Felix Sanchez
Student Simulation Student Simulation Exercise Project 2Exercise Project 2
Project Management for ARA Engineers and Scientists
![Page 2: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/2.jpg)
2
Simulation Exercise Project 2Simulation Exercise Project 2
Request for Proposal –
read handout 4.0• RFP number as example
xx-06-RFP-DETEC-TSTM-XXXX
High energy laser target surface temperature measurement capability Directed Energy Directed Energy
Test and Evaluation Test and Evaluation Capability (DETEC)Capability (DETEC)
![Page 3: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/3.jpg)
3
Background: DETEC Programs Background: DETEC Programs Fulfill a National T&E Infrastructure RequirementFulfill a National T&E Infrastructure Requirement The Central Test and Evaluation Investment Program (CTEIP)
funds the Directed Energy Test and Evaluation Capability (DETEC) project tri-service study
• To identify, scope and prioritize shortfalls in the test and evaluation (T&E) infrastructure needed for testing joint service directed energy (DE) weapons systems
• To develop enhanced capability to test next-generation directed energy weapon systems
The High Energy Laser (HEL) Target Surface Temperature Measurement (TSTM) capability addresses one of these critical shortfalls
• Measure temperatures non-intrusively on a target’s surface when hit by a laser – extreme technical challenges to solve due to nature and physics of the problem
• Build and test and demonstrate a prototype in 18 months• Manufacture a number (12) articles in a couple of years
![Page 4: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/4.jpg)
4
Simulation Exercise Project 2: HEL TSTMSimulation Exercise Project 2: HEL TSTM A real RFP and program bid by ARA
• Complexity of project is representative of programs that ARA must win in the future to stay competitive and grow
• Dollar value $2M-$4M+ over first two years – more in out-years
Customer required use of various Management Best Practices, specifically:• Detailed Work Breakdown Structure, Integrated Master Plan, Integrated
Master Schedules, etc.• Earned Value Management • Research and Development plus build prototype • A Systems Engineering approach
▪ System Requirements Review▪ Preliminary Design Review▪ Critical Design Review▪ Test Readiness Review, etc.
More customers requiring Best Practices in the Management ApproachMore customers requiring Best Practices in the Management Approach
![Page 5: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/5.jpg)
5
Simulation Exercise – HandoutsSimulation Exercise – HandoutsSolicitation DocumentsSolicitation Documents
Must read to do the exercise• Proposal instructions to offerors (RFP)
• Evaluation criteria and standards (RFP)
• Statement of work (RFP)
Background info only provided in handouts (scan)• Performance specification
• Risk management analysis
• Concept of operations
Must read before tomorrow!Must read before tomorrow!
![Page 6: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/6.jpg)
6
Simulation Exercise Project 2: HistorySimulation Exercise Project 2: History ARA Proposal Manager and the designated Program
Manger:• Sharp engineer with previous ARA PI experience • BUT, no experience in Management Approach requiring:
▪ WBS, IMP, IMS
▪ EVMS and CDRL Format 1 and 2 Program Control reporting
▪ Large Cost Proposal “bottoms up” build-up
▪ Systems Engineering approach as part of management approach
A competitive Technical Approach and solution proposed
One of the goals for ARA PM course:One of the goals for ARA PM course:Prepare ARA’s PMs to design, Prepare ARA’s PMs to design,
organize and execute a complex organize and execute a complex project and NOT have to experience project and NOT have to experience
what this PI went throughwhat this PI went through
![Page 7: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/7.jpg)
7
Simulation Exercise (SE) 2 DLOsSimulation Exercise (SE) 2 DLOs Teams will design the program structure
• Create the Work Breakdown Structure (SE 2a)
• Design the Team Organizational structure (SE 2b)
Teams will design the Plan and the Schedule • Build the Integrated Master Plan (IMP) (SE 2c)
• Build the Integrated Master Schedule (IMS) (SE 2d)
![Page 8: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/8.jpg)
8
Assignment of TeamsAssignment of Teams Team 1
• Jennifer Albertson (PM for SE 2a)• Sarah Gray (PM for SE 2b)• Matthew Janisz (PM for SE 2c – IMP)• Clayton Tinsley (PM for SE 2d – IMS)
Team 2• Juan Archilla (PM for SE 2a)• James A. Gravelin (PM for SE 2b)• John Markey (PM for SE 2c – IMP)• Ed Sears (PM for SE 2d – IMS)
Team 3• Suzanne Bates (PM for SE 2a)• Paul J. Edwardson (PM for SE 2b)• Thomas Moser (PM for SE 2d – IMP & IMS)
Team 4• LeeAnn Bongiorno (PM for SE 2a)• Rob Phillips (PM for SE 2b)• Rob Karl (PM for SE 2c/d – IMP & IMS)
![Page 9: Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists](https://reader036.vdocuments.us/reader036/viewer/2022083008/56649f0c5503460f94c20587/html5/thumbnails/9.jpg)
9
SummarySummary Through realistic Simulated Case Studies, you will be
better prepared for a PM role on any project, whether small, mid-size or large, and on more complex projects using best practices and principles that customers expect.
Opportunity for team-building and to practice leadership skills needed to run a motivated team