Fence and Gate Layout                     Man gate access with blackboard control located on building wall.  Man gate operator connected to Blackboard controller and 120‐V power supply Blackboard access controller located on south and east walls to access man‐gate. Blackboard access controller on stanchion with Bollard on both the north and south side of the concrete island.  Located approximately 10 feet from the gate on the north and south sides.  See detail. 1/2‐HP, 120 volt, single‐phase, sliding gate operator with concrete pad per manufacturer’s installation instructions.  See Bollard detail this plan set.  Bollards to protect back side of Card reader stanchion and exposed side of sliding gate controller. See bollard detail. 9‐gauge chain link fence gate 36” wide with locking hardware.  Continue with three strands of Barbed wire over gate top. Pedestrians traffic signage, see detail. New Fence to match existing Fencing 

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Fence and Gate Layout 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Man gate access with blackboard control located on building wall.  Man gate operator connected to Blackboard controller and 120‐V power supply 

Blackboard access controller located on south and east walls to access man‐gate. 

Blackboard access controller on stanchion with Bollard on both the north and south side of the concrete island.  Located approximately 10 feet from the gate on the north and south sides.  See detail. 

1/2‐HP, 120 volt, single‐phase, sliding gate operator with concrete pad per manufacturer’s installation instructions.  

See Bollard detail this plan set.  Bollards to protect back side of Card reader stanchion and exposed side of sliding gate controller.  See bollard detail.

9‐gauge chain link fence gate 36” wide with locking hardware.  Continue with three strands of Barbed wire over gate top. 

Pedestrians traffic signage, see detail. 

New Fence to match existing Fencing 

Page 2: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

BlackBoard Communications  Conduit Layout 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blackboard Master Controller in existing communications closet with Controller for vehicle gate operator.  See Blackboard Details 

Blackboard Control Conduits.  3/4” conduit with Belden 8723 communications cable.  See Blackboard Details.  Man Gate Door Controller.  

See Blackboard detail. 

1” conduit with control cables 

Page 3: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Electrical Conduit Layout 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Panel M located on south wall. 

¾”” conduit with 2‐#12AWG and 1‐#12 AWG copper THHN conductors from man gate operator to house power panelboard “M”. 

3/4” conduit with 2‐#10 AWG and 1‐#10 AWG copper THHN conductors from sliding gate operator pad to house power panelboard “M”. 

¾”” conduit with 2‐#12AWG and 1‐#12 AWG copper THHN conductors from motorcycle charger station to house power panelboard “M”. 

¾”” conduit with 2‐#12AWG and 1‐#12 AWG copper THHN conductors from man gate door controller  to house power panelboard “M”.

¾”” conduit with 2‐#12AWG and 1‐#12 AWG copper THHN conductors from Master Controller  to house power panelboard “M”. 

Page 4: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Concrete Sidewalk and Bollard Layout 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Parking Bumpers. 

4” diameter schedule 40 steel pipe 60” above finished grade, extending 30” below grade, grouted solid, painted safety yellow.  Pipe centered in 30” deep by 16” diameter concrete base.   Center bollards on parking space and on parking stripes 6” inside fence line.  4000 PSI Concrete.  See bollard detail 

Notes: 

1. Contractor to match existing sidewalk width with width of new sidewalk. 2. Contractor to match grade on all sides of new sidewalk. See sidewalk detail 

Page 5: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Sliding Gate Detail 

 

Page 6: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Vehicle Gate Controller 

 

Page 7: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Man Gate Controller 

  

Page 8: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

BlackBoard Control and Communication Detail 

  

Page 9: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

General Notes: 1. All work shown on these plans must comply with New Mexico State University Construction Guidelines as well as the latest versions of all applicable National, State, and Local Codes.  Guidelines 

can be obtained from Facilities and Services at 1530 Wells Street on the main campus of NMSU or on the Facilities and Services Website. 2. Contractor responsible for obtaining and posting all required construction permits and will provide the Owner with a Certificate of Inspection/Occupancy from New Mexico CID at completion of 

work. 3. Contractor responsible to verify and confirm the equipment submitted will fit within the allotted space requirements shown on the plans.   4. Any utility lines, pipeline lines or underground utility lines shown on these drawings are shown in an approximate manner only and such lines may exist where none are shown.  It is the 

responsibility of the contractor to call 811 for a locate of any and all underground utilities. 5. Contractor shall immediately contact NMSU Project Manager and appropriate utility of any damaged utilities. 6. Contractor responsible for repairing any marker utilities that are damaged as a result of construction activities. 7. The intent of the plan set is to indicate the general extent of the work required for the project.  The drawings for electrical work are diagrammatic, showing location, type of devices and equipment 

required.  The contractor shall supply all necessary equipment to facilitate the design will function as indicated by the drawings and referenced equipment. 8. Contractor will visit the site of the proposed work and thoroughly acquaint himself/herself of the existing utilities and working conditions to be encountered, etc.  9. Upon completion of the work under these drawings and specifications, the Contractor will provide the owner (NMSU Facilities and Services) with a complete set of “red‐line” drawings showing the 

“Record Drawing” condition of the installed work. 10. Perform the excavation and backfill required for work outlined in the plan set, specifications, and guidelines.  Off‐site materials will be approved by the NMSU Project Representative.  Contractor 

to provide minimum 95% compaction for all fill/backfill. 11. Contractor responsible for the removal of all waste soil materials, debris, gravel, rubbish, and old, replaced, or unused equipment resulting from Work at the construction site(s).  The waste 

material will be disposed of at a City/County approved facility.   12. Contractor solely responsible for keeping the construction site(s) clean and neat at all times. 13. Contractor responsible to provide a wash‐down pit for concrete trucks, pumps, etc. Contractor responsible for clean‐up and disposal of pit at end of work activities.  14. The Contractor is responsible for returning pavement and curbing to its original condition.  NMSU Grounds Shop will be responsible for returning the irrigation system piping and landscaping to its 

original condition.  Contractor will incur minimum damage to landscape.   15. Contractor responsible for marking and barricading construction site, site activities, and equipment for public and traffic safety. 16. The Contractor will, at all times, keep open all required exits, fire lanes, etc.   17. Contractor shall immediately notify NMSU Project Manager of any accidents or involving personnel or property not belonging to contractor. 18. Contractor required to provide submittals to NMSU project manager for approval by the design engineer on all installed equipment. 19. Contractor responsible for all third party testing required for items such a concrete and medium voltage equipment/cable. 20. Contractor responsible for repair/replacement of all product that fails to meet required specifications.   21. Concrete shall not be placed until specified compaction test results of sub‐grade have been approved by NMSU Project Manager. 22. Contractor responsible for SWIPP plan and remediation if required. 23. All road and parking lot closures or partial closures and any utility outages shall be coordinated thru the NMSU Project Manager.  A three‐week lead time is required on any closure/outage. 24. All vehicles, including contractor pick‐ups must display NMSU parking pass.  This does not apply to construction equipment (graders, backhoes, rollers, cranes, etc.) 25. All utilities, water, electrical, etc., staging area, and wash‐down pit will be coordinated with the NMSU Project Manager.  

Scope of Work for Concrete Ramp with Handrail 

Page 10: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

1. Contractor to supply and install concrete ramp and handrail as outlined by the drawings.  All concrete will be 4000 PSI rated and will be tested by the contractor using a third party testing agency.  Contractor will submit written testing reports to NMSU Project Manager.  Handrail can be constructed from available material or be prefabricated as necessary to comply with the plan set.  Contractor will submit handrail submittal to NMSU Project Representative.   

2. Contractor to supply and install all back fill material and compact to 95%  3. Contractor to supply and install clean dirt to match grade from the ramp incline to 5 feet south of the south ramp edge. 4. Contractor to supply and install sewer cleanout extension and appropriate cover. 5. Location of man gate card swipe and gate controller will be determined by length of ADA ramp.  Electrical contractor and ADA ramp contractor to coordinate locations of card reader and electrical 

conduits and card reader stanchion locations and type. 

Scope of Work for the Fence and Sliding Gate Operator. 1. Contractor to supply and install new fencing to match existing fencing; approximately 9 gauge wire fence, 8 foot height  fence with appropriate hardware to match existing fence at NMSU Police 

Department. 2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator or equivalent and concrete pad for gate operator. 3. Contractor to supply and install sliding gate 28 feet long and 8 feet high to work with sliding gate operator.  4. Contractor to supply and install all equipment related to sliding gate controller manufacturer’s instructions. 5. Contractor to supply and install two controller stanchions with bollards for Blackboard controllers; one south and one north of the gate controller. 6. Contractor to supply and install lockable man gate in northeast side of new fence.  Contact NMSU Project Manager for location. 7. Contractor to supply and install bollards along southwest sidewalk. 8. All concrete will be 4000 PSI rated.  

Scope of Work for Card Swipe Controlled Man Gate and Lockable Man Gate.   1. Contractor to supply and install two (2) 36” wide man gates to work new fence.  One man‐gate at the end of the ADA ramp to operate with man gate controller and one man gate with pad lockable 

hardware on the northeast side of the new fence.  Contact NMSU Project Manager for location of this lockable man gate. 2. Contractor to supply and install all equipment related to mounting man gate controller and card readers including stanchions, frames mounts and brackets. 3. Contractor to supply and install two controller stanchions for Blackboard card readers.  See stanchion details. 4. Contractor to supply and install bollards along southwest sidewalk. 5. Contractor to supply and install bollard on west side of north card reader island.  6. All concrete will be 4000 PSI rated. 

Scope of Work for Blackboard and Power Systems 1. Contractor to install and terminate owner supplied Blackboard control equipment per plan set. Owner supplied equipment: one blackboard controller located in communications closet; four 

Blackboard swipe units, two on the building and one for each stanchion; Blackboard cable. 2. Contractor to supply, install, and terminate power conductors, control conductors, related conduits and junction boxes, and BlackBoard equipment. 3. Contractor to supply, install, and terminate communications cables connecting to NMSU fiber systems.  Contractor to contact NMSU ICT for communications cables and terminating hardware 

specifications.   4. Contractor to supply, install and terminate conduit, conductors, GFI receptacle, box, device cover and stanchion for motorcycle charging station. 5. Contractor to supply, install and terminated all breakers for panelboard circuits. 

Page 11: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Island Detail Card Reader Stanchion and Bollards 

  

Individual Bollard Detail 

 

Page 12: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator

Electrical Information 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

Page 13: Fence and Gate Layout - Facilities & Services...2. Contractor to supply, install, and terminate Lift Master SL58501UL, ½‐HP, 120/208 volt, single‐phase, sliding gate operator