FEO Process Flow
“RCSU-FES”
1. Firearms
Application for License to Own and Possess Firearms (LTOPF)
Figure B.1 LTOPF Process Flow
YES
NO
YES
NO
Submit Application to RCSU Briefer
(Applicant)
Evaluate Application (Briefer)
COMPLETE AND VALID
Return to Applicant
Picture Taking & Encoding (Encoder)
Evaluate Application (Briefer)
Electronic Transmission of Endorsement
(C, FLD)
Manual Transmittal of Application
(C, FEO)
Applicant Receives System Generated OP via SMS
Pay License Fee at any branch of Land Bank of the
Philippines (Applicant)
System Captures Payment and Printout LTOPF Cert
Release of LTOPF Cert to Applicant
(Releasing Clerk)
End
APPROVAL
Notify Applicant
Page | 2
1. Legal bases for requirements 2. Legal bases for fees/charges/fines 3. Legal bases for license/permit/accreditation/recognition/certificate and purpose 4. Remove copies of license/permit if issued by FEO/SOSIA as requirement 5. Replace request letter with request form 6. Identify designation of signatories 7. Indicate disclaimer 8. Process flow for MDR/LTO/Accreditation/LESP/Verification and Validation 9. SOSIA Disposition of VTR
Page | 3
License to Own and Possess Firearms (LTOPF) Procedure
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit Documents to LTOPF Briefer
Evaluates LTOPF requirements submitted by applicants for its validity and completeness of documents prior to endorsement for encoding, picture taking and scanning.
Issues Pre-Evaluation Slip.
RCSU LTOPF Briefer
Application Form (Art II Sec 4e)
MTC and RTC or NBI Clearance (Art II Sec 4a)
DI or Police Clearance (Art II Sec 4f)
NP Exam (Art II Sec 4b)
Drug Test Result (Art II Sec 4c)
Birth Certificate
Gun Safety Seminar
Proof of Income
2 Valid IDs
Proof of Billing or Brgy Clearance
15 minutes
2 Submit Application Form to Encoder Picture Taking Window
Encodes applicants’ basic information and photo capture
Encoder and Picture Taking
Application Form only 15 minutes
3 Submit
Requirements to LTOPF Scanning Window
Receives, reviews and verifies the completeness and validity of documentary requirements of walk in LTOPF applicants prior to encoding and scanning
Issues Commitment Slip
LTOPF Scanner Same as requirements above
15 minutes
4 Electronic transfer of application recommends approval of C, FLD
Reviewer, OCFLD 3 minutes
5 Electronic transfer of application for approval
of C, FEO
Reviewer, OFEO 3 minutes
6 Will receive Reference No. via SMS
Landbank of the Philippines
LBP Teller LBP Oncoll Payment Slip 1,000 Type 1 2,000 Type 2 3,000 Type 3 5,000 Type 4 10,000 Type 5 50% off for Active and Retired Govt Officials/ Employees 20% off for Senior Citizens
7 Present LBP On-coll Slip
Verifies Receipt and print LTOPF Certificate
Action PNCO/ Printing LTOPF Certificate
(PAID) LBP On-coll Payment Slip No Fees
2 minutes
END OF TRANSACTION TOTAL 53 minutes
Table B.1 LTOPF Procedure
Page | 4
Application of New/Renewal for Firearms Registration (FR)
Submit Application to RCSU Briefer
(Applicant)
COMPLETE AND VALID
Return to Applicant
Picture Taking & Encoding (Encoder)
YES
NO
Scanning of Documents (FAs Encoder/Scanner)
Electronic Transmission of Endorsement
(C, FLD)
Manual Transmittal of Application for Approval
(C, FEO)
Applicant Receives System-
Generated OP via SMS
Pay License Fee at Land Bank (Applicant)
Printout Certificate of FAs Registration and Release
to Applicant (Printer)
End
Figure B.2 Firearms Registration (FR) Process Flow
Page | 5
Firearms Registration (FR) Procedure
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit Documents to Firearms
Registration Window
Receives, reviews and verifies the completeness and validity of documentary requirements of walk in Firearms Registration applicants prior to encoding and scanning.
Issues Pre-Evaluation Slip for applicants with incomplete requirements.
Encoder/ Scanner Firearms Registration
Application Form
Photocopy of LTOPF Certificate
Photocopy of License Card
Deed of Sale/Donation (for Transfer of Ownership)
Ballistic and Stencil Certificate (New Purchase)
SPA and Undertaking (New Purchase
No fees
15 minutes
2 Electronic transfer of application recommends approval of C, FLD
Reviewer, OCFLD No Fees 3 minutes
3 Electronic transfer of application for approval of C, FEO
Reviewer, OFEO No Fees 3 minutes
4 Will receive Reference No. via SMS
Landbank of the Philippines LBP Teller LBP On-coll Payment Slip 1,600 for small arms 4,000 for Light Weapon A 50% off for Active and Retired Govt
Officials/ Employees 20% off for Senior Citizens
5 Present LBP On-coll Payment Slip
Verifies Receipt and print LTOPF Certificate
Action PNCO/ Printing Firearm Registration
Certificate
(PAID) LBP On-coll Payment Slip No Fees
2 minutes
END OF TRANSACTION TOTAL 23 minutes
Table B.2 Firearms Registration (FR) Procedure
Page | 6
Validation of Gun Safety Seminar Certificate
Figure B.3 Validation of Gun Safety Seminar Certificate Process Flow
PRINT/VALIDATE CERTIFICATE OF GUN
SAFETY SEMINAR (PROCESSOR)
5 min
ENDORSEMENT (Chief, FES)
3 mins
PREPARE AND ISSUE OP TO THE APPLICANT SLIP
5 mins
APPLICANT PAY TO LBP & SUBMIT SBR TO
PROCESSOR 10 mins
PHOTOCOPY OF APPROVED
CERTIFICATE FOR FILE (PROCESSOR)
5 mins
APPROVAL (Chief, RCSU)
10 mins
RETURNS APPROVED APPLICATION TO EEMD
(RCSU MESSASGE CENTER) 5 mins
RELEASE CERTIFICATE TO REPRESENTATIVE
(PROCESSOR) 5 mins
RECEIVE AND EVALUATE REQUIREMENTS
(PROCESSOR) 2 mins
Complete, Valid and Correct
No
Yes
ISSUE PRE-EVALUATION SLIP 2 mins
ISSUE COMMITMENT SLIP
(PROCESSOR) 2 mins
FILE APPLICATION (APPLICANT/
REPRESENTATIVE) 1 min
Page | 7
Validation of Gun Safety Seminar Certificate
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Checks the completeness, authenticity and validity of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, authentic and valid.
Processor, FES
1x1 ID Picture
Accomplished Application Form
Certificate of Attendance on Gun Safety and Responsible Gun Ownership Seminar
8 minutes
2 Pay the necessary fee to Land Bank of the Philippines and submit SBR to the processor
Prepares and issues Order of Payment (OP) to the applicant
Processor, FES
Order of Payment (OP)
Special Bank Receipt (SBR)
P100.00
10 minutes
3 Validates Certificate of Attendance on Gun Safety and Responsible Gun Ownership
Seminar
Processor, FES Certificate of Attendance on Gun Safety and Responsible Gun
Ownership Seminar
10 minutes
4 Endorses/Transmits Chief, RCSU
Chief, FES 5 minutes
5 Approval/Disapproval Chief, RCSU 20 minutes
6 Returns approved application to FES
RCSU Message Center
5 minutes
7 Photocopies of validated
Certificate for file
Processor, FES 10 minutes
8 Claim approved Permit to Transport
Releases validated Certificate to applicant
Releasing FES 5 minutes
END OF TRANSACTION TOTAL 1 hour and 13 minutes
Table B.3 Validation of Gun Safety Seminar Certificate Procedure
Validation is similar if not equivalent to authentication.
Page | 8
Application for Authority to Conduct Shooting Competition
File Application (Applicant/Representative)
Receive and Evaluate Requirements
(RCSU Processor, FES)
COMPLETE AND VALID
Return to Applicant
Prepare and Issue OP to Applicant
(RCSU Processor, FES)
YES
NO
YES
NO
APPROVAL
Notify Applicant
Approval/Disapproval (C, RCSU)
Release Certificate (RCSU Processor, FES)
End
Applicant Pay to Land Bank and Submit SBR to RCSU
Processor, FES
Concurrence/ Non-Concurrence
(Asst. Chief, RCSU)
Receive and Evaluate Requirements
(RCSU Processor, FES)
Prepares and Print Permit (RCSU Encoder, FES)
Endorsement (Chief, FES)
Figure B.4 Authorization to Conduct Shooting Competition Process Flow
Page | 9
Authority to Conduct Shooting Competition
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Checks the completeness, correctness and validity of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, authentic and valid.
RCSU Processor, FES
Letter Request addressed to Chief, RCSU from President Host Gun Club
Photocopy of valid Gun Club Recognition
Photocopy of Valid Firing Range Accreditation
Endorsement from Provincial Director/ City Director
Course of Fire
Special Bank Receipt
Pre-evaluation slip
Commitment Slip
Level I -II P1,200.00 Level III
P2,400.00
17 minutes
Encodes/Logs Application Receiving Clerk
Application Folder with Complete Documents
5 minutes
Processes and prepares
Permit to Conduct Shooting Competition
RCSU Processor,
FES
Permit to Conduct Shooting
Competition
15minutes
Counter checks documents RCSU Processor, FES
5 minute
Endorses/Transmits Permit to Conduct Shooting Competition to Chief, RCSU
Chief, FES 5minutes
Approval/Disapproval Chief, RCSU 10 minutes
Returns approved application to EEMD
RCSU Message Center
5 minutes
Photocopies of approved Permit to Conduct Shooting Competition for file
RCSU Processor, FES
10 minutes
2 Claim approved P Permit to Conduct Shooting Competition
Releases approved Permit to Conduct Shooting Competition to applicant
Releasing, RCSU Permit to Conduct Shooting Competition
5 minutes
END OF TRANSACTION TOTAL 1 hour 17 minutes
Table B.4 Authority to Conduct Shooting Competition Procedure
Page | 10
Application for: Renewal of Shooting Range Accreditation for Government Owned/Operated Renewal of Shooting Range Accreditation for Security Training Center Renewal of Gun Club Recognition/Registration
File Application (Applicant/Representative)
Receive and Evaluate Requirements
(RCSU Processor, FES)
COMPLETE
AND VALID
Return to Applicant
Prepare and Issue OP to Applicant
(RCSU Processor, FES)
YES
NO
YES
NO
APPROVAL
Notify Applicant
Approval/Disapproval (C, RCSU)
Release Certificate (RCSU Processor, FES)
End
Applicant Pay to Land Bank and Submit SBR to RCSU
Processor, FES
Concurrence/ Non-Concurrence
(Asst. Chief, RCSU)
Receive and Evaluate Requirements
(RCSU Processor, FES)
Print Gun Club Recognition & Firing Range Accreditation
Certificate (RCSU Processor, FES)
Figure B.5 Shooting Range and Gun Club Renewal Process Flow
Page | 11
Renewal Shooting Range Accreditation for Government Owned/Operated
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Checks the completeness, correctness and validity of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, authentic and valid.
RCSU Processor, FES
Letter Request from Head of Government Agency addressed to C, RCSU)
Shooting Range Location Plan/Map
Photo of Burglar and Fireproof Armory Vault
Endorsement from Provincial Director/City Director or RCSU
Mayor’s Permit
Security Survey Report City Police Office (CPO)/ City Police Station (CPS)/Municipal Police Station (MPS),
Inspection Report from RCSU for Regional/Provincial or I&E Section for NCR
Photos of Office and Shooting Range
Photos of Gun Safety Rules Posted at the range
Photos of Lecture Room
Copy of latest Certificate of Accredited FEO Range Safety Officer/NROI Range Officer
Monthly Accomplishment Report
Special Bank Receipt
Pre-evaluation slip
Commitment Slip
P1,500.00
17 minutes
Encodes/Logs Application
RCSU Receiving Application Folder with Complete Documents
5 minutes
Processes and prepares Shooting Range Accreditation Certificate
RCSU Processor, FES Shooting Range Accreditation Certificate
15minutes
Counter checks documents
RCSU Processor, FES 5 minute
Endorses/Transmits Shooting Range Accreditation Certificate to Chief, RCSU
Chief, FES 5minutes
Approval/Disapproval Chief, RCSU 10 minutes
Returns approved application to FES
RCSU Message Center 5 minutes
Shooting Range Accreditation Certificate
RCSU Processor, FES 10 minutes
2 Claim approved Shooting Range Accreditation Certificate
Releases approved PTT to applicant
RCSU Releasing Shooting Range Accreditation Certificate
5 minutes
END OF TRANSACTION TOTAL 1 hr 17 mins
Table B.5 Renewal Shooting Range Accreditation for Government Owned/Operated Procedure
Page | 12
Shooting Range Accreditation for Security Training Center
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Checks the completeness, correctness and validity of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, authentic and valid.
RCSU Processor, FES
Letter Request from the President addressed to Chief, RCSU
Copy of Authority to Conduct Security Training from SOSIA
Shooting Range Location Plan/Map
Photo of Burglar and Fireproof Armory Vault
P3,000.00
17 minutes
Encodes/Logs Application RCSU Receiving Application Folder with Complete Documents
5 minutes
Processes and prepares Shooting Range Accreditation Certificate
RCSU Processor, FES
Shooting Range Accreditation Certificate
15minutes
Counter checks documents RCSU Processor, FES
5 minute
Endorses/Transmits Shooting Range Accreditation Certificate to Chief, RCSU
Chief, FES 5minutes
Approval/Disapproval Chief, RCSU 10 minutes
Returns approved application to FES
RCSU Message Center
5 minutes
Photocopies of approved
Shooting Range Accreditation Certificate for file
RCSU Processor,
FES
10 minutes
2 Claim approved Shooting Range Accreditation Certificate
Releases approved Shooting Range Accreditation Certificate to applicant
RCSU Releasing Shooting Range Accreditation Certificate
5 minutes
END OF TRANSACTION TOTAL 1 hour 17 minutes
*Step 1: FORMS/REQUIREMENTS
Endorsement from Provincial Director/City Director or RCSU
Mayor’s Permit
Security Survey Report City Police Office (CPO)/ City Police Station (CPS)/Municipal Police Station (MPS),
Inspection Report from FESSAGS/RCSU for Regional/Provincial or I&E Section for NCR
Photos of Office and Shooting Range
Photos of Gun Safety Rules Posted at the range
Photos of Lecture Room
Copy of latest Certificate of Accredited FEO Range Safety Officer/NROI Range Officer
Monthly Accomplishment Report
Special Bank Receipt
Pre-evaluation slip
Commitment Slip
Table B.6 Shooting Range Accreditation for Security Training Center Procedure
Page | 13
Renewal of Gun Club Recognition/Registration
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Checks the completeness, correctness and validity of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, authentic and valid.
RCSU Processor, FES
Letter Request from Gun Club President addressed to Chief, RCSU
Authenticated copy of the LTOPF Certificate and Certificate of Firearm Registration of the members of Gun Club
Location Plan/Map of Gun Club Office and Shooting Range and Land Title/Lease Contract/ Memorandum of Agreement executed by both parties, Gun Club rightful owner of the lot where the shooting range is situate
P3,000.00
17 minutes
Encodes/Logs Application RCSU Receiving Application Folder with
Complete Documents
5 minutes
Processes and prepares Gun Club Registration Certificate
RCSU Processor, FES
Gun Club Registration Certificate
15minutes
Counter checks documents RCSU Processor, FES
5 minute
Endorses/Transmits Gun Club Registration Certificate to Chief, RCSU
Chief, FES 5minutes
Approval/Disapproval Chief, RCSU 10 minutes
Returns approved application to FES
RCSU Message Center
5 minutes
Photocopies of approved Gun Club Registration Certificate for file
RCSU Processor, FES
10 minutes
2 Claim approved Gun Club Registration
Certificate
Releases approved Gun Club Registration Certificate to applicant
RCSU Releasing Gun Club Registration Certificate
5 minutes
END OF TRANSACTION TOTAL 1 hour 17 minutes
*Step 1: FORMS/REQUIREMENTS
Recommendation from Regional Director/ Provincial Director/ City Director
Security Survey Report City Police Office (CPO)/ City Police Station (CPS)/Municipal Police Station (MPS).
Photos of Gun Club Office and Shooting Range with Captions
Photos of Loading/Unloading area or Safety Area and Gun Safety Rules posted at the Range
Shooting Range –Inspection Report
Photocopy of Certificate of Attendance of FEO Accredited Instructor/s or Range Safety Officer
Special Bank Receipt
Pre-evaluation slip
Commitment Slip
Table B.7 Renewal of Gun Club Recognition/Registration Procedure
Page | 14
Application for Tagging of Lost Firearms
Tagger/Verifier Determines Completeness and Validity of
Requirements
Applicant Request for Tagging
of Lost Firearms
Tagger/Verifier Determines Whether or not Loss is Due
to Negligence
Complete and Valid
Return to Applicant
YES
NO
Refer to Chief, RCSU for Comment and
Recommendation
Forward Request to Chief, FEO for Approval
(thru FLLRB)
Preparation of Investigation Report
Loss Due to Negligence
YES
NO
Approval
YES NO
FEO Shall Tag Firearms as Lost and Issue Resolution for
the Lost Firearm and Revocation of LTOPF &
Firearms Registration
Notify Applicant
End
Figure B.6 Tagging of Lost Firearms Process Flow
Page | 15
Tagging of Lost Firearms
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Checks the completeness, correctness and validity of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Sets Schedule and Issue commitment slip if the requirements are complete, authentic and valid.
Verifier
Accomplished Lost Firearm Tagging request Form;
Original Investigation Report with dry sealed Final Resolution;
Original Police Report with dry seal;
Original Special Bank Receipt
Original and Notarized Affidavit of Loss;
Death certificate (If Licensee is dead)
Authenticated copy of PTCFOR if lost outside of residence.
Pre-evaluation slip
Commitment Slip
P10,000.00
(failure to notify lost or stolen firearm within 30 days) P5,000.00 (Administrative fine)
12 minutes
Encodes/Logs Application Receiving Clerk
Case Folder with Complete Documents
5 minutes
Designates Investigator to Handle the Case
Chief, CIDS
10 minutes
Tags Firearm/s as Under Investigation and recommend case for FLRRB Deliberation
Investigator 20 minutes
Schedules Deliberation of the case
Chief, Arbitration Section/ Head Secretariat, FLRRB
20 minutes
Deliberations of the case and approval/ disapproval of the recommendation of the investigator
FLRRB Draft Resolution 2 hours
Endorsements of Resolution
for the approval/disapproval of C, FEO
Chairman, FLRRB Draft Resolution 5 minutes
Approval/ Disapproval C, FEO Approved/Disapproved Resolution
20 minutes
Forwards approved/disapproved Resolution to CIDS
Message Center, FEO
Approved/Disapproved Resolution
5 minutes
2 Claim copy of Resolution and Certificate of Lost Firearm
Tags Firearm/s as Lost Firearm and release Certificate of Lost Firearm if approved and Notify licensed citizen or licensed juridical entity if disapproved
Tagger/Releasing Clerk
Approved/Disapproved Resolution
Certificate of Lost Firearm
10 minutes
END OF TRANSACTION TOTAL 3 hour 17minutes
Table B.8 Tagging of Lost Firearms Procedure
Page | 16
Investigation
Figure B.7 Investigation Process Flow
Refer to Chief, RCSU for
Comment
Complainant
(Letter, Walk-in, E-mail)
Received by Duty Investigator
Conduct Investigation
Submit Investigation Report and Forwards/Transmits
Recommendation to FLLRB
Page | 17
Intelligence Escorting
Figure B.8 Intelligence Process Flow
Figure B.9 Escorting Process Flow
Determine Violations
Committed
Gather Information
Refer to Chief, RCSU for Comment
Determine and Prepare
Appropriate Charges
Refer to Investigation
Investigator on Case will Follow Process Flow of
Investigation
Complainant (against stakeholders
and individual)
On The Spot
Escort will Contact Requesting Party for Information
Admin PNCO, RCSU will Assign Report
Escort Shall Submit After Escort Report to the Admin/Records
PNCO, RCSU
Shipment, Delivery or Movement (Movement must be covered w/
Valid ATT, PME, COMELEC exemptions, Radio Message and
other Necessary Documents Required as Provided by Existing
Laws)
Admin/Records PNCO, RCSU Shall Record the Said Movement
Applicant Request Letter from the
Applicant
Page | 18
Application for Inspection
Figure B.10 Inspection Process Flow
Conduct Inspection
Schedule for Inspection
Draft and Edit Certificate of Inspection and After
Inspection Report
Applicant Must Comply Submission of the Required
Pictures
Approval of Certificate of Inspection
Applicant Request Letter from the Applicant Stating its Purpose for Inspection
with the Contact Number
Page | 19
Certificate of Inspection (Firearm Manufacturer/Dealer, Explosive/Explosive Ingredients Magazine, Controlled Chemical Storage Facility, Shooting Range and Gun Smith/Gun
Repair Shop)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Checks the completeness, correctness and validity of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Sets Schedule and Issue commitment slip if the requirements are complete, authentic and valid.
Verifier
Accomplished Request for Inspection Form
Location Map
Floor plan
Security Survey Report City Police Office (CPO)/ City Police Station (CPS)/Municipal Police Station (MPS) Pre-evaluation slip
Commitment Slip
20 minutes
Encodes/Logs Application Receiving Clerk
Application Folder with Complete Documents
5 minutes
Conducts Inspection I&E, Inspector Certificate of Inspection 1 day
Generates Inspection Report and Certificate of Inspection for approval of Chief, I&E Section
I&E, Inspector 30 minutes
Approval/Disapproval Chief, I&E Section 10 minutes
Signs Certificate of Inspection
Chief, EEMD 5 minutes
2 Claim Certificate of Inspection
Files Inspection Report and Releases approved Certificate of Inspection
Releasing Clerk, EEMD
Inspection Report
Certificate of Inspection
10 minutes
END OF TRANSACTION TOTAL 1 day hour 20 minutes
Table B.9 Issuance of Certificate of Inspection Procedure
Page | 20
2. Explosives and Explosive Ingredients (EEIs) Application for Inspection
(PPO) Application for Inspection
(RCSU)
Figure B.11 Inspection (PPO) Process Flow
Figure B.12 Inspection (RCSU) Process Flow
DPDO
Applicant
Provincial FESAGS
PD, PPO
For Endorsement of
Application to Chief, RCSU
Inspection Team
Applicant
Firearms and Explosives Section (FES)
(Message Center)
Chief, RCSU
For Endorsement of Application to Chief, RCSU
Page | 21
Special Survey and Inspection (SSI) (NCR POLICE STATION)
Investigation Report (IR) (EEMD, FEO)
Figure B.13 Special Survey and Inspection (SSI) (NCR POLICE STATION) Process Flow
Figure B.14 Investigation Report (IR) (EEMD, FEO) Process Flow
Inspection Team
Applicant
Police Station (Message Center)
COP
For Endorsement of
Application to Chief, RCSU
Inspection Team
Applicant
Inspection & Enforcement Section (IES, EEMD)
(Message Center)
Chief, EEMD
For Endorsement of Application to Chief, RCSU
Page | 22
Application for: 1. New License to Possess EEIs (Manufacturer & Dealer) 2. Permit to Import & Export EEIs (Manufacturer & Dealer)
Civil Security Group (CSG)
Applicant
Firearms and Explosives
Office (FEO)
Directorate for Operations
(DO)
The Chief Directorial Staff
(TCDS)
Office of the Chief, PNP
Returns to EMD for Scanning
and Releasing
Figure B.15 Application for New License to Possess & Permit to Import & Export EEIs
Process Flow
Page | 23
New License to Possess EEIs (Manufacturer)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original SBR (Special Bank Receipt) – Landbank
Application Form (PNP Form 6)
P25,000.00
45 minutes
Encodes Application
Prepares endorsement & license for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorses to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the office of TCDS
TDO
Counterchecks and endorses to the Office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved license
Records, scans and releases approved license
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 50 minutes except NHQ command group
Page | 24
* STEP 1: FORMS/REQUIREMENTS:
Letter request (signed by the authorized representative indicating, among others, the explosives/explosive ingredients/controlled chemical/s to be procured, quantity (based on the capacity of their storage facility), purity/grade. Since the signatory is an authorized representative, he must attach to the LR a certified true copy of his valid company ID, Board of Director’s Resolution/Director’s Certificate/SPA (for partnership and single proprietorship). (No alterations by any person except the signatory himself/herself, on the LR shall be allowed);
Original and notarized copy of Board of Director’s Resolution/Secretary’s Certificate or Director’s Certificate (for companies with Branch Office in the Philippines (date should be within the same year as the year of filing)
Company Profile(Indicating the firm’s history, date of establishment and line of business);
SEC Registration, Articles of Incorporation and By-laws with General Information Sheet (GIS) machine-validated) by SEC (for corporations/partnerships);
DTI Registration, Business Permit and Certificate of Capital invested in the business from the City or Municipal Treasurer (for sole proprietorships);
Original NBI Clearance of the authorized representative (Purpose: PNP Requirement/Business Requirement/Other Requirement ONLY);
Signed Personal History Statement of the authorized representative and of company employees having access to the storage facility where explosives/explosive ingredients and/or Explosives/Explosive Ingredients are stored/warehoused (notarized and should contain the following information: personal circumstances such as complete name, date and place of birth, city address, provincial address, complete name, date and place of birth of mother and father (deceased or not); education and training background; financial, investment and loan history; travel history (local and foreign); offense/criminal record; address history (for the past 10 years, please state inclusive dates); employment background; organizational affiliations (religious, socio-civic, professional); licenses/accreditations, certifications/eligibilities; medical history; and handwriting specimen;
Process Flowchart - Description of the process flow where the explosive/s, explosive ingredient/s and/or controlled chemical/s will be used (including the purpose of the use of the explosive/s, explosive ingredient/s and/or controlled chemical/s and the quantity/purity requirement to justify its procurement; must be prepared and signed by the person authorized to use the explosive/s, explosive ingredient/s and/or controlled chemical/s) (For Manufacturer and Purchaser Only) Sec 1d
Material Safety Data Sheet (MSDS) from the supplier/s of the explosive/explosive ingredient/s and/or controlled chemical/s
Inspection Reports (Certification of Inspection of Magazine/Storage Facility, Magazine/Storage Facility Inspection Checklist, Summary of Inventory of explosives/explosive ingredient/s and/or controlled chemical/s, Inventory of explosives/explosive ingredient/s and/or controlled chemical/s, Security Survey) by the PD/CD (for Prov’l Applicant) and I&E, FEO (for NCR Applicant)
Properly labeled pictures (8”x10” in size) printed in photo paper
Location map and floor plan of magazine/storage facility and mode of stacking
Endorsement from PD/CD (for Prov’l Applicants)
Table B.10 New License to Possess EEIs (Manufacturer) Procedure
Page | 25
New License to Possess EEIs (Dealer)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original SBR (Special Bank Receipt) – Landbank
Application Form (PNP Form 6)
P15,000.00
45 minutes
Encodes Application
Prepares endorsement & license for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the Office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorses to the Office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the Office of TCDS
TDO
Counterchecks and endorses to the Office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved license
Records, scans and releases approved license
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 50 minutes except NHQ command group
Page | 26
* STEP 1: FORMS/REQUIREMENTS:
Letter request (signed by the authorized representative indicating, among others, the explosives/explosive ingredients/controlled chemical/s to be procured, quantity (based on the capacity of their storage facility), purity/grade. Since the signatory is an authorized representative, he must attach to the LR a certified true copy of his valid company ID, Board of Director’s Resolution/Director’s Certificate/SPA (for partnership and single proprietorship). (No alterations by any person except the signatory himself/herself, on the LR shall be allowed);
Original and notarized copy of Board of Director’s Resolution/Secretary’s Certificate or Director’s Certificate (for companies with Branch Office in the Philippines (date should be within the same year as the year of filing)
Company Profile(Indicating the firm’s history, date of establishment and line of business);
SEC Registration, Articles of Incorporation and By-laws with General Information Sheet (GIS) machine-validated) by SEC (for corporations/partnerships);
DTI Registration, Business Permit and Certificate of Capital invested in the business from the City or Municipal Treasurer (for sole proprietorships);
Original NBI Clearance of the authorized representative (Purpose: PNP Requirement/Business Requirement/Other Requirement ONLY);
Signed Personal History Statement of the authorized representative and of company employees having access to the storage facility where explosives/explosive ingredients and/or Explosives/Explosive Ingredients are stored/warehoused (notarized and should contain the following information: personal circumstances such as complete name, date and place of birth, city address, provincial address, complete name, date and place of birth of mother and father (deceased or not); education and training background; financial, investment and loan history; travel history (local and foreign); offense/criminal record; address history (for the past 10 years, please state inclusive dates); employment background; organizational affiliations (religious, socio-civic, professional); licenses/accreditations, certifications/eligibilities; medical history; and handwriting specimen;
Process Flowchart - Description of the process flow where the explosive/s, explosive ingredient/s and/or controlled chemical/s will be used (including the purpose of the use of the explosive/s, explosive ingredient/s and/or controlled chemical/s and the quantity/purity requirement to justify its procurement; must be prepared and signed by the person authorized to use the explosive/s, explosive ingredient/s and/or controlled chemical/s) (For MANUFACTURER and PURCHASER Only)
Material Safety Data Sheet (MSDS) from the supplier/s of the explosive/explosive ingredient/s and/or controlled chemical/s
Inspection Reports (Certification of Inspection of Magazine/Storage Facility, Magazine/Storage Facility Inspection Checklist, Summary of Inventory of explosives/explosive ingredient/s and/or controlled chemical/s, Inventory of explosives/explosive ingredient/s and/or controlled chemical/s, Security Survey) by the PD/CD (for Prov’l Applicant) and I&E, FEO (for NCR Applicant)
Properly labeled pictures (8”x10” in size) printed in photo paper
Location map and floor plan of magazine/storage facility and mode of stacking
Endorsement from PD/CD (for Prov’l Applicants)
TableB.11 Issuance of New License to Possess EEIs (Dealer) Procedure
Page | 27
Permit to Import EEIs (Manufacturer & Dealer)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Special Bank Receipt (Land Bank of the Philippines LBP);
PNP Form 6 (Application Form)
Photocopy of License
Letter request (LR) signed by the authorized representative indicating the
following: - kind of explo/explo
ingredients - quantity to be
imported, based on storage capacity
- purity/grade
P6,000.00
45 minutes
Encodes Application
Prepares endorsement & permit for approval of CPNP
Monitoring Clerk &
Processor, EMD
2hrs and
5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the Office of CDS, CSG
Secretary & Chief, FEO 15 minutes
Counterchecks and endorses to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the office of TCDS
TDO
Counterchecks and endorses to the office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved permit Records, scans and releases
approved permit
Releasing
Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 50 minutes except NHQ command group
Page | 28
* STEP 1: FORMS/REQUIREMENTS:
Inspection Reports - Certification of Inspection of Magazine/Storage Facility; - Magazine/Storage Facility Inspection Checklist; - Summary of Inventory of explo/explo Ingredients - Inventory of explo/explo ingredients - Security Survey) by the PD/CD (for Prov’l Applicant) and I&E,FEO for NCR Applicant)
Endorsement from PD/CD (for Prov’l applicants only)
Notarized Latest Monthly Report
Notarized 12 months Consumption Report
Table B.12 Permit to Import EEIs (Manufacturer & Dealer) Procedure
Page | 29
Permit to Export EEIs
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issue pre-evaluation slip if there is/are lacking requirement/s
Issue commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Letter request (LR) signed by the authorized representative Indicating the following:
-kind of explosives/explosive ingredients
-quantity
Manufacturer’s or Dealer’s License (Photocopy)
Letter of Intent and End-User’s Certificate of Consignee - Original Copy
Certification from the consignee that the items will not be exported to a third party country – Original Copy
NO FEE
45 minutes
Encodes Application
Prepare endorsement & permit for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the Office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorses to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the office of TCDS
TDO
Counterchecks and endorses to
the office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved
permit
Records, scans and release
approved permit
Releasing
Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 50 minutes except NHQ command group
Table B.13 Permit to Export EEIs Procedure
Page | 30
Application for:
1. New License to Possess EEIs (Purchaser) 2. Permit to Import & Export EEIs (Purchaser) 3. Amendment of License to Possess EEIs (Manufacturer, Dealer & Purchaser) 4. Foreman Blaster (New)
Figure B.16 Process Flow for New License to Possess EEIs (Purchaser), Permit to Import & Export EEIs (Purchaser), Amendment of License to Possess EEIs (Manufacturer, Dealer &
Purchaser) and Foreman Blaster (New)
Office of the Chief, FEO
Applicant
Explosives Management
Division (EMD)
Office of the Director, CSG
Returns to EMD for Scanning
and Releasing
Page | 31
New License to Possess EEIs (Purchaser)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original SBR (Special Bank Receipt) – Landbank
Application Form (PNP Form 6)
Letter request (signed by the authorized representative indicating, among others, the explosives/explosive ingredients/controlled chemical/s to be procured, quantity (based on the capacity of their storage facility), purity/grade. Since the signatory is an authorized representative, he must attach to the LR a certified true copy of his valid company ID, Board of Director’s Resolution/Director’s Certificate/SPA (for partnership and single proprietorship). (No alterations by any person except the signatory himself/herself, on the LR shall be allowed);
P5,000.00
45 minutes
Encodes Application
Prepares endorsement & license for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents
submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the Office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorses to the office DCSG
CDS&DD, CSG 25 minutes
Approval/disapproval D, CSG 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Monitoring Clerk, CDS; and Admin FEO
10 minutes
2 Claim approved license Records, scans and releases approved license
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 20 minutes
Page | 32
* STEP 1: FORMS/REQUIREMENTS:
Original and notarized copy of Board of Director’s Resolution/Secretary’s Certificate or Director’s Certificate (for companies with Branch Office in the Philippines (date should be within the same year as the year of filing)
Company Profile(Indicating the firm’s history, date of establishment and line of business);
SEC Registration, Articles of Incorporation and By-laws with General Information Sheet (GIS) machine-validated) by SEC (for corporations/partnerships);
DTI Registration, Business Permit and Certificate of Capital invested in the business from the City or Municipal Treasurer (for sole proprietorships);
Original NBI Clearance of the authorized representative (Purpose: PNP Requirement/Business Requirement/Other Requirement ONLY);
Signed Personal History Statement of the authorized representative and of company employees having access to the storage facility where explosives/explosive ingredients and/or Explosives/Explosive Ingredients are stored/warehoused (notarized and should contain the following information: personal circumstances such as complete name, date and place of birth, city address, provincial address, complete name, date and place of birth of mother and father (deceased or not); education and training background; financial, investment and loan history; travel history (local and foreign); offense/criminal record; address history (for the past 10 years, please state inclusive dates); employment background; organizational affiliations (religious, socio-civic, professional); licenses/accreditations, certifications/eligibilities; medical history; and handwriting specimen;
Process Flowchart - Description of the process flow where the explosive/s, explosive ingredient/s and/or controlled chemical/s will be used (including the purpose of the use of the explosive/s, explosive ingredient/s and/or controlled chemical/s and quantity/purity requirement to justify its procurement; must be prepared and signed by the person authorized to use the explosive/s, explosive ingredient/s and/or controlled chemical/s) (For MANUFACTURER and PURCHASER Only)
Material Safety Data Sheet (MSDS) from the supplier/s of the explosive/explosive ingredient/s and/or controlled chemical/s
Inspection Reports (Certification of Inspection of Magazine/Storage Facility, Magazine/Storage Facility Inspection Checklist, Summary of Inventory of explosives/explosive ingredient/s and/or controlled chemical/s, Inventory of explosives/explosive ingredient/s and/or controlled chemical/s, Security Survey) by the PD/CD (for Prov’l Applicant) and I&E, FEO (for NCR Applicant)
Properly labeled pictures (8”x10” in size) printed in photo paper
Location map and floor plan of magazine/storage facility and mode of stacking
Endorsement from PD/CD (for Prov’l Applicants)
Additional requirement:
Accreditation from the Philippine Drug Enforcement Agency (PDEA) (for entities using Toluene, Potassium Permanganate, Sulfuric Acid and/or Hydrochloric Acid)
Accreditation from the Fertilizer and Pesticide Authority (FPA) (for entities using Controlled Chemicals as Fertilizers)
Accreditation from the Food and Drugs Administration (FDA) (for entities using Controlled Chemicals in food analysis)
Accreditation from the Department of Energy (DOE) (for entities using Controlled Chemicals in power generation)
Accreditation from the Environmental Management Bureau (for entities using Controlled Chemicals in determining air/water quality)
Accreditation from the Mines and Geosciences Bureau (for mining companies);
Accreditation from the Bureau of Forest Development (for lumber or logging firms);
Certificate of registration of the business and certificate from the City or Municipality
Treasurer stating the capital invested (for blasting contractors);
Copy of the Declaration of Real Estate Property were the explosives will be used for (private blasting work);
Copy of contract with NASSCO (for salvagers of sunken vessels).
Table B.14 New License to Possess EEIs (Purchaser) Procedure
Page | 33
Permit to Import & Export EEIs (Purchaser)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Special Bank Receipt (Land Bank of the Philippines LBP);
PNP Form 6 (Application Form)
Photocopy of License
Letter request (LR) signed by the authorized representative indicating the following: - kind of explo/explo
ingredients - quantity to be
imported, based on storage capacity
- purity/grade
P6,000.00
45 minutes
Encodes Application
Prepares endorsement & permit for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the
office of CDS, CSG
Secretary & Chief,
FEO
15 minutes
Counterchecks and endorses to the office DCSG
CDS&DD, CSG 25 minutes
Approval/disapproval D, CSG 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Monitoring Clerk, CDS; and Admin FEO
10 minutes
2 Claim approved permit Records, scans and releases
approved permit
Releasing
Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 20 minutes
* STEP 1: FORMS/REQUIREMENTS:
Inspection Reports - Certification of Inspection of Magazine/Storage Facility;
- Magazine/Storage Facility Inspection Checklist; - Summary of Inventory of explo/explo Ingredients - Inventory of explo/explo ingredients - Security Survey) by the PD/CD (for Prov’l Applicant) and I&E,FEO for NCR Applicant)
Endorsement from PD/CD (for Prov’l applicants only)
Notarized Latest Monthly Report
Notarized 12 months Consumption Report
Table B.15 Permit to Import & Export EEIs (Purchaser) Procedure
Page | 34
Amendment of License to Possess EEIs (Manufacturer, Dealer & Purchaser)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Valid Original License with Original SBR from Land Bank
PNP Form 6 (Application Form)
NO FEE
45 minutes
Encodes Application
Prepares endorsement & license for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the Office of CDS, CSG
Secretary & Chief, FEO 15 minutes
Counterchecks and endorses to the
office DCSG
CDS&DD, CSG 25 minutes
Approval/disapproval D, CSG 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Monitoring Clerk, CDS; and Admin FEO
10 minutes
2 Claim approved license Records, scans and releases approved license
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hrs and 20 mins
* STEP 1: FORMS/REQUIREMENTS:
Letter request (LR) signed by the authorized representative indicating, among others, the explosives/explosive ingredients to be procured, quantity (based on the capacity of their storage facility versus stock on hand), purity/grade. Since the signatory is an authorized representative, he must attach to the LR a certified true copy of his valid company ID and Board of Director’s Resolution/Director’s Certificate (for company with Branch Office in the Philippines) (for corporations)/Special Power of Attorney (for partnerships and sole proprietorships), as proof of his authority to transact on behalf of said entity. (No alterations by any person except the signatory himself, on the LR shall be allowed);
Updated Original and notarized copy of Secretary’s Certificate / Board of Director’s Resolution or Director’s Certificate (is required only when any one of the authorized representatives has resigned, or has been replaced or terminated by the company);
SEC Registration, Articles of Inc. and By-laws with General Information Sheet (GIS) machine-validated by SEC (for corporations/partnerships);
DTI Registration, Business Permit and Certificate of Capital invested in the business from the City or Municipality Treasurer (for sole proprietorships); (for Prov’l Applicants)(for CCN)
Inspection Reports: (for CMSFA and ADCQEEI)
Certification of Inspection of Magazine/Storage Facility (conducted, prepared and signed by PNP personnel from the PPO (for Provincial Applicants) and I&E, FEO (for NCR Applicants) which exercises territorial jurisdiction based on the location of the storage facility);
Magazine/Storage Facility Inspection Checklist (conducted, prepared and signed by PNP personnel from the PPO (for Provincial Applicants) and I&E, FEO (for NCR Applicants) which exercises territorial jurisdiction based on the location of the storage facility);
Summary of Inventory of explosive/s, explosive ingredient/s (prepared and signed by license applicant and reviewed and signed by PNP personnel from the PPO (for Provincial Applicants) and I&E, FEO (for NCR Applicants) which exercises territorial jurisdiction based on the location of the storage facility)
Inventory of explosive/s, explosive ingredient/s, (prepared and signed by license applicant and reviewed and signed by PNP personnel from the PPO (for Provincial Applicants) and I&E, FEO (for NCR Applicants)which exercises territorial jurisdiction based on the location of the storage facility);
Security Survey (conducted, prepared and signed by PNP personnel from the CPS/MPS which exercises territorial jurisdiction based on the location of the storage facility)
Properly labeled pictures (8”x10” in size) printed in photo paper
Detailed Location map, Floor Plan of magazine and Mode of Stacking
Notarized Latest Monthly Report and 12 Months Consumption Report
TableB.16 Amendment of License to Possess EEIs Procedure
Page | 35
Endorsement from PD/CD (for provincial applicants only);(for CMSFA and ADCQEEI)
Foreman Blaster (New)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary
requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Checks the completeness, validity and correctness of
submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Special Bank Receipt from Landbank
PNP Form 6 (Application Form)
Updated Purchaser’s License of the employer - photocopy
Letter request of applicant (State Purpose)
Original Clearances: (NBI and PNP DI/R2 Clearance)
Drug Test - Original
Valid Company ID – Authenticated Xerox Copy
P2,500.00
30 minutes
Encodes Application
Prepares endorsement & license for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents
submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorses to the office DCSG
CDS&DD, CSG 25 minutes
Approval/disapproval D, CSG 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Monitoring Clerk, CDS; and Admin FEO
10 minutes
2 Claim approved license
Records, scans and releases approved license
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 5 minutes
* STEP 1: FORMS/REQUIREMENTS:
As per TDI Memo, May 26, 2010 (PBDC Requirements)
Notarized Updated Copy of Personal History Statement (PHS) with recent photograph of applicant
Ten-print taken by PNP Crime Laboratory
Brief statement of blasting procedure - photocopy
Photographs and description of blasting materials/equipment being used
Certificate of Employment from employer with a valid License to Possess Explosives
Certification from a certified/licensed mining engineer that applicant is capable of handling explosives (if applicant is not a licensed mining engineer)
Endorsement from ROPD & PD/CD (for Prov’l Applicants)
Endorsement from Bureau of Mines (for mining and quarrying)
Table B.17 Foreman Blaster (New) Procedure
Page | 36
Page | 37
Application for:
1. Renewal of License to Possess EEIs (Manufacturer, Dealer & Purchaser) 2. Permit to Purchase & Move EEIs 3. Permit to Unload 4. Special Permit to Purchase & Move EEIs 5. Foreman Blaster (Renewal)
Figure B.17 Process Flow for the Renewal of License to Possess EEIs (Manufacturer, Dealer & Purchaser), Permit to Unload, Purchase & Move EEIs, Special Permit to Purchase & Move EEIs
and Foreman Blaster (Renewal)
Office of the Chief, FEO
Applicant
Explosives Management Division (EMD)
Returns to EMD for Scanning and Releasing
Page | 38
Permit to Purchase & Move EEIs
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be
submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Photocopy of license;
Original Special Bank Receipt (LBP)
Letter request (LR) signed by the authorized representative indicating, among others, the explosives/explosive ingredients to be purchased/transfer, based on stock on hand and purity/grade. Indicate initial/full quantity and tentative date of delivery and route from origin to destination
Notarized Latest Monthly Report
Previous PPME and Delivery Receipt (photocopy)
Endorsement from PD/CD
P1,500.00
45 minutes
Encodes Application
Prepares endorsement & permit for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit
Records, scans and releases approved permit
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20
minutes
Page | 39
* STEP 1: FORMS/REQUIREMENTS: For Blasting Contractor:
Blasting Scheme
Agreement or contract of the project w/ duration
Certification from PD/CD in the construction/establishment of an issuing magazine where the project is located
Environmental Compliance Certificate (ECC) from DENR
Endorsement from BMGS (Mining & Quarrying)
Endorsement from DOE (Oil & Geothermal Exploration)
Endorsement from PCG (Salvaging)
Endorsement from FPA (Fertilizer Formulator)
Endorsement from DPWH (Road Construction, etc.)
Endorsement from City Engineer’s Office (development of subdivision)
Endorsement from other government agencies
Table B.18 Permit to Purchase & Move EEIs Procedure
Page | 40
Permit to Unload EEIs
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Photocopy of License;
Original Special Bank Receipt (Land Bank of the
Philippines
PNP Form No. 6 – Application to Unload Explosives from Vessels/Aircrafts and Transport to Destination
Letter request (LR) signed by the authorized
representative indicating, among others, the explosives/explosive ingredients to be unloaded, based on storage capacity versus stock on hand and purity/grade
Permit to Import (Notarized monthly report)
Packing List/ Bill of Lading (for sea freight)
Airway Bill (for air freight only)/ Proforma Invoice (for air freight only)
P.10/KG/ LTR
45 minutes
Encodes Application
Prepares endorsement & permit for approval of C, FEO
Monitoring Clerk &
Processor, EMD
2hrs and
5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit
Records, scans and releases approved permit
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20
minutes
Table B.19 Permit to Unload EEIs Procedure
Page | 41
Special Permit to Purchase & Move EEIs
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original Special Bank Receipt (LBP);
PNP FORM 6A
Letter request (LR) signed by the authorized representative indicating, among others, the explosives/explosive ingredients to be purchased/ transferred, purity/grade
If Corporation or Partnership, SEC Registration
If Single Proprietorship, DTI Registration
Business Permit
Original NBI Clearance (Purpose: for PNP Requirement, Business/Other requirement)
P1,500.00
30 minutes
Encodes Application
Prepares endorsement & permit for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards
approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20 minutes
Table B.20 Special Permit to Purchase & Move EEIs Procedure
Page | 42
Foreman Blaster (Renewal)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s Issues Order of Payment Issues commitment slip if the
requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original licenses to be renewed Original Special Bank
Receipt (LBP) Photocopy of Purchaser’s License of the company Letter request of applicant (State Purpose) Original Clearances: (NBI and PNP DI Clearance) Drug Test
Recent picture of the licensee (2x2) Certification of safety handling from a licensed Mining Engineer to include photocopy of updated PRC License
P2,500.00
30 minutes
Encodes Application Prepares endorsement & license for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20
minutes
* STEP 1: FORMS/REQUIREMENTS:
Updated copy of applicant’s Personal History Statement (PHS) with recent photograph duly notarize
Certification from the employer/ company
Certificate of being capable of handling explosives from licensed mining engineer (if applicant is not a licensed mining engineer)
Summary of Consumption/withdrawal Report or Notarized Affidavit of no consumption/withdrawal
Endorsement from ROPD & PD/CD (for Prov’l Applicant)
Endorsement from Bureau of Mines (if company is a mining firm)
Table B.21 Foreman Blaster (Renewal) Procedure
Page | 43
3. Controlled Chemicals (CCs)
Application for Inspection (PPO)
Application for Inspection (RCSU)
Figure B.18 Application for Inspection (PPO)
Process Flow Figure B.19 Application for Inspection (RCSU)
Process Flow
DPDO
Applicant
Provincial FESAGS
PD, PPO
For Endorsement of Application to Chief, RCSU
Inspection Team
Applicant
Firearms and Explosives Section (FES)
(Message Center)
Chief, RCSU
For Endorsement of
Application to Chief, RCSU
Page | 44
Special Survey and Inspection (SSI) (NCR POLICE STATION)
Investigation Report (IR) (EEMD, FEO)
Inspection Team
Applicant
Police Station
(Message Center)
COP
For Endorsement of Application to Chief, FEO
Inspection Team
Applicant
Inspection & Enforcement Section (IES, EEMD)
(Message Center)
Chief, EEMD
For Endorsement of
Application to Chief, FEO
Figure B.20 Special Survey and Inspection (SSI) (NCR POLICE STATION) Process Flow
Figure B.21 Investigation Report (IR) (EEMD, FEO) Process Flow
Page | 45
Application for: 1. New License to Possess CCs (Manufacturer & Dealer) 2. Permit to Import & Export (Manufacturer & Dealer)
Civil Security Group (CSG)
Applicant
Firearms and Explosives Office (FEO)
Directorate for Operations (DO)
The Chief Directorial Staff (TCDS)
Office of the Chief, PNP
Returns to EMD for Scanning and Releasing
Figure B.22 New License to Possess & Permit to Import & Export CCs Process Flow
Page | 46
New License to Possess CCs (Manufacturer)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to
the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issue pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
For local corporation/partnership: Certificate of Registration of the firm with the Securities and Exchange Commission (SEC) to include its machine validated Articles of Incorporation and
General Information Sheet (GIS);For foreign multi-corporation: SEC Registration to do business in the Philippines; For Single Proprietorship: Certificate of Registration with the
Department of Trade and Industry (DTI);
P25,000.00
45 minutes
Encodes Application
Prepares endorsement & license for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counter check documents submitted C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorse to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorse to the
office of TCDS
TDO
Counterchecks and endorse to the office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved license
Records, scans and release approved license
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 50 minutes except NHQ command group
Page | 47
* STEP 1: FORMS/REQUIREMENTS:
Personal Data Sheet (PDS) of the applicant and the management personnel of the storage facility/warehouse where the controlled chemicals will be stored;
NBI Clearance of the applicant;
Business Permit;
Process flowchart (for manufacturer and purchaser only);
Material Safety Data Sheet (MSDS)/Safety Data Sheet (SDS) of controlled chemicals to be provided by the supplier;
Vicinity map of the factory and storage facility showing distance from the nearest Police Headquarters;
Floor/Location plan of the storage facility;
Properly labeled pictures (8”x10” in size) of storage facility printed in photo paper;
For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from Chief, EEMD, FEO. For outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, Police Provincial Office (PPO)/City Director, City Police Office (CPO) and Certificate of Inspection from the RCSU or the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU.
Proof of payment from the Land Bank of the Philippines.
Table B.22 New License to Possess CCs (Manufacturer) Procedure
Page | 48
New License to Possess CCs (Dealer)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1* Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to
the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
For local corporation/partnership: Certificate of Registration of the firm with the Securities and Exchange Commission (SEC) to include its machine validated Articles of Incorporation and General
Information Sheet (GIS);For foreign multi-corporation: SEC Registration to do business in the Philippines; For Single Proprietorship: Certificate of Registration with the Department of
Trade and Industry (DTI);
P15,000.00
45 minutes
Encodes Application
Prepare endorsement for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counter check documents submitted C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher &
Chief, EEMD
20 minutes
Endorses application to the office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorses to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the office of TCDS
TDO
Counterchecks and endorses to the office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved license
Records, scans and releases approved license
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL
4hours and 50 minutes except NHQ command
group
Page | 49
* STEP 1: FORMS/REQUIREMENTS:
Personal Data Sheet (PDS) of the applicant and the management personnel of the storage facility/warehouse where the controlled chemicals will be stored;
NBI Clearance of the applicant;
Business Permit;
Process flowchart (for manufacturer and purchaser only);
Material Safety Data Sheet (MSDS)/Safety Data Sheet (SDS) of controlled chemicals to be provided by the supplier;
Vicinity map of the factory and storage facility showing distance from the nearest Police Headquarters;
Floor/Location plan of the storage facility;
Properly labeled pictures (8”x10” in size) of storage facility printed in photo paper;
For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from Chief, EEMD, FEO. For outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, Police Provincial Office (PPO)/City Director, City Police Office (CPO) and Certificate of Inspection from the RCSU or the Provincial Director, PPO/City Director, CPO pending fu ll activation of the RCSU. Proof of payment from the Land Bank of the Philippines.
Table B.23 New License to Possess CCs (Dealer) Procedure
Page | 50
Permit to Import CCs (Manufacturer & Dealer)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of
submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Inventory Report from Chief, EEMD
FEO or Chief, RCSU or from the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU; and
Proof of payment from the Land Bank of the Philippines;
P6,000.00
45 minutes
Encodes Application
Prepares endorsement & permit for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the Office of CDS, CSG
Secretary & Chief, FEO 15 minutes
Counterchecks and endorses to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the office of TCDS
TDO
Counterchecks and endorses to the office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved
permit
Records, scans and releases
approved permit
Releasing
Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL
4 hours and 50 minutes except NHQ command group
Table B.24 Permit to Import CCs (Manufacturer & Dealer) Procedure
Page | 51
Permit to Export CCs (Manufacturer & Dealer)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original Letter of Intent and End-User’s Certificate of the Consignee; and
Certification from the licensee-exporter with confirmation from the PNP accredited logistic service provider/broker/forwarder/ trucker.
NO FEE
45 minutes
Encodes Application
Prepare endorsement & permit for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the
Office of CDS, CSG
Secretary & Chief, FEO 15 minutes
Counterchecks and endorses to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the office of TCDS
TDO
Counterchecks and endorses to the office of the CPNP if no correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL
4 hours and 50 minutes except NHQ command group
Table B.25 Permit to Export CCs (Manufacturer & Dealer) Procedure
Page | 52
Application for:
1. New License to Possess CCs (Purchaser) 2. Permit to Import & Export (Purchaser) 3. Amendment of License to Possess CCs (Manufacturer, Dealer & Purchaser)
Figure B.23 Process Flow for New License to Possess CCs (Purchaser), Permit to Import & Export (Purchaser), Amendment of License to Possess CCs (Manufacturer, Dealer & Purchaser)
& Foreman Blaster (New & Renewal)
Office of the Chief, FEO
Applicant
Explosives Management
Division (EMD)
Office of the Director, CSG
Returns to EMD for Scanning
and Releasing
Page | 53
New License to Possess CCs (Purchaser)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach
SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted
documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
For local corporation/ partnership: Certificate of
Registration of the firm with the Securities and Exchange Commission (SEC) to include its machine validated Articles of Incorporation and General Information Sheet (GIS);For foreign multi-corporation: SEC
Registration to do business in the Philippines; For Single Proprietorship: Certificate of Registration with the Department of Trade and Industry (DTI);
P5,000.00
45 minutes
Encodes Application
Prepares endorsement for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & C, EMD
20 minutes
Endorses application to the office of CDS, CSG
Secretary & Chief, FEO 15 minutes
Counterchecks and endorses to the
office DCSG
CDS&DD, CSG 25 minutes
Approval/disapproval D, CSG 10 minutes
Records and forward approved/disapproved applications to EMD, FEO
Monitoring Clerk, CDS; and Admin FEO
10 minutes
2 Claim approved license
Records, scans and releases approved license
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 20 minutes
* STEP 1: FORMS/REQUIREMENTS:
Personal Data Sheet (PDS) of the applicant and the management personnel of the storage facility/warehouse where the controlled chemicals will be stored;
NBI Clearance of the applicant;
Business Permit;
Process flowchart (for manufacturer and purchaser only);
Material Safety Data Sheet (MSDS)/Safety Data Sheet (SDS) of controlled chemicals to be provided by the supplier;
Vicinity map of the factory and storage facility showing distance from the nearest Police Headquarters;
Floor/Location plan of the storage facility;
Properly labeled pictures (8”x10” in size) of storage facility printed in photo paper;
For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from Chief, EEMD, FEO. For outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, Police Provincial Office (PPO)/City Director, City Police Office (CPO) and Certificate of Inspection from the RCSU or the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU.
Proof of payment from the Land Bank of the Philippines
Table B.26 New License to Possess CCs (Purchaser) Procedure
Page | 54
Permit to Import (Purchaser)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Inventory Report from Chief, EEMD FEO or Chief, RCSU or from the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU; and
Proof of payment from the Land Bank of the Philippines
P6,000.00
45 minutes
Encodes Application
Prepares endorsement & permit for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the office of CDS, CSG
Secretary & Chief, FEO
15 minutes
Counterchecks and endorses to the office DCSG
CDS&DD, CSG 25 minutes
Approval/disapproval D, CSG 10 minutes
Records and forwards approved/disapproved
applications to EMD, FEO
Monitoring Clerk, CDS; and Admin
FEO
10 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 20 minutes
Table B.27 Permit to Import (Purchaser) Procedure
Page | 55
Permit to Export
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original Letter of Intent and End-User’s Certificate of the Consignee; and
Certification from the licensee-exporter with confirmation from the PNP accredited logistic service provider/broker/forwarder/ trucker.
NO FEE
45 minutes
Encodes Application
Prepares endorsement & permit for approval of CPNP
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Endorses application to the
Office of CDS, CSG
Secretary & Chief,
FEO
15 minutes
Counterchecks and endorses to the office of TDO if no correction
CDS, DD & D, CSG; and FEO
55 minutes
Counterchecks and endorses to the office of TCDS
TDO
Counterchecks and endorses to the office of the CPNP if no
correction
TCDS, TDCO
Approval/disapproval CPNP
Records and forwards approved/disapproved applications to EMD, FEO
Msg Center, OCPNP & OCDS; Monitoring Clerk, CDS; and Admin FEO
20 minutes
2 Claim approved permit Records, scans and release approved permit
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL
4 hours and 50 minutes except NHQ command group
Table B.28 Permit to Export Procedure
Page | 56
Amendment of License to Possess CCs (Manufacturer, Dealer & Purchaser)
STEP APPLICANT SERVICE PROVIDER OFFICE/
PERSON RESPONSIBLE FORMS/
REQUIREMENTS FEES PROCESSING
TIME
1* Submit application and documentary requirements
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
In case of additional controlled chemicals: 1) Process flowchart; 2) Material Safety Data
Sheet (MSDS)/Safety Data Sheet (SDS) of the controlled chemicals to be provided by the supplier; and
3) For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from Chief, EEMD, FEO.
4) For outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, PPO/City Director, CPO and Certificate of Inspection from the RCSU or the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU.
NO FEE
45 minutes
Encodes Application
Prepares endorsement & license for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/Dispatcher & Chief, EMD
20 minutes
Endorses application to the Office of CDS, CSG
Secretary & Chief, FEO 15 minutes
Counterchecks and endorses to
the office DCSG
CDS & DD, CSG 25 minutes
Approval/disapproval D, CSG 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Monitoring Clerk, CDS; and Admin FEO
10 minutes
2 Claim approved license
Records, scans and releases approved license
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 4 hours and 20 minutes
Page | 57
* STEP 1: FORMS/REQUIREMENTS:
In case of increase in quantity of controlled chemicals and/or establishment of additional storage facility: a. Notarized latest Monthly Consumption Report; b. Properly labeled pictures (8”x10” in size) of the additional storage facility printed in photo paper; and c. For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from Chief,
EEMD, FEO. For outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, PPO/City Director, CPO and Certificate of Inspection from the RCSU or the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU. where the controlled chemicals will be stored;
In case of change of storage facility: a. Duly accomplished Application Form; b. Business Permit; c. Vicinity map of the factory and storage facility showing distance from the nearest Police Headquarters; d. Floor/Location plan of the storage facility; e. Properly labeled pictures (8”x10” in size) of storage facility printed in photo paper; f. For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from Chief,
EEMD, FEO.
For outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, PPO/City Director, CPO and Certificate of Inspection from the RCSU or the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU.
In case of change of corporate/business address: a. For local Corporation or Partnership: Certificate of Registration of the firm with the SEC to include its machine validated Article of Incorporation and GIS.
For Foreign Multi-corporation: SEC Registration to do business in the Philippines. For Single Proprietorship: Certificate of Registration with DTI.
b. Business Permit; c. Vicinity map of the factory and storage facility showing distance from the nearest Police Headquarters; d. Floor/Location plan of the storage facility; e. Properly labeled pictures (8”x10” in size) of storage facility printed in photo paper; and f. For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from the Chief,
EEMD FEO. For outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, PPO/City Director, CPO and Certificate of Inspection from the Regional Civil Security Unit or from the Provincial Director, PPO/City Director, CPO pending full activation of the RCSU.
In case of change of corporate/business name: For Corporation or Partnership: Certificate of Registration of the firm with SEC to include its machine validated Article o f Incorporation and GIS;
For foreign multi-corporation – SEC Registration to do business in the Philippines. For Single Proprietorship: Certificate of Registration with DTI.
Table B.29 Amendment of License to Possess CCs Procedure
Page | 58
Application for: 1. Renewal of License to Possess CCs (Manufacturer, Dealer & Purchaser) 2. Permit to Purchase & Move CCs 3. Permit to Unload 4. Special Permit to Purchase & Move CCs
Figure B.24 Process Flow for Renewal of License to Possess (Manufacturer, Dealer & Purchaser), Permit to Purchase, Move & Unload & Special Permit to Purchase & Move CCs
Office of the Chief, FEO
Applicant
Explosives Management
Division (EMD)
Returns to EMD for Scanning
and Releasing
Page | 59
Renewal of License to Possess CCs (Manufacturer)
STEP APPLICANT SERVICE PROVIDER OFFICE/
PERSON RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Business Permit;
For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and
Certificate of Inspection from the Chief, EEMD, FEO; For Outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, PPO/City Director, CPO
and Certificate of Inspection from the RCSU or from the Provincial Director, PPO/City Director, CPO pending full the activation of the RCSU; and
Proof of payment from the Land Bank of the Philippines.
P25,000.00
45 minutes
Encodes Application
Prepares endorsement for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved license Records, scans and releases approved license
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 35 minutes
Table B.30 Renewal of License to Possess CCs Procedure
Page | 60
Renewal of License to Possess CCs (Dealer)
STEP APPLICANT SERVICE PROVIDER OFFICE/
PERSON RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Business Permit;
For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of
Inspection from the Chief, EEMD, FEO ;For Outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, PPO/City Director, CPO and Certificate of
Inspection from the RCSU or from the Provincial Director, PPO/City Director, CPO pending full the activation of the RCSU; and
Proof of payment from the Land Bank of the Philippines.
P15,000.00
45 minutes
Encodes Application
Prepares endorsement & license for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/ Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved license Records, scans and releases
approved license
Releasing Clerk/
Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 35 minutes
Table B.31 Renewal of License to Possess CCs (Dealer) Procedure
Page | 61
Renewal of License to Possess CCs (Purchaser)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Business Permit;
For Metro Manila applicants: Security Survey Inspection Report from the Chief of Police of the concerned Police Station and Certificate of Inspection from the Chief, EEMD, FEO; For Outside Metro Manila applicants: Security Survey Inspection Report from the Provincial Director, PPO/City Director, CPO and Certificate of Inspection from the RCSU or from the Provincial Director, PPO/City Director, CPO pending full the activation of the RCSU; and
Proof of payment from the Land Bank of the Philippines.
P5,000.00
45 minutes
Encodes Application
Prepares endorsement & license for approval of C, FEO
Monitoring Clerk &
Processor, EMD
2hrs and
5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of
Chief, FEO
Secretary/Releasing Clerk/
Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved license Records, scans and releases approved license
Releasing Clerk/Dispatcher,
EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 35 minutes
Table B.32 Renewal of License to Possess CCs (Purchaser) Procedure
Page | 62
Permit to Purchase & Move CCs
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Endorsement from Provincial Director, PPO/City Director, CPO (for provincial applicant);
Certification from the licensee with confirmation from the PNP accredited logistic service provider/broker/forwarder/trucker; and
Proof of payment from the Land Bank of the Philippines.
P1,500.00
45 minutes
Encodes Application
Prepares endorsement & permit for approval of C,
FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/ Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20 minutes
Table B.33 Permit to Purchase & Move CCs Procedure
Page | 63
Permit to Unload CCs
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Computes quantity allowed
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Copy of Permit to Import with Certificate of Balance;
Notarized latest Monthly Consumption Report;
Commercial/Proforma Invoice for sea freight or for air freight in lieu of Bill of Lading or Airway
Bill;
Certification from the licensee with confirmation from the PNP accredited logistic service provider/broker/forwarder/trucker; and
Proof of payment from the Land Bank of the Philippines.
P.10/KG/LTR
45 minutes
Encodes Application
Prepares endorsement & permit for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EEMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved
applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20 minutes
Table B.34 Permit to Unload CCs Procedure
Page | 64
Special Permit to Purchase & Move CCs
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Duly accomplished Application Form;
Personal Data Sheet (PDS) of the applicant;
NBI Clearance of the applicant; and
Proof of payment from the Land Bank of the Philippines.
P1,500.00
30 minutes
Encodes Application
Prepares endorsement & permit for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved
applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20 minutes
Table B.35 Special Permit to Purchase & Move CCs Procedure
Page | 65
4. Firecrackers and Pyrotechnic Devices (FC/PD)
Application for Inspection (PPO)
Application for Inspection (RCSU)
Figure B.25 Application for Inspection (PPO)
Process Flow Figure B.26 Application for Inspection (RCSU)
Process Flow
DPDO
Applicant
Provincial FESAGS
PD, PPO
For Endorsement of Application to Chief, RCSU
Inspection Team
Applicant
Firearms and Explosives Section (FES)
(Message Center)
Chief, RCSU
For Endorsement of
Application to Chief, RCSU
Page | 66
Special Survey and Inspection (SSI) (NCR Police Station)
Investigation Report (IR) (EEMD, FEO)
Inspection Team
Applicant
Police Station
(Message Center)
COP
For Endorsement of Application to Chief, RCSU
Inspection Team
Applicant
Inspection & Enforcement Section (IES, EEMD)
(Message Center)
Chief, EEMD
For Endorsement of
Application to Chief, RCSU
Figure B.27 Special Survey and Inspection (SSI) (NCR Police Station) Process Flow
Figure B.28 Investigation Report (IR) (EEMD, FEO) Process Flow
Page | 67
Application for: 1. New License to Possess FC/PD (Manufacturer & Dealer) 2. License to Possess FC/PD - Renewal (Manufacturer & Dealer) 3. Permit to Import & Export FC/PD (Manufacturer & Dealer) 4. Fireworks Display Operator’s License
Figure B.29 Process Flow for New License to Possess FC/PD (Manufacturer & Dealer), License
to Possess FC/PD – Renewal (Manufacturer & Dealer), Permit to Import & Export FCPD (Manufacturer & Dealer) & Fireworks Display Operator’s License
Office of the Chief, FEO
Applicant
Explosives Management
Division (EMD)
Office of the Director, CSG
Returns to EMD for Scanning
and Releasing
Page | 68
Application for:
1. Retailer’s Permit 2. Permit to Transport 3. Special Permit to Display Fireworks
Figure B.30 Process Flow for Retailer’s Permit, Permit to Transport & Special Permit to Display Fireworks
Office of the Chief, FEO
Applicant
Explosives Management
Division (EMD)
Returns to EMD for Scanning
and Releasing
Page | 69
Retailer’s Permit (FC/PD)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Original SBR (Special Bank Receipt) – Landbank
Letter Request (State Purpose) a. Certified photocopy of
Manufacturer’s and/or Dealer’s License
b. Resume
Certification from the Manufacturer and/or Dealer that he is connected with the company
Original or authenticated Fireworks Safety Training Course (FSTC) certificate
Photocopy of Previous License
P5,000.00
30 minutes
Encodes Application
Prepares endorsement & license for approval of D, CSG
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits
application to the office of Chief, FEO
Secretary/Releasing
Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved license Records, scans and releases approved license
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20 minutes
Table B.36 Retailer’s Permit (FC/PD) Procedure
Page | 70
Permit to Transport (FC/PD)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Letter Request (State expected date of departure and, origin and point of destination)
Certified photocopy of Dealer’s License
Original Copy of Special Bank Receipt (SBR)
Original Copy of Special Bank Receipt (SBR)
P360.00
30 minutes
Encodes Application
Prepares endorsement & permit for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved
applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved permit Records, scans and releases approved permit
Releasing Clerk/ Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20 minutes
Table B.37 Permit to Transport (FC/PD) Procedure
Page | 71
Special Permit to Display Fireworks (FC/PD)
STEP APPLICANT SERVICE PROVIDER OFFICE/ PERSON
RESPONSIBLE
FORMS/ REQUIREMENTS
FEES PROCESSING TIME
1 Submit application and documentary requirements
Pay the necessary fee to Land Bank of the Philippines and attach SBR to the folder to be submitted
Checks the completeness, validity and correctness of submitted documents
Issues pre-evaluation slip if there is/are lacking requirement/s
Issues Order of Payment
Issues commitment slip if the requirements are complete, valid and correct.
Statistician &Verifier, EMD
Letter Request (State Purpose)
Certified photocopy of Manufacturer’s and/or Dealer’s License
Original Special Bank Receipt (LBP)
Original or Certified photocopy of the contract/Agreement duty notarized
Fireworks Display Operator’s (FDO) License
P3,000.00
30 minutes
Encodes Application
Prepares endorsement for approval of C, FEO
Monitoring Clerk & Processor, EMD
2hrs and 5minutes
Counterchecks documents submitted
C, LPS, EMD 5 minutes
Endorses/Transmits application to the office of Chief, FEO
Secretary/Releasing Clerk/ Dispatcher & Chief, EMD
20 minutes
Approval/disapproval C, FEO 10 minutes
Records and forwards approved/disapproved applications to EMD, FEO
Secretary of C, FEO 5 minutes
2 Claim approved special permit
Records, scans and releases approved special permit
Releasing Clerk/Dispatcher, EMD
5 minutes
END OF TRANSACTION TOTAL 3 hours and 20 minutes
Table B.38 Special Permit to Display Fireworks (FC/PD) Procedure
Page | 72
FEO Level of Processing, Endorsing and Approving 1. Firearms Licensing Division (FLD)
Licenses/Permits
/Others
Processing, Endorsing and Approving Offices
RCSU C,FLD C,FEO D,CSG C,PNP SILG
1. License to Own and Possess Firearms (LTOPF) - New
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
2. License to Own and Possess Firearms (LTOPF) - Renewal
Processing & Endorsement
Approval
3. Firearms Registration – New
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
4. Firearms Registration – Renewal
Processing & Endorsement
Approval
5. Firearms Registration – Transfer of Ownership
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
License to Manufacture (Main)
6. License to Manufacture in Firearm and its Major Parts and Minor Parts (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Endorsement Approval
7. License to Manufacture in Ammunition and/or Ammunition Reloading Components (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Endorsement Approval
8. License to Manufacture in
Processing & Endorsement
Processing/ Review &
Endorsement Endorsement Endorsement Approval
Page | 73
Minor Parts and Accessories (New)
Endorsement
9. License to Manufacture in Airguns/Airsoft (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Endorsement Approval
10. License to Manufacture in Bullet Proof Vest/Vestment (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Endorsement Approval
11. License to Manufacture in Firearms, Ammunition, Air Munition Products, Smoke Grenade, Mortar Fuzes, Bomb Suits and Blankets for sale to AFP/PNP and other foreign counterparts (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Endorsement Approval
12. License to Manufacture in Firearms, Firearms Parts and Ammunition for sale to authorized Law Enforcement Agencies (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Endorsement Approval
13. License to Manufacture in Sporting Riflescope (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Endorsement Approval
14. License to Processing & Processing/ Endorsement Endorsement Endorsement Approval
Page | 74
Manufacture in Load/Reload (New)
Endorsement Review & Endorsement
15. License to Manufacture in Firearm and its Major Parts and Minor Parts (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
16. License to Manufacture in Ammunition and/or Ammunition Reloading Components (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
17. License to Manufacture in Minor Parts and Accessories (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
18. License to Manufacture in Airguns/Airsoft (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
19. License to Manufacture in Sporting Riflescope (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
20. License to Manufacture in Firearms, Ammunition,
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
Page | 75
Air Munition Products, Smoke Grenade, Mortar Fuzes, Bomb Suits and Blankets for sale to AFP/PNP and other foreign counterparts (Renewal and/or amendment)
21. License to Manufacture in Firearms, Firearms Parts and Ammunition for sale to authorized Law Enforcement Agencies (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
22. License to Manufacture in Bullet Proof Vest/Vestment (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
23. License to Manufacture in Load/Reload (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
License to Deal (Main)
24. License to Deal in Firearms, Major Parts and
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
Page | 76
Ammunition (New)
25. License to Deal in Firearm Minor Parts, Spare Parts and Accessories, laser, telescopic and optic sights, sound suppressor and silencer (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
26. License to Deal in Airgun/Airsoft (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
27. License to Deal in Ammunition Reloading Components (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
28. License to Deal in Reloading Machine, Parts and Accessories (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
29. License to Deal in Bullet Proof Vest /Vestment (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
30. License to Deal in Firearms, Major Parts and Ammunition (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
31. License to Processing & Processing/ Approval
Page | 77
Deal in Firearm Minor Parts, Spare Parts and Accessories, laser, telescopic and optic sights, sound suppressor and silencer (Renewal and/or amendment)
Endorsement Review & Endorsement
32. License to Deal in Airgun/Airsoft (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
33. License to Deal in Ammunition Reloading Components (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
34. License to Deal in Reloading Machine, Parts and Accessories (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
35. License to Deal in Bullet Proof Vest /Vestment (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
License to Deal (Branch Store)
36. License to Deal in
Processing & Endorsement
Processing/ Review &
Approval
Page | 78
Firearms, Major Parts and Ammunition (Renewal and/or amendment)
Endorsement
37. License to Deal in Firearms, Major Parts and Ammunition (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
38. License to Deal in Firearm Minor Parts, Spare Parts and Accessories, laser, telescopic and optic sights, sound suppressor and silencer (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
39. License to Deal in Airgun/Airsoft (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
40. License to Deal in Ammunition Reloading Components (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
41. License to Deal in Reloading Machine, Parts and Accessories (New)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
42. License to Deal in Airgun/Airsoft
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
Page | 79
(Renewal and/or amendment)
43. License to Deal in Bullet Proof Vest /Vestment (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
44. License to Deal in Firearm Minor Parts, Spare Parts and Accessories, laser, telescopic and optic sights, sound suppressor and silencer (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
45. License to Deal in Ammunition Reloading Components (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
46. License to Deal in Reloading Machine, Parts and Accessories (Renewal and/or amendment)
Processing & Endorsement
Processing/ Review &
Endorsement
Approval
47. Gunsmith License – New
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
48. Gunsmith License –
Processing & Endorsement
Processing/ Review &
Endorsement Approval
Page | 80
Renewal and/or amendment
Endorsement
49. Indentor’s License – New
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Endorsement Approval
50. Indentor’s License – Renewal and/or amendment
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Approval
Other Permits
51. Authority to Import
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Approval Approval
52. Authority to Export
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Approval Approval
53. Authority to Display
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Approval
54. Certificate of Balance
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Approval
55. Registration of Bullet Proof Vest/Vestment
Processing & Endorsement
Processing/ Review &
Endorsement
Endorsement Approval
Table B.39 Level of Processing, Endorsing and Approving – FLD
Page | 81
2. Enforcement and Education Management Division (EEMD)
Licenses/Permits/Others Processing, Endorsing and Approving Offices
RCSU C,FEO D,CSG C,PNP
1. Permit to Transport Firearms and Ammunition for Licensed Citizen/ Licensed Sports Shooter
Processing and Approval (within the Region only)
Approval for Inter-Region Application
2. Permit to Transport Firearms and Ammunition for Licensed Juridical Entity (Private Security Agency, Private Entity), Authorized Dealer and Authorized Manufacturer
Processing and Approval (within the Region only)
Approval for Inter-Region Application/ movement
3. Permit to Transport Firearms and Ammunition for Diplomat and other Foreign Dignitary
Processing and Endorsement
Approval
4. Permit to Transport Firearms and Ammunition Law Enforcement Agency (LEA), Local Government Unit (LGU) and Government Owned and Controlled Corporation (GOCC)
Processing and Approval (within the Region only)
Approval for Inter-Region Application/ movement
5. Permit to Transport Firearms and Ammunition for Export/Import
Processing and Endorsement
Approval
6. Permit/ Authority to Bring Firearms in/out of the Country -Shooters
Processing and Endorsement
Approval
7. Permit to Conduct Shooting Competition - Level I only
Processing and Approval
8. Permit to Conduct Shooting Competition - Level II –IV
Endorsement Approval
9. Certificate of Shooting Range Accreditation for Private/Commercial -New
Endorsement Processing and
Endorsement
Endorsement Approval
10. Certificate of Shooting Range Accreditation for Private/Commercial -Renewal
Endorsement Approval
11. Certificate of Shooting Endorsement Processing Endorsement Approval
Page | 82
Range for College/Universities-New
and Endorsement
12. Certificate of Shooting Range for College/Universities-Renewal
Endorsement Approval
13. Certificate of Shooting Range for Government Owned/Operated -New
Endorsement Processing and
Endorsement
Endorsement Approval
14. Certificate of Shooting Range for Government Owned/Operated-Renewal
Endorsement Approval
15. Certificate of Shooting Range for Security Training Center - New
Endorsement Processing and
Endorsement
Endorsement Approval
16. Certificate of Shooting Range for Security Training Center - Renewal
Endorsement Approval
17. Certificate of Gun Club Registration - New
Endorsement Processing and
Endorsement
Endorsement Approval
18. Certificate of Gun Club Registration - Renewal
Endorsement Approval
19. Authorization of Gun Club to conduct GSRGOS
Processing and Endorsement
Approval
20. License to Possess and Operate Ammunition Reloading Machine - New
Endorsement Processing and
Endorsement
Endorsement Approval
21. Certificate of Airgun/Airsoft Registration
Processing and Endorsement
Approval
22. Validation of Gun Safety Seminar Certificate
Validation (within the
Region only)
Table B.40 Level of Processing, Endorsing and Approving – EEMD
Page | 83
3. Explosives Management Division (EMD)
a. Explosives and Explosive Ingredients (EEIs)
Licenses/Permits/Others Processing, Endorsing and Approving Offices
RCSU C,FEO D,CSG C,PNP
1. License to Possess Explosives/ Explosive Ingredients - New (Manufacturer & Dealer)
Processing and Endorsement
Endorsement Endorsement Approval
2. License to Possess Explosives/ Explosive Ingredients - New (Purchaser)
Processing and Endorsement
Endorsement Approval
3. License to Possess Explosives/ Explosive Ingredients - Renewal (Manufacturer, Dealer & Purchaser)
Processing and Endorsement
Approval
4. License to Possess Explosives/ Explosive Ingredients - Amendment (Manufacturer, Dealer & Purchaser)
Processing and Endorsement
Endorsement Approval
5. Foreman Blaster’s License - New and Renewal
Processing and Endorsement
Endorsement Approval
6. Permit to Import Explosives/ Explosive Ingredients (Manufacturer & Dealer)
Processing and Endorsement
Endorsement Endorsement Approval
7. Permit to Import Explosives/ Explosive Ingredients (Purchaser)
Processing and Endorsement
Endorsement Approval
8. Permit to Export Explosives/ Explosive Ingredients (Manufacturer & Dealer)
Processing and Endorsement
Endorsement Endorsement Approval
9. Permit to Purchase and Move Explosives/
Processing and Endorsement
Approval
Page | 84
Explosive Ingredients (Regional Boundaries)
10. Permit to Purchase and Move Explosives/ Explosive Ingredients (Movement is within the region)
Approval
11. Permit to Transfer and Move Explosives/ Explosive Ingredients (Movement is region to region)
Processing and Endorsement
Approval
12. Permit to Transfer and Move Explosives/ Explosive Ingredients (Movement is within the region)
Approval
13. Permit to Unload Explosives/ Explosive Ingredients
Processing Approval
14. Special Permit to Purchase and Move Explosives/ Explosive Ingredients (Movement is outside the region)
Processing and Endorsement
Approval
15. Special Permit to Purchase and Move Explosives/Explosive Ingredients (Movement is within the region)
Approval
16. Disposal of expired, rotten & deteriorating explosives
Processing and Endorsement
Approval
Table B.41 Level of Processing, Endorsing and Approving – EMD (EEIs)
Page | 85
b. Controlled Chemicals (CCs)
Licenses/Permits/Others Processing, Endorsing and Approving Offices
RCSU C,FEO D,CSG C,PNP
1. Manufacturer’s License - New
Processing Endorsement Endorsement Approval
2. Dealer’s License -New Processing Endorsement Endorsement Approval
3. Purchaser’s License -New Processing Endorsement Approval
4. Purchaser’s License - New, Renewal, Amendment DOH, DTI Accredited, Small Enterprise, DepEd
Processing Approval
5. Purchaser’s License -New, Renewal, Amendment Brgy Certified Farmers
Processing Approval
6. Manufacturer’s License - Renewal
Processing Approval
7. Dealer’s License -Renewal Processing Approval
8. Purchaser’s License - Renewal
Processing Approval
9. Purchaser’s License - Amendment
Processing Endorsement Approval
10. Manufacturer’s License - Amendment
Processing Endorsement Approval
11. Dealer’s License - Amendment
Processing Endorsement Approval
12. Purchaser’s License - Amendment
Processing Endorsement Approval
13. Permit to Export – Manufacturer & Dealer
Processing Endorsement Endorsement Approval
14. Permit to Import Controlled Chemicals (Manufacturer & Dealer)
Processing Endorsement Endorsement Approval
15. Permit to Import Controlled Chemicals (Purchaser)
Processing Endorsement Approval
16. Permit to Purchase & Move Controlled Chemicals (Movement transcend regional boundaries)
Processing Approval
17. Permit to Purchase & Move Controlled Chemicals (Movement is within the region)
Approval
18. Special Permit to Purchase Processing Approval
Page | 86
& Move Controlled Chemicals (Movement transcend regional boundaries)
19. Special Permit to Purchase & Move Controlled Chemicals (Movement is within the region)
Approval
20. Permit to Transfer & Move Controlled Chemicals (Transfer transcend regional boundaries)
Processing Approval
21. Permit to Transfer & Move Controlled Chemicals (Transfer is within the region)
Approval
22. Permit to Unload Controlled Chemicals
Processing Approval
23. Permit to Transport Controlled Chemicals (Transport transcend regional boundaries)
Processing Approval
24. Permit to Transport Controlled Chemicals (Transport is within the region)
Approval
25. Certificate of Inspection - New license - Renewal of license - Amendment of license
Approval
26. Inventory Report 5.6.6 - Permit to Import
Approval
27. Notarized Monthly Consumption Report 8.3
Approval
Table B.42 Level of Processing, Endorsing and Approving – EMD (CCs)
Page | 87
c. Firecrackers and Pyrotechnic Devices (FCPDs)
Licenses/Permits Processing, Endorsing and Approving Offices
RCSU C,FEO D,CSG C,PNP
1. Manufacturer’s License - New & Renewal
Processing Endorsement Approval
2. Dealer’s License - New & Renewal
Processing Endorsement Approval
3. Permit to Unload Explosive Ingredients for FC/PD
Processing Approval
4. Permit to Purchase and Move Explosives for FC/PD (Manufacturer)
Processing Approval
5. Fireworks Display Operator’s License – New & Renewal
Processing Endorsement Approval
6. Permit to Import FC/PD Processing Endorsement Approval
7. Permit to Export FC/PD Processing Endorsement Endorsement Approval
8. Permit to Transport FC/PD (Transport is within the region)
Approval
9. Permit to Transport FC/PD (Transport is region to region)
Processing Approval
10. Special Permit for Fireworks Display
Processing Approval
11. Retailer’s Permit (NCR, COR, Regions 1-5)
Processing Approval
12. Retailer’s Permit (ARMM, CARAGA, Regions 6-12,18)
Approval
13. Inspection Report of Warehouse (Storage/Bodega) (Manufacturer & Dealer)
Approval
Table B.43 Level of Processing, Endorsing and Approving – EMD (FCPDs)