08:53 – set up cart, Nitrogen purge and hardware for MFC to US mini connection.
08:58 – MFC’s zero’d and data logging started.
09:23 – Hose connection from MFC to US Mini RAV completed.
09:25 – Scroll pump started, pump set to 250 sccm, vent MFC opened.
10:02 – AMV closed, Turbo started, MFC’s closed.
10:04 – RGA turned on,
13:20 – 1st calibrated leak test at 3:16:04 for 1 minute.
13:23 – Pressure at 6.7 e-8.
13:24 - Sprayed helium for 30 seconds on hose and mini RAV at 3:20:00 on the RGA.
13:41 – 2nd calibrated leak test at 3:37:14 on the RGA for 30 seconds.
13:44 – RGA turned off and file saved.
13:47 – Data logging restarted
13:49 – Turbo turned off
14:16 – Pressure in hose set to 780 Torr, opened US mini RAV, pressure went to 797 Torr.
14:20 – Data logging restarted.
14:22 – Started pumping down string through US mini RAV at 250 sccm
26 September 2018 – Wednesday
06:06 – Pressure at 4.35 Torr
06:26 – Slightly opened the turbo inlet gate valve.
08:00 – AMV closed, Turbo turned on, both MFC’s closed.
8:45 – RGA started.
11:13 – Pressure at 1.4 e-7
11:15 – Opened calibrated leak (2:30:19 on RGA) ran for 2 min.
11:24 – sprayed helium for 5 min into down stream end. Pressure at 1.3 e-7.
11:30 – Sprayed helium for 5 min into up stream end.
11:36 – Spay complete (2:50:44 on RGA)
13:25 – 2nd calibrated leak test done at 4:40:18 for 1 minute
13:32 – Closing US GV (both sides under vacuum).
13:36 – restarted data logging
13:37 – AMV open, Turbo inlet gate valve closed, turbo off.
14:12 – 796 Torr reached. Stopped logging data.