNA
Pavement Capital Program West Side Road pavement 5102 Ocean Ave to Cooneymus Rd. NA Non-BridgeNA
Pavement Capital Program Spring Street pavement 5103 High St. to Mohegan Trail NA Non-BridgeNA
Pavement Capital Program Mohegan Trail pavement5104 Spring St. to Lakeside Dr. NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportNewport
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Farewell Street Enhancements5106 America's Cup Avenue to Van Zandt Avenue
2026 Non-BridgeNA
Transportation Alternatives Bellevue Ave Improvements5107 Kay St. to Ocean Ave. 2023 Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportNorth Kingstown
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Post Road to Richard Smith Drive paving and sidewalks
1303 Richard Smith Dr, from Post Road to Richard Smith Dr.
NA Non-BridgeNA
Pavement Capital Program Intersection impv. to Oak Hill/Rt. 4 1320 Intersection of Oak Hill Rd and Rt 4 NA Non-BridgeNA
Pavement Capital Program Intersection impv. to W Allenton Road/Rt 4
1344 Intersection of W Allenton Rd and Rt 4 NA Non-BridgeNA
Pavement Capital Program Sidewalks along W Main Street 1368 Rt 1A (US-1 to Brown St) 2019 Non-Bridge2019
Transportation Alternatives Smith Castle Enhancements5114 Post Rd/55 Richard Smith Drive NA Non-BridgeNA
Transportation Alternatives Post Road curbing and sidewalks5120 Camp Avenue to Route 1A (West Main Street)
2019 Non-Bridge2019
Traffic Safety Capital Program
High hazard intersection at Ferry Road and Boston Neck Road
5122 Ferry Road and Boston Neck Road NA Non-BridgeNA
Transportation Alternatives Post Road bike route 5124 Maxwell Drive to West Main Street NA Non-BridgeNA
Transportation Alternatives Belleville House to Wickford sidewalk and crosswalk improvements
5125 Phillips Street between Belleville House (just south of Ten Rod Road) to Brown Street in Wickford Village
2026 Non-BridgeNA
Transportation Alternatives Phillips Street sidewalk (Grouped into Belleville House to Wickford sidewalk as one project)
5125 Phillips Street between Belleville House (just south of Ten Rod Road) to Brown Street in Wickford Village
2026 Non-BridgeNA
Transportation Alternatives Sidewalks on Rte 102 from Home Depot to Wickford
5127 Home Depot to Wickford Junction Plaza
2026 Non-BridgeNA
Pavement Capital Program Route 102 Resurfacing 5326 Route 102/Phillips Street from Route 1A to Route 2
NA Non-BridgeNA
Traffic Safety Right turn lane at intersection of SB Rt 1 and Rte 102
6699 Intersection of Routes 1 and 102 NA Non-BridgeNA
Transit Operations - RIDOT Weekend transit service to Wickford 7111 Wickford Junction train station NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportNorth Providence
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Drainage Capital Program Woodward Road - Mineral Spring Ave to Gale Court
5130 Mineral Spring Ave. to Providence line NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportNorth Smithfield
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Road resurfacing (Rte 104 from Rte 7 to Rte 5)
1316 Mechanic St (Nichols Ln to Rt 3), Woodville-Alton Rd (Rt 3 to Townsend Rd), Rt 2 Bald Hill Rd (West Natick to WB Mason U-turn), Rt 5/104 Greenville Rd (Rt 7 to Rt 5), Middle Rd (Union St to Schoolhouse Ln)
NA Non-Bridge2017
Pavement Capital Program Branch River 146 Access1345 Northbound Ramp, Pound Hill Rd and 146 to Branch River Industrial Park site
NA Non-BridgeNA
Traffic Safety Capital Program
146A North Deceleration Lane 1440 146A to Old Smithfield Rd NA Non-BridgeNA
Traffic Safety Capital Program
Intersection Improvements to Rte 146 1459 Rout 146 (Route 99 to Route 146A) 2019 Non-Bridge2017
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportPawtucket
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Slater Mill Phase II5155 Roosevelt Ave. from Main to Leather Ave.
2018 Non-Bridge2017
Transportation Alternatives Exchange Street Enhancements 5156 Roosevelt Ave to Broadway NA Non-BridgeNA
Transit Operations - RIDOT Pawtucket/Central Falls TOD Municipal Improvements
7112 Pawtucket Train Station area streets including Barton St, Goff Ave, Dexter St, Pine St, Garden St, Main St, Church St, Weeden St, Conant St, Lonsdale Ave
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportPortsmouth
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Drainage Capital Program Roadway Drainage Improvements-Park Avenue
5170 Boyd's Lane to Island Avenue NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportProvidence
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Exchange Street 1460 Washington St. to Railroad St. 2018 Non-Bridge2018
Transportation Alternatives Providence Bicycle Master Plan 1488 Citywide 2019 Non-BridgeNA
Transportation Alternatives Woonasquatucket 5178 Park Street to Aleppo Street 2018 Non-Bridge2017
Transit Operations - RIDOT Kennedy Plaza7113 Washington St, Exchange Terr, Fulton St, Exchange St, Dorrance St, N. Main St.
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportQDC
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transit Capital Program - RIDOT
Compass Circle Crossings 2031 All American Way to Bonneau Rd NA Non-BridgeNA
Transit Capital Program - RIDOT
Burlingham Crossing Safety Improvements
2032 Burlingham Ave from Roger Williams Way to Circuit Drive
NA Non-BridgeNA
Projects of Regional Significance
Route 403 Deferred Ramps (West Davisville and Post Road)
5118 West Davisville Road to Post Rd NA Non-BridgeNA
Transit Administration & Operations - RIPTA
Quonset Business Park Flex Transit Service
7025 In the Quonset Buisiness Park from CCRI - Warwick to Roger Williams Way
NA Non-BridgeNA
Transit Operations - RIDOT Quonset Commuter Rail Feasibility Study
7114 Quonset Buisiness Park NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportRichmond
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Planning - Program Development
Shannock Hill Rd / Rt 2 Configuration 5086 The intersection of Shannock Hill Rd and Rout 2
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportRIPTA
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transit Corridors - RIPTA Transit Corridor Development 5254 Statewide 2021 Non-BridgeNA
Other Transit Initiatives - RIPTA
Green Fleet Transition Project5255 Statewide NA Non-BridgeNA
Transit Corridors - RIPTA East Side Tunnel Modernization 7019 East Side Transit Tunnel 2019 Non-BridgeNA
Transit Administration & Operations - RIPTA
Maintenance Facility Modernization 7026 705 / 750 Elmwood Ave, Providence NA Non-BridgeNA
Transit Administration & Operations - RIPTA
GovPass7027 Statewide NA Non-BridgeNA
Transit Administration & Operations - RIPTA
Quonset Biz Park Transit Access Pilot 7028 Roger Williams Way from the Quonset Bus Park to Kennedy Plaza
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportSmithfield
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Greenville Avenue , Smithfield/Johnston 1341 Atwood Ave to US-44 2024 Non-Bridge2024
Pavement Capital Program Rt 7 & Rt 116 Economic Corridor1363 Douglas Pike, from Exit 8B off I-295 to George Washington Highway Rt 116
NA Non-BridgeNA
Planning - Program Development
Douglas Pike, Rt 7 5087 Exit 8A off I-295 to Limerock Rd NA Non-BridgeNA
Traffic Safety Capital Program
I-295 On/Off Ramps Engineering Study 5226 Route 116 @I-295 NB/SB NA Non-BridgeNA
Transportation Alternatives Replace Old County Road asphalt sidewalks with concrete sidewalks
5229 Wolf Hill Road to Dean Avenue 2026 Non-BridgeNA
Pavement Capital Program Cedar Swamp Road and Sanderson Road-Sidewalks, drainage, resurfacing
5230 Pleasant View Avenue to Johnston Town Line
NA Non-BridgeNA
Transportation Alternatives Esmond Street-New Sidewalks 5231 Route 44 to Dean Avenue NA Non-BridgeNA
Transportation Alternatives Whitman St & Fernwood St-New sidewalks/drainage/resurface
5232 Waterman Avenue to Whipple Avenue NA Non-BridgeNA
Traffic Safety Capital Program
Cross Street-widening & safety upgrades5233 Stillwater Road to Whipple Avenue NA Non-BridgeNA
Pavement Capital Program Dean Avenue resurfacing project 5234 Esmond Street to Johnston Town Line NA Non-BridgeNA
Transportation Alternatives Stillwater Road-New sidewalks5235 Homestead Avenue to River Road NA Non-BridgeNA
Transportation Alternatives Thurber Blvd-new sidewalks5236 Douglas Pike to Stillwater Road NA Non-BridgeNA
Pavement Capital Program Smith Avenue (Route 116)-resurfacing 5238 Route 44 to Glocester Town Line NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportSouth Kingstown
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Matunuck Beach Sea Wall Extension1422 From existing seawall to a location 400' west along Matunuck Beach Rd
NA Non-BridgeNA
Planning - Program Development
Old Tower Hill Rd Traffic Safety and Pedestrian Accomodation Study
5116 Rt 1 to Rt 108 NA Non-BridgeNA
Pavement Capital Program Route 108 Sidewalk Installation and Drainage Improvements
5246 Rt. 108 from Meadowbrook Apartments (north of Curtis cord Rd./Saugatucket Rd) to Rt. 138
NA Non-BridgeNA
Traffic Safety Capital Program
Route 138/Broad Rock Road/Stony Fort Rd Intersection Improvements
5248 Rt. 138 at Broad Rock Rd. & Stony Fort Rd.
NA Non-BridgeNA
Planning - Program Development
South Kingstown Commuter Rail Feasibility Study
5249 Kingstown Station Vicinity NA Non-BridgeNA
Bridge Capital Program Route 108 Pedestrian Bridge at Peacedale Stone Arch - incorporate pedestrian bridge with bridge work
6529 2022 Bridge Group 25B2022
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportTiverton
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Traffic Safety Capital Program
Bulgarmarch Road (Rt 177) at Fish Road Intersection safety improvements
1437 Intersection of Bulgarmarsh Rd and Fish Rd
NA Non-BridgeNA
Transportation Alternatives Mount Hope Bay Greenway-walking and bike path
1489 Newport Secondary ROW in Tiverton from MA State Line to Sakonnet River Bridge
NA Non-BridgeNA
Planning - Program Development
Fish Road at Industrial Way-intersection safety improvements
5117 Fish Rd from Industrial Way to Rt 24 bridge at Fish
NA Non-BridgeNA
Pavement Capital Program Reconstruction of Canonicus Street 5257 From Main Rd to 650 feet west NA Non-BridgeNA
Bridge Capital Program Riverside Drive-culvert replacement6708 Railroad Easement to 150' North of same
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportURI
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Plains Road Rehabilitation and Improvements
1426 Route 138 to West Alumni Ave NA Non-BridgeNA
Transportation Alternatives URI/South County Bike Path Connector and Ext.
5245 Connection from Flagg Rd. to the South County Bike Path
2018 Non-BridgeNA
Pavement Capital Program Upper College Road Complete Streets5324 Rt 138 to Flagg Rd 2018 Non-BridgeNA
Transit Capital Program - RIDOT
URI/SK Intermodal Station5325 Plains Rd, Kingston between Amtrack Line and Flagg Rd.
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportWarren
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Transportation Alternatives Water Street Sidewalks5268 Water Street from Route 114 to Luther St.
NA Non-BridgeNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportWesterly
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program School Street Reconstruction1374 From Granite St to Main St NA Non-BridgeNA
Pavement Capital Program Wells Street 3R Westminster to East1382 Westminster to East St NA Non-BridgeNA
Pavement Capital Program Church Street Route 216 3R 1383 Bradford Rd to Ross Hill Rd NA Non-BridgeNA
Pavement Capital Program Elevating Bradford Road 1385 Approx. 450 Bradford Rd to Approx 460 Bradford Rd
NA Non-BridgeNA
Transportation Alternatives Langworthy Road Sidewalks1479 Post Rd to Shore Rd 2026 Non-BridgeNA
Transportation Alternatives Bradford Road Sidewalks1480 Westerly-Bradford Rd to 163 Bradford Rd
NA Non-BridgeNA
Transportation Alternatives Misquamicut Bike Loop1490 Loop: Atlantic Ave, Winnapaug Rd, Shore Rd, Weekapaug Rd
NA Non-BridgeNA
Transportation Alternatives Dunns Corners Road Shared Bike Lane1494 Westerly Bradford Rd to Post Rd NA Non-BridgeNA
Pavement Capital Program Main Street Drainage and Resurfacing 5288 Broad St. to Crescent St. NA Non-BridgeNA
Pavement Capital Program Upper Canal Street Resurfacing 5289 White Rock Rd. to High St. NA Non-BridgeNA
Traffic Safety Capital Program
Reconstruction of Airport Road and Winnapaug Road Intersection
5290 Airport Rd and Winnapaug Rd NA Non-BridgeNA
Pavement Capital Program Elevating Atlantic Ave and Bike Lane5291 Weekapaug Bridge to Maplewood Avenue
NA Non-BridgeNA
Transit Capital Program - RIDOT
Downtown Parking Garage (Union Street)
5292 #5 Union Street to town-owned parcel NA Non-BridgeNA
Bridge Capital Program Replacement of Boombridge Road Bridge (Bridge ID: 04744) (NOT a RI Bridge)
6746 NA n/aNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-
FFY 18-27 STIP Project Application Status ReportWoonsocket
TIP Program Category Project NameTIP ID Project LimitsCurrent
FFY 17-25 STIP
DRAFT FFY 18-27 STIP
Bridge Group
Pavement Capital Program Worral Street Reconstruction 1428 NA Non-BridgeNA
Traffic Safety Capital Program
Cass Ave Reconstruction5298 Cumberland St. to Mendon Road NA Non-BridgeNA
Pavement Capital Program East School Street Reconstruction 5299 North Main Street to Social Street NA Non-BridgeNA
Pavement Capital Program North Main Street Reconstruction5300 Blackstone Street to MA Stateline NA Non-BridgeNA
Pavement Capital Program Gaskill Street Reconstruction5301 Harris Avenue to MA Stateline NA Non-BridgeNA
Pavement Capital Program Park East Drive Reconstruction 5302 Route 122 (Cumberland Hill Road) to Woonsocket city line
NA Non-BridgeNA
Pavement Capital Program Manville Road Reconstruction5304 Hamlet Avenue to Woonsocket city line
NA Non-BridgeNA
Pavement Capital Program Mendon Road Reconstruction5306 Route 122 (Cumberland Hill Road) to MA Stateline
NA Non-BridgeNA
Transportation Alternatives Woonsocket River Landing 5307 2023 Non-Bridge2023
Transit Capital Program - RIDOT
Commuter Rail Feasibility Study and Design
5308 Rail Lines including the Providence and Worcester Railway Mainline and the Northeast Corridor between Worcester and T.F. Greene, with a focus on Woonsocket
NA Non-BridgeNA
Transportation Alternatives Middle Main street Improvements (Grouped into Main Street Improvements)
5309 Main St. Overlay District, and Main St. from Prospect to Arnold
2019 Non-Bridge2019
Transportation Alternatives Main Street Improvements5309 Main St. Overlay District, and Main St. from Prospect to Arnold
2019 Non-Bridge2019
Traffic Safety Capital Program
Truman Drive Realignment 5310 Bernon Street to Clinton Street NA Non-BridgeNA
Bridge Capital Program Elm Street Bridge at Peters River6687 2022 Bridge Group 26BNA
Where shown: NA = Not Applicable (Project is not in Current 17-25 STIP or not funded in DRAFT FFY 18-27 STIP)
Funded years: Projects with initial funded year listed as 2017 in the Current FFY 17-25 STIP column and the earliest funded year listed as 2018 in the Draft 18-27 STIP column represent projects that will begin in FFY 2017 and continue into future years.
-
-