Page 1: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

DECEMBER 03, 2019

FERDINAND T. DAY ELEMENTARY SCHOOL

GYM ADDITIONCommunity Meeting

Page 2: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

01 Introductions02 Site Analysis / Existing Conditions03 Proposed Design04 Construction Impacts05 Next Steps06 Q & A

AGENDA

Page 3: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

01 Introductions

Page 4: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Our Team

Page 5: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Site Analysis02

Page 6: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Existing Site Diagram

Page 7: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Proposed Site Diagram

Project Goals1. Provide larger gym than the

current physical activity space and a new stage which will serve the entire school and community events.

2. Provide permanent enclosed connection between school and playground.

3. Add more storage space for gym, stage and school.

4. Fit new gym addition design within the existing context.

Page 8: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

03 Proposed Design

Page 9: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Building DiagramA. Existing School EntranceB. Gym Egress Stair/ After

Hours Entrance C. ADA Accessible/ after

Hours Entrance

Plan Notes Legend

D. Existing Garage Entrance

D

CB

AExisting parking garage

Existing school

123456R

Page 10: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Floor Plan: Level 1

EXISTING SCHOOL

A

EXISTING PARENT DROP-OFF TO REMAIN

B

Notes Legend

A. Egress StairB. Current Physical Activity

SpaceC. After hours stairD. Pedestrian entrance to

garageE. Existing ADA accessible

elevatorsF. DumpstersG. DeliveriesH. Gym above

CD

G

123456R

Page 11: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Floor Plan: Level 3

AFTER HOURS STAIR

EGRESS STAIR

EXISTING SCHOOL

123456R

Program Comparisons

1. Existing physical activity space: 3,200 gsf: 14’ high

2. New Gym Space: 4,500 gsf: 25’ high

3. Existing multi-purpose platform:180 gsf: 8’-6” high

4. New Stage: 665 gsf: 20’ high

Page 12: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Existing MaterialsA B C A. Brick

B. Metal PanelsC. Sun Shades

Notes Legend

Page 13: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Fiber Cement Panels:

Page 14: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION
Page 15: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

East Elevation

B

A

C

D

GarageSchool

A. Sloped TPO roofB. Angled Fiber Cement Panels to match brickC. Columns clad in concreteD. Steel Frames

E

E. Flat Fiber Cement Panels to match school additionF. Storefront windows w/ sunshades

Notes Legend

F

Page 16: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

South ElevationA. Sloped TPO roofB. Angled Fiber Cement Panels to match brickD. Steel Frames F. Storefront windows w/ sunshades

Notes Legend

BAD

School

FD

Page 17: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

West Elevation A. Sloped TPO roofB. Angled Fiber Cement Panels to match brickC. Columns clad in concreteD. Steel Frames E. Flat Fiber Cement Panels to match school additionF. Storefront windows G. Mechanical Screen

Notes Legend

C

AB

Garage School

FG

D

E

Page 18: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

North Elevation A. Sloped TPO roofB. Angled Fiber Cement Panels to match brickC. Columns clad in concreteD. Steel Frames E. Flat Fiber Cement Panels to match school additionF. Storefront windowsG. Mechanical ScreenH. Guardrail

Notes Legend

BAD

Garage

EGF

C

H

Playground

Page 19: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

04 Construction Impacts

Page 20: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Impacts during construction

• The school and playground will remain open while school is in session.

Safety fences will be put in place for the duration of construction to keep

the students and staff safe and separate from construction activity.

• New alternatives for the parent drop-off / pick-up loop are being explored

together with ACPS and the city to determine the best options.

• New alternatives for the deliveries and dumpster access are being

explored together with ACPS and the city to determine the best options.

• General Contractor will work closely with school to coordinate activities to

support school operations.

Page 21: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Next Steps05

Page 22: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

• Next Community Meeting – coming late winter/early spring 2020

• Design completed and submitted to City for Building Permit – February, 2020

• Construction begins – Summer, 2020

• Substantially complete – Winter/Spring, 2021

Next Steps

Page 23: FERDINAND T. DAY ELEMENTARY SCHOOL GYM ADDITION

Questions?06