Product System: INNO_APS covers aluminium prop systems (APS)
Example of
FFC-Task Processing with
Formwork Priority (from Clearance)
Formwork Priority: Example of Given
28.04.2019 © 2019 InnoScaff GmbH
2
10
00
Clearance: Top = Base x = 2000 mm y = 2500 mm Baywidths: x = 1000 mm y = 1000 mm Height: 4500 mm Legloads: -10kN Bearing: Top Held x y Base Restraints acc. to DIN 12811 (LDB: hinged at spindles)
Given: Baywidths plus Loads plus Clearance-Layout
1000
First: Choose your Product System
28.04.2019 © 2019 InnoScaff GmbH
3
Choose your product system
Establish a Section
28.04.2019 © 2019 InnoScaff GmbH
4
Hint: Best would be to establish a FFCc-file when starting a „Project“. A section is defined by its location, represented by the origin of its local coordinates an its area eg. width along x, width along y. The extend of a section area will be defined under Clearance respectivly entering the Task Object if given. unless you change the data here:
global = local
BIM: Rename a Section
28.04.2019 © 2019 InnoScaff GmbH
5
Rename a Section (as long as no objects are available): Global Tab BIM select Section Name Edit Section Local
Clearance: “Generate Clearance“
28.04.2019 © 2019 InnoScaff GmbH
6
One may generate simply flat planes in the distance of a supporting height while editing the measures. More complex shapes must be imported or edited point for point! Example : no Object, no Formwork Build-Up available
not required in this case
Propping Plan: „Generate Leg Dummies“
28.04.2019 © 2019 InnoScaff GmbH
7
Proposal: open a window which includes top and base clearance. Propping will automatically centered in origin of local coordinates
Alternatively: Select breakthrough of coordinates at the foundation
Propping Plan: „Generate Leg Dummies“ (Dummy Towers)
28.04.2019 © 2019 InnoScaff GmbH
8
Initial Picture: Correspondending with choosen System Choose tower width and tower depth, if towers are desired, and go ahead with: • Simple mode:
Insert a desired number of dummy towers with a preset distance once in x-direction and once in y-direction (other distance possible than in x-direction)
or • Advanced mode:
Insert a sequence of dummy towers with desired distances in x- and y-directions.
Falsework Configuration: „Generate Falsework“
28.04.2019 © 2019 InnoScaff GmbH
9
Follow the wizard.
Falsework Configuration: „Generate Falsework“
28.04.2019 © 2019 InnoScaff GmbH
10
Select reference leg in scene
Falsework Configuration via wizard: „Generate Falsework“
28.04.2019 © 2019 InnoScaff GmbH
11
Proposals of wizards depend on your
choice of available components! Choose preferred/available leg components.
Falsework Configuration: Ledger Configuration
28.04.2019 © 2019 InnoScaff GmbH
12
A wizard controlled proposal will be established. You may finish it at your choice after finalizing the wizard.
Option: Adjustments
28.04.2019 © 2019 InnoScaff GmbH
13
See tools for finishing the configuration from wizard!
Falsework Structural Design: „Generate LDBs“
28.04.2019 © 2019 InnoScaff GmbH
14
LDBs represent beam dummies structurally!
Falsework Structural Design: „Create Concentrated Loads“ - Preparatoy work
28.04.2019 © 2019 InnoScaff GmbH
15
Preparatoy work: To meet the legs with loads, the easiest way is to display only the spindles on which loads are applied (Right-click on picture).
Falsework Structural Design: „Create Concentrated Loads“
28.04.2019 © 2019 InnoScaff GmbH
16
Execution
Falsework Structural Design: „Create Bearing“ - Top
28.04.2019 © 2019 InnoScaff GmbH
17
All bearings required are available as templates. (Template = default settings of the program) • Top held x/y = held laterally
Falsework Structural Design: „Create Bearing“ - Base
28.04.2019 © 2019 InnoScaff GmbH
18
All bearings required are available as templates. (Template = default settings of the program) Base 12811 x y means: • Vertically fixed • Laterally sliding: steel/concrete • Bending restraint according to DIN EN
12812
Falsework Structural Design: Show Hidden Selection
28.04.2019 © 2019 InnoScaff GmbH
19
Falsework Structural Design: „ Add Calculation Group“
28.04.2019 © 2019 InnoScaff GmbH
20
Falsework Structural Design: „Start Calculation“ and save Project
28.04.2019 © 2019 InnoScaff GmbH