federal projects - usfw region 3

50
Federal Projects Progressive Consulting Engineers, Inc.

Upload: jschelkoph

Post on 12-Apr-2017

770 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Federal Projects - USFW Region 3

Federal ProjectsProgressive Consulting Engineers, Inc.

Page 2: Federal Projects - USFW Region 3

Firm Background

• Progressive Consulting Engineers, Inc. (PCE)• Civil Engineering Consulting Firm

• Founded in 1980• 1st USFW Project in 1988 – Region 3• Registered in CCR– Small Business / Minority Owned

• Currently Under IDIQ Contract with Region 3

Page 3: Federal Projects - USFW Region 3

Firm Background Cont…

• Transportation Engineering• Minnesota Department of Transportation• Road and bridge work for Counties and Townships

• Water Supply• Water System Modeling• Pump Stations• 1,200-48,000 GPM

Page 4: Federal Projects - USFW Region 3

Firm Background Cont…

• Hydraulic Engineering• Waterway and Channel Design• Control Structure Design and Rehabilitation• Erosion Repair and Prevention Design• Dam and Spillway Rehabilitation• Watershed Analysis• HEC-RAS Modeling• Bridge Design

Page 5: Federal Projects - USFW Region 3

Region 3 Project Experience

• All 8 States

Page 6: Federal Projects - USFW Region 3

• Minnesota, Agassiz NWR• 61,000 Acres in Northern Minnesota

Page 7: Federal Projects - USFW Region 3
Page 8: Federal Projects - USFW Region 3
Page 9: Federal Projects - USFW Region 3
Page 10: Federal Projects - USFW Region 3

• Minnesota, Agassiz NWR• Road and Water Management Canal

Rehabilitation• Road Deterioration• Canal Deterioration• Erosion• Overland Flooding (1997)• Animal Burrowing

Page 11: Federal Projects - USFW Region 3

Agassiz NWRWater Management Canal/Road Project

• PCE responded• Site Visit / Report• Topographic Survey• Geotechnical Analysis / Report• Two Phase Design

Page 12: Federal Projects - USFW Region 3

Agassiz NWRWater Management Canal/Road Project

• 8 reaches totaling more than 12 miles• Phase 1 • 4 Reaches• 7.6 miles

• Phase 2• 4 Reaches • 5.2 miles

Page 13: Federal Projects - USFW Region 3

Agassiz NWRWater Management Canal/Road Project

• 60 Days / Phase• Average design rate of 800 ft / day• How did we do it?• Planning and Scheduling• Internal Deadlines• Review Timelines• Quality Control

Page 14: Federal Projects - USFW Region 3

Agassiz NWRWater Management Canal/Road Project

• Civil 3D Design Software• Reduced Plan Revision Time• Higher Detailed End Product• Improved Visualization• Dynamic Cost Estimation• GPS Machine Control

Page 15: Federal Projects - USFW Region 3
Page 16: Federal Projects - USFW Region 3

Agassiz NWRWater Management Canal/Road Project

• Met every deadline• 50% (30 days)• 95% (50 days)• 100% (60 days)

• Satisfied Regional Engineer and USFW Staff!• Craig Swedenborg• 612.713.5265

Page 17: Federal Projects - USFW Region 3

• Minnesota, Agassiz NWR• Radial Gate Structure Rehabilitation

Page 18: Federal Projects - USFW Region 3

Agassiz Radial Gate Structure

Page 19: Federal Projects - USFW Region 3

Built in 1967

Page 20: Federal Projects - USFW Region 3

Cross-Section of Structure

Page 21: Federal Projects - USFW Region 3

Agassiz NWRRadial Gate Structure Rehabilitation

• Tasks• Replace 2 Radial Gates• New Electric Hoist System• Replace Hand Railing• Rehabilitate Concrete Structure• Concrete Curbrail Extension• W-Beam Guardrail

Page 22: Federal Projects - USFW Region 3
Page 23: Federal Projects - USFW Region 3

Agassiz NWRRadial Gate Structure Rehabilitation

• Design Challenges• Maintain Flow through One Gate• 150 cfs to 1800 cfs• Required 10 foot of hydraulic protection

above work area.• Limited foot print for cofferdam.

Page 24: Federal Projects - USFW Region 3

Agassiz NWR Radial Gate Structure Rehabilitation

• Met every deadline• 50% (30 days)• 95% (60 days)• 100% (70 days)

• Satisfied Regional Engineer and USFW Staff!• Craig Swedenborg• 612.713.5265

Page 25: Federal Projects - USFW Region 3
Page 26: Federal Projects - USFW Region 3

• Squaw Creek NWR, MO• Radial Gate Structure Rehabilitation

Page 27: Federal Projects - USFW Region 3
Page 28: Federal Projects - USFW Region 3
Page 29: Federal Projects - USFW Region 3
Page 30: Federal Projects - USFW Region 3

Squaw Creek NWR Radial Gate Structure Rehabilitation

• Tasks• Replace 3 Radial Gates• New Electric Hoist System• Replace Hand Railing• Rehabilitate Concrete Structure

Page 31: Federal Projects - USFW Region 3

Squaw Creek NWR Radial Gate Structure Rehabilitation

• ARRA• 60 days• Detailed Concrete Rehabilitation

Design• Challenging Upstream / Downstream

Conditions

Page 32: Federal Projects - USFW Region 3

Squaw Creek NWR Radial Gate Structure Rehabilitation

• Met every deadline• 50% (30 days)• 95% (50 days)• 100% (60 days)

• Satisfied Regional Engineer and USFW Staff!• Craig Swedenborg• 612.713.5265

Page 33: Federal Projects - USFW Region 3

Title

Page 34: Federal Projects - USFW Region 3

Crab Orchard, ILWater Line Replacementand System Modeling

Page 35: Federal Projects - USFW Region 3

• Crab Orchard NWR– Purchases Water from Herrin, IL– Sells it to Southern Illinois University– Two Water Towers– Booster Pump Station– Watermains from 4” to 16” (deteriorated)

Page 36: Federal Projects - USFW Region 3
Page 37: Federal Projects - USFW Region 3

Crab Orchard NWR Water System Analysis

• Tasks– Construct Water System Model– Assess Fire Flow Protection– Replacement System Optimization

Page 38: Federal Projects - USFW Region 3

Other Projects with Region 3• Wisconsin– Trempealeau NWR (Bridge Design)

Page 39: Federal Projects - USFW Region 3

Other Projects with Region 3• Wisconsin– Genoa Fish Hatchery (Pump

Station/River Intake)

Page 40: Federal Projects - USFW Region 3

Other Projects with Region 3• Indiana– Big Oaks NWR Bridge Replacement

Study

Page 41: Federal Projects - USFW Region 3

Other Projects with Region 3• Michigan– Shiawassee NWR, Spalding Drain Levee

Page 42: Federal Projects - USFW Region 3

Erosion Protection Projects• Army Corps. of Engineers• HW 169 Emergency Bank Protection• Minnesota River• Feasibility Report• Environmental Assessment• Design of Riprap Protection

Page 43: Federal Projects - USFW Region 3
Page 44: Federal Projects - USFW Region 3
Page 45: Federal Projects - USFW Region 3
Page 46: Federal Projects - USFW Region 3

Erosion Protection Projects• Army Corps. of Engineers• HW 28 Emergency Bank Protection• Le Sueur River, Blue Earth, MN• Feasibility Report• Environmental Assessment• Design of Riprap Protection

Page 47: Federal Projects - USFW Region 3

Other Projects with ACOE• Onalaska Dam, Wisconsin• Phased over two seasons• Maintained a 500 cfs minimum

flow rate to prevent fish kill

Page 48: Federal Projects - USFW Region 3

Other Projects with ACOE• Renville Park Project – Minot ND• Souris River Flood Control• 7,103 feet of levees• Control Structures• Reconstruction of Roadway

“I wish to thank you and your team for the excellent design support your provided.”-Colonel Kenneth S. Kasprisin

Current Assistant Secretary of Homeland Security

Page 49: Federal Projects - USFW Region 3

Summary• Since 1988, PCE has provided high-

quality design services on dozens of projects for Region 3 and other federal agencies.

• At this time, we have an IDIQ with Region 3 that allows us to contract directly with Region 6.

• We formally offer our design services and look forward to new horizons with the Mountain - Prairie Region.

Page 50: Federal Projects - USFW Region 3

Thank you for your time.Any Questions?