Παρουσίαση του powerpoint -...

26
Company Presentation June 2015

Upload: others

Post on 27-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Company Presentation June 2015

Page 2: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

- Business

A company active in the field of advanced

engineering plastics and composites production,

with over 30-years of production experience and

major subcontracting co-operations in the

aerospace, military, automotive and electrical /

electronics industries.

- Services

A full range of manufacturing services are

provided, which include tools and parts design,

production and assembly engineering, tool

construction, production of components and

subassemblies.

Business and Services

Our Moto: We bring ideas into life

Page 3: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Established: 1979

Premises : Offices: 32 Ardittou Str., 11636, Athens

Factory (1): Viotia Region, Thiva, 32200, Piri Area

Factory (2): 1st km of Markopoulo – Kalivia Avenue

19003, Markopoulo, Attika, Greece

Share Capital: 5.403.942 Euro

Personnel: 75 people (June 2015)

ISO Certifications: ISO 9001:2008 and ISO 14001:2004

HMOD Certified: Listed in the HMOD Defense Manufacturers Registry (#00023)

Memberships: Hellenic Chamber of Industry

Hellenic Aerospace & Defense Industries Group (HASDIG)

Hellenic Subcontractors Association

Hellenic Plastics Industries Association

ICAP Strongest Companies in Greece

General Information

Page 4: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Major Customers

Domestic

Aluminium of Greece

Bosch-Siemens Home Appliances (BSH)

Demka

Hellenic Air Force (HAF)

Hellenic Aerospace Industry (HAI)

Hellenic Defense Systems (HDS)

Hellenic Petroleum

Hellenic Power Company

Intrakom

Landis+Gyr Corinth

Miltech Hellas

Vodafone – Greece

International

Dassault Aviation (France)

EADS France (France)

Enics (Sweden)

Festo KG (Germany)

Georg Fischer WAGA (Holland)

Gretsch Unitas GmbH (Germany)

Jabil (Poland)

Jac Products Ltd (Great Britain)

Landis+Gyr International (Switzerland)

Landis+Gyr UK (United Kingdom)

MBDA (France)

Trelleborg Vibracoustic GmbH (Germany)

Page 5: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Main European Markets Served

L+G (FR)

L+G (UK)

JAC Products

Trelleborg-Vibracoustic

Enics

Celestica

Jabil

MBDA

Airbus

Airbus Helicopters

Gretsch Unitas

Page 6: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(1) Design – Engineering & Tool-shop

- Molds and production tools

(2) Production

- Engineering Plastics (injection molding) & BMC

Injection of Thermoplastic Materials and BMC

Gas Assisted Injection Molding

- Composites

Resin Transfer Molding

Vacuum Resin Infusion

- Assemblies, Subsystems & Final Products

In-house process:

- Machining, US Welding, Riveting, Hot-Stamping , Wet Paint

- Tampon-Printing, Manual Assembly, EFI for plastics, etc

Subcontracting process:

- Powder coating, Vacuum metalize, etc

Purchasing: Electronics, Special components etc

(3) Other Services

- Quality and logistics

Areas of Activity

Page 7: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Design – Engineering & Tool-Shop

Page 8: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(1) Stereo-lithographic prototypes (STL Parts)

(2) Functional Prototypes

- Machined Prototypes

- From prototyping moulds

Design - Prototypes

Initial plastic machined

prototypes

Aluminum machined

prototypes

Initial Molded

Prototypes

Final Molded

Prototypes

Mold Bases with aluminum

inserts for prototypes and

small series

STL and serial products

Page 9: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(1) Design for manufacturing

- Customer: TrelleborgVibracoustic GmbH

- Assembly: Engine mount hydro-mechanical sub-

system for the VW GOLF

- Final Product: Engine Mount for Golf Serie

- Successfully cooperated in the development phase

and received the contract for the production

- Audited by VOLKSWAGEN for the release of the

production

(2) Complete Assembly Modeling

- Customer: Miltech SA

- Product: Military Field Telephone

- Complete product study

- 3D Parametric Design of all components

- Assembly Verification

Design - Parts and Subsystems (examples)

Page 10: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

- Flow Simulation Analysis

- Complete 3D Parametric Design of all

Mould details

- Use of standard items from reliable

suppliers

- Feed design (gates, runners, hot-runner

systems)

Design - Mold and Fixtures

Page 11: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Construction of Molds & Production Tools

- Modern construction procedures

- Full Computer Aided Manufacturing

- Experienced and trained personnel

- Fully equipped tool shop

- 15+ years experience in CNC machining

of complex shapes

Tool Shop

Page 12: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Tools Manufacturing Experience

• Use: Military

• Raw material: PEEK (Victrex)

• Cavities: 3 (different parts)

• Guarantee: 1M cycles

• Mold Base : Pedrotti

• Use: Electrical - Electronics

• Raw material: BMC (Tetradur)

• Cavities: 4

• Accuracy: 0.005 inches

• Guarantee: 5M cycles

• Mold Base : Pedrotti

Page 13: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Tools Manufacturing Experience (c’ntd) • Use: Automotive

• Raw material: Polyamide 66 30%GF, heat stabilized,

hydrolysis resistant - ZYTEL (DuPont)

• Cavities: 4

• Guarantee: 2M cycles

• Mold Base : HASCO

• Use: Automotive

• Raw material: Thermoplastic Elastomere

SANTOPRENE 101-80 (AES)

• Cavities: 8

• Guarantee: 1M cycles

• Mold Base : Pedrotti

Page 14: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Engineering Plastics & Composites

Production

Page 15: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Engineering Plastics & BMC

Machine park – Engineering Plastics

- Working 3 shifts – 5 days per week

- 14 Machines ranging from 60tn to 520tn

Machine park - BMC

- Working 3 shifts – 5 days per week

- 3 Krauss-Maffei Machines 300tn

Over 30 years of experience

Page 16: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(1) Materials

- Carbon fibers, glass-fibers, Kevlar-fibers

- Epoxy Resins

- Polyester resins

(2) Production Methods

- RTM

- Light RTM

- Vacuum Resin Infusion

- Wet Lay-up

(3) Product Weight & Size

- No actual limitation

Composites

Page 17: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(1) Post-Molding Operations

- Conventional and CNC Machining

- Ultrasonic Welding and Inserting

- Riveting

- Hot-Stamping and Tampo-Printing

- Manual Assembly

- Packaging

(2) Subsystems

- Subsystem release following ISO, Military or

custom Standards

- Design and implementation of testing

procedures

- Provide guarantee period

Production – Assemblies & Subsystems

Twin Container for Carl-Gustaff

ammunition

IBM AS400 Pedestal Assembly

Page 18: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Major Production Projects

in Engineering Plastics and Thermosets

Page 19: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(1) Assembly for IBM AS 400 Systems

- Production started in 1987 and finished in 1993, when the new

generation of Pedestal (the LTS assembly) was launched.

- Single Source supplier for IBM and awarded many times the

“Supplier of the Month” award

(2) Ferraris Electro-Mechanical Power Meters for Landis+Gyr

- In 1996 signed a major contract with the Swiss based company

Landis+Gyr for the production of all thermoplastic components

of the Ferraris electro-mechanical power meters

- Many of these items are still under production

(3) Carl - Gustaff Ammunition Container for HDS S.A. (former EBO)

- In 1998 signed a contract for the production of the twin-

container for the ammunition of the Carl - Gustaff anti-tank

weapon.

- The contract has been successfully completed

- Small quantities have been additionally ordered the following

years

Indicative Major Production Projects

Page 20: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(4) Engine mount hydro-mechanical sub-system for the VW GOLF

- In 2003, received from Vibracoustic Gmbh the first order for

prototype tools for a new patented product

- Successfully cooperated in the development phase and received

the contract for the production

- Audited by VOLKSWAGEN for the release of the production

- Project is still active and expands to other customers like PSA,

BMW and Jaguar

(5) FOCUS New Generation Electronic Power Meter for Landis+Gyr

- In 2010, initiated the production of BMC parts for the new

Landis+Gyr electronic power meter

- New technology production process & materials

- Overall investment of 1.2M Euro in new machinery

- Sole E.U. supplier for Landis+Gyr on this project

Indicative Major Production Projects cnt’d

Page 21: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Major Production Projects in Composites

Page 22: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

(1) Composite Electrical Junction boxes – Rafale Fighter

- Wet lay-up components (polyester, glass fibers, aluminum net)

- Machined epoxy parts

- Final Assembly (riveting, machining, painting)

- Sole source

(2) DEMKA CARBON Spear-Gun

Producing a revolutionary body for DEMKA CARBON Spear-Gun, sold world-

wide and considered one of the best spear-guns ever produced. This is a

special composite product with:

- Polyurethane Core

- Unidirectional Carbon fibers

- Carbon braids

- Aeronautical grade of epoxy system

Major Production Projects in Composites

Page 23: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Major Production Projects in Composites (cnt’d)

• An innovative product designed and developed by Dasyc

which addresses mobile storage, parking and other

housing needs.

• The facility is comprised of composite prefabricated

panels, produced in the manufacturing plant.

• The panels are easily transported (land-sea-air),

assembled and disassembled at any site

• Attributes: structural strength, fire resistance, ease of

manufacture and assembly, increased thermo / sound

insulating capabilities

• Options: fire arms protection, solar panels, a/c integration,

electrical installation, doors, IR painting…

Hangar modular design

Pieces Junction Detail

Arches detail design

Page 24: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Major Production Projects in Composites (cnt’d)

- Customer: Hellenic Air Force (130CS - Limnos)

- Deliverables: 1 Transportable Hangar (930 m²)

Two-sides Covers (Tents – Enhanced Solution)

On-site Installation Services

Electrical Installation (Anti-explosive)

- Customer: Hellenic Air Force (112BW – Elefsis)

- Deliverables: 1 Transportable Hangar (930 m²)

Two-sides Covers (Tents – Simple Solution)

On-site Installation Services

Electrical Installation (industrial)

- Customer: Hellenic Air Force (AD Rhodes)

- Deliverables: 1 Transportable Hangar (930 m²)

Two-sides Covers (Tents – Enhanced Solution)

On-site Installation Services

Electrical Installation (Anti-explosive)

1

2

3

Page 25: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Other Services

Page 26: Παρουσίαση του PowerPoint - Dasycdasyc.gr/wp-content/uploads/2015/06/Dasyc_Company... · - Manual Assembly - Packaging (2) Subsystems - Subsystem release following ISO,

Other Services (1) Quality

- ISO 9001:2008 and ISO 14001:2004 Certified

- PPAP Documentations

- Material “Certificate of Compliance”

- IMDS Data Entry (global database for automotive parts)

- Process Capability Study, Process Flow Chart

- Test Plan (Quality Control Sheet)

- Packaging Standard

- Emergency Plan

(2) Logistics

- Ship-To-Line / Ship-To-Stock / Ship-To-Consignment Stock

- KANBAN supply method

- Annual Contracts

- Ship directly to the end-users on behalf of our customers

Name

1. 5. 1. 1.

2. 6. 2. 2.

3. 7. 3. 3.

4. 8. 4. 4.

LENKUNGS-

ART METHODEN

Montage 1. Duesensysteme einwandfrei montiert - Ο Wenn Clip am Lagerdeckel angerissen ist, Deckel FLK

Verclipsung i.O. demontieren und in Ausschusskiste werfen.

Montagevorgang mit neuem Lagerdeckel wiederholen.

2. Gewicht 110,8-113,8 gr (interne Vorgabe W Teile aussortieren in Behaelter (mit gelbem Aufkleber) - FLK

zur Variantenpruefung) Information an Qualitaetssicherung zur Kontrolle.

Pruefung 1. Bauhoehe 20,15 +1 / -0,5 M (H) Teil als Ausschuss kennzeichnen, 2 weitere Teile pruefen. FLK

2. Laenge 94,9 -0,2 M (M) Teil als Ausschuss kennzeichnen, 2 weitere Teile pruefen. FLK

Code Technika Plastika SAAusgabenBezuegliche Zeichnungen und Vorschriften:

3618 372 / 172 Index 10 640254 (GERMANY)

R036037272

HAEUFIGKEIT

PRUEFUNGS-

Duesensystem Kompl DIESEL

Code Nummer

640254QUALITAETSKONTROLLBLATT

3618 372 / 172

Kunden-code

KONTROLLIERTE MASSE UND MERKMALE REAKTIONSPLAN

647254 (CZECH REP.)

100%

100%

2 St. / Karton

2 St. / Karton

Α