fence c-c b-b stop c-c

1
STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP 51.50 IL IL IL IL IL BUILDING WASTE SPOIL HEAPS/ CONC. SLAB CONC. SLAB CONC. SLAB CONC. SLAB MH CL=46.80 IL=43.50 450MM CONC PIPE IL=44.07 PEG PEG PEG PEG PEG PEG SPRAY B-B B-B C-C C-C A-A A-A STOP STOP STOP STOP BUS BUS Site Legend 10m Riparian Buffer Zone Proposed Road Proposed Foothpath Proposed Ramp Proposed Home Zone Proposed Off Road Cycle Track Proposed Off Road Cycle Track Proposed Tactile Paving Proposed Corduroy Paving Application Site 157,395m² | 15.7Hectares Notes: Drawing Notes: E: [email protected] W: www.reddyarchitecture.com Reddy Architecture + Urbanism T: +353 (0)56 7762697 41 Dean Street, Kilkenny R95 P291 Drawing Title: Job No: Date: Scale@ Status: Drawing Number Revision Purpose: Project Details: Client Details: Drawn By: Checked By: REV DATE DRN DESCRIPTION + urbanism : architecture reddy LANDSCAPE Do not scale from this drawing. Dse figured dimensions in all cases. Verify dimensions on site and report any discrepancies to the architects immediately. This drawing to be read in conjunction with the Architects Specification, Fire Certificate, DAC, other consultants issued drawings and reports. Contractor is responsible for: 1. All dimensions, quantities and performance requirements to be confirmed on site 2. All information that pertains solely to the fabrication processes or to the techniques of construction 3. All coordination of the work of all trades 4. Assuring consistency with the contract documents © This drawing is copyright and may only be reproduced with the architect's permission. A1 A1 Proposed Residential Development at Clonattin, Gorey AXIS Construction Proposed Site Masterplan 20/11/2019 1:1250 LB MK P19-147K P19-147K-RAU-XX-XX-DR-A-31001 Planning 03. Design Development P06 P01 19.12.04 LB Issued for Information P02 19.12.19 LB Issued for Information P03 20.01.28 LB Signed_Off 27.01.20 P04 13.08.20 LB Issued for information P05 06.11.20 GM Issued For Review P06 27.01.21 LB Issued for Planning SITE AREA Gross Site Area: 157,395m² | 15.73Ha RED LINE BOUNDARY NET Developable Site Area: 95,650m² | 9.56Ha (excl. Riparian Buffer Zone / Primary Road Infrastructure) Public Open Space: Requirement 15% / 23,59 m² | 2.35Ha Provided: 15.3% / 24,098 m² | 2.40Ha Car Parking Provision: 690 2 spaces / dwelling - (262 x 2) 524 no. Spaces (curtilage / on-street) 1 space / apartment / Duplex - (101 x 1) 101 no. Spaces (parking courts / on-street) Creche (plus drop off) 19 no. Spaces (parking courts / on-street) Visitors Spaces 46 no. Spaces *12no. Accessible Parking Bays provided throughout the scheme Densities | Plot Ratios | Coverage: 40,081m² / 95,650m² = 0.41 : 1 18,185m² / 95,650m² = 19% 9.56 Ha / 363 dwellings = 38DPH Dual Aspect: 81no. Apartments 45no. Dual Aspect 55.5% Public Park Attenuation Pond Public Open Space Public Open Space Linear Walk Linear Walk Public Open Space Existing Public Open Space Proposed Bridge Crossing of Stream Indicative School Outline (Not forming part of this Application) Proposed Cycle Lane Plan 2 Plan 1: Site Masterplan 1:1250 Plan 2: Continuation Plan of Proposed Distributor Road 1:1250 Plan 2 Continuation Line Proposed Distributor Road (Refer to Engineer's Drawings and Details for Further information) Gorey Cinema Existing Car Park New connection for Proposed Distributor Road Road Alignment adjusted for shared cycle and footpath R742 COURTOWN ROAD to Gorey Town Centre to M11 / Courtown

Upload: others

Post on 18-Oct-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

P19-147K-RAU-XX-XX-DR-A-31001PEG
PEG
PEG
PEG
PEG
PEG
SPRAY
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
Fence
B-B
B-B
Proposed Off Road Cycle Track Proposed Off Road Cycle Track
Proposed Tactile Paving
Proposed Corduroy Paving
Notes:
Drawing Title:
architecturereddy
LANDSCAPE
Do not scale from this drawing. Dse figured dimensions in all cases. Verify dimensions on site and report any discrepancies to the architects immediately. This drawing to be read in conjunction with the Architects Specification, Fire Certificate, DAC, other consultants issued drawings and reports. Contractor is responsible for: 1. All dimensions, quantities and performance requirements to be confirmed on site 2. All information that pertains solely to the fabrication processes or to the
techniques of construction 3. All coordination of the work of all trades 4. Assuring consistency with the contract documents © This drawing is copyright and may only be reproduced with the architect's permission.
A1
A1
AXIS Construction
P06
P01 19.12.04 LB Issued for Information P02 19.12.19 LB Issued for Information P03 20.01.28 LB Signed_Off 27.01.20 P04 13.08.20 LB Issued for information P05 06.11.20 GM Issued For Review P06 27.01.21 LB Issued for Planning
SITE AREA Gross Site Area: 157,395m² | 15.73Ha RED LINE BOUNDARY NET Developable Site Area: 95,650m² | 9.56Ha (excl. Riparian Buffer Zone / Primary Road Infrastructure)
Public Open Space: Requirement 15% / 23,59 m² | 2.35Ha Provided: 15.3% / 24,098 m² | 2.40Ha
Car Parking Provision: 690 2 spaces / dwelling - (262 x 2) 524 no. Spaces (curtilage / on-street) 1 space / apartment / Duplex - (101 x 1) 101 no. Spaces (parking courts / on-street) Creche (plus drop off) 19 no. Spaces (parking courts / on-street) Visitors Spaces 46 no. Spaces
*12no. Accessible Parking Bays provided throughout the scheme
Densities | Plot Ratios | Coverage: 40,081m² / 95,650m² = 0.41 : 1
18,185m² / 95,650m² = 19%
9.56 Ha / 363 dwellings = 38DPH
Dual Aspect: 81no. Apartments 45no. Dual Aspect 55.5%
Public Park
Attenuation Pond
Indicative School Outline (Not forming part of this Application)
Proposed Cycle Lane Plan 2
Plan 1: Site Masterplan 1:1250
Plan 2: Continuation Plan of Proposed Distributor Road 1:1250
Pl an
2 C
on tin
ua tio
n Li
Further information)
Gorey Cinema
Road
R742 COURTOWN ROAD