(federal), islamabad [1. pwp-ii pakistan public works department]

1086
Khyber Pakhtunkhwa CCD-I Peshawar Haider Ali Shah dated 6.9.12 MNA NA-16 1 Small Bores for Drinking Water Supply Thall. 10.000 9.800 -0.200 100% 2 Pavement of Streets at Tehsil Thall. 10.000 9.800 -0.200 100% 3 Protection wall at Tehsil Thall. 5.000 4.898 -0.102 100% 4 Shingle Road at Tehsil Hango. 10.000 9.800 -0.200 100% 5 Small Bores for Drinking Water Supply at Hango. 5.000 4.900 -0.100 100% 6 Community Centre Jandi / Public Park at Darsamand. 6.000 5.880 -0.120 100% 7 Water Supply at Tehsil Thall. 4.000 3.919 -0.081 100% 7 50.000 48.997 -1.003 Haider Ali Shah dated 1.11.12 MNA NA-16 1 Protection Wall at Toarawari Darsamand & Karboga Sharifi District Hangu. 10.000 9.800 -0.200 100% 2 Pavement of Streets Naryab Torwari & Doaba District Hangu. 10.000 9.800 -0.200 100% 3 Water Supply at Shanwari & Dershi Mato Khel District Hangu. 4 Pavement of Street at Tehsil Hango. 5.000 4.900 -0.100 100% 4 25.000 24.500 -0.500 Istaqbal khan MNA NA-28 1 Construction of Small Bores for Drinking Water Supply at Gagra. 10.000 9.800 -0.200 100% 2 Construction of Small Bores for Drinking Water Supply at Daggar. 10.000 9.800 -0.200 100% 3 Construction of Small Bores for Drinking Water Supply at Mandan. 5.000 4.900 -0.100 100% 4 Construction of Small Bores for Drinking Water Supply at Totally. 5.000 4.900 -0.100 100% Implementation Status of the Prime Minister Directives Executing Agency Pakistan Public Works Department 40.000 655 01-Nov-12 39.900 01-Sep-12 177 Directive Cost Directive Date Directive No. 50.000 275 06-Sep-12 Amount Released (In Million) Name of Scheme Saving/ Excess (In Million) Phyiscal progress Executing Agency Exp. Incurred (In Million) S.No Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD Page 1

Upload: phamtu

Post on 02-Jan-2017

523 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Khyber Pakhtunkhwa

CCD-I

Peshawar

Haider Ali Shah dated 6.9.12

MNA NA-16

1 Small Bores for Drinking Water Supply Thall. 10.000 9.800 -0.200 100%

2 Pavement of Streets at Tehsil Thall. 10.000 9.800 -0.200 100%

3 Protection wall at Tehsil Thall. 5.000 4.898 -0.102 100%

4 Shingle Road at Tehsil Hango. 10.000 9.800 -0.200 100%

5Small Bores for Drinking Water Supply at

Hango.5.000 4.900 -0.100 100%

6Community Centre Jandi / Public Park at

Darsamand.6.000 5.880 -0.120 100%

7 Water Supply at Tehsil Thall. 4.000 3.919 -0.081 100%

7 50.000 48.997 -1.003

Haider Ali Shah dated 1.11.12

MNA NA-16

1Protection Wall at Toarawari Darsamand &

Karboga Sharifi District Hangu.10.000 9.800 -0.200 100%

2Pavement of Streets Naryab Torwari &

Doaba District Hangu.10.000 9.800 -0.200 100%

3Water Supply at Shanwari & Dershi Mato

Khel District Hangu.

4 Pavement of Street at Tehsil Hango. 5.000 4.900 -0.100 100%

4 25.000 24.500 -0.500

Istaqbal khan

MNA NA-28

1Construction of Small Bores for Drinking

Water Supply at Gagra.10.000 9.800 -0.200 100%

2Construction of Small Bores for Drinking

Water Supply at Daggar.10.000 9.800 -0.200 100%

3Construction of Small Bores for Drinking

Water Supply at Mandan.5.000 4.900 -0.100 100%

4Construction of Small Bores for Drinking

Water Supply at Totally.5.000 4.900 -0.100 100%

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

40.000 655 01-Nov-12

39.900 01-Sep-12177

Directive

Cost

Directive

Date

Directive

No.

50.000 275 06-Sep-12

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Page 1

Page 2: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5 Construction of Community Hall at Daggar. 5.000 4.900 -0.100 100%

6

Construction of Community Hall at Jor on the

name of Late Abdul Matin Khan (Ex-MNA). 4.900 4.800 -0.100 100%

6 39.900 39.100 -0.800

Istaqbal khan dated 1.11.12

MNA NA-28

1

Construction of Small Bores for Drinking

Water Supply at Village Amnor Shalbandi

Gagra Bajkata Dagar Wari at Tehsil Gagra

Distt: Bunner.

7.608 7.477 -0.131 100%

2Construction of Small Bores for Drinking

Water Supply at Daggar.4.000 3.920 -0.080 100%

3PCC / Katcha Road at Tehsil Daggar Distt:

Buner.4.000 3.920 -0.080 100%

4Construction of Katcha Road at Tehsil

Daggar.

5

Construction of Community Hall / pcc Road at

Village Makhranay Malasar Karapa & Daggar

Hospital.

6PCC ? Katcha Road at Tehsil Mandon /

Totalay District Bunner.4.000 3.920 -0.080 100%

7Water Supply at Tehsil Mandan / Totallay

District Buner.4.000 3.920 -0.080 100%

7 23.608 23.157 -0.451

Istaqbal khan dated 21.11.12

MNA NA-28

735 21-Nov-12 10.370 1Construction of PCC / Katcha Road at Village

Bajkata UC-Gagra District Buner.10.370 9.800 -0.570 100%

1 10.370 9.800 -0.570

39.630 01-Nov-12658

39.900 01-Sep-12177

Page 2

Page 3: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ramesh Lal dated 6.3.13

MNA NA-334

1Constructon of Small Bore at Tehsil

Mandar,Gagra & Dagar District Buner.

2Constructon of Katcha road Daggar Tehsil

Gagra District Buner.

3DWSS at Muslim Chargbag Phase-III, District

Swat.

4Constructon of Small Bore at Tehsil

Mandar,Gagra & Dagar District Buner.

4

Ramesh Lal

MNA NA-334

1Improvement / Widening of Katcha Road

Bizordum UC-Kishora District Swat.6.000 5.800 -0.200 100%

2Construction of Protection wall at Chum

Charbagh District Swat.5.000 4.900 -0.100 100%

2 11.000 10.700

Syed Zahir Shah

MPA, PK-2

1Re-Boring of Tube Well in Mohallah shah

Masoom District Peshawar.2.000 -2.000

2Re-Boring of Tube Well in Akunabad District

Peshawar.2.000 -2.000

3

Re-Boring of Tube Well in Mohallah Maskeen

abad No.3 & Shaheen Muslim Town District

Peshawar.

2.000 -2.000

4Pavment of Street Drain Pipe Culvert at UC-

Turu Mardan.2.000 -2.000

5

Const: of Streets along with Drain at

Sikandar Town,Bilal Town,Nishtarbad &

Qadrabad District Peshawar.

11.000 08-Aug-1230

10.000 897 16-Jan-13

50.000 06-Mar-131024

CCD-II, Peshawar

Page 3

Page 4: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Const: of Streets along with Drain at

Ghulbahar # 1,2,3,4 & UC-13 District

Peshawar.

7

Const: of Streets along with Drain at

Sheikhabad 1,2,3 Hussainabad UC-13 &

Islamabad etc District Peshawar.

8Water Supply Shceme at Koti Gram

Chakdara Lower Dir.2.000 -2.000

8 10.000 -10.000

Syed Zahir Ali Shah dated 24.10.12

MPA, PK-2

1

Const: of Streets along with Drain at Bilal

Town Nishtarabad & Qadrabad etc UC-9

District Peshawar.

1.000 0.755 -0.245 76%

2Const: of Streets along with Drain at Gul

Bahar etc UC-10 District Peshawar.2.000 1.075 -0.925 54%

3Const: of Streets along with Drain at

Shaheen abad UC-11 District Peshawar.1.000 0.612 -0.388 61%

4

Const: of Streets along with Drain at

Shaheen Muslim Town etc UC-12 District

Peshawar.

1.000 0.707 -0.293 71%

5

Const: of Streets along with Drain at

Sheikhanbad Hussainabad etc UC-13 District

Peshawar.

1.000 0.980 -0.020 98%

6Const: of Streets along with Drain at Lahori

Ward etc UC-14 District Peshawar.1.000 0.474 -0.526 47%

7

Const: of Streets along with Drain at Kareem

Pura Ward UC-15 District Peshawar. 1.000 0.327 -0.673 33%

8Const: of Iron Gate at Ander Sher Ward UC-

16 District Peshawar.1.000 -1.000

9Const: of Streets along with Drain at Gunj

Ward UC-19 District Peshawar.1.000 0.375 -0.625 38%

10Const: of Streets along with Drain at

Akhunabad etc UC-26 District Peshawar.1.000 0.684 -0.316 68%

15.000 24-Oct-12651

10.000 897 16-Jan-13

Page 4

Page 5: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Const: of Water Supply Line in Differenct

UC's District Peshawar.4.000 2.743 -1.257 69%

11 15.000 8.732 -6.268

Saleem Khan

MPA, PK-89

1Re-Construction of Jeepable Bridge at Prail

UC-Kot.

2 Construction of Link road at Marajal Hinlil. 1.500 1.500 100%

3 Using of Irregation Channel Drohil.

4Repair of Ajorl valay road from Thrier to

Borbar.1.000 1.000 100%

5 Construction of Link road at Arrandugol. 1.000 1.000 100%

6Construction of Grain gowdown at Mulkoh

(Uthol).0.600 0.600 100%

7 Purchase of 50 KV Transformers.

8Construction of PCC at Link road

Zargarendah.1.500 1.500 100%

9Repair & Existion of Road from Dadgardinl to

Kaldam.0.500 0.500 100%

10 Construction of PCC at Link road at Jogher. 1.500 1.500 100%

11Repair of Irregation Channel Sqelan Khan

Shotkhar Torkoti.

12 Repair of road from Birzin to Gobor. 0.500 0.500 100%

13 Construction of Achingol road Bakerabad. 0.400 0.400 100%

14Repair of Irregation Channel Madak Lashi

No.1.0.700 0.700 100%

15Construction of PCC at Link road at Baranzik

Kalzatak.0.800 0.800 100%

15 10.000 10.000

Dr.Arbab Alamgir Khan dated 11.9.12

MNA NA-02

15.000 24-Oct-12651

15.000 21-Jan-13905

CCD-III, Peshawar

Page 5

Page 6: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1Pavement of Street & Drain at Shaheen

Town District Peshawar.2.000 1.269 -0.731 63%

2Pavement of Street & Drain at University

Town District Peshawar.2.000 1.628 -0.372 81%

3Pavement of Street & Drain at Tehkal Payan

District Peshawar.3.500 3.395 -0.105 97%

4Pavement of Street & Drain at Tehkal Bala

District Peshawar.7.000 5.754 -1.246 82%

5Pavement of Street & Drain at Palosai District

Peshawar.3.500 3.430 -0.070 100%

6Pavement of Street & Drain at Malakander

District Peshawar.3.000 2.939 -0.061 100%

7Pavement of Street & Drain at Pawaka

District Peshawar.3.000 2.939 -0.061 100%

8Pavement of Street & Drain at Sufaid Dheri

District Peshawar.4.000 3.787 -0.213 100%

9Pavement of Street & Drain at Achini Bala

District Peshawar.2.500 2.452 -0.048 100%

10Pavement of Street & Drain at Landi

Baghbanan District Peshawar.2.000 1.603 -0.397 80%

11Pavement of Street & Drain at Landi Arbab

District Peshawar.2.500 2.223 -0.277 89%

12Pavement of Street, Drain & W/S at Nouthia

Qadeed District Peshawar.1.500 0.647 -0.853 43%

13Pavement of Street, Drain & W/S at Nouthia

Jadeed District Peshawar.1.500 1.373 -0.127 92%

14Pavement of Street & Drain at Cantt: (Ward-

1,2,3 & 4) District Peshawar.2.500 2.449 -0.051 100%

15Pavement of Street & Drain at Regi District

Peshawar.4.500 4.410 -0.090 100%

16Pavement of Street & Drain at Sarband

District Peshawar.3.000 2.611 -0.389 100%

17Pavement of Street & Drain at Pishtakhara

District Peshawar.2.000 1.960 -0.040 100%

17 50.000 44.869 -5.131

50.000 11-Sep-12363

Page 6

Page 7: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Noor Alam Khan dated 27.11.12

MNA NA-03

1

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Village Hassan Ghari

District Peshawar.

2.500 -2.500

2

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Pakha Ghulam District

Peshawar.

5.000 -5.000

3

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Kaneeza District

Peshawar.

10.000 -10.000

4

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Khazana District

Peshawar.

5.000 -5.000

5

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Haryana Payan District

Peshawar.

10.000 -10.000

6

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Kafoor Dheri District

Peshawar.

2.500 -2.500

7

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Haryana Payan District

Peshawar.

2.500 -2.500

8

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Larama District

Peshawar.

2.500 -2.500

9

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Daag District Peshawar. 5.000 -5.000

10

PCC pavement of Street/PCC Drain, side

wall,RCC Culvert at Chaghar Matti District

Peshawar.

5.000 -5.000

10 50.000 -50.000

50.000 27-Nov-12741

CCD, Nowshera

Page 7

Page 8: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Himayatullah Maayar dated 16.8.12

MNA NA-9

1Construction of Road / Pavement of Street at

U/C Mayar (PF-25) District Nowshera.4.200 4.189 -0.011 100%

2

Construction of Road / Pavement of Street at

U/C Shamat Pur (PF-25) District Nowshera. 4.200 4.200 100%

3Construction of Road / Pavement of Street at

U/C (PF-25) District Nowshera.4.200 4.087 -0.113 100%

4Construction of Road / Pavement of Street at

U/C Gumbat (PF-25) District Nowshera.4.200 4.190 -0.010 100%

5

Construction of Road / Pavement of Street at

U/C Mohib Banda (PF-25) District Nowshera. 4.200 4.198 -0.002 100%

6Construction of Road / Pavement of Street at

U/C (PF-25) District Nowshera.4.200 4.083 -0.117 100%

7Construction of Road / Pavement of Street at

U/C Toru (PF-25) District Nowshera.4.200 4.200 100%

8

Construction of Road / Pavement of Street at

U/C Ghala Dher (PF-25) District Nowshera. 4.200 4.187 -0.013 100%

9Construction of Road / Pavement of Street at

U/C (PF-25) District Nowshera.4.200 4.087 -0.113 100%

10

Construction of Road / Pavement of Street at

U/C Guli Bagh (PF-25) District Nowshera. 4.200 4.200 100%

11

Construction of Road / Pavement of Street at

U/C Muho Dheri (PF-25) District Nowshera. 4.000 4.192 0.192 100%

12Construction of Road / Pavement of Street at

U/C Mayar (PF-25) District Nowshera.4.000 4.079 0.079 100%

12 50.000 49.892 -0.108

50.000 16-Aug-12718

Page 8

Page 9: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Himayatullah Maayar dated 16.8.12

MNA NA-9

1Construction of Road / Pavement of Street at

Kandar District Mardan.4.000 3.983 -0.017 100%

2Construction of Road / Pavement of Street at

UC-Mohib Banda District Mardan.4.000 3.984 -0.016 100%

3Construction of Road / Pavement of Street at

UC-Toru District Mardan.4.000 3.984 -0.016 100%

4Construction of Road / Pavement of Street at

UC-Mayar District Mardan.4.000 3.985 -0.015 100%

5Construction of Road / Pavement of Street at

UC-Shamat Pur District Mardan.4.000 4.000 100%

6Construction of Road / Pavement of Street at

UC-Ghala Dher District Mardan.4.000 3.987 -0.013 100%

7Construction of Road / Pavement of Street at

UC-Gumbat District Mardan.4.000 3.986 -0.014 100%

8Construction of Road / Pavement of Street at

UC-Chak Hoti District Mardan.4.000 3.986 -0.014 100%

9Construction of Road / Pavement of Street at

UC-Par Hoti District Mardan.4.000 3.984 -0.016 100%

10Construction of Road / Pavement of Street at

UC-Sikandarai District Mardan.4.000 3.99 -0.010 100%

11Construction of Road from Nihar abad to

Mabana Dherai at District Mardan.5.000 4.961 -0.039 100%

12Construction of Road from Kanal Road to

Hoti District Mardan.5.000 4.954 -0.046 100%

12 50.000 49.784 -0.216

Haji Khanzada Khan dated 16.8.12

MNA NA-11

1Pavement of Street,Drain and Culvert at U/C

Koi Burmol District Mardan.1.900 1.900 100%

2Pavement of Street,Drain and Culvert at U/C

Babuzai District Mardan.1.900 1.900 100%

50.000 16-Aug-1258

50.000 16-Aug-12180

Page 9

Page 10: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3Pavement of Street,Drain and Culvert at U/C

Shamozai District Mardan.1.900 1.900 100%

4Pavement of Street,Drain and Culvert at U/C

Katlung-I District Mardan.1.900 1.900 100%

5Pavement of Street,Drain and Culvert at U/C

Katlung-II District Mardan.1.900 1.900 100%

6Pavement of Street,Drain and Culvert at U/C

Jamal Ghari District Mardan.1.900 1.900 100%

7Pavement of Street,Drain and Culvert at U/C

Katti ghari District Mardan.1.900 1.900 100%

8Pavement of Street,Drain and Culvert at U/C

Mardan Rural District Mardan.1.900 1.900 100%

9Pavement of Street,Drain and Culvert at U/C

Sawal Dher District Mardan.1.900 1.900 100%

10Pavement of Street,Drain and Culvert at U/C

Fatima District Mardan.1.900 1.900 100%

11Pavement of Street,Drain and Culvert at U/C

Bala Ghari District Mardan.1.900 1.900 100%

12Pavement of Street,Drain and Culvert at U/C

Shahbaz Ghari District Mardan.1.900 1.900 100%

13Pavement of Street,Drain and Culvert at U/C

Baghicha Dherai District Mardan.1.900 1.900 100%

14Pavement of Street,Drain and Culvert at U/C

Garyala District Mardan.1.900 1.900 100%

15Pavement of Street,Drain and Culvert at U/C

Khatta Khat District Mardan.1.900 1.900 100%

16Pavement of Street,Drain and Culvert at U/C

Bazar District Mardan.1.900 1.900 100%

17Pavement of Street,Drain and Culvert at U/C

Rustam District Mardan.1.900 1.900 100%

18Pavement of Street,Drain and Culvert at U/C

Bakhshalai District Mardan.1.900 1.900 100%

19Pavement of Street,Drain and Culvert at U/C

Palu Dhari District Mardan.1.900 1.900 100%

20Pavement of Street,Drain and Culvert at U/C

Kot Daulatzai District Mardan.1.900 1.900 100%

21Pavement of Street,Drain and Culvert at U/C

Machai District Mardan.1.900 1.900 100%

50.000 16-Aug-1258

Page 10

Page 11: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

22Pavement of Street,Drain and Culvert at U/C

Chargulai District Mardan.1.900 1.900 100%

23Pavement of Street,Drain and Culvert at U/C

Babanai District Mardan.1.900 1.900 100%

24Pavement of Street,Drain and Culvert at U/C

Ghari Ismailzai District Mardan.1.900 1.900 100%

25Pavement of Street,Drain and Culvert at U/C

Gujrat District Mardan.1.900 1.900 100%

26Pavement of Street,Drain and Culvert at U/C

Ghari Daulatzai District Mardan.1.900 1.900 100%

27DWSS at U/C Mian Khan Sangao District

Mardan.0.600 0.600 100%

27 50.000 50.000

Haji Khanzada Khan

MNA NA-11

1Pavement of Street,Drain, Culvert & DWSS

at U/C Bazar District Mardan.2.384 -2.384

2Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Chargulai District Mardan.3.384 -3.384

3Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C BaghichaDistrict Mardan.3.384 -3.384

4

Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Kot daulatzai District Mardan. 2.384 -2.384

5

Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Ghari daulatzai District

Mardan.

2.384 -2.384

6

Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Kot Ismailzai District Mardan. 2.384 -2.384

7Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Jamal Ghari District Mardan.2.384 -2.384

8Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Katti Ghari District Mardan.3.384 -3.384

50.000 16-Aug-1258

9/10/112504

Page 11

Page 12: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Katlung-II District Mardan.2.384 -2.384

10Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Katlung-I District Mardan.2.384 -2.384

11Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Shamozai District Mardan.2.384 -2.384

12Pavement of Street,Drain, Culvert,P/wall &

DWSS at U/C Babozai District Mardan.2.384 -2.384

13

Pavement of Street,Drain, Culvert,Shingle

road & P/wall at U/C Koi Barmol District

Mardan.

2.384 -2.384

14

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Bala Ghari District Mardan.

2.384 -2.384

15

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Machai District Mardan.

2.384 -2.384

16

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Machai District Mardan.

2.884 -2.884

17

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Rural District Mardan.

2.884 -2.884

18

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C -

Babanai District Mardan.

3.384 -3.384

19

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Fatima District Mardan.

3.384 -3.384

20

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Sawal Dher District Mardan.

2.884 -2.884

21

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Bakhshali District Mardan.

2.884 -2.884

22

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Gujart District Mardan.

2.884 -2.884

9/10/112504

Page 12

Page 13: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

23

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Khatta Khat District Mardan.

3.384 -3.384

24

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Palu Dheri District Mardan.

3.384 -3.384

25

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Rustam District Mardan.

3.000 -3.000

26

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Garyala District Mardan.

2.050 -2.050

27

Pavement of Street,Drain,

Culvert,P/wall,Shingle Road & DWSS at U/C

Shahbaz Ghari District Mardan.

3.234 -3.234

27 75.000 -75.000

Engr Muhammad Tariq Khattak dated 12.9.12

MNA NA-5

1Pavement of Street,Drain, & Retaining Wall

in Chapri UC-D.I.K District Nowshera.0.500 0.500 100%

2Pavement of Street,Drain, & Retaining Wall

in Spin Khak District Nowshera.1.000 1.000 100%

3Pavement of Street,Drain, & Retaining Wall

in Jaroba District Nowshera.1.000 1.000 100%

4Pavement of Street,Drain, & Retaining Wall

in Kottly Kala District Nowshera.1.000 1.000 100%

5

Pavement of Street,Drain, & Retaining Wall

in UC-Jalozai / Sheikhan / Haliki Banda

District Nowshera.

2.000 2.000 100%

6Pavement of Street,Drain, & Retaining Wall

in Mera Jalozai & Shabara District Nowshera. 1.500 1.500 100%

7

Pavement of Street,Drain, & Retaining Wall

in Noor abad, Tapwan, Sherafzal Karoona

District Nowshera.

1.000 1.000 100%

8

Pavement of Street & Drain in Adam Khan

Ghari, Khan Dahadar Ghari, Gharebabad

District Nowshera.

1.000 1.000 100%

100.000 12-Sep-12386 & 334

9/10/112504

Page 13

Page 14: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Pavement of Street & Drain in Rabbi-I District

Nowshera.2.000 2.000 100%

10Pavement of Street & Drain in Rabbi-II Khan

Sher Ghari District Nowshera.2.000 2.000 100%

11Hand Pumps in Dagbsud (10 Nos) District

Nowshera.1.000 1.000 100%

12Pavement of Street & Drain in Village Ali Beg

District Nowshera.1.000 1.000 100%

13Pavement of Street & Drain in Jaru & Jabba

District Nowshera.2.000 2.000 100%

14Pavement of Street & Drain in Village Qasa

Kalay & Said Gul abad District Nowshera.1.000 1.000 100%

15Pavement of Street & Drain in UC-Akbarpura

District Nowshera.2.500 2.500 100%

16

Pavement of Street & Drain in Zahi

Qabaristan,Zahi Charbagh,Zahi Miana & Zahi

Koroona District Nowshera.

1.500 1.500 100%

17Pavement of Street & Drain in UC-Mohib

Banda District Nowshera.2.000 1.932 -0.068 100%

18Pavement of Street & Drain in Chowky Drub

District Nowshera.1.500 1.500 100%

19

Pavement of Street & Drain in UC-Dagai,Dagi

Qadeem, Jadeed & Band Nabi District

Nowshera.

2.500 2.500 100%

20Pavement of Street & Drain in Azakhel Bala

District Nowshera.1.000 1.000 100%

21Pavement of Street & Drain in Azakhel Payan

District Nowshera.1.000 1.000 100%

22Pavement of Street & Drain in Pirpai District

Nowshera.2.500 2.500 100%

23Pavement of Street in Mohallah Village Pirpai

District Nowshera.1.500 1.500 100%

24Pavement of Street in Deri Kattikhel District

Nowshera.1.500 1.500 100%

25Hand Pumps (22 Nos) in UC-Badrashi

District Nowshera.2.640 2.640 100%

26Pavement of Street & Drain in Village

Badrashi District Nowshera.0.860 0.860 100%

100.000 12-Sep-12386 & 334

Page 14

Page 15: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

27

Pavement of Street, Drain & Retaining Wall

in A.C. Colony, Mandina Colony & Khattak

Colony District Nowshera.

1.000 1.000 100%

28Pavement of Street, Retaining Wall & Drain

in Tangi Khattak District Nowshera.1.000 1.000 100%

29Pavement of Street / Retaining Wall in Lakari,

Palosi Payen & Bala District Nowshera. 1.000 1.000 100%

30Pavement of Street & Drain in Ziarat Kaka

Sahib District Nowshera.2.000 2.000 100%

31Pavement of Street in UC-Kheshki Bala

District Nowshera.2.000 1.993 -0.007 100%

32Pavement of Street in UC-Kheshki Payan

District Nowshera.2.000 1.991 -0.009 100%

33Pavement of Street in UC-Ganderi District

Nowshera.2.000 1.500 -0.500 100%

34Remaining work of Bridge / Causeway Jaba

Tar UC-shah Kot District Nowshera.1.500 1.500 100%

35Pavement of Street / Drain in shah Kot Bala

District Nowshera.1.000 1.000 100%

36Causeway in Jaba Tar UC-Shahkot District

Nowshera.1.000 1.000 100%

37

Pavement of Street / Drain in Kandi Tazadin

& UC-Choky Mamvaiz District Nowshera. 1.000 1.000 100%

38Community Centre / Jarga Hall at Dak Ismail

Khel District Nowshera.5.000 4.984 -0.016 100%

39Retaining Wall in Dak Ismail Khel District

Nowshera.2.000 2.000 100%

40Water Supply Scheme at Dawar abad

D.I.K(UC) District Nowshera.0.500 0.500 100%

41Causeway at Dak Ismail Khel District

Nowshera.1.500 1.500 100%

42Foot Ball Ground / Retaining Wall in Dak

Ismail Khel District Nowshera.1.000 0.988 -0.012 100%

43Community Centre at Dagbasud District

Nowshera.2.000 -2.000 100%

44Pavement of Street Side Drain at UC-Taru

Jaba District Nowshera.2.500 2.434 -0.066 100%

100.000 12-Sep-12386 & 334

Page 15

Page 16: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

45Katcha Road from Jaba Khushik to Spin

Kanray District Nowshera.6.000 6.000 100%

46Repair / Maintenance & Widening of Katcha

Road to Balu District Nowshera.5.000 4.984 -0.016 100%

47Pavement of Street / Drain Banda Nabi UC-

Dagai District Nowshera.0.200 0.200 100%

48Pavement of Street in Spin Karay in UC-

Pahari Kati Khel District Nowshera.2.000 2.000 100%

49Community Centre at Jaba Daud Zai UC-

Mohib Banda District Nowshera.2.500 -2.500 100%

50Pavement of Street/ Drain in Momin Ghari

UC-Bohid Banda District Nowshera.1.500 1.418 -0.082 100%

51Pavement of Street / Drain in UC-Kurvi

District Nowshera.2.000 1.990 -0.010 100%

52

Road Shingling in Amandot, Khush

Mugan,Kandi Tazadin,Wapda Colony & Taru

Jaba District Nowshera.

0.800 0.800 100%

53Remaining working of (Retaining wall) in UC-

Manki Sharif District Nowshera.1.000 1.000 100%

54Hand Pump in U/C Kheshki Bala (22 Nos)

District Nowshera.1.320 1.255 -0.065 100%

55Pressure Pumps in UC-Dak Ismail Khel (10

Nos) District Nowshera.1.500 -1.500

56Pressure Pumps in UC-Spinkhak (05 Nos)

District Nowshera.0.700 -0.700

57Pressure Pumps in UC-Shah Kot (05 Nos)

District Nowshera.0.700 -0.700

58Pressure Pumps in UC-Jaba Khushak (05

Nos) District Nowshera.0.700 -0.700

59Pressure Pumps in UC-Jaba Tar (05 Nos)

District Nowshera.0.700 -0.700

60Pressure Pumps in UC-Spin Karay (05 Nos)

District Nowshera.0.700 -0.700

61Pressure Pumps in Jaroba UC-Spin Khak (05

Nos) District Nowshera.0.700 -0.700

62Pressure Pumps in UC-Kotli Khurd District

Nowshera.0.140 -0.140

63Pressure Pumps in UC-Bakhti (05 Nos)

District Nowshera.0.700 -0.700

100.000 12-Sep-12386 & 334

Page 16

Page 17: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

64Hand Pumps in UC-Curvi (20 Nos) District

Nowshera.1.200 -1.200

65Hand Pumps in UC-Khudrazai (10 Nos)

District Nowshera.0.600 -0.600

66Hand Pumps in UC-Pir Pai (03 Nos) District

Nowshera.0.180 -0.180

67 Small Bore at Amankot District Nowshera. 0.080 -0.080

68Small Bore at Khudzazai District Nowshera.

0.080 -0.080

68 100.000 85.969 -14.031

Masood Abbas Khattak dated 6.9.12

MNA NA-6

1

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Khairabad Town District Nowshera.

3.000 2.993 -0.007 100%

2

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Shaidu District Nowshera.

6.500 6.500 100%

3

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Mera Akora Khattak District Nowshera.

4.000 3.963 -0.037 100%

4

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Akora Khattak District Nowshera.

7.000 7.000 100%

5

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Aman Garh District Nowshera.

4.000 3.960 -0.040 100%

6

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Kabal River District Nowshera.

4.000 3.991 -0.009 100%

7

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

U/C Nowshera City, U/C Naway Kallay & U/C

Chowki Town District Nowshera.

6.000 5.993 -0.007 100%

100.000 12-Sep-12386 & 334

50.000 06-Sep-12276

Page 17

Page 18: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Adamzai District Nowshera.

4.000 3.818 -0.182 100%

9

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

Isori Payan District Nowshera.

4.000 3.961 -0.039 100%

10

Pavement of Street,Drain, Water

Supply,Roads,Retaining Walls & Culverts at

U/C Adamzai District Nowshera.

7.500 7.361 -0.139 100%

10 50.000 49.540 -0.460

Masood Abbas Khattak dated 18.10.12

MNA NA-6

1

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at Khair abad District

Nowshera.

7.500 7.500 100%

2

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at Akora Khattak

District Nowshera.

3.800 3.742 -0.058 100%

3

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at Merra Akora

Khattak District Nowshera.

5.500 5.497 -0.003 100%

4

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at UC-Adamzai District

Nowshera.

2.000 2.000 100%

5

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at Jehangira District

Nowshera.

2.000 2.000 100%

6

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at Wisalabad, Sais

Mandi,Kandar & Resalpur District Nowshera.9.000 8.782 -0.218 100%

7

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at UC-Pir Sabaq

District Nowshera.

4.000 3.991 -0.009 100%

43.800 18-Oct-12618

50.000 06-Sep-12276

Page 18

Page 19: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Pavement of Street,Drain, Culvert,Retaining

Walls, Community Hall & Water Supply at

Nowshera Cantt:District Nowshera.

6.000 5.592 -0.408 100%

9

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at UC-Manduri District

Nowshera.

3.000 3.000 100%

10

Pavement of Street,Drain, Culvert,Retaining

Walls & Water Supply at UC-Inzari District

Nowshera.

1.000 1.000 100%

10 43.800 43.104 -0.696

Pervaiz Khan dated 5.9.12

MNA NA-13

1

Construction of Katcha Road to Sarkoi Bala

and Payan in Godoon-Amazaia District

Swabi.

10.000 9.991 -0.009 100%

2Construction of Mettled Road from

Pabnaiance to Malik abad District Swabi.10.000 9.975 -0.025 100%

3

Construction / Extension of road to Sherdeen

Banda at Village Thandkoi District Swabi. 2.500 2.495 -0.005 100%

4Construction / Extension of road to Shimalee

Banda at Village Thandkoi District Swabi.2.500 2.495 -0.005 100%

5

Construction of Bridge at Partugay drain

Leading to Landed property of indhabitants &

PCC road from thandkoi to Marghuz District

Swabi.

5.000 4.987 -0.013 100%

6Construction / Rehabilitation of pavement

street at U/C Marghuz District Swabi.4.000 3.998 -0.002 100%

7Construction / Rehabilitation of pavement

street at U/C Topi East District Swabi.3.000 2.995 -0.005 100%

8Construction / Rehabilitation of pavement

street at U/C Topi West District Swabi.3.000 2.995 -0.005 100%

9

Construction of Female Block at Swabi Public

School, Shahmazsoor Town ship) District

Swabi.

10.000 9.962 -0.038 100%

43.800 18-Oct-12618

50.000 05-Sep-12213

Page 19

Page 20: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9 50.000 49.893 -0.107

Pervaiz Khan dated 16.10.12

MNA NA-13

1

Construction of Katcha Road to Sarkoi Bala

and Payan in Godoon-Amazaia District

Swabi.

5.000 4.990 -0.010 100%

2Construction of Mettled Road from

Pabnaiance to Malik abad District Swabi.5.000 4.995 -0.005 100%

3

Construction / Extension of road to Sherdeen

Banda at Village Thandkoi District Swabi. 5.000 4.990 -0.010 100%

4

Construction / Extension of road to Shimalee

Banda at Village Thandkoi District Swabi. 5.000 4.996 -0.004 100%

5

Construction of Bridge at Partugay drain

Leading to Landed property of indhabitants &

PCC road from thandkoi to Marghuz District

Swabi.

5.000 5.000 100%

6Construction / Rehabilitation of pavement

street at U/C Marghuz District Swabi.5.000 4.998 -0.002 100%

7Construction / Rehabilitation of pavement

street at U/C Topi East District Swabi.5.000 4.997 -0.003 100%

8Construction / Rehabilitation of pavement

street at U/C Topi West District Swabi.5.000 4.996 -0.004 100%

9

Construction of Female Block at Swabi Public

School, Shahmazsoor Town ship) District

Swabi.

5.000 4.997 -0.003 100%

10

Construction of Female Block at Swabi Public

School, Shahmazsoor Town ship) District

Swabi.

5.000 4.988 -0.012 100%

10 50.000 49.947 -0.053

50.000 582 16-Oct-12

Page 20

Page 21: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Liaqat Shabab dated 16.1.13

MPA, PK-14

10.000 -10.000

10.000 -10.000

Sher Afghan Khan dated 24.10.12

MPA, PK-26

1

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Gojar Ghari District

Mardan.

2.000 1.990 -0.010 100%

2

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Jehangir abad

District Mardan.

2.000 2.000 100%

3

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Sari Balhool District

Mardan.

2.000 2.000 100%

4

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Kot District Mardan. 2.000 1.980 -0.020 100%

5

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Saro Shah District

Mardan.

2.000 1.980 -0.020 100%

6

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Narai District

Mardan.

2.000 1.975 -0.025 100%

7

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Put Baba District

Mardan.

3.000 3.000 100%

8

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Daman-e-Koh

District Mardan.

2.000 2.000 100%

20.000 24-Oct-12640

10.000 16-Jan-13886

Page 21

Page 22: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Daman-e-Koh

District Mardan.

2.000 2.000 100%

10

Pavement of Street,Drain, Culvert &

Retaining Wall at UC-Jehangir abad

District Mardan.

1.000 1.000 100%

10 20.000 19.925 -0.075

Sher Afghan Khan dated 31.1.13

MPA, PK-26

1

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-Gojar

Ghari District Mardan.

2.000 -2.000

2

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-

Jehangir abad District Mardan.

2.000 -2.000

3

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-Sari

Balhool District Mardan.

2.000 -2.000

4

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shinglel at UC-Kot

District Mardan.

2.000 -2.000

5

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-Saro

Shah District Mardan.

2.000 -2.000

6

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-Narai

District Mardan.

7

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-Put

Baba District Mardan.

8

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-Daman-

e-Koh District Mardan.

20.000 24-Oct-12640

20.000 31-Jan-13941

Page 22

Page 23: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Pavement of Street,Drain, Culvert,Water

Supply,Side Wall & Shingle at UC-Daman-

e-Koh District Mardan.

9 10.000 -10.000

Shahi Syed dated 5.11.12

Senator

1Construction of PCC Street in UC-Kohey

Barmool Tehsil Katlung District Mardan

2Construction of PCC Street in UC-Shamozai

Tehsil Katlung District Mardan

3Construction of PCC Street in UC-Alo Tehsil

Katlung District Mardan

4Construction of PCC Street in UC-Qasmy

Tehsil Katlung District Mardan

5Construction of PCC Street in UC-Deri

Lakpani Tehsil Katlung District Mardan

6

Construction of PCC Street in UC-Mohallah

abba Khel Syeder to Mohallah Palu UC-

Babuzai Tehsil Katlung District Mardan

7Construction of DWSS at Village Babuzai

Tehsil Katlung District Mardan

8

Construction of PCC Street from Main road to

Abbu Khel Babuzai & Main road to Bharat

Khel Babuzai Tehsil Katlung District Mardan

9Construction of PCC Street in UC-Babuzai

Tehsil Katlung District Mardan

10Construction of PCC Street /DWSS in UC-

Babuzai Tehsil Katlung District Mardan

10

05-Nov-12693 83.200

20.000 31-Jan-13941

Page 23

Page 24: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Sadiq dated 7.12.12

Notable

797 07-Dec-12 1.500 1

Pavement of Street & Under Ground Pipe

Line for Sewerage & Drainage at Mohallah

Sadiq Village Karnal Sher Khan, District

Swabai.

1.500 1.405 -0.095 100%

1 1.500 1.405 -0.095

Mazhar Ali Qasam dated 1.11.12

Notable

Abdul Nabir Bangash dated 5.11.12

Senator

699 05-Nov-12 2.300 1Construction of PCC Road & Drain from

Shanai Bala to Nullah District Mansehra.

1

Muhammad Tariq Khan Swati dated 21.1.13

Notable

1Construction of PCC Road / Street at Dub No-

2 District Mansehra.1.000 -1.000

2Construction of PCC Road / Street at Dub No-

2 Near Tariq Shah District Mansehra.1.400 -1.400

3

Construction of PCC Road / Street at

Ghanda near Umer-i-Farooq Mosque District

Mansehra.

5.360 -5.360

4Construction of PCC Road / Street at Chatti

Dehri District Mansehra.1.200 -1.200

30.000 21-Jan-13909

CCD, Abbottabad

Page 24

Page 25: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5Construction of PCC Road / Street at C/o

Aurang Zeb house District Mansehra.1.000 -1.000

6Construction of PCC Road / Street at Tanoli

Mohallah Thakan District Mansehra.1.700 -1.700

7Construction of PCC Road / Street at Sarajia

District Mansehra.1.800 -1.800

8

Construction of PCC Road / Street at Lower

Nogazi near Veternary Hospital District

Mansehra.

1.100 -1.100

9Construction of PCC Road / Street at Mughal

house District Mansehra.0.215 -0.215

10

Construction of PCC Road / Street at

Mohallah Mutti abad from H.O.Abdul Waheed

District Mansehra.

0.730 -0.730

11Construction of PCC Road / Street at Sarwar

abad District Mansehra.0.435 -0.435

12

Construction of PCC Road / Street at

Mohallah Masjid Usman-e-Ghani C/o Saeed

& Nawaz District Mansehra.

1.400 -1.400

13

Construction of PCC Road / Street at Dub No-

2 C/o Nawaz Khan SwatiDistrict Mansehra. 0.760 -0.760

14Installation of 19 Nos Water Pumps in District

Mansehra.1.900 -1.900

14 20.000 -20.000

Syed Ahmed shah dated 31.1.13

MPA, PK-54

1

Construction of Shingle road Kamal Ban UC-

Kaghan Tehsil Balakot District Mansehra. 1.200 -1.200

2

Construction of PCC road Jabri Shohal UC-

Shohal Mahzullah Tehsil Balakot District

Mansehra.

1.000 -1.000

30.000 21-Jan-13909

15.000 31-Jan-13938

Page 25

Page 26: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of Shingle road Reen Mandi UC-

Sat Banni Tehsil Balakot District Mansehra. 1.000 -1.000

4Construction of Shingle road Josuocha UC-

ghanool Tehsil Balakot District Mansehra.0.500 -0.500

5

Construction of Shingle road Dheri

Battakundi UC-Kaghan Tehsil Balakot Distt:

Mansehra.

0.800 -0.800

6

Construction of PCC Street Peela Khara UC-

Balakot Tehsil Balakot District Mansehra. 0.500 -0.500

7

Construction of Shingle road Dheri Medan

UC_Kaghan Tehsil Balakot Distt: Mansehra. 0.500 -0.500

8

Construction of PCC road Gran Jarid(Phase-

II) UC-Mohandri Tehsil Balakot District

Mansehra.

1.000 -1.000

9

Construction of PCC road abbotabad

Mohallah Banda Qazi Dehrian Tehsil Balakot

District Mansehra.

0.500 -0.500

10

Construction of PCC road Jabba Mohallah

Shah Jahan shah UC-Atter Shisha Tehsil

Balakot District Mansehra.

0.500 -0.500

11

Construction of PCC Street Mohallah Kaghan

near Lari adda Mansehra Tehsil Balakot

District Mansehra.

0.800 -0.800

12Construction of PCC Street Jabbi UC-

Talahatta Tehsil Balakot District Mansehra.0.700 -0.700

13

Construction of Bridge village Baila Mohandri

UC-Mohandri Tehsil Balakot District

Mansehra.

0.600 -0.600

14

Construction of Bridge Village Sari Manoor

UC-Mohandri Tehsil Balakot District

Mansehra.

0.400 -0.400

15Construction of Katcha road Ochri Jarid UC-

Mohandri Tehsil Balakot District Mansehra.

16

Construction of Protection Wall LAMA

Battakundi UC-Kaghan Tehsil Balakot District

Mansehra.

15.000 31-Jan-13938

Page 26

Page 27: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17

Construction of Katcha road Kalas Jamal

Mari UC-Kaghan Tehsil Balakot District

Mansehra.

18

Construction of PCC Streets Kagil Talahatta

UC-Talahatta Tehsil Balakot District

Mansehra.

19Construction of PCC Streets at Hassan UC-

Garlat Tehsil Balakot District Mansehra.

20Construction of Katcha Road Lary UC-

Kaghan Tehsil Balakot District Mansehra.

21Construction of Shingle Road Lunda UC-

Talahatta Tehsil Balakot District Mansehra.

22

Construction of Katcha Irrigation Channal

Shali Jareed UC-Mohandri Tehsil Balakot

District Mansehra.

22 10.000 -10.000

Engr. Muzaffar Ul Mulk dated 31.8.12

MNA NA-29

1

Construction of Katcha / Shingle Roads in

different UC's of Tehsil Swat,Kabal & Barikot,

District Swat.

10.000 10.000 100%

2

Construction of PCC Roads / Streets in

different UC's of Tehsil Swat,Kabal & Barikot,

District Swat.

10.000 10.000 100%

3Water Supply Scheme in different UC's of

Tehsil Swat,Kabal & Barikot, District Swat.30.000 29.500 -0.500 100%

3 50.000 49.500 -0.500

50.000 31-Aug-12162

15.000 31-Jan-13938

CCD, Batkhela

Page 27

Page 28: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Engr. Muzaffar Ul Mulk dated 1.11.12

MNA NA-29

1Water Supply Scheme in different UC's of

Tehsil Swat.8.500 8.500 100%

2Water Supply Scheme in different UC's of

Tehsil Kabal.8.500 8.500 100%

3Water Supply Scheme in different UC's of

Tehsil Barikot.8.000 8.000 100%

3 25.000 25.000

Syed Allauddin dated 5.9.12

MNA NA-30

1Construction of Katcha Road at U/C Fateh

Pur, District Swat.4.500 4.500 100%

2Construction of Katcha Road at U/C Mindam,

District Swat.4.000 4.000 100%

3Construction of Katcha Road at U/C

Bartanna, District Swat.4.000 4.000 100%

4Construction of Katcha Road at U/C

Gwalerai, District Swat.4.000 4.000 100%

5Construction of Katcha Road at U/C Pir

Kalay, District Swat.4.000 4.000 100%

6Construction of Katcha Road at U/C Bihaa,

District Swat.4.500 4.500 100%

7Construction of Katcha Road at U/C Kishora,

District Swat.4.000 4.000 100%

8Construction of Katcha Road at U/C

Taligram, District Swat.4.000 4.000 100%

9Construction of Katcha Road at U/C Uthrore,

District Swat.4.500 4.500 100%

10Construction of Katcha Road at U/C Kotanai,

District Swat.4.000 4.000 100%

11Construction of Katcha Road at U/C

Chamtali, District Swat.4.000 4.000 100%

50.000 05-Sep-12218

25.000 01-Nov-12669

Page 28

Page 29: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12Construction of Katcha Road at U/C Matta

Kharari, District Swat.4.500 4.500 100%

12 50.000 50.000

Syed Allauddin dated 11.9.12

MNA NA-30

1

Construction of Katcha Road at U/C Miadam,

U/C Sakkhra & U/C Shawar, District Swat. 10.000 10.000 100%

2

DWSS at U/C Kalam,U/C Balakot, U/C

Mandiall,U/C Madyan, U/C Basheegram, U/C

Bahrain, U/C Tiraat, U/C Sakhra & U/C Pir

Kalay.

5.000 5.000 100%

3

Construction of PCC road / Street at UC-

Charbagh, UC-Gulibagh, UC-Taligram, UC-

Madyan, UC-Janu Chamtalai, UC-Kotanai,

UC-gwalerai, UC-Tirrat, UC-Fatehpur, UC-

Chupriyal, UC-Biha, UC-Sakhra, UC-Matta

Kharerai, UC-Baidarra & UC-Shawar.

20.000 20.000 100%

4

Construction of Arch Bridge, suspension

Bridges and one one RCC Bridge in UC-

Bahrain, UC-Shalpeen, UC-Charbagh, UC-

Pir Kalay, UC-Shawar, UC-Sheen & UC-

Kishawra.

15.000 15.000 100%

4 50.000 50.000

Najam UD Din Khan dated 10.9.12

MNA NA-33

1PCC Street Pavement in various UC's (NA-

33)10.000 10.000 100%

2Extension / constructin of Water Channel in

NA-331.000 1.000 100%

3Extension of Water supply schemes in

various UC of NA-3314.500 14.500 100%

40.000 10-Sep-12319

50.000 05-Sep-12218

50.000 11-Sep-12366

Page 29

Page 30: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4Const: / Rehabilitation of Retaining / Danga

Wall in Various UC of NA-331.000 1.000 100%

5Const: / Rehabilitation of Road in various UC

of NA-3310.000 10.000 100%

6 Const: of PCC street at Mataka Dir Town 2.000 2.000 100%

7 Const: of Retaining Wall police line Dir 0.500 0.500 100%

8 Const: of Road at Artango Dir Upper 1.000 1.000 100%

8 40.000 40.000

Najam UD Din Khan dated 8.10.12

MNA NA-33

1Supply & Fixation of Micro Hydel Power

Station in various UC's in District Upper Dir.20.000 19.600 -0.400 100%

2Construction of Dug Wells in various UC's in

District Upper Dir.10.000 8.000 -2.000 80%

2 30.000 27.600 -2.400

Malik Azmat Khan dated 11.9.12

MNA NA-34

1Construction of PCC Road / Streets at U/C

Gal, Zamindara, Lal Qila, Kotkay.4.000 4.000 100%

2

Construction of PCC Road / Streets at U/C

Bishgram,Haya Serai,Lajbok, Koto Haji abad. 4.000 4.000 100%

3Extension of DWSS at U/C Gal, Zmindara,Lal

Qila & Kotkay.4.000 4.000 100%

4Extension of DWSS at U/C Bishgram, Haya

Seral, Lajbok, Koto Haji Abad.4.000 4.000 100%

5Construction of PCC Road / Streets at

Balambat, Timergara, Khungi & Rabat. 4.000 4.000 100%

6

Construction of PCC Road / Streets at Bagh

Dushkhel, Shahi Khel,Noora Khel, Manjai &

Banda Gai.

4.500 4.500 100%

7Extension of DWSS at Balambat,

Timergara,Khungi & Rabat.4.000 4.000 100%

100.000 11-Sep-12365

40.000 10-Sep-12319

30.000 08-Oct-12439

Page 30

Page 31: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Extension of DWSS at Bagh Dushkhel,Shahi

Khel,Noora Khel,Manjal & Banda Gai. 4.500 4.500 100%

9

Construction of PCC Road / Streets at U/C

Munda,Mian Kalay,Sadber Kalay & Summer

Bagh.

4.000 4.000 100%

10

Construction of PCC Road / Streets at U/C

Mayar, Drangal,Khazana,Maskini, Darra &

Kambat.

4.500 4.500 100%

11

Installation of Hand pumps / Extension of

DWSS at U/C Munda,Mian Kalay,Sadber

Kalay & Summer Bagh.

4.000 4.000 100%

12

Installation of Hand pumps / Extension of

DWSS at U/C Mayar,Drangal,Khazana,

Maskini Darra & Kambat.

4.500 4.500 100%

13 PCC at Ouch / Batan Road. 9.000 9.000 100%

14 PCC at Chakdara / Khadagzai / Badwan. 6.000 6.000 100%

15DWSS / Installation of Hand Pumps at Jandol

Area.7.000 7.000 100%

16 Shingle Road at Asbanr. 4.000 4.000 100%

17 DWSS at U/C Kotigram. 4.000 4.000 100%

18 DWSS at U/C Ouch. 4.000 4.000 100%

19 DWSS at U/C Asbanr. 4.000 4.000 100%

20 DWSS at U/C Tazagram. 4.000 4.000 100%

21 DWSS at U/C Khan Pur. 4.000 4.000 100%

22 DWSS at U/C Badwan / Khadagzai. 4.000 4.000 100%

22 100.000 100.000

Lal Muhammad Khan dated 15.8.12

MNA NA-35

1Improvement of Nallah & Shingle Road at Lal

Colony UC-Thana Jadeed.1.600 1.600 100%

2 PCC Streets at Nul UC-Bandajat. 1.500 1.500 100%

3 PCC Streets at Gunlyar UC-Bandajat. 1.500 1.500 100%

4 Shingle Road at Pingen UC-Aladand. 2.500 2.500 100%

100.000 11-Sep-12365

50.000 53 15-Aug-11

Page 31

Page 32: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5 Shingle Road at UC-Deeri Julagram. 1.500 1.500 100%

6 Shingle Road at Peer Khail. 4.500 4.500 100%

7 Shingle Road at Tota khan. 4.600 4.600 100%

8 Shingle Road at UC-Agrah. 5.000 5.000 100%

9Installation of Hand Pumps at UC-Swat

Ranazai.3.000 3.000 100%

10Water Supply at UC-Malakand (Subedar Maj

Ameer).0.300 0.300 100%

11Construction / Improvement of Malakand

Picnic Spot.2.000 2.000 100%

12PCC Road at Jangal Road UC-Thana

Jadeed.2.000 2.000 100%

13Shingle Road at Totay to Seial Pattee UC-

Selai Pattee.5.000 5.000 100%

14 PCC Road at Zor Hero shah. 2.500 2.500 100%

15 PCC Road at Jabban. 1.000 1.000 100%

16Retaining Wall Stone Masonary at Tehsil

Batkhela.0.500 0.500 100%

17 PCC Road at Manna UC-Kot. 2.500 2.500 100%

18 PCC Road at Gul Dad Khan Bandal. 3.000 3.000 100%

19PCC Streets at Said Faqir Bandal UC-Dargal.

1.000 1.000 100%

20 PCC Road at Mongai. 4.000 4.000 100%

21 PCC Road at Salqra Banda UC-Guk. 0.500 0.500 100%

21 50.000 50.000

Lal Muhammad Khan dated 11.9.12

MNA NA-35

1 Shingle road at Khanroa in UC-Salai pati. 5.000 5.000 100%

2 Shingle Road in UC-Agra. 5.000 5.000 100%

3 Shingle road in UC-Totai 3.000 3.000 100%

4Installation of Hand Pumps in NA-35

Malakand (25 Nos)1.500 1.500 100%

5Construction of PCC Road / Street in UC-

Thana Jadeed.1.500 1.500 100%

100.000 359 11-Sep-12

50.000 53 15-Aug-11

Page 32

Page 33: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Dangawal at Street Mushtaq at UC-Thana

Jadeed.0.500 0.500 100%

7Serwar Khan Deri Street at UC-Thana

Jadeed.4.500 4.500 100%

8Khadim abad Street Saddiq Khan at UC-

Thana Badajat.1.000 1.000 100%

9Construction of PCC Road / Street in UC-

aladand (Israr Amandara)3.000 3.000 100%

10Construction of PCC Road / Street at UC-

Dheri (Dangawal)0.500 0.500 100%

11Construction of PCC Road / Street in UC-

Thana Badajat (Rafiq Road).1.500 1.500 100%

12Construction of PCC Road / Street in UC-

Batkhela Middle.2.500 2.500 100%

13Construction of PCC Road / Street in UC-

Batkhela Lower.2.500 2.500 100%

14Construction of PCC Road / Street in UC-

Batkhela Upper.2.500 2.500 100%

15Construction of PCC Road / Street in UC-

Khar.2.500 2.500 100%

16Construction of PCC Road / Street in UC-

Dheri Jolagram.2.000 2.000 100%

17Construction of PCC Road / Street in UC-

Dargai.3.000 3.000 100%

18Construction of PCC Road / Street in UC-

Sakhakot Khas.3.000 3.000 100%

19Construction of PCC Road / Street in UC-

Sakhakot Jadeed.3.000 3.000 100%

20Construction of PCC Road / Street in UC-

Sakhakot Bandajat.3.000 3.000 100%

21Construction of PCC Road / Street in UC-

Varteer.2.500 2.500 100%

22Construction of PCC Road / Street in UC-

Badarga (Dongawal).0.500 0.500 100%

23Construction of PCC Road / Street in UC-

Mirday.2.000 2.000 100%

24Construction of PCC Road / Street in UC-

Koper.2.000 2.000 100%

25 Black Top Road at Nava Danda. 42.000 41.500 -0.500 100%

100.000 359 11-Sep-12

Page 33

Page 34: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

25 100.000 99.500 -0.500

Mr.Saleem Khan dated 29.12.12

MPA (PK-89)

1 WSS at Dombat Dame. 0.200 0.200 100%

2 Repair of Link Road Damel to Kamsal. 0.500 0.500 100%

3 Repair of WSS at Badaool. 0.500 0.500 100%

4 WSS at Badagol. 0.300 0.300 100%

5 Electrification of Langorbat Bala Village. 0.500 0.500 100%

6 Extension of Link road Kuru Drosh. 0.300 0.300 100%

7Repair of Valley road Shisni Koh to Madak

Lasht.0.300 0.300 100%

8 Const: of F/P bund Kuru Goee Dome. 0.500 0.500 100%

9 Const: of Link Road Poteniandeh Drosh. 0.300 0.300 100%

10 Provision of Steel Pools to Village Koghuzi. 0.500 0.500 100%

11Provision of 50 KV Transfermer to Seen

Lasht.0.500 0.500 100%

12 Improvement of WSS Jughoor. 0.300 0.300 100%

13 Improvement of WSS Throiandeh Ayun. 0.500 0.500 100%

14 Repair of Romber Valley Road. 0.300 0.300 100%

15 Re-Const: of Jeepable Bridge at Bilphok. 0.300 0.300 100%

16 Const: of Link Road Miraladeh Parson. 0.300 0.300 100%

17Improvement of Karimabad Valley Road

harth Side.0.500 0.500 100%

18Improvement of Karimabad Valley Road

harth Side.0.500 0.500 100%

19 Improvement of Arkari Valley Road. 0.500 0.500 100%

20 Extension of Link Road Dangarikandeh. 0.700 0.700 100%

21Const: of Drain & Washing Place at

Garamchashma.0.800 0.800 100%

22Improvement of WSS Bazar Garamchashma.

1.000 1.000 100%

23Improvement of Link Road from Beshqeer to

Narkuret.0.400 0.400 100%

24 Provision of Steel Pools Munor Village. 1.000 1.000 100%

20.000 29-Dec-12645

Page 34

Page 35: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

25Provision of Steel Pools Al-Nasir Cluster

Organization Kandojal.0.500 0.500 100%

26 Const: of Link Road village Behmi. 1.000 1.000 100%

27 Const: of Link Road Kisik Bala. 0.500 0.500 100%

28 WSS Kochangol Ashirate. 0.500 0.500 100%

29 Repair of Road Begusht Valley. 0.500 0.500 100%

30 Improvement of WSS Town Chitral. 0.300 0.300 100%

31 Extension of WSS Orguch Payeen. 0.500 0.500 100%

32 Const: of Link Road Charangol Narkuret. 0.500 0.500 100%

33 Const: of Link Road Sher Shal Karimabad. 1.000 1.000 100%

34 Const: of Link Road Shonjor Koch Arkari. 0.200 0.200 100%

35 Const: of Link Road at Momi Deh. 0.500 0.500 100%

36 WSS & Tank at Binisar. 0.500 0.500 100%

37 Improvement of Link Road Awi Shoghore. 0.500 0.500 100%

38 Improvement of Link Road Diri Murdan. 0.300 0.300 100%

39 Const; of F/P Bund at Mough. 0.700 0.700 100%

40 Const; of F/P Bund at Murdan. 0.500 0.500 100%

40 20.000 20.000

M.Anwar Khan dated 7.11.12

MPA, PP-91

1 DWSS at UC-Qulandi. 2.000 2.000 100%

2 DWSS at UC-Urban. 2.000 2.000 100%

3 DWSS at UC-Chukiatan. 2.000 2.000 100%

4 DWSS at UC-Sawni. 2.000 2.000 100%

5 DWSS at UC-Bibyawar. 2.000 2.000 100%

6 DWSS at UC-Darora. 2.000 2.000 100%

7 DWSS at UC-Ganori. 2.000 2.000 100%

8 DWSS at UC-Barawal Bandi. 2.000 2.000 100%

9 DWSS at UC-Shahi Kot. 2.000 2.000 100%

10 DWSS at UC-Darikand. 2.000 2.000 100%

10 20.000 20.000

20.000 07-Nov-12701

20.000 29-Dec-12645

Page 35

Page 36: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

M.Anwar Khan dated 16.1.13

MPA, PP-91

1DWSS at UC-Qulandi Qashqari, Nehergah &

Belanzai etc.2.000 2.000 100%

2DWSS at UC-Urban Bakarai, Kharaw

Rokhan etc.2.000 2.000 100%

3DWSS at UC-Chukistan Hyagai, alla & New

Ghundakay etc.2.000 2.000 100%

4DWSS at UC-Sawni Dogor, Seratai,Shrmai &

Dodba etc.2.000 2.000 100%

5DWSS at UC-Bibyawar Sarai, Cheragalai

Shamorgai, Kair Dara etc.2.000 2.000 100%

6DWSS at UC-Darora Katan, gandigar Landay

shah, Kass etc.

7DWSS at UC-Ganori Surbot, Hatan,

Bachakaly etc.

8DWSS at UC-Barawal Bandi Pully Baba,

Sundrawal Tikar Kot etc.

9DWSS at UC-Shahi Kot Ziarano, Sonai

shaltalo etc.

10DWSS at UC-Darikand Shingara Kass,

Shingaragul etc.

10 10.000 10.000

Malik Badshah Saleh Khan dated 12.11.12

MPA, PP-92

1DWSS at UC-Sheringai dir Upper,Balanzai

etc.2.000 2.000 100%

2 DWSS at UC-Dir Dog Dara Dir Upper. 2.000 2.000 100%

3 DWSS at UC-Patrak Dir. 2.000 2.000 100%

4 DWSS at UC-Gawaldai Dir Upper. 2.000 2.000 100%

5 DWSS at UC-Barikot Dir Upper. 2.000 2.000 100%

6 DWSS at UC-Kalkot Dir Upper. 2.000 2.000 100%

7 DWSS at UC-Jabbar Dir Upper. 2.000 2.000 100%

20.000 12-Nov-12713

16-Jan-13890

Page 36

Page 37: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8 DWSS at UC-Tarpatar Dir Upper. 2.000 2.000 100%

9 DWSS at UC-Palam Dir Upper. 2.000 2.000 100%

10 DWSS at UC-Duslor Dir Upper. 2.000 2.000 100%

10 20.000 20.000

Malik Badshah Saleh Khan dated 16.1.13

MPA, PP-92

1DWSS at UC-Sheringai dir Upper,Balanzai

etc.2.000 2.000 100%

2 DWSS at UC-Dir Dog Dara Dir Upper. 2.000 2.000 100%

3 DWSS at UC-Patrak Dir. 2.000 2.000 100%

4 DWSS at UC-Gawaldai Dir Upper. 2.000 2.000 100%

5 DWSS at UC-Barikot Dir Upper. 2.000 2.000 100%

6 DWSS at UC-Kalkot Dir Upper.

7 DWSS at UC-Jabbar Dir Upper.

8 DWSS at UC-Tarpatar Dir Upper.

9 DWSS at UC-Palam Dir Upper.

10 DWSS at UC-Duslor Dir Upper.

10 10.000 10.000

Nawab Zada Mahmood Zeb Khan dated 16.1.13

MPA, PK-94

1

Construction of Shingle road at UC-

Norakhel,UC-Rabat, UC-Mongal, UC-

Doshkhel & UC-Khungal.

10.000 10.000 100%

2Construction of PCC Road at UC-

Shahikot,UC-Noara Khel & UC-Drushkhel.

3 DWSS at UC-Timergara & UC-Balambat.

3 10.000 10.000

10.000 16-Jan-13892

20.000 12-Nov-12713

20.000 16-Jan-13891

Page 37

Page 38: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Zamin Khan dated 10.10.12

MPA, PP-96

1Construction of Shingle Road Landai /

Luqman Banda.3.500 3.500 100%

2Construction of Shingle Road at UC-Lajbook.

3.000 3.000 100%

3 Construction of Shingle Road at UC-Kotki. 2.000 2.000 100%

4 Construction of Shingle Road at UC-Gali. 4.000 4.000 100%

5Construction of Shingle Road at UC-

Zaimdara.2.000 2.000 100%

6 Pavement of Steet in PK-96. 2.000 2.000 100%

7 PCC Road in PK-96. 2.000 2.000 100%

8Flood Protection Works in PK-96, District Dir

Lower.1.500 1.500 100%

8 20.000 20.000

Muhammad Zamin Khan dated 16.1.13

MPA, PK-96

1

Construction of Shingle road at UC-

Lanai/Luqman Banda, Lajbook UC-Kotki,UC-

Guli Dir Lower.

10.000 10.000 100%

2Construction of PCC Road at UC-Zalmdara

Dir Lower.

3DWSS at UC-Landai/Luqman Banda,Lajbook

Dir Lower.

3 10.000 10.000

Zakirullah Khan dated 16.1.13

MPA, PK-97

1

PCC Road at UC-Khanpur, Asbanr,

Tazagram,Ouch, Chakdara,

Badwan,Khadgzai & Kotigram.

20.000 893 16-Jan-13

20.000 894 16-Jan-13

20.000 10-Oct-12556

Page 38

Page 39: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2 DWSS at UC-Khanpur, Tazagram Asbanr. 5.000 5.000 100%

3DWSS at UC-Ouch,Chakdara,

Badwan,Khadgzai & Kotigram.5.000 5.000 100%

3 10.000 10.000

Zakirullah Khan dated 25.10.12

MPA, PK-97

1

PCC Road at UC-Khanpur,

Tazagram,Ouch,Chakdara,Badwan,Khadgzai

& Kotigram.

7.000 7.000 100%

2

Construction of Shingle at UC-Khanpur,

Tazagram,Ouch, Chakdara,

Badwan,Khadgzai & Kotigram.

5.000 5.000 100%

3

DWSS at UC-Khanpur,

Tazagram,Ouch,Chakdara,Badwan,Khadgzai

& Kotigram.

8.000 8.000 100%

3 20.000 20.000

Syed Muhammad Ali Shah dated 24.10.12

MPA, PF-98

1PCC/Culvert/Retining wall/Drain at UC-

Wartair.1.000 1.000 100%

2PCC/Culvert/Retining wall/Drain at UC-

Dargai.1.500 1.500 100%

3PCC/Culvert/Retining wall/Drain at UC-

Khanbasal.1.500 1.500 100%

4PCC/Culvert/Retining wall/Drain at UC-

Mehrdi.1.000 1.000 100%

5PCC/Culvert/Retining wall/Drain at UC-

Sakhakot.3.000 3.000 100%

6PCC/Culvert/Retining wall/Drain at UC-

Koper.1.500 1.500 100%

20.000 648 25-Oct-12

20.000 641 24-Oct-12

20.000 894 16-Jan-13

Page 39

Page 40: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7PCC/Culvert/Retining wall/Drain at UC-

Badraga.2.000 2.000 100%

8PCC/Culvert/Retining wall/Drain at UC-Hero

Shah.1.500 1.500 100%

9PCC/Culvert/Retining wall/Drain at UC-

G.V.Khird.1.000 1.000 100%

10 PCC/Culvert/Retining wall/Drain at UC-Kot. 1.500 1.500 100%

11PCC/Culvert/Retining wall/Drain at UC-Selay

Patti.1.500 1.500 100%

12 Installation of Hand Pumps in PK-96. 3.000 3.000 100%

12 20.000 20.000

Syed Muhammad Ali Shah dated 16.1.13

MPA, PF-98

1 Rehabilitation of Jahzono Dag Road.

2Installation of Hand Pumps / Pressure Pumps

at PK-98.5.000 5.000 100%

3

Construction of PCC Road/ Street at UC-

Badgaga,Coper, Herosha, Skhakot & Gou

Khel.

5.000 5.000 100%

3 10.000 10.000

Muhammad Hamayun Khan dated 1.11.12

MPA, PK-99

1Extension of Water Supply Schemes at Piran

Kallay, District Malakand.6.000 6.000 100%

2Water Supply Schemes from Banj Banda to

Malakand, District Malakand.6.000 6.000 100%

3Construction of PCC Road Karkani UC-Khar

District Malakand.4.000 4.000 100%

4Constructon / Extension of Road from

chappal to Sholawai District Malakand.4.000 4.000 100%

4 20.000 20.000

20.000 895 16-Jan-13

20.000 01-Nov-12654

20.000 641 24-Oct-12

Page 40

Page 41: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Hamayun Khan dated 16.1.13

MPA, PK-99

1Construction of PCC Road at shahkot to

Palai.5.000 5.000 100%

2Construction of PCC Road at at Khar Shtab

Ghar.

3 Water Supply Scheme PK-99.

4R/Wall/PCC of Street at New abadi Nal

Khwar.1.000 1.000 100%

5Construction of PCC Road at Mashahor

Malik Agra.1.000 1.000 100%

6 Construction of PCC Road at Pinjanr. 1.000 1.000 100%

7Construction of PCC Road at Serai,Pirana &

Loryan.1.000 1.000 100%

8 Construction of PCC Road at Shawe Banr.

9Construction of PCC Street at Sabar shah

Nakhtar Gwanday.1.000 1.000 100%

10 Water Supply Scheme at Jolagram.

10 10.000 10.000

Ramesh Lal dated 3.12.12

MNA, NA-334

1

Construction of Dug well,Hand Pumps water

tanks at ground mugabara Hafizabad Masjid

area Dabagaro UC-Charbagh District Swat.5.000 4.900 -0.100 100%

2Katcha Road Malam Jaba at village Spina

Obba District Swat.5.000 4.900 -0.100 100%

3

Construction of Dug well,Hand Pumps water

tanks at Genajeer Surrounding area District

Swat.

5.000 4.900 -0.100 100%

4Small Bore,Hand Pumps at Seer area District

Swat.5.000 4.900 -0.100 100%

5Water tank,Water Supply at Seer &

Surrounding area District Swat.5.000 4.900 -0.100 100%

20.000 16-Jan-13896

100.000 627 20-Dec-12

Page 41

Page 42: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Water tank,Water Supply at Malam Jaba

District Swat.5.000 4.900 -0.100 100%

7Water Supply at Telegram Seer Band

Surrounding area District Swat.5.000 4.900 -0.100 100%

8Const: of Katcha Road at Balakot District

Swat.5.000 4.900 -0.100 100%

9Const: of Katcha Road at Shinkad to

Shallaloo District Swat.5.000 4.900 -0.100 100%

10Water Supply at Shaltaloo Gat Kishawara

District Swat.5.000 4.900 -0.100 100%

11Small Bore at Walibad Alamjung wakilabad

District Swat.5.000 4.900 -0.100 100%

12 Small Bore at Guli Bagh District Swat. 5.000 4.900 -0.100 100%

13Small Bore Dakorak Sar Kalay District Swat.

5.000 4.900 -0.100 100%

14 WSS at Guli Bagh District Swat. 5.000 4.900 -0.100 100%

15Small Bore at Ashar Bunr Toha Shalam

Gandaro District Swat.5.000 4.900 -0.100 100%

16 WSS Ashar Bunr Toha Bar District Swat. 5.000 4.900 -0.100 100%

17 WSS Drushkhella Bara District Swat. 5.000 4.900 -0.100 100%

18Small Bore,Hand Pumps at Charbagh District

Swat.5.000 4.900 -0.100 100%

19 WSS at Tehsil charbagh District Swat. 5.000 4.900 -0.100 100%

20Protection wall at Khanak Dairai Charbagh

Dadgaro District Swat.5.000 4.900 -0.100 100%

20 100.000 98.000 -2.000

Zahida Khan dated 1.11.12

Senator

1Supply of Drinking Water in UC-Gall & UC-

Lal Qillah, Distt: Lower Dir.

2PCC Roads at UC-Maskeni & UC-Drangal

District Lower Dir.

100.000 661 01-Nov-12

100.000 627 20-Dec-12

Page 42

Page 43: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3Extension Widening of Roads at UC-

Zaimdara Distt: Lower Dir.

4

Const: of Retaining walls at UC-Kambat

Kalay,Darangal, Maskani,Khazana,Mayar,

Sarambag & Monda District Lower Dir.

5

Const: of PCC Roads at Zaimdara,Bishigram

Lal Qila, Gal,Kotkay,Hayasarai, Lagbook &

Koto District Lower Dir.

6

PCC Roads at UC-Kambat, Mian

kalay,Sadbar Kalay,

Darangal,Maskani,Khazana,

Mayar,Sarmabagh & Monda District Lower

Dir.

7

DWSS at Kambat,Mian Kalay, Sadbar Kalay,

Khazana,Mayar, Samar Bagh & Monda

District Lower Dir.

8

PCC Roads at Kambat,Mian Kalay, Sadbar

Kalay, Khazana,Mayar, Samar Bagh &

Monda District Lower Dir.

9

PCC Roads at Zaimdara, Bishigram, Lal

Qilla, Gal, Kotkay,Haya Sirya,Lajbok & Koto

District Lower Dir.

10DWSS at UC-Qulandai, Cukyatan & Ganori

District Lower Dir.

11DWSS at UC-Bandi,Darikand, Dir Urban &

DaroraDistrict Lower Dir.

12

DWSS at UC-Arandu,asherat,

Drosh,Shesheco,Broze,Ayun,Shagram,Chitra

l & Shogore District Lower Dir.

13

DWSS UC-Drosh,Ayun,Danin,

Darimabad,Shoqore,Garanm

Chashma,Koh,Sharum & Chirtral District

Lower Dir.

13

100.000 661 01-Nov-12

Page 43

Page 44: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Zahida Khan dated 29.12.12

Senator

1

WSS at UC-Noor Khel,Shahi

Khel,Bandagai,Dosh Khel, Khungai Urban

Timergara, Balambat,Munjai, Koto Rabat, PK-

94 District Lower Dir.

4.000 4.000 100%

2

Const: of Shingle Road at UC-Noor

Khel,Shahi Khel,Bandagai, Dosh Khel,

Khungai Urban Timergara, Balambat,Munjai,

Koto Rabat, PK-94 District Lower Dir.

6.000 6.000 100%

3

PCC Roads at UC-Noor Khel,Shahi

Khel,Bandagai,Dosh Khel, Khungai Urban

Timergara, Balambat,Munjai, Koto Rabat, PK-

94 District Lower Dir.

5.000 5.000 100%

3 15.000 15.000

Amar Jeet Malhotra dated 1.11.12

Senator

1

Renovation / Maintenance of Church,Mandar

& Gurdawaras at Peshawar,

Nowshera,Mardan,Kohat,

Buner,Dawanababa Buner & Mingora.

2

Installation of Small Bores & Fixing of Hand

Pumps at Tehsil Barikot,Shamozai,Matta,

Kabal,Bobozai District Swat.

3

Pavement of Streets in (NA-29) at Tehsil

Barikot,Shamozai, Matta,Kabal Babozal

District Swat.

3

55.000 01-Nov-12664

15.000 29-Dec-12157

Page 44

Page 45: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Kamran Khan dated 5.9.12

MNA NA-40

1

Construction of Flood Protection Band at

Village Haji Mameer Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

2

Construction of Flood Protection Band at

Village Haji Qaid-e-Azam Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

3

Construction of Flood Protection Band at

Village Ikram Ullah Kot Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

4

Construction of Flood Protection Band at

Village Shawaz Khan Kot Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

5

Construction of Flood Protection Band at

Village Noor Shall Khan Kot Mada Khel

Tehsil Datta Khel.

3.000 3.000 100%

6

Construction of Flood Protection Band at

Village Habib Kot Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

7

Construction of Flood Protection Band at

Village Iqbal Nazar Khel Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

8

Construction of Flood Protection Band at

Village Miroom Jan Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

9

Construction of Flood Protection Band at

Village Haji Anwar Khan Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

10

Construction of Flood Protection Band at

Village Haji Anwar Khan Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

11

Construction of Flood Protection Band at

Village Haji Saeed Khan Muhammad Kot

Mada Khel Tehsil Datta Khel.

3.000 3.000 100%

100.000 230 05-Sep-12

CCD, Bannu

Page 45

Page 46: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Construction of Flood Protection Band at

Village Mawla Jan Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

13

Construction of Flood Protection Band at

Village Qatawaz Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

14

Construction of Flood Protection Band at

Village Eid Wali Khan Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

15

Construction of Flood Protection Band at

Village Gul Sharif Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

16

Construction of Flood Protection Band at

Village Qamber Khan Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

17

Construction of Flood Protection Band at

Village Nazar Khel Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

18

Construction of Flood Protection Band at

Village Abdul Manan Kaza Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

19Construction of Flood Protection Band at

Village Mustafa Tehsil Datta Khel.3.000 3.000 100%

20Construction of Flood Protection Band at

Village Gul Mada Khel Tehsil Datta Khel.3.000 3.000 100%

21Construction of Flood Protection Band at

Village Asad Ullah Tehsil Datta Khel.3.000 3.000 100%

22Construction of Flood Protection Band at

Village Ashar Mada Khel Tehsil Datta Khel.3.000 3.000 100%

23Construction of Flood Protection Band at

Village Salim Mada Khel Tehsil Datta Khel.3.000 3.000 100%

24

Construction of Flood Protection Band at

Village Maizan Mada Khel Tehsil Datta Khel. 3.000 3.000 100%

25

Construction of Flood Protection Band at

Village Khwaja Khel Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

100.000 230 05-Sep-12

Page 46

Page 47: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

26

Construction of Flood Protection Band at

Village Ali Khan Khel Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

27

Construction of Flood Protection Band at

Village Saroom Macha Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

28

Construction of Flood Protection Band at

Village Latka Kazza Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

29

Construction of Flood Protection Band at

Village Khaisor Mada Khel Tehsil Datta Khel. 3.000 3.000 100%

30

Construction of Flood Protection Band at

Village Tangarai Mada Khel Tehsil Datta

Khel.

3.000 3.000 100%

31

Construction of Flood Protection Band at

various places at Village Mada Khel Tehsil

Datta Khel.

3.000 3.000 100%

32

Construction of Flood Protection Band at

various places at Village Sarband Kai Tehsil

Miranshah.

3.000 3.000 100%

33

Construction of Flood Protection Band at

various places at Village Darpa Khel Tehsil

Datta Khel.

3.000 3.000 100%

34

Construction of Flood Protection Band at

various places at Village Shah Tehsil

Miranshah.

1.000 1.000 100%

34 100.000 100.000

Muhammad Kamran Khan dated 18.10.12

MNA NA-40

1Const: of PCC Road/Street at Arif Khan

Korona Tehsil Datta Khel Mada Khel NWA.

2

Const: of PCC Road/Street at Village Datta

Khel Asghar Khan Koroona Tehsil Datta Khel

Mada Khel NWA.

50.000 597 18-Oct-12

100.000 230 05-Sep-12

Page 47

Page 48: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Const: of PCC Road/Street at Village Datta

Khel Tehsil Datta Khel Imran Koroona NWA.

4

Const: of PCC Road/Street at Village Sherani

Mada Khel Tehsil Datta Khel NWA.

5

Construction of Flood Protection Band at

Village Shami Mada Khel Tehsil Datta Khel

NWA.

6Construction of Flood Protection Band at

Asar Areal Khel Tehsil Datta Khel NWA.

7Construction of Flood Protection Band at

Muhd: Khel Tehsil Boya NWA.

8

Construction of Flood Protection Band / Spur:

at Sajid Koroona Tehsil Datta Khel NWA.

9

Construction of Flood Protection Band at

Village Datta Khel Valley Tehsil Datta Khel

NWA.

10Construction of Flood Protection Band at

Datta Khel Raghazi Tehsil Datta Khel.

11

Construction of Flood Protection Band at

Sawab-ur-Rehman at Village Kaza Mada

Khel NWA.

12Construction of Flood Protection Band at Zal

Mir Village Kaza Mada Khel NWA.

13Construction of Flood Protection Band at

Akbar Jan Kot Datta Khel NWA.

14

Construction of Flood Protection Band at

Sharif Khan Sanzali mada Khel Tehsil Datta

Khel NWA.

15Construction of Flood Protection Band at

Tariq Khan Koroona Tehsil Datta Khel.

16

Construction of Flood Protection Band at

Shahbaz Khan Nazar Khel Tehsil Datta Khel.

17Construction of Flood Protection Band at

Ghazo bund Mada Khel Tehsil Datta Khel.

50.000 597 18-Oct-12

Page 48

Page 49: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17

Noor Ul Haq Qadri dated 17.10.12

MNA NA-45

1Construction of Pre-Stressed RCC Bridge at

Mullagori Khyber Agency.

2Construction of Janaz Gah at Main

Kabrastan Mullagori Khyber Agency.

3

Construction of Protection Wall at Landi Kotal

& Jamrud Sub Division Khyber Agency.

4DWSS at Landi Kotal Jamrud Sub Division

Khyber Agency.

5DWSS at Landi Kotal Jamrud Sub Division

Khyber Agency.

5

Zafar Baig dated 7.9.12

MNA NA-47

1Construction of Flood Protection Band at

Ismail Kot FR Tank.0.500 0.490 -0.010 100%

2Construction of Flood Protection Band at Gull

Alam Kot FR Tank.4.500 4.410 -0.090 100%

3Construction of Flood Protection Band at

Muhammad Ali Kot FR Tank.5.000 4.900 -0.100 100%

4Construction of Flood Protection Band at Mir

Hawas Kot FR Tank.5.000 4.900 -0.100 100%

5Construction of Flood Protection Band at

Shafique Kot FR Tank.5.000 4.900 -0.100 100%

6Construction of Flood Protection Band at

Najib ur Rehman Kot FR Tank.5.000 4.900 -0.100 100%

7Construction of Flood Protection Band at

Mehmood Kot FR Tank.5.000 4.900 -0.100 100%

8 Installation of Dug well Zabir Kot FR Tank. 10.000 9.986 -0.014 100%

100.000 314 07-Sep-12

50.000 17-Oct-12590

Page 49

Page 50: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Construction of Flood Protection Band at

Muham-mad Hammad FR Lakki.10.000 9.950 -0.050 100%

10Construction of Flood Protection Band at

Awais Kot FR Lakki.10.000 9.712 -0.288 100%

11 Shingle Road Ibrar Kot FR Lakki. 10.000 9.706 -0.294 100%

12Installation of Dug well Haji Mastu Khan FR

Bannu.10.000 9.712 -0.288 100%

13Construction of Flood Protection Band atWali

Kot FR Bannu.10.000 10.000 100%

14 Shingle Road Hakim Khan Kot FR Bannu. 10.000 10.000 100%

14 100.000 98.466 -1.534

Zafar Baig dated 17.10.12

MNA NA-47

1Construction of Flood Protection Band at

Shiraz Khan, Kach Daryoba FR Bannu.

2Construction of Flood Protection Band at

Abdul Rehim Daryoba FR Bannu.

3Construction of Flood Protection Band at

Musa Kach Daryoba FR Bannu.

4Construction of Flood Protection Band at

Amanullah Korana Daryoba FR Bannu.

5Construction of Shingle Road at Aurangzeb

Korana Pir Tangi FR Tank.

6Construction of Flood Protection Band at

Shah Zeb Kach Pir Tangi FR Tank.

7Construction of Flood Protection Band at Gul

Alam Kach FR Tank.

8Construction of Flood Protection Band at

Syed Badsha Pir Tangi FR Tank.

9Construction of Flood Protection Band at

Muhammad Usman FR Lakki.

10Construction of Flood Protection Band at

Jahanzeb Kach FR Lakki.

11Construction of Flood Protection Band at

Doulat FR Lakki.

100.000 314 07-Sep-12

50.000 17-Oct-12584

Page 50

Page 51: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11

Akram Masih Gill dated 4.10.12

MNA NA-340

1Installation of 11 Nos Dugwells at Khwargai

area FR Bannu.10.000 9.724 -0.276 100%

2Installation of 27 Nos Pressure Pumps at

Khainder Khan Khel area FR Bannu.10.000 9.650 -0.350 100%

3Installation of 27 Nos Pressure Pumps at

Bezan Khel area FR Bannu.10.000 9.653 -0.347 100%

3 30.000 29.027 -0.973

Moulana Ata UR Rehman dated 27.2.13

MNA NA-25

1Execution of Misc: Development Schemes in

District D.I.Khan-Cum-Tank.50.000 -50.000

2Pressure Pumps in District D.I.Khan-Cum-

Tank.20.000 -20.000

2 70.000 -70.000

Moulana Fazal UR Rehman dated 27.2.13

MNA NA-26

1Execution of Misc: Development Schemes in

District D.I.Khan.51.000 -51.000

2Execution of Six Tube Wells in District

D.I.Khan.36.708 -36.708

3Execution of Misc: Development Schemes in

District Mansehra.12.292 -12.292

3 100.000 -100.000

100.000 1003 27-Feb-13

30.000 04-Oct-12503

70.000 27-Feb-131004

CCD, Dera Ismail Khan

Page 51

Page 52: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ms.Shahnaz Wazir Ali dated 30.10.12

MNA NA-290

1

Rehabilitation of Chakwal Road from Kakhra

to Bijniyal toward Govt: Girls High School

Bijnial(Ameer Abdullah house) Tehsil Gujar

Khan District Rawalpindi.

25.800 24.481 -1.319 100%

2Renovation of Govt: Primary School Hariyal

Tehsil Gujar Khan District Rawalpindi.1.480 -1.480

3Renovation of Govt: High School Bijniyal

Tehsil Gujar Khan District Rawalpindi.2.720 -2.720

3 30.000 24.481 -5.519

Fouzia Habib dated 13.12.12

MNA NA-296

1

Water Supply scheme from Lawrance

College to Ghora Gali, UC-Ghora Gali, Tehsil

Murree, District Rawalpindi.

3.500 -3.500 20%

2Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 0.572 -0.428 90%

3Const: of Road at Plasi UC-Angoori Tehsil

Murree, District Rawalpindi.4.000 -4.000 25%

4Const: of Road at Missiari UC-Missiari Tehsil

Murree, District Rawalpindi.1.500 -1.500 45%

5Improvement of Col Habib Bridge & Road at

Pharee Tehsil Murree, District Rawalpindi.5.000 -5.000 55%

6

Const: of Road at Abbasi Colony Missiari UC-

Missiari Tehsil Murree, District Rawalpindi. 1.500 -1.500 75%

7Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.3.600 -3.600 40%

8Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.5.000 -5.000 35%

60.000 802 13-Dec-12

30.000 30-Oct-12638

Punjab (North)

CCD-IV, Islamabad

Page 52

Page 53: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.500 1.010 -1.490 65%

10Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.0.500 -0.500 15%

11Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.0.500 -0.500 15%

12Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.0.500 -0.500 15%

13Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 -1.000 40%

14Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.000 -2.000 75%

15Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.800 -1.800 60%

16Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.000 -2.000 75%

17Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 1.064 0.064 85%

18Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 0.378 -0.622 80%

19Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.500 -2.500 30%

20Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 0.646 -0.354 95%

21Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.3.500 -3.500 40%

22Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.300 -1.300 30%

23Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.0.300 0.825 0.525 65%

24Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.000 -2.000 25%

25Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.0.500 -0.500 45%

26Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 -1.000 85%

27Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.000 -2.000 75%

60.000 802 13-Dec-12

Page 53

Page 54: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

28Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.000 0.657 -1.343 75%

29Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 0.863 -0.137 75%

30Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.1.000 0.534 -0.466 60%

31Const: of Road at Nandkoat UC-Tret Tehsil

Murree, District Rawalpindi.2.000 -2.000 80%

32Const: of PCC Road atBhatti Brothery Even

Chajhana UC-Mallot, District Rawalpindi.1.000 -1.000 20%

33Const: of Road at Jawa UC-Mallot Saltian,

District Rawalpindi.1.000 -1.000

33 60.000 6.549 -53.451

Ch.Pervaiz Elahi dated 5.3.13

MNA, NA-58

918 05-Mar-13 1.500 1

Construction of road from Kuddan Bazar to

Seher Village Oucha, Tehsil Murree District

Rawalpindi.

1.500 -1.500

1 1.500 -1.500

Malik Ehsan dated 17.12.12

Notable

813 17-Dec-12 51.742 1Widening / Rehabilitation of Bhadana Road

in NA-48, District Islamabad.51.742 33.979 -17.763 75%

1 51.742 33.979 -17.763

Haji Ghulam Dastgir & Malik Rizwan dated 17.12.12

Notable

814 17-Dec-12 53.846 1Water Supply Scheme Tarnol in NA-48,

District Islamabad.53.846 -53.846

1 53.846 -53.846

60.000 802 13-Dec-12

Page 54

Page 55: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Raja Jan dated 17.12.12

Notable

1

Rehabilitation of Jori Rajgan & Sangjani /

Bhadana Kalan Road in NA-48, District

Islamabad.

33.000 4.000 -29.000 65%

2PCC Road & Nallah at Chauntra in NA-48,

District Islamabad.5.000 5.000 65%

3Const: of PCC Road at Kashmir Colony &

Ittefaq Colony in NA-48, District Islamabad.4.151 4.151 65%

4W/S Scheme Shamas Colony in NA-48,

District Islamabad.5.000 5.000 65%

4 33.000 18.151 -14.849

Khan Nawazish Khan dated 17.12.12

Notable

816 17-Dec-12 43.500 1Rehabilitation of Sara-I- Kharbooza Road in

NA-48, District Islamabad.43.500 22.509 -20.991 60%

1 43.500 22.509 -20.991

C/o Raja Imran Ashraf dated 21.1.13

Notable

1

Construction of PCC Road at Chauntra/Gaya

& Adjoining Abadies F.A.Islamabad.

2

Construction of PCC Road from Kashmir

Highway to Shamas Colony F.A.Islamabad. -290.000

3Construction of PCC Road at Ittefaq Colony

Tarnol F.A.Islamabad.

4Water Supply Scheme at Shamas Colony

F.A.Islamabad.

290.000 21-Jan-13915

33.000 17-Dec-12815

290.000

Page 55

Page 56: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4 290.000 -290.000

Raja M Azhar Hussain dated 1.2.13

Notable

963 01-Feb-13 60.000 1Construction of PCC Road at Dhota Kot UC-

Dalwal to Karyala in District Chakwal.60.000 14.530 -45.470 30%

1 60.000 14.530 -45.470

Raja M Azhar Hussain dated 1.2.13

Notable

964 01-Feb-13 40.000 1Construction of PCC Roads/Streets & Path at

different UC's in District Chakwal.40.000 34.970 -5.030 90%

1 40.000 34.970 -5.030

Raja M Azhar Hussain dated 15.02.13

Notable

966 15-Feb-13 50.000 1Construction of PCC Roads / Streets at

different UC's in District Chakwal.50.000 17.031 -32.969 95%

1 50.000 17.031 -32.969

Maj Usman Nawaz Kiyani dated 11.3.13

Notable

975 11-Mar-13 0.200 1Renovation of Aviation Squardon Brefing

Rooms.0.200 -0.200

1 0.200 -0.200

Page 56

Page 57: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Mustafa Nawaz Khokhar dated 10.12.12

Notable

1Development Schemes at UC-Koral, ICT

Islamabad.

2Development Schemes at UC-Sihala, ICT

Islamabad.

3Development Schemes at UC-Rawat, ICT

Islamabad.

4Development Schemes at UC-Sohan &

Dirpa, ICT Islamabad.

5Development Schemes at UC-Tarlai, ICT

Islamabad.

6

Development Schemes at UC-Chirah,Tumair

& Shah Allah Ditta, ICT Islamabad.

7

Development Schemes at UC-

Saidpur,shahdra,Norola & Kurri, ICT

Islamabad.

8Development Schemes at UC-Phulgran, ICT

Islamabad.

8

Mr.Javed Akhtar Malik dated 13.3.13

Notable

946 13-Mar-13 150.000 1

PCC road/Retaining Wall at Dhareak Mori to

Shah Allah Ditta, Federal Area Islamabad. 150.000

1 150.000

200.000 10-Dec-12799

Page 57

Page 58: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Mr.Javed Akhtar Malik dated 13.3.13

Notable

955 13-Mar-13 50.000 1

PCC Streets in Villages Drekmohri,Seri Siral,

Shah Allah Ditta, Pind Parrian, Jangi Saydan,

Pind Hoon, Nogazzi & Mohallah Usmania in

ICT Islamabad.

50.000

1 50.000

Mr.Javed Akhtar Malik dated 13.3.13

Notable

956 13-Mar-13 50.000 1

PCC Streets in Villages Dhoke Abbasi, Golra

Sharif, Dhoke Ramzanian,Sundemar,Noon,

Badhana, Sangjani & Shams Colony in ICT

Islamabad.

50.000

1 50.000

Ghulam Murtaza Satti dated 13.3.13

Notable

996 13-Mar-13 30.000 1Construction of PCC / Katcha Roads in UC-

Kottli Sattin District Rawalpindi.30.000 4.892 -25.108 40%

1 30.000 4.892

Malik Amir Ali dated 13.3.13

Notable

957 13-Mar-13 47.500 1Extension of Water Supply Schemes at Shah

allah Ditta ICT Islamabad.47.500

1 47.500

Page 58

Page 59: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Amir Ali dated 13.3.13

Notable

972 13-Mar-13 15.000 1

Execution of Misc: Development Schemes

(PCC / Drains & Streets) in Pind Malkan, ICT

Islamabad.

15.000

1 15.000

Malik Amir Ali dated 13.3.13

Notable

973 13-Mar-13 2.638 1Up-Gradation of Dispensary of Village

Bhimbertarar, ICT Islamabad.2.638

1 2.638

Qazi Sultan Mehmood dated 13.3.13

Notable

1006 13-Mar-13 20.000 1

Construction of Box Culvert i/c Approach

Road and Retaining Walls at Nallah abadi

Mohra (Old Sohan) UC-Sohan Federal

Area Islamabad.

20.000

1 20.000

Qazi Sultan Mehmood dated 13.3.13

Notable

1Extension of Water Supply Line from Tarnol,

ICT Islamabad.

2Supply of Equipments to Tarnol Hospital, ICT

Islamabad.

2

1006 13-Mar-13 42.520

Page 59

Page 60: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Shahbaz dated 13.12.12

Notable

800 13-Dec-12 4.600 1

Water Supply Scheme in New Faisal Colony

Near EME College, Peshawar Road,

Islamabad.

1

Malik Zulfiqar Ali dated 30.1.13

Notable

913 30-Jan-13 50.000 1

Construction / Repair of roads,Pavments of

Streets and other Misc: Dev.Schemes in

Various UC's of District Jehlum.

50.000 -50.000

1 50.000 -50.000

Raja Qasim Ali Khan dated 30.1.13

Notable

914 30-Jan-13 50.000 1

Construction / Repair of roads,Pavments of

Streets and other Misc: Dev.Schemes in

Various UC's of District Jehlum.

50.000 -50.000

1 50.000 -50.000

Raja Qasim Ali Khan dated 1.2.13

Notable

949 01-Feb-13 150.000 1

Construction / Repair of roads,Pavments of

Streets and other Misc: Dev.Schemes in

Various UC's of District Jehlum.

150.000

1 150.000

CCD-V, Islamabad

Page 60

Page 61: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Zulfiqar Ali dated 1.2.13

Notable

948 01-Feb-13 150.000 1

Construction / Repair of roads,Pavments of

Streets and other Misc: Dev.Schemes in

Various UC's of District Jehlum.

150.000

1 150.000

Akram Masih Gill dated

MNA

503 1.000 1Execution of Misc. Dev: Scheme in Distt:

Rawalpindi. 1.000 -1.000

1 1.000 -1.000

Raja Pervaiz Ashraf dated 25.7.12

MNA NA-51

5 25-Jul-12 30.000 1Construction / Rehabilitation Nallah at Gujjar

Khan City, District Rawalpindi.30.000 27.416 -2.584 100%

1 30.000 27.416 -2.584

Raja Pervaiz Ashraf

MNA NA-51

1

Widening / Resurfacing of road from

G.T.Road Gujar Khan to Behlot, Tehsil Gujjar

Khan District Rawalpindi.

134.000 83.722 -50.278 100%

2

Widening / Resurfacing of road from Dhoke

Amb to Sasral, Tehsil Gujjar Khan District

Rawalpindi.

89.000 57.994 -31.006 100%

8 27-Jul-12 223.000

CCD-VIII, Islamabad

Page 61

Page 62: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2 223.000 141.716 -81.284

Raja Pervaiz Ashraf

MNA NA-51

1

Widening / Resurfacing of road from Daultala

to Sukhu to Gujar Khan G.T.Road, Tehsil

Gujjar Khan District Rawalpindi.

165.000 161.608 -3.392 100%

2

Widening / Resurfacing of road from Ratial

Chowk to Chak Beli Khan road, Tehsil Gujjar

Khan District Rawalpindi.

94.000 92.116 -1.884 100%

2 259.000 253.724 -5.276

Raja Pervaiz Ashraf

MNA NA-51

1

Widening / Resurfacing of road from Jatli

More to Sarwar Muhammad Hussain

Shaheed Tomb, Tehsil Gujjar Khan District

Rawalpindi.

29.340 27.270 -2.070 100%

2

Resurfacing of Existing Black Top road and

Construction of PCC road from Dhoke

Badhal Road (Sardar Chowk) to village Rajali

U/C Mangote) Tehsil Gujjar Khan District

Rawalpindi.

35.240 30.994 -4.246 100%

3

Widening / Resurfacing of road from Link

road Hijo Morre to Rajoa U/C Mngote, Tehsil

Gujjar Khan District Rawalpindi.

13.760 10.155 -3.605 100%

3 78.340 68.419 -9.921

Raja Pervaiz Ashraf

MNA NA-51

9 27-Jul-12 259.000

78.340 27-Jul-1210

Page 62

Page 63: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Widening / Resurfacing of road from Kool

Chowk to Mazharabad Darbar Via Alima

Abad UC Badhana, Tehsil Gujjar Khan

District Rawalpindi.

27.000 22.518 -4.482 100%

2

Widening / Resurfacing of road from

Badhana to Jund Njar Chowk Via Kool

Chowk U/C Badhana, Tehsil Gujjar Khan

District Rawalpindi.

35.250 15.991 -19.259

2 62.250 38.509 -23.741

Raja Pervaiz Ashraf

MNA NA-51

1

Construction of PCC road Kool Chowk to

Bhlote Chowk (UC-Bhadana), Tehsil Gujjar

Khan District Rawalpindi.

26.500 15.037 -11.463 100%

2

Widening / Resurfacing of road from Rakh

more Via Pari to Sukhu, Tehsil Gujjar Khan

District Rawalpindi.

82.000 76.404 -5.596 100%

2 108.500 91.441 -17.059

Raja Pervaiz Ashraf

MNA NA-51

1

Construction of PCC Road from Bewel road

to Pakka Khan Pur (UC- Hdhana) Tehsil

Gujjar Khan District Rawalpindi.

41.500 29.021 -12.479 100%

2

Construction of PCC Road from Existing road

Dhoke Rajgan to Bhai Khan G.T.Road Tehsil

Gujjar Khan District Rawalpindi.

24.000 23.442 -0.558 100%

3

Construction of PCC Road from Govt: High

School Islam Pura Jabar to Peam Tehsil

Gujjar Khan District Rawalpindi.

27.500 24.632 -2.868 100%

4

Wideing / Resurfacing of road from Jabar to

Bewel Tehsil Gujjar Khan District Rawalpindi. 90.000 83.591 -6.409 100%

183.000 27-Jul-1313

62.250 27-Jul-1211

12 27-Jul-12 108.500

Page 63

Page 64: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4 183.000 160.686 -22.314

Raja Pervaiz Ashraf

MNA NA-51

1Construction of Road from Pari to Begwal,

Tehsil Gujjar Khan District Rawalpindi.45.200 43.662 -1.538 100%

2

Construction of PCC road from Govt: Boys

High School Missa Kaswal Dhoke Bhatian to

House of Raja Azkar, Tehsil Gujjar Khan

District Rawalpindi.

19.500 19.002 -0.498 100%

2 64.700 62.664 -2.036

Raja Pervaiz Ashraf

MNA NA-51

1

Widening / Resurfacing of road from Tali

More to Danda Machina, Tehsil Gujjar Khan

District Rawalpindi.

80.200 70.263 -9.937 100%

2

Construction of PCC road from Krumb

Lodhay Via Lalyal, Tehsil Gujjar Khan District

Rawalpindi.

49.800 47.738 -2.062 100%

2 130.000 118.001 -11.999

Raja Pervaiz Ashraf

MNA NA-51

1

Construction of PCC Road Street from Bhatti

to Dokhily Tehsil Gujjar Khan District

Rawalpindi.

38.500 35.131 -3.369 100%

2

Widening / Resurfacing of Road from Jatal to

Jamal Darkhala More (3 Km) Tehsil Gujjar

Khan District Rawalpindi.

20.060 19.587 -0.473 100%

2 58.560 54.718 -3.842

15 27-Jul-12 130.000

16 27-Jul-12 58.560

14 27-Jul-12 64.700

Page 64

Page 65: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Raja Pervaiz Ashraf

MNA NA-51

1

Construction of PCC Road from Chakwal

road to Panjgran Kalan Tehsil Gujjar Khan

District Rawalpindi.

20.000 19.403 -0.597 100%

2

Widening / Resurfacing of Road from Syed

Adda to Village SyedTehsil Gujjar Khan

District Rawalpindi.

31.000 25.440 -5.560 100%

2 51.000 44.843 -6.157

Raja Pervaiz Ashraf

MNA NA-51

1

Construction of PCC Road from Kalas to

Dhoke Mustakeem Tehsil Gujjar Khan District

Rawalpindi.

10.620 9.622 -0.998 100%

2

Construction of PCC Road from 17 Mile

G.T.Road Stop Via Sangoori Painda Khan to

Sarwar Shaheed RoadTehsil Gujjar Khan

District Rawalpindi.

35.000 32.743 -2.257 100%

2 45.620 42.365 -3.255

Raja Pervaiz Ashraf

MNA NA-51

1

Widening / Resurfacing of road from Jhalyari

Moazam Shah to Tubkian Tehsil Gujjar Khan

District Rawalpindi.

25.000 22.256 -2.744 100%

2

Construction of PCC Road from Natha Road

to Sarain Tehsil Gujjar Khan District

Rawalpindi.

15.000 14.087 -0.913 100%

2 40.000 36.343 -3.657

Raja Pervaiz Ashraf

MNA NA-51

19 27-Jul-12 40.000

17 27-Jul-12 51.000

18 27-Jul-12 45.620

Page 65

Page 66: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Widening / Resufacing of road from Banth

More to Sarwar Shaheed Yadgar in Tehsil

Gujjar Khan District Rawalpindi (1.5Km)

2

Widening / Resufacing of road from Banth

More to Sarwar Shaheed Yadgar in Tehsil

Gujjar Khan District Rawalpindi.

54.500 41.000 -13.500 100%

2 54.500 41.000 -13.500

Raja Pervaiz Ashraf

MNA

1

Construction of PCC Road from Banth Ada to

Dhoke Baba Faiz Tehsil Gujjar Khan District

Rawalpindi.

12.800 5.949 -6.851 100%

2

Construction of PCC Road from Kalyam

awan to Qutab Ferozai Tehsil Gujjar Khan

District Rawalpindi.

16.000 15.095 -0.905 100%

2 28.800 21.044 -7.756

Raja Pervaiz Ashraf

MNA NA-51

1

Construction of PCC Road from Mandra

Chakwal road to Darbar Bhangali Sharif

Tehsil Gujjar Khan District Rawalpindi.

15.000 14.087 -0.913 100%

2

Construction of PCC Road Darbar Baba

Azeem to Gick Badhal Tehsil Gujjar Khan

District Rawalpindi.

7.000 5.795 -1.205 100%

2 22.000 19.882 -2.118

Raja Pervaiz Ashraf

MNA NA-51

22 27-Jul-12 22.000

21 27-Jul-12 28.800

67.000 27-Jul-1220

Page 66

Page 67: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Construction of PCC Road from Mandra

Chakwal to Village Kakhary Tehsil Gujjar

Khan District Rawalpindi.

5.500 5.123 -0.377 100%

2

Construction of PCC Road from G.T.Road to

Village Argan Tehsil Gujjar Khan District

Rawalpindi.

6.500 6.368 -0.132 100%

2 12.000 11.491 -0.509

Saqlain Ejaz Janjua

NA-51

1Construction of PCC Streets Mohra Amin UC-

Jhungle.2.000 2.000 100%

2

Construction of road Chak Sabz to Ghaiya,

Noorabad to Dhoke Butt, Darkali Khurd to

Katha, Mohra Amin Darbar Jungle Sharif Kot

Sydan Dhoke Lass UC-Jungle.

27.000 26.000 -1.000 95%

3

Construction of PCC Streets at Darkali

Kalam, Pari Sydan Dhoke Lass, Bagh

Faqirian UC-Jhungle.

5.000 4.550 -0.450 50%

4Rehabilitation / Widening of Road from

Sukhu More to Sukhu City UC-Sukhu.18.000 17.000 -1.000 95%

5Construction of PCC Streets Taju Jhungle

UC-Sahang.2.550 2.455 -0.095 100%

5 54.550 52.005 -2.545

Raja Pervaiz Ashraf

MNA NA-51

1

Const: of PCC Road from Chak Shahbaz to

Khaiya UC-Jhungle Tehsil Gujar Khan District

Rawalpindi.

21.000 -21.000

54.500 847 07-Jan-13

59.300 07-Jan-13852

23 27-Jul-12 12.000

Page 67

Page 68: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Const: of PCC Road from Panjgran road to

Darbar Heera Lal Shahbaz Qalandar UC-

Qazian Tehsil Gujar Khan District Rawalpindi.23.300 -23.300

3

Construction of Hall, 02 Nos Bath Rooms,

Prayer Room, Stairs & Rising of Boundary

wall at Press Club Gujar Khan Tehsil Gujar

Khan District Rawalpindi.

9.000 -9.000

6.000 -6.000

3 59.300 -59.300

Raja Pervaiz Ashraf

MNA NA-51

1

Const: of PCC Road from Jhand Mehlu to

Dhoke Mall UC-Jhand Mehlu Tehsil Gujar

Khan District Rawalpindi.

12.000 4.902 -7.098 70%

2

Const: of PCC Road from Bara Nagail

Railway Phattak to Hallia UC-Jhand Mehlu

Tehsil Gujar Khan District Rawalpindi.

4.000 2.500 -1.500 70%

3

Widening/Resurfacing of road from Sukho

More to Sukho City Tehsil Gujar Khan District

Rawalpindi.

32.000 18.000 -14.000 70%

4

Construction of PCC Road from Daulatala

Road to Darbar Hasal Sharif Tehsil Gujar

Khan District Rawalpindi.

6.500 4.500 -2.000 70%

4 54.500 29.902 -24.598

Raja Pervaiz Ashraf

MNA NA-51

854 59.000 1

Construction of PCC Road from Qazian to

Jabbar to Shabbir House UC-Qazian Tehsil

Gujar Khan District Rawalpindi.

59.000 18.106 -40.894 55%

1 59.000 18.106 -40.894

54.500 853 07-Jan-13

07-Jan-13

59.300 07-Jan-13852

Page 68

Page 69: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Raja Pervaiz Ashraf

MNA NA-51

1

Const: of PCC Road from Guliana road to

Dolmi Katrial UC-Mankiala Muslim Tehsil

Gujar Khan District Rawalpindi.

10.000 2.500 -7.500 50%

2

Const: of PCC Road from Rajoa Road UC-

Mangot Tehsil Gujar Khan District

Rawalpindi.

24.000 5.000 -19.000 50%

3

Construction of Retaining wall in Village

Thikrian UC-Rama Tehsil Gujar Khan District

Rawalpindi.

2.500 2.500 100%

4

Construction of PCC Streets / Retaining

Walls & Open Drains in UC-Sahang Tehsil

Gujar Khan District Rawalpindi.

10.500 2.500 -8.000 50%

5

Construction of PCC Road at Dara Kayal UC-

Jarmote Tehsil Gujar Khan District

Rawalpindi.

10.000 2.500 -7.500 50%

5 57.000 15.000

Raja Pervaiz Ashraf

MNA NA-51

1

Const: of PCC Street/ Retaining wall in UC-

Ghungrilla Tehsil Gujar Khan District

Rawalpindi.

1.200 1.200 100%

2

Const: of PCC Road from Banth Adda to

Railway Bridge UC-Kalyam Awan Tehsil

Gujar Khan District Rawalpindi.

6.250 4.900 -1.350 70%

3

Widening/Resurfacing of road from Mohra

Noori to Karsar Tehsil Gujar Khan District

Rawalpindi.

20.000 8.500 -11.500 70%

4

Construction of PCC Road from Razi Bridge

to Tal Syedian Tehsil Gujar Khan District

Rawalpindi.

14.000 9.500 -4.500 70%

54.600 856

07-Jan-13

07-Jan-13

57.000 07-Jan-13855

Page 69

Page 70: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Construction of PCC Road Dhoke

Kashmirian to Sanpal UC-Sukho Tehsil Gujar

Khan District Rawalpindi.

6.700 3.009 -3.691 70%

6

Construction of PCC Road in Village Kak UC-

Rama Tehsil Gujar Khan District Rawalpindi. 6.500 4.600 -1.900 70%

6 54.650 31.709 -22.941

Muhammad Basharat Raja

PP-5 & 6, NA-52

1Completion of Stadium Dhamial UC-Dhamial,

Rawalpindi.8.000 7.385 -0.615 100%

2Completion of Press Club, Adiala Road,

Rawalpindi.1.000 0.977 -0.023 100%

3Rehabilitation of Lukho Road Staring from

Chakra Tehsil Rawalpindi.10.000 9.717 -0.283 100%

3 19.000 18.079 -0.921

Ghulam Murtaza Satti dated 5.9.12

Notable

1

Improvement / Construction of Phagwari to

Hud road U/C Phagwari, Tehsil Murree

District Rawalpindi.

5.030 5.030 100%

2

Improvement / Construction of Pail road U/C

Phagwari, Tehsil Murree District Rawalpindi. 7.471 6.240 -1.231 100%

3

Construction of Road from Phagwari to

chorian U/C Phagwari, Tehsil Murree District

Rawalpindi.

9.833 9.798 -0.035 100%

3 22.334 21.068 -1.266

05-Sep-12 22.334 189

54.600 856

07-Jan-13

19.000 378 07-Jan-13

Page 70

Page 71: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ghulam Murtaza Satti dated 28.9.12

Notable

1

Construction of road Della Earth work &

Concrete Union Council Trait Tehsil Muree

Distt: Rawalpindi

0.700 0.425 -0.275 61%

2

Construction of road village Lakote Union

Council Numbal Tehsil Muree Distt:

Rawalpindi

0.700 -0.700

3

Construction of road Sanoha Pantti Union

Council Angori, Tehsil Muree Distt:

Rawalpindi

1.000 0.706 -0.294 71%

4

Construction of road village Phota Union

Council Phoata Earth Work+Concrete),

Tehsil Muree Distt: Rawalpindi

2.000 -2.000

5

Construction of road Ghora Kupri, Union

Council Masyari, Tehsil Muree Distt:

Rawalpindi

0.700 -0.700

6

Construction of Link road to Master Naseer

House, Union Council Masyari, Tehsil Muree

Distt: Rawalpindi (NA-50)

0.700 0.494 -0.206 71%

7Construction of Tahal road, Union Council

Bun, Tehsil Muree Distt: Rawalpindi 0.900 -0.900

8

Construction of Bamrot Mori road Union

Council Aaryari, Tehsil Kotli Satian Distt:

Rawalpindi (NA-50)

1.200 -1.200

9

Earth Work Bamlot Lehri Union Council

Araari, Tehsil Kotli Sattian Distt: Rawalpindi 0.500 -0.500

10

Repair & Maintinance Surba road village

Surba, Tehsil Kotli Sattian Distt: Rawalpindi 1.500 -1.500

11

Construction of Lower Phopandi road, Union

Council Kotli Sattian, C/o Col. Amjad &

Comandar Jameel Tehsil Muree Distt:

Rawalpindi

0.700 0.498 -0.202 71%

12Construction of Lower Phopandi road, Tehsil

Kotli Sattian Distt: Rawalpindi 0.800 -0.800

50.000 28-Sep-12465

Page 71

Page 72: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13

Const: & Earth Work of Luss Kotli road U/C

Kotli Sattian Sarrola, Tehsil Kotli Sattian Distt:

Rawalpindi (NA-50)

1.500 -1.500

14

Constructon of Hangla Gali to Kethola Union

Council Mallot Sattian, Tehsil Kotli Sattian

Distt: Rawalpindi (NA-50)

0.700 -0.700

15

Const: of road (New Alignment Kacha Trak)

Deer Kot Katwala, to Khid house, U/C Derkot

Kotli Sattian, Tehsil Kotli Sattian Distt:

Rawalpindi

1.200 -1.200

16

Construction of road Bobri chowk to Govt.

Girls Primary School, Nuker Union Council ,

Chajana Tehsil Kotli Sattian Distt: Rawalpindi

(NA-50)

0.600 -0.600

17

Construction of road Govt boys high School

to lower Bori, Union Council , Wagal Tehsil

Kotli Sattian Distt: Rawalpindi (NA-50)

0.700 -0.700

18Const: of Anwar Baig road Uinon Council

Malot Sattian Distt: Rawalpindi (NA-50)0.700 0.541 -0.159 77%

19

Construction of road Sain Matloob road

Union Council Bhattian, Tehsil Kotli Satian

Distt: Rawalpindi (NA-50)

1.500 -1.500

20

Construction of road peer Phrian road Union

Council Lehtrar Tehsil Kotli Sattian Distt:

Rawalpindi (NA-50)

1.000 -1.000

21Const: of road Delore and Union Council

Khadiot Tehsil Kahuta Distt: Rawalpindi 0.900 0.605 -0.295 67%

22

Construction of Kanesar road, Union Council

Hothla Tehsil Kahuta Distt: Rawalpindi (NA-

50)

0.800 0.568 -0.232 71%

23

Construction of Laudi road, Union Council

Hothla C/O Abid Ex: Naib Nazim Tehsil

Kahuta Distt: Rawalpindi (NA-50)

0.800 0.568 -0.232 71%

24Construction of Alioyot road Union Council

Hothla Tehsil Kahuta Distt: Rawalpindi 1.000 -1.000

25

Construction of Raja Mazhar Bhoon road ,

Union Council Hothla Tehsil Kahuta

Distt: Rawalpindi (NA-50)

1.000 0.539 -0.461 54%

50.000 28-Sep-12465

Page 72

Page 73: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

26

Construction of Dakhli Loona road ,Union

Council Dakhli Tehsil Kahuta Distt:

Rawalpindi

1.200 0.763 -0.437 64%

27

Construction of Fida Shah Road Loona ,

Union Council Dakhli Tehsil Kahuta

Distt: Rawalpindi (NA-50)

0.500 0.326 -0.174 65%

28

Construction of Moura Kamu road, Union

Council Dakhli Tehsil Kahuta Distt:

Rawalpindi

0.600 0.395 -0.205 66%

29

Installation of Submersible pumping sets for

water Supply Schemes at Gryat, Union

Council Mauwara Tehsil Kahuta Distt:

Rawalpindi

2.500 0.532 -1.968 21%

30

Construction of Road Asloua Sattian, Union

Council Mauwara Tehsil Kahuta Distt:

Rawalpindi (NA-50)

0.700 0.525 -0.175 75%

31

Construction of Bamlot Qabristan to Sao

Dania C/o Haji Sadiq Union Council

Mauawara Tehsil Kahuta Distt: Rawalpindi

(NA-50)

0.700 0.759 0.059 108%

32

Construction of Thoua Saunti road ,Union

Council Mator Tehsil Kahuta Distt:

Rawalpindi

1.200 0.717 -0.483 60%

33

Repair & Maintenance of Mera road, Brig

Rab Nawaz, Union Council Mator Tehsil

Kahuta Distt: Rawalpindi.

1.000 0.518 -0.482 52%

34Construction Karnoyian road Union Council

Beour Tehsil Kahuta Distt: Rawalpindi.0.900 -0.900

35

Construction of Road Raja Anwar-ul-

HaqUnion Council Bun Tehsil Muree Distt:

Rawalpindi (NA-50)

2.000 -2.000

36

Construction of road/Retaining wall Jaral

Abad Union Council Panjar. Tehsil Kahuta

Distt: Rawalpindi

0.700 0.727 0.027 90%

37Construction of Keral road ,Union Council

Panjar Tehsil Kahuta Distt: Rawalpindi 1.200 -1.200

38Construction of Sela Syedan Union Council

Karor, Tehsil Kotli Sattian Distt: Rawalpindi0.700 -0.700

50.000 28-Sep-12465

Page 73

Page 74: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

39

Construction of Krore road Naniyan Union

Council Karor, Tehsil Kotli Sattian Distt:

Rawalpindi (NA-50)

0.800 -0.800

40

Construction of road Darnoyian Union

Council Darnoyian Tehsil Kotli Sattian Distt:

Rawalpindi (NA-50)

1.000 0.226 -0.774 23%

41

Construction of Gali Dhok Mirzian ,Union

Council Nara Tehsil Kahuta Distt: Rawalpindi 0.300 0.213 -0.087 71%

42

Construction of Dhok Mirzian to Irzam house

, Union Council Nara Tehsil Kahuta Distt:

Rawalpindi (NA-50)

0.300 0.370 0.070 90%

43

Construction of Gali Dhok Arain Madni

Mohallah , Union Council Nara Tehsil Kahuta

Distt: Rawalpindi

0.500 0.306 -0.194 61%

44

Construction of Gali Dhok Mhra Rajgan

Ashraf Haji House , Union Council Nara

Tehsil Kahuta Distt: Rawalpindi

0.600 0.664 0.064 90%

45

Construction Gali Katarian, Mirza Zahor

house, Union Council Nara Tehsil Kahuta

Distt: Rawalpindi (NA-50)

1.000 0.296 -0.704 30%

46

Construction of Dhok Makhi Choa, Union

Council Nara Tehsil Kahuta Distt: Rawalpindi 0.400 0.575 0.175

47Installation of 02 Nos Hand Pumps UC-

Lehari Tehsil Kahuta District Rawalpindi.0.400 -0.400

48

Const of Sumbal Syedan road Charyan C/o

Shafiqat Shah Tehsil Murree Distt:

Rawalpindi.

1.000 0.370 -0.630 37%

49

Construction of Road Mitti Ka Dher Road UC-

Karor Tehsil Kottli Sattian Distt: Rawalpindi 1.000 0.465 -0.535 47%

50

Construction of Water Tank in Jhamater,

Union Council Punjar Tehsil Kahuta Distt:

Rawalpindi

0.400 -0.400

51Construction of road at village Kahlla UC-

Punjar Tehsil Murree Distt: Rawalpindi0.500 -0.500

52Construction of road from Plassi to Sani UC-

Angori Tehsil Murree Distt: Rawalpindi0.700 -0.700

50.000 28-Sep-12465

Page 74

Page 75: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

53Construction of road at Jangwari

Tehsil Kahuta Distt: Rawalpindi (NA-50)1.100 0.374 -0.726 34%

54

Construction of road Commando Ateeq

Union Council Tehsil Kahuta Distt:

Rawalpindi (NA-50)

0.500 0.318 -0.182 64%

55

Construction of road at Mallot Sattian Union

Council Punjar Tehsil Kahuta

Distt:Rawalpindi.

0.400 -0.400

56Construction of road at Asif House UC-

Chariyan Tehsil Murree Distt: Rawalpindi.0.400 -0.400

57

Installation of 2 Nos Submersible pumping

sets for water Supply Scheme at Seheri

village Nara, Union Council Nara Tehsil

Kahuta Distt: Rawalpindi (NA-50)

0.500 -0.500

58

Installation of 1 No Hand pumps, at Union

Council Santh Sarolla Tehsil Kahuta Distt:

Rawalpindi (NA-50)

0.200 -0.200

59

Installation of 2 Nos Hand pumps, at

Shameem house Tehsil Kahuta Distt:

Rawalpindi.

0.300 -0.300

59 50.000 14.383 -35.617

P.M Visit to Lawrence College Ghora Gali Murree dated 15.10.12

Annoucement

3039 15-Oct-12 20.000 1Development of Lawrence College at Ghora

Gali Tehsil Murree District Rawalpindi.

1

50.000 28-Sep-12465

Page 75

Page 76: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Raja Gustasab dated 4.12.12

Notable, NA-51

1Construction of Dispensary / BHU Tehsil

Gujar Khan District Rawalpindi.8.940 -8.940

2

Construction of Girls Secondary School in

Ward 14 & 16 Karolli Tehsil Gujar Khan

District Rawalpindi.

11.270 -11.270

3

Construction of Janaza Gah in Ward No.14 &

16 Karolli Tehsil Gujar Khan District

Rawalpindi.

4.700 -4.700

4

Construction / Widening of Saeed Ahmed

Road in Ward No.16 in Karolli Tehsil Gujar

Khan District Rawalpindi.

0.670 -0.670

4 25.580 -25.580

Brig.® Hassan , Ikhlaq Khaki, Tariq, Avais dated 7.2.13

Notable, NA-51

1Construction of PCC Streets at UC-51/1

Tehsil Gujar Khan District Rawalpindi.13.000 3.000 -10.000 30%

2Construction of PCC Streets at UC-51/2

Tehsil Gujar Khan District Rawalpindi.14.000 4.000 -10.000 30%

3Construction of PCC Streets at UC-51/3

Tehsil Gujar Khan District Rawalpindi.13.000 3.000 -10.000 30%

4

Construction of PCC road from Dhoke

Dhamial to Dera Muslim UC-Krumb Ilyas

Tehsil Gujar Khan District Rawalpindi.

6.000 2.148 -3.852 30%

5

Construction of PCC Road from Chak Naban

to Naban Syedan UC-Krumb Ilyas Tehsil

Gujar Khan District Rawalpindi.

12.000 3.600 -8.400 30%

6

Construction of PCC Road Laliani Link road

UC-Krumb Ilyas Tehsil Gujar Khan District

Rawalpindi.

2.000 1.000 -1.000 30%

6 60.000 16.748 -43.252

25.580 784 04-Dec-12

60.000 07-Feb-13958

Page 76

Page 77: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Raja Irfan, Brig® Hassan, Qazi Nauman dated 7.2.13

Notable, NA-51

1

Construction of PCC Streets at Manja

Maira,UC-Davi Tehsil Gujar Khan District

Rawalpindi.

10.000 1.500 -8.500 25%

2

Construction of PCC Streets at Mohri Rajgan

UC-Kuntrilla Tehsil Gujar Khan District

Rawalpindi.

3.600 1.500 -2.100 25%

3

Construction of PCC Road from Rakh Tara

Garh to Rakh Ghakhran Tehsil Gujar Khan

District Rawalpindi.

18.900 2.200 -16.700 25%

4

Construction of PCC road from Data Batt to

Bhal UC-Devi Tehsil Gujar Khan District

Rawalpindi.

22.000 1.497 -20.503 25%

5

Construction of PCC Road from Mangla to

Rukhia Sharif UC-Qazian Tehsil Gujar Khan

District Rawalpindi.

4.200 1.100 -3.100 25%

5 58.700 7.797 -50.903

Raja Zamir Minhas, Raja Irfan & Brg® Hassan dated 7.2.13

Notable, NA-51

1

Water Supply Scheme at Krumb Ilyas UC-

Krumb Ilyas Tehsil Gujar Khan District

Rawalpindi.

30.000 -30.000

2

Water Supply Scheme at Mohri Rajgan UC-

Kuntrilla Tehsil Gujar Khan District

Rawalpindi.

19.000 -19.000

3

Construction of PCC Road Mohra Dhamial,

Railway Line Dhoke Blulian Tehsil Gujar

Khan District Rawalpindi.

10.800 -10.800

3 59.800 -59.800

58.700 959 07-Feb-13

59.800 960 07-Feb-13

Page 77

Page 78: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Tube Wells in Na-51 (Store & Workshop Division) dated 7.2.13

Notable for Gujjar Khan, NA-51

961 07-Feb-13 42.776 1

Completion of ongoing schemes of

Installation of Tube wells & Miscro Wells in

NA-51, Tehsil Gujar Khan, District

Rawalpindi.

42.776 42.776 100%

1 42.776 42.776

FUNDS RELEASED TO NLC

1 Dualization of Mandra to Chakwal Road (64 km) 2,675.918 39%

2 Dualization of Sohawa to Chakwal Road (70 km) 3,300.000

2 5,975.918 2,300.918 3,675.000

Sheikh Aftab Ahmed dated 28.9.12

MNA, NA-57

1

Construction of PCC Road / Street & Raising

of Old Nallah at Shamasabad Village Tehsil

Hazro District Attock.

5.000 5.000 100%

2Construction of PCC Road / Street at Village

Kamra District Attock.5.000 5.000 100%

3

Re-habilitation / Improvement & Widening of

Road at Village Fatuchak Tehsil Hazro

District Attock.

5.000 5.000 100%

4

Construction of PCC Road / Street at Village

Mirza(Phase-I) Tehsil & District Attock . 5.000 5.000 100%

5

Construction of PCC Road & RCC Pipe

Causeway at Village Mirza (Bhoora) District

Attock (Phase-II).

5.000 4.831 -0.169 100%

60.000 469 28-Sep-12

PCD-II, Islamabad

2300.918 3,675.00

Page 78

Page 79: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction / Widening of PCC Road & PCC

Street & Drain at Village Haji Shah (Phase-I)

District Attock.

5.000 5.000 100%

7

Construction of PCC Road / Street & Drain at

Village Haji Shah (Phase-II) District Attock. 5.000 5.000 100%

8

Construction of PCC Road / Street at Village

Dheri Lagal & Sheen Bagh District Attock. 5.000 4.756 -0.244 100%

9

Construction of PCC Road / Street at Village

Dheri Chauhan & Construction of Janaz-e-

Gah at Village Dheri Kot District Attock.5.000 4.795 -0.205 100%

10

Construction of PCC Road / Street at Village

Mungiwali & Village Surg District Attock. 5.000 3.009 -1.991 100%

11

Construction of PCC Road / Street at Village

Garyala & Dhoke Wariach District Attock. 5.000 4.726 -0.274 100%

12Re-habilitation / Improvement & Sidening of

Road at Village Dhakhnair District Attock.5.000 4.839 -0.161 100%

12 60.000 56.956 -3.044

Syed Azmat Ali Bukhari dated 30.11.12

NA-57

761 30-Nov-12 50.000 1

Repair / Re-carpeting and Widening of

Existing Road from G.T.Road to Malahi Tola

& Attock Khurd, District Attock.

50.000 37.656 -12.344 80%

1 50.000 37.656 -12.344

Malik Shahan Hakeem Khan dated 1.10.12

MPA, PP-15

1Construction of PCC Street / Path of UC-

Akhori District Attock.1.500 1.500 100%

60.000 469 28-Sep-12

17.000 478 01-Oct-12

Page 79

Page 80: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of PCC Street of Village Baryar

near Nawazish Residence, District Attock. 0.500 0.500 100%

3Construction of PCC Street / Repair of Road

of UC-Surag Salar District Attock.3.500 3.500 100%

4Construction of PCC Street Behind Khalid

Saeed Hospital UC-I District Attock.0.700 0.700 100%

5Construction of PCC Street near Mughal-e-

Azam 3Mila Chowk District Attock.1.000 1.000 100%

6Construction of PCC Street at Noora Baba

Dhoke District Attock.1.500 1.500 100%

7Construction of PCC Street near

Choa,Sarwala District Attock.0.500 0.500 100%

8Construction of PCC Street at Khatta

Sanjwali District Attock.0.800 0.800 100%

9Construction of PCC Street at Dhoke Gama

District Attock.1.000 1.000 100%

10Repair of Road, Chungi No3 Mohallah

Muhammad Naqar District Attock.1.000 1.000 100%

11Construction of PCC Street of UC-Mirza /

Boora District Attock.2.000 2.000 100%

12Construction of Eid Gah at Sheenbagh

District Attock.3.000 2.969 -0.031 100%

12 17.000 16.969 -0.031

811 14.12.2012 Ch Ihasan ul Haque Noulatia PP 253, 10.000

811 14.12.2012 Ch Ijaz Ahmed kahloon PP 34 50.000

811 14.12.2012 Major R Abdula Rehman Rana PP 53 10.000

811 14.12.2012 Malik Fiaz Ahmed Awan PP 105 10.000

811 14.12.2012 Iftikhar Ali Babar Khaitran PP 266 10.000

811 14.12.2012 Muhammad Ashraf Khan Sohna PP 190 10.000

811 14.12.2012 Qasim Zia PP 59, 10.000

811 14.12.2012 Waseem Afzal Chan PP119, 10.000

811 14.12.2012 Raja Tariq Kiani, PP03, 10.000

811 14.12.2012 Sardar Muhammad Amanullah Khan Dareshik PP 249 10.000

17.000 478 01-Oct-12

Page 80

Page 81: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Shahan Hakeem Khan dated 14.12.12

MPA, PP-15

1Construction of PCC Street/Path of UC-

Shakardara District Attock.2.000 -2.000

2Construction of PCC Street/Path of UC-

Baryal District Attock.2.000 -2.000

3Construction of PCC Street/Path of UC-

Surag Salar District Attock.2.000 -2.000

4Construction of PCC Street/Path of UC-

Akhori District Attock.1.500 -1.500

5Construction of PCC Street/Path of UC-Mirza

District Attock.2.500 -2.500

5 10.000 -10.000

Mushahid Hussain Syed dated 1.11.12

Senator

1

Const. of House of Light School Under

Horizon International Trust at Pind Begwal,

Islamabad

4.000 -4.000

2

Const. of BT Road from Karor Road to Farm

House No.7 at Village Tumair, Distt:

Islamabad

1.500 -1.500

2 5.500 -5.500

Shahi Syed dated 5.11.12

Senator

1

Construction of Box Culvert on Water Course

(Nallah) at Mouza Mohra Noor Tehsil &

District Islamabad.

2

Construction of Retaining wall and Filling at

Mouza Mohra Noor Tehsil & District

Islamabad.

2

10.000 05-Nov-12694

10.000 14-Dec-12811

8.000 01-Nov-12675

Page 81

Page 82: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Col. ® Saleem dated 30.11.12

Notable

506 30-Nov-12 40.000 1

Construction of PCC Streets /

Roads,Nallah,Boundary Walls & Brick Soling

Streets at different Union Councils in District

Chakwal.

40.000 39.544 -0.456 100%

1 40.000 39.544 -0.456

Malik Muhammad Amir dated 30.11.12

Notable

507 30-Nov-12 50.000 1

Construction of PCC Streets /

Roads,Nallah,Boundary Walls & Brick Soling

Streets at different Union Councils in District

Chakwal.

50.000 44.980 -5.020 85%

1 50.000 44.980 -5.020

Faisal Majeed dated 30.11.11

Notable

508 30-Nov-12 50.000 1

Construction of PCC Streets /

Roads,Nallah,Boundary Walls & Brick Soling

Streets at different Union Councils in District

Chakwal.

50.000 23.214 -26.786 85%

1 50.000 23.214 -26.786

Raja Adeel Dandoot dated 30.11.12

Notable

509 30-Nov-12 50.000 1

Construction of PCC Streets /

Roads,Nallah,Boundary Walls & Brick Soling

Streets at different Union Councils in District

Chakwal.

50.000 18.510 -31.490 85%

1 50.000 18.510 -31.490

Page 82

Page 83: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ghulam Murtaza Satti dated 22.2.13

Notable

979 22-Feb-13 10.000 1Construction of Road in UC-Nurar Tehsil

Kahota District Rawalpindi.10.000 -10.000 5%

1 10.000 -10.000

CH.Pervaiz Elahi dated 28.8.12

MNA NA-58

1

Construction of Road from Govt: Girls

Primary School to Village Ismail U/C Gali

Jagir Tehsil Fateh Jang District Attock.

5.700 3.940 -1.760 100%

2Construction of Link road Rehmania

Restaurant to Usman Floor Mills Attock.2.300 1.498 -0.802 100%

2 8.000 5.438 -2.562

Sardar Saleem Haider Khan dated 30.8.12

MNA, NA-59

1Construction of Dhurnal Bya e Pass Tehsil

Fateh Jang District Attock.6.000 2.368 -3.632 39%

2

Re-habilitation / Improvement of Bhooi Garah

Road Tehsil Fateh Jang District Attock. 17.000 13.010 -3.990 100%

3Repairing of Road at Kasana Tehsil Fateh

Jang District Attock.2.000 0.381 -1.619 19%

4Construction of Causeway at Dhoke Silu

Tehsil Fateh Jang District Attock.1.000 -1.000

5Repair of Road at Soak Tehsil Fateh Jang

District Attock.1.500 -1.500

6Construction of PCC Road at Utmanabad

Tehsil Hassanabadal District Attock.0.700 0.416 -0.284 100%

34.400 30-Aug-12140

11.000 28-Aug-12112

PCD-III, Islamabad

Page 83

Page 84: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Construction of Retaining wall & Apran at

Existing Casuwey Tehsil Fateh Jang District

Attock.

0.200 0.170 -0.030 100%

6.000 -6.000

7 34.400 16.345 -18.055

Tariq Mahmood Bajwa dated 17.8.12

Mna, NA-75

1

Construction of Metalled Road Chak

No.197/RB Bagha wala District Faisalabad. 3.000 2.940 -0.060 100%

2

Construction of Metalled Road Soling/Drain

Chak No.201/RB Chandain Tallawan District

Faisalabad.

3.000 2.940 -0.060 100%

3Construction / Repairing of Metalled Road

Chak No.201/RB, District Faisalabad.2.000 1.920 -0.080 100%

4

Construction of Metalled Road Chak

No.195/RB Jundian wala, District Faisalabad. 2.400 1.870 -0.530 100%

5

Construction of Soling/Drain Chak

No.191/RB Moloani Herla, District

Faisalabad.

1.600 1.580 -0.020 100%

6

Construction of Soling/Drain Chak

No.191/RB Moloani Barain, District

Faisalabad.

1.000 0.980 -0.020 100%

7

Construction of Soling/Drain Chak

No.187/RB Katcha Jhumra, District

Faisalabad.

1.000 0.980 -0.020 100%

34.400 30-Aug-12140

44.000 17-Aug-1265

CCD, Faisalabad

Punjab (Central)

Page 84

Page 85: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Construction of Soling/Drain Chak

No.165/RB, District Faisalabad.0.766 0.729 -0.037 100%

9

Construction / Repairing of Metalled Road

Chak No.113/JB, Phali, District Faisalabad. 2.000 1.970 -0.030 100%

10

Construction of Metalled Road and

Soling/Drain Chak No.162/RB District

Faisalabad.

3.000 1.980 -1.020 100%

11Construction of Soling/Drain Chak No.69/RB,

District Faisalabad.3.000 2.960 -0.040 100%

12

Construction of Rooms at Primary School

Chak No.162/RB Mustafa abad, District

Faisalabad.

3.000 1.250 -1.750 100%

13Construction of Soling/Drain Chak

No.145/RB, District Faisalabad.1.000 0.946 -0.054 100%

14Construction of Soling/Drain Chak

No.144/RB Ghartal, District Faisalabad.1.000 0.980 -0.020 100%

15Construction of Nala Chak No.132/RB Sahoo

Wala, District Faisalabad.3.500 3.420 -0.080 100%

16Construction of Nala Chak No.129/RB,

District Faisalabad.2.000 1.940 -0.060 100%

17Construction of Soling/Drain Chak No.18/JB,

District Faisalabad.1.000 0.980 -0.020 100%

18Construction of Soling/Drain Chak No.23/JB,

District Faisalabad.1.000 0.975 -0.025 100%

19Construction of Tuff Paver Chak No.162/RB

Mustafa abad, District Faisalabad.3.650 3.580 -0.070 100%

20Construction of Soling/Drain Chak No.74/RB,

District Faisalabad.2.000 1.956 -0.044 100%

21Construction of Soling/Drain Chak

No.141/RB Aaqal, District Faisalabad.1.000 0.965 -0.035 100%

22Construction of Janaz Gah Chak No.190/RB

Karari District Faisalabad.2.084 2.065 -0.019 100%

22 44.000 39.906 -4.094

44.000 17-Aug-1265

Page 85

Page 86: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Tariq Mahmood Bajwa dated 23.11.12

Mna, NA-75

1Construction of Soling/Drain Chak No.19/JB

Kado Kay, District Faisalabad.1.000 0.988 -0.012 100%

2Construction of Soling/Drain Chak No.65/RB

Ringal Ringal, District Faisalabad.1.000 0.994 -0.006 100%

3Const: of Soling/Drain Chak No.71/RB

Balowala, Fsd.1.500 1.491 -0.009 100%

4Construction of Soling/Drain Chak

No.197/RB Bhagay wala, District Faisalabad.1.500 1.490 -0.010 100%

5

Construction of Soling/Drain Chak

No.201/RB Chandian Talawan, District

Faisalabad.

1.000 0.989 -0.011 100%

6Construction of Soling/Drain, P.C.C.Road

Chak Jhumra City, District Faisalabad.2.500 2.479 -0.021 100%

7Repairing of Metalled Road Chak No.192/RB

Kalwan, District Faisalabad.2.864 2.834 -0.030 100%

8Construction of Soling/Drain Chak

No.141/RB Sadar wala, District Faisalabad.1.000 0.980 -0.020 100%

9

Construction of Soling/Drain Chak

No.146/RB Dow wala & Khawa, District

Faisalabad.

1.500 1.425 -0.075 100%

10Construction of Soling/Drain Chak

No.188/RB Nalay wala, District Faisalabad.1.000 0.983 -0.017 100%

11

Construction of Soling/Drain Chak

No.150/RB Madwana Badlay, District

Faisalabad.

1.000 0.992 -0.008 100%

12Construction of Soling/Drain Chak No.59/RB

Abadi Gandi Wand, District Faisalabad.1.000 0.992 -0.008 100%

13Const: of Soling/Drain Chak No.93/RB,

District Faisalabad.1.500 1.456 -0.044 100%

55.000 23-Nov-12751

Page 86

Page 87: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14Construction of Soling/Drain Chak No.43/RB

Peroana Darbar, District Faisalabad.3.000 2.982 -0.018 100%

15Construction of Soling/Drain Chak

No.151/RB Wangwain, District Faisalabad.1.000 0.990 -0.010 100%

16Construction of Metalled Road / Soling/Drain

Chak No.57/RB, District Faisalabad.2.500 2.485 -0.015 100%

17Const: of Soling/Drain Chak No.21/JB,

District Faisalabad.0.753 0.744 -0.009 100%

18

Construction of Soling/Drain Chak

No.162/RB Sikandar Pur, District

Faisalabad.

1.000 0.992 -0.008 100%

19Construction of Nala and Soling Chak

No.139/RB Ghummi, District Faisalabad.2.342 2.310 -0.032 100%

20Construction of Soling/Drain Chak

No.159/RB Bilal Nagar, District Faisalabad.1.000 0.980 -0.020 100%

21Construction of Soling/Drain Chak No.24/JB

Lahrain, District Faisalabad.1.000 0.993 -0.007 100%

22Construction of Soling/Drain Chak No.73/RB

Tibbi, District Faisalabad.1.000 0.975 -0.025 100%

23Construction of Soling/Drain Chak No.73/RB

Karain wala, District Faisalabad.1.000 0.978 -0.022 100%

24Const: of Soling/Drain Chak No.72/RB,

District Faisalabad.1.000 0.975 -0.025 100%

25Construction / Repairing of Metalled Road

Chak No.74/RB Lohkay, District Faisalabad.1.053 1.015 -0.038 100%

26Construction of Metalled Road Chak

No.77/RB Lohkay, District Faisalabad.2.032 1.995 -0.037 100%

27Construction of Metalled Road Chak

No.97/RB Johal, District Faisalabad.1.563 1.548 -0.015 100%

28Const: of Soling/Drain Chak No.94/RB,

District Faisalabad.1.000 0.980 -0.020 100%

29Const: of Soling/Drain Chak No.92/RB,

District Faisalabad.1.000 0.981 -0.019 100%

55.000 23-Nov-12751

Page 87

Page 88: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

30Construction of Metalled Road / Soling/Drain

Chak No.25/JB, District Faisalabad.1.757 1.732 -0.025 100%

31Const: of Soling/Drain Chak No.95/RB,

District Faisalabad.1.500 1.470 -0.030 100%

32Construction of Soling/Drain Chak No.74/RB

Bandhla, District Faisalabad.1.000 0.983 -0.017 100%

33

Construction / Repairing / Raising of Metalled

Road Chak No.70/RB Gujjar Singh wala,

District Faisalabad.

3.000 2.974 -0.026 100%

34Construction of Soling/Drain Chak No.69/RB

Ghaseet pura, District Faisalabad.1.500 1.482 -0.018 100%

35Construction of Soling/Drain Chak

No.201/RB Azafi Abadi, District Faisalabad.1.000 0.992 -0.008 100%

36

Construction of Soling/Drain Chak

No.140/RB Muthran wala, District

Faisalabad.

1.000 0.993 -0.007 100%

37Construction of Metalled Road / Soling/Drain

Chak No.195/RB, District Faisalabad.2.500 -2.500 100%

38Construction of Soling/Drain Chak

No.190/RB Karari Khurd District Faisalabad.1.136 0.985 -0.151 100%

38 55.000 51.627 -3.373

Nawab Sher Waseer dated 17.8.12

Mna, NA-76

1

Construction of P.C.C.Road in Streets

Mohallah Eid Gah U.C.No.39 City Jaranwala

District Faisalabad.

5.000 4.860 -0.140 100%

55.000 23-Nov-12751

50.000 17-Aug-1260

Page 88

Page 89: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of P.C.C.Road in Streets

Mohallah Anwar Abad, U.C.No.41 City

Jaranwala District Faisalabad.

5.000 4.580 -0.420 100%

3

Construction of Carpet Road from Housing

Colony to Canal Road City Jaranwala, District

Faisalabad.

1.500 1.456 -0.044 100%

4

Construction of Metalled Road from 653/4-

GB Plot to 628/GB (Remaining) Tehsil

Jaranwala District Faisalabad.

4.000 3.915 -0.085 100%

5

Construction of Metalled Road in streets

Chak No.126/GB Sheroana, Tehsil

Jaranwala District Faisalabad.

1.500 1.455 -0.045 100%

6

Construction of P.C.C.Road Faizane Madina

to Khalid Bhai House & to Principal

house(Remaining) City Jaranwala District

Faisalabad.

0.500 0.485 -0.015 100%

7Construction of Soling/Drain Chak No.654/5-

GB, Tehsil Jaranwala, District Faisalabad.2.500 2.340 -0.160 100%

8

Construction of Soling/Drain & Nala Chak

No.105/GB, Tehsil Jaranwala, District

Faisalabad.

5.000 4.869 -0.131 100%

9

Construction of Soling/Drain Chak No.64/GB,

Tehsil Jaranwala, District Faisalabad. 2.000 1.819 -0.181 100%

10

Improvement of Metalled Road from Canal

Road to Chak No.119/GB Tehsil Jaranwala

District Faisalabad.

2.000 1.940 -0.060 100%

11

Construction of Metalled Road in Main Bazar

Chak No.107/GB Tehsil Jaranwala, District

Faisalabad.

2.000 1.945 -0.055 100%

12

Construction of Soling/Drain Chak

No.561/GB Naroo Chak, Tehsil Jaranwala,

District Faisalabad.

2.000 1.925 -0.075 100%

13

Construction of Soling/Drain Chak

No.625/GB Jgaaten, Tehsil Jaranwala,

District Faisalabad.

1.800 1.724 -0.076 100%

14

Construction of Soling/Drain Chak

No.625/GB Abadi Qazian, Tehsil Jaranwala,

District Faisalabad.

0.640 0.609 -0.031 100%

50.000 17-Aug-1260

Page 89

Page 90: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Construction of Soling/Drain & Nala Chak

No.625/GB Raja Watto, Tehsil Jaranwala,

District Faisalabad.

1.450 1.350 -0.100 100%

16Repair of Bucheki Buchiana Road Tehsil

Jaranwala, District Faisalabad.2.400 2.280 -0.120 100%

17Construction of Soling Thana Rodala, Tehsil

Jaranwala, District Faisalabad.0.700 0.645 -0.055 100%

18

Construction of P.C.C.Road Soling/Drain

Chak No.128/GB Tehsil Jaranwala District

Faisalabad.

4.500 4.350 -0.150 100%

19

Construction of Bridge over Small Canal in

Chak No.97/GB & Soling Tehsil Jaranwala

District Faisalabad.

1.000 0.980 -0.020 100%

20

Construction of Metalled Road from Chak

No.626/GB to 627/GB (Remaining) Tehsil

Jaranwala, District Faisalabad.

4.510 4.320 -0.190 100%

20 50.000 47.847 -2.153

Nawab Sher Waseer dated 31.8.12

Mna, NA-76

1

Improement of Metalled Road from Chak

No.564/GB to Chak No.569/GB Tehsil

Jaranwala Distt: Faisalabad (Phase-I).

10.000 9.870 -0.130 100%

2

Improement of Metalled Road from Chak

No.564/GB to Chak No.569/GB Tehsil

Jaranwala Distt: Faisalabad (Phase-II).

10.000 9.789 -0.211 100%

3

Constructionof Metalled Road from adda

Lundianwala to Peer Da Khoo (Remaining)

Tehsil Jaranwala District Faialabad.

4.500 4.289 -0.211 100%

4

Construction of Metalled Road in Streets

Chak No.559/GB (Remaining) Tehsil

Jaranwala District Faisalabad.

0.710 0.680 -0.030 100%

5

Construction of Metalled Road from 658/9

Plot to 624/GB (Remaining), Tehsil

Jaranwala District Faisalabad.

2.750 2.689 -0.061 100%

70.000 31-Aug-12151

50.000 17-Aug-1260

Page 90

Page 91: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of Nala Chak No. 567/GB

Abbasi Chak, Tehsil Jaranwala, District

Faisalabad.

2.700 2.620 -0.080 100%

7

Construction of Nala Chak No. 629/GB New

Chak Waseeran, Tehsil Jaranwala, District

Faisalabad.

2.000 1.970 -0.030 100%

8

Construction of Soling/Drain Chak

No.629/GB Old Chak Waseeran, Tehsil

Jaranwala, District Faisalabad.

3.000 2.936 -0.064 100%

9

Raising of Metalled Road & Construction of

Soling/Drain Chak No.108/GB Sai Di Khoiee,

Tehsil Jaranwala, District Faisalabad.

5.000 4.875 -0.125 100%

10

Improvement of Shahkot Nankana Road to

Chak No.559/GB Bhatti Chak, Tehsil

Jaranwala District Faisalabad.

5.000 4.980 -0.020 100%

11

Construction of Metalled Road in Main Bazar

Chak No.107/GB Tehsil Jaranwala, District

Faisalabad.

2.000 -2.000 100%

12

Construction of Soling/Drain Chak

No.627/GB Dadu Ka Chak Tehsil Jaranwala

District Faisalabad.

2.000 1.835 -0.165 100%

13Construction of Soling/Drain Chak Sunaar

wala, Tehsil Jaranwala District Faisalabad.1.000 0.960 -0.040 100%

14

Construction of Soling/Drain Adda

Lundianwala, Tehsil Jaranwala District

Faisalabad.

2.000 1.940 -0.060 100%

15Construction of Nala at Adda Lundianwala,

Tehsil Jaranwala, District Faisalabad.2.500 2.395 -0.105 100%

16

Construction of Soling/Drain at Adda

Lundianwala, Tehsil Jaranwala District

Faisalabad.

2.500 2.420 -0.080 100%

17

Construction of Mohtarma Benazir Bhutto

Shaheed Park City Jaranwala (Remaining

work) S.H.Pathway, S.H.Jogging Track,

S.H.Stage City Jaranwala District Faisalabad.

3.222 3.128 -0.094 100%

70.000 31-Aug-12151

Page 91

Page 92: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18

Construction of Mohtarma Benazir Bhutto

Shaheed Park City Jaranwala S.H.Metalled

Road (Remaining) District Faisalabad.

3.040 2.120 -0.920 100%

19

Construction of Passenger Shed at Chak

No.630/GB Jalib Chak Tehsil Jaranwala

District Faisalabad.

0.377 0.354 -0.023 100%

20

Construction of Soling/Drain Chak

No.630/GB Jalib Chak, Tehsil Jaranwala

District Faisalabad.

4.630 4.570 -0.060 100%

21

Construction of Metalled Road in Main Bazar

Chak No.240/GB Shoukat abad Mughal pura,

Tehsil Jaranwala Disrict Faisalabad.

3.071 3.012 -0.059 100%

21 70.000 67.432 -2.568

Ms.Raheela Shahadat dated 8.8.12

Mna, NA-78

1Construction of Soling/Drain Chak

No.596/GB, District Faisalabad.0.500 0.490 -0.010 100%

2

Construction of Soling/Drain Chak

No.596/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

3Construction of Soling/Drain Chak

No.594/GB, District Faisalabad.0.500 0.490 -0.010 100%

4

Construction of Soling/Drain Chak

No.594/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

5Construction of Soling/Drain Chak

No.592/GB, District Faisalabad.0.500 0.490 -0.010 100%

6

Construction of Soling/Drain Chak

No.592/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

7Construction of Soling/DrainChak

No.593/GB, District Faisalabad.0.500 0.490 -0.010 100%

8

Construction of Soling/Drain Chak

No.593/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

70.000 31-Aug-12151

100.000 08-Aug-1240

Page 92

Page 93: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Construction of Soling/Drain Chak

No.599/GB, District Faisalabad.0.500 0.490 -0.010 100%

10

Construction of Soling/Drain Chak

No.599/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

11Construction of Soling/Drain Chak

No.421/GB, District Faisalabad.0.500 0.490 -0.010 100%

12

Construction of Soling/Drain Chak

No.421/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

13Construction of Soling/Drain Chak

No.421/GB Sunpal, District Faisalabad.0.500 0.490 -0.010 100%

14

Construction of Soling/Drain Chak

No.601/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

15Construction of Soling/Drain Chak

No.601/GB, District Faisalabad.0.500 0.490 -0.010 100%

16Construction of Soling/Drain Chak

No.602/GB, District Faisalabad.0.500 0.490 -0.010 100%

17

Construction of Soling/Drain Chak

No.602/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

18Construction of Soling/Drain Chak

No.603/GB, District Faisalabad.0.500 0.490 -0.010 100%

19

Construction of Soling/Drain Chak

No.603/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

20Construction of Soling/Drain Chak

No.600/GB, District Faisalabad.0.500 0.490 -0.010 100%

21

Construction of Soling/Drain Chak

No.600/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

22Construction of Soling/Drain Chak

No.423/GB, District Faisalabad.0.500 0.490 -0.010 100%

23Construction of Soling Chak No.423/GB Azafi

Abadi, District Faisalabad.0.500 0.490 -0.010 100%

24Construction of Soling/Drain Chak

No.431/GB, District Faisalabad.0.500 0.490 -0.010 100%

100.000 08-Aug-1240

Page 93

Page 94: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

25

Construction of Soling/Drain Chak

No.431/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

26Construction of Soling/Drain Chak

No.429/GB, District Faisalabad.0.500 0.490 -0.010 100%

27

Construction of Soling/Drain Chak

No.429/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

28Construction of Soling/Drain Chak

No.430/GB, District Faisalabad.0.500 0.490 -0.010 100%

29

Construction of Soling/Drain Chak

No.430/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

30Construction of Soling/Drain Chak

No.425/GB, District Faisalabad.0.500 0.490 -0.010 100%

31

Construction of Soling/Drain Chak

No.425/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

32Construction of Soling/Drain Chak

No.426/GB, District Faisalabad.0.500 0.490 -0.010 100%

33

Construction of Soling/Drain Chak

No.426/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

34Construction of Soling/Drain Chak

No.420/GB, District Faisalabad.0.500 0.490 -0.010 100%

35

Construction of Soling/Drain Chak

No.420/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

36Construction of Soling/Drain Chak

No.424/GB, District Faisalabad.0.500 0.490 -0.010 100%

37

Construction of Soling/Drain Chak

No.424/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

38Construction of Soling/Drain Chak

No.418/GB, District Faisalabad.0.500 0.490 -0.010 100%

39

Construction of Soling/Drain Chak

No.418/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

100.000 08-Aug-1240

Page 94

Page 95: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

40Construction of Soling/Drain Chak

No.419/GB, District Faisalabad.0.500 0.490 -0.010 100%

41

Construction of Soling/Drain Chak

No.419/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

42Construction of Soling/Drain Chak

No.410/GB, District Faisalabad.0.500 0.490 -0.010 100%

43

Construction of Soling/Drain Chak

No.410/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

44Construction of Soling/Drain Chak

No.416/GB, District Faisalabad.0.500 0.490 -0.010 100%

45

Construction of Soling/Drain Chak

No.416/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

46Construction of Soling/Drain Chak

No.415/GB, District Faisalabad.0.500 0.490 -0.010 100%

47

Construction of Soling/Drain Chak

No.415/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

48Construction of Soling/Drain Chak

No.393/GB, District Faisalabad.0.500 0.490 -0.010 100%

49

Construction of Soling/Drain Chak

No.393/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

50Construction of Soling/Drain Chak

No.392/GB, District Faisalabad.0.500 0.490 -0.010 100%

51

Construction of Soling/Drain Chak

No.392/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

52Construction of Soling/Drain Chak

No.391/GB, District Faisalabad.0.500 0.490 -0.010 100%

53

Construction of Soling/Drain Chak

No.391/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

54Construction of Soling/Drain Chak

No.400/GB, District Faisalabad.0.500 0.490 -0.010 100%

100.000 08-Aug-1240

Page 95

Page 96: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

55

Construction of Soling/Drain Chak

No.400/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

56Construction of Soling/Drain Chak

No.451/GB, District Faisalabad.0.500 0.490 -0.010 100%

57

Construction of Soling/Drain Chak

No.451/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

58Construction of Soling/Drain Chak

No.450/GB, District Faisalabad.0.500 0.488 -0.012 100%

59

Construction of Soling/Drain Chak

No.450/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

60Construction of Soling/Drain Chak

No.449/GB, District Faisalabad.0.500 0.490 -0.010 100%

61

Construction of Soling/Drain Chak

No.449/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

62Construction of Soling/Drain Chak

No.396/GB, District Faisalabad.0.500 0.490 -0.010 100%

63

Construction of Soling/Drain Chak

No.396/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

64Construction of Soling/Drain Chak

No.395/GB, District Faisalabad.0.500 0.490 -0.010 100%

65

Construction of Soling/Drain Chak

No.395/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

66Construction of Soling/Drain Chak

No.403/GB, District Faisalabad.0.500 0.490 -0.010 100%

67

Construction of Soling/Drain Chak

No.403/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

68Construction of Soling/Drain Chak

No.402/GB, District Faisalabad.0.500 0.490 -0.010 100%

69

Construction of Soling/Drain Chak

No.402/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

100.000 08-Aug-1240

Page 96

Page 97: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

70Construction of Soling/Drain Chak

No.404/GB, District Faisalabad.0.500 0.490 -0.010 100%

71

Construction of Soling/Drain Chak

No.404/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

72Construction of Soling/Drain Chak

No.401/GB, District Faisalabad.0.500 0.490 -0.010 100%

73

Construction of Soling/Drain Chak

No.401/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

74Construction of Soling/Drain Chak

No.405/GB, District Faisalabad.0.500 0.490 -0.010 100%

75

Construction of Soling/Drain Chak

No.405/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

76Construction of Soling/Drain Chak

No.608/GB, District Faisalabad.0.500 0.490 -0.010 100%

77

Construction of Soling/Drain Chak

No.608/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

78Construction of Soling/Drain Chak

No.609/GB, District Faisalabad.0.500 0.488 -0.012 100%

79

Construction of Soling/Drain Chak

No.609/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

80Construction of Soling/Drain Chak

No.604/GB, District Faisalabad.0.500 0.490 -0.010 100%

81

Construction of Soling/Drain Chak

No.604/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

82Construction of Soling/Drain Chak

No.606/GB, District Faisalabad.0.500 0.490 -0.010 100%

83

Construction of Soling/Drain Chak

No.606/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

84Construction of Soling/Drain Chak

No.607/GB, District Faisalabad.0.500 0.490 -0.010 100%

100.000 08-Aug-1240

Page 97

Page 98: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

85

Construction of Soling/Drain Chak

No.607/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

86Construction of Soling/Drain Chak

No.610/GB, District Faisalabad.0.500 0.490 -0.010 100%

87

Construction of Soling/Drain Chak

No.610/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

88Construction of Soling/Drain Chak

No.606/GB, District Faisalabad.0.500 0.490 -0.010 100%

89

Construction of Soling/Drain Chak

No.606/GB Azafi abadi, District Faisalabad. 0.500 0.490 -0.010 100%

90Construction of Soling/Drain Pindi Sheikh

Musa, District Faisalabad.0.500 0.490 -0.010 100%

91Construction of Soling/Drain Razi Dhawn

Singh, District Faisalabad.0.500 0.490 -0.010 100%

92Construction of Soling/Drain Khwoo Roda,

District Faisalabad.0.500 0.490 -0.010 100%

93Construction of Soling/Drain Thatha Fazal

Shah, District Faisalabad.0.500 0.490 -0.010 100%

94Construction of Soling/Drain Mouza Khai,

District Faisalabad.0.500 0.490 -0.010 100%

95Construction of Soling/Drain Ahata Khai,

District Faisalabad.0.500 0.490 -0.010 100%

96Construction of Soling/Drain Chak

No.612/GB, District Faisalabad.0.500 0.490 -0.010 100%

97

Construction of Soling/Drain Chak

No.612/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

98Construction of Soling/Drain Chak

No.613/GB, District Faisalabad.0.500 0.490 -0.010 100%

99

Construction of Soling/Drain Chak

No.613/GB Azafi Abadi, District Faisalabad. 0.500 0.490 -0.010 100%

100Construction of Soling/Drain Chak

No.614/GB, District Faisalabad.0.500 0.490 -0.010 100%

100 50.000 48.996 -1.004

100.000 08-Aug-1240

Page 98

Page 99: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ms.Raheela Shahadat dated 18.10.12

Mna, NA-78

1Construction of Soling/Drain Chak

No.540/GB, District Faisalabad.0.500 0.490 -0.010 100%

2Construction of Soling/Drain Chak

No.540/GB Azafi Abadi, District Faisalabad.0.500 0.490 -0.010 100%

3Construction of Soling/Drain Chak

No.542/GB, District Faisalabad.0.500 0.490 -0.010 100%

4Construction of Soling/Drain Chak

No.542/GB Azafi Abadi, District Faisalabad.0.500 0.490 -0.010 100%

5Construction of Soling/Drain Chak

No.553/GB, District Faisalabad.0.500 0.490 -0.010 100%

6Construction of Soling/Drain Chak

No.553/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

7Construction of Soling/Drain Chak

No.550/GB, District Faisalabad.0.500 0.489 -0.011 100%

8Construction of Soling/Drain Chak

No.550/GB Azafi Abadi, District Faisalabad.0.500 0.489 -0.011 100%

9Construction of Soling/Drain Chak

No.555/GB, District Faisalabad.0.500 0.489 -0.011 100%

10Construction of Soling/Drain Chak

No.555/GB Azafi Abadi, District Faisalabad.0.500 0.489 -0.011 100%

11Construction of Soling/Drain Chak

No.543/GB, District Faisalabad.0.500 0.489 -0.011 100%

12Construction of Soling/Drain Chak

No.543/GB Azafi abadi, District Faisalabad.0.500 0.489 -0.011 100%

13Construction of Soling/Drain Chak

No.457/GB, District Faisalabad.0.500 0.489 -0.011 100%

14Construction of Soling/Drain Chak

No.457/GB Azafi Abadi, District Faisalabad.0.500 0.490 -0.010 100%

50.000 577 18-Oct-12

Page 99

Page 100: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15Construction of Soling/Drain Chak

No.458/GB, District Faisalabad.0.500 0.490 -0.010 100%

16Construction of Soling/Drain Chak

No.458/GB Azafi Abadi, District Faisalabad.0.500 0.490 -0.010 100%

17Construction of Soling/Drain Kallian Wala,

District Faisalabad.0.500 0.490 -0.010 100%

18Construction of Soling/Drain Kallian Wala

Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

19Construction of Soling/Drain Jali Tarhana,

District Faisalabad.0.500 0.490 -0.010 100%

20Construction of Soling/Drain Jali Tarhana

Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

21Construction of Soling/Drain Jali Fatyana,

District Faisalabad.0.500 0.490 -0.010 100%

22Construction of Soling/Drain Jali Fatyana

Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

23Construction of Soling/Drain Chak No.53/1

Tukra, District Faisalabad.0.500 0.490 -0.010 100%

24Construction of Soling/Drain Azafi Abadi

Chak No.53/1 Tukra, District Faisalabad.0.500 0.490 -0.010 100%

25Construction of Soling/Drain 53/2 Tukra,

District Faisalabad.0.500 0.490 -0.010 100%

26Construction of Soling/Drain Azafi abadi, 53/2

Tukra, District Faisalabad.0.500 0.490 -0.010 100%

27Construction of Soling/Drain 53/3 Tukra,

District Faisalabad.0.500 0.495 -0.005 100%

28Construction of Soling/Drain Azafi abadi, 53/3

Tukra, District Faisalabad.0.500 0.495 -0.005 100%

29Construction of Soling/Drain 53/5 Tukra,

District Faisalabad.0.500 0.495 -0.005 100%

30Construction of Soling/Drain Azafi abadi, 53/5

Tukra, District Faisalabad.0.500 0.495 -0.005 100%

31Construction of Soling/Drain Chak

No.514/GB, District Faisalabad.0.500 0.495 -0.005 100%

32Construction of Soling/Drain Chak

No.514/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

50.000 577 18-Oct-12

Page 100

Page 101: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

33Construction of Soling/Drain Bhutto Abadi

Chak No.514/GB, District Faisalabad.0.500 0.495 -0.005 100%

34Construction of Soling/Drain Saeed Khatia

Chak No.514/GB, District Faisalabad.0.500 0.495 -0.005 100%

35Construction of Soling/Drain Chak

No.500/GB, District Faisalabad.0.500 0.495 -0.005 100%

36Construction of Soling/Drain Chak

No.500/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

37Construction of Soling/Drain Chak

No.501/GB, District Faisalabad.0.500 0.495 -0.005 100%

38Construction of Soling/Drain Chak

No.501/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

39Construction of Soling/Drain Chak

No.502/GB, District Faisalabad.0.500 0.495 -0.005 100%

40Construction of Soling/Drain Chak

No.502/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

41Construction of Soling/Drain Chak

No.503/GB, District Faisalabad.0.500 0.495 -0.005 100%

42Construction of Soling/Drain Chak

No.503/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

43Construction of Soling/Drain Chak

No.504/GB, District Faisalabad.0.500 0.495 -0.005 100%

44Construction of Soling/Drain Chak

No.504/GB Azafi Abadi, District Faisalabad.0.500 0.495 -0.005 100%

45Construction of Soling/Drain Chak

No.557/GB, District Faisalabad.0.500 0.495 -0.005 100%

46Construction of Soling/Drain Chak

No.557/GB Azafi Abadi, District Faisalabad.0.500 0.495 -0.005 100%

47Construction of Soling/Drain Chak

No.558/GB, District Faisalabad.0.500 0.495 -0.005 100%

48Construction of Soling/Drain Chak

No.558/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

50.000 577 18-Oct-12

Page 101

Page 102: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

49Construction of Soling/Drain Chak

No.552/GB, District Faisalabad.0.500 0.495 -0.005 100%

50Construction of Soling/Drain Chak

No.552/GB Azafi Abadi, District Faisalabad.0.500 0.495 -0.005 100%

51Construction of Soling/Drain Chak

No.551/GB, District Faisalabad.0.500 0.495 -0.005 100%

52Construction of Soling/Drain Chak

No.551/GB Azafi Abadi, District Faisalabad.0.500 0.495 -0.005 100%

53Construction of Soling/Drain Chak

No.556/GB, District Faisalabad.0.500 0.495 -0.005 100%

54Construction of Soling/Drain Chak

No.556/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

55Construction of Soling/Drain Chak

No.554/GB, District Faisalabad.0.500 0.495 -0.005 100%

56Construction of Soling/Drain Chak

No.554/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

57Construction of Soling/Drain Chak

No.498/GB, District Faisalabad.0.500 0.495 -0.005 100%

58Construction of Soling/Drain Chak

No.498/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

59Construction of Soling/Drain Chak

No.499/GB, District Faisalabad.0.500 0.495 -0.005 100%

60Construction of Soling/Drain Chak

No.499/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

61Construction of Soling/Drain Chak

No.505/GB, District Faisalabad.0.500 0.495 -0.005 100%

62Construction of Soling/Drain Chak

No.505/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

63Construction of Soling/Drain Chak

No.510/GB, District Faisalabad.0.500 0.495 -0.005 100%

50.000 577 18-Oct-12

Page 102

Page 103: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

64Construction of Soling/Drain Chak

No.510/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

65Construction of Soling/Drain Chak

No.511/GB, District Faisalabad.0.500 0.495 -0.005 100%

66Construction of Soling/Drain Chak

No.511/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

67Construction of Soling/Drain Chak

No.508/GB, District Faisalabad.0.500 0.495 -0.005 100%

68Construction of Soling/Drain Chak

No.508/GB Azafi abadi, District Faisalabad.0.500 0.495 -0.005 100%

69Construction of Soling/Drain Chak

No.507/GB, District Faisalabad.0.500 0.490 -0.010 100%

70Construction of Soling/Drain Chak

No.507/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

71Construction of Soling/Drain Chak

No.494/GB, District Faisalabad.0.500 0.490 -0.010 100%

72Construction of Soling/Drain Chak

No.494/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

73Construction of Soling/Drain Chak

No.492/GB, District Faisalabad.0.500 0.490 -0.010 100%

74Construction of Soling/Drain Chak

No.492/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

75Construction of Soling/Drain Chak

No.493/GB, District Faisalabad.0.500 0.490 -0.010 100%

76Construction of Soling/Drain Chak

No.493/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

77Construction of Soling/Drain Chak

No.490/GB, District Faisalabad.0.500 0.490 -0.010 100%

78Construction of Soling/Drain Chak

No.490/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

50.000 577 18-Oct-12

Page 103

Page 104: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

79Construction of Soling/Drain Chak

No.491/GB, District Faisalabad.0.500 0.490 -0.010 100%

80Construction of Soling/Drain Chak

No.491/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

81Construction of Soling/Drain Chak

No.496/GB, District Faisalabad.0.500 0.490 -0.010 100%

82Construction of Soling/Drain Chak

No.496/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

83Construction of Soling/Drain Chak

No.489/GB, District Faisalabad.0.500 0.490 -0.010 100%

84Construction of Soling/Drain Chak

No.489/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

85Construction of Soling/Drain Chak

No.509/GB, District Faisalabad.0.500 0.490 -0.010 100%

86Construction of Soling/Drain Chak

No.509/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

87Construction of Soling/Drain Chak

No.497/GB, District Faisalabad.0.500 0.490 -0.010 100%

88Construction of Soling/Drain Chak

No.497/GB Azafi abadi, District Faisalabad.0.500 0.490 -0.010 100%

89Construction of Soling/Drain Nawab Colony,

District Faisalabad.0.500 0.490 -0.010 100%

90Construction of Soling/Drain Shamas Pura,

District Faisalabad.0.500 0.490 -0.010 100%

91Construction of Soling/Drain Islam Pura,

District Faisalabad.0.500 0.493 -0.007 100%

92Construction of Soling/Drain Jinnah Colony,

District Faisalabad.0.500 0.493 -0.007 100%

93Construction of Soling/Drain Raza Abad,

District Faisalabad.0.500 0.493 -0.007 100%

94Construction of Soling/Drain Hussain Abad,

District Faisalabad.0.500 0.493 -0.007 100%

95Construction of Soling/Drain Mumtaz Abad,

District Faisalabad.0.500 0.493 -0.007 100%

50.000 577 18-Oct-12

Page 104

Page 105: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

96Construction of Soling/Drain Sarwar Colony,

District Faisalabad.0.500 0.493 -0.007 100%

97Construction of Soling/Drain Mubarak Pura,

District Faisalabad.0.500 0.493 -0.007 100%

98Construction of Soling/Drain Iqbal Colony,

District Faisalabad.0.500 0.490 -0.010 100%

99Construction of Soling/Drain Butt Colony,

District Faisalabad.0.500 0.490 -0.010 100%

100Construction of Soling/Drain Azafi Abadi

Mubarak Pura, District Faisalabad.0.500 0.490 -0.010 100%

100 50.000 49.224 -0.776

Raheela Baloch dated 2.11.12

MNA, NA-78

687 02-Nov-12 49.964 49.964

49.964

Rana M Farooq Saeed Khan dated 5.9.12

Mna, NA-79

1

Construction of Nalian / Soling & Nala Union

Concil No.119, City Samundri, District

Faisalabad.

2.000 1.945 -0.055 100%

2

Construction of Nalian / Soling & Nala Union

Concil No.120, City Samundri, District

Faisalabad.

2.000 1.940 -0.060 100%

3

Construction of Nalian / Soling & Nala Union

Concil No.121, City Samundri, District

Faisalabad.

2.000 1.920 -0.080 100%

50.000 577 18-Oct-12

20.000 05-Sep-12201

Page 105

Page 106: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Constrution of Nalian / Soling Chak

No.166/GB Mailun, Tehsil Samundri District

Faisalabad.

1.000 0.980 -0.020 100%

5

Constrution of Nalian / Soling Chak

No.165/GB Harsa Cot, Tehsil Samundri

District Faisalabad.

1.000 0.975 -0.025 100%

6

Constrution of Nalian / Soling Chak

No.136/GB, Tehsil Samundri District

Faisalabad.

1.000 0.975 -0.025 100%

7

Constrution of Nalian / Soling Chak

No.372GB Nawan Chak, Tehsil Samundri

District Faisalabad.

1.000 0.977 -0.023 100%

8

Constrution of Nalian / Soling Chak

No.530/GB, Tehsil Samundri District

Faisalabad.

1.000 0.980 -0.020 100%

9

Constrution of Nalian / Soling Chak

No.531/GB, Tehsil Samundri District

Faisalabad.

1.000 0.975 -0.025 100%

10

Constrution of Nalian / Soling Chak

No.474/GB, Tehsil Samundri District

Faisalabad.

1.000 0.974 -0.026 100%

11

Constrution of Soling & Water Tank Chak

No.475/GB Basti Qureshian, Tehsil Samundri

District Faisalabad.

1.000 0.970 -0.030 100%

12

Constrution of Nalian / Soling Chak

No.478/GB, Tehsil Samundri District

Faisalabad.

1.000 0.968 -0.032 100%

13

Laying of Water Supply Pipe Chak

No.484/GB, Tehsil Samundri District

Faisalabad.

1.000 0.968 -0.032 100%

14

Constrution of Nalian / Soling Chak

No.487/GB, Tehsil Samundri District

Faisalabad.

1.000 0.980 -0.020 100%

15

Constrution of Nalian / Soling Chak

No.488/GB Haji Farooq Wali, Tehsil

Samundri District Faisalabad.

1.000 0.971 -0.029 100%

16

Constrution of Nalian / Soling & Nala Chak

No.445/GB, Tehsil Samundri District

Faisalabad.

2.000 1.945 -0.055 100%

20.000 05-Sep-12201

Page 106

Page 107: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

16 20.000 19.443 -0.557

Rana M Farooq Saeed Khan dated 5.9.12

Mna, NA-79

1

Construction of Metalled Road Chak

No.201/GB to Chak No.204/GB Tehsil

Samundri, District Faisalabad.

8.790 6.870 -1.920 100%

2

Construction of Metalled Road Chak

No.464/GB to Chak No.465/GB, Tehsil

Samundri, District Faisalabad.

9.576 6.540 -3.036 100%

3

Construction / Repair of Metalled Road Chak

No.199/GB to Main Rajana Road to Gaon

Tak, Tehsil Samundri, District Faisalabad.

3.660 3.592 -0.068 100%

4

Construction / Repair of Metalled Road Chak

No.218/GB to 213/GB, Tehsil Samundri,

District Faisalabad.

7.974 7.789 -0.185 100%

4 30.000 24.791

Rana M Farooq Saeed Khan dated 27.11.12

MNA, NA-79

1

Construction of Nalian / Soling Chak

No.193/GB, Tehsil Samundri District

Faisalabad.

0.984 100%

2

Construction of Nalian / Soling Chak

No.196/GB Nai Abadi, Tehsil Samundri

District Faisalabad.

0.980 100%

3

Construction of Nala Nalian / Soling Chak

No.199/GB, Tehsil Samundri District

Faisalabad.

0.983 100%

4

Construction of Nalian / Soling Chak

No.201/GB Tehsil Samundri District

Faisalabad.

0.975 100%

30.000 05-Sep-12202

60.000 27-Nov-12759 60.000

Page 107

Page 108: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Construction of Nalian / Soling Chak

No.203/GB Tehsil Samundri District

Faisalabad.

0.973 100%

6

Construction of Nala Nalian / Soling Chak

No.207/GB, Tehsil Samundri District

Faisalabad.

0.975 100%

7

Construction of Nala Nalian / Soling Chak

No.214/GB, Tehsil Samundri District

Faisalabad.

8Construction of Nala Chak No.223/GB

Bhojian, Tehsil Samundri District Faisalabad.0.980 100%

9

Construction of Nalian/ Soling Chak

No.224/GB Warrialian, Tehsil Samundri

District Faisalabad.

0.962 100%

10

Construction of Nala, Nalian / Soling Chak

No.226/GB, Tehsil Samundri District

Faisalabad.

0.965 100%

11

Construction of Nala, Nalian / Soling Chak

No.530/GB, Tehsil Samundri District

Faisalabad.

0.980 100%

12

Construction of Nalian/ Soling Chak

No.527/GB Mankariala,Tehsil Samundri

District Faisalabad.

13

Construction of Nalian/ Soling Chak

No.136/GB Quaid-e-Azam Colony,Tehsil

Samundri District Faisalabad.

0.980 100%

14

Construction of Nalian/ Soling Chak

No.388/GB,Tehsil Samundri District

Faisalabad.

1.935 100%

15

Construction of Nala, Nalian/ Soling Chak

No.46/GB Mankariala,Tehsil Samundri

District Faisalabad.

0.780 100%

16

Constrution of Nala / Nalian / Soling Chak

No.386/GB, Tehsil Samundri District

Faisalabad.

17

Constrution of Nalian / Soling Chak

No.385/GB, Tehsil Samundri District

Faisalabad.

60.000 27-Nov-12759 60.000

Page 108

Page 109: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18

Constrution of Nalian / Soling Chak

No.169/GB Nathu Kot, Tehsil Samundri

District Faisalabad.

1.940 100%

19

Constrution of Nalian / Soling Chak

No.197/GB, Tehsil Samundri District

Faisalabad.

0.980 100%

20

Constrution of Nala / Nalian / Soling Chak

No.136/GB, Tehsil Samundri District

Faisalabad.

0.972 100%

21

Construction of Boundary Wall & Repair of

Vetnary Hospital Chak No.483/GB Pakka

Koh, Tehsil Samundri District Faisalabad.

0.905 100%

22

Constrution of Nala / Nalian / Soling Chak

No.373/GB, Tehsil Samundri District

Faisalabad.

0.980 100%

23

Constrution of Nalian / Soling Chak

No.169/GB Nathu Kot, Tehsil Samundri

District Faisalabad.

0.980 100%

24

Laying of Water Supply Pipe line Chak

No208/GB and 209/GB, Tehsil Samundri

District Faisalabad.

14.890 100%

25

Laying of Water Supply Pipe line Chak

No.213/GB, Tehsil Samundri District

Faisalabad.

4.580 100%

26

Constrution of Nalian / Soling Chak

No.439/GB, Tehsil Samundri District

Faisalabad.

1.935 100%

27

Constrution of Steps/Sitting area of Foot ball

Ground Chak No.445/GB, Tehsil Samundri

District Faisalabad.

0.975 100%

27 60.000 42.589 -17.411

Rana M Farooq Saeed Khan dated 4.12.12

MNA, NA-79

1

Construction of Drain / Soling Chak

No.47/GB, Tehsil Samundri District

Faisalabad.

40.000 04-Dec-12782

60.000 27-Nov-12759 60.000

Page 109

Page 110: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of Drain / Soling Chak

No.476/GB, Tehsil Samundri District

Faisalabad.

40.000 0.974 -39.026 100%

3

Construction of Drain / Soling Chak

No.488/GB, Tehsil Samundri District

Faisalabad.

0.985 0.985 100%

4

Construction of Drain / Soling Chak

No.199/GB, Tehsil Samundri District

Faisalabad.

0.980 0.980 100%

5

Construction of Drain / Soling Chak

No.201/GB, Tehsil Samundri District

Faisalabad.

0.980 0.980 100%

6

Construction of Drain / Soling Chak

No.203/GB, Tehsil Samundri District

Faisalabad.

7

Construction of Drain / Soling Chak

No.210/GB, Tehsil Samundri District

Faisalabad.

0.980 0.980 100%

8

Construction of Drain / Soling Chak

No.531/GB, Tehsil Samundri District

Faisalabad.

0.975 0.975 100%

9

Construction of Drain / Soling Chak

No.195/GB, Tehsil Samundri District

Faisalabad.

0.975 0.975 100%

10

Construction of Drain / Soling & Nala Chak

No.136/GB, Tehsil Samundri District

Faisalabad.

0.976 0.976 100%

11

Construction of Drain / Soling Chak

No.222/GB, Tehsil Samundri District

Faisalabad.

0.965 0.965 100%

12

Construction of Drain / Soling Chak

No.227/GB, Tehsil Samundri District

Faisalabad.

0.980 0.980 100%

13

Construction of Drain / Soling Chak

No.474/GB, Tehsil Samundri District

Faisalabad.

0.980 0.980 100%

14

Construction of Drain / Soling Chak

No.479/GB, Tehsil Samundri District

Faisalabad.

40.000 04-Dec-12782

Page 110

Page 111: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Construction of Drain / Soling Chak

No.485/GB, Tehsil Samundri District

Faisalabad.

1.945 1.945 100%

16

Construction of Drain / Soling Chak

No.484/GB, Tehsil Samundri District

Faisalabad.

17

Construction of Drain / Soling & Nala Chak

No.46/GB, Tehsil Samundri District

Faisalabad.

18

Construction of Drain / Soling Chak

No.468/GB, Tehsil Samundri District

Faisalabad.

19Construction of Nala Chak No.467/GB,

Tehsil Samundri District Faisalabad.0.980 0.980 100%

20

Construction of Drain / Soling Chak

No.227/GB, Tehsil Samundri District

Faisalabad.

0.980 0.980 100%

21

Construction of Drain / Soling Chak

No.166/GB, Tehsil Samundri District

Faisalabad.

0.980 0.980 100%

22Construction of Nala Chak No.414/GB,

Tehsil Samundri District Faisalabad.

22 40.000 15.635 -24.365

Rana M Farooq Saeed Khan dated 27.2.13

MNA, NA-79

1Constrution of Road from Chak No.414/GB to

413/GB Tehsil Samundri District Faisalabad.10.000 -10.000

2

Construction of Water Supply for Chak

No.165/GB Deyalpur Tehsil Samundri District

Faisalabad.

5.000 -5.000

40.000 04-Dec-12782

40.000 27-Feb-13999

Page 111

Page 112: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of Nalian / Soling, Nala at Union

Council No.119 Samundri City District

Faisalabad.

5.000 -5.000

4

Construction of Nalian / Soling, Nala at Union

Council No.120 Samundri City District

Faisalabad.

5.000 -5.000

5

Construction of Nalian / Soling, Nala at Union

Council No.121 Samundri City District

Faisalabad.

5.000 -5.000

6

Construction of Nala Chak No.51/GB

Khushpur Tehsil Samundri District

Faisalabad.

1.000 -1.000

7

Construction of Nalian/Soling, Nala Chak

No.488/GB (South) Tehsil Samundri District

Faisalabad.

1.000 -1.000

8

Construction of Nalian/Soling, Nala Chak

No.214/GB Tehsil Samundri District

Faisalabad.

1.000 -1.000

9

Construction of Nalian/Soling, Nala Chak

No.447/GB Tehsil Samundri District

Faisalabad.

1.000 -1.000

10Repair of Road Chak No.486/GB Tehsil

Samundri District Faisalabad.2.000 -2.000

11

Construction of Nala Chak No.51/GB

Khushpur Tehsil Samundri District

Faisalabad.

2.000 -2.000

12

Construction of Stadium Steps, Chak

No.196/GB Tehsil Samundri District

Faisalabad.

1.000 -1.000

13

Construction of Nalian/Soling, Nala Chak

No.199/GB Tehsil Samundri District

Faisalabad.

1.000 -1.000

13 40.000 -40.000

40.000 27-Feb-13999

Page 112

Page 113: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Rana Asif Tauseef dated 3.9.12

Mna, NA-80

1Construction of Metalled Road U.C.No.129,

District Faisalabad (Phase-I).3.000 2.768 -0.232 100%

2Construction of Metalled Road U.C.No.129,

District Faisalabad (Phase-II).3.000 2.749 -0.251 100%

3Construction of Soling / Drain U.C.No.129,

District Faisalabad.2.500 2.077 -0.423 100%

4Construction of Soling / Drain U.C.No.129,

District Faisalabad.2.500 2.348 -0.152 100%

5Construction of Metalled Road U.C.No.130,

District Faisalabad (Phase-I).2.500 2.418 -0.082 100%

6Construction of Metalled Road U.C.No.130,

District Faisalabad (Phase-II).2.500 2.431 -0.069 100%

7Construction of Metalled Road U.C.No.133,

District Faisalabad (Phase-I).3.000 2.754 -0.246 100%

8Construction of Metalled Road U.C.No.133,

District Faisalabad (Phase-II).3.000 2.963 -0.037 100%

9Construction of Soling / Drain U.C.No.133,

District Faisalabad.2.000 1.630 -0.370 100%

10Renovation of Church U.C.No.133, District

Fsd.1.400 1.370 -0.030 100%

11Renovation of Church U.C.No.134, District

Fsd.1.400 1.370 -0.030 100%

12Renovation of Church U.C.No.137, District

Fsd.1.400 1.370 -0.030 100%

13Const: of Soling / Drain U.C.No.140, District

Fsd.3.000 2.948 -0.052 100%

14Construction of Metalled Road U.C.No.142,

District Faisalabad (Phase-II).2.500 2.441 -0.059 100%

15Construction of Metalled Road U.C.No.142,

District Faisalabad (Phase-III).2.500 2.126 -0.374 100%

16Construction of Metalled Road U.C.No.142,

District Faisalabad (Phase-IV).2.500 1.629 -0.871 100%

17Const: of Boundary Wall U.C.No.142,

Faisalabad.1.150 1.118 -0.032 100%

18Const: of Metalled Road U.C.No.142, District

Fsd.1.750 1.151 -0.599 100%

100.000 03-Sep-12175

Page 113

Page 114: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

19Construction of Metalled Road U.C.No.143,

District Faisalabad (Phase-I).2.500 2.450 -0.050 100%

20Construction of Metalled Road U.C.No.143,

District Faisalabad (Phase-I).2.500 1.713 -0.787 100%

21Construction of Metalled Road U.C.No.143,

District Faisalabad (Phase-II).2.500 2.431 -0.069 100%

22Construction of Soling / Drain U.C.No.143,

District Faisalabad.3.000 2.652 -0.348 100%

23Construction of Soling / Drain U.C.No.144,

District Faisalabad.2.500 2.077 -0.423 100%

24Construction of Soling / Drain U.C.No.144,

District Faisalabad.2.000 1.962 -0.038 100%

25Construction of Metalled Road U.C.No.144,

District Faisalabad (Phase-I).2.500 2.457 -0.043 100%

26Construction of Metalled Road U.C.No.144,

District Faisalabad (Phase-II).2.500 2.252 -0.248 100%

27Rehabilitation of Janaz Gah U.C.No.145,

District Faisalabad.1.400 1.340 -0.060 100%

28Construction of Soling / Drain U.C.No.145,

District Faisalabad.2.500 2.456 -0.044 100%

29Construction of Metalled Road U.C.No.146,

District Faisalabad.3.000 2.975 -0.025 100%

30Construction of Soling / Drain U.C.No.146,

District Faisalabad.2.500 2.452 -0.048 100%

31Construction of Soling / Drain U.C.No.146,

District Faisalabad.2.000 1.945 -0.055 100%

32Construction of Metalled Road U.C.No.132,

District Faisalabad.2.500 2.450 -0.050 100%

33Construction of Soling / Drain U.C.No.132,

District Faisalabad.2.000 1.980 -0.020 100%

34Construction of Metalled Road Mazhar abad,

Tehsil Depal Pur, District Okara.3.000 2.881 -0.119 100%

35Const: of Nala U.C.No.178, District

Faisalabad.2.000 1.901 -0.099 100%

36Laying of Water Supply U.C. No.134 District

Faisalabad.2.000 0.560 -1.440 100%

37Const: of Soling U.C.No.137, District

Faisalabad.2.000 1.980 -0.020 100%

100.000 03-Sep-12175

Page 114

Page 115: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

38Laying of Water Supply U.C. No.132 District

Faisalabad.13.500 8.890 -4.610 100%

38 100.000 87.465 -12.535

CH.Saeed Iqbal dated 27.9.12

MNA,NA-81

1

Construction of Class Rooms + Bramda

Govt.Boys Middle School, Chak No.51/JB

District Faisalabad.

2.500 2.430 -0.070 100%

2Construction of Bridge / Pull Rajbah at Chak

No.69/JB Faisalabad.1.600 1.520 -0.080 100%

3

Construction of 2 Rooms + Bramda

Govt.Girls Middle School, Chak No.62/JB

District Faisalabad.

2.500 2.450 -0.050 100%

4Constructionof Boundary Wall of Govt.Boys

Primary School Chak No.50/JB Faisalabad.3.400 3.310 -0.090 100%

4 10.000 9.710 -0.290

CH.Saeed Iqbal dated 15.10.12

MNA,NA-81

1

Construction of Nala Chak No.100/JB Azafi

Abadi Ghulam Muhammad Abad No.2,

District Faisalabad.

0.900 0.895 -0.005 100%

2

Construction of Soling / Drain (RDS) Chak

No.100/JB Additional Abadi Mohallah Hadir

abad, District Faisalabad.

1.000 0.990 -0.010 100%

3

Construction of Soling / Drain (RDS) Chak

No.100/JB Azafi Abadi Jalal Town and

Ghubay Shah, District Faisalabad.

0.900 0.890 -0.010 100%

4Construction of Verandha Govt.Boys Middle

School Chak No.100/JB District Faisalabad.0.700 0.685 -0.015 100%

5Construction of Stage with roof play ground

Chak No.73/JB District Faisalabad.1.400 1.430 0.030 100%

17.900 15-Oct-12565

100.000 03-Sep-12175

10.000 27-Sep-12447

Page 115

Page 116: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of Sludge Carrier Nala Chak

No.67/JB Abadi Data De Nagri, District

Faisalabad.

1.200 1.185 -0.015 100%

7Construction of Soling / Drain (RDS) Chak

No.33/JB, District Faisalabad.1.400 1.384 -0.016 100%

8Construction of Verandha Govt.Boys High

School Chak No.49/JB District Faisalabad.0.700 0.665 -0.035 100%

9Construction of Verandha Govt.Girls Primary

School Chak No.27/JB District Faisalabad.0.700 0.667 -0.033 100%

10

Construction of Verandha Govt.Boys Primary

School Chak No.49/JB Munda Pind, District

Faisalabad.

0.700 0.660 -0.040 100%

11Construction of Soling / Drain (RDS) Chak

No.37/JB, District Faisalabad.1.500 1.420 -0.080 100%

12Construction of Soling / Drain (RDS) Chak

No.275/JB, District Faisalabad.1.600 1.510 -0.090 100%

13Construction of Metalled Road Chak

No.276/JB, District Faisalabad.1.500 1.435 -0.065 100%

14Construction of Soling / Drain (RDS) Chak

No.60/JB, District Faisalabad.1.000 0.990 -0.010 100%

15Construction of Soling / Drain (RDS) Chak

No.33/JB Azafi Abadi, District Faisalabad.1.400 1.390 -0.010 100%

16Construction of Soling / Drain (RDS) Chak

No.38/JB Azafi Abadi, District Faisalabad.1.300 1.288 -0.012 100%

16 17.900 17.484 -0.416

Muhammad Ejaz Virk dated 17.8.12

Mna, NA-83

1

Construction of P.C.C. Road Rasool Park

Gali No.17 Nimra Masjid Wali Gali,

U.C.No.223, Faisalabad.

2.330 2.275 -0.055 100%

17.900 15-Oct-12565

50.000 17-Aug-1261

Page 116

Page 117: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2Construction of P.C.C. Road Ali Town Gali

No.2 & 3, U.C.No.226, Faisalabad.2.700 2.675 -0.025 100%

3Construction of P.C.C. Road Ali Irfan abad

Gali No.1, U.C.No.200, Faisalabad.2.550 2.520 -0.030 100%

4Construction of P.C.C. Road Khakhshan

Colony, U.C.No.220, Faisalabad.2.142 2.003 -0.139 100%

5Construction of P.C.C. Road Y-Block Gali

No.7, U.C.No.222, Faisalabad.2.142 2.100 -0.042 100%

6Construction of P.C.C. Road Distgheer

Colony Gali No.1 U.C.No.203, Faisalabad.2.500 2.453 -0.047 100%

7

Construction of P.C.C. Road Muhammad

Khan Town, Gali No.7, U.C.No.203,

Faisalabad.

2.500 2.473 -0.027 100%

8Construction of P.C.C.Road Z-Block Park,

U.C.No.222, Faisalabad.1.780 1.650 -0.130 100%

9

Construction of P.C.C. Road Y-Block Madni

Masjid Park, U.C.No.222, Faisalabad. 1.475 1.444 -0.031 100%

10Construction of P.C.C. Road Sardar Colony

Gali No.7, U.C.No.202, Faisalabad.2.500 2.447 -0.053 100%

11

Construction of P.C.C. Road Mohallah

Distgheer Pura Gali No.2,3 cross,

U.C.No.246, Faisalabad.

2.500 2.468 -0.032 100%

12

Construction of P.C.C.Road Mohallah Noor

Pura Gali No.8 & 9, U.C.No.227, Faisalabad. 1.263 1.278 0.015 100%

13

Construction of P.C.C. Road Gali No.8 Jhami

Masjid Naseer abad Farooquia, U.C.No.205,

Faisalabad.

2.500 2.465 -0.035 100%

14Construction of P.C.C.Road Mansoor abad

Gali No.11, U.C.No.204, Faisalabad.0.815 0.787 -0.028 100%

15

Construction of P.C.C.Road Mohallah Fateh

abad Gali No.9, U.C.No.229, Faisalabad. 0.315 0.350 0.035 100%

16Construction of P.C.C. Road Quaid-e-Azam

Park, U.C.No.202, Faisalabad.2.500 2.372 -0.128 100%

17

Construction of P.C.C. Road Mohallah Sadiq

Akbar Town, U.C.No.203, Faisalabad. 2.500 2.481 -0.019 100%

50.000 17-Aug-1261

Page 117

Page 118: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18

Construction of P.C.C. Road Ideal Bakery

wali gali Socan Road, U.C.No.224,

Faisalabad.

2.500 2.478 -0.022 100%

19Construction of P.C.C. Road Mughal Pura,

U.C.No.205, Faisalabad.2.500 2.468 -0.032 100%

20Construction of P.C.C. Road Mohallah

Yousaf abad, U.C.No.220, Faisalabad.2.500 2.459 -0.041 100%

21

Construction of P.C.C. Road Mohallah Noor

Pur Ali Masjid wali gali, U.C.No.227,

Faisalabad.

2.500 1.244 -1.256 100%

22

Construction of P.C.C. Road Khan Model

Colony Maki Masjid wali gali, U.C.No.227,

Faisalabad.

1.974 1.936 -0.038 100%

23

Construction of P.C.C. Road Rabani Colony

No.2, Gali No.1, U.C.No.237, Faisalabad. 1.974 1.947 -0.027 100%

24Construction of P.C.C. Road Rasool Park

Gali No.15, U.C.No.223, Faisalabad.1.040 1.015 -0.025 100%

24 50.000 47.788 -2.212

Muhammad Ejaz Virk dated 30.8.12

Mna, NA-83

1Construction of P.C.C. Road Malik Pur Gali

No.1, U.C.No.202, Faisalabad.3.000 2.929 -0.071 100%

2Construction of P.C.C. Road Malik Pur Gali

No.10, U.C.No.202, Faisalabad.2.500 2.450 -0.050 100%

3Construction of P.C.C. Road Baqar Mohallah

Gali No.1, U.C.No.226, Faisalabad.2.256 2.256 100%

4Construction of P.C.C. Road Gali No.2 & 3,

Umer Town, U.C.No.220, Faisalabad.2.400 2.353 -0.047 100%

5

Construction of P.C.C. Road Gali No.1 &

Masjid wali gali, Waris Pura, U.C.No.247,

Faisalabad.

2.500 2.454 -0.046 100%

150.000 117 30-Aug-12

50.000 17-Aug-1261

Page 118

Page 119: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Construction of P.C.C. Road Officer Colony,

U.C.No.224 (Khurum Balouch), Faisalabad.2.011 1.933 -0.078 100%

7Construction of P.C.C. Road Gali No.12, X-

Block, U.C.No.223, Faisalabad.2.500 2.452 -0.048 100%

8

Construction of P.C.C.Road Ghousia Road to

Fareed Road Dhuddiwala, U.C.No.220,

Faisalabad.

2.836 2.780 -0.056 100%

9Construction of P.C.C. Road Dhuddiwala

Khakhshan Colony, U.C.No.220, Faisalabad.2.500 2.451 -0.049 100%

10Construction of Carpet Road,W-Block near

Police Station, U.C.No.223, Faisalabad.2.650 2.608 -0.042 100%

11Construction of P.C.C. Road Rajadaha Town,

U.C.No.227, Faisalabad.2.424 2.367 -0.057 100%

12

Construction of Carpet Road,

Comprehensive Model Girls High School

Madina Town, Faisalabad.

1.789 1.764 -0.025 100%

13

Construction of P.C.C.Road, Gali No.8 with

cross gali Barkat Pura, U.C.No.246,

Faisalabad.

2.300 2.255 -0.045 100%

14Construction of P.C.C.Road Mohallah Amin

Park Main Bazar and cross, Faisalabad.2.500 2.451 -0.049 100%

15

Construction of P.C.C.Road Gali No.20 Amir

Saleemi Gali Rasool Park, U.C.No.223,

Faisalabad.

2.500 2.451 -0.049 100%

16

Construction of P.C.C. Road Gali No.9,

Sohail Public School wali gali Rasool Park,

U.C.No.223, Faisalabad.

2.400 2.345 -0.055 100%

17Construction of P.C.C. Road Gali No.1,2,3,

Usman abad, U.C.No.226, Faisalabad.2.444 2.348 -0.096 100%

18

Construction of P.C.C. Road Mohallah

Madina abad Gali No.8, 9 & 10, U.C.No.226,

Faisalabad.

2.450 2.322 -0.128 100%

19

Construction of P.C.C. Road and Marble

Flooring Holy Rozry Church Waris Pura,

Faisalabad.

2.500 2.407 -0.093 100%

20Construction of P.C.C. Road Amin Town,

U.C.No.203, Faisalabad.1.800 1.720 -0.080 100%

150.000 117 30-Aug-12

Page 119

Page 120: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

21Repairing of Carpet Road links street Irshad

Road, U.C.No.222, Faisalabad.1.740 1.698 -0.042 100%

22Construction/Repairing of Carpet Road

Officer Colony U.C.No.221, Faisalabad.5.700 5.583 -0.117 100%

23Repairing of Carpet Road W-Block Madina

Town U.C.No.219, Faisalabad.2.740 2.645 -0.095 100%

24Repairing of Carpet Road Khybain Colony

No.3, U.C.No.219, Faisalabad.2.880 2.605 -0.275 100%

25Laying of Sewer Line Saeed Colony Main

Road & link street U.C.No.219, Faisalabad.3.766 3.680 -0.086 100%

26Laying of Sewer Line Khakhashan Colony to

Grave Yard Road, U.C.No.226, Faisalabad.1.788 1.720 -0.068 100%

27

Construction of Carpet Road College Road

Chowk toward Kohi-e-Noor School Gate,

U.C.No.222, Faisalabad.

3.250 3.048 -0.202 100%

28Construction of P.C.C. Road Sardar Colony

and Malik Pur, U.C.No.202, Faisalabad.2.187 2.176 -0.011 100%

29Construction of Sewer Line Rasool Park Gali

No.15, U.C.No.223, Faisalabad.0.407 0.392 -0.015 100%

30Construction of Sewer Line Usman abad,

U.C.No.226, Faisalabad.0.585 0.558 -0.027 100%

31Construction of P.C.C. Road Changhran wali

Gali Rasool Nagar, U.C.No.226, Faisalabad.2.296 2.180 -0.116 100%

32

Construction of P.C.C. Road Azhar Town

Gali No.4 and near Street, U.C.No.200,

Faisalabad.

1.261 1.210 -0.051 100%

33Construction of P.C.C. Road Ali Irfan abad,

U.C.No.200, Faisalabad.2.296 2.251 -0.045 100%

34Laying of Sewer Line Muhammad abad,

U.C.No.236, Faisalabad.0.370 0.345 -0.025 100%

35Construction of P.C.C.Road Gali No.4,

Sherain abad, U.C.No.200, Faisalabad.1.025 0.998 -0.027 100%

36Construction of Sewer Line Rasool Nagar,

U.C.No.226, Faisalabad.1.244 1.185 -0.059 100%

37Construction of Sewer Line Umer Town,

U.C.No.220, Faisalabad.0.500 0.490 -0.010 100%

150.000 117 30-Aug-12

Page 120

Page 121: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

38Construction of Sewer Line Dawood Colony,

U.C.No.220, Faisalabad.0.500 0.490 -0.010 100%

39Construction of P.C.C. Road Khybain Colony,

U.C.No.219, Faisalabad.2.250 2.150 -0.100 100%

40Construction of P.C.C. Road Yaseen abad,

U.C.No.246, Faisalabad.2.296 2.234 -0.062 100%

41Construction of P.C.C. Road Dawood Colony

Tariq wali gali, U.C.No.220, Faisalabad.1.420 1.394 -0.026 100%

42Laying of Sewer Line Jhanda Singh wala,

U.C.No.240, Faisalabad.0.225 0.216 -0.009 100%

43Construction of Carpet Road Baba Fareed

Road U.C.No.220, Faisalabad.6.440 6.189 -0.251 100%

44

Repairing of Carpet Road Canal Garden

Colony gate to Faisal Garden U.C.No.201,

Faisalabad.

0.700 0.682 -0.018 100%

45Construction/Repairing of Carpet Road

Saeed Colony, U.C.No.219, Faisalabad.2.601 2.570 -0.031 100%

46Construction of P.C.C. Road Darul Islam

Colony, U.C.No.221, Faisalabad.1.273 1.252 -0.021 100%

47Construction of P.C.C. Road Al-Mehran

Colony, U.C.No.226, Faisalabad.2.900 2.750 -0.150 100%

48Repairing of Carpet Road Peoples Colony

U.C.No.224, Faisalabad.1.665 1.589 -0.076 100%

49Construction of P.C.C. Road Salamat Block,

U.C.No.203, Faisalabad.2.294 2.245 -0.049 100%

50Construction of P.C.C. Road Jhanda Singh

Wala, U.C.No.240, Faisalabad.1.400 1.370 -0.030 100%

51Laying of Sewer Line Gali No.6 Shamas

abad, U.C.No.200, Faisalabad.0.366 0.359 -0.007 100%

52Construction of Tuff Paver along College

Road, U.C.No.222, Faisalabad.0.709 0.689 -0.020 100%

53

Construction of P.C.C. Road Gali No.4

Meharban abad Shamas abad, U.C.No.200,

Faisalabad.

0.615 0.606 -0.009 100%

54Construction of P.C.C. Road Naimat Town

Malik Pur, U.C.No.201, Faisalabad.2.530 2.483 -0.047 100%

150.000 117 30-Aug-12

Page 121

Page 122: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

55

Construction of P.C.C. Road Gali No.11 &

12, Quaid-e-Azam Park, U.C.No.202,

Faisalabad.

2.294 2.244 -0.050 100%

56Construction of P.C.C. Road , Quaid-e-Azam

Park, U.C.No.202, Faisalabad.2.900 2.860 -0.040 100%

57Laying of Sewer Line Quaid-e-Azam Park

U.C.No.202, Faisalabad.2.000 1.982 -0.018 100%

58Construction of P.C.C. Road Masjid wali gali

80 Marabah, U.C.No.201, Faisalabad.0.876 0.845 -0.031 100%

59

Repairing of Carpet Road Distgheer Pura

Shahbaz Jutt wali gali, U.C.No.246,

Faisalabad.

2.027 1.990 -0.037 100%

60Construction of P.C.C.Road Peoples Colony,

U.C.No.224, Faisalabad.2.290 2.200 -0.090 100%

61Construction of P.C.C.Road Muhammad

Nagar Gali No.11, U.C.No.227, Faisalabad.1.340 1.278 -0.062 100%

62Repairing of Carpet Road Babar Chowk to

Officer Colony, U.C.No.221, Faisalabad.1.090 1.025 -0.065 100%

63Repairing of Carpet Road Amin Town,

U.C.No.203, Faisalabad.2.436 2.396 -0.040 100%

64Construction of Carpet Road, U.C.No.220,

Faisalabad.2.195 2.120 -0.075 100%

65Laying of Sewer Line Saeed Colony Canal

Road, Faisalabad.0.693 0.640 -0.053 100%

66Laying of Sewer Line Noshai Street al-Faiz

Colony, Faisalabad.0.452 0.445 -0.007 100%

67Construction of Carpet Road Akram Shah

Road, U.C.No.204, Faisalabad.2.238 2.125 -0.113 100%

68Laying of Sewer Line Nawaz Town Amin

Town, U.C.No.203, Faisalabad.1.410 1.398 -0.012 100%

69

Repairing of Carpet Road and Tuff Tile

Kashmir Road link street, U.C.No.219,

Faisalabad.

2.270 2.210 -0.060 100%

70Construction of P.C.C. Road Roza Park

Mansoor abad, U.C.No.204, Faisalabad.2.530 2.492 -0.038 100%

71Construction of P.C.C. Road Khakshan

Colony No.1, U.C.No.226, Faisalabad.2.530 2.486 -0.044 100%

72Construction of P.C.C. Road Waris Pura,

U.C.No.246, Faisalabad.2.530 2.486 -0.044 100%

150.000 117 30-Aug-12

Page 122

Page 123: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

73

Construction / Raising of Compound Wall

Peoples Colony Saif Hashami wali Park,

U.C.No.228, Fsd.

2.400 -2.400 100%

74

Construction of P.C.C. Road White Rose

Public School wali gali Chibban Road,

U.C.No.205, Fsd.

1.020 0.984 -0.036 100%

74 150.000 143.334 -6.666

Syed Inyat Ali Shah dated 14.9.12

Mna, NA-86

1Construction of Soling/Drain Chak

No.149/JB, District Chiniot.0.700 0.681 -0.019 100%

2Construction of Boundary WallSoling / Drain

Chak No.12/JB, District Chiniot.1.000 0.980 -0.020 100%

3Construction of Soling/Drain & Nala Chak

No.13/JB Village & Colony, District Chiniot.1.000 0.978 -0.022 100%

4

Const: of Soling/Drain Chak No.13 /JB

Walana wala, Noorka Ghoghani, District

Chiniot.

1.000 0.980 -0.020 100%

5Construction of Soling/Drain Kot Khuda Yar,

District Chiniot.1.000 0.980 -0.020 100%

6

Construction of Boundary Wall / Soling/Drain

Chak No.126/JB Nethoo Kary, District

Chiniot.

0.800 0.776 -0.024 100%

7Construction of Soling/Drain Mouza Lodain,

District Chiniot.0.500 0.490 -0.010 100%

8Construction of Soling/Drain Jhania, District

Chiniot.1.000 0.975 -0.025 100%

9Construction of Soling/Drain Abadi Dhper,

District Chiniot.0.500 0.485 -0.015 100%

10Construction of Soling/Drain Lasla Waris,

District Chiniot.0.500 0.490 -0.010 100%

11Construction of Soling/Drain Thatha Kamoka,

District Chiniot.0.600 0.588 -0.012 100%

12Construction of Soling/Drain Mouza Checher

Pedhen, District Chiniot.0.500 0.490 -0.010 100%

150.000 117 30-Aug-12

50.000 392 14-Sep-12

Page 123

Page 124: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13Construction of Soling/Drain Thatha Glotrain,

District Chiniot.0.500 0.489 -0.011 100%

14Construction of Soling/Drain Thatha Rehman

Abadi Sultan Jappa, District Chiniot.0.500 0.490 -0.010 100%

15Construction of Soling/Drain Mouza Jhanb,

District Chiniot.1.000 0.980 -0.020 100%

16Construction of Soling/Drain Qazi Herl,

District Chiniot.0.500 0.490 -0.010 100%

17Construction of Soling/Drain Mouza

Assayain, District Chiniot.0.800 0.767 -0.033 100%

18Const: of Soling/Drain Mouza Hersa Sheikh,

District Chiniot.1.000 0.980 -0.020 100%

19Construction of Soling/Drain Chak No.125/JB

Jappa, District Chiniot.0.800 0.786 -0.014 100%

20Construction of Soling/Drain Chak No.129/JB

Kohray, District Chiniot.0.800 0.783 -0.017 100%

21Construction of Soling/Drain Mouza Rasloo,

District Chiniot.0.500 0.490 -0.010 100%

22Construction of Soling/Drain Pingho More

Jhang Road, District Chiniot.0.800 0.780 -0.020 100%

23Construction of Soling/Drain Mouza Metta,

District Chiniot.0.500 0.485 -0.015 100%

24Construction of Soling/Drain Thatha

Kanjwan, District Chiniot.0.500 0.485 -0.015 100%

25Construction of Soling/Drain Chak

No.144/JB, District Chiniot.0.500 0.490 -0.010 100%

26Construction of Soling/Drain Chak No.156

Bhakharain, District Chiniot.1.000 0.980 -0.020 100%

27Construction of Soling/Drain Chak No.154

Ludhyana, District Chiniot.1.000 0.966 -0.034 100%

28Construction of Soling/Drain Mouza

Shamble, District Chiniot.1.000 0.978 -0.022 100%

29Construction of Soling/Drain Adda Pathan

Kot, District Chiniot.0.500 0.490 -0.010 100%

30Construction of Soling/Drain Thatha Bhadali,

District Chiniot.1.000 0.979 -0.021 100%

50.000 392 14-Sep-12

Page 124

Page 125: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

31Construction of Soling/Drain Chak No.153/JB

Ghatti Sayadain, District Chiniot.1.500 1.461 -0.039 100%

32Construction of Soling/Drain Ghutti Kamokay

Chak No.152/JB, District Chiniot.1.000 0.974 -0.026 100%

33Construction of Soling/Drain Colony Jand

Wala, District Chiniot.0.500 0.484 -0.016 100%

34Construction of Soling/Drain Cha Klasan

wala, District Chiniot.0.500 0.485 -0.015 100%

35Construction of Soling/Drain Pithan Kay,

District Chiniot.0.700 0.678 -0.022 100%

36Construction of Soling/Drain Chak

No.235/JB, District Chiniot.1.400 1.387 -0.013 100%

37Construction of Soling/Drain Chak No.142/JB

Heer, District Chiniot.1.000 0.980 -0.020 100%

38Construction of Soling/Drain Chak No.145/JB

Salaray, District Chiniot.0.900 0.879 -0.021 100%

39Construction of Soling/Drain Adda Mamia

abad, District Chiniot.1.000 0.888 -0.112 100%

40Construction of Soling/Drain Manora, District

Chiniot.1.000 0.980 -0.020 100%

41Construction of Soling/Drain Colony Manarra,

District Chiniot.0.500 0.490 -0.010 100%

42Construction of Soling/Drain Colony Baghra

Sadat, District Chiniot.0.500 0.490 -0.010 100%

43Construction of Soling/Drain Mahoon, District

Chiniot.1.000 0.980 -0.020 100%

44Construction of Soling/Drain Kanwain Wali,

District Chiniot.0.500 -0.500 100%

45Construction of Soling/Drain Sajan Ke,

District Chiniot.0.500 0.490 -0.010 100%

46Construction of Soling/Drain Adlana, District

Chiniot.0.700 0.651 -0.049 100%

47Construction of Soling/Drain Chak No.468/JB

Dangray, District Chiniot.1.100 1.082 -0.018 100%

48

Construction of Boundary Wall, Soling/Drain,

Tuff Tile and P.C.C.Road U.C.No.34,

Mohallah Ghafoor abad, Haji abad, Rehman

abad, District Chiniot.

2.400 2.352 -0.048 100%

50.000 392 14-Sep-12

Page 125

Page 126: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

49

Construction of Tuff Tile, P.C.C.Road,

Soling/Drain, U.C.No.35, Satelite Town,

Mohallah Khan Shah Bukhari Tathi Mochain,

Shah Nawaz Colony, District Chiniot.

1.500 1.470 -0.030 100%

50

Construction of Tuff Tile, P.C.C.Road,

Soling/Drain, U.C.No.37, Tabla Kamanghra

Thathi East, West, District Chiniot.

3.000 2.914 -0.086 100%

51

Construction of Tuff Tile, P.C.C.Road,

Soling/Drain, U.C.No.38, Mohallah Insarian

Mohallah Aadi Terkhana Mohallah, District

Chiniot.

2.500 2.420 -0.080 100%

52

Construction of Tuff Tile, P.C.C.Road,

Soling/Drain, U.C.No.39, Mohallah

Qusabain, Muslim Bazar Mohallah Rakhti,

District Chiniot.

1.000 0.964 -0.036 100%

53

Construction of Tuff Tile, P.C.C.Road,

Soling/Drain, U.C.No.40, Rasheed abad,

Mohallah Usman abad, Mouzam Shah,

District Chiniot.

3.000 2.901 -0.099 100%

53 50.000 48.181 -1.819

Riaz Fatyana dated 6.9.12

Mna, NA-94

1

Construction of Soling/Drain Chak

No.751/GB Azafi abadi Amanat Ali Nakiana,

District Toba Tek Singh.

0.500 0.493 -0.007 100%

2

Construction of Soling/Drain Chak

No.759/GB Zbadi Nooray wala Abadi Shahid

Arain, District Toba Tek Singh.

0.500 0.493 -0.007 100%

3

Construction of Soling/Drain Chak No.

744/GB Azafi abadi, Mehr Muhammad Afzal

Parbana, District Toba Tek Singh.

0.500 0.493 -0.007 100%

4Construction of Soling/Drain Chak

No.326/GB, District Toba Tek Singh.1.000 0.980 -0.020 50%

80.000 251 06-Sep-12

50.000 392 14-Sep-12

Page 126

Page 127: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5Construction of Soling/Drain Chak

No.322/GB District Toba Tek Singh.1.500 0.980 -0.520 50%

6Construction of Soling/Drain Chak

No.334/GB District Toba Tek Singh.1.000 0.980 -0.020 50%

7Construction of Soling/Drain Chak No.663/4-

GB, District Toba Tek Singh.0.900 0.835 -0.065 50%

8Construction of Soling/Drain A-Plot Abadi

Ghulam Abbas, District Toba Tek Singh.0.500 0.493 -0.007 100%

9

Construction of Soling/Drain Chak No.666/7-

GB Azafi Abadi Khalid Mehmood Musali,

District Toba Tek Singh.

0.500 0.493 -0.007 100%

10Construction of Soling/Drain Chak

No.332/GB, District Toba Tek Singh.0.800 0.779 -0.021 50%

11

Construction of Soling/Drain C-Plot Khan

Jawan Gali Imran Gondal, District Toba Tek

Singh.

1.000 0.980 -0.020 50%

12

Construction of Soling/Drain Chak No.661/2-

GB Azafi Abadi Maqsood Ahmad Baloch,

District Toba Tek Singh.

0.500 0.490 -0.010 100%

13Construction of Soling/Drain Chak No.669/10-

GB, District Toba Tek Singh.1.500 1.456 -0.044 50%

14Construction of Soling/Drain Chak

No.771/GB. District Toba Tek Singh.1.000 0.957 -0.043 50%

15Construction of Soling/Drain Chak No.

691/33-GB,District Toba Tek Singh.1.000 0.970 -0.030 50%

16Construction of Soling/Drain Chak No.693/35-

GB, District Toba Tek Singh.0.500 0.493 -0.007 100%

17Construction of Soling/Drain Chak No.

696/38-GB, District Toba Tek Singh.1.000 0.967 -0.033 50%

18

Construction of Soling/Drain Chak No.679/20-

GB Dera Iqbal Gopay Da, District Toba Tek

Singh.

0.500 0.490 -0.010 100%

19

Construction of Soling/Drain Chak No.685/26-

GB, Dera Allah Yar Marth, District Toba Tek

Singh.

0.800 0.779 -0.021 50%

20

Construction of Soling/Drain Chak

No.327/GB Basti Oder, District Toba Tek

Singh.

0.500 0.490 -0.010 100%

80.000 251 06-Sep-12

Page 127

Page 128: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

21

Construction of Soling/Drain Mouza Nawab

Abadi Mohd Aslam Nohana, District Toba

Tek Singh.

0.500 0.490 -0.010 100%

22

Construction of Soling/Drain abadi Chochar

Gana Abadi Shah Nazam, District Toba Tek

Singh.

0.500 0.493 -0.007 100%

23

Construction of Soling/Drain Chak

No.718/GB Abadi Sahoo Marth, District Toba

Tek Singh.

0.500 0.490 -0.010 100%

24

Construction of Soling/Drain Mouza Ram Pur

Darbar Shouda, District Toba Tek Singh. 0.500 0.482 -0.018 100%

25

Construction of Soling/Drain Chak No.

771/GB Abadi Ghulam Mohd. Jhakar, District

Toba Tek Singh.

1.000 0.980 -0.020 50%

26

Construction of Soling/Drain Chak

No.717/GB Azafi abadi, District Toba Tek

Singh.

1.000 0.980 -0.020 50%

27

Construction of Soling/Drain Chak

No.776/GB Azafi abadi Ch.Wariam Number

dar, District Toba Tek Singh.

1.000 0.980 -0.020 50%

28

Construction of Soling/Drain Chak

No.319/GB Azafi Abadi Oadar, District Toba

Tek Singh.

0.500 0.482 -0.018 100%

29

Construction of Soling/Drain Chak

No.722/GB Main Chak & Azafi Abadi, District

Toba Tek Singh.

1.000 0.975 -0.025 50%

30Construction of Soling/Drain Chak

No.329/GB, District Toba Tek Singh.1.000 0.968 -0.032 50%

31Construction of Soling/Drain Chak

No.321/GB, District Toba Tek Singh.1.000 0.968 -0.032 50%

32

Construction of Soling/Drain Mouza Mahr

Chand, Abadi Ghous Gujjar, District Toba

Tek Singh.

0.500 0.493 -0.007 100%

33Construction of Soling/Drain Mouza Kot

Karam Shah, District Toba Tek Singh.0.500 0.493 -0.007 100%

34Construction of Soling/Drain Adda Budhan

Khoo, District Toba Tek Singh.0.500 0.490 -0.010 100%

80.000 251 06-Sep-12

Page 128

Page 129: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

35Construction of Soling/Drain Chak

No.721/GB, District Toba Tek Singh.0.500 0.490 -0.010 100%

36Construction of Soling/Drain Chak

No.746/GB District Toba Tek Singh.0.500 0.493 -0.007 100%

37Construction of Soling/Drain Chak

No.761/Gb, District Toba Tek Singh.0.500 0.492 -0.008 100%

38

Construction of Soling/Drain Chak No.683/24-

GB, Qabarstan wali gali, District Toba Tek

Singh.

1.000 0.982 -0.018 100%

39

Construction of Soling/Drain Chak No.666/7-

GB Abadi Razwan Shah District Toba Tek

Singh.

0.500 0.490 -0.010 100%

40Construction of Soling/Drain Chak No.

670/11-GB, District Toba Tek Singh.0.500 0.490 -0.010 100%

41Construction of Soling/Drain C-Plot Abadi

Kamlay Shah, District Toba Tek Singh.0.500 0.490 -0.010 100%

42Construction of Soling/Drain Mouza Sheikh

Burhan, District Toba Tek Singh.1.500 1.420 -0.080 100%

43Construction of Soling/Drain Mouza Syed

Musa, District Toba Tek Singh.1.000 0.981 -0.019 100%

44Construction of Soling/Drain Mouza Mal

Fatyana, District Toba Tek Singh.1.500 1.456 -0.044 100%

45Construction of Soling/Drain Mouza Gardana,

District Toba Tek Singh.1.500 1.458 -0.042 100%

46Construction of Soling/Drain Mouza Jaloka,

District Toba Tek Singh.0.500 0.493 -0.007 100%

47

Construction of Soling/Drain Mouza Ghoas

Khod Abadi Allah Ditta, District Toba Tek

Singh.

0.500 0.493 -0.007 100%

48Construction of Soling/Drain Mouza

Mumbarh, District Toba Tek Singh.0.500 0.492 -0.008 100%

49Construction of Soling/Drain Mouza Khod,

District Toba Tek Singh.0.500 0.490 -0.010 100%

50Construction of Soling/Drain Sair Mosal,

District Toba Tek Singh.0.500 0.490 -0.010 100%

51Construction of Soling/Drain Mouza Ravi

Khokhar, District Toba Tek Singh.0.500 0.490 -0.010 100%

80.000 251 06-Sep-12

Page 129

Page 130: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

52

Construction of Soling/Drain Chak

No.739/GB Kasmana Abadi Alam Sher,

District Toba Tek Singh.

1.000 0.981 -0.019 100%

53

Construction of Soling/Drain Mohallah

Khurshid abad Kamalai, District Toba Tek

Singh.

1.500 1.475 -0.025 100%

54

Construction of Soling/Drain Mohallah Baghi

wala Kamalia, District Toba Tek Singh. 1.500 1.452 -0.048 100%

55Construction of Soling/Drain Mouza Sultan

Kay Baghalay, District Toba Tek Singh.0.500 0.493 -0.007 100%

56Construction of Soling/Drain Mouza Ghatay

kay Baghalay, District Toba Tek Singh.0.500 0.493 -0.007 100%

57Construction of Soling/Drain Mouza Chowki

Chaddar, District Toba Tek Singh.0.500 0.492 -0.008 100%

58Construction of Soling/Drain Chak

No.725/GB, District Toba Tek Singh.1.500 1.450 -0.050 50%

59Construction of Soling/Drain Chak

No.724/GB, District Toba Tek Singh.1.000 0.978 -0.022 50%

60Construction of Soling/Drain Chak

No.740/GB, District Toba Tek Singh.0.500 0.493 -0.007 100%

61Construction of Soling/Drain Chak

No.735/GB, District Toba Tek Singh.1.000 0.967 -0.033 50%

62Construction of Soling/Drain Chak Amir Ali

Shah, District Toba Tek Singh.0.500 0.493 -0.007 100%

63Construction of Soling/Drain Chak No.55/GB

Tukra, District Toba Tek Singh.0.500 0.493 -0.007 100%

64Construction of Soling/Drain Chak No.56/GB

Tukra, District Toba Tek Singh.0.500 0.493 -0.007 100%

65Construction of Soling/Drain Chak

No.706/GB, District Toba Tek Singh.0.500 0.490 -0.010 100%

66

Construction of Soling/Drain Chak

No.710/GB Abadi Shafi wala Abadi Jinnah,

District Toba Tek Singh.

0.500 0.490 -0.010 100%

67Construction of Soling/Drain Chak

No.709/GB, District Toba Tek Singh.0.500 0.490 -0.010 100%

68Construction of Soling/Drain Chak

No.738/GB, District Toba Tek Singh.1.000 0.975 -0.025 100%

80.000 251 06-Sep-12

Page 130

Page 131: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

69Construction of Soling/Drain Chak No.58/3

Tukra, District Toba Tek Singh.0.500 0.490 -0.010 100%

70Construction of Soling/Drain Chak No.54/2

Tukra, District Toba Tek Singh.1.000 0.969 -0.031 100%

71Construction of Soling/Drain Chak No.54/1

Tukra, District Toba Tek Singh.0.500 0.490 -0.010 100%

72Construction of Soling/Drain Chak

No.713/GB, District Toba Tek Singh.1.000 0.968 -0.032 100%

73Construction of Soling/Drain Cha Dal wala

Baroon Kamalia, District Toba Tek Singh.0.500 0.490 -0.010 100%

74Construction of Soling/Drain Cha Sikandar

Baroon Kamalia, District Toba Tek Singh.0.500 0.490 -0.010 100%

75Construction of Soling/Drain Mouza Mosal,

District Toba Tek Singh.0.500 0.490 -0.010 100%

76Construction of Soling/Drain Basti Iqbal

Nagar Kamalia, District Toba Tek Singh.0.500 0.490 -0.010 100%

77Construction of Soling/Drain Basti Sarwar

Nakiana, District Toba Tek Singh.1.000 0.770 -0.230 50%

78Construction of Soling/Drain Chak

No.732/GB, District Toba Tek Singh.0.500 0.490 -0.010 100%

79

Construction of Soling/Drain Chak

No.712/GB Abadi Dastgheer Jutt, District

Toba Tek Singh.

1.000 0.869 -0.131 100%

80Construction of Soling/Drain Mouza Kalera

Malik Khoar, District Toba Tek Singh.0.500 0.493 -0.007 100%

81

Construction of Soling/Drain Chak

No.742/GB Tehsil Kamalia, District Toba Tek

Singh.

1.500 1.288 -0.212 100%

82

Construction of Soling/Drain Chak

No.733/GB Tehsil Kamalia District Toba Tek

Singh.

1.000 0.980 -0.020 100%

83

Construction of Soling/Drain Chak

No.747/GB Tehsil Kamalia District Toba Tek

Singh.

1.000 0.979 -0.021 100%

84

Construction of Soling/Drain Chak

No.325/GB Tehsil Kamalia District Toba Tek

Singh.

1.000 0.980 -0.020 100%

80.000 251 06-Sep-12

Page 131

Page 132: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

85

Construction of Soling/Drain Chak

No.320/GB Tehsil Kamalia District Toba Tek

Singh.

1.000 0.980 -0.020 50%

86

Construction of Soling/Drain Zulfiqar Colony,

Pir Mehal Tehsil Kamalia, District Toba Tek

Singh.

1.500 1.456 -0.044 100%

87

Construction of Soling/Drain Chak

No.734/GB Tehsil Kamalia District Toba Tek

Singh.

0.800 0.775 -0.025 100%

88

Construction of Soling/Drain Chak

No.734/GB Abadi Riaz Doltana Tehsil

Kamalia District Toba Tek Singh.

0.500 0.493 -0.007 100%

89

Construction of Soling/Drain Chak No.53/7

Tukra Tehsil Kamalia District Toba Tek

Singh.

0.700 0.684 -0.016 100%

90

Construction of Soling/Drain Chak No.75/4

Tukra Tehsil Kamalia District Toba Tek

Singh.

0.500 0.493 -0.007 100%

91

Construction of Soling/Drain Chak

No.715/GB Tehsil Kamalia District Toba Tek

Singh.

0.500 0.492 -0.008 100%

92

Construction of Soling/Drain Mouza Qadir

Buksh Tehsil Kamalia District Toba Tek

Singh.

1.500 1.460 -0.040 100%

93

Construction of Soling/Drain Mouza

Mumbhar Tehsil Kamalia District Toba Tek

Singh.

0.500 0.492 -0.008 100%

94

Construction of Soling/Drain Chak

No.710/GB Tehsil Kamalia District Toba Tek

Singh.

1.000 0.980 -0.020 100%

95

Construction of P.C.C.Road Mohallah Chah

Bagh wala & Mohallah Chirh Tehsil Kamalia

District Toba Tek Singh.

1.000 0.970 -0.030 100%

96

Construction of Metalled Road Mal Fatyana

Road to Dars Sadiq Sialvi Tehsil Kamalia

District Toba Tek Singh.

3.000 1.977 -1.023 100%

97

Construction of Metalled Road Mal Fatyana

Road to New Tablighi Markaz Tehsil Kamalia

District Toba Tek Singh.

1.600 0.999 -0.601 100%

80.000 251 06-Sep-12

Page 132

Page 133: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

98Construction of Multi Purpose Hall Tehsil

Kamalia District Toba Tek Singh.1.400 -1.400 100%

98 80.000 74.220 -5.780

Haji Liaqat Ali dated 5.9.12

MPA, PP-51

1

Construction / Repairing of Metalled Road

Deputy Wala Inter Change to Chak

No.111/JB Dhowlan wall District Faisalabad.8.980 8.820 -0.160 100%

2

Construction of P.C.C.Road and Drain Chak

No.111/JB Dhowlan wall District Faisalabad. 11.020 11.003 -0.017 100%

2 20.000 19.823 -0.177

Haji Liaqat Ali dated 14.12.12

MPA, PP-51

1Construction of P.C.C.Road and Drain Chak

No.111/JB Dhowlan wall District Faisalabad.10.000 9.856 -0.144 100%

2

Construction / Repairing of Metalled Road

Chak No.110/JB Moga wala Distrct

Faisalabad.

3Construction of Metalled Road Chak

No.111/JB Dhowlan Wall Distrct Faisalabad.

3 10.000 9.856 -0.144

30.000 14-Dec-12811

80.000 251 06-Sep-12

20.000 05-Sep-1238

Page 133

Page 134: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Zafar Zulqurnain Sahi dated 6.9.12

MPA, PP-52

1Construction of Soling/Drain Chak No.52/RB,

District Faisalabad.1.000 0.975 -0.025 100%

2Construction of Soling/Drain Chak No.54/RB,

District Faisalabad.1.000 0.982 -0.018 100%

3Construction of Metalled Road Chak

No.55/RB, District Faisalabad.3.000 2.897 -0.103 100%

4Construction of Soling/Drain Chak No.55/RB,

District Faisalabad.0.500 0.480 -0.020 100%

5Construction of Soling/Drain Chak No.56/RB,

District Faisalabad.1.000 0.980 -0.020 100%

6Construction of Soling/Drain Chak No.57/RB,

District Faisalabad.2.000 1.880 -0.120 100%

7Construction of Soling/Drain Chak No.58/RB,

District Faisalabad.1.000 0.975 -0.025 100%

8Construction of Soling/Drain Chak No.59/RB,

District Faisalabad.1.000 0.975 -0.025 100%

9Construction of Soling/Drain Chak No.60/RB,

District Faisalabad.2.000 1.940 -0.060 100%

10Construction of Soling/Drain Chak No.62/RB,

District Faisalabad.1.000 0.970 -0.030 100%

11Construction of Soling/Drain Chak No.63/RB

Qaim, District Faisalabad.1.000 0.978 -0.022 100%

12Construction of Soling/Drain Chak No.63/RB

Nialoana, District Faisalabad.1.000 0.976 -0.024 100%

13Construction of Soling/Drain Chak No.66/RB,

District Faisalabad.1.000 0.978 -0.022 100%

14Construction of Soling/Drain Chak No.67/RB,

District Faisalabad.2.000 1.940 -0.060 100%

15Construction of Soling/Drain Chak No.68/RB,

District Faisalabad.2.000 1.935 -0.065 100%

16Construction of Soling/Drain Chak No.69/RB,

District Faisalabad.1.500 1.450 -0.050 100%

17Construction of Soling/Drain Chak No.70/RB,

District Faisalabad.1.500 1.420 -0.080 100%

50.000 06-Sep-12243Page 134

Page 135: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18Construction of Soling/Drain Chak No.71/RB,

District Faisalabad.1.000 0.980 -0.020 100%

19Construction of Soling/Drain Chak No.72/RB,

District Faisalabad.1.000 0.980 -0.020 100%

20Construction of Soling/Drain Chak No.73/RB

Karrianwala, District Faisalabad.2.000 1.935 -0.065 100%

21Construction of Soling/Drain Chak No.74/RB,

District Faisalabad.2.000 1.940 -0.060 100%

22Construction of Soling/Drain Chak No.76/RB,

District Faisalabad.1.000 0.947 -0.053 100%

23Construction of Soling/Drain Chak No.77/RB,

District Faisalabad.1.800 1.740 -0.060 100%

24Construction of Soling/Drain Chak No.90/RB,

District Faisalabad.1.000 0.980 -0.020 100%

25Construction of Soling/Drain Chak No.91/RB,

District Faisalabad.1.000 0.960 -0.040 100%

26Construction of Soling/Drain Chak No.92/RB,

District Faisalabad.1.000 0.965 -0.035 100%

27Construction of Soling/Drain Chak No.93/RB,

District Faisalabad.1.000 0.980 -0.020 100%

28Construction of Soling/Drain Chak No.94/RB,

District Faisalabad.2.000 1.920 -0.080 100%

29Construction of Soling/Drain Chak No.95/RB,

District Faisalabad.1.000 0.975 -0.025 100%

30Construction of Soling/Drain Chak No.96/RB,

District Faisalabad.1.000 0.965 -0.035 100%

31Construction of Soling/Drain Chak No.97/RB,

District Faisalabad.2.000 1.935 -0.065 100%

32Construction of Soling/Drain Chak No.98/RB,

District Faisalabad.1.000 0.932 -0.068 100%

33Construction of Soling/Drain Chak

No.149/RB, District Faisalabad.1.000 0.975 -0.025 100%

34Construction of Soling/Drain Chak

No.150/RB, District Faisalabad.1.000 0.980 -0.020 100%

35Construction of Soling/Drain Chak

No.151/RB, District Faisalabad.1.000 0.980 -0.020 100%

36

Construction of Metalled Road Faisalabad

Sheikhupura Road Saim Nallah to Abadi

Kalan District Faisalabad.

3.700 3.589 -0.111 100%

50.000 06-Sep-12243

Page 135

Page 136: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

36 50.000 48.389 -1.611

Maj® Abdul Rehman Rana dated 5.9.12

MPA, PP-53

1

Construction of Soling/Drain Chak

No.591/GB Tehsil Jaranwala District

Faisalabad.

1.000 0.970 -0.030 100%

2

Construction of Soling/Drain Chak

No.571/GB Tehsil Jaranwala District

Faisalabad.

1.000 0.970 -0.030 100%

3

Construction of Soling/Drain Chak

No.588/GB Tehsil Jaranwala District

Faisalabad.

1.000 0.970 -0.030 100%

4Construction of Nala Chak No.566/GB Tehsil

Jaranwala District Faisalabad. 1.000 0.980 -0.020 100%

5Construction of Nala Chak No.61/GB Tehsil

Jaranwala District Faisalabad. 1.000 0.980 -0.020 100%

6Construction of Soling/Drain Chak No.655/6-

GB Tehsil Jaranwala District Faisalabad. 1.000 0.968 -0.032 100%

7

Construction of Soling/Drain Chak

No.107/GB Tehsil Jaranwala District

Faisalabad.

1.000 0.966 -0.034 100%

8

Construction of Boundary Wall in

Govt.Primary School at Chak No.93/GB,

Tehsil Jaranwala District Faisalabad.

1.000 0.968 -0.032 100%

9

Construction of Two Rooms and Boundary

Wall in Chak No.567/GB Tehsil Jaranwala

District Faisalabad.

3.241 3.165 -0.076 100%

10

Construction of Primary School in Chak

No.240/GB, Tehsil Jaranwala District

Faisalabad.

2.280 2.145 -0.135 100%

11

Construction of Boundary Wall in

Govt.Primary School at Chak No.644/GB,

Tehsil Jaranwala District Faisalabad.

3.720 3.670 -0.050 100%

20.000 37 05-Sep-12

Page 136

Page 137: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Improvement of Metalled Road from Main

Road to Chak No.98/GB Tehsil Jaranwala

District Faialabad.

2.759 2.689 -0.070 100%

12 20.000 19.441 -0.559

Rai Muhammad Shahjahan Khan dated 5.9.12

MPA, PP-54

1Construction of PCC Road / Drain Streets

Jaranwala City District Faisalabad.10.000 9.786 -0.214 100%

2Construction of Soling / Drain Adda

Lundianwala Jaranwala District Faisalabad.1.000 0.980 -0.020 100%

3Construction of Soling / Drain Chak

Lakarwana Jaranwala District Faisalabad.2.000 1.925 -0.075 100%

4Construction of Metalled Road Harchoki

Tehsil Jaranwala District Faisalabad.4.000 3.980 -0.020 100%

5Construction of Metalled Road Chak

No.569/GB Jaranwala District Faisalabad.3.000 2.980 -0.020 100%

5 20.000 19.651 -0.349

Rai Muhammad Shahjahan Khan dated 14.12.12

MPA, PP-54

1Constructioon of P.C.C. Road City Jaranwala

District Faisalabad.10.000 9.828 -0.172 100%

2

Construction of Soling / Drain Chak

No.53/GB, 54/GB & 55/GB District

Faisalabad.

3

Construction of Soling / Drain Chak

No.119/GB, 120/GB, 121/GB & 123/GB

District Faisalabad.

4

Construction of Soling / Drain Chak

No.459/GB Ahmad wala Mouza Noor pura

District Faisalabad.30.000 14-Dec-12811

20.000 37 05-Sep-12

20.000 05-Sep-12197

Page 137

Page 138: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Construction of Soling / Drain Chak

No.627/GB & 629/GB Sai da Chak District

Faisalabad.

6

Construction of Soling / Drain Lundianwala,

Kot Hadayat, Lodiwala Azafi Abadies District

Faisalabad.

7Construction of Soling / Drain Chak

No.21/GB and 22/GB District Faisalabad.

8Construction of Soling / Drain Chak

No.645/GB District Faisalabad.

8 10.000 9.828 -0.172

Ch.Zaheer UD DIN dated 24.8.12

MPA, PP-55

1

Construction of P.C.C.Road in Street Chak

No.266/RB Khurrianwala, U.C.No.20, District

Faisalabad.

2.000 1.975 -0.025 100%

2

Construction of Soling/Drain Chak

No.266/RB Abadi Madina Town,

Khurrianwala, U.C.No.20, District Faisalabad.

1.000 0.975 -0.025 100%

3

Construction of Soling/Drain Chak

No.266/RB, Khurrianwala, U.C.No.21, District

Faisalabad.

2.000 1.980 -0.020 100%

4

Construction of Soling/Drain Chak

No.206/RB Saddouana, U.C.No.21, District

Faisalabad.

1.000 0.980 -0.020 100%

5

Construction of Metalled Road Chak

No.206/RB Munsi wala (remaining),

U.C.No.22, District Faisalabad.

4.000 3.987 -0.013 100%

6

Construction of Soling/Drain Chak

No.193/RB Shreewala, U.C.No.22, District

Faisalabad.

2.000 1.897 -0.103 100%

7

Construction of Boundary Wall Christian

Grave yard at Chak No.200/RB Lathianwala

(Remaining) District Faisalabad.

0.500 0.482 -0.018 100%

30.000 14-Dec-12811

100.000 106 24-Aug-12

Page 138

Page 139: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Construction of Boundary Wall Chak

No.194/RB Lathianwala, District Faisalabad.1.500 1.470 -0.030 100%

9

Construction / Improvement of Metalled Road

from Saim Bye-Pass to 107-1/2 Chaudhary

Wala, U.C.No.23, Tehsil Jaranwala District

Faisalabad.

5.000 4.890 -0.110 100%

10

Construction of Soling/Drain Chak

No.104/RB Paandi wala, U.C.No.23, District

Faisalabad.

2.000 1.945 -0.055 100%

11

Construction of Soling/Drain Chak

No.105/RB Ghabbian wala, U.C.No.23,

District Faisalabad.

2.000 1.968 -0.032 100%

12Construction of Soling/Drain Chak

No.101/RB, U.C.No.24, District Faisalabad.1.500 1.398 -0.102 100%

13Construction of Soling/Drain Chak No.75/RB

Lohky Khurd, U.C.No.24, District Faisalabad.2.000 1.948 -0.052 100%

14

Construction of Soling/Drain Chak

No.109/RB Adda Workshop, U.C.No.33,

District Faisalabad.

1.800 1.720 -0.080 100%

15

Improvement of Metalled Road Chak

No.205/RB Mohal wala, U.C.No.33, District

Faisalabad.

2.500 2.450 -0.050 100%

16

Construction of Soling/Drain Chak

No.109/RB Adda Workshop, U.C.No.33,

District Faisalabad.

0.500 0.490 -0.010 100%

17

Improvement of Metalled Road from Bye-

Pass to 211/RB Mujawaran, U.C.No.33,

District Faisalabad.

4.000 3.913 -0.087 100%

18

Construction of Soling/Drain Chak

No.210/RB Lakkouana, U.C.No.33, District

Faisalabad.

3.000 2.940 -0.060 100%

19

Construction of Soling/Drain Chak

No.229/RB Makkouana (Mai Mastaani),

U.C.No.34, District Faisalabad.

4.000 3.910 -0.090 100%

20

Construction of Soling/Drain Chak

No.229/RB Makkouana Purani abadi,

U.C.No.34, District Faisalabad.

3.000 2.940 -0.060 100%100.000 106 24-Aug-12

Page 139

Page 140: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

21

Construction of Soling/Drain Chak

No.229/RB Makkouana New abadi,

U.C.No.34, District Faisalabad.

3.000 2.935 -0.065 100%

22

Improvement of Bye-Pass Metalled Road

Jaranwala Road to Guroana via 112/GB

U.C.No.35, District Faisalabad.

7.600 7.240 -0.360 100%

23Construction of Soling/Drain Chak

No.111/GB Azafi Abadi District Faisalabad.1.000 0.980 -0.020 100%

24

Construction of Soling/Drain Chak

No.112/GB Abadi & Veternery Hospital

District Faisalabad.

1.000 0.980 -0.020 100%

25

Improvement of Bye-Pass Metalled Road

Jarnwala Road to Guroana via 112/GB

U.C.No.35, District Faisalabad.

0.900 0.875 -0.025 100%

26Construction of Soling/Drain Chak No.57/GB,

U.C.No.35, District Faisalabad.1.500 1.480 -0.020 100%

27

Construction of Soling/Drain & School Room

in Chak No.56/GB, U.C.No.65, District

Faisalabad.

3.000 2.935 -0.065 100%

28

Construction of Soling/Drain Chak

No.216/RB Muhammad wala Both abadies,

U.C.No.34, District Faisalabad.

3.000 2.910 -0.090 100%

29Construction of Soling/Drain Chak

No.109/GB, U.C.No.35, District Faisalabad.1.500 1.485 -0.015 100%

30Construction of Soling/Drain Chak No.73/GB,

U.C.No.36, District Faisalabad.2.300 2.235 -0.065 100%

31Construction of Soling/Drain Chak

No.114/GB U.C.No.36, District Faisalabad.3.000 2.942 -0.058 100%

32Construction of Soling/Drain Chak No.71/GB,

U.C.No.36, District Faisalabad.4.000 3.915 -0.085 100%

33

Widening & Improvement of Metalled Road

Chak No.70/GB to 72/GB, U.C.No.36,

District Faisalabad.

3.000 2.925 -0.075 100%

34

Construction & Improvement of Metalled

Road from Main Road to Chak No.65/GB,

U.C.No.37, Tehsil Jaranwala District

Faisalabad.

1.900 1.812 -0.088 100%

100.000 106 24-Aug-12

Page 140

Page 141: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

35Construction of Soling/Drain Chak

No.110/GB, U.C.No.37, District Faisalabad.1.500 1.430 -0.070 100%

36Construction of Soling/Drain Chak No.65/GB

New Abadi, U.C.No.37, District Faisalabad.3.000 2.925 -0.075 100%

37Construction of Soling/Drain Chak No.68/GB

Khurd, U.C.No.37, District Faisalabad.3.000 2.920 -0.080 100%

38Construction of Soling/Drain Chak No.23/GB,

U.C.No.64, District Faisalabad.2.000 1.940 -0.060 100%

39Construction of Soling/Drain Chak No.24/GB,

U.C.No.64, District Faisalabad.2.000 1.935 -0.065 100%

40Construction of Soling/Drain Chak No.72/GB,

U.C.No.67, District Faisalabad.1.000 0.975 -0.025 100%

41Construction of Soling/Drain Chak No.74/GB,

U.C.No.67, District Faisalabad.2.000 1.922 -0.078 100%

42

Construction of Soling/Drain Chak

No.200/RB Lathianwala, U.C.No.22, District

Faisalabad.

3.500 3.410 -0.090 100%

42 100.000 97.364 -2.636

Malik Shamshair Haider Wattoo dated 5.9.12

MPA, PP-57

1Construction of Metalled Road Chak

No.422/GB District Faisalabad.2.500 2.430 -0.070 100%

2Construction of Metalled Road Chak

No.609/GB District Faisalabad.2.500 2.445 -0.055 100%

3Construction of Metalled Road Chak

No.412/GB (Bhattian), District Faisalabad.1.500 1.452 -0.048 100%

4Construction of Boundary Wall Qabarstan

Mouza Khai, District Faisalabad.1.500 1.459 -0.041 100%

5Construction of Boundary Wall Ground

Mouza Kaki, District Faisalabad.1.000 0.980 -0.020 100%

6Construction of Soling Chak No.612/GB

District Faisalabad.1.000 0.979 -0.021 100%

20.000 198 05-Sep-12

100.000 106 24-Aug-12

Page 141

Page 142: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7Construction of Soling Mouza Duhd Bhoor,

District Faisalabad.1.000 0.980 -0.020 100%

8Construction of Soling Mouza Pindi Sheikh

Musa, District Faisalabad.1.000 0.980 -0.020 100%

9Construction of Soling Mari Pattan District

Faisalabad.1.000 0.982 -0.018 100%

10Construction of Soling Chak No.396/GB

(Walia Wattoo) District Faisalabad.1.000 0.975 -0.025 100%

11Construction of Soling Chak No.396/GB

(Shadoo Kay) District Faislabad.0.500 0.490 -0.010 100%

12Construction of Nala / Drain & Soling

(Khaddian), District Faisalabad.2.000 1.975 -0.025 100%

13Construction of Nala & Drain Chak

No.426/GB, District Faisalabad.1.000 0.980 -0.020 100%

14

Construction of Boundary Wall Primary

School Chak No.605/GB District Faisalabad. 0.500 0.490 -0.010 100%

15Construction of Soling Chak No.605/GB

Abadi Rana Wattoo, District Faisalabad.0.500 0.490 -0.010 100%

16Construction of Soling Chak No.404/GB

District Faisalabad.0.500 0.488 -0.012 100%

17Construction of Soling Chak No.404/GB Azafi

Abadi, District Faisalabad.0.500 0.488 -0.012 100%

18Construction of Soling Chak No.396/GB,

District Faisalabad.0.500 0.485 -0.015 100%

18 20.000 19.548 -0.452

Malik Shamshair Haider Wattoo dated 14.12.12

MPA, PP-57

811 14-Dec-12 30.000 10.000

10.000

20.000 198 05-Sep-12

Page 142

Page 143: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Mian Qasim Zia dated 5.9.12

PP-59

1

Construction of Nalian / Soling Chak

No.192/GB Kotla, Tehsil Samundri District

Faisalabad.

1.000 0.970 -0.030 100%

2

Construction of Nalian / Soling Chak

No.192/GB Zojla, Tehsil Samundri District

Faisalabad.

1.000 0.975 -0.025 100%

3

Construction of Nalian / Soling Chak

No.193/GB Shumali, Tehsil Samundri District

Faisalabad.

1.000 0.970 -0.030 100%

4

Construction of Nalian / Soling Chak

No.195/GB Tehsil Samundri District

Faisalabad.

1.000 0.975 -0.025 100%

5

Construction of Stairs Ground Chak

No.196/GB Tehsil Samundri District

Faisalabad.

1.000 0.968 -0.032 100%

6

Construction of Nalian / Soling Chak

No.201/GB Raja Basti, Tehsil Samundri

District Faisalabad.

1.000 0.970 -0.030 100%

7

Construction of Nalian / Soling Chak

No.210/GB, Tehsil Samundri District

Faisalabad.

1.000 0.972 -0.028 100%

8

Construction of Nalian / Soling Chak

No.213/GB Basti Nai Abadi, Tehsil Samundri

District Faisalabad.

1.000 0.969 -0.031 100%

9

Construction of Nalian/ Soling Chak

No.215/GB, Tehsil Samundri District

Faisalabad.

1.000 0.985 -0.015 100%

10

Construction of Nalian / Soling Chak

No.216/GB, Tehsil Samundri District

Faisalabad.

1.000 0.975 -0.025 100%

11

Construction of Nalian/ Soling Chak

No.218/GB,Tehsil Samundri District

Faisalabad.

1.000 0.975 -0.025 100%

12

Construction of Nalian/ Soling & Nala Chak

No.219/GB, Tehsil Samundri District

Faisalabad.

1.000 0.967 -0.033 100%

20.000 05-Sep-12199

Page 143

Page 144: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13

Construction of Nalian/ Soling Chak

No.222/GB,Tehsil Samundri District

Faisalabad.

1.000 0.961 -0.039 100%

14

Construction of Nala / Nalian/ Soling Chak

No.223/GB Tehsil Samundri District

Faisalabad.

1.000 0.971 -0.029 100%

15

Constrution of Nalian / Soling Chak

No.224/GB Tehsil Samundri District

Faisalabad.

1.000 0.997 -0.003 100%

16

Construction of Nalian/ Soling & Nala Chak

No.226/GB Basti Islamabad,Tehsil Samundri

District Faisalabad.

1.000 0.973 -0.027 100%

17

Constrution of Nalian / Soling Chak

No.227/GB Mallu Nangal, Tehsil Samundri

District Faisalabad.

1.000 0.980 -0.020 100%

18

Construction of Nalian/ Soling & Nala Chak

No.228/GB,Tehsil Samundri District

Faisalabad.

1.000 0.975 -0.025 100%

19

Construction of Nala / Nalian/ Soling Chak

No.46/GB,Tehsil Samundri District

Faisalabad.

1.000 0.980 -0.020 100%

20

Constrution of Nalian / Soling Chak

No.49/GB, Tehsil Samundri District

Faisalabad.

1.000 0.977 -0.023 100%

20 20.000 19.485 -0.515

Sardar Dildar Ahmed Cheema dated 17.10.12

PP-61

548 17-Oct-12 50.000 25.000 -25.000

25.000 -25.000

20.000 05-Sep-12199

Page 144

Page 145: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ch.Ali Akhtar Khan dated 24.8.12

PP-62 Notable

1

Construction of Soling/Drain Chak No.85/GB

Manpur, U.C.No.129,District Faisalabad. 1.500 1.420 -0.080 100%

2

Construction of Soling/Drain Chak No.86/GB

Haji Pur Grala,U.C.No.129, District

Faisalabad.

1.500 1.435 -0.065 100%

3

Construction of Soling/Drain Chak No.91/GB

Jigat Pur, U.C.No.129, District Faisalabad. 1.500 1.440 -0.060 100%

4

Construction of Soling/Drain Chak

No.129/GB Nabi Abad, U.C.No.129, District

Faisalabad.

1.000 0.962 -0.038 100%

5

Construction of Soling/Drain Chak No.75/GB

Radana Harla, U.C.No.143, District

Faisalabad.

2.000 1.940 -0.060 100%

6

Construction of Soling/Drain Chak

No.239/RB Khanuana, U.C.No.143, District

Faisalabad.

2.000 1.925 -0.075 100%

7

Construction of Soling/Drain Chak

No.209/RB Akal Garh, U.C.No.144, District

Faisalabad.

4.000 3.895 -0.105 100%

8

Construction of Soling/Drain Chak

No.215/RB New Abadi, U.C.No.145, District

Faisalabad.

5.000 4.720 -0.280 100%

9

Construction of Soling / Drain Chak

No.215/RB Kakkuana, Rana Town, Faisal

Town, Jinnah abadi, U.C.No.145, District

Faisalabad.

5.000 4.785 -0.215 100%

10

Construction of Soling/Drain Awami Town,

Fateh Pur, Humayyun Nagar, Madina Abad,

U.C.No.145, District Faisalabad.

5.000 4.825 -0.175 100%

11

Construction of Soling/Drain Hammayun

Town, Kot Umer Farooq, Islam Pura,

Suleman Town, Cheema Town, Sajid Town,

U.C.No.145, District Faisalabad.

5.000 4.785 -0.215 100%50.000 102 24-Aug-12

Page 145

Page 146: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Construction of Soling/Drain Chak No.79/GB,

U.C.No.146, District Faisalabad. 1.500 1.345 -0.155 100%

13

Construction of Soling/Drain Chak

No.238/RB Awan wala, U.C.No.146, District

Faisalabad.

1.500 1.345 -0.155 100%

14

Construction of Soling/Drain Chak

No.289/RB Rodi, U.C.No.147, District

Faisalabad.

1.500 1.345 -0.155 100%

15

Construction of Soling/Drain Chak

No.296/RB Wakeel wala, Yasir Town, Chotta

Rasala, U.C.No.147, District Faisalabad.2.000 1.945 -0.055 100%

16

Construction of Soling/Drain Chak

No.232/RB Sahianwala Sadar, U.C.No.148,

District Faisalabad.

1.000 0.980 -0.020 100%

17

Construction of Soling/Drain Chak

No.233/RB Hari Singh wala / Tikay wala,

U.C.No.148, District Faisalabad.

1.000 0.980 -0.020 100%

18

Construction of Soling/Drain Chak

No.202/RB Sharki Gatti, Garbi Bhai wala,

Abadi Meharban wala, U.C.No.178, District

Faisalabad.

4.000 3.912 -0.088 100%

19

Construction of Soling/Drain Chak

No.219/RB Shahiwala, Talianwala, Naimat

Abad, Badi Ghari, Liaquat Town, Ganda

Singh wala, U.C.No.180, District Faisalabad.

2.000 1.956 -0.044 100%

20

Construction of Soling/Drain Chak

No.220/RB Fareed Town, Babu wala Naimat

Abad, Mukhtar Colony, Rasheeda Abad, Nai

Abadi Pathan wala, Saif abad, U.C.No.181,

District Faisalabad.

2.000 1.975 -0.025 100%

20 50.000 47.915 -2.085

Raja Riaz Ahmed dated 5.9.12

MPA, PP-65

50.000 102 24-Aug-12

Page 146

Page 147: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Construction of P.C.C.Road at Street No.7 &

Street Cornal Akbar Wali Sarfraz Colony,

U.C.No.186, Faisalabad.

2.000 1.940 -0.060 100%

2Construction of P.C.C.Road at Street No.6 &

7, Faisalabad.2.800 2.891 0.091 100%

3Construction of P.C.C.Road Kanak Basti &

Saeed abad, U.C.No.186, Faisalabad.5.000 4.801 -0.199 100%

4Construction of P.C.C.Road Saeed abad,

U.C.No.186, Faisalabad.2.300 2.125 -0.175 100%

5

Construction of P.C.C.Road at Street No.5/3

Green View Colony U.C.No.190, Faisalabad. 2.300 2.170 -0.130 100%

6

Construction of Carpet Road from Jail Road

to Islam nagar Mohallah Rafiq Colony,

Faisalabad.

3.000 2.980 -0.020 100%

7

Constrution of Metalled Road Main Bazar

Katchi abadi and Rehman abad U.C.No.199,

Faisalabad.

2.600 2.528 -0.072 100%

7 20.000 19.435 -0.565

Raja Riaz Ahmed dated 14.12.12

MPA, PP-65

811 14-Dec-12 30.000 10.000 -10.000

10.000

Ch.Bilal Ashgar Warriach dated 5.3.13

MPA, PP-84

922 05-Mar-13 30.000 20.000 -20.000

20.000

20.000 05-Sep-1250

Page 147

Page 148: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Haji Muhammad Ishaq dated 14.12.12

MPA, PP-85

1

Constructioon of P.C.C. and Drain at Street

No.2 Mukhtar wali Aleem / Hussain Park

Gojra District Toba Tek Singh.

0.700 -0.700

2

Constructioon of Soling at Street No.1

Hussain Park near Masjid Islamil Gojra

District Toba Tek Singh.

1.030 -1.030

3Constructioon of P.C.C. at Kot Aman Ullah

Khan Gojra District Toba Tek Singh.0.850 -0.850

4Constructioon of P.C.C. Mian Road Gulshan

Colony Gojra District Toba Tek Singh.

5

Repair of Metalled Road Adda Bashir abad to

Chak No.157/GB Gojra District Toba Tek

Singh.

6Constructioon of Nala / Drain / P.C.C. at

Nashta abad Gojra District Toba Tek Singh.1.850 -1.850

7Constructioon of P.C.C. Street No.2 Bhaghat

pura Gojra District Toba Tek Singh.

8Constructioon of Road in Chak No.159/GB

Gugomal Gojra District Toba Tek Singh.

9

Constructioon of Boundary Wall to Tomb and

Soling Chak No.371/JB Gandasingh wala

Gojra District Toba Tek Singh.

1.665 -1.665

10Constructioon of PCC at Street No.3 Insar

Colony Gojra District Toba Tek Singh.

11

Constructioon of Soling Chak No.371/GB

Ganda Singh wala Gojra District Toba Tek

Singh.

12Constructioon of Soling Street No.4 Hussain

Colony Gojra District Toba Tek Singh.0.375 -0.375

13Constructioon of Boundary Wall at Baba Eido

Darbar Gojra District Toba Tek Singh.0.670 -0.670

30.000 811 14-Dec-12

Page 148

Page 149: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14

Constructioon of Soling/Drain in Chak

No.248/GB Marli Gojra District Toba Tek

Singh.

15Constructioon of PCC at Rasool Nagar Malik

Shafiq wali Gojra District Toba Tek Singh.

16

Repair of Road from Gojra Mochiwala Road

to Chak No.353/JB Mehndi abad Gojra

District Toba Tek Singh.

17Constructioon of Drain / Soling in Chak

No.297/JB Gojra District Toba Tek Singh.1.260 -1.260

18Constructioon of Metalled Road in Chak

No.297/JB Gojra District Toba Tek Singh.1.600 -1.600

19Constructioon of Soling in Green Town Gojra

District Toba Tek Singh.

20Constructioon of Drain / Soling in Chak

No.178/GB Gojra District Toba Tek Singh.

21Constructioon of PCC Street No.10 Dastgeer

Colony Gojra District Toba Tek Singh.

21 10.000 -10.000

Neelam Jabbar Ch dated 5.9.12

MPA, PP-86

1Construction of Metalled Road at Kachi Basti

District Toba Tek Singh.0.500 0.498 -0.002 100%

2Construction Water Course at Chak

No.379/GB Kaloyan District Toba Tek Singh.1.500 1.471 -0.029 100%

3Construction of Sludge Carrier at Chak

No.320/GB District Toba Tek Singh.0.700 0.686 -0.014 100%

4

Construction of Soling/Drain at Chak

No.324/JB Azafi Abadi District Toba Tek

Singh.

0.500 0.492 -0.008 100%

30.000 811 14-Dec-12

20.000 200 05-Sep-12

Page 149

Page 150: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5Construction of P.C.C. Gali Jilani Wali &

Majadia Chowk, District Toba Tek Singh.1.000 0.981 -0.019 100%

6Construction of Boundary Wall / Soling

Christian Graveyard District Toba Tek Singh.1.000 0.978 -0.022 100%

7

Construction of Sewerage / Soling Gali

Mahmood Masjid New Islam Pura, District

Toba Tek Singh.

0.600 0.584 -0.016 100%

8Construction of Boundary Wall at Chak

No.298/GB District Toba Tek Singh.0.400 0.390 -0.010 100%

9Construction of P.C.C. Gali Khwar Wali New

Islam Pura, District Toba Tek Singh.0.400 0.393 -0.007 100%

10Construction of Soling Mohallah Siddique

Park, District Toba Tek Singh.0.800 0.788 -0.012 100%

11

Construction of Soling/Drain at Chak

No.385/JB Salerhrian, District Toba Tek

Singh.

1.000 0.981 -0.019 100%

12

Consruction of P.C.C. / Water Supply pipe

Gali Qalendri wali Awami Basti District Toba

Tek Singh.

0.600 0.564 -0.036 100%

13

Construction of P.C.C.Gali Safder Nasir

Chowhan wali Awami Basti District Toba Tek

Singh.

1.000 0.980 -0.020 100%

14Construction of P.C.C.Gali Khadim wali

Sirhand Colony District Toba Tek Singh.0.400 0.364 -0.036 100%

15Construction of P.C.C. Gali Master Bashir

Wali, Gobind Pura, District Toba Tek Singh.1.500 1.425 -0.075 100%

16Construction of P.C.C. at Mohallah Islam

Pura, District Toba Tek Singh.1.000 0.981 -0.019 100%

17Construction of Drain at Chak No.296/GB

District T.T Singh.0.500 0.487 -0.013 100%

18

Construction of P.C.C. / Drain Gali Imam

Bargha wali Bakhshi Park, District Toba Tek

Singh.

0.500 0.491 -0.009 100%

19

Construction of Metalled Road and Repair of

Sewerage at Chak No.328/JB District Toba

Tek Singh.

2.000 1.924 -0.076 100%

20.000 200 05-Sep-12

Page 150

Page 151: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

20Construction of Soling/Drain at Chak

No.437/JB Kunjran District Toba Tek Singh.1.000 0.981 -0.019 100%

21Construction of Soling/Drain at Chak

No.438/JB Bhawana District Toba Tek Singh.1.000 0.980 -0.020 100%

22Construction of Soling/Drain at Chak

No.439/JB Virkan District Toba Tek Singh.1.000 0.980 -0.020 100%

23

Construction of Water Supply at Chak

No.297/GB Azafi Abadi District Toba Tek

Singh.

0.500 0.490 -0.010 100%

24Construction of Soling at Mohallah New Geo

Shala, District Toba Tek Singh.0.400 0.392 -0.008 100%

25Construction of P.C.C. at Gali Mubashir wali

Bakhshi Park, District Toba Tek Singh.0.200 0.185 -0.015 100%

25 20.000 19.466 -0.534

Neelam Jabbar Ch dated 14.12.12

MPA, PP-86

1Construction of Water Course at Chak

No.313/JB Phase-I, District Toba Tek Singh.0.500 -0.500

2Construction of Water Course at Chak

No.313/JB Phase-II, District Toba Tek Singh.0.500 -0.500

3Construction of Soling at Chak No.319/JB

District Toba Tek Singh.

4Construction of Soling/Drain at Chak

No.309/JB Phase-I, District Toba Tek Singh.0.500 -0.500

5Construction of Soling/Drain at Chak

No.309/JB Phase-II, District Toba Tek Singh.0.500 -0.500

6Construction of Soling/Drain at Chak

No.321/JB, District Toba Tek Singh.0.500 -0.500

30.000 14-Dec-12811

20.000 200 05-Sep-12

Page 151

Page 152: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7Construction of Roof of Church / Soling at

Chak No.321/JB, District Toba Tek Singh.0.500 -0.500

8

Construction of Soling/Drain at Mustafa Town

Waryam Road Phase-I, District Toba Tek

Singh.

0.500 -0.500

9

Construction of Soling/Drain at Mustafa Town

Waryam Road Phase-II, District Toba Tek

Singh.

0.500 -0.500

10Construction of Soling/Soling Chak

No.388/JB Phase-I, District Toba Tek Singh.0.500 -0.500

11Construction of Soling/Soling Chak

No.388/JB Phase-II, District Toba Tek Singh.0.500 -0.500

12

Consruction of Soling/Drain at Chak

No.331/JB Basti Pthanan Wali, District Toba

Tek Singh.

0.500 -0.500

13Construction of Soling/Drain at Chak

No.399/JB Ajram, District Toba Tek Singh.0.500 -0.500

14Construction of Soling/Drain at Chak

No.323/JB Trandi, District Toba Tek Singh.0.500 -0.500

15Construction of Soling/Drain at Chak

No.477/JB Alowal, District Toba Tek Singh.0.500 -0.500

16Construction of Soling/Drain at Chak

No.322/JB, District Toba Tek Singh.0.500 -0.500

17

Construction of Soling/Drain at Chak

No.401/JB Dabanwala, District Toba Tek

Singh.

0.500 -0.500

18

Construction of Roof R.C.C.at Chak

No.425/JB Christian Church wally, District

Toba Tek Singh.

0.500 -0.500

19

Construction of Roof Christian

Graveyard/Soling at Chak No.425/JB wally,

District Toba Tek Singh.

0.500 -0.500

20Construction of Soling/Drain at Chak

No.380/JB Tail, District Toba Tek Singh.0.500 -0.500

21

Construction of Improvement P.C.C. of Park

Mohallah Gao Shala, District Toba Tek

Singh.

0.500 -0.500

30.000 14-Dec-12811

Page 152

Page 153: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

22Construction of Soling/Drain at Chak

No.389/JB, District Toba Tek Singh.

23Construction of Soling/Drain at Chak

No.314/JB, District Toba Tek Singh.

24Construction of Metalled Road at Chak

No.330/JB Seyowall, District Toba Tek Singh.

25Construction of Soling/Drain at Chak

No.384/JB Esspur, District Toba Tek Singh.

26Construction of Soling/Drain at Noor Park,

District Toba Tek Singh.

27Construction of P.C.C. at Mohallah Eid Gah,

District Toba Tek Singh.

28Construction of P.C.C. at Awami Basti Gali

Javeed wali, District Toba Tek Singh.

29Construction of P.C.C. at Awami Basti,

District Toba Tek Singh.

30Repair of Metalled Road at Mohallah Islam

Pura, District Toba Tek Singh.

31Construction of Sewer line at Mohallah Islam

Pura, District Toba Tek Singh.

32Construction of P.C.C. at Raja Park, District

Toba Tek Singh.

33Construction of P.C.C. at Gali Afzal wali Raja

Park, District Toba Tek Singh.

34Construction of P.C.C. at Gali Ajmal wali Raja

Park, District Toba Tek Singh.

35Construction of P.C.C. at Muhammad Pura,

District Toba Tek Singh.

36Construction of P.C.C. / Soling at Muhammad

Pura, District Toba Tek Singh.

37Construction of Soling at Muhammad pura,

District Toba Tek Singh.

38Construction of P.C.C. at Mohallah Kachi

Basti Phase-I, District Toba Tek Singh.

39Construction of P.C.C. at Mohallah Kachi

Basti Phase-II, District Toba Tek Singh.

30.000 14-Dec-12811

Page 153

Page 154: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

40Construction of P.C.C. at Mohallah Kachi

Basti Phase-III, District Toba Tek Singh.

41Repair of Metalled Road at Chak No.328/JB,

District Toba Tek Singh.

42Construction of Metalled Road at Chak

No.328/JB, District Toba Tek Singh.

43

Repair of Metalled Road main hole cover

frame at Chak No.328/JB, District Toba Tek

Singh.

44

Construction of Soling/Gate Grill main hole

cover frame at Chak No.328/JB, District

Toba Tek Singh.

45Construction of Soling/Drain at Chak

No.328/JB, District Toba Tek Singh.

46

Construction of Soling/Drain at Chak

No.325/JB Dolam Phase-I, District Toba Tek

Singh.

47

Construction of Soling/Drain at Chak

No.325/JB Dolam Phase-II, District Toba Tek

Singh.

48Repair of Mosque at Chak No.315/JB Kala

phar, District Toba Tek Singh.

49Construction of P.C.C. at Bakhshi Park

Phase-I, District Toba Tek Singh.

50Construction of P.C.C. at Bakhshi Park

Phase-II, District Toba Tek Singh.

51Construction of P.C.C. at Bakhshi Pari Phase-

III, District Toba Tek Singh.

52Construction of P.C.C. at Bakhshi Park

Phase-IV, District Toba Tek Singh.

53Construction of P.C.C. at Bakhshi Park

Phase-V, District Toba Tek Singh.

54Construction of Soling at Hadarori, District

Toba Tek Singh.

55Construction of Soling / Sewer Bakhshi Park,

District Toba Tek Singh.

56

Repair of Masjid Boundary Wall Gate and

Gate Pillar at Bakhshi Park, District Toba Tek

Singh.

30.000 14-Dec-12811

Page 154

Page 155: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

57

Repair of Masjid Mazique Flooring Door and

Window at Bakshi Park, District Toba Tek

Singh.

58Construction of Sludge Carrier at Chak

No.317/JB Noor Pur, District Toba Tek Singh.

59Construction of Soling/Drain at Chak

No.385/JB Slariyan, District Toba Tek Singh.

60Construction of Soling/Drain at Chak

No.386/JB, District Toba Tek Singh.

61Construction of Metalled Road at Pearah

Colony, District Toba Tek Singh.

61 10.000 -10.000

Ch.Khalid Nabi (Ex-MPA) dated 6.9.12

Notable

1Construction of Soling/Drain Chak

No.171/GB District Faisalabad.1.000 0.980 -0.020 100%

2Construction of Soling/Drain Chak

No.172/GB District Faisalabad.1.000 0.981 -0.019 100%

3Construction of Soling/Drain Chak

No.173/GB District Faisalabad.1.500 0.981 -0.519 100%

4Construction of Soling/Drain Chak

No.175/GB District Faisalabad.1.500 1.435 -0.065 100%

5Construction of Soling/Drain Chak

No.169/GB District Faisalabad.1.000 0.981 -0.019 100%

6Construction of Soling/Drain Chak

No.165/GB District Faisalabad.1.000 0.975 -0.025 100%

7Construction of Soling/Drain Chak

No.437/GB District Faisalabad.1.000 0.970 -0.030 100%

8Construction of Soling/Drain Chak

No.440/GB District Faisalabad.1.500 1.450 -0.050 100%

9Construction of Soling/Drain Chak

No.385/GB District Faisalabad.1.000 0.941 -0.059 100%

30.000 14-Dec-12811

40.000 06-Sep-12244

Page 155

Page 156: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10Construction of Soling/Drain Chak

No.373/GB District Faisalabad.2.000 1.925 -0.075 100%

11Construction of Soling/Drain Chak

No.463/GB District Faisalabad.1.500 1.475 -0.025 100%

12Construction of Soling/Drain Chak

No.461/GB District Faisalabad.2.000 1.967 -0.033 100%

13Construction of Soling/Drain Chak

No.471/GB District Faisalabad.1.500 1.420 -0.080 100%

14Construction of Soling/Drain Chak

No.468/GB District Faisalabad.1.000 0.970 -0.030 100%

15Construction of Soling/Drain Chak

No.469/GB District Faisalabad.1.000 0.972 -0.028 100%

16Construction of Soling/Drain Chak

No.472/GB District Faisalabad.1.000 0.970 -0.030 100%

17Construction of Soling/Drain Chak

No.528/GB District Faisalabad.1.000 0.982 -0.018 100%

18Construction of Soling/Drain Chak No.50/GB

District Faisalabad.2.000 1.919 -0.081 100%

19Construction of Soling/Drain Chak

No.134/GB District Faisalabad.1.500 1.436 -0.064 100%

20Construction of Soling/Drain Chak

No.136/GB District Faisalabad.2.000 1.960 -0.040 100%

21Construction of Soling/Drain Chak

No.137/GB District Faisalabad.1.500 1.475 -0.025 100%

22Construction of Soling/Drain Chak

No.138/GB District Faisalabad.2.000 1.970 -0.030 100%

23Construction of Soling/Drain Chak

No.142/GB District Faisalabad.1.500 1.465 -0.035 100%

24Construction of Soling/Drain Chak

No.143/GB District Faisalabad.1.500 1.475 -0.025 100%

25Construction of Soling/Drain Chak

No.140/GB District Faisalabad.1.500 1.480 -0.020 100%

26Construction of Soling/Drain Chak

No.141/GB District Faisalabad.1.500 1.470 -0.030 100%

27Construction of Soling/Drain Chak

No.443/GB District Faisalabad.1.000 0.980 -0.020 100%

28Construction of Soling/Drain Chak

No.417/GB District Faisalabad.1.000 0.980 -0.020 100%

40.000 06-Sep-12244

Page 156

Page 157: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

29Construction of Soling/Drain Chak

No.167/GB District Faisalabad.1.500 1.390 -0.110 100%

29 40.000 38.375 -1.625

Sahibzada M Nazir Sultan dated 8.10.12

Notable, NA-90

1

Construction of Metalled Road Jhang Road

Pull Mankan to Basti Mankan via Basti M.

Nawaz Mankan Mouza Mankan District

Jhang.

14.00 8.975 -5.025 80%

2

Const: of Metalled Road Pattan Road Jiwan

Chowk to Jinnah Colony Bunda Surbana

District Jhang.

7.000 4.281 -2.719 80%

3

Const: of Metalled Road Multan Road Kotla

Zareef Khan to Doran pur Chah Piple wala

District Jhang.

14.00 8.796 -5.204 80%

4

Const: of Metalled Road Pull Jhanday wali to

Abadi Burkhurdar Mouza Harray wala District

Jhang.

5.000 3.316 -1.684 100%

4 40.000 25.368 -14.632

Muhammad Amjad Yaseen dated 27.2.13

Notable

1Construction of Carpet Road U.C.No.200,

Faisalabad.2.500 -2.500 15%

2Construction of P.C.C.Road U.C.No.200,

Faisalabad.2.500 -2.500 10%

3Construction of Carpet Road U.C.No.201,

Faisalabad.2.500 -2.500 10%

4Construction of P.C.C.Road U.C.No.201,

Faisalabad.2.500 -2.500 15%

5Construction of Carpet Road U.C.No.202,

Faisalabad.2.500 -2.500 15%

6Construction of P.C.C.Road U.C.No.202,

Faisalabad.2.500 -2.500 15%

40.000 08-Oct-12520

100.000 27-Feb-13998

40.000 06-Sep-12244

Page 157

Page 158: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7Construction of Carpet Road U.C.No.203,

Faisalabad.2.500 -2.500 20%

8Construction of P.C.C.Road U.C.No.203,

Faisalabad.2.500 -2.500 20%

9Construction of Carpet Road U.C.No.204,

Faisalabad.2.500 -2.500 15%

10Construction of P.C.C.Road U.C.No.204,

Faisalabad.2.500 -2.500 15%

11Construction of Carpet Road U.C.No.205,

Faisalabad.2.500 -2.500 15%

12Construction of P.C.C.Road U.C.No.205,

Faisalabad.2.500 -2.500 20%

13Construction of Carpet Road U.C.No.219,

Faisalabad.2.500 -2.500 20%

14Construction of P.C.C.Road U.C.No.219,

Faisalabad.2.500 -2.500 10%

15Construction of Carpet Road U.C.No.229,

Faisalabad.2.500 -2.500 10%

16Construction of P.C.C.Road U.C.No.229,

Faisalabad.2.500 -2.500 15%

17Construction of Carpet Road U.C.No.221,

Faisalabad.10.000 -10.000

18Construction of P.C.C.Road U.C.No.221,

Faisalabad.10.000 -10.000

19Construction of Carpet Road U.C.No.220,

Faisalabad.5.000 -5.000

20Construction of P.C.C.Road U.C.No.220,

Faisalabad.5.000 -5.000

21Construction of Carpet Road U.C.No.222,

Faisalabad.5.000 -5.000

22Construction of P.C.C.Road U.C.No.222,

Faisalabad.5.000 -5.000

23Construction of Carpet Road U.C.No.218,

Faisalabad.5.000 -5.000

24Construction of P.C.C.Road U.C.No.218,

Faisalabad.5.000 -5.000

25

Construction of Carpet Road W-Block,

Madina Town, Kohi-e-Noor Flat, U.C.No.223,

Faisalabad.

5.000 -5.000

100.000 27-Feb-13998

Page 158

Page 159: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

26

Construction of P.C.C.Road W-Block,

Madina Town, Kohi-e-Noor Flat, U.C.No.223,

Faisalabad.

5.000 -5.000

26 100.000 -100.000

Nadeem Afzal Gondal dated 31.8.12

MNA, NA-64

1Construction of Metalled Road, Jehanewala,

Bhalwal, Sargodha.8.000 7.910 -0.090 100%

2

Construction of Metalled Road From Saim

Nalla Pul to Nehr Vida Dera Sialan, Chabba

Phularwan, Tehsil Bhalwal, District

Sargodha.

6.000 2.864 -3.136 60%

3

Construction of Metalled Road From Al-Saif

Restaurant to Dera Punjootha Salam, Tehsil

Bhalwal, District Sargodha.

10.000 5.861 -4.139 70%

4

Construction of Metalled Road From

Remaining Portion Head Faqirian to Ratu

Kala, Tehsil Bhalwal, District Sargodha.

7.000 6.853 -0.147 60%

5

Laying of Soling Road From Dera Akram to

Dera Ch. Hassan Midh Pargna,

Tehsil Bhalwal, District Sargodha.

1.500 1.443 -0.057 100%

6Construction of Metalled Road From Hazoor

Pur to Saim Nalla Pind Makoo.7.500 4.607 -2.893 60%

6 40.000 29.538 -10.462

Ch.Anwer Ali Cheema dated 18.1.13

Mna, NA-67

864 18-Jan-13 19.581 1

Widening & Improvement of Metalled Road

From Bridge 111/SB Sargodha Faisalabad

Road to Chak No. 115/ASB connecting

58/SB, Barrier-119/SB, Road District

Sargodha.

19.581 8.310 -11.271 20%

40.000 31-Aug-12143

100.000 27-Feb-13998

CCD, Sargodha

Page 159

Page 160: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1 19.581 8.310 -11.271

Nawabzada Malik Amad Khan dated 10.9.12

MNA, NA-71

1Construction of PCC Road /Drain Kalabagh,

District Mianwali NA-71.5.000 4.892 -0.108 100%

2Construction of PCC Road /Drain UC Tani

Khel, District Mianwali NA-71.2.000 1.935 -0.065 100%

3Construction of PCC Road /Drain UC Sultan

Khel, District Mianwali NA-71.2.500 2.448 -0.052 100%

4Construction of PCC Road /Drain UC Moch,

District Mianwali NA-71.10.000 9.804 -0.196 100%

5Construction of PCC Road /Drain UC

Shehbaz Khel, District Mianwali NA-71.5.000 4.866 -0.134 100%

6Construction of PCC Road /Drain UC Daud

Khel, District Mianwali NA-71.5.000 4.886 -0.114 100%

7Construction of PCC Road /Drain UC Mari

Indus, District Mianwali NA-71.5.000 4.887 -0.113 100%

8Construction of PCC Road /Drain UC Ban

Hafiz G, District Mianwali NA-71.5.000 4.901 -0.099 100%

9

Construction of PCC Road /Drain and 12"

Span Culvert kalabagh & Kot Chanana UC

kalabagh, District Mianwali NA-71.

2.500 2.425 -0.075 100%

10

Construction of Vented Causeway and PCC

Road Misarwala UC Tibisar, District Mianwali 5.000 4.883 -0.117 100%

11

Construction of PCC Road /Drain &

Boundary Wall of Jinazagah(Eidgah)

Matokhail UC Tola Bangi Khail, District

Mianwali NA-71.

5.000 3.798 -1.202 100%

12

Construction of PCC Road /Drain &

Boundary Wall of Jinazagah UC Chapri,

District Mianwali NA-71.

4.000 3.914 -0.086 100%

13Construction of Stone Pitching Kalabagh

District Mianwali NA-71.4.000 3.926 -0.074 100%

13 60.000 57.565 -2.435

60.000 10-Sep-12325

Page 160

Page 161: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Nazar Muhammad Gondal dated 630

MNA, NA-109

1

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Kuthila Sheikhan, District

mandi Bahauddin PP-120.

5.000 3.576 -1.424 80%

2

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Chak No. 40, District mandi

Bahauddin PP-120.

5.000 4.962 -0.038 100%

3

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Alha, District mandi

Bahauddin PP-120.

5.000 3.519 -1.481 76%

4

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Cheemo, District mandi

Bahauddin PP-120.

5.000 3.172 -1.828 60%

5

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Haria, District mandi

Bahauddin PP-120.

5.000 3.650 -1.350 80%

6

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Kadhar, District mandi

Bahauddin PP-120.

5.000 3.226 -1.774 70%

7

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Mianwal, District mandi

Bahauddin PP-120.

5.000 4.112 -0.888 85%

8

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Bjolja, District mandi

Bahauddin PP-120.

5.000 2.927 -2.073 60%

9

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Sahana, District mandi

Bahauddin PP-120.

5.000 3.249 -1.751 65%

10

Construction of (Road)/PCC/Drain/Saim

Nallah/Soling UC Nain Ranjha, District mandi

Bahauddin PP-120.

5.000 2.224 -2.776 55%

10 50.000 34.617 -15.383

50.000 23-Oct-12630

Page 161

Page 162: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ch.Muhammad Awais Aslam dated 5.9.12

MPA, PP-31

1

Repair of Metalled road Chak No. 20 to Basti

Justice Mehar Iqbal Haral Sahib and Link

with Kandri Ke Hawailee Tehsil Kotmomin

District Sargodha Pp-31

8.500 3.263 -5.237 5%

2

Repair of Metalled road from Main road

Kotmoman to Village Alamwala Tehsil

Kotmomin District Sargodha Pp-31

3.500 1.964 -1.536 5%

3

Construction of metalled road from Mander

Jan Muhammad Wala Sial More via Basti

Said Kee I/c links and sulverts Tehsil

Kotmoman District Sargodha PP-31

7.000 4.148 -2.852 5%

4

Construction of soling basti Nawaz Ranjha

Mahka Naseerpur Kalan Tehsil Kotmoman

District Sargodha PP-31.

0.500 0.477 -0.023 100%

5

Construction of soling and drain at Sial More

Tehsil Kotmoman District Sargodha PP-31. 0.500 0.485 -0.015 100%

5 20.000 10.337 -9.663

Ch.Muhammad Awais Aslam dated 14.12.12

MPA, PP-31

1

Construction of Metalled Road Basti

Muhammad Aslam Noon & Shafqat Noon

(21 Chak Janobee) Tehsil Kotmoman,

District Sargodha PP-31.

5.000 -5.000 5%

2

Construction of Metalled Road Basti Saif

Nisowana (Laksian) Tehsil Kotmoman,

District Sargodha PP-31.

3

Construction of Metalled Road Basti Fayyaz

Ahmad Haral I/c Culverts, Tehsil Kotmoman,

District Sargodha PP-31.5.000 -5.000 5%

30.000 14-Dec-12811

20.000 05-Sep-12214

Page 162

Page 163: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of Soling & Pullian Basti

Ghulam Ahmad Badrana, Tehsil Kotmoman

District Sargodha PP-31.

5

Construction of Soling & Pullian Basti Ahsan

Ahmad Badrana (Thattian), Tehsil Kotmoman

District Sargodha PP-31.

6

Construction of Soling & Drainage Basti

Ahmad Bakash Ranjha Naseerpur Kalan,

Tehsil Kotmoman District Sargodha PP-31.

7

Construction of Soling & Drainage Basti Jaka

Ranjha Naseerpur Kalan, Tehsil Kotmoman

District Sargodha PP-31.

8

Construction and Repair Main Road

Kotmoman to Moza Alam Wala Tehsil

Kotmoman District Sargodha PP-31.

9

Construction of Soling & Drainage Basti

Shada Nither (Rahanwal), Tehsil Kotmoman

District Sargodha PP-31.

10

Construction and Repari with Pullian Main

Road Phalia Ahmadnager to Village

Naseerpur Khurd Tehsil Kotmoman District

Sargodha PP-31.

10 10.000 -10.000

Ch.Ijaz Ahmed Kahloon dated 5.9.12

MPA, PP-34

1

Construction of Drain in Bajwa Colony , Aqa

Colony, Chak No. 78 NB, Chak No. 87 N.B. &

Chak No. 86 N.B. Sargodha.

2.000 0.738 -1.262 0.750

2

Construction of Brick Soling in Bajwa Colony,

Aqa Colony, Chak No. 78 NB, Chak No. 48

N.B., 87 N.B. Chak No. 86 N.B. Sargodha.3.000 2.937 -0.063 100%

3Construction of Bricks soling in Chak No. 49

N.B. & Surrounding Area.1.500 1.491 -0.009 100%

4Construction of Bricks soling in Union Council

153/14, Sargodha.3.000 2.910 -0.090 100%

30.000 14-Dec-12811

20.000 05-Sep-12215

Page 163

Page 164: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5Construction of Bricks soling in Union Council

156/17, Sargodha.1.500 1.466 -0.034 80%

6Construction of TST Street Road in Union

Council 155/16,Sargodha, 1.000 0.928 -0.072 95%

7Construction of TST Street Road in Union

Council 157/18,Sargodha, .2.000 1.508 -0.492 90%

8Construction of TST Street Road in Union

Council 156/17,Sargodha, .1.000 0.402 -0.598 50%

9Construction of TST Street Road in Union

Council 158/19,Sargodha, .1.000 0.391 -0.609 45%

10

Construction of TST Street Roads in Farooq

Colony,Kalyar Town, Cheema Colony &

Surrounding Area.,Sargodha..

1.000 0.316 -0.684 45%

11Const. Of TST Street Roads in chak No. 87

NB,48NB, & 78NB Sargodha2.000 0.546 -1.454 60%

12

Construction of Sewerage in Muhammad Ali

Block, Queen road, Block D, Satellite Town &

Bashir Colony,Sargodha.

1.000 -1.000 80%

12 20.000 13.633 -6.367

Ch.Ijaz Ahmed Kahloon dated 1.10.12

MPA, PP-34

1

Const. of Metalled Road from Chak No.49

NB to linked with By-Pass Chak No.87 N.B &

Link with Dera Tehsil & Distt:Sargodha

2

Const. of Drain Nallah for Drainage Chak

No.78 N.B via chak 86 N.B to main Drain link

with Bajwa Colony, Chak No.87 N.B & Chak

No.48 N.B Tehsil & Distt:Sargodha

2

Sardar Kamil Gujjar dated 10.8.12

MPA, PP-35

118.808 01-Oct-12481

20.000 05-Sep-12215

Page 164

Page 165: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Repair/ Construction of Metalled road and

soling/Drain in Chak No. 46 SB District

Sargodha.

5.000 4.899 -0.101 100%

2Construction of Soling/drain Dhareema

District Sargodha5.000 4.896 -0.104 100%

3Construction of PCC/Drain Haiderabad

Town, District Sargodha.5.000 4.910 -0.090 100%

4

Construction of soling/drain Chak No.

188/NB, Tarkota and Rasolabad, District

Sargodha

2.000 1.960 -0.040 100%

5Construction of Soling/Drain Chak No. 81/NB

& 92/NB District Sargodha. 3.000 2.812 -0.188 95%

5 20.000 19.477 -0.523

Rana Munawar Ghous dated 10.8.12

MPA, PP-36

1Construction of Metalled road 127 SB to 124

SB District Sargodha5.000 4.906 -0.094 100%

2

Construction of Metalled road Chak No. 50

SB to Chak No. 130 SB Link road District

Sargodha.

2.500 2.451 -0.049 100%

3Repair of Metalled road chak No.122 NB

District Sargodha.1.000 0.881 -0.119 100%

4Repair of Metalled road Chak No. 129 NB to

Chak No. 147, 148 NB district Sargodha2.500 2.477 -0.023 100%

5Construcction of Link road chak No. 137 SB

District Sargodha1.200 1.129 -0.071 100%

6Construction of soling chak No. 151 NB

District Sargodha.1.000 0.933 -0.067 100%

7Construction of soling chak No. 118 NB

District Sargodha.1.000 0.974 -0.026 100%

8Construction of Boundary wall Eidgah Chak

No. 120 SB District Sargodha.1.000 0.947 -0.053 100%

9

Construction of Soling/Nallah Chak No. 120

SB and ahak No.115 SB, District Sargodha. 0.500 -0.500 100%

20.000 10-Aug-1245

20.000 10-Aug-1246

Page 165

Page 166: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10Construction of soling/Drain Chak No. 125

NB District Sargodha. 1.300 1.271 -0.029 100%

11Construction of soling/Drain chak No.125 SB,

District Sargodha.0.500 0.489 -0.011 100%

12Construction of soling/Drain chak No.118 SB,

District Sargodha.1.000 0.977 -0.023 100%

13Construction of Soling/Drain Chak No.119SB

District Sargodha.0.500 0.482 -0.018 100%

14Construction of Nallah Chak No. 126 SB

District Sargodha.1.000 0.973 -0.027 100%

14 20.000 18.890 -1.110

Rana Munawar Ghous dated 14.12.12

MPA, PP-36

1

Construction of Soling/Resoling, Drain and

Watersupply, Boundarywall and Bridge Chak

120 SB, 64/136 SB, 125,130,129 SB &

172/173 NB 151 NB, 133 SB, 140 SB,

Shahnikdar, District Sargodha. PP-36

2

Rehabitation of Metalled Road Sargodha

Sillanwali, Shaheenabad Road District

Sargodha PP-36.

2

Asif Bashir Bagahat dated 8.8.12

MPA, PP-117

34 08-Aug-12 20.000 20.000 -20.000

20.000 -20.000

20.000 10-Aug-1245

30.000 14-Dec-12811

Page 166

Page 167: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ms.Baasima Ch. & Riaz Ashgar Ch dated 8.10.12

Ex-MPA

1

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Narang ,

District Mandi Bahauddin PP-117.

4.000 3.913 -0.087 95%

2

Constuction of PCC/Soling/Metalled Road in

UC Jokalian , District Mandi Bahauddin

PP-117.

2.000 1.237 -0.763 80%

3

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Pind Kalu ,

District Mandi Bahauddin PP-117.

4.000 3.878 -0.122 90%

4

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Pahrian

Wali , District Mandi Bahauddin PP-117.

7.000 6.748 -0.252 75%

5

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Haslan

Wala , District Mandi Bahauddin PP-117.

4.000 2.997 -1.003 65%

6

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Chak Janu ,

District Mandi Bahauddin PP-117.

4.000 3.887 -0.113 95%

7

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Dharakan ,

District Mandi Bahauddin PP-117.

3.000 1.870 -1.130 65%

8

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Ghanian ,

District Mandi Bahauddin PP-117.

4.000 2.015 -1.985 50%

9

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Phalian ,

District Mandi Bahauddin PP-117.

4.000 1.811 -2.189 50%

10

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Dhoul

Ranjha , District Mandi Bahauddin PP-117.

3.000 2.878 -0.122 95%

11

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Dhugal ,

District Mandi Bahauddin PP-117.

3.000 2.912 -0.088 95%

12

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Raika ,

District Mandi Bahauddin PP-117.

4.000 3.883 -0.117 85%

50.000 08-Oct-12524

Page 167

Page 168: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13

Constuction of PCC/Soling/Metalled

Road/Drain/Nallah/Culvert in UC Hailan ,

District Mandi Bahauddin PP-117.

4.000 3.944 -0.056 75%

13 50.000 41.973 -8.027

Maj® Zulfiqar Ali Gondal dated 27.9.12

MPA, PP-118

1Construction of Soling in UC Bhoa Ahsan

District M.B.Din PP-1184.500 0.461 -4.039 50%

2Construction of Soling & Drain in UC

Bheerowal District M.B.Din PP-1184.000 3.384 -0.616 40%

3Construction of Soling in UC Hardo Rerka,

District M.B.Din PP-1184.000 3.529 -0.471 80%

4Construction of Soling in UC Miana Gondal,

District M.B.Din PP-1184.000 3.411 -0.589 85%

5Construction of Soling in UC Bar Mossa,

District M.B.Din PP-1184.000 2.291 -1.709 60%

6Construction of Soling in UC Garah, District

M.B.Din PP-1184.000 3.895 -0.105 40%

7Construction of Soling in UC Kot Hast Khan,

District M.B.Din PP-1184.000 3.025 -0.975 75%

8Construction of Soling in UC Pindi Ranwan,

District M.B.Din PP-1184.000 3.677 -0.323 90%

9Construction of Soling in UC Sadia Sharif ,

District M.B.Din PP-1184.000 3.150 -0.850 80%

10Construction of Soling in UC Qadirabad,

District M.B.Din PP-1184.000 3.690 -0.310 90%

11Construction of Soling in UC Bhekhoo,

District M.B.Din PP-1184.000 3.332 -0.668 85%

12Construction of Soling & Drain in UC Dogull,

District M.B.Din PP-1181.500 1.391 -0.109 95%

13Construction of Soling in UC Dunni, District

M.B.Din PP-1184.000 3.859 -0.141 95%

13 50.000 39.095 -10.905

50.000

50.000 27-Sep-12464

08-Oct-12524

Page 168

Page 169: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Waseem Afzal Chan dated 5.9.12

MPA, PP-119

1Laying of Soling, Dera karam Ali to Chak No.

8, District M.B.Din PP-1191.000 0.953 -0.047 100%

2

Laying of Soling, Badshahpur to Railway Line

Dera Salabat S/o Karam Dad, District

M.B.Din

1.000 0.953 -0.047 100%

3Laying of Nallah Al-Hayat Town and kamal

Din , District Mandi Bahauddin PP-119.1.000 0.705 -0.295 75%

4Laying of Soling, Dera Azhar S/o Ghulam

Abbas And Abadi Kalowal, District M.B.Din1.000 0.945 -0.055 100%

5Laying of Soling, New Abadi Chak Daddan

Chak No. 7. District M.B.Din.1.000 0.980 -0.020 100%

6

Widning/Improvement of Metalled Road

Miana Gondal Chowk to Pind Makko ,

District M.B.Din

35.000 34.246 -0.754 98%

7Rehabiliatin of Metalled Road head Faqirian

to Remount Depot Mandi, District M.B.Din5.000 3.174 -1.826 65%

8Construction of Repair/ of Metalled Road

Rukkan to Daffar, District M.B.Din.5.000 4.590 -0.410 100%

8 50.000 46.546 -3.454

Waseem Afzal Chan dated 10.9.12

MPA, PP-119

1

Construction of Metalled Road Sargodha-

Gujrat Road to Chak No. 29, District M.B.Din. 4.800 4.588 -0.212 100%

2

Construction of Metalled Road Sargodha-

Gujrat Road to Chak No. 28, District M.B.Din. 4.300 4.208 -0.092 100%

3Construction of metalled Road 31 More to

Chak No. 30 Shadiwal, District M.B.Din5.000 4.923 -0.077 100%

50.000 05-Sep-12253

25.000 10-Sep-12315

Page 169

Page 170: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4Construction of Soling Road Chak No. 23 To

Bahowal, District M.B.Din.3.000 2.580 -0.420 95%

5Laying of Soling/Drain Mona Saydan, District

M.B.Din.1.300 1.209 -0.091 100%

6

Laying of Soling/Drain Chak Hussain Pur,

Mona Saydan, Yousaf Pur , District M.B.Din. 1.600 1.555 -0.045 100%

7Laying of Soling/Drain Pind Makko, Naiki Pur

, District M.B.Din.1.500 1.428 -0.072 100%

8Laying of Soling/Drain Moza Shumhari ,

District M.B.Din.1.500 1.421 -0.079 100%

9Laying of Soling/Drain/PCCMalakwal UC

No.49 , District M.B.Din.1.000 0.940 -0.060 70%

10Laying of Soling/Drain/PCCMalakwal UC

No.50 , District M.B.Din.1.000 0.814 -0.186 90%

10 25.000 24 -1.334

Afzal Chan dated 10.9.12

PP119

1Laying of Soling/Drain At Bosal Sukka Pull ,

District M.B.Din PP-119.1.900 1.728 -0.172 100%

2Laying of Soling/Drain At Bukkan Adda &

16 Chak , District M.B.Din PP-119.1.900 1.709 -0.191 100%

3Laying of Soling/Drain At Rukkan Masharki ,

District M.B.Din PP-119.1.900 1.022 -0.878 54%

4Laying of Soling/Drain At Rukkan Magrabi ,

District M.B.Din PP-119.1.900 1.818 -0.082 100%

5Laying of Soling/Drain At Jand & Nakay Wala

Bosal , District M.B.Din PP-119.1.800 1.714 -0.086 100%

6Laying of Soling/Drain At Jhang, Sajan,

Thatha , District M.B.Din PP-119.1.800 1.720 -0.080 100%

7Laying of Soling/Drain At Badshahpur &

Kartowal , District M.B.Din PP-119.1.800 1.296 -0.504 72%

8Laying of Soling/Drain At Chak No. 20 &

Bhalowal , District M.B.Din PP-119.2.000 1.936 -0.064 100%

50.000 10-Sep-12317

25.000 10-Sep-12315

Page 170

Page 171: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Laying of Soling/Drain At Chak No. 24-26-28

& 30 , District M.B.Din PP-119.2.000 1.899 -0.101 100%

10Laying of Soling/Drain At Waryayat, District

M.B.Din PP-119.2.000 1.832 -0.168 100%

11Laying of Soling/Drain At Kotli Masnani &

Pandowal Payn , District M.B.Din PP-119.2.000 1.937 -0.063 100%

12Laying of Soling/Drain At Khai Nathoo Kote &

Bhagal , District M.B.Din PP-119.2.000 1.886 -0.114 100%

13Laying of Soling/Drain At Ajjowal , District

M.B.Din PP-119.2.000 1.876 -0.124 100%

14Laying of Soling/Drain Chak 23, Daffar &

Jara , District M.B.Din PP-119.2.500 2.408 -0.092 100%

15

Laying of Soling/Drain At Moza Wara Alam

Shah, Bahowal & Wasowal , District M.B.Din

PP-119.

2.500 2.388 -0.112 100%

16

Laying of Soling/Drain At Chak No.7, chak

No. 19 & Kuthiala Khurd , District M.B.Din PP-

119.

2.500 1.952 -0.548 78%

17

Laying of Soling/Drain At Chhawind, kalowal

& Chak Daddan , District M.B.Din PP-119. 1.600 0.942 -0.658 59%

18Laying of Soling/Drain At Bukkan Village ,

District M.B.Din PP-119.1.100 1.045 -0.055 100%

19Laying of Soling/Drain At Chak No.33, Gohr

& Gohri, District M.B.Din PP-119.2.300 1.882 -0.418 100%

20Laying of Soling/Drain At Pandowala Bala &

Khamb , District M.B.Din PP-119.2.300 0.677 -1.623 29%

21Laying of Soling/Drain At Sahbwala &

Bhojowal, District M.B.Din PP-119.1.500 1.202 -0.298 80%

22Laying of Soling/Drain At Chot Dheeran

Msharki , District M.B.Din PP-119.2.200 2.093 -0.107

23

Laying of Soling/Drain At Chot Dheeran

Maghrabi & Chah Charhana,

District M.B.Din PP-119.

2.400 2.255 -0.145 94%

24Laying of Soling/Drain At Chak No.9 & Chak

Raib , District M.B.Din PP-119.2.400 2.329 -0.071 100%

25Laying of Soling/Drain At Gojra, District

M.B.Din PP-119.1.700 1.261 -0.439 74%

50.000 10-Sep-12317

Page 171

Page 172: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

25 50.000 42.807 -7.193

Tariq Mahmood Alwana dated 10.9.12

MPA, PP-120

1Construction of Street Soling /Drain UC

Sohawa Bolani, District M.B.Din PP-120.2.500 2.297 -0.203 100%

2Construction of Street Soling /Drain UC

Sohawa Dilloana, District M.B.Din PP-120.2.500 2.396 -0.104 100%

3Construction of Street Soling /Drain UC Chak

No.40, District M.B.Din PP-120.2.500 2.209 -0.291 100%

4Construction of Street Soling /Drain UC

Bhikki, District M.B.Din PP-120.2.000 1.028 -0.972 51%

5Construction of Street Soling /Drain UC

Kadhar, District M.B.Din PP-120.2.000 1.504 -0.496 75%

6

Construction of PCC Street Mandi road to

Jama Masjid Sohawa Bolani, M.B.Din PP-

120

1.200 0.605 -0.595 50%

7Construction of Street Soling /Drain UC

Sahna District M.B.Din PP-120.1.500 1.420 -0.080 100%

8Construction of Soling UC Mong, District

M.B.Din PP-120.1.500 1.409 -0.091 100%

9Construction of Soling UC Mangat, District

M.B.Din PP-120.1.500 1.333 -0.167 89%

10Construction of Nallah Chak No. 21, District

M.B.Din PP-120.1.000 0.542 -0.458 54%

11Construction of Street Soling /Drain UC

Murad Wala, District M.B.Din PP-120.0.800 0.768 -0.032 100%

12Construction of Street Soling /Drain UC Pindi

Elahi, District M.B.Din PP-120.1.000 0.950 -0.050 100%

12 20.000 16.461 -3.539

Tariq Mahmood Alwana dated 14.12.12

MPA, PP-120

20.000 10-Sep-12326

Page 172

Page 173: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1Constuction of Street Soling/Drain UC

Sahana District Mandi Bahauddin PP-120

2Constuction of Street Soling/Drain UC

Sohawa, District Mandi Bahauddin PP-1201.000 0.881 -0.119 88%

3Constuction of Street Soling UC Sohawa

Jamiani, District Mandi Bahauddin PP-1201.000 -1.000

4

Constuction of Street Soling/Drain UC

Sohawa Dilloana, District Mandi Bahauddin

PP-120

5Constuction of Street Soling/Drain UC Aaki,

District Mandi Bahauddin PP-1201.000 -1.000

6

Constuction of Street Soling/Drain UC Chak

Basawa District Mandi Bahauddin PP-120 1.000 -1.000

7Constuction of Street Soling/Drain UC

Chround, District Mandi Bahauddin PP-120

8Constuction of Street Soling/Drain UC Bohit,

District Mandi Bahauddin PP-120

9

Constuction of Street Soling/Drain UC khumb

Khord, District Mandi Bahauddin PP-120 1.000 -1.000

10

Repair of Metalled Road & Construction of

Soling /Drain UC Majhi, District Mandi

Bahauddin PP-120.

1.500 -1.500

11Constuction of Street Soling/Drain UC

Khewa, District Mandi Bahauddin PP-120

12

Constuction of Street Soling/Drain UC

Khutayala Sheikhan, District Mandi

Bahauddin PP-120

1.000 -1.000

13

Constuction of Street Soling/Drain UC

Shammo, District Mandi Bahauddin PP-120

14Constuction of Street Soling/Drain UC

Jholana, District Mandi Bahauddin PP-1201.000 -1.000

15

Constuction of Street Soling/Drain UC

Mianwal Ranja, District Mandi

Bahauddin PP-120

1.000 0.749 -0.251 75%

30.000 14-Dec-12811

Page 173

Page 174: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

16

Constuction of Street Soling/Drain UC Chak

No.4, District Mandi Bahauddin PP-120

17Constuction of Street Soling/Drain UC Jaya,

District Mandi Bahauddin PP-120

18Constuction of Street Soling/Drain UC Eidel,

District Mandi Bahauddin PP-120

19Constuction of Street Soling/Drain UC Jasik,

District Mandi Bahauddin PP-1200.500 -0.500

20

Constuction of Bridge Over Saim in Uc

Amana Lok Majhi, District Mandi Bahauddin

PP-120

20 10.000 1.630 -8.370

Ch.Muhammad Arif Gondal dated 10.10.12 Corrigendum issued on 01.11.12

Notable(PP-120)

1

Cosntruction of Metalled

Road/PCC/Soling/Drain & Nallah At UC

Chammo & Chak No. 40,

District Mandi Bahauddin.

20.000 -20.000

2

Cosntruction of Metalled

Road/PCC/Soling/Drain & Nallah At UC

Kadher, Khatiyala Sheikh, Mangat, Chak

Basawa, Marala Sohawa, Dilloania,

District Mandi Bahauddin.

3

Cosntruction of Metalled

Road/PCC/Soling/Drain & Nallah At UC

Bahki, Pharia Mong, Ahlah, Sohawa Bolani,

District Mandi Bahauddin.

3 20.000 -20.000

30.000 14-Dec-12811

30.000 01-Nov-12512

Page 174

Page 175: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Qamar Amir Ch dated 12.11.12

MPA, PP-358

710 12-Nov-12 25.090 1Const. of Soling, Nallah and Drain Chak

No.96/SB Distt:Sargodha25.090 6.480 -18.610 26%

1 25.090 6.480 -18.610

Ch.Dost Muhammad Tungar dated 24.12.12

Notable

840 24-Dec-12 1.500 1

Construction of Soling From Village Gohri,

Tehsil Malakwal, District Mandi Bahauddin

(NA-109).

1.500 -1.500 80%

1 1.500 -1.500

CH.Imtiaz Safdar Warriach dated 31.8.12

Mna, NA-98

1

Construction of PCC/Drain in Maqbool

Shaheed Abad, NA-98 District Gujranwala

(01/08).

5.000 5.000 100%

2Construction of PCC/Drain in Aadoy Ray, NA-

98 District Gujranwala (02/08).5.000 4.900 -0.100 100%

3Construction of PCC/Drain in Chadiala,

NA-98 District Gujranwala (03/08).5.000 4.874 -0.126 100%

4Construction of PCC/Drain in Chian Wali,

NA-98 District Gujranwala (04/08).5.000 4.900 -0.100 100%

5Construction of PCC/Drain in Dhillanwali,

NA-98 District Gujranwala (05/08).5.000 4.732 -0.268 100%

6

Construction of PCC/Drain in Dakian, Yousaf

Pura, NA-98 District Gujranwala (06/08). 5.000 4.900 -0.100 100%

7Construction of PCC/Drain in Kot Shera, NA-

98 District Gujranwala (07/08).7.000 6.869 -0.131 100%

200.000 31-Aug-12142

CCD, Gujranwala

Page 175

Page 176: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Construction of PCC/Drain in Mughal Chak,

NA-98 District Gujranwala (08/08).8.000 7.843 -0.157 100%

9

Construction of Metalled Road of

Khabeke to Q.D. Sing and Q.M. Singh and

Kot, NA-98 District Gujranwala.(1/4)

8.000 7.807 -0.193 100%

10Construction of By Pass Qilla Dedar Singh

NA-98 District Gujranwala.(2/4)8.000 7.775 -0.225 100%

11

Repari/ Up-gradation of Metalled Road from

Nandpur to Cheema Chowk, NA-98 District

Gujranwala.(3/4)

9.000 6.952 -2.048 77%

12

Construction of Metalled Road from Alipur

Road to Kot Amir Singh, Nawan Pind,

Thakarke, NA-98 District Gujranwala.(4/4)

15.000 14.954 -0.046 100%

13Construction of PCC/Drain in Chanianan, NA-

98, Gujranwala. (01/11).2.000 1.971 -0.029 100%

14

Construction of PCC/Drain and Metalled

Road in Ali Pur Road to Bahneke, NA-98,

Gujranwala. (02/11).

8.000 7.840 -0.160 100%

15

Construction of PCC/Drain and Metalled

Road in Gogranwala, NA-98, Gujranwala.

(03/11).

8.000 7.900 -0.100 100%

16

Construction of PCC/Drain /Nallah near

Railway line More Emenabad, NA-98,

Gujranwala. (04/11).

5.000 4.900 -0.100 100%

17Construction of Nallah in Nandpur, NA-98,

Gujranwala. (05/11).4.000 3.813 -0.187 100%

18Construction of High School Building in

Nandpur, NA-98, Gujranwala. (06/11).6.000 -6.000

19Construction of Metalled Road of Puranpur,

NA-98, Distt: Gujranwala. (7/11)3.000 2.930 -0.070 100%

20Repair/ Up-gradation of Metalled Road of

Luraki, NA-98, Distt: Gujranwala (08/11).3.000 2.929 -0.071 100%

21

Repair/ Up-gradation of Metalled Road of

Pipli Wala to Muslim Chak, NA-98, Distt:

Gujranwala (09/11).

5.000 4.900 -0.100 100%

22Repair of Metalled Road of Nawan Pind, NA-

98, Distt: Gujranwala (10/11).6.000 5.946 -0.054 100%

23Repair of Metalled Road of Papnakha,

NA-98, Distt: Gujranwala (11/11).7.000 -7.000

200.000 31-Aug-12142

Page 176

Page 177: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

24Constructon of PCC/Drain in Maan NA-98,

Gujranwala. (01/06).8.000 7.739 -0.261 100%

25Construction of PCC/Drain in Mudu Khalil NA-

98, District Gujranwala. (02/06)8.000 7.535 -0.465 100%

26Construction of PCC/Drain in Attawa, NA-

98, District Gujranwala. (03/06)9.000 8.820 -0.180 100%

27

Construction of PCC/Drain in Botala Sharim

Singh, NA-98, District Gujranwala. (04/06) 9.000 8.867 -0.133 100%

28Construction of PCC/Drain in Jhangi, Rukh

Keekran NA-98, District Gujranwala.(5/06)9.000 8.826 -0.174 100%

29Construction of PCC/Drain in Ladhywala

Warraich NA-98, District Gujranwala.(6/06)15.000 14.700 -0.300 100%

29 200.000 181.122 -18.878

CH.Imtiaz Safdar Warriach dated 12.2.13

Mna, NA-98

1Constructon of PCC/Drain in Ladhywala

Warriach, NA-98, Gujranwala. 4.100 4.029 -0.071 100%

2Construction of PCC/Drain in Harianwala Kot

Mand, NA-98, District Gujranwala. 0.550 0.549 -0.001 100%

3

Const. / Repair of Metalled road from Qila

Dave Sanay Wala to Qila Mian Singh NA-98,

District Gujranwala.

3.000 2.912 -0.088 100%

4Construction of PCC/Drain in Uggo Chak, NA-

98, District Gujranwala. 0.900 0.835 -0.065 100%

5

Const. of PCC/Drain & M/Road in Abass

Nagar Mallowala More Emanabad, NA-

98, District Gujranwala.

9.200 9.200 100%

6

Const./ Repair of M/Road from Hassan Wali

Khaliq Pur, NA-98, District Gujranwala. 0.590 0.587 -0.003 100%

7Const. of PCC/Drain in Ladhywala Warriach,

NA-98, District Gujranwala.4.340 -4.340

8Const. of PCC/Drain in Sansra new Abadi

Tari Sansi, NA-98, District Gujranwala.7.900 -7.900

200.000 31-Aug-12142

32.580 12-Feb-13962

Page 177

Page 178: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Const. of PCC/Drain in Dera Zaiullah, NA-

98, District Gujranwala.2.000 -2.000

9 32.580 18.112 -14.468

Tasadaq Masood Khan dated 17.8.12

Mna, NA-100

1

Wediening/Improvement of road from Nokhar

road to Nadhan kot NA-100 Distt:

Gujranwala.

9.740 9.533 -0.207 100%

2

Wediening/Improvement of road from

Nadhan kot to Chak Virkan NA-100 Distt:

Gujranwala.

16.100 13.872 -2.228 100%

3

Wediening/Improvement of road from Chak

Virkan to Qilla Jae singh chowk NA-100 Distt:

Gujranwala.

12.200 9.334 -2.866 100%

4

Wediening/Improvement of road from Qilla

Jae singh chowk to Olajh Bhai ke NA-100

Distt: Gujranwala.

11.960 11.960 100%

4 50.000 44.699 -5.301

Tasadaq Masood Khan dated 30.8.12

Mna, NA-100

1Constrution of PCC/Drain in Abid Abad, NA-

100 District Gujranwala (1/20)1.500 1.460 -0.040 100%

2Constrution of PCC/Drain in Lundhy,

NA-100 District Gujranwala (2/20)1.500 1.325 -0.175 100%

3Constrution of PCC/Drain in Chak Chatha,

NA-100 District Gujranwala (3/20)1.500 1.345 -0.155 100%

4Constrution of PCC/Drain in Sadho Goraya

NA-100 District Gujranwala (4/20)2.000 1.903 -0.097 100%

5Constrution of PCC/Drain in Jhattan Wali,

NA-100 District Gujranwala (5/20)2.500 2.207 -0.293 100%

50.000 17-Aug-1262

70.000 30-Aug-12129

32.580 12-Feb-13962

Page 178

Page 179: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Constrution of PCC/Drain in Baloke, NA-100

Distt: Gujranwala (6/20).3.000 2.931 -0.069 100%

7Constrution of PCC/Drain in Qasim Pur,

NA-100 District Gujranwala (7/20)3.000 2.769 -0.231 100%

8Constrution of PCC/Drain in Mahhar,

NA-100 District Gujranwala (8/20)3.000 2.855 -0.145 100%

9Constrution of PCC/Drain in Chacho Ke, NA-

100 District Gujranwala (9/20)3.000 2.484 -0.516 100%

10Constrution of PCC/Drain in Bhangam,

NA-100 District Gujranwala (10/20)3.000 2.931 -0.069 100%

11Constrution of Saim Bridge at Jhattan Wali

NA-100 District Gujranwala (11/20)6.000 5.880 -0.120 100%

12Constrution of Saim Bridge at Thiri Gillan,

NA-100 District Gujranwala (12/20)3.000 1.334 -1.666 44%

13Constrution of Bridge at Canal Loonke,

NA-100 District Gujranwala (13/20)3.000 2.296 -0.704 77%

14Constrution of Saim Bridge at Jajo Ke,

NA-100 District Gujranwala (14/20)2.500 1.201 -1.299 48%

15Constrution of Pull at Bridge Duburji, NA-

100 District Gujranwala (15/20)2.500 1.058 -1.442 42%

16Constrution of Boundary Wall of School of

Ghara, NA-100 District Gujranwala (16/20)1.500 1.229 -0.271 100%

17

Constrution of Boundary Wall of Christian

Graveyard of Nokhar, NA-100 District

Gujranwala (17/20)

2.500 2.450 -0.050 100%

18

Constrution of Boundary Wall of Grave yard

of Buggy, NA-100 District Gujranwala

(18/20)

2.000 1.999 -0.001 100%

19Constrution of Cattle Ghatt in Kotli Aarora

NA-100 District Gujranwala (19/20)1.000 0.937 -0.063 100%

20Constrution of Metalled Road for Shahpur NA-

100 District Gujranwala (20/20)2.000 1.970 -0.030 100%

21Constrution of PCC/Drain /Sewer in Manjh

Wali, NA-100 District Gujranwala (1/7)2.000 1.982 -0.018 100%

22Constrution of PCC/Drain in Kot Rasool

Purian, NA-100 District Gujranwala (2/7)2.000 1.958 -0.042 100%

23Constrution of PCC/Drain in Dhilum Dogran

NA-100 District Gujranwala (3/7)2.000 1.959 -0.041 100%

70.000 30-Aug-12129

Page 179

Page 180: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

24Constrution of PCC/Drain in Sadhon Wali,

NA-100 District Gujranwala (4/7)2.000 1.964 -0.036 100%

25Constrution of PCC/Drain in Rana Pur,

NA-100 District Gujranwala (5/7)2.500 2.481 -0.019 100%

26Constrution of PCC/Drain in Dera Ghakhran,

NA-100 District Gujranwala (6/7)3.500 3.187 -0.313 100%

27Constrution of Metalled Road for Budha

Goraya NA-100 District Gujranwala (7/7)6.000 2.711 -3.289 45%

27 70.000 58.806 -11.194

Tasaduq Masood Khan dated 27.9.12

Mna, NA-100

449 27-Sep-12 30.000 1

Wediening/Improvement of Metalled Road &

PCC Road from Thabal Dhusha to Qila Jaay

Singh NA-100 Distt: Gujranwala.

30.000 14.300 -15.700 50%

1 30.000 14.300 -15.700

Tasadq Masood Khan dated 27.9.12

Mna, NA-100

943 27-Sep-12 20.000 1

Wediening/Improvement of Metalled Road &

PCC Road from Thalil Dhucha to Qilla Jae

SingDistt: Gujranwala.

20.000 12.082 -7.918 62%

1 20.000 12.082 -7.918

JUSTICE ® IFTIKHAR AHMAD CHEEMA. dated 17.8.12

Mna, NA-101

1Const: of PCC/Drain/Nallah in Jamkey

Chatha Distt: Gujranwala (NA-101) (1/37).2.500 -2.500

2Const: of PCC/Drain/Nallah in Sallho Ki

chatha, Distt: Gujranwala (NA-101) (2/37).3.000 -3.000

3Const: of PCC/Drain in Rukh Kalan, Distt:

Gujranwala (NA-101) (3/37).1.000 -1.000

50.000 17-Aug-12986

70.000 30-Aug-12129

Page 180

Page 181: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4Const: of PCC/Drain in Rukh Khurd, Distt:

Gujranwala (NA-101) (4/37).1.000 -1.000

5

Const: of PCC/Drain/Nallah in Hazrat

Kalianwala, Distt: Gujranwala (NA-101)

(5/37).

3.000 -3.000

6Const: of PCC/Drain inSaid Nagar, Distt:

Gujranwala (NA-101) (6/37).2.000 -2.000

7Const: of PCC/Drain inAli Pur Chatha, Distt:

Gujranwala (NA-101) (7/37).3.000 -3.000

8Const: of PCC/Drain inPando Ki Maqbra,

Distt: Gujranwala (NA-101) (8/37).0.500 -0.500

9Const: of PCC/Drain inPando Ki Anwar Wali,

Distt: Gujranwala (NA-101) (9/37).1.000 -1.000

10Const: of PCC/Drain in Pandori Kalan, Distt:

Gujranwala (NA-101) (10/37).2.000 -2.000

11Const: of PCC/Drain in Pandori Khurd, Distt:

Gujranwala (NA-101) (11/37).1.000 -1.000

12

Const: of PCC/Drain/Nallah in Sarro Ki

Cheema, Distt: Gujranwala (NA-101) (12/37). 2.000 -2.000

13Const: of PCC/Drain in Islamabad Sarro Ki,

Distt: Gujranwala (NA-101) (13/37).1.000 -1.000

14Const: of PCC/Drain in Mansoor Wali, Distt:

Gujranwala (NA-101) (14/37).1.000 -1.000

15Const: of PCC/Drain in Kathore Khurd, Distt:

Gujranwala (NA-101) (15/37).0.500 -0.500

16Const: of PCC/Drain/Nallah in Kot Jaffer,

Distt: Gujranwala (NA-101) (16/37).1.500 -1.500

17Const: of PCC/Drain in Wandala Cheema,

Distt: Gujranwala (NA-101) (17/37).1.000 -1.000

18Const: of PCC/Drain in Baggrian Now, Distt:

Gujranwala (NA-101) (18/37).1.000 -1.000

19Const: of PCC/Drain in Chak Dadon, Distt:

Gujranwala (NA-101) (19/37).2.000 -2.000

20Const: of PCC/Drain in Nath Kalan, Distt:

Gujranwala (NA-101) (20/37).3.000 -3.000

21Const: of PCC/Drain in Iben Wali, Distt:

Gujranwala (NA-101) (21/37).2.000 -2.000

50.000 17-Aug-12986

Page 181

Page 182: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

22Const: of PCC/Drain in Mattum (Near chorra,

Distt: Gujranwala (NA-101) (22/37).1.000 -1.000

23

Const: of Soling Dera Dost Muhammad to

Rajbah Bridge in Saadan Wali, Distt:

Gujranwala (NA-101) (23/37).

1.000 -1.000

24

Const: of PCC/Drain in Tappai Amir Singh

Main Gala, Distt: Gujranwala (NA-101)

(24/37).

0.500 -0.500

25Const: of PCC/Drain in Changanwali, Distt:

Gujranwala (NA-101) (25/37).0.500 -0.500

26Const: of PCC/Drain in Baggrian Kohna,

Distt: Gujranwala (NA-101) (26/37).1.000 -1.000

27Const: of PCC/Drain in Ojla Kalan, Distt:

Gujranwala (NA-101) (27/37).1.000 -1.000

28Const: of PCC/Drain/Nallah in Dad Wali,

Distt: Gujranwala (NA-101) (28/37).2.000 -2.000

29Const: of PCC/Drain in Jandiala Dhab Wala,

Distt: Gujranwala (NA-101) (29/37).1.000 -1.000

30Const: of PCC/Drain/ Nallah in Ali Nagar,

Distt: Gujranwala (NA-101) (30/37).1.500 -1.500

31

Const: of PCC/Drain in Sajjad Colony

Talwara near Sohdra, Distt: Gujranwala (NA-

101) (31/37).

1.000 -1.000

32Const: of PCC/Drain/ Nallah in Mandiala

Chatha, Distt: Gujranwala (NA-101) (32/37).1.500 -1.500

33Const: of PCC/Drain in Kot Yousaf, Distt:

Gujranwala (NA-101) (32/37).1.000 -1.000

34Const: of PCC/Drain in Jokhian, Distt:

Gujranwala (NA-101) (34/37).0.500 -0.500

35Const: of PCC/Drain in Bheegha, Distt:

Gujranwala (NA-101) (35/37).0.500 -0.500

36Const: of PCC/Drain in Ghayye Wala, Distt:

Gujranwala (NA-101) (36/37).0.500 -0.500

37Const: of PCC/Drain in Mohlan-Key Wala,

Distt: Gujranwala (NA-101) (37/37).0.500 -0.500

37 50.000 -50.000

50.000 17-Aug-12986

Page 182

Page 183: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

CH.Mehdi Hassan Bhatti Ex-MNA dated 6.9.12

Ex-MNA, NA-102

1Construction of PCC/Drain U/C Kasoki

District Hafizabad NA-102.5.000 4.802 -0.198 100%

2Construction of PCC/Drain U/C Gariala

District Hafizabad NA-102.5.000 4.922 -0.078 100%

3Construction of PCC/Drain U/C Wani

District Hafizabad NA-102.5.000 4.750 -0.250 100%

4Construction of PCC/Drain U/C Sagar Kalan

District Hafizabad NA-102.4.000 3.916 -0.084 100%

5Construction of PCC/Drain U/C Chak Karl

District Hafizabad NA-102.4.000 3.936 -0.064 100%

6Construction of PCC/Drain U/C Ram Kay

Chatta District Hafizabad NA-102.4.000 3.080 -0.920 100%

7Construction of PCC/Drain U/C Lalal Kay

Deernkay District Hafizabad NA-102.4.000 3.905 -0.095 100%

8Construction of PCC/Drain U/C Wani Kay

Tarar District Hafizabad NA-102.4.000 3.849 -0.151 100%

9Construction of PCC/Drain U/C Koulo Tarar

District Hafizabad NA-102.4.000 3.915 -0.085 100%

10Construction of PCC/Drain U/C Kot Said

Muhammad District Hafizabad NA-102.4.000 3.781 -0.219 100%

11Construction of PCC/Drain U/C Kot Ishaq

District Hafizabad NA-102.4.000 3.880 -0.120 100%

12Construction of PCC/Drain U/C Gagay

District Hafizabad NA-102.5.000 4.908 -0.092 100%

13

Construction of PCC/Drain & Tuff Tile

Hafizabad City U/C No-1 District Hafizabad

NA-102.

4.000 3.946 -0.054 100%

14

Construction of PCC/Drain & Tuff Tile

Hafizabad City U/C No-2,3 District Hafizabad

NA-102.

4.000 4.000 100%

15

Construction of PCC/Drain & Tuff Tile

Hafizabad City U/C No- 4,5 District

Hafizabad NA-102.

4.000 4.000 100%

16

Construction of PCC/Drain & Tuff Tile

Hafizabad City U/C No-6,7 District Hafizabad

NA-102.

4.000 3.920 -0.080 100%

80.000 06-Sep-12238

Page 183

Page 184: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17Construction of PCC/Drain U/C Sulangi Awan

District Hafizabad NA-102.4.000 3.964 -0.036 100%

18Construction of PCC/Drain U/C Qila Ram

Kore District Hafizabad NA-102.4.000 3.778 -0.222 100%

19Construction of PCC/Drain U/C Chak Chatta

District Hafizabad NA-102.4.000 3.900 -0.100 100%

19 80.000 77.152 -2.848

Liaqat Abbas Bhatti dated 22.8.12

MNA, NA-103

1Construction of PCC/Drain in U/C Mateki,

Distt: Hafizabad (NA-103). 2.000 2.000 100%

2Construction of Soling/Drain in U/C Mateki,

Distt: Hafizabad (NA-103). 2.000 1.970 -0.030 100%

3

Construction of PCC/Drain in U/C Mateki

Thatha Gajoki Sambal, Distt: Hafizabad (NA-

103).

1.000 0.992 -0.008 100%

4Construction of PCC/Drain in U/C Khurram

Charera, Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

5

Construction of Soling/Drain in U/C Khurram

Charera, Distt: Hafizabad (NA-103). 2.000 1.959 -0.041 100%

6

Construction of PCC/Drain in U/C Khurram

Charera Mirza Bhangseka Bagh Kohna Gari

Abdullah, Distt: Hafizabad (NA-103).

1.000 0.888 -0.112 100%

7Construction of PCC/Drain in U/C Thati

Belolpur, Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

8Construction of Soling/Drain in U/C Thati

Belolpur, Distt: Hafizabad (NA-103). 2.000 1.023 -0.977 100%

9

Construction of PCC/Drain in U/C Thati

Belolpur Chochak Maqsooda, Distt:

Hafizabad (NA-103).

1.000 0.975 -0.025 100%

10Construction of PCC/Drain in U/C Badar Ali,

Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

100.000 22-Aug-12113

80.000 06-Sep-12238

Page 184

Page 185: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Construction of Soling/Drain in U/C Badar Ali,

Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

12

Construction of PCC/Drain in U/C Badar Ali

Chukerian Gabreka, Distt: Hafizabad (NA-

103).

1.000 0.980 -0.020 100%

13Construction of PCC/Drain in U/C

Mustafabad, Distt: Hafizabad (NA-103). 2.000 1.986 -0.014 100%

14Construction of Soling/Drain in U/C

Mustafabad, Distt: Hafizabad (NA-103) 2.000 1.990 -0.010 100%

15

Construction of PCC/Drain in U/C

Mustafabad Machonika Chak 474, Distt:

Hafizabad (NA-103).

1.000 0.976 -0.024 100%

16Construction of PCC/Drain in U/C Kot Nakka,

Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

17Construction of Soling/Drain in U/C Kot

Nakka, Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

18

Construction of PCC/Drain in U/C Kot Nakka

Thatha Raika, Distt: Hafizabad (NA-103). 1.000 0.998 -0.002 100%

19Construction of PCC/Drain in U/C Khairo

Matmal, Distt: Hafizabad (NA-103). 2.000 1.940 -0.060 100%

20

Construction of Soling/Drain in U/C Khairo

Matmal, Distt: Hafizabad

(NA-103).

2.000 1.960 -0.040 100%

21

Construction of PCC/Drain in U/C Khairo

Matmal Ujjan and Fateki, Distt: Hafizabad.

(NA-103).

1.000 0.970 -0.030 100%

22Construction of PCC/Drain in U/C Pindi

Bhattian, Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

23

Construction of Soling/Drain in U/C Pindi

Bhattian, Distt: Hafizabad

(NA-103).

2.000 1.960 -0.040 100%

24

Construction of PCC/Drain in U/C Pindi

Bhattian Hassan and Bilalpura, Distt:

Hafizabad (NA-103).

1.000 0.960 -0.040 100%

25Construction of PCC/Drain in U/C Nariawala,

Distt: Hafizabad (NA-103). 2.000 1.947 -0.053 100%

26Construction of Soling/Drain in U/C

Nariawala, Distt: Hafizabad (NA-103). 2.000 1.990 -0.010 100%

100.000 22-Aug-12113

Page 185

Page 186: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

27

Construction of PCC/Drain in U/C Nariawala

Killa Usman Ghani, Distt: Hafizabad (NA-

103).

1.000 0.963 -0.037 100%

28Construction of PCC/Drain in U/C Kot

Sarwar, District Hafizabad (NA-103).2.000 1.960 -0.040 100%

29Construction of Soling/Drain in U/C Kot

Sarwar, District Hafizabad (NA-103).2.000 1.960 -0.040 100%

30

Construction of PCC/Drain in U/C Kot Sarwar

Jandraka, District Hafizabad (NA-103). 1.000 0.980 -0.020 100%

31Construction of PCC/Drain in U/C Rasool Pur-

Tarar, District Hafizabad (NA-103).2.000 1.997 -0.003 100%

32Construction of Soling/Drain in U/C Rasool

Pur-Tarar, District Hafizabad (NA-103).2.000 1.973 -0.027 100%

33Construction of PCC/Drain in U/C Bobra,

District Hafizabad (NA-103).2.000 2.000 100%

34Construction of Soling/Drain in U/C Bobra,

District Hafizabad (NA-103).2.000 1.995 -0.005 100%

35

Construction of PCC/Drain in U/C Bobra

Mona Ambal Taas Paraneki, District

Hafizabad (NA-103).

1.000 0.982 -0.018 100%

36Construction of PCC/Drain in U/C Chak

Bhatti, District Hafizabad (NA-103).2.000 2.000 100%

37Construction of Soling/Drain in U/C Chak

Bhatti, District Hafizabad (NA-103).2.000 1.977 -0.023 100%

38

Construction of PCC/Drain in U/C Chak

Bhatti Narowal Kuttay Shah, District

Hafizabad (NA-103).

1.000 0.996 -0.004 100%

39Construction of PCC/Drain in U/C Jalal Pur-

Bhattian, Distt: Hafizabad (NA-103) 1.000 0.995 -0.005 100%

40Construction of PCC/Drain in U/C Sukkheki

Sarwar, Distt: Hafizabad (NA-103). 2.000 1.985 -0.015 100%

41Construction of Soling/Drain in U/C Sukkheki

Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

42Construction of PCC/Drain U/C Sukkheki

Haji Pura, Distt: Hafizabad (NA-103). 1.000 0.993 -0.007 100%

43Construction of PCC/Drain in U/C Shah

Jamal, Distt: Hafizabad (NA-103). 2.000 1.996 -0.004 100%

100.000 22-Aug-12113

Page 186

Page 187: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

44Construction of Soling/Drain in U/C Shah

Jamal, Distt: Hafizabad (NA-103). 2.000 2.000 100%

45

Construction of PCC/Drain in U/C Shah

Jamal Thatha Asian Thatha Jahad, Distt:

Hafizabad (NA-103).

1.000 0.953 -0.047 100%

46Construction of PCC/Drain in U/C Nathe,

Distt: Hafizabad (NA-103). 2.000 2.000 100%

47Construction of Soling/Drain in U/C Nathe,

Distt: Hafizabad (NA-103). 2.000 2.000 100%

48

Construction of PCC/Drain in U/C

Nathe Hardo Atley Lakrianla, Distt: Hafizabad

(NA-103).

1.000 0.990 -0.010 100%

49Construction of PCC/Drain in U/C Nanoana,

Distt: Hafizabad (NA-103). 2.000 1.994 -0.006 100%

50Construction of Soling/Drain in U/C Nanoana,

Distt: Hafizabad (NA-103). 2.000 1.960 -0.040 100%

51

Construction of PCC/Drain in U/C Nanoana

Kot Mian Samra, Distt: Hafizabad (NA-103). 1.000 0.970 -0.030 100%

52Construction of PCC/Drain in U/C Kaleki

Mandi, Distt: Hafizabad (NA-103) 2.000 1.980 -0.020 100%

53

Construction of Soling/Drain in U/C Kaleki

Mandi, Distt: Hafizabad

(NA-103).

2.000 1.935 -0.065 100%

54

Construction of PCC/Drain in U/C Kaleki

Mandi Channi Charera, Distt: Hafizabad (NA-

103).

1.000 0.959 -0.041 100%

55Construction of PCC/Drain in U/C Madora

Kalan, Distt: Hafizabad (NA-103). 2.000 2.000 100%

56Construction of Soling/Drain in U/C Madora

Kalan, Distt: Hafizabad (NA-103). 2.000 1.711 -0.289 100%

57

Construction of PCC/Drain in U/C Madora

Kalan Kota Khushal Syedwala, Distt:

Hafizabad (NA-103).

1.000 0.995 -0.005 100%

58Construction of PCC/Drain in U/C Sadoki,

Distt: Hafizabad (NA-103). 2.000 1.810 -0.190 100%

59Construction of Soling/Drain in U/C Sadoki,

Distt: Hafizabad (NA-103). 2.000 1.979 -0.021 100%

100.000 22-Aug-12113

Page 187

Page 188: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

60

Construction of PCC/Drain in U/C Sadoki

Naiwala Mir Mukhtar, Distt: Hafizabad (NA-

103).

1.000 0.969 -0.031 100%

60 100.000 97.101 -2.899

CH.Muhammad Tariq Gujjar dated 10.9.12

MPA, PP-93

1

Construction of PCC/Drain/Sewer in Shah

Rukh Colon y, Madina Colony, Bilal Road, PP-

93 District Gujranwala

2.000 1.960 -0.040 100%

2Construction of PCC/Drain/Sewer in Dhully

PP-93 District Gujranwala 2.000 1.807 -0.193 100%

3Construction of PCC/Drain/Sewer in Gurjak

PP-93 District Gujranwala 2.000 1.838 -0.162 100%

4

Construction of PCC/Drain/Sewer in Abbas

Pura, Hassan Pura, Hameed Pura, PP-93

District Gujranwala

2.000 1.867 -0.133 100%

5

Construction of PCC/Drain/Sewer in Abbas

Kotli Rustam, Abbas Colony, Rasheed

Colony, PP-93 District Gujranwala

2.000 1.195 -0.805 100%

6

Construction of PCC/Drain/Sewer in Bath

Colony, Rehman Abad, Sadiqabad, PP-

93 District Gujranwala

2.000 1.706 -0.294 100%

7

Construction of PCC/Drain/Sewer in Jannat

Town, Muhammad Abad, Baghwala, PP-93

District Gujranwala

2.000 1.908 -0.092 100%

8

Construction of PCC/Drain/Sewer in

Rasool Pura, Azam Abad, Camp No.2,

PP-93 District Gujranwala

2.000 1.439 -0.561 100%

9

Construction of PCC/Drain/Sewer in

Gobind Garh, Daban Pura, Naila Chowk, PP-

93 District Gujranwala

2.000 1.727 -0.273 100%

10

Construction of PCC/Drain/Sewer in

Mohallah Sultan Pura, Rehman Pura,

Mehboob-e-Haq, PP-93 District Gujranwala 2.000 1.960 -0.040 100%

100.000 22-Aug-12113

20.000 10-Sep-12322

Page 188

Page 189: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10 20.000 17.407 -2.593

CH.Muhammad Tariq Gujjar dated 14.12.12

MPA, PP-93

811 14-Dec-12 30.000 1 10.000 -10.000

1 10.000 -10.000

Mian Muhammad Arqam Khan dated 10.9.12

MPA, PP-98

1Construction of PCC/Drain in Qilla Nao

Singh, PP-98 District Gujranwala 1.500 1.468 -0.032 100%

2Construction of PCC/Drain in Nawan Pind,

PP-98 District Gujranwala 1.500 1.466 -0.034 100%

3

Construction of PCC/Drain in Galla Baba

Phola Wala Jhangi, PP-98 District

Gujranwala

3.000 3.000 100%

4Construction of PCC/Drain in Basharat Town,

PP-98 District Gujranwala 2.000 1.891 -0.109 100%

5Construction of PCC/Drain in Muraliwala, PP-

98 District Gujranwala 2.000 1.970 -0.030 100%

6Construction of PCC/Drain in Goro Colony,

Nagry, PP-98 District Gujranwala 2.000 1.865 -0.135 100%

7Construction of PCC/Drain in Mughal Chak,

PP-98 District Gujranwala 2.500 2.353 -0.147 100%

8

Construction of PCC/Drain in Galla Real

Taste Hotel Jalik Town, PP-98 District

Gujranwala

3.500 3.448 -0.052 100%

9Construction of PCC/Drain in Dhillan Wali

PP-98 District Gujranwala 1.200 1.156 -0.044 100%

10Construction of PCC/Drain in Chandiala

Kallan, PP-98 District Gujranwala 1.800 1.770 -0.030 100%

20.000 10-Sep-12323

Page 189

Page 190: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10 20.000 20.387 0.387

Mian Muhammad Arqam Khan dated 14.12.12

MPA, PP-98

1

Const. of PCC/Drain Gali Irfan Sadho Wali in

Basharat Town More Emanabad, PP-98

District Gujranwala

0.500 -0.500

2Const. of PCC/Drain in Dera Meeran, PP-98

Distt. Gujranwala 1.000 -1.000

3Const. of PCC/Drain in Qila Khazana, PP-98

Distt. Gujranwala 1.000 -1.000

4Const. of PCC/Drain in Enemabad, PP-98

District Gujranwala 1.000 -1.000

5

Const. of PCC/Drain in Qila Mullah Singh, UC-

Botala sharim Singn, PP-98 District

Gujranwala

1.000 -1.000

6

Const. of PCC/Drain in Gali Baba Ghulam

Rasool Wali, Bashir Colony, Jhanghi, PP-98

District Gujranwala

0.600 -0.600

7Const. of PCC/Drain in Musa Pur UC-Attawa,

PP-98 District Gujranwala 0.900 -0.900

8Const. of PCC/Drain in Thiri Sansi, PP-98

District Gujranwala 1.300 -1.300

9

Const. of PCC/Drain in Thatha Mughlan and

Thatha Punotha, UC-Attawa, PP-98 District

Gujranwala

1.400 -1.400

10

Const. of PCC/Drain in Maqbool Shaheed

Abad, UC-Attawa, UC-Attawa, PP-98 District

Gujranwala

1.300 -1.300

11Const. of PCC/Drain from Ladher to Nagry,

PP-98 District Gujranwala --

12Const. of PCC/Drain UC-Kohlowala, PP-98

District Gujranwala --

13Const. of PCC/Drain in Kot Hanif, UC-Attawa,

PP-98 District Gujranwala --

30.000 12-Dec-12811

Page 190

Page 191: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14

Const. of PCC/Drain in Safdar Uddin Colony,

More Emenabad, PP-98 District Gujranwala --

15Const. of PCC/Drain in UC-Dhariwal, PP-98

District Gujranwala --

16

Const. of PCC/Drain Bazar Rana Iftikhar

Wala Jhangi, UC-Rukh Keekran, PP-98

District Gujranwala

--

17Const. of PCC/Drain in UC-Sensra Goraya

PP-98 District Gujranwala --

18Const. of PCC/Drain in UC-Iftikhar Colony

UC-thiri Sansi, PP-98 District Gujranwala --

18 10.000 -10.000

Qaiser Iqbal Sindhu dated 10.9.12

MPA, PP-99

1

Construction of PCC/Drain/ Sewer in

Ghangar Kay, PP-99 District Gujranwala

(01/21).

1.200 1.080 -0.120 100%

2

Construction of PCC/Drain/ Sewer in

Talwandi Musa Khan, PP-99 District

Gujranwala (02/21).

1.250 1.159 -0.091 100%

3

Construction of Boundary Wall Grave Yard

Jeenabad PP-99 District Gujranwala

(03/21).

0.500 0.490 -0.010 100%

4

Construction of Boundary Wall Grave Yard

Mohn Pur Bhattian PP-99 District Gujranwala

(04/21).

0.500 0.490 -0.010 100%

5Construction of Soling/Drain in Goralli,

PP-99 District Gujranwala (05/21).0.500 0.490 -0.010 100%

6

Construction of PCC/Drain in Mokhal

Sandhuan, PP-99 District Gujranwala

(06/21).

1.000 0.959 -0.041 100%

7

Construction of PCC/Drain in Duburji Wagga,

PP-99 District Gujranwala (07/21). 2.000 1.960 -0.040 100%

19.300 10-Sep-12330

30.000 12-Dec-12811

Page 191

Page 192: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Const: of Nallah/Soling in Ferozwala with

Dera Jall, PP-99, Distt: Gujranwala (08/21).0.700 0.031 -0.669 100%

9Construction of PCC/Drain in Kot Des Raj,

PP-99 District Gujranwala (09/21).0.600 0.588 -0.012 100%

10Const: of Nallah in Rahim Pur, PP-99, Distt:

Gujranwala (10/21).0.700 0.686 -0.014 100%

11Const: of Culvert in Saib & Soling/Drain in

Gonaour, PP-99, Distt: Gujranwala (11/21).0.700 0.685 -0.015 100%

12

Const: of Nallah in Doulo Wali Yeran and

Soling in Doulowali Abad, PP-99, Distt:

Gujranwala (12/21).

1.000 0.978 -0.022 100%

13Const: of Nallah in Chak Rehan, PP-99, Distt:

Gujranwala (13/21).0.700 0.673 -0.027 100%

14Construction of PCC/Drain in Sambla,

PP-99 District Gujranwala (14/21).0.500 0.490 -0.010 100%

15Const: of PCC/Soling in Bagh Wala, PP-99,

Distt: Gujranwala (15/21).1.000 0.980 -0.020 100%

16Construction of PCC/Drain in Whando,

PP-99 District Gujranwala (16/21).0.700 0.686 -0.014 100%

17

Construction of PCC/Drain in Noeen Key

Sandhuan, PP-99 District Gujranwala

(17/21).

0.500 0.416 -0.084 100%

18Const: of Soling/Drain in Manget Kallar,

PP-99, Distt: Gujranwala (18/21).0.650 0.636 -0.014 100%

19Construction of PCC/Drain in Mandiala

Tegga, PP-99 District Gujranwala (19/21).0.800 0.784 -0.016 100%

20Const: of Nallah in Kotli Now PP-99, Distt:

Gujranwala (20/21).0.500 0.490 -0.010 100%

21Const: of Soling/Drain in Sohawa Dhilwan,

PP-99, Distt: Gujranwala (21/21).0.700 0.686 -0.014 100%

21 19.300 15.437 -3.863

CH.Zulfiqar Ali Bhinder dated 12.9.12

MPA, PP-100

1

Constrution of PCC/Drain in UC-163/8

Mohallah Toop Sari, PP-100 District

Gujranwala (1/10)

2.500 2.441 -0.059 100%

19.300 10-Sep-12330

20.000 12-Sep-12348

Page 192

Page 193: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Constrution of PCC/Drain in UC-163/8

Mohallah Faiz-e-Madina, PP-100 District

Gujranwala (2/10)

2.500 2.450 -0.050 100%

3Constrution of PCC/Drain in UC-162/7

PP-100 District Gujranwala (3/10)2.500 2.500 100%

4Constrution of PCC/Drain in Sadhoke,

PP-100 District Gujranwala (4/10)2.500 2.450 -0.050 100%

5Constrution of PCC/Drain in UC-160/5,

PP-100 District Gujranwala (5/10)2.000 1.850 -0.150 100%

6Constrution of PCC/Drain in UC-161/6,

PP-100 District Gujranwala (6/10)2.000 1.960 -0.040 100%

7Constrution of PCC/Drain in UC-157/2, PP-

100 District Gujranwala (7/10)2.000 1.927 -0.073 100%

8Constrution of PCC/Drain in UC-158/3, PP-

100 District Gujranwala (8/10)2.000 1.958 -0.042 100%

9Constrution of PCC/Drain in UC-156/1,

PP-100 District Gujranwala (9/10)1.000 0.980 -0.020 100%

10Constrution of PCC/Drain in UC-159/4,

PP-100 District Gujranwala (10/10)1.000 0.980 -0.020 100%

10 20.000 19.496 -0.504

CH.Zulfiqar Ali Bhinder dated 14.12.12

MPA, PP-100

1Const. of PCC/Drain in UC-158/3, PP-100

District Gujranwala 1.500 2.441 0.941 100%

2Const. of PCC/Drain in UC-159/4, PP-100

District Gujranwala 1.500 2.450 0.950 100%

3Const. of PCC/Drain in UC-160/5, PP-100

District Gujranwala 1.500 2.500 1.000 100%

4Const. of PCC/Drain in UC-161/6, PP-100

District Gujranwala 1.500 2.450 0.950 100%

5Const. of PCC/Drain in Marri Thakaran,PP-

100 District Gujranwala 1.500 1.850 0.350 100%

6Const. of PCC/Drain in Chandala, PP-100

District Gujranwala 1.500 1.960 0.460 100%

7Const. of PCC/Drain in UC-Ghogha, PP-100

District Gujranwala 1.000 1.927 0.927 100%

20.000 14-Dec-12811

20.000 12-Sep-12348

Page 193

Page 194: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Const. of PCC/Drain in UC-Tamoli, PP-100

District Gujranwala 1.958 1.958 100%

9Const. of PCC/Drain in UC-163/8, PP-100

District Gujranwala 0.980 0.980 100%

10Const. of PCC/Drain in UC-162/7, PP-100

District Gujranwala

11Const. of PCC/Drain in UC-Sadhoki, PP-100

District Gujranwala 0.980 0.980 100%

11 10.000 19.496 9.496

CH.Ali Asghar Cheema dated 30.10.12

MPA, PP-103

1Construction of Pcc/Drain Kakka Kolo, Tehsil

Wazirabad, Distt:- Gujranwala.

2Construction of Pcc/Drain Kheway wali,

Tehsil Wazirabad, Distt:- Gujranwala.

3Construction of Pcc/Drain Saroki, Tehsil

Wazirabad, Distt:- Gujranwala.

4Construction of Pcc/Drain Islamabad, Tehsil

Wazirabad, Distt:- Gujranwala.

5Construction of Pcc/Drain Mansoor wali,

Tehsil Wazirabad, Distt:- Gujranwala.

6Construction of Pcc/Drain Jafer Kot, Tehsil

Wazirabad, Distt:- Gujranwala.

7Construction of Pcc/Drain Gunnian wala,

Tehsil Wazirabad, Distt:- Gujranwala.

8Construction of Pcc/Drain Kathore, Tehsil

Wazirabad, Distt:- Gujranwala.

9Construction of Pcc/Drain Goralli, Tehsil

Wazirabad, Distt:- Gujranwala.

10Construction of Pcc/Drain Khan Ki, Tehsil

Wazirabad, Distt:- Gujranwala.

11Construction of Pcc/Drain Ratto wali, Tehsil

Wazirabad, Distt:- Gujranwala.

12Construction of Pcc/Drain Chak Ali Sher,

Tehsil Wazirabad, Distt:- Gujranwala.

20.000 14-Dec-12811

30.000 30-Oct-12518

Page 194

Page 195: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13Construction of Pcc/Drain Ratti Thatt, Tehsil

Wazirabad, Distt:- Gujranwala.

14Construction of Pcc/Drain Dilawar Cheema,

Tehsil Wazirabad, Distt:- Gujranwala.

15Construction of Pcc/Drain Dharowala, Tehsil

Wazirabad, Distt:- Gujranwala.

16

Construction of Pcc/Drain Faqiran wali

Khurd, Tehsil Wazirabad, Distt:- Gujranwala.

17Construction of Pcc/Drain Thatti Baloch,

Tehsil Wazirabad, Distt:- Gujranwala.

18Construction of Pcc/Drain Burj Cheema,

Tehsil Wazirabad, Distt:- Gujranwala.

19Construction of Pcc/Drain Mandiala, Tehsil

Wazirabad, Distt:- Gujranwala.

20Construction of Pcc/Drain Jam Ke, Tehsil

Wazirabad, Distt:- Gujranwala.

21Construction of Pcc/Drain Nawan Kot, Tehsil

Wazirabad, Distt:- Gujranwala.

22Construction of Pcc/Drain Dhella Chatha,

Tehsil Wazirabad, Distt:- Gujranwala.

23Construction of Pcc/Drain Jam wala, Tehsil

Wazirabad, Distt:- Gujranwala.

24Construction of Pcc/Drain Pir Kot, Tehsil

Wazirabad, Distt:- Gujranwala.

25

Construction of Pcc/Drain Ladhay wala

Cheema, Tehsil Wazirabad, Distt:-

Gujranwala.

26Construction of Pcc/Drain Kalay wala, Tehsil

Wazirabad, Distt:- Gujranwala.

27Construction of Pcc/Drain Kot Buddha, Tehsil

Wazirabad, Distt:- Gujranwala.

27

30.000 30-Oct-12518

Page 195

Page 196: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Faiz Muhammad Awan dated 10.9.12

MPA, PP-105

1Const. of PCC Street and Drain at City

Hafizabad (PP-105).8.000 7.900 -0.100 100%

2Const. of PCC Street and Drain at UC-

Kasoki, Distt: Hafizabad, (PP-105).3.500 3.430 -0.070 100%

3Const. of PCC Street and Drain at UC-

Kariala, Distt: Hafizabad (PP-105).3.500 3.454 -0.046 100%

4

Const. of PCC Street and Drain at UC-5/22,

UC-4/21 City Hafizabad, Distt: Hafizabad

(PP-105).

2.000 1.955 -0.045 100%

4 17.000 16.739 -0.261

Haji Riasat Ali Kharal Notable dated 5.3.13

PP-105

1Const. of PCC / Drian at Village Philo (Dera

Jat), PP-105 District Hafizabad.2.000 -2.000

2Const. of PCC / Soling / Drian at Village Philo

(Dera Jat), PP-105 District Hafizabad.1.000 -1.000

3Const. of PCC / Drian at Village Peelo (Dera

Jat), PP-105 District Hafizabad.2.000 -2.000

4

Const. of PCC / Soling / Drian at Village

Peelo (Dera Jat), PP-105 District Hafizabad. 2.000 -2.000

5Const. of PCC / Drian at Village Saroopwala,

PP-105 District Hafizabad.2.000 -2.000

6Const. of PCC / Drian at Village Bashmilla

Saroopwala, PP-105 District Hafizabad.1.000 -1.000

7Const. of PCC / Drian at Village Shah Jamal,

PP-105 District Hafizabad.2.000 -2.000

8Const. of PCC / Drian at Village Gagay, PP-

105 District Hafizabad.2.000 -2.000

9Const. of PCC / Drian at Village Thata Jat

Philo, PP-105 District Hafizabad.1.000 -1.000

10Const. of PCC / Drian at Village Udo Key, PP-

105 District Hafizabad.1.300 -1.300

17.000 10-Sep-12324

30.000 05-Mar-13923

Page 196

Page 197: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Const. of Primary School Building Bankar

Kuna, PP-105 District Hafizabad.2.000 -2.000

12

Const. of Boundary Wall Toilet Block Primary

School Bankar Kuna, PP-105 District

Hafizabad.

1.700 -1.700

12 20.000 -20.000

Mehdi Hassan Bhatti Notable dated 5.3.13

PP-105

1Const. of PCC / Drian in UC Chak Kharl, NA-

102 District Hafizabad.20.000

2Const. of PCC / Soling / Drian in UC Chak

Kharl, NA-102 District Hafizabad.

3Const. of PCC / Drian in UC Chak Ram Kay

Chatta, NA-102 District Hafizabad.

4

Const. of PCC / Soling / Drian in Ram Kay

Chatta Chak Kharl, NA-102 District

Hafizabad.

5Const. of PCC / Drian in Lalkay Derkay, NA-

102 District Hafizabad.

6Const. of PCC / Soling / Drian in Lalkay

Derkay, NA-102 District Hafizabad.

7Const. of PCC / Drian in Wanakay Tarar, NA-

102 District Hafizabad.

8Const. of PCC / Soling / Drian in Wanakay

Tarar, NA-102 District Hafizabad.

9Const. of PCC / Drian in Kot Said

Muhammad, NA-102 District Hafizabad.

10Const. of PCC / Soling / Drian in Kot Said

Muhammad, NA-102 District Hafizabad.

11Const. of PCC / Drian in Kot Ishaq, NA-102

District Hafizabad.

12Const. of PCC / Soling / Drian in Kot Ishaq,

NA-102 District Hafizabad.

12 20.000

974 05-Mar-13 20.000

30.000 05-Mar-13923

Page 197

Page 198: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ch.Shoukat Ali Bhatti dated 6.9.12

Ex-MPA, PP-106

1Constrution of PCC/Drain UC-Kalay Ke

Mandi, Distt: Hafizabad (PP-106) (01/09).6.000 5.909 -0.091 100%

2Constrution of PCC/Drain UC-Gagay, Distt:

Hafizabad (PP-106) (02/09).4.000 3.920 -0.080 100%

3Constrution of PCC/Drain UC-Nano Aana,

Distt: Hafizabad (PP-106) (03/09).6.000 5.909 -0.091 100%

4Constrution of PCC/Drain UC-Narian Wala

Distt: Hafizabad (PP-106) (04/09).6.000 5.880 -0.120 100%

5Constrution of PCC/Drain UC-Jalal Pur

Bhattian Distt: Hafizabad (PP-106) (05/09).4.000 3.920 -0.080 100%

6

Constrution of Road Kaseesay, Jalal Pur

Road Kaloaana, UC- Jalal Pur Bhattian Distt:

Hafizabad (PP-106) (06/09).

5.000 4.899 -0.101 100%

7Constrution of PCC/Drain UC-Chak Bhatti

Distt: Hafizabad (PP-106) (07/09).4.000 3.753 -0.247 100%

8Constrution of PCC/Drain UC-Sado Ke, Distt:

Hafizabad (PP-106) (08/09).1.000 0.988 -0.012 100%

9Constrution of PCC/Drain UC-Rasool Pur

Tarar, Distt: Hafizabad (PP-106) (09/09).4.000 3.910 -0.090 100%

9 40.000 39.088 -0.912

Shoaib Shahnawaz dated 21.1.13

Notable, PP-107

1Cconst: of Soling and Drain at UC-Khurram

Charera, Distt: Hafizabad (PP-107) 2.000 -2.000

2Cconst: of Soling and Drain at UC- Sukheki

Distt: Hafizabad (PP-107) 2.000 -2.000

3Cconst: of Soling and Drain at UC- Mustafa

Abad, Distt: Hafizabad (PP-107) 2.000 -2.000

4Cconst: of Soling and Drain at UC-Kot

Nakka, Distt: Hafizabad (PP-107) 2.000 -2.000

5Cconst: of Soling and Drain at UC-Narian

Wala, Distt: Hafizabad (PP-107) 2.000 -2.000

10.000 21-Jan-13910

40.000 249 06-Sep-12

Page 198

Page 199: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5 10.000 -10.000

CH. Naveed Anwar Bhinder dated 31.8.12

Notable NA-97

1Const: of PCC/Drain in Village Chandrak &

Baho Chak Distt: Gujranwala (NA-97).1.500 1.314 -0.186 100%

2Const: of PCC/Drain in Village Mandiala

Warraich Distt: Gujranwala (NA-97)1.500 1.485 -0.015 100%

3Const: of PCC/Drain in Buddo Ki Kasain

Distt: Gujranwala (NA-97)1.000 0.970 -0.030 100%

4Const: of PCC/Drain Sardar Colony Aroop,

Distt: Gujranwala (NA-97)1.000 -1.000

5Const: of PCC/Drain Sabar Colony Aroop

Morre, Distt: Gujranwala (NA-97)1.000 -1.000

6Const: of PCC/Drain in Nagri Ahmad Shah

Distt: Gujranwala (NA-97)5.000 4.893 -0.107 100%

7Const: of PCC/Drain in Village Arrbang, Distt:

Gujranwala (NA-97)1.000 0.990 -0.010 100%

8Const: of PCC/Drain in Mufti Colony Aroop,

Distt: Gujranwala (NA-97)1.000 1.000 100%

9

Const: of PCC/Drain in Bismillah Colony

Sialkot Road By Pass, Distt: Gujranwala (NA-

97)

1.000 -1.000

10Const: of PCC/Drain in Village Bhatti

Bhango, Distt: Gujranwala (NA-97)1.500 -1.500

11Const: of PCC/Drain in Village Aroop, Distt:

Gujranwala (NA-97)4.000 3.921 -0.079 100%

12Const: of Metalled Road Tarrigri to Gajo

Chak, Distt: Gujranwala (NA-97)5.000 -5.000

13

Const: of Metalled Road G.T. Road Rahwali

to Tarrigri Minor Bridge, Distt: Gujranwala

(NA-97)

7.000 6.860 -0.140 100%

14Const: of Nallah High School to Main Trunk

Sewer, Distt: Gujranwala (NA-97)5.000 -5.000

15Const: of PCC/Drain in Village Buttra Wali

Nizam Pur, Distt: Gujranwala (NA-97)2.000 1.838 -0.162 100%

16Const: of PCC/Drain in Village Bheeko Pura

Slalknat, Distt: Gujranwala (NA-97)0.500 0.499 -0.001 100%

100.000 31-Aug-12141

Page 199

Page 200: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17Const: of PCC/Drain in Village Kucha Fattoo

Mand, Distt: Gujranwala (NA-97)0.500 0.500 100%

18Const: of PCC/Drain in Sui Gas Road

Mustafa Colony Distt: Gujranwala (NA-97)1.000 0.990 -0.010 100%

19Const: of PCC/Drain in Thatha Dad, Distt:

Gujranwala (NA-97)3.500 3.424 -0.076 100%

20Const: of PCC/Drain in Chandar Kay, Distt:

Gujranwala (NA-97)3.500 3.427 -0.073 100%

21Const: of PCC/Drain in Aroop Town, Distt:

Gujranwala (NA-97)4.125 -4.125

22Const: of PCC/Drain in Buttran Wali, Distt:

Gujranwala (NA-97)2.000 1.960 -0.040 100%

23Const: of PCC/Drain in Chak Jagna, Distt:

Gujranwala (NA-97)1.500 1.068 -0.432 100%

24Const: of PCC/Drain in Aroop Morre, Distt:

Gujranwala (NA-97)1.750 1.734 -0.016 100%

25Const: of PCC/Drain in Tarigrri, Distt:

Gujranwala (NA-97)1.500 1.485 -0.015 100%

26Const: of PCC/Drain in Union Council 45/7,

Distt: Gujranwala (NA-97)3.000 2.423 -0.577 100%

27Const: of PCC/Drain in Village Gondalan

Wala, Distt: Gujranwala (NA-97)2.200 2.030 -0.170 100%

28Const: of PCC/Drain in Gulzar Colony, Distt:

Gujranwala (NA-97)2.000 1.960 -0.040 100%

29Const: of PCC/Drain in Bhamo Wali, Distt:

Gujranwala (NA-97)1.000 0.840 -0.160

30

Const: of PCC/Drain Masjid Faizan-e-

Mustafa Jinnah Road U/C Jagna, Distt:

Gujranwala (NA-97)

1.850 1.758 -0.092 100%

31Const: of PCC/Drain Raja Colony & Gulzar

Colony, Distt: Gujranwala (NA-97)2.500 2.475 -0.025 100%

32Const: of PCC/Drain in Warriya, Distt:

Gujranwala (NA-97)2.000 1.960 -0.040 100%

33Const: of PCC/Drain in Abdal, Distt:

Gujranwala (NA-97)1.600 1.568 -0.032 100%

34Const: of PCC/Drain in Shah Kot, Distt:

Gujranwala (NA-97)2.000 1.960 -0.040 100%

35Const: of PCC/Drain in Rahwali Union

Council, Distt: Gujranwala (NA-97)2.500 2.450 -0.050 100%

100.000 31-Aug-12141

Page 200

Page 201: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

36Const: of PCC/Drain in Raj Kot, Distt:

Gujranwala (NA-97)2.000 1.774 -0.226

37Const: of Metalled Road Kotli Saba Link

Talwandi Road, Distt: Gujranwala (NA-97)1.500 0.015 -1.485

38

Const: of PCC/Drain Gali Shafqat Master

Umar Din/ Jamait Ali / Masood Bhinder Wali,

Distt: Gujranwala (NA-97)

1.975 1.960 -0.015

39Const: of PCC/Drain in Talwandi Khajoor

Wali, Distt: Gujranwala (NA-97)4.000 3.922 -0.078

40Const: of PCC/Drain in Saleem Pura

Rahwali, Distt: Gujranwala (NA-97)3.500 3.486 -0.014

41Const: of PCC/Drain in Union Council Jalal

Balgan Distt: Gujranwala (NA-97)4.500 4.388 -0.112

42Const: of PCC/Drain in Union Council 45/7

Sui Gas Road, Distt: Gujranwala (NA-97)2.000 1.969 -0.031

43Const: of PCC/Drain in Village Lambanwali,

Distt: Gujranwala (NA-97)1.500 -1.500

43 100.000 75.296 -24.704

Ch.Zafar Ullah Cheema dated 21.11.12

Notable (NA-199)

1Construction of Pcc/Drain in U/C Jandiala

Bagh wala District Gujranwala.

2Construction of Pcc/Drain in U/C Talwandi

Musa Khan District Gujranwala.

3Construction of Pcc/Drain in U/C Mokhal

Sandhwan District Gujranwala.6.000 3.404 -2.596 57%

4Construction of Pcc/Drain in U/C Nadala

Sandhwan District Gujranwala.5.000 1.949 -3.051 39%

5Construction of Pcc/Drain in U/C Ferozwala

District Gujranwala.

6Construction of Pcc/Drain in U/C Mandiala

Tegha District Gujranwala.5.000 2.097 -2.903 42%

7Construction of Pcc/Drain in U/C Dhanser

District Gujranwala.5.000 4.333 -0.667 87%

50.000 21-Nov-12724

100.000 31-Aug-12141

Page 201

Page 202: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Construction of Pcc/Drain in U/C Chak

Ramdas District Gujranwala.5.200 3.369 -1.831 65%

9Construction of Pcc/Drain in U/C Kali Suba

District Gujranwala.5.200 4.950 -0.250

100%

10Construction of Pcc/Drain in U/C Sohawa

Guloki District Gujranwala.5.200 4.829 -0.371

93%

11Construction of Pcc/Drain in U/C Gunaur

District Gujranwala.3.000 -3.000

12Construction of Pcc/Drain in U/C Nangal

Donasingh District Gujranwala.5.200 4.867 -0.333

100%

13Construction of Pcc/Drain in U/C Macharala

District Gujranwala.

14Construction of Pcc/Drain in U/C Kotli Nawab

District Gujranwala.

15Construction of Pcc/Drain in U/C Wahndu

District Gujranwala.5.200 4.900 -0.300

100%

16Construction of Pcc/Drain in U/C Ladhay

wala Goraya District Gujranwala.3.000 2.793 -0.207

93%

16 50.000 37.491 -12.509

Ch.Muhammad Nasir Cheema dated 17.1.13

Notable

1

Construction of PCC/Drain/Soling in UC-

Botala Jhanda Singh, PP-97 District

Gujranwala

2.000 -2.000

2Construction of PCC/Drain/Soling in UC-

Chak Uggo, PP-97 District Gujranwala 4.000 -4.000

3Construction of PCC/Drain/Soling in UC-

Papnaka, PP-97 District Gujranwala 2.000 -2.000

4Construction of PCC/Drain/Soling in UC-

Bhoma Batth, PP-97 District Gujranwala 4.000 -4.000

5Construction of PCC/Drain/Soling in UC-

Kalas Kay, PP-97 District Gujranwala 2.000 -2.000

50.000 21-Nov-12724

20.000 17-Jan-13832

Page 202

Page 203: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Construction of PCC/Drain/Soling in UC-Qila

Mian Singh, PP-97 District Gujranwala

7Construction of PCC/Drain/Soling in UC-Kot

Amer Singh, PP-97 District Gujranwala

8

Construction of PCC/Drain/Soling in UC-

Ladhay Wala Cheema, PP-97 District

Gujranwala

1.000 -1.000

9

Construction of PCC/Drain/Soling in UC-

Beankey Cheema, PP-97 District Gujranwala

9 15.000 -15.000

Ch.Tanveer Azam Cheema dated 17.1.13

Notable

1

Constrution of PCC/Drain/ Soling in UC-

Hardo Saharan, PP-102 District Gujranwala

(1/8)

4.000 -4.000

2

Constrution of PCC/Drain/ Soling in UC-

Noen Wala, PP-102 District Gujranwala (2/8) 2.000 -2.000

3

Constrution of PCC/Drain/ Soling in UC-

Jhatan Wali, PP-102 District Gujranwala (3/8) 2.000 -2.000

4Constrution of PCC/Drain/ Soling in UC-

Phillo Ki, PP-102 District Gujranwala (4/8)2.000 -2.000

5Constrution of PCC/Drain/ Soling in UC-

Bhirri, PP-102 District Gujranwala (5/8)2.500 -2.500

6

Constrution of PCC/Drain/ Soling in UC-Kot

Ladha, PP-102 District Gujranwala (6/8) 2.500 -2.500

7

Constrution of PCC/Drain/ Soling in UC-

Chahal Kalan, PP-102 District Gujranwala

(7/8)

8

Constrution of PCC/Drain/ Soling in UC-

Udho Wali, PP-102 District Gujranwala (8/8)

20.000 17-Jan-13833

20.000 17-Jan-13832

Page 203

Page 204: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8 15.000 -15.000

Ch.Wajahat Hussain dated 19.10.12

MNA, NA-104

1Construction of PCC/Drain U/C 60/1 , Jalal

Pur Jattan District Gujrat NA-104(1/11)5.500 5.309 -0.191 100%

2Construction of PCC/Drain U/C 61/2, Jalal

Pur Jattan District Gujrat NA-104(2/11)5.500 5.393 -0.107 100%

3Construction of PCC/Drain U/C 62/3, Jalal

Pur Jattan District Gujrat NA-104(3/11)5.500 5.370 -0.130 100%

4Construction of PCC/Drain U/C 63/4, Jalal

Pur Jattan District Gujrat NA-104(4/11)5.500 4.908 -0.592 90%

5Construction of PCC/Drain U/C Manjo Chak

District Gujrat NA-104(5/11)3.000 2.756 -0.244 92%

6Construction of PCC/Drain U/C Doulta Nagar

District Gujrat NA-104(6/11)5.000 4.378 -0.622 90%

7Construction of PCC/Drain U/C Noora

Mandiala District Gujrat NA-104(7/11)5.000 4.966 -0.034 100%

8Construction of PCC/Drain U/C Alam Garh

District Gujrat NA-104(8/11)5.000 4.714 -0.286 95%

9Construction of PCC/Drain U/C Thatha Musa

District Gujrat NA-104(9/11)5.000 4.914 -0.086 100%

10Construction of PCC/Drain U/C Sheikh Pur

District Gujrat NA-104(10/11)2.000 1.958 -0.042 100%

11Construction of PCC/Drain U/C Baro

District Gujrat NA-104(11/11)5.000 4.673 -0.327 95%

12Construction of PCC/Drain U/C Karianwala

District Gujrat NA-104(1/9)6.000 5.953 -0.047 100%

13Construction of PCC/Drain U/C Bhago Wal

District Gujrat NA-104(2/9)6.000 5.990 -0.010 100%

14Construction of PCC/Drain U/C Lakhanwal

District Gujrat NA-104(3/9)5.000 4.873 -0.127 95%

15Construction of PCC/Drain U/C Chopala

District Gujrat NA-104(4/9)5.000 4.481 -0.519 100%

100.000 19-Oct-12616

CCD, Sialkot

Page 204

Page 205: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

16Construction of PCC/Drain U/C Tanda

District Gujrat NA-104(5/9)6.000 5.452 -0.548 91%

17Construction of PCC/Drain U/C Bhareela

Sharief District Gujrat NA-104(6/9)5.000 4.912 -0.088 100%

18Construction of PCC/Drain U/C Surkh Pur

District Gujrat NA-104(7/9)5.000 4.692 -0.308 94%

19Construction of PCC/Drain U/C Mari

Khokharan District Gujrat NA-104(8/9)5.000 4.552 -0.448 93%

20Construction of PCC/Drain U/C Bharaj

District Gujrat NA-104(9/9)5.000 4.951 -0.049 100%

20 100.000 95.195 -4.805

Ch.Wajahat Hussain dated 21.11.12

MNA, NA-104

723 21-Nov-12 20.000 1

Re-Construction of Carpet Road, PCC &

Nallah Maternity Hospital Raja Market NA-

104 District Gujrat

20.000 14.603 -5.397 75%

1 20.000 14.603 -5.397

Ch.Ahmad Mukhtar dated 31.7.12

Mna, NA-105

25 31-Jul-12 11.000 1

Construction of Metalled Raod Gujrat Awan

Sharif Road (Madina) in NA-105 District

Gujrat

11.000 6.673 -4.327 80%

1 11.000 6.673 -4.327

Ch.Ahmad Mukhtar dated 31.8.12

Mna, NA-105

1Construction of PCC/Drain in U/C 45 NA-

105 District Gujrat 4.000 3.986 -0.014 100%

2Construction Water Filteration Plant in U/C

45 NA-105 District Gujrat1.000 0.008 -0.992 30%

156 31-Aug-12 200.000

100.000 19-Oct-12616

Page 205

Page 206: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3Construction of PCC/Drain in U/C 46 NA-105

District Gujrat 5.000 4.967 -0.033 100%

4

Construction of PCC/Drain and Water supply

pipe line in U/C 47 NA-105 District

Gujrat

5.000 4.967 -0.033 100%

5Construction of PCC/Drain in U/C 48 NA-105

District Gujrat 6.000 3.211 -2.789 60%

6Construction Water Filteration Plant in U/C

48 NA-105118 District Gujrat1.000 -1.000 15%

7Construction of PCC/Drain in U/C 49 NA-105

District Gujrat 5.000 4.997 -0.003 100%

8Construction of PCC/Drain in U/C 50 NA-105

District Gujrat 5.000 4.967 -0.033 100%

9Construction of PCC/Drain in U/C 51 NA-105

District Gujrat 5.000 4.907 -0.093 100%

10Construction of PCC/Drain in U/C 52 NA-105

District Gujrat 5.000 4.976 -0.024 100%

11Construction of PCC/Drain in U/C 53 NA-105

District Gujrat 5.000 4.913 -0.087 100%

12Construction of PCC/Drain in U/C 54 NA-105

District Gujrat 3.000 2.945 -0.055 100%

13Construction of PCC/Drain in U/C 55 NA-105

District Gujrat 2.500 1.961 -0.539 80%

14Construction of PCC/Drain in U/C 56 NA-105

District Gujrat 7.000 2.672 -4.328 45%

15Construction of PCC/Drain in U/C 57 NA-105

District Gujrat 5.000 4.911 -0.089 100%

16

Construction of PCC/Drain and Water supply

line in U/C 58 NA-105 District Gujrat 5.000 4.929 -0.071 100%

17Construction of PCC/Drain in U/C 59 NA-105

District Gujrat 5.000 2.643 -2.357 60%

18

Construction of PCC/Drain and Nallah from

G.T Road To GFC Fan in NA-105 District

Gujrat

4.000 2.464 -1.536 70%

19Furnishing of Benazir Bhutto Library in

Kunjah NA-105 District Gujrat 1.000 0.952 -0.048 100%

156 31-Aug-12 200.000

Page 206

Page 207: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

20

Construction of PCC/Drain and Boundary

Wall G.G Primary School Dharowal NA-105

District Gujrat

2.000 1.947 -0.053 100%

21Construction of Open Drain Nallah in U/C

Madina NA-105 District Gujrat6.000 1.528 -4.472 30%

22Construction of PCC Road Qiladar to

Sandhar NA-105 District Gujrat 5.000 2.486 -2.514 55%

23

Construction of PCC Road Jalal Pur Jattan

Road to Sook Kalan NA-105 District

Gujrat

5.000 3.262 -1.738 70%

24Construction of PCC/ Drain and Sewer Line

in U/C Madina NA-105 District Gujrat 7.000 6.912 -0.088 100%

25

Construction of PCC/Drain in Rehmanian

and Pakhowal U/C Sabowal NA-105

District Gujrat

5.000 4.553 -0.447 100%

26Construction of PCC/Drain in U/C Moeen-U-

Din Pur NA-105 District Gujrat 6.000 5.964 -0.036 100%

27Construction of PCC/Drain in U/C Manju

Chak NA-105 District Gujrat 7.000 6.932 -0.068 100%

28Construction of PCC/Drain in U/C Sada

Chak NA-105 District Gujrat 5.000 4.936 -0.064 100%

29Construction of PCC/Drain in U/C Kathala

NA-105 District Gujrat 5.000 4.937 -0.063 100%

30Construction of PCC/Drain in U/C Haria

Wala NA-105 District Gujrat 7.500 7.453 -0.047 100%

31

Construction of PCC/Drain in U/C Shadiwal

NA-105 District Gujrat 6.000 5.688 -0.312 100%

32Construction of PCC/Drain in U/C Golaki

NA-105 District Gujrat 7.000 6.936 -0.064 100%

33Construction of PCC/Drain in U/C Langay

NA -105 District Gujrat 6.000 5.760 -0.240 100%

34

Construction of PCC/Drain in U/C

Jheeranwali NA-105 District

Gujrat

7.000 6.947 -0.053 100%

35

Construction of PCC/Drain in U/C

Mangowal NA-105 District Gujrat 7.000 6.865 -0.135 100%

156 31-Aug-12 200.000

Page 207

Page 208: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

36Construction of PCC/Drain in U/C Gakhra

Kalan NA-105 District Gujrat 7.000 6.935 -0.065 100%

37Construction of PCC/Drain in U/C Kunjah

NA-105 District Gujrat 7.000 6.841 -0.159 100%

38Construction of PCC/Drain in U/C Saroki

NA-105 District Gujrat 4.000 3.982 -0.018 100%

39

Construction of PCC/Drain in U/C

Nagrianwala NA-105 District

Gujrat

5.000 4.994 -0.006 100%

40

Construction of PCC/Drain in U/C Mandiala

NA-105 District Gujrat 2.000 1.946 -0.054 100%

41

Construction of PCC/Drain in U/C Chechian

NA-105 District Gujrat 2.000 1.949 -0.051 100%

41 200.000 175.129 -24.871

Ch.Ahmad Mukhtar dated 2.11.12

Mna, NA-105

688 02-Nov-12 40.000 40.000 -40.000

40.000 -40.000

Qamar Zaman Kaira dated 31.8.12

Mna, NA-106

1

Construction of PCC/Drain and Soling in U/C

Amra Kalan NA-106 District Gujrat (1/13) 5.000 4.959 -0.041 100%

2

Construction of PCC/Drain and Soling in U/C

Mirza Tahir NA-106 District Gujrat (2/13) 5.000 4.960 -0.040 100%

3Construction of PCC/Drain and Soling in U/C

Jani Chak NA-106 District Gujrat (3/13) 5.000 4.714 -0.286 100%

156 31-Aug-12 200.000

90.000 31-Aug-12164

Page 208

Page 209: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of PCC/Drain and Soling in U/C

Warraichan Wala NA-106 District Gujrat

(4/13)

5.000 4.956 -0.044 100%

5

Construction of PCC/Drain and Soling in U/C

Seekarwali NA-106 District Gujrat (5/13) 5.000 4.925 -0.075 100%

6

Construction of PCC/Drain and Soling in U/C

Bahagirianwala NA-106 District Gujrat (6/13) 5.000 4.078 -0.922 85%

7

Construction of PCC/Drain and Soling in U/C

Chakori Bheelowal NA-106 District Gujrat

(7/13)

5.000 4.935 -0.065 100%

8Construction of PCC/Drain and Soling in U/C

Joura NA-106 District Gujrat (8/13) 7.000 6.869 -0.131 100%

9Construction of PCC/Drain and Soling in U/C

Saroki NA-106 District Gujrat (9/13) 1.000 0.988 -0.012 100%

10Construction of PCC/Drain and Soling in U/C

Sabowal NA-106 District Gujrat (10/13) 1.000 0.979 -0.021 100%

11Construction of PCC/Drain and Soling in U/C

Karnana NA-106 District Gujrat (11/13) 2.000 1.966 -0.034 100%

12Construction of PCC/Drain and Soling in U/C

Nagrian NA-106 District Gujrat (12/13) 2.000 1.954 -0.046 100%

13

Construction of PCC/Drain and Soling in U/C

Dinga City NA-106 District Gujrat (13/13) 2.000 1.983 -0.017 100%

14Construction of PCC/Drain and Soling in U/C

Barnali NA-106 District Gujrat (1/8) 2.000 1.979 -0.021 100%

15

Construction of PCC/Drain and Soling in U/C

Kolian Shah Hussain NA-106 District Gujrat

(2/8)

3.000 2.955 -0.045 100%

16Construction of PCC/Drain and Soling in U/C

Machhiana NA-106 District Gujrat (3/8) 3.000 2.979 -0.021 100%

17

Construction of PCC/Drain and Soling in U/C

Haji Muhammad NA-106 District Gujrat (4/8) 3.000 2.983 -0.017 100%

18

Providing and Laying of Sewer Line /PCC

and Drain in U/C Lala Musa City NA-106

District Gujrat (5/8)

3.000 0.825 -2.175 50%

90.000 31-Aug-12164

Page 209

Page 210: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

19

Construction of Metalled Road /PCC and

Drain at Dhola Banian Chachian NA-106

District Gujrat (6/8)

16.000 13.403 -2.597 85%

20

Construction Water Filteration Plants (6 No's)

in Lala Musa City NA-106 District Gujrat (7/8) 6.000 1.558 -4.442 30%

21

Construction Water Filteration Plants (4 No's)

in Dinga City City NA-106 District Gujrat (8/8) 4.000 0.627 -3.373 30%

21 90.000 75.575 -14.425

Tariq Tarar dated 17.8.12

Mna, NA-108

1

Construction of Streets,Drain and Soling in

village Raikey in NA-108 District Mandi

Bahauddin.

20.000 19.928 -0.072 100%

2Repair of Metalled Road Haila Nehar Pull to

Kotli Qazi District Mandi Bahauddi NA-1085.000 4.950 -0.050 100%

3

Construction of Metalled Road Marala to

Dhok Shahani District Mandi Bahauddi NA-

108

5.000 4.900 -0.100 100%

4Construction of Metalled Road Ram Tarar

District Mandi Bahauddi NA-1085.000 4.982 -0.018 100%

5 Construction of Soling Thathi to Sulma

District Mandi Bahauddi NA-1085.000 4.950 -0.050 100%

6Construction of Soling Pindi Lala to Dera

Bhattian District Mandi Bahauddi NA-1083.000 2.943 -0.057 100%

7Construciton of PCC/Drain & Soling Vasoo

District Mandi Bahauddi NA-1085.000 4.937 -0.063 100%

8Construciton of PCC/Drain & Soling Kalue

District Mandi Bahauddi NA-1088.000 7.940 -0.060 100%

9Construciton of PCC/Drain & Soling Narang

District Mandi Bahauddi NA-1085.000 4.950 -0.050 100%

10

Construciton of PCC/Drain & Soling

Shoranwala District Mandi Bahauddi NA-108 5.000 4.896 -0.104 100%

122.000 17-Aug-1266

90.000 31-Aug-12164

Page 210

Page 211: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Construciton of Culvert at village Nawan Ruk

District Mandi Bahauddi NA-1082.000 -2.000 10%

12

Construciton of PCC/Drain & Soling Nallah

and Nawan Lok Sahib Ka Lok, Kalo Wali and

Ghora District Mandi Bahauddi NA-1085.000 4.988 -0.012 100%

13

Construction of Metalled Road from RQ Link

to Pindi Kalu Via Janukey District Mandi

Bahauddi NA-108

8.000 7.787 -0.213 100%

14Repair of Metalled Road from Shana Lok to

Kotra District Mandi Bahauddi NA-1083.000 2.940 -0.060 100%

15

Construction of Metalled Road Said Saghar

to Sheikh Ali Pur (Remaining Portion) District

Mandi Bahauddi NA-108

4.000 3.934 -0.066 100%

16Repair of Metalled Road Khewa to Ditu

Chohar District Mandi Bahauddi NA-1085.000 4.785 -0.215 100%

17

Construction of Metalled Road Soya to

Chak Sher Muhammad District Mandi

Bahauddi NA-108

5.000 4.927 -0.073 100%

18

(SUBSTITUTED SCHEME)

Construction of PCC/Soling, Drain U.C

Narang District Mandi Bahauddi NA-108

10.000 9.882 -0.118 100%

19

(SUBSTITUTED SCHEME)

Construction of PCC/ Drain in village

Sohawa District Mandi Bahauddi NA-108

10.000 9.950 -0.050 100%

20Construction of Community Centre Mouza

Ruk NA-108 District Mandi Bahauddin1.500 0.756 -0.744 55%

21

Construction of Community Centre

Mouchianwala NA-108 District Mandi

Bahauddin

1.500 0.838 -0.662 65%

22

Construction of Boundary Wall Graveyard

Mouza Ruk District Mandi Bahauddin. NA-

108

1.000 -1.000 30%

22 122.000 116.163 -5.837

122.000 17-Aug-1266

Page 211

Page 212: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Tariq Tarar dated 22.11.12

MNA, NA-108

1

Construction of PCC/Drain at village Pindi

Bahauddin District Mandi Bahauddin NA-

108(1/9)

10.000 9.789 -0.211 100%

2

Construction of Soling Union Council Chak

Janoo District Mandi Bahauddin NA-

108(2/9)

10.000 9.904 -0.096 100%

3Construction of Soling Moza Lassori District

Mandi Bahauddin NA-108(3/9)5.000 4.947 -0.053 100%

4Construction of Soling Moza Kot Baloach

District Mandi Bahauddin NA-108(4/9)5.000 4.869 -0.131 100%

5Construction of PCC/Drains at village Bhot

District Mandi Bahauddin NA-108(5/9)5.000 4.955 -0.045 100%

6

Construction of PCC/Drains at village

Churrand District Mandi Bahauddin NA-

108(6/9)

5.000 4.927 -0.073 100%

7

Construction of PCC/Drain at village Monjian

Wala District Mandi Bahauddin NA-

108(7/9)

10.000 9.905 -0.095 100%

8Construction of Soling Moza Charan Wala

District Mandi Bahauddin NA-108(8/9)5.000 4.955 -0.045 100%

9

Construction of PCC/Drain Moza Kak Wal &

Chak-12 District Mandi Bahauddin NA-

108(9/9)

5.000 4.808 -0.192 100%

9 60.000 59.059 -0.941

Firdous Ashiq Awan dated 6.9.12

Mna, NA-111

1

Construction of PCC/Drain at village Gamu

Garh.U/C Kammanwala .Tehsil and District

Sialkot NA 111 .(1/41)

1.000 0.959 -0.041 100%

100.000 06-Sep-12277

60.000 22-Nov-12729

Page 212

Page 213: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of PCC/Drain at village Dait.U/C

Kammanwala .Tehsil and District Sialkot NA

111 .(2/41)

1.000 0.982 -0.018 100%

3

Construction of PCC/Drain at village Crol.U/C

Kammanwala .Tehsil and District Sialkot NA

111 .(3/41)

1.000 0.971 -0.029 100%

4

Repair of Metalled Road from Bouth to

Kammanwala Pully.U/C Kammanwala .Tehsil

and District Sialkot NA 111 ..(4/41)

2.500 2.356 -0.144 100%

5

Construction of PCC/Drain at village

Rasoolpur Awana.U/C Kammanwala .Tehsil

and District Sialkot NA 111 (5/41)

0.500 0.490 -0.010 100%

6

Construction of PCC/Drain at village

Jhulki.U/C Kammanwala .Tehsil and District

Sialkot NA 111 .(6/41)

1.000 0.975 -0.025 100%

7

Construction of PCC/Drain at village

Jalfanwali.U/C Kammanwala .Tehsil and

District Sialkot NA 111 .(7/41)

1.000 0.980 -0.020 100%

8

Construction of PCC/Drain at village

Tonkan.U/C Kammanwala .Tehsil and District

Sialkot NA 111 .(8/41)

0.500 0.492 -0.008 100%

9

Water Supply at village Bhaira and Bhairi U/C

Khorata Syedan Tehsil & District Sialkot

(Remaining work)

2.500 1.672 -0.828 100%

10

Construction of PCC/Drain at village Kharota

Syedan.U/C Kharota Syedan.Tehsil and

District Sialkot NA 111 .(10/41)1.500 1.374 -0.126 100%

11

Construction of PCC/Drain at village

Marakiwal.U/C Kharota Syedan.Tehsil and

District Sialkot NA 111 .(11/41)

1.500 1.477 -0.023 100%

12

Construction of PCC/Drain at village Kotli

Loharan (West).U/C Kotli Loharan.Tehsil and

District Sialkot NA 111 .(12/41)

1.000 0.978 -0.022 100%

13

Construction of PCC/Drain at village Moma

Klan.U/C Moma.Tehsil and District Sialkot NA

111 .(13/41)

1.000 0.936 -0.064 100%

100.000 06-Sep-12277

Page 213

Page 214: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14

Construction of PCC/Drain at village

Dulchikey.U/C Moma.Tehsil and District

Sialkot NA 111 .(14/41)

1.000 0.960 -0.040 100%

15

Construction of PCC/Drain at village

Lalian.U/C Mongar.Tehsil and District Sialkot

NA 111 .(15/41)

1.000 0.703 -0.297 70%

16

Construction of PCC/Drain at village Rehang

Khokhran.U/C Mongar.Tehsil and District

Sialkot NA 111 .(16/41)

1.000 0.986 -0.014 100%

17

Construction of PCC/Drain at village Khojay

Chak.U/C Phuklian.Tehsil and District Sialkot

NA 111 .(17/41)

1.000 0.978 -0.022 100%

18

Construction of PCC/Drain at village

Phuklian.U/C Phuklian.Tehsil and District

Sialkot NA 111 .(18/41)

1.000 0.975 -0.025 100%

19

Construction of PCC/Drain at village

Sadha.U/C Plora.Tehsil and District Sialkot

NA 111 .(19/41)

1.000 0.980 -0.020 100%

20

Construction of PCC/Drain at village Kotli

Said Meer.U/C Plora.Tehsil and District

Sialkot NA 111 .(20/41)

1.000 0.974 -0.026 100%

21

Construction of PCC/Drain at village

Zahoora.U/C Plora.Tehsil and District Sialkot

NA 111 .(21/41)

1.000 0.980 -0.020 100%

22

Construction of PCC/Drain at village

Panwal.U/C Plora.Tehsil and District Sialkot

NA 111 .(22/41)

1.000 0.979 -0.021 100%

23

Construction of PCC/Drain at village

Tilakpur.U/C Plora.Tehsil and District Sialkot

NA 111 .(23/41)

1.000 0.687 -0.313 69%

24

Construction of PCC/Drain at village

Dhool/Malanay.U/C Plora.Tehsil and District

Sialkot NA 111 (24/41)

1.000 0.982 -0.018 100%

25

Construction of PCC/Drain at village

Mehdipur.U/C Plora.Tehsil and District

Sialkot NA 111 .(25/41)

1.000 0.971 -0.029 100%

26

Construction of PCC/Drain at village Kubey

Chak.U/C Sheni.Tehsil and District Sialkot

NA 111 .(26/41)

1.500 1.493 -0.007 100%

100.000 06-Sep-12277

Page 214

Page 215: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

27

Construction of PCC/Drain at village

Kharaney Chak.U/C Sheni.Tehsil and District

Sialkot NA 111 .(27/41)

0.500 0.490 -0.010 100%

28

Construction of PCC/Drain at village

Dingay.U/C Sheni.Tehsil and District Sialkot

NA 111 .(28/41)

1.000 0.980 -0.020 100%

29

Construction of PCC/Drain at village

Rattowal.U/C Sheni.Tehsil and District Sialkot

NA 111 .(29/41)

0.500 0.490 -0.010 100%

30

Construction of PCC/Drain at village Pindi

Panjoran.U/C Sheni.Tehsil and District

Sialkot NA 111 .(30/41)

1.000 0.980 -0.020 100%

31

Construction of PCC/Drain at village

Shadiwal.U/C Sheni.Tehsil and District

Sialkot NA 111 .(31/41)

1.000 0.980 -0.020 100%

32

Construction of PCC/Drain at village

Punnowal .U/C Sheni.Tehsil and District

Sialkot NA 111 .(32/41)

1.500 1.482 -0.018 100%

33

Construction of PCC/Drain at village

Chaila.U/C Sheni.Tehsil and District Sialkot

NA 111 .(33/41)

2.000 1.922 -0.078 100%

34

Repair of Metalled road from Chaila to

Sheni.U/C Sheni.Tehsil and District Sialkot

NA 111 .(34/41)

2.500 1.998 -0.502 80%

35

Construction of PCC/Drain at village Mallowal

U/C Sheni.Tehsil and District Sialkot NA 111

.(35/41)

1.000 0.976 -0.024 100%

36

Construction of PCC/Drain at village Putlian

Chak.U/C Sheni.Tehsil and District Sialkot

NA 111 .(36/41)

1.000 0.974 -0.026 100%

37

Construction of PCC/Drain at village Gujral

U/C Sheni.Tehsil and District Sialkot NA 111

.(37/41)

1.500 1.464 -0.036 100%

38

Construction of PCC/Drain at village Rangpur

Sarochan.U/C Sheni.Tehsil and District

Sialkot NA 111(38/41)

1.000 0.980 -0.020 100%

39

Construction of PCC/Drain at village

Roliwal.U/C Sheni.Tehsil and District Sialkot

NA 111 .(39/41)

0.500 0.490 -0.010 100%

100.000 06-Sep-12277

Page 215

Page 216: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

40

Construction of PCC/Drain at village Thay

Dargai.U/C Sheni.Tehsil and District Sialkot

NA 111 .(40/41)

0.500 0.488 -0.012 100%

41

Construction of PCC/Drain at village Kotli

Chandu.U/C Sheni.Tehsil and District Sialkot

NA 111 .(41/41)

0.700 0.633 -0.067 100%

42

Construction of Metalled Road from Lalpur

Stop to Kala Khambra. U/C Ballannwala

.Tehsil and District Sialkot NA 111. (1/42)

3.000 2.559 -0.441 85%

43

Construction of Metalled road from

Ballanwala to Machhi Khokhar.U/C

Ballannwala .Tehsil and District Sialkot NA

111. (2/42

3.300 2.814 -0.486 85%

44

Construction of PCC/Drain at village Propi

Araiyan . U/C Ballannwala .Tehsil and District

Sialkot NA 111 .(3/42)

1.000 0.976 -0.024 100%

45

Construction of Metalled road from

Ballanwala to Chak Budhu. U/C Ballannwala

.Tehsil and District Sialkot NA 111. ( 4/42)3.000 2.573 -0.427 86%

46

Construction of PCC/Drain at village Machi

Khokhar.U/C Ballannwala .Tehsil and District

Sialkot NA 111. (5/42)

1.000 0.951 -0.049 100%

47

Construction of PCC/Drain at village Bahu

Bhattian.U/C Bhagwal Awana .Tehsil and

District Sialkot NA 111 .(6/42)

1.000 0.989 -0.011 100%

48

Construction of PCC/Drain at village

Shankarpur.U/C Bhagwal Awana .Tehsil and

District Sialkot NA 111 .(7/42)

1.000 0.990 -0.010 100%

49

Construction of PCC/Drain at village Green

Town.U/C Bhagwal Awana .Tehsil and

District Sialkot NA 111 .(8/42)

1.500 1.469 -0.031 100%

50

Construction of PCC/Drain at village

Harar.U/C Bhagwal Awana .Tehsil and

District Sialkot NA 111 .(9/42)

1.000 0.815 -0.185

51

Construction of PCC/Drain at village

Bharth.U/C Bharth .Tehsil and District Sialkot

NA 111 .(10/42)

1.500 1.481 -0.019 100%

100.000 06-Sep-12277

Page 216

Page 217: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

52

Construction of PCC/Drain at village Rani

Chak.U/C Bharth .Tehsil and District Sialkot

NA 111 .(11/42)

1.000 0.947 -0.053 100%

53

Construction of PCC/Drain at village

Bouth.U/C Bharth .Tehsil and District Sialkot

NA 111 .(12/42)

1.000 0.980 -0.020 100%

54

Construction of PCC/Drain at village

Khichian.U/C Bharth .Tehsil and District

Sialkot NA 111 .(13/42)

1.000 0.879 -0.121

55

Construction of PCC/Drain at village

Bonkan.U/C Bonkan .Tehsil and District

Sialkot NA 111 .(14/42)

2.000 1.980 -0.020 100%

56

Construction of PCC/Drain at village

Muradpur.U/C Bonkan .Tehsil and District

Sialkot NA 111 .(15/42)

1.000 0.988 -0.012 100%

57

Construction of PCC/Drain at village Malkey

Klan.U/C Bonkan .Tehsil and District Sialkot

NA 111 .(16/42)

1.000 0.980 -0.020 100%

58Construction of Salehpur Bridge U/C Chaprar

Tehsil and District Sialkot NA-1114.500 4.499 -0.001 100%

59

Construction of PCC/Drain at village

ChaprarU/C Chaprar.Tehsil and District

Sialkot NA 111 .(18/42)

1.000 0.989 -0.011 100%

60

Construction of PCC/Drain at village

Rwal.U/C Chaprar.Tehsil and District Sialkot

NA 111 .(19/42)

1.000 0.979 -0.021 100%

61

Construction of PCC at village Jogo

Chak.U/C Chaprar.Tehsil and District Sialkot

NA 111 .(20/42)

1.500 1.470 -0.030 100%

62

Construction of Pully Nallah at Salehpur in

front of Masjid and Graveyard Resman U/C

Chaprar.Tehsil and District Sialkot NA 111

.(21/42)

0.500 0.490 -0.010 100%

63

Construction of PCC/Soling/drain at village

Chaprar Bala.U/C Chaprar.Tehsil and District

Sialkot NA 111 .(22/42)

1.500 1.441 -0.059 100%

64

Construction of Soling/drain at Chota Rwal

(Band Wala).U/C Chaprar.Tehsil and District

Sialkot NA 111 .(23/42)

0.500 0.410 -0.090 82%

100.000 06-Sep-12277

Page 217

Page 218: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

65

Construction of Soling at village

suragpur.U/C Chaprar.Tehsil and District

Sialkot NA 111 .(24/42)

1.000 0.976 -0.024 100%

66

Construction of PCC/Drain at village

Akbarabad.U/C Chrind.Tehsil and District

Sialkot NA 111 .(25/42)

1.000 0.985 -0.015 100%

67

Construction of PCC/Drain at village

Vains.U/C Dalowali.Tehsil and District Sialkot

NA 111 .(26/42)

1.000 0.973 -0.027 100%

68

Construction of PCC/Drain at village

Godhpur.U/C Godhpur.Tehsil and District

Sialkot NA 111 .(27/42)

1.500 1.410 -0.090 100%

69

Construction of PCC/Drain at village

Kaurpur.U/C Godhpur.Tehsil and District

Sialkot NA 111 .(28/42)

1.500 1.487 -0.013 100%

70

Construction of PCC/Drain at village

Gondal.U/C Gondal Tehsil and District

Sialkot NA 111 .(29/42)

1.000 0.847 -0.153 85%

71

Construction of PCC/Drain at village

Garhi.U/C Gondal Tehsil and District Sialkot

NA 111 .(30/42)

1.000 0.617 -0.383 62%

72

Construction of PCC/Drain at village Saidra

Khurd.U/C Gondal Tehsil and District Sialkot

NA 111 .(31/42)

1.000 0.980 -0.020 100%

73

Construction of PCC/Drain at village

Kakwal.U/C Gondal Tehsil and District

Sialkot NA 111 .(32/42)

1.000 0.794 -0.206

74

Construction of PCC/Drain at village Matrial

Khurd.U/C Head Marala Tehsil and District

Sialkot NA 111 .(33/42)

0.500 0.495 -0.005 100%

75

Construction of PCC/Drain at village

Dhallaywal..U/C Head Marala Tehsil and

District Sialkot NA 111 .(34/42)

1.000 0.990 -0.010 100%

76

Construction of PCC/Drain at village

Dongarpur..U/C Head Marala Tehsil and

District Sialkot NA 111 .(35/42)

1.000 0.990 -0.010 100%

77

Construction of Nallah at village Lado

Pindi..U/C Head Marala Tehsil and District

Sialkot NA 111 .(36/42)

1.500 1.480 -0.020 100%

100.000 06-Sep-12277

Page 218

Page 219: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

78

Construction of Nallah at village

Munawwarpura..U/C Head Marala Tehsil and

District Sialkot NA 111 .(37/42)

1.000 0.916 -0.084 100%

79

Construction of Soling/drain at Gali Master

Sadiq, village Majwal..U/C Head Marala

Tehsil and District Sialkot NA 111 .(38/42)

1.000 0.952 -0.048 100%

80

Construction of PCC/Drain at village Hail

Bajwan..U/C Kachhi Maand .Tehsil and

District Sialkot NA 111 .(39/42)

1.000 0.963 -0.037 100%

81

Construction of PCC/Drain at village Chak

Santhal.U/C Kachhi Maand .Tehsil and

District Sialkot NA 111 .(40/42)

1.000 0.980 -0.020 100%

82

Construction of PCC/Drain at village Pull

Bajwan.U/C Kachhi Maand .Tehsil and

District Sialkot NA 111 .(41/42)

1.000 0.950 -0.050 100%

83

Construction of PCC/Drain at village

Dhailey.U/C Kammanwala .Tehsil and District

Sialkot NA 111 .(42/42)

0.500 0.493 -0.007 100%

83 100.000 93.544 -6.456

Firdous Ashiq Awan dated 1.10.12

Mna, NA-111

477 01-Oct-12 4.500 4.500 -4.500

4.500 -4.500

Firdous Ashiq Awan dated 19.12.12

Mna, NA-111

1Construction of PCC/Drain U/C Adalat Garha

District Sialkot NA-111 (1/18)3.000 1.774 -1.226 60%

2Construction of PCC/Drain U/C Bonkan

District Sialkot NA-111 (2/18)2.500 1.247 -1.253 50%

100.000 06-Sep-12277

50.000 19-Dec-12820

Page 219

Page 220: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3Construction of PCC/Drain U/C Chaprar

District Sialkot NA-111 (3/18)2.000 0.594 -1.406 35%

4Construction of PCC/Drain U/C Godhpur

District Sialkot NA-111 (4/18)2.500 1.448 -1.052 70%

5Construction of PCC/Drain U/C Gondal

District Sialkot NA-111 (5/18)2.000 -2.000 10%

6Construction of PCC/Drain U/C Head Marala

District Sialkot NA-111 (6/18)2.000 1.113 -0.887 60%

7Construction of PCC/Drain U/C Kachhi

Maand District Sialkot NA-111 (7/18)8.000 1.782 -6.218 55%

8Construction of PCC/Drain U/C Kharota

Syedan District Sialkot NA-111 (8/18)1.000 -1.000 15%

9Construction of PCC/Drain U/C Kotli

Loharan District Sialkot NA-111 (9/18)3.000 1.695 -1.305 75%

10Construction of PCC/Drain U/C Miani

District Sialkot NA-111 (10/18)2.000 -2.000 10%

11Construction of PCC/Drain U/C Moma

District Sialkot NA-111 (11/18)2.000 1.610 -0.390 85%

12Construction of PCC/Drain U/C Mongar

District Sialkot NA-111 (12/18)2.000 -2.000

13

Construction of PCC/Drain/Soling U/C

Phukhlian District Sialkot NA-111 (13/18) 8.000 -8.000 10%

14Construction of PCC/Drain U/C Pindi

Khokhran District Sialkot NA-111 (14/18)2.000 1.231 -0.769 75%

15Construction of PCC/Drain U/C Plora

District Sialkot NA-111 (15/18)1.000 -1.000 10%

16Construction of PCC/Drain U/C Pragpur

District Sialkot NA-111 (16/18)2.000 0.556 -1.444 30%

17Construction of PCC/Drain U/C Sheni

District Sialkot NA-111 (17/18)3.000 -3.000

18Construction of PCC/Drain U/C Uggoki

District Sialkot NA-111 (18/18)2.000 1.035 -0.965 60%

18 50.000 14.085 -35.915

50.000 19-Dec-12820

Page 220

Page 221: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sahibzada Syed Murtaza Amin dated 13.9.12

MNA, NA-113

1

Construction/Improvement of Metalled Road

Mianwali Banglow toward Manga Pul Tehsil

Daska District Sialkot NA-113

(Phase-I)(1/7)

10.000 9.909 -0.091 100%

2

Construction/Improvement of Metalled Road

Mianwali Banglow toward Manga Pul Tehsil

Daska District Sialkot NA-113

(Phase-II)(1/7)

10.000 8.080 -1.920 44%

3

Construction/Improvement of Metalled Road

Daska City toward Pasrur District Sialkot

NA-113(Phasse-I) (2/7)

10.000 9.674 -0.326 100%

4

Construction/Improvement of Metalled Road

Daska City toward Pasrur District Sialkot

NA-113(Phasse-II) (2/7)

10.000 9.829 -0.171 100%

5

Construction/Improvement of Metalled Road

Dhalayke to Chalayke Tehsil Daska District

Sialkot NA-113(3/7)

2.000 1.922 -0.078 100%

6

Construction of Metalled Road and PCC at

U/C Anayat Khan Tehsil Pasrur District

Sialkot NA-113(4/7)

1.500 1.400 -0.100 93%

7

Construction of Soling and Drain at Village

Tersike Dera Ashfaq Cheema Tehsil Daska

District Sialkot NA-113(5/7)

1.000 0.971 -0.029 100%

8

Construction of PCC/Drain at Village Binna

Tehsil Pasrur District Sialkot NA-113(6/7) 0.500 0.490 -0.010 100%

9Construction of PCC/Drain at Village

Sohavee District Sialkot NA-113(7/7)0.500 0.480 -0.020 100%

10

Construction/Improvement of Metalled Road

Mitranwali toward Bambanwala Tehsil Daska

District Sialkot NA-113(1/19) (Phase-I)15.000 14.966 -0.034 100%

11

Construction/Improvement of Metalled Road

Bhaday Wala to Toti Chak Tehsil Daska

District Sialkot NA-113(II/19) (Phase-II)

15.000 14.941 -0.059 100%

100.000 13-Sep-12393

Page 221

Page 222: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Construction/Laying Sewer Line and PCC/

Drain at Daska City- Madina Colony District

Sialkot NA-113(2/19)

5.000 4.913 -0.087 100%

13

Construction of PCC/ Drain at Village

Classwala Tehsil Pasrur District Sialkot NA-

113(3/19)

1.500 1.467 -0.033 100%

14

Construction of PCC/ Drain at Village Chakri

, Pahari Pur District Sialkot NA-113(4/19) 0.800 0.783 -0.017 100%

15

Construction of PCC/ Drain at Village

Dheedowali Tehsil Daska District Sialkot

NA-113(5/19)

1.000 0.974 -0.026 100%

16

Construction of Soling at Village Bharake

U/C Classwala Tehsil Pasrur District

Sialkot NA-113(6/19)

0.500 0.490 -0.010 100%

17

Construction of PCC/ Drain at Village

Thatha Bawa Tehsil Pasrur District

Sialkot NA-113(7/19)

0.500 0.490 -0.010 100%

18

Construction of Soling at Village Mehar

Tehsil Pasrur District Sialkot NA-113(8/19) 0.500 0.490 -0.010 100%

19

Construction of PCC/Drain at Daska

City/Kanwanlit/ Ram Aarin/Bharthan Wala,

Anod Pur District Sialkot NA-113(9/13)

5.000 4.834 -0.166 100%

20

Construction of Soling/ Drain at Village

Fateh Wali Tehsil Daska District Sialkot

NA-113(10/19)

0.500 0.479 -0.021 100%

21

Construction of Soling at Village Basra

Tehsil Pasrur District Sialkot NA-

113(11/19)

0.500 0.490 -0.010 100%

22

Construction of PCC/ Drain at Village

Kalanwali Tehsil Pasrur District Sialkot

NA-113(12/19)

0.500 0.493 -0.007 100%

23

Construction of PCC/ Drain at Village

Gujarke Goraya Tehsil Pasrur District

Sialkot NA-113(13/19)

0.700 0.681 -0.019 100%

24

Construction of PCC/Soling/ Drain at Village

Qila Kalarwala Tehsil Pasrur District

Sialkot NA-113(14/19)

2.000 1.922 -0.078 100%

100.000 13-Sep-12393

Page 222

Page 223: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

25

Construction of PCC/ Drain at Village

Adamkay Nagra Tehsil Pasrur District

Sialkot NA-113(15/19)

0.500 0.490 -0.010 100%

26

Construction of PCC/ Drain at Village Merk

Pur Tehsil Daska District Sialkot NA-

113(16/19)

0.500 0.486 -0.014 100%

27

Construction of Soling/ Drain at Village

Basiwala Tehsil Pasrur District Sialkot

NA-113(17/19)

1.500 1.444 -0.056 100%

28

Repair and T.S.T.of Metalled Road Mianwali

Banglow to Veerwala Remaining Portion

Tehsil Daska District Sialkot NA-113 (18/19)2.000 1.853 -0.147 80%

29

Construction of PCC/Soling/ Drain at Village

Dhalayke, Sheikhupura District Sialkot

NA-113(19/19)

1.000 0.985 -0.015 100%

29 100.000 96.426 -3.574

Ch.Maqsood Ahmed dated 8.10.12

Notable (NA-114)

1

Construction of Soling /Drains and PCC in

villages Alkary, Ameen shah District Sialkot.

NA-114

0.400 0.388 -0.012 100%

2

Construction of Soling /Drains and PCC in

villages haripa , chohan , nokrian Sialkot. NA-

114

0.600 0.584 -0.016 100%

3

Construction of Soling /Drains and PCC in

villages hargan, balgan, khechian, bhatian

District Sialkot. NA-114

0.600 0.595 -0.005 100%

4

Construction of Soling /Drains and PCC in

villages ropowali. Kala pahar District Sialkot.

NA-114

0.400 0.392 -0.008 100%

5

Construction of Soling /Drains and PCC in

villages charondm, kamalpur chestian

District Sialkot. NA-114

0.400 0.387 -0.013 100%

100.000 13-Sep-12393

30.000 08-Oct-12516

Page 223

Page 224: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of Soling /Drains and PCC in

villages kalowali saidan, fatah, sodian

District Sialkot. NA-114

0.600 0.581 -0.019 100%

7Construction of Soling /Drains and PCC in

villages sarang pur District Sialkot. NA-1140.500 0.487 -0.013 100%

8

Construction of Soling /Drains and PCC in

villages matayke rajputan District Sialkot. NA-

114

0.500 0.483 -0.017 100%

9

Construction of Soling /Drains and PCC in

villages jajo pur, madu pur, venius District

Sialkot. NA-114

1.000 0.980 -0.020 100%

10

Construction of Soling /Drains and PCC in

villages hameed pur, kotli tarhana District

Sialkot. NA-114

0.800 0.753 -0.047 100%

11Construction of Soling /Drains in villages

rajian, kamal pur District Sialkot. NA-1140.400 -0.400

12Construction of Soling /Drains in villages kotli

faqeer chand District Sialkot. NA-1141.000 0.975 -0.025 100%

13

Construction of Soling /Drains and PCC in

villages sarangian, ferozkay nagra District

Sialkot. NA-114

1.000 0.877 -0.123 88%

14

Construction of Soling /Drains and PCC in

villages gangian wali, degre gumnan District

Sialkot. NA-114

0.800 0.724 -0.076 91%

15

Construction of Soling /Drains and PCC in

villages muhala eid gah rehman pur dhoop

sari chwinda District Sialkot. NA-114

1.000 0.982 -0.018 100%

16

Construction of Soling /Drains and PCC in

villages muhla douban pura imam bargha gali

azam gujjar chawinda District Sialkot. NA-

114

1.000 0.425 -0.575 43%

17

Construction of Soling /Drains and PCC in

villages muhla naqi bori . Mehmand wali

muhla bajawa District Sialkot. NA-114

0.600 0.588 -0.012 100%

18Construction of Soling /Drains in villages

chawinda city District Sialkot. NA-1141.000 0.945 -0.055 100%

19

Construction of Soling /Drains and PCC in

villages manela, gull jahal, manga, jalwawa

District Sialkot. NA-114

1.000 0.979 -0.021 100%

30.000 08-Oct-12516

Page 224

Page 225: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

20

Construction of Soling /Drains and PCC in

villages munjaykay, nakhay, saleem kay

colony District Sialkot. NA-114

0.800 0.783 -0.017 100%

21Construction of Soling /Drains and PCC in

villages ramkay District Sialkot. NA-1141.000 0.787 -0.213 100%

22

Construction of Soling /Drains and PCC in

villages abdali, mardana, sargodah District

Sialkot. NA-114

0.600 0.569 -0.031 100%

23

Construction of Soling /Drains and PCC in

villages koot karal, panwana District Sialkot.

NA-114

0.500 0.483 -0.017 100%

24

Construction of Soling /Drains and PCC in

villages nool kaly wali District Sialkot. NA-

114

0.400 0.330 -0.070

25

Construction of Soling /Drains and PCC in

villages kotli haji pur, kotli bajwa District

Sialkot. NA-114

0.800 0.510 -0.290

26

Construction of Soling /Drains and PCC in

villages torian wala, koot ghuman District

Sialkot. NA-114

1.000 0.857 -0.143

27

Construction of Soling /Drains and PCC in

villages musa pur, dhalam pur District

Sialkot. NA-114

0.800 0.643 -0.157

28

Construction of Soling /Drains and PCC in

villages nangul, mirza pur, raap chand,

doborgi raam chand District Sialkot. NA-1140.800 0.790 -0.010 100%

29

Construction of Soling /Drains and PCC in

villages randhawa, chak randhawa District

Sialkot. NA-114

0.600 0.535 -0.065 89%

30

Construction of Soling /Drains and PCC in

villages loharay chghar District Sialkot. NA-

114

0.400 0.386 -0.014 100%

31Construction of Soling /Drains and PCC in

villages karngwali District Sialkot. NA-1140.400 0.391 -0.009 100%

32Construction of Soling /Drains and PCC in

villages jadhala District Sialkot. NA-1141.200 1.079 -0.121 90%

30.000 08-Oct-12516

Page 225

Page 226: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

33

Construction of Soling /Drains and PCC in

villages talwandi anayat khan, saqander pur

District Sialkot. NA-114

0.400 0.382 -0.018 100%

34

Construction of Soling /Drains and PCC in

villages ghazi phar, kotli khawaja District

Sialkot. NA-114

0.400 0.375 -0.025 100%

35

Construction of Soling /Drains and PCC in

villages uncha pharang, takhat pur osayan

District Sialkot. NA-114

0.600 0.592 -0.008 100%

36

Construction of Soling /Drains and PCC in

villages aeyes pur chohor District Sialkot. NA-

114

0.400 0.392 -0.008 100%

37

Construction of Soling /Drains and PCC in

villages jabokay nawaday, chak machana

District Sialkot. NA-114

0.400 0.389 -0.011 100%

38Construction of Soling /Drains and PCC in

villages siyah wal District Sialkot. NA-1140.500 0.490 -0.010 100%

39Construction of Soling /Drains and PCC in

villages shehzada District Sialkot. NA-1140.500 0.417 -0.083 83%

40

Construction of Soling /Drains and PCC in

villages dhol bajawa, jhato kay District

Sialkot. NA-114

0.500 -0.500

41

Construction of Soling /Drains and PCC in

villages kang joiyan District Sialkot. NA-114 0.500 0.489 -0.011 98%

42

Construction of Soling /Drains and PCC in

villages degre haryal District Sialkot. NA-114 0.500 0.490 -0.010 100%

43

Construction of Soling /Drains and PCC in

villages dogran wali District Sialkot. NA-114 0.500 0.485 -0.015 100%

44

Construction of Soling /Drains and PCC in

villages khan pur saidan, throo District

Sialkot. NA-114

0.800 0.771 -0.029 100%

45

Construction of Soling /Drainsand PCC in

villages khan hari, maqad hari, chak bama

District Sialkot. NA-114

0.600 0.454 -0.146 76%

30.000 08-Oct-12516

Page 226

Page 227: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

46

Construction of Soling /Drains and PCC in

villages pindi khurd, chak lala District Sialkot.

NA-114

0.500 0.490 -0.010 100%

47Construction of Soling /Drains and PCC in

villages galan wala District Sialkot. NA-1140.500 0.488 -0.012 100%

48Construction of Soling /Drains and PCC in

villages mandyala District Sialkot. NA-1140.500 0.490 -0.010 100%

49

Construction of Soling /Drains and PCC in

villages aal sulehria, kingra majhwara District

Sialkot. NA-114

0.600 0.588 -0.012 100%

50Construction of Soling /Drains and PCC in

villages sabaz koot District Sialkot. NA-1140.500 0.476 -0.024 100%

51

Construction of Soling /Drains and PCC in

villages pindi manhasan, khalil pur District

Sialkot. NA-114

1.000 0.571 -0.429 57%

52

Construction of PCC /Drains and Culvert in

villages chal sangah, mahal potray, sangriala

District Sialkot. NA-114

0.600 0.588 -0.012 100%

53

Construction of Soling /Drains and PCC in

villages murad pur, godam rad, gali yaqoob

mimber pasror District Sialkot. NA-114

1.000 0.874 -0.126 87%

54Construction of Soling /Drains and PCC in

villages borikay District Sialkot. NA-1141.000 0.767 -0.233 77%

55

Construction of Soling /Drains and PCC in

villages faisal colony, muslim colony, modal

town pasror District Sialkot. NA-114

1.000 0.602 -0.398 60%

56

Construction of Soling /Drains and PCC in

villages anayat pura, rehman puta pasror

District Sialkot. NA-114

1.000 0.858 -0.142 86%

57Construction of Soling /Drains and PCC in

villages pasror city District Sialkot. NA-1141.000 0.948 -0.052 95%

58

Construction of Soling /Drains and PCC in

villages badyana haidri chok District Sialkot.

NA-114

1.000 0.825 -0.175 83%

59

Construction of Soling /Drains and PCC in

villages porab kalair District Sialkot. NA-114 0.600 0.583 -0.017 97%

60Construction of Soling /Drains and PCC in

villages harll District Sialkot. NA-1140.400 0.371 -0.029 100%

30.000 08-Oct-12516

Page 227

Page 228: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

61Construction of Soling /Drains and PCC in

villages dingay District Sialkot. NA-1140.400 0.391 -0.009 100%

62Construction of Soling /Drains and PCC in

villages gughyal District Sialkot. NA-1140.500 0.489 -0.011 100%

63

Construction of Soling /Drains and PCC in

villages bhatay kalan, bhago bhatay District

Sialkot. NA-114

0.800 0.687 -0.113 86%

64

Construction of Soling /Drains and PCC in

villages sabo singhay, kalo payara District

Sialkot. NA-114

0.500 0.480 -0.020 100%

65

Construction of Soling /Drains and PCC in

villages hari pur oura District Sialkot. NA-114 0.500 0.486 -0.014 100%

66Construction of Soling /Drains and PCC in

villages langriyali District Sialkot. NA-1140.500 0.441 -0.059 88%

67Construction of Soling /Drains and PCC in

villages mally chak District Sialkot. NA-1140.500 0.477 -0.023 100%

68Construction of PCC and Nallah in villages

ranger road, oura District Sialkot. NA-1140.500 0.490 -0.010 100%

69

Construction of Soling /Drains and PCC in

villages dharkali, darghan wali District

Sialkot. NA-114

0.500 0.476 -0.024 100%

70

Construction of Soling /Drains and PCC in

villages malou chaith, saidan wali District

Sialkot. NA-114

0.600 -0.600

71

Construction of Soling /Drains and PCC in

villages kotli araiyan, gopal pur District

Sialkot. NA-114

0.600 0.236 -0.364 39%

72

Construction of Soling /Drains and PCC in

villages nago kay, pathana wali District

Sialkot. NA-114

0.600 0.578 -0.022 100%

73

Construction of Soling /Drains and PCC in

villages kalrop, waghra District Sialkot. NA-

114

0.500 0.473 -0.027 100%

74Construction of Soling /Drains and PCC in

villages bhago wal District Sialkot. NA-1140.600 0.395 -0.205 66%

75Construction of Soling /Drains and PCC in

villages raja harpal District Sialkot. NA-1140.500 0.492 -0.008 100%

30.000 08-Oct-12516

Page 228

Page 229: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

76

Construction of Soling /Drains and PCC in

villages khewa bajwa, barath, balwatla ,

chak ishaq District Sialkot. NA-114

1.200 1.194 -0.006 100%

76 30.000 43.298 13.298

Ch.Muhammad Tariq Anees dated 14.9.12

MNA, NA-116

1

Completion of Sewerage System in

Shakargarh City

25.000 0.017 -24.983 15%

2

Construction of Metalled Road from Heera

Chun to Harrial /Pakhral U/C Bara Manga

Tehsil Shakargarh District Narowal NA-116

(1/3)

17.000 5.720 -11.280 35%

3

Construction of Bridge 50 Feet Span on

Nallah from Shahlla to Hou Kalan Tehsil

Shakargarh District Narowal NA-116)

(1/2)(Remaining portion)

2.557 2.264 -0.293 100%

4

Construction of Bridge 50 Feet Span on

Nallah at Baga Kasana Tehsil Shakargarh

District Narowal NA-116) (2/2)(Remaining

portion)

2.143 2.097 -0.046 100%

5Completion of Sewerage System in

Shakargarh City NA-116(2/3)

6

Re-Construction of Road from Shakargarh

City to Masroor, Tehsil Shakargarh District

Narowal. (Phase-I)

49.886 -49.886

7

Re-Construction of Road from Shakargarh

City to Masroor, Tehsil Shakargarh District

Narowal.(Phase-II)

50.114 -50.114

146.700 14-Sep-12396

30.000 08-Oct-12516

Page 229

Page 230: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7 146.700 10.098 -136.602

Ch.Muhammad Tariq Anees dated 6.3.13

MNA, NA-116

1021 06-Mar-13 60.000 60.000 -60.000

60.000 -60.000

Akram Masih Gill dated 4.10.12

MNA NA-340

1

Construction of Christian Graveyard

Boundary Wall at Kunjah Gujrat NA-340

(1/12)

1.000 0.851 -0.149 85%

2Construction of Catholic Church at Mughal

Colony, Gujrat NA-340(2/12)1.000 0.235 -0.765 24%

3

Construction of PCC & Drain at Streets of

Iqbal Masih & Sahian Basih, Mughal Colony

Gujrat NA-340(3/12)

1.000 0.587 -0.413 59%

4Construction of PCC & Drain at Main Bazar

Kallu Pura Gujrat NA-340(4/12)0.500 0.450 -0.050 90%

5

Construction of PCC & Drain at Streets of

Hanif Masih & Baba Barkat ,Khlidabad

Gujrat NA-340(5/12)

1.000 0.941 -0.059 95%

6Renovation of Budh Sang Memorial church

Mohallah Siraj Colony Gujrat NA-340(6/12)1.000 0.431 -0.569 43%

7

Renovation of Church at Mohallah

Sultanabad, Union Council No.50 Gujrat NA-

340(7/12)

1.000 0.846 -0.154 85%

8

Renovation of Church at Mohallah Kalu Pura

Union Council No.51 Gujrat NA-340(8/12) 0.500 0.265 -0.235 53%

9Renovation of Pastor Haroon Ajmal Church

at Lala Musa Gujrat NA-340(9/12)0.800 0.398 -0.402 50%

9.300 04-Oct-12503

Page 230

Page 231: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10

Construction of Jinnaz Gah in Christian

graveyard at Mohallah Ali Pura Gujrat NA-

340(10/12)

0.500 0.243 -0.257 49%

11Renovation of F.G.A Chuch at Mohallah

Mission Compound Gujrat NA-340(11/12)0.500 0.325 -0.175 65%

12Construction/Renovation of Church at Jalal

Pur Jattan Gujrat NA-340(12/12)0.500 0.403 -0.097 81%

12 9.300 5.975 -3.325

Ch.Shujat Hussain dated 27.11.12

Senator

1

Construction of Road

/PCC/Drain/Soling/Culvert at U/C Kunjah ,

PP-110 (1/5)

10.000 9.913 -0.087 100%

2

Construction of Road

/PCC/Drain/Soling/Culvert at U/C Langhay

PP-110 (2/5)

10.000 9.947 -0.053 100%

3

Construction of Road

/PCC/Drain/Soling/Culvert at U/C

Harianwala PP-110 (3/5)

10.000 9.832 -0.168 100%

4

Construction of Road

/PCC/Drain/Soling/Culvert at U/C Moin-ud-

Din Pur PP-110 (4/5)

10.000 6.711 -3.289 100%

5

Construction of Road

/PCC/Drain/Soling/Culvert at U/C Gakhra

Kalan , PP-110 (5/5)

10.000 9.790 -0.210 100%

6

Construction of Road

/PCC/Drain/Soling/Culvert at U/C

Jheernwali , PP-110 (1/5)

10.000 9.811 -0.189 100%

7

Construction of Metalled Road Tibi Gori to

G.T.Road by Pass Gujrat and Filteration

Plant at village Kot Qutab Din in U/C

Golayki , PP-110 (2/5)

10.000 9.618 -0.382 100%

8

Construction of Road

/PCC/Drain/Soling/Culvert at U/C Shadiwal

, PP-110 (3/5)

10.000 9.974 -0.026 100%

100.000 27-Nov-12763

9.300 04-Oct-12503

Page 231

Page 232: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Construction of Road

/PCC/Drain/Soling/Culvert at U/C Kathala ,

PP-110 (4/5)

10.000 9.388 -0.612 100%

10Construction of Soling/Culvert at U/C

Nagrianwawla , PP-110 (5/5)10.000 9.846 -0.154 100%

10 100.000 94.830 -5.170

Khalid AsgharGhoral dated 30.10.12

MPA, PP-108

1

Repair of Metalled Road at Village Awan

Sharif to Malikee District Gujrat PP-108

(1/8)

10.000 7.897 -2.103 80%

2

Construction of PCC/Drain/ Metalled Road

and Boundary Wall U/C Santal District

Gujrat PP-108 (2/8)

10.000 9.852 -0.148 100%

3Construction of PCC/Drain and Road

Village U/C Peero Shah District Gujrat PP-

108 (3/8)

5.000 4.187 -0.813 84%

4

Construction of PCC/Drain and Road

Village U/C Hazra Mughalan District Gujrat

PP-108 (4/8)

5.000 4.435 -0.565 91%

5

Construction of PCC/Drain and Road

Village U/C Agnallah District Gujrat PP-108

(5/8)

5.000 4.284 -0.716 92%

6

Construction of PCC/Drain and Road

Village U/C Hajiwala District Gujrat PP-

108 (6/8)

5.000 4.573 -0.427 100%

7

Construction of PCC/Drain and Road

Village U/C Chak Kamala District Gujrat

PP-108 (7/8)

5.000 4.663 -0.337 100%

8

Construction of PCC/Drain and Road

Village U/C Jalal Pur Sobtian District

Gujrat PP-108 (8/8)

5.000 4.669 -0.331 100%

8 50.000 44.560 -5.440

100.000 27-Nov-12763

50.000 20-Oct-12519

Page 232

Page 233: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ch. Abdullah Yousaf Warraich dated 19.10.12

MPA, PP-109

1Repair of Metalled Road Village Shahbaz Pur

District Gujrat PP-109 (1/8)15.000 14.895 -0.105 100%

2

Construction of PCC/Drain and Road

Village U/C Machi Wal District Gujrat PP-

109 (2/8)

5.000 4.367 -0.633 87%

3

Construction of PCC/Drain and Road

Village Fateh Pur U/C Fateh Pur District

Gujrat PP-109 (3/8)

5.000 4.974 -0.026 100%

4

Construction of PCC/Drain and Road U/C

Jaura Jalal Pur District Gujrat PP-109 (4/8) 5.000 4.972 -0.028 100%

5Construction of PCC/Drain and Road U/C

Ikhlas Garh District Gujrat PP-109 (5/8)5.000 4.860 -0.140 100%

6Construction of PCC/Drain and Road U/C

Doga District Gujrat PP-109 (6/8)5.000 4.940 -0.060 100%

7Construction of PCC/Drain and Road U/C

Chachian District Gujrat PP-109 (7/8)5.000 4.919 -0.081 100%

8Construction of PCC/Drain and Road U/C

Chak Maju District Gujrat PP-109 (8/8)5.000 4.912 -0.088 100%

8 50.000 48.839 -1.161

Ch. Moonis Elahi   dated 31.8.12

MPA, PP-110

1Construction of Road PCC and Drain at U/C

Mangowal Gharbi PP-110 District Gujrat(1/2) 46.500 45.677 -0.823 100%

2Construction of Road PCC and Drain at U/C

Nagerian Wala PP-110 District Gujrat(2/2) 10.500 10.486 -0.014 100%

3Construction of Road PCC and Drain at U/C

Harianwala PP-110 District Gujrat (1/4)15.000 14.107 -0.893 100%

4Construction of Road PCC and Drain at U/C

Sarooki PP-110 District Gujrat(2/4)4.000 3.988 -0.012 100%

50.000 19-Oct-12607

250.000 31-Aug-12149

Page 233

Page 234: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5Construction of Road PCC and Drain at U/C

Sabowal PP-110 District Gujrat(3/4)5.000 4.696 -0.304 100%

6Construction of Road PCC and Drain at U/C

Shadiwal PP-110 District Gujrat(4/4)30.000 24.860 -5.140 83%

7Construction of Road PCC and Drain at U/C

Chak Manjoo PP-110 District Gujrat(1/3)20.000 12.567 -7.433 63%

8Construction of Road PCC and Drain at U/C

Jhioronwali PP-110 District Gujrat(2/3) 15.000 14.290 -0.710 100%

9Construction of Road PCC and Drain at U/C

Kathala PP-110 District Gujrat(3/3)15.000 14.284 -0.716 100%

10Construction of Road PCC and Drain at U/C

Kunjah PP-110 District Gujrat(1/3)21.000 19.580 -1.420 100%

11Construction of Road PCC and Drain at U/C

Gakhra Kalan PP-110 District Gujrat(2/3)20.000 19.878 -0.122 100%

12Construction of Road PCC and Drain at U/C

Chak Saada PP-110 District Gujrat(3/311.000 10.914 -0.086 100%

13Construction of Road PCC and Drain at U/C

Langay PP-110 District Gujrat(1/6)10.000 9.746 -0.254 100%

14Construction of Road PCC and Drain at U/C

Moin- ud-Din Pur PP-110 District Gujrat(2/6) 10.000 9.782 -0.218 100%

15Construction of Road PCC and Drain at U/C

Golay Ki PP-110 District Gujrat(3/6)10.000 9.303 -0.697 100%

16Construction of Road PCC and Drain at U/C

Madina PP-110 District Gujrat(4/6)5.000 4.397 -0.603 100%

17Construction of PCC and Drain at U/C

Mandhiala PP-110 District Gujrat(5/6)1.000 0.966 -0.034 100%

18Construction of Road PCC and Drain at U/C

Chechian PP-110 District Gujrat(6/6)1.000 0.927 -0.073 100%

18 250.000 230.448 -19.552

Ch.Muhammad Saleem Baryar dated 6.9.12

PP-112

1Construction of Street / Drains at Kotli

Marlan U/C Ghuinke District Sialkot .1.000 0.923 -0.077 92%

30.000 06-Sep-12237

250.000 31-Aug-12149

Page 234

Page 235: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2Construction of Street / Drains at Ismail

Awan U/C Ghuinke District Sialkot .0.500 0.469 -0.031 100%

3Construction of Street / Drains at Talwara

U/C Ghuinke District Sialkot .0.700 0.687 -0.013 100%

4Constructon of Street / Drains at Baqar Pur

U/C Aalo Mahar District Sialkot . .1.000 0.977 -0.023 100%

5Construction of Street / Drains at Bhallo Wali

East U/C Peero chak District Sialkot.. 1.500 1.443 -0.057 100%

6Construction of Street / Drains at Lakra

Kalan U/C Peero chak District Sialkot.0.700 0.688 -0.012 100%

7

Construction of Street / Drains at village

Bhallo walli West U/C Peero Chak District

Sialkot ..

1.500 1.468 -0.032 100%

8Construction of Street / Drains at Simble Pur

U/C Peero chak District Sialkot.0.500 0.490 -0.010 100%

9Construction of Street / Drains at Lakra

Khurd U/C Peero chak District Sialkot.0.700 0.687 -0.013 100%

10Construction of Street / Drains Bhobhangi

U/C Peero chak District Sialkot.1.000 0.646 -0.354 65%

11Construction of Street / Drains Changan Wali

U/C Peero chak District Sialkot.0.500 0.490 -0.010 100%

12Construction of Street / Drains at Peero

Chak U/C Peero chak District Sialkot.0.600 0.582 -0.018 100%

13

Construction of Street / Drains at Gopi Pur

& Nawan Pind U/C Sehjo kala District

Sialkot.

0.500 0.490 -0.010 100%

14Construction of Street / Drains at Kotli Lundi

& Kotli Jandu U/C Sehjo kala District

Sialkot.

0.500 0.490 -0.010 100%

15Construction of Street / Drains at Duburji

Wirkan U/C Sehjo kala District Sialkot.1.000 0.951 -0.049 100%

16Construction of Street / Drains at Adam

Daraz U/C Sehjo kala District Sialkot.0.500 0.490 -0.010 100%

17Construction of Street / Drains at Kotli

Kakian U/C Aalo Mahar District Sialkot.0.800 0.757 -0.043 95%

18Construction of Street / Drains at Sal Adah

Motra U/C Aalo Mahar District Sialkot.1.000 0.900 -0.100 100%

19Construction of Street / Drains at Sonehra

Goraya U/C Aalo Mahar District Sialkot.0.500 0.489 -0.011 100%30.000 06-Sep-12237

Page 235

Page 236: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

20Construction of Street / Drains at Gid Pur

Adah U/C Aalo Mahar District Sialkot.0.500 0.490 -0.010 100%

21Construction of Street / Drains at Moutra

U/C Aalo Mahar District Sialkot.0.500 0.483 -0.017 100%

22

Construction of Street / Drains at Kotla

Sukhia & Maitlay U/C Boghray District

Sialkot.

0.500 0.490 -0.010 100%

23Construction of Street / Drains at Rachara

U/C Boghray District Sialkot.1.000 0.904 -0.096 90%

24Construction of Street / Drains at Trigri U/C

Boghray District Sialkot.0.700 0.687 -0.013 100%

25Construction of Street / Drains at Kotli

Bhago U/C Ghuinke District Sialkot.1.000 0.976 -0.024 100%

26Construction of Street / Drains at Gujer

Kullah U/C Ghuinke District Sialkot.1.000 0.801 -0.199 80%

27Construction of Street / Drains at Ghuinke

U/C Ghuinke District Sialkot.1.000 0.973 -0.027 100%

28Construction of Street / Drains at Sabke &

Kour Pur U/C Kharolian District Sialkot.1.000 0.907 -0.093 100%

29Construction of Street / Drains at Ralio ke

U/C Kharolian District Sialkot.0.500 0.490 -0.010 100%

30Construction of Street / Drains at Kharolian

& Fazal Abad U/C Kharolian District Sialkot. 1.000 0.980 -0.020 100%

31Construction of Street / Drains at Rajo ke

U/C Kanwan Lit District Sialkot.1.500 1.025 -0.475 68%

32Construction of Street / Drains at Dheedo

wali U/C Kanwan Lit District Sialkot.0.500 0.490 -0.010 100%

33

Construction of Street / Drains at Bhopal

wala & Khenian Chak U/C Bhopal Wala

District Sialkot.

1.000 0.978 -0.022 100%

34Construction of Street /Drain at Muhammad

Pura U/C Ghuinkey Tehsil & District

Sialkot.

0.800 0.784 -0.016 100%

35Construction of Culvert at Village Artala

Sharif Tehsil & District Sialkot.1.000 0.972 -0.028 100%

36Construction of Street /Drain at Village Alo

Mahar Tehsil & District Sialkot.0.500 0.490 -0.010 100%

37Construction of Street /Drain at Sna-ullah

Street Daska District Sialkot.1.000 0.940 -0.060 94%

30.000 06-Sep-12237

Page 236

Page 237: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

37 30.000 27.977 -2.023

Tanvir Ashraf Kaira dated 5.9.12

MPA, PP-112

1

Construction of PCC/Soling/Drainage at

Qadirabad U/C Lala Musa-I District Gujrat

PP-112 (1/22)

2.500 2.472 -0.028 100%

2

Construction of PCC/Soling/Drainage at Haji

Pura U/C Lala Musa-II District Gujrat PP-

112 (2/22)

2.500 2.435 -0.065 100%

3

Construction of PCC/Soling/Drainage at

Seyda U/C Lala Musa-III District Gujrat PP-

112 (3/22)

2.500 2.484 -0.016 100%

4

Construction of PCC/Soling/Drainage at

Nazam Pura U/C Lala Musa-IV District

Gujrat PP-112(4/22)

2.500 2.480 -0.020 100%

5

Construction of PCC/Soling/Drainage at

Adowal U/C Adowal District Gujrat PP-112

(5/22)

3.000 2.926 -0.074 100%

6

Construction of PCC/Soling/Drainage at

Jaliani U/C Dewao Mandi District Gujrat

PP-112 (6/22)

3.000 2.989 -0.011 100%

7

Construction of PCC/Soling/Drainage at

Kotla Sarng U/C Kotla Qasim, District

Gujrat PP-112 (7/22)

3.000 2.962 -0.038 100%

8

Construction of PCC/Soling/Drainage at

Sandaria U/C Theekriyan District Gujrat

PP-112 (8/22)

3.000 2.951 -0.049 100%

9

Construction of PCC/Soling/Drainage at

Warowali U/C Chakari District Gujrat PP-

112 (9/22)

3.000 2.952 -0.048 100%

10

Construction of PCC/Soling/Drainage at

Nandowal U/C Khawas Pur District Gujrat

PP-112 (10/22)

3.000 2.981 -0.019 100%

11

Construction of PCC/Soling/Drainage at U/C

Miana Chak District Gujrat PP-112 (11/22) 1.000 0.975 -0.025 100%

50.000 05-Sep-12217Page 237

Page 238: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Construction of PCC/Soling/Drainage at U/C

Machyana District Gujrat PP-112 (12/22) 1.000 0.972 -0.028 100%

13

Construction of PCC/Soling/Drainage at

Shahabdian wall U/C Adowal District Gujrat

PP-112 (13/22)

3.000 2.953 -0.047 100%

14

Construction of PCC/Soling/Drainage at

Salam Pura U/C Theekryan District Gujrat

PP-112(14/22)

3.000 2.966 -0.034 100%

15

Construction of PCC/Soling/Drainage at

Paswal U/C Kotla Qasim District Gujrat

PP-112 (15/22)

3.000 2.931 -0.069 100%

16

Construction of PCC/Soling/Drainage at

Tiba Bootay Shah U/C Dewana Mandi

District Gujrat PP-112 (16/22)

3.000 2.980 -0.020 100%

17

Construction of PCC/Soling/Drainage at

Losar U/C Khawaspur District Gujrat PP-

112 (17/22)

2.500 2.480 -0.020 100%

18

Construction of PCC/Soling/Drainage at

Chohan U/C Chakari District Gujrat PP-

112 (18/22)

1.500 1.466 -0.034 100%

19

Construction of PCC/Soling/Drainage at

Kareem Pura U/C Lala Musa -I District

Gujrat PP-112 (19/22)

1.000 0.985 -0.015 100%

20

Construction of PCC/Soling/Drainage at

Bahari Colony U/C Lala Musa -II District

Gujrat PP-112 (20/22)

1.000 0.988 -0.012 100%

21

Construction of PCC/Soling/Drainage at

Gala Mandi U/C Lala Musa -III District

Gujrat PP-112 (21/22)

1.000 0.952 -0.048 100%

22

Construction of PCC/Soling/Drainage at

Qasiba Mohallah U/C Lala Musa -IV

District Gujrat PP-112 (22/22)

1.000 0.986 -0.014 100%

22 50.000 49.266 -0.734

50.000 05-Sep-12217

Page 238

Page 239: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Tanvir Ashraf Kaira dated 14.12.12

MPA, PP-112

1Construction of PCC/ Drainage and Soling

U/C 84/1 District Gujrat PP-112 (1/15)1.500 -1.500 15%

2Construction of PCC/ Drainage and Soling

U/C 85/1 District Gujrat PP-112 (2/15)1.500 1.194 -0.306 90%

3Construction of PCC/ Drainage and Soling

U/C 86/1 District Gujrat PP-112 (3/15)1.500 1.285 -0.215 90%

4Construction of PCC/ Drainage and Soling

U/C 87/1 District Gujrat PP-112 (4/15)1.500 1.344 -0.156 90%

5Construction of PCC/ Drainage and Soling

U/C Bhadar District Gujrat PP-112 (5/15)2.000 1.302 -0.698 70%

6

Construction of PCC/ Drainage and Soling

U/C Khawaspur District Gujrat PP-112

(6/15)

4.000 3.477 -0.523 90%

7

Construction of PCC/ Drainage and Soling

U/C Miana Chak District Gujrat PP-112

(7/15)

2.000 1.822 -0.178 95%

8

Construction of PCC/ Drainage and Soling

U/C Theekriyan District Gujrat PP-112

(8/15)

1.500 1.487 -0.013 100%

9Construction of PCC/ Drainage and Soling

U/C Punjan District Gujrat PP-112 (9/15)2.000 1.847 -0.153 100%

10

Construction of PCC/ Drainage and Soling

U/C Gunjah District Gujrat PP-112 (10/15) 3.000 2.493 -0.507 85%

11

Construction of PCC/ Drainage and Soling

U/C Kotla Qasim Khan District Gujrat PP-

112 (11/15)

4.000 2.460 -1.540 65%

12

Construction of PCC/ Drainage and Soling

U/C Chakori Sher Ghazi District Gujrat PP-

112 (12/15)

1.500 1.474 -0.026 100%

13Construction of PCC/ Drainage and Soling

U/C Dewna District Gujrat PP-112 (13/15)1.000 0.716 -0.284 80%

14Construction of PCC/ Drainage and Soling

U/C Adowal District Gujrat PP-112 (14/15)2.000 0.796 -1.204 45%

15Construction of PCC/ Drainage and Soling

U/C Saroki District Gujrat PP-112 (15/15)1.000 0.926 -0.074 100%

30.000 811 14-Dec-12

Page 239

Page 240: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15 30.000 22.623 -7.377

Tanvir Ashraf Kaira dated 14.12.12

MPA, PP-112

1Construction of Nallah U/C-I, Lala Musa

District Gujrat PP-112(1/15) 1.500 1.428 -0.072 100%

2Construction of PCC/Drain/Soling U/C-2 Lala

Musa District Gujrat PP-112(2/15) 1.000 0.934 -0.066 100%

3Construction of PCC/Drain/Soling U/C-3

Lala Musa District Gujrat PP-112 (3/15)1.500 1.317 -0.183 95%

4Construction of PCC/Drain/Soling U/C-4

Lala Musa District Gujrat PP-112(4/15)1.000 0.944 -0.056 100%

5

Construction of PCC/Drain/Soling at village

Adowal District Gujrat PP-112(5/15) 1.500 1.288 -0.212 85%

6

Construction of PCC/Drain/Soling at village

Sabowal District Gujrat PP-112(6/15) 1.000 0.952 -0.048 100%

7

Construction of PCC/Drain/Soling at village

Dewana District Gujrat PP-112(7/15) 1.000 0.987 -0.013 100%

8

Construction of PCC/Drain/Soling at village

Chokri Qazi District Gujrat PP-112 (8/15) 1.000 0.828 -0.172 90%

9

Construction of PCC/Drain/Soling at village

Kotla Qasim District Gujrat PP-112 (9/15) 1.500 1.445 -0.055 100%

10

Construction of PCC/Drain/Soling at village

Ghanjay District Gujrat PP-112 (10/15) 2.000 -2.000 15%

11

Construction of PCC/Drain/Soling at village

Theekerian District Gujrat PP-112 (11/15) 1.500 1.210 -0.290 90%

12

Construction of PCC/Drain/Soling at village

Panjan District Gujrat PP-112(12/15) 1.500 1.376 -0.124 95%

20.000 980 14-Dec-12

Page 240

Page 241: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13

Construction of PCC/Drain/Soling at village

Maina Chak District Gujrat PP-112(13/15) 1.500 -1.500 14%

14

Construction of PCC/Drain/Soling at village

Khawas Pur District Gujrat PP-112(14/15) 1.500 -1.500 15%

15

Construction of PCC/Drain/Soling at village

Padar District Gujrat PP-112 (15/15) 1.000 -1.000 12%

15 20.000 12.709 -7.291

Tariq Mahmood Sahi dated 12.9.12

MPA, PP-116

1

Construction of PCC/Drain/ Soling, Culvert

and Boundary Wall Dhok Kasib District

Mandi Bahauddin PP-116

3.500 3.483 -0.017 100%

2

Rehabilitation/ Metalled Road and

PCC/Drain/ Soling, Culvert at village Nawan

Lok U/C Moujianwala District Mandi

Bahauddin PP-116

4.500 4.439 -0.061 100%

3

Construction of PCC/Drain/ Soling,Culvert at

village Mouz Dhok Saharan District Mandi

Bahauddin PP-116

3.000 2.974 -0.026 100%

4

Construction of PCC/Drain/ Soling,Culvert

at village Wasawa U/C Wala District Mandi

Bahauddin PP-116

4.500 4.461 -0.039 100%

5

Construction of PCC/Drain/ Soling,Culvert at

village Chak Basawa U/C Chak Basawa

District Mandi Bahauddin PP-116

3.000 2.937 -0.063 100%

6Construction of PCC/Drain at village Marala

District Mandi Bahauddin PP-1161.500 1.195 -0.305 85%

6 20.000 19.489 -0.511

20.000 12-Sep-12347

20.000 980 14-Dec-12

Page 241

Page 242: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Tariq Mahmood Sahi dated 14.12.12

MPA, PP-116

1Construction of Soling U/C Dhok Qasib

District Mandi Bahauddin PP-116(2/9)2.346 -7.654 80%

2

Construction of Soling /Drain and PCC U/C

Jalianwala District Mandi Bahauddin PP-

116(3/9)

2.504 2.504 90%

3

Construction of Soling /Drain/ PCC and

Culvert U/C Chak Basawa District Mandi

Bahauddin PP-116(6/9)

2.794 2.794 95%

4

Construction of Soling /Drain and Culvert

U/C Rasool District Mandi Bahauddin PP-

116(7/9)

4 10.000 7.644 -2.356

Asif Bashir Bhagat dated 14.12.12

MPA, PP-117

1Construction of PCC/Drain U/C Helian District

Mandi Bahauddin PP-117(6/10)3.000 2.770 -0.230 95%

2Construction of PCC/Drain U/C Phalia

District Mandi Bahauddin PP-117(7/10)3.000 2.516 -0.484 90%

3

Construction of PCC/Drain U/C Pindi Kalu

Dhogal District Mandi Bahauddin PP-

117(8/10)

3.000 2.747 -0.253 94%

4

Construction of Boundary Wall School ,

Kamonky and Soling U/C Chak Jano District

Mandi Bahauddin PP-17(10/10)

1.000 0.948 -0.052 100%

4 10.000 8.981 -1.019

CH: MOONIS ELAHI dated 31.8.12

MPA, PP-118

1

Construction of PCC/Drain/ Soling and

Rehablitation of Metalled Road in U/C Qadir

Abad PP-118 District Mandi Bahaudin (1/1)60.000 59.768 -0.232 100%

30.000 14-Dec-12811

250.000 31-Aug-12150

30.000 14-Dec-12811 10.000

Page 242

Page 243: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction/Improvement/Raising of

Metalled Road & Soling U/C Garh Qaim PP-

118 District Mandi Bahaudin (1/4)

50.000 47.343 -2.657 95%

3

Construction of PCC/Drain and Soling in U/C

Kot Hasht Khan PP-118 District Mandi

Bahaudin(2/4)

9.000 8.920 -0.080 100%

4

Construction of PCC/Drain and Soling in U/C

Bhoa Ahsan PP-118 District Mandi Bahaudin

(3/4)

20.000 19.777 -0.223 100%

5

Construction of PCC/Drain and Soling in U/C

Bheerowal PP-118 District Mandi

Bahaudin(4/4)

20.000 19.807 -0.193 100%

6

Construction of PCC/Drain and Soling in U/C

Bhekhoo PP-118 District Mandi Bahaudin

(1/8)

8.000 7.940 -0.060 100%

7

Construction of Nallah and Soling in U/C

Doughal PP-118 District Mandi Bahaudin

(2/8)

2.000 1.950 -0.050 100%

8

Construction of PCC/Drain and Soling in U/C

Dhunni PP-118 District Mandi Bahaudin (3/8) 10.000 8.798 -1.202 90%

9

Construction of PCC/Drain and Soling in U/C

Pindi Rawan PP-118 District

Mandi Bahaudin(4/8)

9.000 8.398 -0.602 95%

10

Construction of PCC/Drain and Soling in U/C

Saida Shareef PP-118 District Mandi

Bahaudin(5/8)

10.000 9.733 -0.267 100%

11

Construction of PCC/Drain and Soling in U/C

Hardo Rerka PP-118 District Mandi

Bahaudin(6/8)

19.000 18.709 -0.291 100%

12

Construction of PCC/Drain and Soling in U/C

Miana Gondal PP-118 District Mandi

Bahaudin (7/8)

18.000 17.740 -0.260 100%

13

Construction of PCC/Drain and Soling in U/C

Bar Moosa PP-118 District Mandi Bahaudin

(8/8)

15.000 14.804 -0.196 100%

13 250.000 243.687 -6.313

250.000 31-Aug-12150

Page 243

Page 244: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Major retd Zulfiqar Ali Gondal dated 27.9.12

MPA, PP-118

1Construction of Soling in UC Bhoa Ahsan

District M.B.Din PP-1184.500 -4.500

2Construction of Soling & Drain in UC

Bheerowal District M.B.Din PP-1184.000 -4.000

3Construction of Soling in UC Hardo Rerka,

District M.B.Din PP-1184.000 -4.000

4Construction of Soling in UC Miana Gondal,

District M.B.Din PP-1184.000 -4.000

5Construction of Soling in UC Bar Mossa,

District M.B.Din PP-1184.000 -4.000

6Construction of Soling in UC Garah, District

M.B.Din PP-1184.000 -4.000

7Construction of Soling in UC Kot Hast Khan,

District M.B.Din PP-1184.000 -4.000

8Construction of Soling in UC Pindi Ranwan,

District M.B.Din PP-1184.000 -4.000

9Construction of Soling in UC Sadia Sharif ,

District M.B.Din PP-1184.000 -4.000

10Construction of Soling in UC Qadirabad,

District M.B.Din PP-1184.000 -4.000

11Construction of Soling in UC Bhekhoo,

District M.B.Din PP-1184.000 -4.000

12Construction of Soling & Drain in UC Dogull,

District M.B.Din PP-1181.500 -1.500

13Construction of Soling in UC Dunni, District

M.B.Din PP-1184.000 -4.000

13 50.000 -50.000

Ch.Tahir Mahmood Hundli dated 27.9.12

MPA, PP-125

1

Construction of Street/Drain/Soling at Village

Hundal Tehsil & District Sialkot PP-

125(4/12)

2.000 1.953 -0.047 100%

50.000 27-Sep-12464

20.000 27-Sep-12448

Page 244

Page 245: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of Street/Drain/Soling at

Village Dohata Khu Tehsil & District

Sialkot PP-125 (5/12)

1.000 0.960 -0.040 100%

3

Construction of Street/Drain/Soling at Village

Nawan Pind Tehsil & District Sialkot PP-

125(6/12)

1.000 0.980 -0.020 100%

4

Construction of Street/Drain/Soling at

Village Akbr Abad Tehsil & District Sialkot

PP-125 7/12)

0.500 0.489 -0.011 100%

5

Construction of Street/Drain/Soling at

Village Dhebola Masjid Wali Gali Tehsil &

District Sialkot PP-125 (8/12)

0.500 0.490 -0.010 100%

6

Construction of PCC in / Street/Drain/Soling

at Village Paki Kotli (Pangoron Wali Gali)

Tehsil & District Sialkot PP-125 (9/12)0.800 0.783 -0.017 100%

7

Construction of Street/Drain/Soling at Village

Harrar (Dera Sain Rehmat) Tehsil & District

Sialkot PP-125 (10/12)

0.500 0.489 -0.011 100%

8

Construction of Street/Drain/Soling at Village

Ray Pur Tehsil & District Sialkot PP-125

(11/12)

0.500 0.490 -0.010 100%

9

Construction of Street/Drain/Soling at

Village Sydan Wali Tehsil & District Sialkot

PP-125 (12/12)

0.500 0.490 -0.010 100%

10

Construction of Nallah /PCC Gala Arsa

Factory Tehsil & District Sialkot (PP-125)

(1/10)

2.500 2.487 -0.013 100%

11

Construction of Soling/PCC/Drain at Village

Hundal Tehsil & District Sialkot (PP-125)

(2/10)

1.000 0.985 -0.015 100%

12

Construction of Soling/PCC/Drain at Village

Iqbal Nagar Tehsil & District Sialkot (PP-

125) (4/10)

0.500 0.490 -0.010 100%

13

Construction of PCC Road from Kotli

Hernain to choni Salahrian Tehsil & District

Sialkot (PP-125) (5/10)

3.778 3.746 -0.032 100%

20.000 27-Sep-12448

Page 245

Page 246: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14

Construction of Soling/PCC/Drain at Village

Bhago Wal Tehsil & District Sialkot (PP-

125) (6/10)

1.500 1.470 -0.030 100%

15

Construction of Soling/PCC/Drain at Village

Khoga Tehsil & District Sialkot (PP-125)

(7/10)

0.500 0.489 -0.011 100%

16

Construction of Soling/PCC/Drain at Village

Loharan Chak Tehsil & District Sialkot (PP-

125) (8/10)

0.500 0.486 -0.014 100%

17

Construction of Boundry Wall Christian

Graveyard at Jajay Ram Tehsil & District

Sialkot (PP-125) (9/11)

0.500 0.490 -0.010 100%

18

Construction of Soling/PCC/Drain at Village

Wadian Wala Tehsil & District Sialkot (PP-

125) (10/10)

0.500 0.490 -0.010 100%

19

Construction of Boundry Wall Christian

Graveyard at Sadhar Wali Tehsil & District

Sialkot (PP-125) (10/10)

0.500 0.490 -0.010 100%

20

Construction of Filtration Plant at Village

Nawan Pind (No.3) Tehsil & District Sialkot

(PP-125) (1/1)

0.922 0.648 -0.274 70%

20 20.000 19.395 -0.605

Ch.Tahir Mahmood Hundli dated 14.12.12

MPA, PP-125

1

Construction of Soling/PCC/Drain at village

Chowani Sulehrian Tehsil & District Sialkot

(PP-125) (9/48)

1.000 0.598 -0.402 60%

2

Construction of Soling/PCC/Drain at village

Sattowali Tehsil & District Sialkot (PP-125)

(11 /48)

1.000 -1.000

3

Construction of Soling/PCC/Drain at village

Umranwwali Tehsil & District Sialkot (PP-125)

(13 /48)

1.000 -1.000

4

Construction of Soling/PCC/Drain at village

Koat Mundanwala Tehsil & District Sialkot

(PP-125) ( 14 /48)

0.500 0.490 -0.010 100%

30.000 14-Dec-12811

20.000 27-Sep-12448

Page 246

Page 247: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Construction of Soling/PCC/Drain at village

Dhudianwali Tehsil & District Sialkot (PP-

125) (15 /48)

1.000 -1.000

6

Construction of Soling/PCC/Drain at village

Mana Tehsil & District Sialkot (PP-125) (

21/48)

0.500 0.479 -0.021 100%

7

Construction of Soling/PCC/Drain at village

Kairwali Tehsil & District Sialkot (PP-125) (

22/48)

0.500 -0.500

8

Construction of Soling/PCC/Drain at village

Mandanwala Tehsil & District Sialkot (PP-

125) (28 /48)

0.500 0.488 -0.012 100%

9

Construction of Soling/PCC/Drain at village

Rajwan Tehsil & District Sialkot (PP-125) (

30 /48)

0.500 -0.500

10

Construction of Soling/PCC/Drain at village

Badi Pur Tehsil & District Sialkot (PP-125) (

35 /48)

0.500 0.288 -0.212

58%

11

Construction of Soling/PCC/Drain at village

Lalokay Tehsil & District Sialkot (PP-125) (39

/48)

0.500 0.490 -0.010 100%

12

Construction of Soling/PCC/Drain at village

Bhatay Kalan Tehsil & District Sialkot (PP-

125) ( 43 /48)

0.500 0.406 -0.094

81%

13

Construction of Soling/PCC/Drain at village

Raja Harpal Tehsil & District Sialkot (PP-125)

(44 /48)

0.500 0.315 -0.185

63%

14

Construction of Soling/PCC/Drain at village

Rasol Pur Bahlian Tehsil & District Sialkot

(PP-125) ( 46 /48)

0.500 -0.500

15

Construction of Soling/PCC/Drain at village

Moma Kala Tehsil & District Sialkot (PP-125)

( 47 /48)

1.000 0.799 -0.201

80%

15 10.000 4.353 -5.647

30.000 14-Dec-12811

Page 247

Page 248: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Dr.Tanveer Islam Rana dated 11.9.12

MPA, PP-126

1

Construction of Street Drains and Soling in

village Badiana (Dhagarawali)Tehsil Pasrur

District Sialkot. PP-126

0.800 0.733 -0.067 100%

2

Construction of Street Drains and Soling in

village Coal pur MaigaTehsil Pasrur District

Sialkot. PP-126

0.600 0.564 -0.036 100%

3

Construction of Street Drains and Soling in

village Sangat pur Purab Tehsil Pasrur

District Sialkot. PP-126

0.800 0.782 -0.018 100%

4

Construction of Street Drains and Soling in

village Kot Dana Tehsil Pasrur District

Sialkot. PP-126

0.400 0.392 -0.008 100%

5

Construction of Street Drains and Soling in

village Varsalke Tehsil Pasrur District Sialkot.

PP-126

0.400 0.391 -0.009 100%

6

Construction of Street Drains and Soling in

village Dhumanwali , Saidewali Tehsil Pasrur

District Sialkot. PP-126

0.600 0.575 -0.025 100%

7

Construction of Street Drains and PCC in

village Ghadgor Tehsil Pasrur District Sialkot.

PP-126

0.800 0.525 -0.275 66%

8

Construction of Street Drains and Soling in

village Pindi Bhago Tehsil Pasrur District

Sialkot. PP-126

0.500 0.404 -0.096 81%

9

Construction of Street Drains and Soling in

village Darian pur Tehsil Pasrur District

Sialkot. PP-126

0.300 0.294 -0.006 100%

10

Construction of Street Drains and Soling in

village Chak Khokha Tehsil Pasrur District

Sialkot. PP-126

0.300 0.294 -0.006 100%

11

Construction of Street Drains and PCC in

village Nar singh Tehsil Pasrur District

Sialkot. PP-126

0.500 0.489 -0.011 100%

20.000 11-Sep-12383

Page 248

Page 249: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Construction of Street Drains and Soling in

village Chak Arian Tehsil Pasrur District

Sialkot. PP-126

0.300 -0.300

13

Construction of Street Drains and Soling in

village Harnawali Tehsil Pasrur District

Sialkot. PP-126

0.500 0.477 -0.023 100%

14

Construction of Street Drains and Soling in

village Ganglal Tehsil Pasrur District Sialkot.

PP-126

0.400 0.390 -0.010 100%

15

Construction of Street Drains and PCC in

village Salian khokhar chaianTehsil Pasrur

District Sialkot. PP-126

0.500 0.488 -0.012 100%

16

Construction of Street Drains and Soling in

village Malane , Khanor , Mahal kotli Tehsil

Pasrur District Sialkot. PP-126

0.500 0.490 -0.010 100%

17

Construction of Street Drains and PCC in

village Sarobe Tehsil Pasrur District Sialkot.

PP-126

0.500 0.486 -0.014 100%

18

Construction of Street Drains and Soling in

village Balar wali , Wado wali Tehsil Pasrur

District Sialkot. PP-126

0.600 0.582 -0.018 100%

19

Construction of Street Drains and Soling in

village Angan Tehsil Pasrur District Sialkot.

PP-126

0.300 0.293 -0.007 100%

20

Construction of Street Drains and Soling in

village Peroshahi Tehsil Pasrur District

Sialkot. PP-126

0.300 0.293 -0.007 100%

21

Construction of Street Drains and Soling in

village Kaloay Tehsil Pasrur District Sialkot.

PP-126

0.400 0.392 -0.008 100%

22

Construction of Street Drains and Soling in

village Salo wali Papain Tehsil Pasrur District

Sialkot. PP-126

0.500 0.407 -0.093 81%

23

Construction of Street Drains and Soling in

village Dhamala Tehsil Pasrur District Sialkot.

PP-126

0.300 0.293 -0.007 100%

24

Construction of Street Drains and Soling in

village Markal Tehsil Pasrur District Sialkot.

PP-126

0.500 0.488 -0.012 100%

20.000 11-Sep-12383

Page 249

Page 250: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

25

Construction of Street Drains and Soling in

village Nakhnal Sojan Tehsil Pasrur District

Sialkot. PP-126

0.600 0.562 -0.038 100%

26

Construction of Street Drains and Soling in

village Bhartaal Tehsil Pasrur District Sialkot.

PP-126

0.400 0.391 -0.009 100%

27

Construction of Street Drains and Soling in

village Chak Agha Raam , Lale Chak Tehsil

Pasrur District Sialkot. PP-126

0.500 0.490 -0.010 100%

28Construction of Soling in village Laso Chak

Tehsil Pasrur District Sialkot. PP-1260.800 0.770 -0.030 100%

29

Construction of Street Drains and Soling in

village Kothay Jumian Tehsil Pasrur District

Sialkot. PP-126

0.300 0.294 -0.006 100%

30Construction of Soling in village Busra Tehsil

Pasrur District Sialkot. PP-1260.800 0.784 -0.016 100%

31

Construction of Street Drains and Soling in

villages Bulowali , Adwawali Tehsil Pasrur

District Sialkot. PP-126

0.600 0.509 -0.091 85%

32

Construction of Street Drains and Soling in

villages Kot Izat , Khanawali Tehsil Pasrur

District Sialkot. PP-126

0.500 0.486 -0.014 100%

33

Construction of Street Drains and Soling in

village JhandraTehsil Pasrur District Sialkot.

PP-126

0.300 0.280 -0.020 100%

34

Construction of Street Drains and Soling in

village Jassora Tehsil Pasrur District Sialkot.

PP-126

0.500 0.490 -0.010 100%

35

Construction of Street Drains and Soling in

villages Soudreki , Bhagarian Tehsil Pasrur

District Sialkot. PP-126

0.600 0.538 -0.062 90%

36

Construction of Street Drains and Soling in

villages Wajeedwali , Janewali Tehsil Pasrur

District Sialkot. PP-126

0.400 0.391 -0.009 100%

37

Construction of Street Drains and Soling in

villages Sange Chak , Salowali Tehsil Pasrur

District Sialkot. PP-126

0.600 0.580 -0.020 100%

20.000 11-Sep-12383

Page 250

Page 251: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

38

Construction of Street Drains and Soling in

village Ucha Hurd Pagyal Tehsil Pasrur

District Sialkot. PP-126

0.600 0.588 -0.012 100%

39

Construction of Street Drains and Soling in

village Masyal , Najo chak Tehsil Pasrur

District Sialkot. PP-126

0.600 0.586 -0.014 100%

40

Construction of Street Drains and Soling in

village Shah Pur Tehsil Pasrur District

Sialkot. PP-126

0.300 0.292 -0.008 100%

40 20.000 18.553 -1.447

Dr.Tanveer Islam Rana dated 14.12.12

MPA, PP-126

1

Construction of Soling /Drains and PCC in

village Sohal, Nawadkay District Sialkot PP-

126 ( 3 /54)

0.600 -0.600

2

Construction of Soling /Drains and PCC in

village Hadyana District Sialkot PP-126 ( 4

/54)

0.500 -0.500

3

Construction of Soling /Drains and PCC in

village Nakhnal District Sialkot PP-126 (

6/54)

0.300 -0.300

4

Construction of Soling /Drains and PCC in

village Julsi Pur, Barthal District Sialkot PP-

126 ( 67/54)

0.400 -0.400

5

Construction of Soling /Drains and PCC in

village Bhagyari District Sialkot PP-126 (

9/54)

0.500 -0.500

6

Construction of Soling /Drains and PCC in

village Munday Ki Berian District Sialkot PP-

126 ( 15 /54)

0.400 -0.400

7

Construction of Soling /Drains and PCC in

village Pelo Ki, Fatah Pur District Sialkot

PP-126 ( 17 /54)

0.400 -0.400

8

Construction of Soling /Drains and PCC in

village Bozi to Dhonay District Sialkot PP-

126 ( 19 /54)

0.500 -0.500

30.000 14-Dec-12811

20.000 11-Sep-12383

Page 251

Page 252: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Construction of Soling /Drains and PCC in

village Saedy Wali District Sialkot PP-126 (

20 /54)

0.300 -0.300

10

Construction of Soling /Drains and PCC in

village Jahar Salhrian District Sialkot PP-

126 (23 /54)

0.500 -0.500

11

Construction of Soling /Drains and PCC in

village Siyal Jattan District Sialkot PP-126 (

24/54)

0.400 -0.400

12

Construction of Soling /Drains and PCC in

village Rurki Bajwa District Sialkot PP-126 (

25 /54)

0.400 -0.400

13

Construction of Soling /Drains and PCC in

village Phalora, Kali Wali District Sialkot

PP-126 ( 28/54)

0.500 -0.500

14

Construction of Soling /Drains and PCC in

village Maraj Kay District Sialkot PP-126 (

30/54)

0.400 -0.400

15

Construction of Soling /Drains and PCC in

village Jahar Malya District Sialkot PP-126 (

34 /54)

0.400 -0.400

16

Construction of Soling /Drains and PCC in

village Anola, Seam District Sialkot PP-126

( 37 /54)

0.400 -0.400

17

Construction of Soling /Drains and PCC in

village Bajara Garhi District Sialkot PP-126 (

38 /54)

0.800 -0.800

18

Construction of Soling /Drains and PCC in

village Memo Wali, Deo Wal District Sialkot

PP-126 ( 39/54)

0.400 -0.400

19

Construction of Soling /Drains and PCC in

village Allar District Sialkot PP-126 (

41/54)

0.300 -0.300

20

Construction of Soling /Drains and PCC in

village Khana Wali District Sialkot PP-126 (

42 /54)

0.300 -0.300

21

Construction of Soling /Drains and PCC in

village Kotli Jandhran Shamali, Janubi

District Sialkot PP-126 ( 43 /54)

0.500 -0.500

30.000 14-Dec-12811

Page 252

Page 253: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

22

Construction of Soling /Drains and PCC in

village Rasool Pur, Kot Izat District Sialkot

PP-126 ( 44/54)

0.400 -0.400

23

Construction of Soling /Drains and PCC in

village Lalyal District Sialkot PP-126 (

51/54)

0.400 -0.400

23 10.000 -10.000

Muhammad Rizwan dated 27.8.12

MPA, PP-128

1

Construction of PCC/Soling/Drain at villages

Qila Kalarwala, Sodagar Pur, New Manga

District Sialkot PP-128

2.000 1.953 -0.047 100%

2

Construction of PCC/Soling/Drain at villages

,Ghakhar Wali, Bhoraykey, Fattehwali,

District Sialkot PP-128

2.000 1.955 -0.045 100%

3

Construction of PCC/Soling/Drain at villages

Data Zaidka (Boundary Wall) District Sialkot

PP-128

1.000 0.980 -0.020 100%

4

Construction of PCC/Soling/Drain at villages

Pajoke , New/Old Sohawa ,Sian,

Fakeeranwali,Gharar Baryar ,Kalokay Thatha

,Maliky, Sark Pur District Sialkot PP-128

2.500 2.371 -0.129 100%

5

Construction of PCC/Soling/Drain at villages

Uddo Fateh, Basoo Panu, Kharay, Sahangill ,

Mehmond wali, Loharanwali, Uddo kay ,

Ratta Jhatol District Sialkot PP-128

2.500 2.396 -0.104 100%

6

Construction of PCC/Soling/Drain at villages

Makhan Pur , Dhariwal, Ucha Pharan,

Dhoda, Aidal Pur , Dolowali, Whagay,

Majhiwali District Sialkot PP-128

3.000 2.885 -0.115 100%

30.000 14-Dec-12811

50.000 27-Aug-12105

Page 253

Page 254: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Construction of PCC/Soling/Drain at villages

Shah Hussain, Thatha Bawa, Sarkari, Chak

Ramdas, Kot Kalan, Dera Rana Nasir,

Bharoke, Noukerian District Sialkot PP-128

3.000 2.956 -0.044 100%

8

Construction of PCC/Soling/Drain at villages

Dheedowali , Tayyab Bhutta, Mehdi Pur,

Kakay Jadah, Khewa Bajwa District Sialkot

PP-128

2.000 1.860 -0.140 93%

9

Construction of PCC/Soling/Drain at villages

Soukan Wind, Rajadaywali, Uncha Jaja, Lala

Syeda District Sialkot PP-128

3.000 2.983 -0.017 100%

10

Construction of PCC/Soling/Drain at villages

Chohar Munda, Jeowali, Lody Jaja , Hussa

Jaja District Sialkot PP-128

2.000 1.873 -0.127 94%

11

Construction of PCC/Soling/Drain at villages

Satrah, Ratta Bajwa , Dhandal, Khandowali,

Kotli Mughlani , District Sialkot PP-1287.500 7.274 -0.226 97%

12

Construction of PCC/Soling/Drain at villages

Mianwali Bunglow, Langianwali,Veerwala ,

Malhowali, Huchar District Sialkot PP-1282.500 2.363 -0.137 95%

13

Construction of PCC/Soling/Drain at villages

Wadalah Sundhian , Ismailkay, Pahari Pur ,

Kotli Noshehra , Jhang, Chakri District

Sialkot PP-128

3.000 2.795 -0.205 93%

14

Construction of PCC/Soling/Drain at villages

Tarseekh, Sian, Dheerkay, Bhikhi Sundhian,

Chak Saday District Sialkot PP-1282.000 1.888 -0.112 94%

15

Construction of PCC/Soling/Drain at villages

Kotli Mattwan, Noor Pur Jattan,Noor Pur

Meuian , Marhanah, Gopi Pur, Nawan Pind,

Maji Pur , District Sialkot PP-128

2.500 2.367 -0.133 100%

16

Construction of PCC/Soling/Drain at villages

Bennah , Kotli Nargat , Dharam Kot, Golian

District Sialkot PP-128

1.000 0.969 -0.031 100%

50.000 27-Aug-12105

Page 254

Page 255: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17

Construction of RCC Retaining wall

/Approach Road at village Kakepun District

Sialkot PP-128

2.000 1.644 -0.356 82%

18

Construction of PCC/Soling/Drain at villages

Korayke , Jhulki, Padali, Kareenwali,

Gagarwali District Sialkot PP-1281.500 1.448 -0.052 100%

19

Construction of PCC/Soling/Drain at villages

Uggo Chak, Raokay, Chhangi , Chhanga,

Meerak Pur, Kotli Baba Heeraa District

Sialkot PP-128

2.600 2.541 -0.059 100%

20

Construction of PCC/Soling/Drain at villages

Kotli Shams , Kotli Gul Muhammad,

Loharanwali , Bhagat Pur, Kot Mokhal

District Sialkot PP-128

2.400 2.304 -0.096 100%

20 50.000 47.805 -2.195

CH.MUHAMMAD SALEEM BARYAR dated 06.09.12

MPA, PP-129

1Construction of Street / Drains at Kotli

Marlan U/C Ghuinke District Sialkot .1.000 0.923 -0.077 92%

2Construction of Street / Drains at Ismail

Awan U/C Ghuinke District Sialkot .0.500 0.469 -0.031 100%

3Construction of Street / Drains at Talwara

U/C Ghuinke District Sialkot .0.700 0.687 -0.013 100%

4Constructon of Street / Drains at Baqar Pur

U/C Aalo Mahar District Sialkot . .1.000 0.977 -0.023 100%

5

Construction of Street / Drains at Bhallo Wali

East U/C Peero chak District Sialkot.. 1.500 1.443 -0.057 100%

6Construction of Street / Drains at Lakra

Kalan U/C Peero chak District Sialkot.0.700 0.688 -0.012 100%

7

Construction of Street / Drains at village

Bhallo walli West U/C Peero Chak District

Sialkot ..

1.500 1.468 -0.032 100%

30.000 06-Sep-12237

50.000 27-Aug-12105

Page 255

Page 256: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Construction of Street / Drains at Simble Pur

U/C Peero chak District Sialkot.0.500 0.490 -0.010 100%

9Construction of Street / Drains at Lakra

Khurd U/C Peero chak District Sialkot.0.700 0.687 -0.013 100%

10Construction of Street / Drains Bhobhangi

U/C Peero chak District Sialkot.1.000 0.646 -0.354 65%

11Construction of Street / Drains Changan Wali

U/C Peero chak District Sialkot.0.500 0.490 -0.010 100%

12Construction of Street / Drains at Peero

Chak U/C Peero chak District Sialkot.0.600 0.582 -0.018 100%

13

Construction of Street / Drains at Gopi Pur

& Nawan Pind U/C Sehjo kala District

Sialkot.

0.500 0.490 -0.010 100%

14

Construction of Street / Drains at Kotli Lundi

& Kotli Jandu U/C Sehjo kala District

Sialkot.

0.500 0.490 -0.010 100%

15Construction of Street / Drains at Duburji

Wirkan U/C Sehjo kala District Sialkot.1.000 0.951 -0.049 100%

16Construction of Street / Drains at Adam

Daraz U/C Sehjo kala District Sialkot.0.500 0.490 -0.010 100%

17Construction of Street / Drains at Kotli

Kakian U/C Aalo Mahar District Sialkot.0.800 0.757 -0.043 95%

18

Construction of Street / Drains at Sal Adah

Motra U/C Aalo Mahar District Sialkot. 1.000 0.900 -0.100 100%

19Construction of Street / Drains at Sonehra

Goraya U/C Aalo Mahar District Sialkot.0.500 0.489 -0.011 100%

20Construction of Street / Drains at Gid Pur

Adah U/C Aalo Mahar District Sialkot.0.500 0.490 -0.010 100%

21Construction of Street / Drains at Moutra

U/C Aalo Mahar District Sialkot.0.500 0.483 -0.017 100%

22

Construction of Street / Drains at Kotla

Sukhia & Maitlay U/C Boghray District

Sialkot.

0.500 0.490 -0.010 100%

23Construction of Street / Drains at Rachara

U/C Boghray District Sialkot.1.000 0.904 -0.096 90%

24Construction of Street / Drains at Trigri U/C

Boghray District Sialkot.0.700 0.687 -0.013 100%

30.000 06-Sep-12237

Page 256

Page 257: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

25Construction of Street / Drains at Kotli

Bhago U/C Ghuinke District Sialkot.1.000 0.976 -0.024 100%

26Construction of Street / Drains at Gujer

Kullah U/C Ghuinke District Sialkot.1.000 0.801 -0.199 80%

27Construction of Street / Drains at Ghuinke

U/C Ghuinke District Sialkot.1.000 0.973 -0.027 100%

28Construction of Street / Drains at Sabke &

Kour Pur U/C Kharolian District Sialkot.1.000 0.907 -0.093 100%

29Construction of Street / Drains at Ralio ke

U/C Kharolian District Sialkot.0.500 0.490 -0.010 100%

30

Construction of Street / Drains at Kharolian

& Fazal Abad U/C Kharolian District Sialkot. 1.000 0.980 -0.020 100%

31Construction of Street / Drains at Rajo ke

U/C Kanwan Lit District Sialkot.1.500 1.025 -0.475 68%

32Construction of Street / Drains at Dheedo

wali U/C Kanwan Lit District Sialkot.0.500 0.490 -0.010 100%

33

Construction of Street / Drains at Bhopal

wala & Khenian Chak U/C Bhopal Wala

District Sialkot.

1.000 0.978 -0.022 100%

34

Construction of Street /Drain at Muhammad

Pura U/C Ghuinkey Tehsil & District

Sialkot.

0.800 0.784 -0.016 100%

35Construction of Culvert at Village Artala

Sharif Tehsil & District Sialkot.1.000 0.972 -0.028 100%

36Construction of Street /Drain at Village Alo

Mahar Tehsil & District Sialkot.0.500 0.490 -0.010 100%

37Construction of Street /Drain at Sna-ullah

Street Daska District Sialkot.1.000 0.940 -0.060 94%

37 30.000 27.977 -2.023

Ch.Azeem Noori Ghuman dated 1.11.12

EX-MPA(Notable)

1Construction of PCC/Drain at Sambrial City

District Sialkot PP-131(1/16)20.000 -20.000

30.000 06-Sep-12237

40.000 01-Nov-12678

Page 257

Page 258: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of Class Room Government

Primary School and PCC at village Kung ,

Cheeloky Tehsil Sambrkial District Sialkot

PP-131(2/16)

3

Construction of PCC/Drain at Village

Randheer More Tehil Sambrial District

Sialkot PP-131(3/16)

4

Construction of Metalled Road at Village

Malkhanwala towards Air Port Tehil Sambrial

District Sialkot PP-131(4/16)

5

Construction of PCC/Drain at Village

Malkhanwala Tehil Sambrial District Sialkot

PP-131(5/16)

6

Construction of PCC/Drain at Village Wan

Tehil Sambrial District Sialkot PP-131(6/16)

7

Construction of PCC/Drain at village

Hadokay Tehsil Sambrial District Sialkot PP-

131(7/16)

8

Construction of PCC/Drain at Village

Amreek Pur Tehil Sambrial District Sialkot

PP-131(8/16)

9

Construction of PCC/Drain at Village Kot

Dharan Tehil Sambrial District Sialkot PP-

131(9/16)

10

Construction of PCC/Drain at Village Dhilam

Balagan Tehil Sambrial District Sialkot PP-

131(10/16)

11

Construction of PCC/Drain at Village Kot

Baland Tehil Sambrial District Sialkot PP-

131(11/16)

12

Construction of PCC/Drain Murgi Khana to

Main Road Adam Kay District Sialkot PP-

131(12/16)

13

Construction of PCC/Drain at village

Fardious Pura Banglow Tehsil Sambrial

District Sialkot PP-131(13/16)

14Construction of PCC/Drain at village

Sahowala District Sialkot PP-131(14/16)

40.000 01-Nov-12678

Page 258

Page 259: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Construction of PCC/Drain at Village Balgan

Tehil Sambrial District Sialkot PP-131(15/16)

16

Construction of PCC/Drain/Nallah at

Sambrial City District Sialkot PP-131(16/16)

16 20.000 -20.000

Lt.Col® Muhammad Abbas dated 27.8.12

MPA, PP-134

1

Construction of Street/Drains and Nallah at

village Goe Chak Kothay U/C Bheri Tehsil

Shakargarh District Narowal ,PP-134.(1/50)0.500 0.490 -0.010 100%

2

Construction of Street/Drains and Nallah at

village Lalian U/C Bheri Tehsil Shakargarh

District Narowal, PP-134 .(2/50)0.500 0.492 -0.008 100%

3

Construction of Street/Drains and Nallah at

village Peer Kandiala & Katheel U/C Bheri

Tehsil Shakargarh District Narowal ,PP-134

.(3/50)

0.500 0.490 -0.010 100%

4

Construction of Street/Drain and Nallah at

village Buday Langah and other Langahs

U/C Langah Tehsil Shakargarh District

Narowal ,PP-134 .(4/50)

0.500 0.490 -0.010 100%

5

Construction of Street/Drain and Nallah at

village Panwah to Sundarpur U/C Kalla

Tehsil Shakargarh District Narowal ,PP-134

.(5/50)

0.500 0.486 -0.014 100%

6

Construction of Street/Drain and Nallah at

village Dohday U/C Langah Tehsil

Shakargarh District Narowal ,PP-134.(6/50)

0.500 0.491 -0.009 100%

7

Construction of Street/Drain and Nallah at

village Lal Chandpur U/C Bua Tehsil

Shakargarh District Narowal ,PP-134.(7/50)

0.500 0.489 -0.011 100%

50.000 27-Aug-12103

40.000 01-Nov-12678

Page 259

Page 260: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Construction of Street/Drain and Nallah at

village Bera Gujran & Nanowal U/C Bara

Manga Tehsil Shakargarh District Narowal

,PP-134.(8/50)

0.500 0.456 -0.044 90%

9

Construction of Street/Drain and Nallah at

village Dhariwal U/C Kot Naina Tehsil

Shakargarh District Narowal ,PP-134.(9/50)

0.500 0.488 -0.012 100%

10

Construction of Street/Drain and Nallah at

village Manpur U/C Gorala Tehsil

Shakargarh District Narowal ,PP-134.(10/50)0.500 0.490 -0.010 100%

11

Construction of Street/Drain and Nallah at

village Chak kalay Khan U/C Phagwari

Tehsil Shakargarh District Narowal ,PP-

134.(11/50)

0.500 0.476 -0.024 95%

12

Construction of Street/Drain and Nallah at

village Mundi Khail U/C Langah Tehsil

Shakargarh District Narowal ,PP-134.(12/50)0.500 0.489 -0.011 100%

13

Construction of Street/Drain and Nallah at

village Kotli U/C Mallah Tehsil Shakargarh

District Narowal ,PP-134.(13/50)0.500 0.489 -0.011 100%

14

Construction of Street/Drain and Nallah at

village Aulakh U/C Mallah Tehsil

Shakargarh District Narowal ,PP-134.(14/50)0.500 0.490 -0.010 100%

15

Construction of Street/Drain and Nallah at

village Akikay U/C Ghona Tehsil

Shakargarh District Narowal ,PP-134.(15/50)0.500 0.490 -0.010 100%

16

Construction of Street/Drain and Nallah at

village Nadalah Sulehrian U/C Mallah

Tehsil Shakargarh District Narowal ,PP-

134.(16/50)

0.500 0.483 -0.017 100%

17

Construction of Street/Drain and Nallah at

village Nogazah U/C Walipur Bora Tehsil

Shakargarh District Narowal ,PP-134.(17/50)0.500 0.491 -0.009 100%

50.000 27-Aug-12103

Page 260

Page 261: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18

Construction of Street/Drain and Nallah at

village Patarol U/C Phagwari Tehsil

Shakargarh District Narowal ,PP-134.(18/50)0.500 0.490 -0.010 100%

19

Construction of Street/Drain and Nallah at

village Kotli Syedan U/C Maingri Tehsil

Shakargarh District Narowal ,PP-134.(19/50)0.500 0.490 -0.010 100%

20

Construction of Street/Drain and Nallah at

village Khan Monaka U/C Kot Naina

Tehsil Shakargarh District Narowal ,PP-

134.(20/50)

0.500 0.487 -0.013 100%

21

Construction of Street/Drain and Nallah at

village Jagial U/C Walipur Bora Tehsil

Shakargarh District Narowal ,PP-134.(21/50)0.500 0.490 -0.010 100%

22

Construction of Street/Drain and Nallah at

village Baharwal U/C Akhlaspur Tehsil

Shakargarh District Narowal ,PP-134(.(22/50)0.500 0.490 -0.010 100%

23

Construction of Street/Drain and Nallah at

village Mansoora & Kotli Syedan U/C

Maingri Tehsil Shakargarh District Narowal

,PP-134.(23/50)

0.500 0.490 -0.010 100%

24

Construction of Street/Drain and Nallah at

village Pindi Gulshan U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134.(24/50)0.500 0.479 -0.021 100%

25

Construction of Street/Drain and Nallah at

village Sabirpur & Malusalu U/C Bua Tehsil

Shakargarh District Narowal ,PP-134.(25/50)0.500 0.490 -0.010 100%

26

Construction of Street/Drain and Nallah at

village Bahlolpur U/C Akhlaspur Tehsil

Shakargarh District Narowal ,PP-134.(26/50)0.500 0.492 -0.008 100%

50.000 27-Aug-12103

Page 261

Page 262: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

27

Construction of Street/Drain and Nallah at

village Thekrian Gujran U/C Mallah Tehsil

Shakargarh District Narowal ,PP-134.(27/50)0.500 0.403 -0.097 81%

28

Construction of Street/Drain and Nallah at

village Akhlaspur U/C Akhlaspur Tehsil

Shakargarh District Narowal ,PP-134.(28/50)0.500 0.490 -0.010 100%

29

Construction of Street/Drain and Nallah at

village Bhagwanpur U/C Kot Naina

Tehsil Shakargarh District Narowal ,PP-

134.(29/50)

0.500 0.476 -0.024 100%

30

Construction of Street/Drain and Nallah at

village Tajowal U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134.(30/50)0.500 0.490 -0.010 100%

31

Construction of Street/Drain and Nallah at

village Babral U/C Mallah Tehsil

Shakargarh District Narowal ,PP-134.(31/50)0.500 0.490 -0.010 100%

32

Construction of Street/Drain and Nallah at

village Khanpur Colony U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134.(32/50)0.500 0.495 -0.005 100%

33

Construction of Street/Drain and Nallah at

village Khudaipur U/C Ghona Tehsil

Shakargarh District Narowal ,PP-134.(33/50)0.500 0.490 -0.010 100%

34

Construction of Street/Drain and Nallah at

village Ghona U/C Ghona Tehsil

Shakargarh District Narowal ,PP-134.(34/50)0.500 0.490 -0.010 100%

35

Construction of Street/Drain and Nallah at

village Fatuwal U/C Mallah Tehsil

Shakargarh District Narowal ,PP-134.(35/50)0.500 0.411 -0.089 82%

50.000 27-Aug-12103

Page 262

Page 263: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

36

Construction of Street/Drain and Nallah at

village Beejlipur U/C Bua Tehsil

Shakargarh District Narowal ,PP-134.(36/50)0.500 0.488 -0.012 100%

37

Construction of Street/Drain and Nallah at

village Pagala Purana Sofi Aslam street

U/C Kallah Tehsil Shakargarh District

Narowal ,PP-134.(37/50)

0.500 0.490 -0.010 100%

38

Construction of Street/Drain and Nallah at

village Manzoorpura Plot U/C Gorala

Tehsil Shakargarh District Narowal ,PP-

134.(38/50)

0.500 0.490 -0.010 100%

39

Construction of Street/Drain and Nallah at

village Pindi Kalan U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134.(39/50)0.500 0.490 -0.010 100%

40

Construction of Street/Drain and Nallah at

village Raniwal U/C Gorala Tehsil

Shakargarh District Narowal ,PP-134.(40/50)0.500 0.490 -0.010 100%

41

Construction of Street/Drain and Nallah at

village Basao kot U/C Walipur Bora

Tehsil Shakargarh District Narowal ,PP-

134.(41/50)

0.500 0.489 -0.011 100%

42

Construction of Street/Drain and Nallah at

village Haryal U/C Bara Manga Tehsil

Shakargarh District Narowal ,PP-134.(42/50)0.500 0.490 -0.010 100%

43

Construction of Street/Drain and Nallah at

village Niki Jattan U/C Kot Naina Tehsil

Shakargarh District Narowal ,PP-134.(43/50)0.500 0.490 -0.010 100%

44

Construction of Street/Drain and Nallah at

village Yousafpur U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134.(44/50)0.500 0.490 -0.010 100%

50.000 27-Aug-12103

Page 263

Page 264: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

45

Construction of Street/Drain and Nallah at

village Rangarah Karamat Street U/C

Kallah Tehsil Shakargarh District Narowal

,PP-134.(45/50)

0.500 0.485 -0.015 100%

46

Construction of Street/Drain and Nallah at

village Phabarha Jattan U/C Mallah

Tehsil Shakargarh District Narowal ,PP-

134.(46/50)

0.500 0.485 -0.015 100%

47

Construction of Street/Drain and Nallah at

village Baroti U/C Maingri Tehsil

Shakargarh District Narowal ,PP-134.(47/50)0.500 0.490 -0.010 100%

48

Construction of Street/Drain and Nallah at

village Shagharib U/C Ghona Tehsil

Shakargarh District Narowal ,PP-134.(48/50)0.500 0.490 -0.010 100%

49

Construction of Street/Drain and Nallah at

village Samran U/C Mallah Tehsil

Shakargarh District Narowal ,PP-134.(49/50)0.500 0.490 -0.010 100%

50

Construction of Street/Drain and Nallah at

village Bua U/C Bua Tehsil Shakargarh

District Narowal ,PP-134.(50/50)0.500 0.489 -0.011 100%

51

Construction of Street/Drain and Nallah at

village Noor Kot Mohalla Niter U/C Maingri

Tehsil Shakargarh District Narowal ,PP-

134(1/46)

0.500 0.489 -0.011 100%

52

Construction of Street/Drain and Nallah at

village Achli U/C Kallah Tehsil Shakargarh

District Narowal ,PP-134(2/46)

0.500 0.487 -0.013 100%

53

Construction of Street/Drain and Nallah at

village Darya Minhasa & Nangal U/C Kallah

Tehsil Shakargarh District Narowal ,PP-

134(3/46)

0.500 0.489 -0.011 100%

54

Construction of Street/Drain and Nallah at

village Baqarpur U/C Bua Tehsil

Shakargarh District Narowal ,PP-134(4/46)

0.500 0.467 -0.033 95%

50.000 27-Aug-12103

Page 264

Page 265: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

55

Construction of Street/Drain and Nallah at

village Jarmian Singh U/C Walipur Tehsil

Shakargarh District Narowal ,PP-134(5/46)0.500 0.482 -0.018 100%

56

Construction of Street/Drain and Nallah at

village Veerum U/C Gorala Tehsil

Shakargarh District Narowal ,PP-134(6/46)

0.500 0.490 -0.010 100%

57

Construction of Street/Drain and Nallah at

village Sahari U/C Ghona Tehsil

Shakargarh District Narowal ,PP-134(7/46)

0.500 0.490 -0.010 100%

58

Construction of Street/Drain and Nallah at

village Warsilky U/C Ghona Tehsil

Shakargarh District Narowal ,PP-134(8/46)

0.500 0.490 -0.010 100%

59

Construction of Street/Drain and Nallah at

village Pagala Moor U/C Phulwari Tehsil

Shakargarh District Narowal ,PP-134(9/46)0.500 0.490 -0.010 100%

60

Construction of Nallah at village Jhanday

U/C Bheri Tehsil Shakargarh District

Narowal ,PP-134(10/46)

0.500 0.490 -0.010 100%

61

Construction of Street/Drain and Nallah at

village Tanda U/C Pagwari Tehsil

Shakargarh District Narowal ,PP-134 (11/46)0.500 0.490 -0.010 100%

62

Construction of Street/Drain and Nallah at

village Trail U/C Kot Naina Tehsil

Shakargarh District Narowal ,PP-134 (12/46)0.500 0.490 -0.010 100%

63

Construction of Street/Drain and Nallah at

village Jhanday Riaz wali Galli U/C Bheri

Tehsil Shakargarh District Narowal ,PP-

134(13/46)

0.500 0.485 -0.015 100%

64

Construction of Street/Drain and Nallah at

village Garota U/C Ikhlaspur Tehsil

Shakargarh District Narowal ,PP-134(14/46)0.500 0.380 -0.120 82%

50.000 27-Aug-12103

Page 265

Page 266: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

65

Construction of Street/Drain and Nallah at

village Ahmadabad U/C Ahmadabad

Tehsil Shakargarh District Narowal ,PP-

134(15/46)

0.500 0.490 -0.010 100%

66

Construction of Street/Drain and Nallah at

village Lawankh U/C Bheri Tehsil

Shakargarh District Narowal ,PP-134(16/46)0.500 0.488 -0.012 100%

67

Construction of Street/Drain and Nallah at

village Malowal U/C Gorala Tehsil

Shakargarh District Narowal ,PP-134(17/46)0.500 0.487 -0.013 100%

68

Construction of Street/Drain and Nallah at

village Lalwan U/C Bheri Tehsil

Shakargarh District Narowal ,PP-134(18/46)0.500 0.490 -0.010 100%

69

Construction of Street/Drain and Nallah at

village Ghari U/C Bheri Tehsil Shakargarh

District Narowal ,PP-134(19/46)0.500 0.490 -0.010 100%

70

Construction of Street/Drain and Nallah at

village Char U/C Bheri Tehsil Shakargarh

District Narowal ,PP-134(20/46)0.500 0.490 -0.010 100%

71

Construction of Street/Drain and Nallah at

village Fatuwal Gujjran U/C Bara Manga

Tehsil Shakargarh District Narowal ,PP-

134(21/46)

0.500 0.482 -0.018 100%

72

Construction of Street/Drain and Nallah at

village Zahidpur Syedan U/C Bua Tehsil

Shakargarh District Narowal ,PP-134(22/46)0.500 0.490 -0.010 100%

73

Construction of Street/Drain and Nallah at

village Nangal U/C Kanjroor Tehsil

Shakargarh District Narowal ,PP-134(23/46)0.500 0.490 -0.010 100%

50.000 27-Aug-12103

Page 266

Page 267: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

74

Construction of Street/Drain and Nallah at

village Plot U/C Kanjroor Tehsil Shakargarh

District Narowal ,PP-134(24/46)0.500 0.484 -0.016 100%

75

Construction of Street/Drain and Nallah at

village Kasraj U/C Phalwari Tehsil

Shakargarh District Narowal ,PP-134(25/46)0.500 0.490 -0.010 100%

76

Construction of Street/Drain and Nallah at

village Khanpur U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134(26/46)0.500 0.486 -0.014 100%

77

Construction of Street/Drain and Nallah at

village Naematpur U/C Bua Tehsil

Shakargarh District Narowal ,PP-134(27/46)0.500 0.489 -0.011 100%

78

Construction of Street/Drain and Nallah at

village Ago Munda U/C Mallah Tehsil

Shakargarh District Narowal ,PP-134(28/46)0.500 0.487 -0.013 100%

79

Construction of Street/Drain and Nallah at

village Satowal U/C Langah Tehsil

Shakargarh District Narowal ,PP-134(29/46)0.500 0.490 -0.010 100%

80

Construction of Street/Drain and Nallah at

village Kothay Riasti U/C Langah Tehsil

Shakargarh District Narowal ,PP-134(30/46)0.500 0.488 -0.012 100%

81

Construction of Street/Drain and Nallah at

village Harsan Kot U/C Langah Tehsil

Shakargarh District Narowal ,PP-134(31/46)0.500 0.476 -0.024 100%

82

Construction of Street/Drain and Nallah at

village Dheedar U/C Maingri Tehsil

Shakargarh District Narowal ,PP-134(32/46)0.500 0.490 -0.010 100%

50.000 27-Aug-12103

Page 267

Page 268: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

83

Construction of Street/Drain and Nallah at

village Baghwanpur U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134(33/46)0.500 0.486 -0.014 100%

84

Construction of Street/Drain and Nallah at

village Jattar & Plot U/C Kanjroor Tehsil

Shakargarh District Narowal ,PP-134(34/46)0.500 0.490 -0.010 100%

85

Construction of Street/Drain and Nallah at

village Bakarwal U/C Akhlaspur Tehsil

Shakargarh District Narowal ,PP-134(35/46)0.500 0.490 -0.010 100%

86

Construction of Street/Drain and Nallah at

village Mirpur Jaggian U/C Ghona Tehsil

Shakargarh District Narowal ,PP-134(36/46)0.500 0.490 -0.010 100%

87

Construction of Street/Drain and Nallah at

village Dogran U/C Kot Naina Tehsil

Shakargarh District Narowal ,PP-134(37/46)0.500 0.490 -0.010 100%

88

Construction of Street/Drain and Nallah at

village Chojorian U/C Bara Manga Tehsil

Shakargarh District Narowal ,PP-134(38/46)0.500 0.490 -0.010 100%

89

Construction of Street/Drain and Nallah at

village Baqarpur Sobe Dar Amanat street

U/C Bua Tehsil Shakargarh District Narowal

,PP-134(39/46)

0.500 0.490 -0.010 100%

90

Construction of Street/Drain and Nallah at

villageGhaseetpur U/C Akhlas pur Tehsil

Shakargarh District Narowal ,PP-134(40/46)0.500 0.489 -0.011 100%

91

Construction of water filtration plant at

village Balo Kathana U/C Mallah Tehsil

Shakargarh District Narowal , PP-134(41/46)0.924 0.852 -0.072 100%

50.000 27-Aug-12103

Page 268

Page 269: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

92

Construction of water filtration plant at

village Mandyali U/C GhonaTehsil

Shakargarh District Narowal , PP-134(42/46)0.924 0.862 -0.062 100%

93

Construction of water filtration plant at

village Bheri Kalan U/C Bheri Tehsil

Shakargarh District Narowal , PP-134(43/46)0.924 0.395 -0.529 50%

94

Construction of water filtration plant at

village Babral U/C Mallah Tehsil Shakargarh

District Narowal , PP-134(44/46)0.924 0.856 -0.068 100%

95

Construction of water filtration plant at

village Baghwanpur U/C Kallah Tehsil

Shakargarh District Narowal , PP-134(45/46)0.924 0.643 -0.281 85%

96

Construction of boundary wall grave yard at

village Pagala Purana U/C Kallah Tehsil

Shakargarh District Narowal ,PP-134(46/46)0.380 -0.380 25%

96 50.000 47.248 -2.752

Tariq Shabbir dated 20.9.12

Mna, NA-129

1Const. of PCC / Tuff Tile and Drain at Village

Noor Pur.2.500 2.480 -0.020 100%

2Const. fo PCC Soling Nallah in Street

Graveyar Meher Town Village Lidhar.1.500 1.108 -0.392 100%

3Const. of Soling and Drain at Dera Labha

Bhatti to Mouza Jaman.2.000 1.952 -0.048 100%

4const. of PCC , Soling and Nallah at Hawali

Nabi Buksh Mouza Jahman.1.800 1.749 -0.051 100%

5Const. of PCC , Soling and Drain at Village

Ahlo Havailly basti Rajputan.2.000 1.911 -0.089 100%

50.000 27-Aug-12103

50.000 20-Sep-12410

CCD-I, Lahore

Page 269

Page 270: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Const. of PCC and Drain at Havaly Ahahab-

ud-din Chak Aaso Sriach.3.000 2.956 -0.044 100%

7Const. of Soling and Drain Jahman Havalian

Baroon.3.000 2.928 -0.072 100%

8 Const. of Soling, PCC and Drain Keerka. 3.000 2.971 -0.029 100%

9Const. of PCC, Tuff tile and Drain at

Nashaman Park & Sulman Park Attari.1.000 0.943 -0.057 100%

10const. of PCC and Drain Wasim Park No. 2.

1.000 0.920 -0.080 100%

11Const. of PCC and Drain Muzaffar Colony at

Attari.2.000 1.893 -0.107 100%

12Const. of PCC and Sewerage Mubarik Town

at Attari.2.500 2.474 -0.026 100%

13 Const. of PCC Drain Azhar Town at Attari. 2.500 2.373 -0.127 100%

14Const. of PCC and Drain in Soofia abad &

abadi Fethe Pur at Village Attari.3.500 3.370 -0.130 100%

15Laying of Sewerage in bab jan Street Guju

Matta Ferozepur Road.1.000 0.963 -0.037 100%

16Const. of PCC and Drain Havaly Gajo Matta.

3.000 2.928 -0.072 100%

17Const. of PCC and Drain Muzamal Meyo

Wali Gali at Village Guju Matta.1.500 1.444 -0.056 100%

18Const. of PCC and Drain at Haji Baber Wali

Gali Kahana.1.000 0.984 -0.016 100%

19Const. of PCc and Sewerage Mohalla dr.

Iqbal Near Nigh School Kahana.1.000 0.975 -0.025 100%

20Const. of PCC and Nallah Naseba Abad

Choti Nehar.2.500 2.450 -0.050 100%

21Const. of PCC and Drain Nasebaabad

master Shams Uddin Kahana.2.000 1.922 -0.078 100%

22Const. of PCC and Sewerage Shazada Road

Kahana.2.500 2.434 -0.066 100%

23Const. of PCC, Soling Nallah and Drain at

Abadi Islampura.2.000 1.929 -0.071 100%

24Const. of PCC and Drain at Dam Dama Tiba

Vilalge Kacha.2.200 2.146 -0.054 100%

24 50.000 48.203 -1.797

50.000 20-Sep-12410

Page 270

Page 271: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ms Amna Zulfiqar Dhillon

NA-131

831 16.1.2013 50.000

Rehabilitation of metalled road from Chak

Bhulle to Mouza Ahdian PP-162,District

Sheikhupura. 25.000 5.623

19.377

Tariq Shabbir dated 28.9.12

Mna, NA-129

1Const. of PCC / Nallah at Natha Singh, NA-

129.2.000 1.960 -0.040 100%

2 Const. of PCC at Village Leel, NA-129. 3.000 2.972 -0.028 100%

3Const. of Sewerage Scheme Bahader Abad

Kamahan, NA-129.3.000 2.860 -0.140 100%

4Const. of PCC and Drain Mohallah Arshad

Addvocate Kamahan, NA-129.2.000 1.974 -0.026 100%

5Const. of PCC and Drain Dr. Ismail

Kamahan, NA-129.1.000 0.953 -0.047 100%

6Const. and Repair of Road Ch. Akhtar

Kamahan, NA-129.3.500 3.405 -0.095 100%

7Const. of PCC and Drain Azafi Abadi

Kamahan, NA-129, Distt: 1.500 1.472 -0.028 100%

8Repair of Soling Kothi Ashraf D B Puriya to

Dera Abdul Rahim Village Kamahan.1.000 0.950 -0.050 100%

9Const. of PCC , Soling and Drain Mouza

Theater.3.500 3.430 -0.070 100%

10Const. of PCC, Nallah at Village Theater

Khurd.1.500 1.500 100%

11Const. of PCC at and Sewerage at Dhala

Tailian, NA-129, Distt: 2.000 1.950 -0.050 100%

12Const. of PCC, Soling and Nallah at Village

Malkhoki.1.000 0.961 -0.039 100%

13Const. / Repair and Maintenance Hair,

Maliyian Road, NA-129, Distt: 1.000 0.973 -0.027 100%

14Const. of PCC , Soling and Nallah at Village

Guru Mangat, NA-129, Distt: 2.000 1.961 -0.039 100%

50.000 28-Sep-12468

Page 271

Page 272: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15Const. of Soling and naliyan at Village

Bangotha.1.500 1.460 -0.040 100%

16 Repair of rural health Dispensary Hair. 1.000 0.980 -0.020 100%

17 Const. of PCC and Drain at Village Julkay. 3.000 2.920 -0.080 100%

18Const. of PCC, Soling and Drain at Village

Shazada.3.000 2.950 -0.050 100%

19Const. of PCC, Soling and Drain at Sharif

Park Village Julkay.1.500 1.457 -0.043 100%

20Const. of PCC, Soling and Drain at Sua Asal

Shaheen School.2.000 1.962 -0.038 100%

21Const. of PCC, Soling and Drain at Village

Badokey.2.000 1.856 -0.144 100%

22

Const. of Soling and Drain Baba Muhammad

Hussain / Nasir Mayo Kingra, NA-129, Distt: 2.500 2.467 -0.033 100%

23Const. of Soling and Drain Haji Khalid Dera

Ranjha Kingrah.1.500 1.470 -0.030 100%

24Const. of PCC / Soling and Sewerline Mouza

Jia Bagga.2.500 2.446 -0.054 100%

25Const. of PCC / Drain Mohallah Haji Noor

Mayo Dullu Khurd..1.500 1.469 -0.031 100%

25 50.000 48.758 -1.242

dated 5.9.12

Samina Khalid Ghurki dated 31.8.12

Mna, NA-130

1Construction of Nallah and Carpet Road at

Nathoki UC-61, NA-130, Lahore.11.200 8.020 -3.180 100%

2Construction of Soling at Paday Village UC-

52, NA-130, Lahore.4.200 4.104 -0.096 100%

3Construction of Carpet Road Thatha Tarad

UC-51, NA-130, Lahore.6.100 3.219 -2.881 100%

4Construction of Carpet Nai Abadi Ram Pura

New Manawa UC-51, NA-130, Lahore.3.000 2.749 -0.251 100%

50.000 28-Sep-12468

153.180 31-Aug-12161

Page 272

Page 273: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Construction of Soling / Nallah Bonga Stop

Near Awan Dhaiwala UC-50, NA-130,

Lahore.

3.000 2.948 -0.052 100%

6Construction of PCC / Nallah Babar Butt

Streets Lakhodaire UC-50, Lahore.6.200 6.022 -0.178 100%

7Construction of PCC / Nallah Nai Abadi

Bangali Ada UC-61, NA-130, Lahore.2.300 2.210 -0.090 100%

8

Construction of Carpet Road and Nallah at

Naiabadi Qadirabad UC-62, NA-130, Lahore. 2.700 2.591 -0.109 100%

9

Construction of PCC / Nallah Basti Boharwali

Hadayara Village UC-65, NA-130, Lahore. 2.350 2.240 -0.110 100%

10Construction of Carpet Road Hadayara to

Rampura UC-65, NA-130, Lahore.6.100 5.907 -0.193 100%

11

Construction of Soling Link Dera Mian

Majeed Dolat Nambardar, Talib Chairman,

Malik Ghafoor at Sarja Mirza, NA-130,

Lahore.

2.000 1.915 -0.085 100%

12Construction of PCC / Nallah Opal Village,

NA-130, Lahore.3.400 3.301 -0.099 100%

13Construction of Soling at Opal to Ghanikey,

NA-130, Lahore.2.000 1.940 -0.060 100%

14Construction of PCC / Nallah Ghanikey, NA-

130, Lahore.3.000 2.930 -0.070 100%

15

Construction of Soiling Dera Ilyas Namberdar

to Rampura Road, NA-130, Lahore. 5.000 5.000 100%

16Construction of PCC / Carpet Road and

Nallah at Hadayara, NA-130, Lahore.3.600 3.590 -0.010 100%

17

Construction of PCC / Nallah Main Road

Abadi Bonga to Dera Malik Abid Near Awan

Dhaiwala UC-50, NA-130, Lahore.

5.000 4.973 -0.027 100%

18Construction of PCC at New Canal Park, NA-

130, Lahore.4.000 4.000 100%

19Construction of PCC at Korain Kalan, NA-

130, Lahore.3.000 2.940 -0.060 100%

20Construction of Carpet Road / Retaining Wall

Rampura Khurd, NA-130, Lahore.4.100 2.166 -1.934 100%

153.180 31-Aug-12161

Page 273

Page 274: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

21Construction of Soling Chinko Wandi to

Karnkay Soyan, NA-130, Lahore.3.000 1.940 -1.060 100%

22Construction of PCC at Asim Town, NA-130,

Lahore.3.000 2.990 -0.010 100%

23

Construction of PCC / Sewerage and Nallah

at Bhama Village, UC-53, NA-130, Lahore. 3.000 2.949 -0.051 100%

24

Construction of Soling at Mian Siddiqe Hong

Kon Wala to Basti Taj Din Village Ghanikey

Opal UC-65, NA-130, Lahore.

3.800 3.800 100%

25Construction of Carpet Road at Wahga

Village to Graveyard, NA-130, Lahore.5.744 2.870 -2.874 100%

26Construction of PCC / Sewerage Giarwin

Wala Bazar, Sharif Pura UC-49, Lahore.8.800 8.639 -0.161 100%

27

Construction of PCC / Sewerage Gali No. 9

Gali Baba Nizam Din, Toriwala, Gali No. 3

Gali Ch. Saeed, Sharif Pura UC-49, Lahore.

3.000 3.000 100%

28

Construction of PCC / Sewerage Gali Haji

Khadim Hussain, Sharif Pura UC-49, Lahore. 4.000 3.970 -0.030 100%

29

Construction of PCC / Sewerage Gali, Israr

Butt Wali Gali Ahmad Park, Sharif Pura UC-

49, Lahore.

3.000 3.000 100%

30

Construction of PCC / Nallah Jalal Colony

Near Harbanse Pura, Railway Crossing,

Sharif Pura UC-60, Lahore.

7.100 7.024 -0.076 100%

31Construction of PCC / Nallah Gali No. 4-A at

Pir Naseer, UC-60, NA-130, Lahore.3.000 2.926 -0.074 100%

32Construction of PCC / Nallah at Chandian UC-

60, NA-130 Lahore.4.800 4.700 -0.100 100%

33

Construction of PCC / Nallah Inayat Street at

Pir Naseer Near Ring Road UC-60, NA-130

Lahore.

9.000 8.657 -0.343 100%

34

Construction of Carpet Road Street No. 10,

Ittehad Town / Altaf Colony, NA-130, Lahore. 2.700 2.660 -0.040 100%

35Construction of Carpet Road at Burj Village ,

NA-130, Lahore.6.986 6.392 -0.594 100%

153.180 31-Aug-12161

Page 274

Page 275: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

35 153.180 138.282 -14.898

Samina Khalid Ghurki dated 22.11.12

Mna, NA-130

1Const.of PCC/Sewerage at Ismail Town

Harbanse Pura UC-60 NA-130,Lahore.14.830 6.318 -8.512 43%

2

Const.of PCC/Sewerage and Drain at Village

Bhanni Jattan Minhala NA-130,Lahore. 6.750 5.650 -1.100 84%

3

Const.of PCC/Sewerage and Drain at Village

Mihala Kalan Naiyan Wali Gali UC-53, NA-

130,Lahore.

6.300 3.427 -2.873 54%

4Const.of Soling/Nallah Opal Village UC-65

NA-130,Lahore.1.250 1.242 -0.008 100%

5Const.of Carpet Road at Nazim Abad Main

Bazar UC-52 NA-130,Lahore.4.000 -4.000

6

Const.of PCC at Challaran Gali No.7 Al-

Faisal Town Near Joray Pull NA-130,Lahore. 3.500 3.458 -0.042 99%

7Const.of PCC Nallah Street Church Mariam

Sadiqa Dogage Town NA-130,Lahore.1.500 1.269 -0.231 85%

8Const.of Carpet Road at Village Lakhan

Sharif Bata Pur NA-130.5.000 -5.000

9

Const.of Portion Wall / Building of Vocational

Training School Village Barki NA-130,Lahore. 4.000 1.465 -2.535 37%

10Const.of Carpet Road at UC-57 NA-

130,Lahore.5.000 -5.000

10 50.000 22.829 -27.171

Saeed Zafar Padhrar dated 5.9.12

MNA, NA-137

1Const. of Soling and Drain at Wan Kichian,

NA-137 District Nankana Sahib.0.800 0.784 -0.016 100%

50.000 22-Nov-12746

120.000 05-Sep-12190

Page 275

Page 276: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2Const. of Soling and Drain at Hallah Piran,

Kot Jaffar, NA-137 District Nankana Sahib.1.000 0.980 -0.020 100%

3Const. of Soling and Drain at Mashora

Hashim, NA-137 District Nankana Sahib.1.000 0.988 -0.012 100%

4

Const. of Soling and Drain at Talib Shah

Ameer Shah, NA-137 District Nankana

Sahib.

2.000 1.958 -0.042 100%

5Const. of Soling and Drain at Kot Asghar

Shah, NA-137 District Nankana Sahib.0.500 0.490 -0.010 100%

6Const. of Soling and Drain at Martha Wali,

NA-137 District Nankana Sahib.3.000 2.927 -0.073 100%

7Const. of Soling and Drain at Pindi Peeran,

NA-137 District Nankana Sahib.1.000 0.970 -0.030 100%

8Const. of Soling and Drain at Ghangoo Wala,

NA-137 District Nankana Sahib.0.500 0.490 -0.010 100%

9Const. of Soling and Drain at Chak No. 51/1,

NA-137 District Nankana Sahib.3.000 2.894 -0.106 100%

10Const. of Soling and Drain at Pacca Qila, NA-

137 District Nankana Sahib.1.700 1.700 100%

11

Const. of Soling and Drain at Chak No. 5/61

Arian Wala, NA-137 District Nankana Sahib. 0.800 0.784 -0.016 100%

12Const. of Soling and Drain at City Syed Wala,

NA-137 District Nankana Sahib.3.000 2.936 -0.064 100%

13

Const. of Soling and Drain at Chak No. 19

Syed Wala, NA-137 District Nankana Sahib. 1.000 0.980 -0.020 100%

14

Const. of Soling and Drain at Kot Qadir

Bukhsh Mashmoola Kot Tahir, NA-137

District Nankana Sahib.

3.000 2.947 -0.053 100%

15

Const. of Soling and Drain at Kot Nizam Din

Chak 184, NA-137 District Nankana Sahib. 1.900 1.872 -0.028 100%

16

Const. of Soling and Drain at Sunday Kot

Wali Da Kot, NA-137 District Nankana Sahib. 0.800 0.780 -0.020 100%

17Const. of Soling and Drain at Baghoo Kot,

NA-137 District Nankana Sahib.0.500 0.490 -0.010 100%

120.000 05-Sep-12190

Page 276

Page 277: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18Const. of Soling and Drain at Jhok Sardar,

NA-137 District Nankana Sahib.0.500 0.490 -0.010 100%

19

Const. of Soling and Drain at Syed Pur,

Abadi Darbar Wali, NA-137 District Nankana

Sahib.

0.800 0.780 -0.020 100%

20Const. of Soling and Drain at Dhoni Awana,

NA-137 District Nankana Sahib.0.500 0.490 -0.010 100%

21Const. of Soling and Drain at Raster Pur

Kharay, NA-137 District Nankana Sahib.1.000 0.979 -0.021 100%

22Const. of Soling and Drain at Madhoki, NA-

137 District Nankana Sahib.1.000 0.989 -0.011 100%

23Const. of Soling and Drain at Fareedana, NA-

137 District Nankana Sahib.0.500 0.490 -0.010 100%

24Const. of Soling and Drain at Piddi Pur, NA-

137 District Nankana Sahib.1.500 1.481 -0.019 100%

25

Const. of Soling and Drain at Hallah Kitchain,

Bohti Wala, NA-137 District Nankana Sahib. 1.500 1.500 100%

26Const. of Soling and Drain at Ghugian Gillan,

NA-137 District Nankana Sahib.0.700 0.673 -0.027 100%

27Const. of Soling and Drain at Thatha Perwera

Ashiq, NA-137 District Nankana Sahib. 1.000 0.693 -0.307 100%

28

Const. of Soling and Drain at Thatha Langha

Dada Nai Abadi, NA-137 District Nankana

Sahib.

1.000 0.175 -0.825 100%

29Const. of Soling and Drain at Mir Pur Chak

No. 87, NA-137 District Nankana Sahib.2.500 2.458 -0.042 100%

30Const. of Soling and Drain at Haboki Ballah,

NA-137 District Nankana Sahib.0.500 0.491 -0.009 100%

31

Const. of Soling and Drain at Asghar Wali

GaliMore Khunda, NA-137 District Nankana

Sahib.

0.500 0.487 -0.013 100%

32

Const. of Soling and Drain at Bagh Wala

Khewkay Bhattian, NA-137 District Nankana

Sahib.

0.500 0.487 -0.013 100%

33Const. of Soling and Drain at Kot Akbar Khan

Pithan, NA-137 District Nankana Sahib. 0.500 0.490 -0.010 100%

120.000 05-Sep-12190

Page 277

Page 278: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

34Const. of Soling and Drain at Bara Ghar to

Kot Mahtab, NA-137 District Nankana Sahib. 0.600 0.588 -0.012 100%

35Const. of Soling and Drain at Mora Killan to

Mora Khurd, NA-137 District Nankana Sahib.1.900 1.861 -0.039 100%

36Const. of Soling and Drain at Ahata Baji, NA-

137 District Nankana Sahib.3.000 2.940 -0.060 100%

37Const. of Soling and Drain at Nai Abadi Chak

No. 17 G.B, NA-137 District Nankana Sahib.0.500 0.490 -0.010 100%

38

Const. of Soling and Drain at Nai Abadi Mir

Pur Chak No. 87 R.B, NA-137 District

Nankana Sahib.

0.800 0.784 -0.016 100%

39Const. of Soling and Drain at Chak No. 54/4,

NA-137 District Nankana Sahib.0.900 0.882 -0.018 100%

40Const. of Soling and Drain at Malik Da Chak,

NA-137 District Nankana Sahib.0.500 0.487 -0.013 100%

41Const. of Soling and Drain at Ladhoana, NA-

137 District Nankana Sahib.0.900 0.880 -0.020 100%

42

Const. of Soling and Drain at Islamabad

Ghulam Abad Chak No. 572, NA-137 District

Nankana Sahib.

0.900 0.871 -0.029 100%

43Const. of Soling and Drain at Aseeran Wala,

NA-137 District Nankana Sahib.0.700 0.668 -0.032 100%

44

Const. of Soling and Drain at Kot Rehmat

Wantri Wadhan, NA-137 District Nankana

Sahib.

0.700 0.679 -0.021 100%

45

Const. of Soling and Drain Boundary Wall at

Johar Khadiana, NA-137 District Nankana

Sahib.

0.900 0.881 -0.019 100%

46

Const. of Soling and Drain at Rajba Naikian

Wala Chak No. 13 G.B, NA-137 District

Nankana Sahib.

1.900 1.856 -0.044 100%

47

Const. of Soling and Drain at Jhamki to Kot

Ghulam Ali, NA-137 District Nankana Sahib. 1.900 1.860 -0.040 100%

48Const. of Soling and Drain at Dhoni, NA-137

District Nankana Sahib.0.500 0.489 -0.011 100%

49Const. of Soling and Drain at Mango Taroo,

NA-137 District Nankana Sahib.1.400 1.351 -0.049 100%

120.000 05-Sep-12190

Page 278

Page 279: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

50Const. of Soling and Drain at Bhola Chak

178, NA-137 District Nankana Sahib.1.000 0.975 -0.025 100%

51

Const. of Soling and Drain at Thatha

Hamdanian, NA-137 District Nankana Sahib. 0.500 0.490 -0.010 100%

52Const. of Soling and Drain at Loda Ghar, NA-

137 District Nankana Sahib.0.500 0.488 -0.012 100%

53

Const. of Soling and Drain and PCC at Chak

No. 6 G.B, NA-137 District Nankana Sahib. 1.500 1.451 -0.049 100%

54Const. of Janaz Gah at Changar Hakam

Wala, NA-137 District Nankana Sahib.1.000 0.474 -0.526 100%

55Const. of Soling and Culvert at Kot Wiriam

Khan, NA-137 District Nankana Sahib.0.900 0.884 -0.016 100%

56

Construction of Metalled Road Chak No. 18

G.B (Remaining Portion), NA-137 District

Nankana Sahib.

0.500 0.484 -0.016 100%

57Const. of Soling and Drain at New Fareed

Abad, NA-137 District Nankana Sahib.0.700 0.677 -0.023 100%

58Const. of Culvert and Janaz Gah Qila Roup

Singh, NA-137 District Nankana Sahib.1.900 1.862 -0.038 100%

59Const. of Janaz Gah Chak No. 11 G.B, NA-

137 District Nankana Sahib.1.000 0.980 -0.020 100%

60

Const. of Soling and Drain at Janaz Gah Wali

Gali Master Zahid Rajpura, NA-137 District

Nankana Sahib.

1.500 1.465 -0.035 100%

61Const. of Janaz Gah Sadho Ram Pur, NA-

137 District Nankana Sahib.1.000 0.980 -0.020 100%

62Const. of Soling and Drain at Burhan, NA-

137 District Nankana Sahib.1.000 0.980 -0.020 100%

63Const. of Soling and Drain at Kot Madho Nai

Wala, NA-137 District Nankana Sahib.1.200 1.149 -0.051 100%

64Const. of PCC and Drain at Bara Ghar, NA-

137 District Nankana Sahib.0.700 0.684 -0.016 100%

65Const. of Soling and Drain at Dhari Gujjran,

NA-137 District Nankana Sahib.1.600 -1.600

66

Const. of Soling and Drain at Dhari Haji

Alawal, Mohallah Islam Pura, NA-137 District

Nankana Sahib.

1.000 0.975 -0.025 100%

120.000 05-Sep-12190

Page 279

Page 280: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

67

Const. of Boundary Wall Grave Yard Chak

No. 13 G.B, NA-137 District Nankana Sahib. 1.000 0.973 -0.027 100%

68Const. of PCC and Drain at Chak No. 10

G.B, NA-137 District Nankana Sahib.1.300 1.265 -0.035 100%

69Const. of Soling and Drain at Chak No. 17

G.B, NA-137 District Nankana Sahib.1.000 0.972 -0.028 100%

70Const. of Soling and Drain at Chak No. 19

G.B, NA-137 District Nankana Sahib.1.200 1.170 -0.030 100%

71Const. of PCC and Drain at Chak No. 7 G.B,

NA-137 District Nankana Sahib.1.700 1.682 -0.018 100%

72

Const. of Soling Chak No. 18 G.B to Chak

No. 93 G.B, NA-137 District Nankana Sahib. 1.500 1.460 -0.040 100%

73Const. of Soling and Drain at Keri Beedh, NA-

137 District Nankana Sahib.2.000 1.980 -0.020 100%

74Const. of Soling and Drain at Canada

Colony, NA-137 District Nankana Sahib.1.000 0.980 -0.020 100%

75Const. of Soling and Drain at Chak No. 20

G.B, NA-137 District Nankana Sahib.1.000 0.970 -0.030 100%

76Const. of Soling and Drain at Chak No. 08

G.B, NA-137 District Nankana Sahib.1.000 0.968 -0.032 100%

77Const. of Soling and Drain at Mandiala, NA-

137 District Nankana Sahib.1.400 1.367 -0.033 100%

78Const. of Room at Sohni Wara, NA-137

District Nankana Sahib.1.000 0.990 -0.010 100%

79Const. of Soling and Drain at Nathowala, NA-

137 District Nankana Sahib.1.800 1.777 -0.023 100%

80Const. of Soling and Drain at Kanwan Wali

Araian, NA-137 District Nankana Sahib.1.000 2.249 1.249 100%

81Const. of Soling and Drain at Kanwan Wali

Sikhan, NA-137 District Nankana Sahib.2.300 1.000 -1.300 100%

82Const. of Soling and Drain at Chak No. 12

G.B, NA-137 District Nankana Sahib.1.400 1.370 -0.030 100%

83Const. of Bridge at Samaki Sayian , NA-137

District Nankana Sahib.1.500 1.470 -0.030 100%

84Const. of Metalled Road at Bucheaki , NA-

137 District Nankana Sahib.4.000 3.790 -0.210 100%

120.000 05-Sep-12190

Page 280

Page 281: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

85Const. of Soling at Chain Pur Basain, NA-137

District Nankana Sahib.3.900 3.810 -0.090 100%

86

Const. of Soling and Drain at Kot Padhiar,

Thatha Padhiar, NA-137 District Nankana

Sahib.

0.500 0.482 -0.018 100%

87Const. of Soling and Drain at Thatha Roup

Chand, NA-137 District Nankana Sahib.0.900 0.882 -0.018 100%

88

Const. of Boundary Wall at Maternity Hospital

Chak No. 13 G.B, NA-137 District Nankana

Sahib.

0.500 0.483 -0.017 100%

89

Const. of Soling and Drain at Kamal Pur

Chak No.183 G.B, NA-137 District Nankana

Sahib.

1.400 1.369 -0.031 100%

90Const. of Soling and Drain at Fareed Abad,

NA-137 District Nankana Sahib.2.400 2.364 -0.036 100%

91Const. of Soling and Drain at Chah Umer

Wala, NA-137 District Nankana Sahib.0.500 0.500 100%

92

Const. of Soling and Drain at Chak No. 8/60,

Chah Bura, NA-137 District Nankana Sahib. 0.600 0.481 -0.119 80%

93

Const. of Soling and Drain at Rajab,

Lakshman Das, NA-137 District Nankana

Sahib.

1.000 0.151 -0.849 100%

94Const. of Soling and Drain at Kot Sunnt Ram,

NA-137 District Nankana Sahib.1.400 1.365 -0.035 100%

95

Const. of Soling and Drain at Chak No. 15

G.B Syed Wala, NA-137 District Nankana

Sahib.

1.900 1.879 -0.021 100%

96

Const. of Soling and Drain at Madho

Rehmani Syed Wala, NA-137 District

Nankana Sahib.

1.400 1.384 -0.016 100%

97

Const. of Soling and Drain at Thatha Reham

Shah, NA-137 District Nankana Sahib. 1.000 0.980 -0.020 100%

97 120.000 113.251 -6.749

120.000 05-Sep-12190

Page 281

Page 282: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Akram Masih Gill dated 4.10.12

MNA, NA-340

1

Const. of PCC / Sewerage and Tuff Tile at

Streets of Jeevan Hana, Garden Town,

Lahore.

2.000 1.977 -0.023 99%

2Const. of Soling at F.C college Quarters

Gulberg-III, Lahore.0.700 0.665 -0.035 100%

3Renovation of Cathlic Church at Qurban

Lines, Upper Mall, Lahore.

4Const. of PCC at Streets of Makka colony,

Gulber-III, Lahore.2.000 1.956 -0.044 100%

5Const. of PCC at Hanery Kay, Gulber-III,

Lahore.2.000 1.958 -0.042 100%

6Const. of Carpet Road at St. Mary's Colony,

Ferozepur Road, Lahore.2.000 1.978 -0.022 100%

7Const. of PCC / Sewerage at Nawaz Sharif

Colony, Ferozepur Road, Lahore.1.000 0.970 -0.030 100%

8Const. of PCC Nabi Pura, Near Ghalab

Market Gulber-III, Lahore.1.000 0.966 -0.034 100%

9Remaining work of Church at Ithad Colony

Gulberg, Lahore.1.000 0.966 -0.034 100%

10Renovation of FGA Churh at Henri Kay,

Gulberg-III, Lahore.1.000 0.974 -0.026 100%

11Const. of PCC at Khan Colony, Gulberg-III,

Lahore.1.000 0.974 -0.026 100%

12Const. of PCC at Inayat Colony, Gulberg-III,

Lahore.0.500 0.490 -0.010 100%

13

Const. of Ambassador of Christ Baptist

Church at New Christian Colony, Gulberg-III,

Lahore.

0.300 0.290 -0.010 100%

14

Const. of Carpet Road & Footpath with Rain

Drains at Main Road Youhanabad, Ferozepur

Road Lahore.

10.000 9.946 -0.054 100%

15Const. of PCC and Sewerage at Streets of

Youhanabad, Ferozepur, Lahore.5.000 4.933 -0.067 100%

16Const. of Entrance Gate of Hamza Town,

Ferozepur Lahore.1.000 0.653 -0.347 100%

97.500 503 04-Oct-12

Page 282

Page 283: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17Const. of Tuff Tiles at Gora Graveyard Jail

Road, Lahore.100%

18

Renovation of United Presbyterian Church at

J-Block, youhanabad, Ferozepur Road,

Lahore.

1.000 0.972 -0.028 100%

19Const. of Church at UC-146, Purana Kana,

Ferozepur Road, Lahore.1.000 0.928 -0.072 100%

20Const. of Church at Village Khano Harni, UC-

150, Ferozepur Road, Lahore.1.000 0.957 -0.043 100%

21Const. of Church at UC-1, Begum Kot,

Shahdara, Lahore.1.000 0.951 -0.049 100%

22Const. of Catholic Church at 436/3C2, Green

Town, Lahore.1.000 0.991 -0.009 100%

23Const. of Cathlic Church at Mian Bazar,

Township, Lahore.1.000 0.967 -0.033 100%

24Const. of Church at Boggtian, Raiwind Road,

Lahore.1.000 0.968 -0.032 100%

25

Const. of Catholic Church at T-4, Muhallah

Nijat Pura, Sandan Kalan, Bund Road

Lahore.

1.000 0.961 -0.039 100%

26

Const. of Boudnary Wall & Earth Filling of

Christian Graved at 60-Qurater, Deras Baray

Mian, Mughalpura, Lahore.

1.500 1.447 -0.053 100%

27Renovation of FGA Church at Kot Kambo,

Bakar Mandi, Lahore.1.000 0.977 -0.023 100%

28Const. of Catholic Church at Kot Kambo

Khurd, Bakar Mandi, Bund Road, Lahore.1.000 0.978 -0.022 100%

29

Renovation of Prince of Peace Presbyterian

Church, youhanabad, Ferozepur Road,

Lahore.

1.000 0.952 -0.048 100%

30Const. of Church at Trinity Gospel Church at

98 Modern Colony, Kot Lakhpat, Lahore.1.000 0.980 -0.020 100%

31Const. of St. Joseph's Catholic Church at

Sodiwal, Bund Road, Lahore.1.000 0.974 -0.026 100%

32

Const. of Christian Graveyard Boundary wall

at Shahpur Kanjran, Multan Road, Lahore. 1.000 0.978 -0.022 100%

97.500 503 04-Oct-12

Page 283

Page 284: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

33

Const. of Church of God at 105-Feroze Park,

F-Block, Youhanabad, Ferozepur Road,

Lahore.

1.000 0.955 -0.045 100%

34Const. of Awami Church at Village Dullu

Khurd, Dulum, Ferozepur Road, Lahore.1.000 0.989 -0.011 100%

35Renovation of Grace Church at Youhanabad,

Ferozepur Road, Lahore.0.200 0.190 -0.010 100%

36

Const. of From House of God Church at F-

Block, Youhanabad, Ferozepur Road,

Lahore.

1.000 0.970 -0.030 100%

37

Const. of Childerns' Chapel Church at F-

Block, Youhanabad, Ferozepur Road,

Lahore.

1.000 0.976 -0.024 100%

38Const. of Awami Church at Christian Town,

Near Gloria Colony, Sheikhupura.1.000 0.951 -0.049 100%

39Const. of Soling & Drains at UC-60, Chak -

18, Chunian, Kasur.1.000 0.967 -0.033 100%

40Const. of Carpet Road at Kalarkabad, Post

Office Khas, Kasur.2.000 1.097 -0.903 55%

40 54.200 51.772 -2.428

Farooq Yousaf Ghurki dated 5.9.12

MPA, PP-159

1Const. of PCC / Soling and Nallah at UC-

141, PP-159, Lahore.1.500 1.455 -0.045 100%

2Const. of PCC / Soling and Nallah at UC-

142, PP-159, Lahore.1.500 1.462 -0.038 100%

3Const. of PCC / Soling and Nallah at UC-

147, PP-159, Lahore.1.500 1.470 -0.030 100%

4Const. of PCC / Soling and Nallah at UC-

148, PP-159, Lahore.1.500 1.482 -0.018 100%

5Const. of PCC / Soling and Nallah at UC- 63,

PP-159, Lahore.2.800 2.730 -0.070 100%

6Const. of PCC / Soling and Nallah at UC- 64,

PP-159, Lahore.2.800 2.768 -0.032 100%

97.500 503 04-Oct-12

20.000 05-Sep-1252

Page 284

Page 285: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7Const. of PCC / Soling and Nallah at UC- 66,

PP-159, Lahore.2.800 2.736 -0.064 100%

8Const. of PCC / Soling and Nallah at UC-

146, PP-159, Lahore.2.800 2.744 -0.056 100%

9Const. of PCC / Soling and Nallah at UC-

150, PP-159, Lahore.2.800 2.770 -0.030 100%

9 20.000 19.617 -0.383

Farooq Yousaf Ghurki dated 14.12.12

MPA, PP-159

1Const. of PCC / Soling and Nallah at UC-

141, PP-159, Lahore.

2Const. of PCC / Soling and Nallah at UC-

142, PP-159, Lahore.

3Const. of PCC / Soling and Nallah at UC-

146, PP-159, Lahore.

4Const. of PCC / Soling and Nallah at UC-

150, PP-159, Lahore.

5Const. of PCC / Soling and Nallah at UC- 63,

PP-159, Lahore.5.000 5.000 100%

6Const. of PCC / Soling and Nallah at UC- 64,

PP-159, Lahore.

7Const. of PCC / Soling and Nallah at UC- 66,

PP-159, Lahore.5.000 5.000 100%

8Const. of PCC / Soling and Nallah at UC-

1467 PP-159, Lahore.

8 10.000 10.000

Rana Ijaz Hussain dated 27.8.12

PP-163

1Const. of PCC at Chora Rajpootan, PP-163,

Distt: Sheikhupura.12.500 12.250 -0.250 100%

30.000 14-Dec-12811

50.000 27-Aug-12104

20.000 05-Sep-1252

Page 285

Page 286: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2Const. of PCC at UC-Murid Kay Town, PP-

163, Distt: Sheikhupura.2.500 2.446 -0.054 100%

3Const. of PCC at UC-City Murid kay, PP-163,

Distt: Sheikhupura.2.500 2.282 -0.218 100%

4Const. of PCC at UC-Piran Mandi, PP-163,

Distt: Sheikhupura.2.000 1.940 -0.060 100%

5Const. of PCC at UC-Dao kay, PP-163, Distt:

Sheikhupura.2.500 2.484 -0.016 100%

6Const. of PCC at UC-Haddokay, PP-163,

Distt: Sheikhupura.2.500 -2.500

7Const. of PCC at UC-Busra Colony, PP-163,

Distt: Sheikhupura.2.000 1.960 -0.040 100%

8Const. of PCC at Abadi Ravi Riyan, PP-163,

Distt: Sheikhupura.2.000 1.950 -0.050 100%

9Const. of PCC at Abadi Noon, PP-163, Distt:

Sheikhupura.1.000 0.952 -0.048 100%

10Const. of PCC at Mubarak Abad Murid kay,

PP-163, Distt: Sheikhupura.0.500 -0.500

11Const. of PCC at Salamat pura Sadique

Abad, PP-163, Distt: Sheikhupura.0.800 0.751 -0.049 100%

12Const. of PCC at Khanna Lubbana, PP-163,

Distt: Sheikhupura.0.500 -0.500

13Const. of PCC at Budankay, PP-163, Distt:

Sheikhupura.1.500 1.330 -0.170 100%

14Const. of PCC at Abadi Shahzad Town, Zafar

Park, PP-163, Distt: Sheikhupura.1.500 1.455 -0.045 100%

15Const. of PCC at Punjab Gallah Mandi, PP-

163, Distt: Sheikhupura.1.000 0.893 -0.107 100%

16Const. of PCC at 28-38, E-Block Johar Town,

PP-163, Lahore1.000 0.970 -0.030 100%

17Const. of PCC at Pattiala Dost Muhammad,

PP-163, Distt: Sheikhupura.1.000 0.980 -0.020 100%

18

Const. of Metalled Road Nangal Sahidan

Dera Kamboan, PP-163, Distt: Sheikhupura. 1.500 0.926 -0.574 100%

19Const. of Metalled Road Dera Jhamkay

Bhattian, PP-163, Distt: Sheikhupura.1.000 0.936 -0.064 100%

20Const. of Metalled Road Qarshi wala Road

Taboli, PP-163, Distt: Sheikhupura.1.000 0.926 -0.074 100%

50.000 27-Aug-12104

Page 286

Page 287: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

21

Const. of Metalled Road at Hussain Town

Road to Kot Arian Graveyard, PP-163, Distt:

Sheikhupura.

1.000 0.936 -0.064 100%

22Repair / Widening of Road Mongnawala

Road PP-163, Distt: Sheikhupura.2.000 1.948 -0.052 100%

23Repair / Widening of Road Mongnawala

Road PP-163, Distt: Sheikhupura.2.000 -2.000 100%

24Repair / Widening of Road Mongnawala

Road PP-163, Distt: Sheikhupura.2.000 3.940 1.940 100%

25Repair / Widening of Road Mongnawala

Road PP-163, Distt: Sheikhupura.2.000 0.995 -1.005 100%

25 50.000 43.250 -6.750

Haji Munawar Hussain Manj dated 6.9.12

MPA, PP-166

1Water Supply at Kot Ranjeet Remaining

Portion, PP-166 Distt: Sheikhupura.4.000 3.982 -0.018 100%

2

Construction of Carpet Road and PCC at

Hardev Taray Wala, PP-166 Distt:

Sheikhupura.

12.000 11.999 -0.001 100%

3

Construction of Metalled Road Deer Key

More to Gopay Raw from Thabal, PP-166

Distt: Sheikhupura.

14.000 13.510 -0.490 100%

4

Construction of Metalled Road and PCC at

Motorway Pull to Mirza Wirkan, PP-166 Distt:

Sheikhupura.

10.000 9.926 -0.074 100%

5

Construction of Metalled Road / PCC and

Nallah at Chak Gardas to Abadi Mand

Bukhsh, PP-166 Distt: Sheikhupura.

10.000 9.838 -0.162 100%

5 50.000 49.255 -0.745

50.000 06-Sep-12247

50.000 27-Aug-12104

Page 287

Page 288: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Javed Bhatti dated 5.9.12

MPA, PP-169

1

Construction of Drains, Soling, Nallah & PCC

at Village Jatri Kohna, PP-169 Sheikhupura. 3.000 2.930 -0.070 100%

2

Construction of Drains, Soling, Nallah & PCC

at Village Ajnianwala, PP-169 Sheikhupura. 3.000 2.877 -0.123 100%

3Construction of Drains, Soling, Nallah & PCC

at Village Bhar, PP-169 Sheikhupura.2.500 2.380 -0.120 100%

4

Construction of Drains, Soling, Nallah & PCC

at Village Wahal Wala, PP-169 Sheikhupura. 1.500 1.494 -0.006 100%

5

Construction of Drains, Soling, Nallah & PCC

at Village Borh Bath, PP-169 Sheikhupura. 2.000 1.961 -0.039 100%

6

Construction of Drains, Soling, Nallah & PCC

at Village Jalalabad, PP-169 Sheikhupura. 2.000 1.791 -0.209 100%

7

Construction of Drains, Soling, Nallah & PCC

at Village Thatha Bahadar Shah, PP-169

Sheikhupura.

2.000 1.959 -0.041 100%

8

Construction of Drains, Soling, Nallah & PCC

at Village Butter, PP-169 Sheikhupura. 3.000 2.989 -0.011 100%

9

Construction of Drains, Soling, Nallah & PCC

at Village Street Church Wali (Masjid Molvi

Rahmat Ullah), PP-169 Sheikhupura.

1.000 1.000 100%

9 20.000 19.381 -0.619

Muhammad Javed Bhatti dated 14.12.12

MPA, PP-169

1Const.of Drains,Soling,Nallah & PCC at

Village Gujiana Nao PP-169,Sheikhupura3.000 2.889 -0.111

2Const.of Drains,Soling,Nallah & PCC at

Village Dera Gujran PP-169,Sheikhupura

30.000 14-Dec-12811

20.000 05-Sep-12193

Page 288

Page 289: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3Const.of Drains,Soling,Nallah & PCC at

Village Jujjer,PP-169,Sheikhupura

4Const.of Drains,Soling,Nallah & PCC at

Village Pendoe PP-169,Sheikhupura

5Const.of Drains,Soling,Nallah & PCC at

Village Artali PP-169,Sheikhupura1.500 1.468 -0.032 100%

6Const.of Drains,Soling,Nallah & PCC at

Farooqabad PP-169,Sheikhupura1.000 0.975 -0.025 100%

7Const.of Drains,Soling,Nallah & PCC at

VillageChak Wahi PP-169,Sheikhupura

8Const.of Drains,Soling,Nallah & PCC at

Thatha Nusrat PP-169,Sheikhupura

9

Const.of Drains,Soling,Nallah & PCC at

Village Lunda Bhattian PP-169,Sheikhupura

10Const.of Drains,Soling,Nallah & PCC at

Village Herchand PP-169,Sheikhupura2.000 1.964 -0.036 100%

11Const.of Drains,Soling,Nallah & PCC at

Village Veerkay Bath PP-169,Sheikhupura

12Const.of Drains,Soling,Nallah & PCC at

Village Tarron Virkan PP-169,Sheikhupura

13Const.of Drains,Soling,Nallah & PCC at

Village Bhar, PP-169,Sheikhupura

14

Const.of Drains,Soling,Nallah & PCC at Gali

Master Zulifqar,Sacha Soda PP-

169,Sheikhupura

15Const.of Drains,Soling,Nallah & PCC at Gali

Arshad Virk Wali PP-169,Sheikhupura

16Const.of Drains,Soling,Nallah & PCC at

Village Lalkay PP-169,Sheikhupura

17Const.of Drains,Soling,Nallah & PCC at

VillageMaki 460 PP-169,Sheikhupura2.500 2.456 -0.044 100%

18Const.of Drains,Soling,Nallah & PCC at Mala

Nai, PP-169,Sheikhupura

19Const.of Drains,Soling,Nallah & PCC at Dera

Gujar Jatri Road PP-169,Sheikhupura

20Const.of Drains,Soling,Nallah & PCC at

Village Ogand PP-169,Sheikhupura

30.000 14-Dec-12811

Page 289

Page 290: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

20 10.000 9.752 -0.248

Shahjahan Ahmed Bhatti dated 3.9.12

MPA, PP-172

1

Repair of Metalleld Road at Khiara More

Khunda Road to Kotli Lal, PP-172, Distt:

Nanakana Sahib.

2.700 2.689 -0.011 100%

2

Repair of Metalleld Road at Housing Colony

to Railway Road via Dr. Abdul Hai wali Road,

PP-172, Distt: Nanakana Sahib.

2.000 1.151 -0.849 100%

3

Repair of Metalleld Road at Madina Masjid to

Buchakay Road via Gurdvara Ball Nila, PP-

172, Distt: Nanakana Sahib.

2.000 1.949 -0.051 100%

4Construction of Metalled Road at Bhola

Chak, PP-172, Distt: Nanakana Sahib.2.500 2.413 -0.087 100%

5

Construction of Metalled Road at Nathowala

Pannowa Road to Kawan Wali Arrian, PP-

172, Distt: Nanakana Sahib.

2.600 2.443 -0.157 100%

6

Construction of Soling and Drain Ththa Noor

Narran Wala Dhari Fakeer Hussain PP-172,

Distt: Nankana Sahib.

1.500 1.470 -0.030

7

Construction of Soling & Drian Abadi Yousaf

Wala Dhari Farooq and Kot Zahoor-ul-Haq

PP-172, Distt: Nankana Sahib.

1.000 0.970 -0.030 100%

8Construction of Soling & Drian Chah Pacca

PP-172, Distt: Nankana Sahib.1.500 1.434 -0.066 100%

9Construction of Soling & Drian Kot Karra PP-

172, Distt: Nankana Sahib.1.000 0.964 -0.036 100%

10Construction of Soling & Drian Chak

Watowan PP-172, Distt: Nankana Sahib.1.600 1.509 -0.091 100%

11Construction of Soling & Drian Chak No 16-

GB PP-172, Distt: Nankana Sahib.1.600 1.535 -0.065 100%

11 20.000 18.527 -1.473

20.000 03-Sep-12194

Page 290

Page 291: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Shahjahan Ahmed Bhatti dated 14.12.12

MPA, PP-172

1Construction of Soling / Drain at Jani Wala

PP-172, District Nankana Sahib.-10.000

2

Construction of Soling / Drain Karan Wala,

Khadan Wala PP-172, District Nankana

Sahib.

3Construction of Soling / Drain Challar Gujjar

PP-172, District Nankana Sahib.

4Construction of Soling / Drain Kot Sadho

Ram PP-172, District Nankana Sahib.

5Construction of Soling / Drain Mir Pur

Bhattian PP-172, District Nankana Sahib.

6Construction of PCC / Nallah Lehna Das PP-

172, District Nankana Sahib.

7Construction of PCC / Nallah Sant Ram PP-

172, District Nankana Sahib.

8Construction of PCC / Drain Dhor Kot PP-

172, District Nankana Sahib.

9Construction of PCC / Nallah Ratoana PP-

172, District Nankana Sahib.

10Construction of Soling / Drain Bagha PP-

172, District Nankana Sahib.

11Construction of PCC / Drain Chandar Kot

PP-172, District Nankana Sahib.

12Construction of Soling / Drain Chak No. 4 /

GB PP-172, District Nankana Sahib.

13Construction of PCC / Drain Chak No. 6 / GB

PP-172, District Nankana Sahib.

14Construction of PCC / Drain Chak No. 7 / GB

PP-172, District Nankana Sahib.

15Construction of Soling / Nallah Chak No. 8 /

GB PP-172, District Nankana Sahib.

16Construction of Soling / Drain Chak No. 9 /

GB PP-172, District Nankana Sahib.

17Construction of Soling / Drain Chak No. 11 /

GB PP-172, District Nankana Sahib.

30.000 14-Dec-12 10.000811

Page 291

Page 292: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18Construction of Soling / Drain Chak No. 15 /

GB PP-172, District Nankana Sahib.

19Construction of Soling / Drain Chak No. 12 /

GB PP-172, District Nankana Sahib.

20

Construction of Soling / Drain Chak No. 1 /

GB Mehmood Pura PP-172, District Nankana

Sahib.

20 10.000 -10.000

Syed Abrar Hussain Shah dated 14.12.12

MPA, PP-173

1

Const.of PCC/Soling/Nallah/Culverts/ Drain

Dera Mehar Raja Mashmoola Mangat Dera

Lashkar Chorra Langar,Kot Dewan Singh

Azeem Wala,Sorar Taray Garh,PP-

173,Distt.Nankana Sahib

2

Const.of PCC/Soling/Nallah/Drain,Ahata

Langha,Ahata Khushi Ram,Ahata No.5,Ali

Pur Khokharan,Ghulam Abad,Miran Pur Tash

Pur Chorra Delwan Mandi Dogran Gali Malik

Ahsan Wali,PP-173,Distt.Nankana Sahib

3

Const.of PCC/Soling/Nallah/Drain,Ada Malik

Pur,Hari Wala Golar Wala Pin Mangatan

Wala,Abad Mir Langa Lhalhi Shah,Chori

Garan,Jalal Nou,Dera Rai Shahid,PP-

173,Distt.Nankana Sahib

4

Const.of PCC/Soling/Nallah/Drain, Nawan

Kot,Heray,Dera Syed Numberdar,Dera Abdul

Rouf,Hallan Wala,Bata Bichiki,Abadi Galla

Mandi Jattan,Dera Rana BashirPP-

173,Distt.Nankana Sahib

30.000 14-Dec-12 10.000811

30.000 14-Dec-12811

Page 292

Page 293: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Const.of PCC/Soling/Nallah/Drain, Chiti Jatri

Maso Sharif,Haft Madar Haraya,Burj Bibi Gali

Billu More Khunda,PP-173,Distt.Nankana

Sahib

6

Const.of PCC/Soling/Nallah/Drain, Kota Ki

Khai,Kot Rana,Qila Qamar Singh,Thatha Jan

Chak No.2,Chak No.3,Dhari Nazir

Chairman,PP-173,Distt.Nankana Sahib

7

Const.of PCC/Soling/Nallah/Drain, Dhana

Mamiaran,Dhana Ratan Singh,Gohar,Dhari

Manna Dogar,Mouza Panianwali,PP-

173,Distt.Nankana Sahib

8

Const.of Soling/Drain, Chah Essan

Weala,Mouza Babbarwala,Kot Kameer,Kot

Qaim,PP-173,Distt.Nankana Sahib

9

Rehabnilitation iof Road Jaranwala Road

from Kanonan Nehar to Jogay Bahar,PP-

173,Distt.Nankana Sahib.

10.000 -10.000

10Rehabilitation of Road Hira to Peer Kot,PP-

173,Disatt.Nankana Sahib.

10 10.000 -10.000

Shahjahan Ahmed Bhatti dated 14.12.12

MPA, PP-172

1Construction of Soling / Drain at Jani Wala

PP-172, District Nankana Sahib.

2

Construction of Soling / Drain Karan Wala,

Khadan Wala PP-172, District Nankana

Sahib.

3Construction of Soling / Drain Challar Gujjar

PP-172, District Nankana Sahib.

4Construction of Soling / Drain Kot Sadho

Ram PP-172, District Nankana Sahib.

5Construction of Soling / Drain Mir Pur

Bhattian PP-172, District Nankana Sahib.

14-Dec-12811

30.000 14-Dec-12811

30.000

Page 293

Page 294: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Construction of PCC / Nallah Lehna Das PP-

172, District Nankana Sahib.

7Construction of PCC / Nallah Sant Ram PP-

172, District Nankana Sahib.

8Construction of PCC / Drain Dhor Kot PP-

172, District Nankana Sahib.

9Construction of PCC / Nallah Ratoana PP-

172, District Nankana Sahib.

10Construction of Soling / Drain Bagha PP-

172, District Nankana Sahib.

11Construction of PCC / Drain Chandar Kot

PP-172, District Nankana Sahib.

12Construction of Soling / Drain Chak No. 4 /

GB PP-172, District Nankana Sahib.

13Construction of PCC / Drain Chak No. 6 / GB

PP-172, District Nankana Sahib.

14Construction of PCC / Drain Chak No. 7 / GB

PP-172, District Nankana Sahib.

15Construction of Soling / Nallah Chak No. 8 /

GB PP-172, District Nankana Sahib.

16Construction of Soling / Drain Chak No. 9 /

GB PP-172, District Nankana Sahib.

17Construction of Soling / Drain Chak No. 11 /

GB PP-172, District Nankana Sahib.

18Construction of Soling / Drain Chak No. 15 /

GB PP-172, District Nankana Sahib.

19Construction of Soling / Drain Chak No. 12 /

GB PP-172, District Nankana Sahib.

20

Construction of Soling / Drain Chak No. 1 /

GB Mehmood Pura PP-172, District Nankana

Sahib.

20

14-Dec-12811 30.000

Page 294

Page 295: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Rai Aslam Khan Kharal dated 5.9.12

MPA, PP-174

1

Repair of Metalled Road Syed Wala to Pindi

Charri Phase-II, PP-174 Distt: Nankana

Sahib.

3.000 1.463 -1.537 49%

2Repair of Metalled Road Malka Mouj, PP-174

Distt: Nankana Sahib.1.500 1.449 -0.051 100%

3

Const. of Metalled Road Darbar Chan Peer

to Dera Basharat Dogar PP-174 Distt:

Nankana Sahib.

1.500 1.453 -0.047 100%

4Const. of Soling and Drain at Mangu Taro,

PP-174 Distt: Nankana Sahib.0.800 0.784 -0.016 100%

5Const. of Soling and Drain at Attari Wirkan,

PP-174 Distt: Nankana Sahib.0.700 0.689 -0.011 100%

6Const. of Soling and Drain at Kot Bijli Ghar,

PP-174 Distt: Nankana Sahib.0.700 0.685 -0.015 100%

7Const. of Soling and Drain at Thata Keway

Ki, PP-174 Distt: Nankana Sahib.0.500 0.494 -0.006 100%

8Const. of Soling and Drain at Buchaki, PP-

174 Distt: Nankana Sahib.1.000 0.992 -0.008 100%

9Const. of Soling and Drain at Chak No.

77/24, PP-174 Distt: Nankana Sahib.0.800 0.788 -0.012 100%

10Const. of Soling and Drain at Wan Makhan,

PP-174 Distt: Nankana Sahib.0.800 0.756 -0.044 100%

11Const. of Soling and Drain at Chak No.

17/70, PP-174 Distt: Nankana Sahib.0.800 0.784 -0.016 98%

12Const. of Soling and Drain at Chak No.

15/67, PP-174 Distt: Nankana Sahib.0.700 0.686 -0.014 100%

13

Const. of Soling and Drain at Canada Colony

and Chak No. 18/71, PP-174 Distt: Nankana

Sahib.

1.000 0.987 -0.013 100%

14

Const. of Soling and Drain at Old and New

Syed Wala Shahar, PP-174 Distt: Nankana

Sahib.

1.900 1.899 -0.001 100%

15Const. of Soling and Drain at Khaper Ki, PP-

174 Distt: Nankana Sahib.0.800 0.776 -0.024 100%

16Const. of Soling and Drain at Dera Rana

Aftab, PP-174 Distt: Nankana Sahib.1.000 0.988 -0.012 100%

20.000 05-Sep-1247

Page 295

Page 296: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17

Const. of Boundary Wall Grave Yard at

Hallah Syedaan PP-174 Distt: Nankana

Sahib.

0.500 0.483 -0.017 100%

18Const. of PCC at Bara Ghar PP-174 Distt:

Nankana Sahib.1.500 1.484 -0.016 100%

19Const. of Soling and Drain at Pull Kamiaran,

PP-174 Distt: Nankana Sahib.0.500 0.490 -0.010 98%

19 20.000 18.130 -1.870

Rai Aslam Khan Kharal dated 14.12.12

MPA, PP-174

1Const. of Soling / Drain UC-Syed Wala, PP-

174, Distt: Nankana Sahib.3.000 2.862 -0.138 100%

2Const. of Soling / Drain UC-Mehar Pur, PP-

174, Distt: Nankana Sahib.

3Const. of Soling / Drain UC-Shah Bilawal, PP-

174, Distt: Nankana Sahib.

4Const. of Soling / Drain UC-Malka Haji, PP-

174, Distt: Nankana Sahib.3.000 2.881 -0.119 100%

5Const. of Soling / Drain UC-Haider Abad, PP-

174, Distt: Nankana Sahib.2.000 1.892 -0.108 100%

6Const. of Soling / Drain UC-Machora, PP-

174, Distt: Nankana Sahib.

7Const. of Soling / Drain UC-Bara Ghar Lurka,

PP-174, Distt: Nankana Sahib.2.500 2.361 -0.139 100%

8Const. of Soling / Drain UC-Chaind Pur, Baini

Das, PP-174, Distt: Nankana Sahib.

9

Const. of Soling / Drain UC-Barkhurdar

Bachaekay , PP-174, Distt: Nankana Sahib.

10Const. of Soling / Drain UC-Namdar, PP-174,

Distt: Nankana Sahib.

11

Const. of at PCC/ Soling and Drain UC-

Natha, More Khunda, PP-174, Distt:

Nankana Sahib.

30.000 14-Dec-12811

20.000 05-Sep-1247

Page 296

Page 297: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11 10.000 9.996 -0.004

Ch.Ahmad Ali Tolu dated 31.8.12

MPA, PP-178

1

Const. of Metalled Road from Tarkhana Wali

No. 1 to UC office Ramayana Tehsil Kasur

PP-178, Kasur.

4.000 3.908 -0.092 100%

2

Const. of Soling and Drains Nola Village

Rasool Negar Bazid Pur Kujina Wala &

Fatuhi Wala Tehsil Kasur PP-178, Kasur.

4.000 3.794 -0.206 100%

3Const. of Soling and Drains Sheikh Umad

Kohna PP-178, Kasur.2.000 1.940 -0.060 100%

4Const. of Soling and Drains Village Bhala &

Bhulyana PP-178, Kasur.2.000 1.857 -0.143 100%

5

Const. of Soling and Drains Village Maan,

Bhamniwala and Hari Har Tehsil Kasur PP-

178, Kasur.

4.000 3.999 -0.001 100%

6Const. of Soling and Drains Dhoop Sari and

Kalangar Tehsil Kasur PP-178, Kasur.3.000 2.942 -0.058 100%

7Const. of Soling and Drains Bugru Tehsil

Kasur PP-178, Kasur.1.000 0.944 -0.056 100%

7 20.000 19.384 -0.616

Ch.Ahmad Ali Tolu dated 14.12.12

MPA, PP-178

1Repair of Road from Kani Wala to Mohalam

Khurd Tehsil Kasur.

2

Solinf Drain of Nala Bhedian Kalan,Sanda

Phatik,Mohalam Kalan,Abadi Maan,Naikay &

basti gujjran,charh pura,Hussain Khan

Wala,Soling Tasta Sheikh Umad to Tolu

Wala Kasur.

10.000 9.998 -0.002 100%

20.000 26-Jan-0048

30.000 14-Dec-12811

Page 297

Page 298: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Soling Drain & Nala Rasool Pur Chitti Khuhi

Qadi Wind & Haveli Nathu Wali Tehsil Kasur.

4Nala Drain & Soling Havelian Mashmola

Hardo Sahari Tehsil Kasur

5Soling Rasta Abadi Julluin & Soling Tasta

Haveli Chanday Wali Tehsil Kasur.

6Bridge & Soling Rasta Abadi Dona & Chaut

Tehsil Kasur.

7 Nallah Haveli Blaka Singh Tehsil Kasur

8Nala Drain Qutba Kaloomi Noor Pur Pul

Tehsil Kasur.

9Soling Drains Sheikham,Haveli Nooray

Wali,Haveli Budha Singh.

9 10.000 9.998 -0.002

M Hafeez Akhtar Ch. dated 5.9.12

MPA, PP-223

1

Const: of Matalled Road / Soling / Sewer Line

and Nallah at Chak 185/9-L, East and West,

PP-223 Distt: Sahiwal.

5.000 4.269 -0.731 100%

2

Const: of Matalled Road and Repair of

Mettaled Road Add 150/9-L to 151/9-L, PP-

223 Distt: Sahiwal.

5.000 3.065 -1.935 100%

3Const: of Precast Celling Janazgah Harappa

station PP-223 Distt: Sahiwal.0.800 0.676 -0.124 100%

4

Cont: of Soling and Sewer Line inHafiz

Colony Street No. 3 & 4 Harappa Station PP-

223, Distt: Sahiwal.

1.500 1.328 -0.172 100%

5Const of Metalled Road Chak No. 138 /9-L

Barra Farm PP-223 Distt: Sahiwal1.500 0.990 -0.510 100%

6Const of Soling in Shafi Colony 138/9-L

Barra Farm PP-223 Distt Sahiwal.1.400 1.137 -0.263 100%

7Const: of Soling in Abadi Yousaf Sindhi Wali

152/9-L PP-223 Distt: Sahiwal.1.400 1.372 -0.028 100%

30.000 14-Dec-12811

20.000 05-Sep-12195

Page 298

Page 299: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8Const of Metalled Road Gujjar Basti Chak

No. 158/9-L PP-223 Distt: Sahiwal.1.000 0.666 -0.334 100%

9

Const of Metalled Road and Sewer Line 100-

A/6-R Miray Wali Basti, Haji Aslam Bazar,

Distt: Sahiwal

1.200 1.137 -0.063 100%

10

Const of Metalled Road and Sewer, Mian

Nisar Bazar Harappa City PP-223 Distt

Sahiwal.

1.200 1.132 -0.068 100%

10 20.000 15.772 -4.228

M Hafeez Akhtar Ch. dated

MPA, PP-223

1Const.of Metalled Road/Soling/Drain and

Sewer Line in UC-37,PP-223,Distt.Sahiwal8.000 6.574 -1.426 82%

2Const.of Metalled Road/Soling/Drain and

Sewer Line in UC-38,PP-223,Distt.Sahiwal5.000 4.087 -0.913 82%

3Const.of Metalled Road/Soling/Drain and

Sewer Line in UC-39,PP-223,Distt.Sahiwal6.000 2.973 -3.027 50%

4Const.of Metalled Road/Soling/Drain and

Sewer Line in UC-40,PP-223,Distt.Sahiwal11.000 9.799 -1.201 89%

5Const.of Metalled Road/Soling/Drain and

Sewer Line in UC-41,PP-223,Distt.Sahiwal5.000 4.674 -0.326 93%

6Const.of Metalled Road/Soling/Drain and

Sewer Line in UC-7,PP-223,Distt.Sahiwal5.000 3.796 -1.204 76%

7

Widening and Improvement of Metalled Road

at Adda Jhal to Mirdad (Phase-II)PP-

223,Distt.Sahiwal.

20.000 10.956 -9.044 55%

7 60.000 42.859 -17.141

Shahzad Saeed Cheema dated 5.9.12

MPA, PP-224

20.000 05-Sep-12195

60.000 268

Page 299

Page 300: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Const of Soling / Drain / Sewer Line and

Repair of Metalled Road of UC No. 53, 54 &

55, PP-224 Distt: Sahiwal.

4.100 2.891 -1.209 100%

2

Const of Soling / Drain / Sewer Line and

Repair of Metalled Road of UC No. 57, 58, 59

& 70, PP-224 Distt: Sahiwal.

4.800 4.682 -0.118 100%

3

Const of Soling / Drain / Sewer Line and

Repair of Metalled Road of UC No. 60, 65, 66

& 67, PP-224 Distt: Sahiwal.

5.200 5.111 -0.089 100%

4

Const of Soling / Drain / Sewer Line and

Repair of Metalled Road of UC No. 68, 69, 66

PP-224 Distt: Sahiwal.

5.900 5.877 -0.023 100%

4 20.000 18.561 -1.439

Engr.Shah Elahi, BSC Mech Eng dated 1.11.12

MPA, PP-371

1Renovation and PCC St. Paul Church,

Shadbagh, Lahore.25.000 1.500 -23.500 100%

2Construction of Boundary Wall and Fence of

Graveyard Attokiawan.1.500 1.500 100%

3Construction of Church / Boundary Wall,

Warra-Allah Dad., Lahore.2.000 2.000 100%

4Repairing / Construction of Janazgah Gora

Graveyard at Dharampura, Lahore.1.000 1.000 100%

5Construction of Boundary Wall of Graveyard,

Fazalia Colony, Lahore.0.800 0.800 100%

6Construction and Renovation of Church

Bhaney Dhalwan, Lahore.2.500 2.500 100%

7Extension of Church Koat Done Chand,

Lahore.1.000 1.000 100%

8

Construction of PCC, Sewerage,

Berhammanabad Church Street and Link

Street, Mandianwala, Lahore.

1.000 1.000 100%

9Construction of PCC Sewerage, Church

Street, Durkpura, Lahore.1.000 1.000 100%

10Construction of PCC Sewerage, Link Street,

Youhanabad, Lahore.2.500 2.500 100%

20.000 05-Sep-12196

49.000 01-Nov-12676

Page 300

Page 301: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Construction of PCC Main Link Minhala Road

Lahore.0.800 0.800 100%

12Construction of PCC Sewerage, Asif Town

No. 2, lahore.3.000 3.000 100%

13Construction of PCC Sewerage, Asif Town

No. 1, Lahore.1.700 1.700 100%

14Construction of PCC / Drain at Khaliq Nagar,

Lahore.2.000 2.000 100%

15Construction and Renovation of Church at

Bhaw Meher Din Town Lahore.2.500 2.500 100%

16

Extention & Construction of Pakistan

masehee Rohanee Kaliaian Church

Mehmood Boote, Lahore.

2.000 2.000 100%

17Construction of PCC / Sewerage at Glaxo

TownLahore.1.000 1.000 100%

18

Construction of Church Bahar Colony, Dr.

Jamil Nasir (the chruch of Pentecostal),

Lahore.

3.000 3.000 100%

19

Construction of PCC and Boundary Wall of

Church Presbyterian 59 Nickilson Road,

Lahore.

0.900 0.900 100%

20Construction of Metalled Road Begampura,

G.T Road, Lahore.2.000 2.000 100%

21Construction of PCC / Sewerage at Bhaow

Meher Din Town, Lahore.1.000 1.000 100%

22Construction of PCC / Sewerage Bau Meher

Din Town Lahore.2.000 2.000 100%

23Construction of PCC / Drain at Bhadian,

Chak No. 35 Muhammad Husan Street.0.600 0.600 100%

24Construction of PCC / Drain at Bhadian Chak

No. 35, Yaqub Ghadee Street.0.500 0.500 100%

25Construction of PCC / Drain at Liaqat Street.

0.500 0.500 100%

26

Construction of PCC / Drain at Hameed

Town and Garden Town Muhmmad

Safderwala Bazar.

0.500 0.500 100%

27Construction of PCC / Drain at Niazwala

Bazar.0.500 0.500 100%

49.000 01-Nov-12676

Page 301

Page 302: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

28Construction of PCC / Drain at Gulzar Masih

Street.0.500 0.500 100%

29Construction of PCC / Drain at Darbarwala

Bazar.0.800 0.800 100%

30Construction of PCC / Drain at Malik

Munawerwala Bazar.0.500 0.500 100%

31Construction of PCC / Drain at Iqbalwala

Bazar.0.500 0.500 100%

31 25.000 41.600 16.600

Malik Mushtaq Awan dated 30.8.12

Ex-Minister (NA-133)

1

Const. of PCC Flooring Chak Shanpur, City

Sheikhupura, Distt: Sheikhupura NA-133. 2.500 2.440 -0.060 100%

2

Const. of PCC Flooring Dera Charagh Deen,

City Sheikhupura, Distt: Sheikhupura NA-

133.

3.000 2.953 -0.047 100%

3

Const. of PCC Flooring Araiyanwala Kapery,

City Sheikhupura, Distt: Sheikhupura NA-

133.

3.000 2.977 -0.023 100%

4

Const. of PCC Flooring Salar Town

Sharqpur Road, City Sheikhupura, Distt:

Sheikhupura NA-133.

3.000 2.920 -0.080 100%

5Const. of Boundary Wall Graveyard Mukta

City Sheikhupura NA-133.2.000 1.991 -0.009 100%

6

Const. of PCC Flooring Zafar Ali Road

Purana Sheher, City Sheikhupura, Distt:

Sheikhupura NA-133.

3.000 2.922 -0.078 100%

7

Const. of PCC Flooring Street No. 1

Faisalabad Road Kapery Town, City

Sheikhupura, Distt: Sheikhupura NA-133.

2.500 2.406 -0.094 100%

8

Const. of PCC Flooring Muhallah Roshan

Pura Behind National Floor Mill, City

Sheikhupura, Distt: Sheikhupura NA-133.

2.000 1.960 -0.040 100%

49.000 01-Nov-12676

30.000 30-Aug-12127

Page 302

Page 303: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Const. of PCC Flooring St. Masjid Wali St.

Zafar Wali Tariq Road, City Sheikhupura,

Distt: Sheikhupura NA-133.

2.500 2.490 -0.010 100%

10

Const. of PCC Flooring Farooq Town Ghang

Road City Sheikhupura., City Sheikhupura,

Distt: Sheikhupura NA-133.

3.000 2.897 -0.103 100%

11

Const. of PCC Flooring Damuana Road St.

Mian Tahir and Madrisa Wali City

Sheikhupura., City Sheikhupura, Distt:

Sheikhupura NA-133.

3.000 2.942 -0.058 100%

12

Const. of PCC Flooring Janazgah Noorpur

Mandi Farooqabad, Distt: Sheikhupura NA-

133.

0.500 0.478 -0.022 100%

12 30.000 29.376 -0.624

Khurram Munawar Manj dated 6.9.12

Notable (NA-134)

1

Const. of Carpet Road Warn Farooqabad

Road Remaining Portion-I, NA-134 Distt:

Sheikhupura.

10.000 9.920 -0.080 100%

2

Const. of Carpet Road Warn Farooqabad

Road Remaining Portion-II, NA-134 Distt:

Sheikhupura.

10.500 10.427 -0.073 100%

3

Const. of Metalled Road Manawala Road to

Purana Jheenda, NA-134 Distt: Sheikhupura. 10.000 9.886 -0.114 100%

4

Const. of Metalled Road at Manian Wala to

Station Nawan Pind, NA-134 Distt:

Sheikhupura.

5.000 5.000 100%

5Const. of Soling Drain Ajanian wala NA-134

Distt: Sheikhupura.1.000 0.980 -0.020 100%

6Const. of Soling Drain Keelay NA-134 Distt:

Sheikhupura.1.000 0.970 -0.030 100%

7

Const. of Soling Drain Dera Shireen wala

Bashmoola Ranay kay Manara NA-134 Distt:

Sheikhupura.

0.600 0.563 -0.037 100%

8Const. of Soling Drain at Kot Ranjeet NA-134

Distt: Sheikhupura.0.800 0.784 -0.016 100%

30.000 30-Aug-12127

90.000 06-Sep-12239

Page 303

Page 304: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9Const. of Soling Drain at Dera Hameed

Kamboh UC-77 NA-134 Distt: Sheikhupura.0.600 0.578 -0.022 100%

10

Const. of Soling Drain at Gali Nambardar

Lalkhan wali UC-77 NA-134 Distt:

Sheikhupura.

0.400 0.399 -0.001 100%

11Const. of Soling Drain at Abadi Mansoor

abad NA-134 Distt: Sheikhupura.0.600 0.578 -0.022 100%

12

Const. of Metalled Road Chowk Purana

Jheenda to Bhar, NA-134 Distt: Sheikhupura. 11.000 10.771 -0.229 100%

13Const. of Metalled Road / PCC at Makki 460

to Bhutter, NA-134 Distt: Sheikhupura.12.500 12.481 -0.019 100%

14Const. of Soling at Hardev to Dera Masjid

Wala, NA-134 Distt: Sheikhupura.1.000 0.983 -0.017 100%

15

Const. of Metalled Road at Saim Nallah

Bridge to Mojoki Mallian, NA-134 Distt:

Sheikhupura.

10.000 9.831 -0.169 100%

16

Const. of Carpet Road Chachu key Stop to

Mirza Wirkan from Gopay Raw, NA-134 Distt:

Sheikhupura.

15.000 15.000 100%

16 90.000 89.151 -0.849

Syed Ali Abbas Gul Agha dated 9.6.12

Ex-MPA PP-164

1

Const. of PCC, Drain, Soling & Nallah in

Villages of UC-No. 25 Bhaiyan Wala Kalan,

PP-164, Distt: Sheikhupura.

2.000 1.949 -0.051 100%

2

Const. of PCC, Drain, Soling & Nallah in

Chak No. 32 & 33 UC-25, PP-164, Distt:

Sheikhupura.

2.000 1.949 -0.051 100%

3

Const. of PCC, Drain, Soling & Nallah in

Villages of UC No. 23 Chak 44, PP-164,

Distt: Sheikhupura.

2.000 1.944 -0.056 100%

4

Const. of PCC, Drain, Soling & Nallah in

Villages of UC No. 26 Shamkay, PP-164,

Distt: Sheikhupura.

2.000 0.708 -1.292 100%

90.000 06-Sep-12239

40.000 09-Jun-12248

Page 304

Page 305: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Const. of PCC, Drain, Soling & Nallah

Different Streets of Ferozewala Urban-I UC

No. 27, PP-164, Distt: Sheikhupura.

2.000 1.948 -0.052 100%

6

Const. of PCC, Drain, Soling & Nallah

Different Streets of Ferozewala Urban-II UC

No. 28, PP-164, Distt: Sheikhupura.

2.000 1.953 -0.047 100%

7

Const. of PCC, Drain, Soling & Nallah

Different Streets of Ferozewala Urban-III UC

No. 29, PP-164, Distt: Sheikhupura.

2.000 1.960 -0.040 100%

8

Const. of PCC, Drain, Soling & Nallah

Different Streets of Kot Abdul malik Urban-I

UC No. 34, PP-164, Distt: Sheikhupura.

2.000 1.956 -0.044 100%

9

Const. of PCC, Drain, Soling & Nallah

Different Streets of Kot Abdul malik Urban-II

UC No. 35, PP-164, Distt: Sheikhupura.

2.000 1.947 -0.053 100%

10

Const. of PCC, Drain, Soling & Nallah

Different Streets of Kot Abdul malik Urban-III

UC No. 36, PP-164, Distt: Sheikhupura.

2.000 1.961 -0.039 100%

11

Const. of PCC, Drain, Soling & Nallah in

Villages of UC-No 37 Momanpura, PP-164,

Distt: Sheikhupura.

2.000 1.941 -0.059 100%

12

Const. of PCC, Drain, Soling & Nallah in

Villages of UC-No 38 Mandiali, PP-164, Distt:

Sheikhupura.

2.000 1.953 -0.047 100%

13

Const. of PCC, Drain, Soling & Nallah in

Villages of UC-No 39 Kot Pindi Das, PP-164,

Distt: Sheikhupura.

2.000 1.940 -0.060 100%

14

Const. of PCC, Drain, Soling & Nallah in

Villages of UC-No 41 Khanpur, PP-164, Distt:

Sheikhupura.

2.000 1.948 -0.052 100%

15

Const. of Metalled Road from Sheikhupura

Kot Pindi Das Road to Qila Sattar Shah

Village, PP-164, Distt: Sheikhupura.

12.000 11.776 -0.224 100%

15 40.000 37.833 -2.167

40.000 09-Jun-12248

Page 305

Page 306: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Shahid Manzoor Gill dated 12.11.12

Notable

1Const: of PCC at UC-Jogay Kot Nou Bahar,

Distt: Nankana Sahib, (NA-136).4.000 3.844 -0.156 96%

2

Const: of PCC at UC-Jogay Kot Nou Bahar

Chachkay Gill, Distt: Nankana Sahib, (NA-

136)

3.000 2.921 -0.079 97%

3Const: of Carpet Road Jalal to Nehar Distt:

Nankana Sahib (NA-136)6.000 2.446 -3.554 41%

4Const: of PCC at UC-100 Manawala, Distt:

Nankana Sahib, (NA-136).5.000 4.883 -0.117 98%

5Const: of PCC at Faisal Town Manawala,

Distt: Nankana Sahib, (NA-136)4.000 3.920 -0.080 98%

6

Const: of PCC and Soling UC-Qila Sheryou

Singh, Distt: Nankana Sahib, (NA-136) 2.500 2.450 -0.050 98%

7Const: of PCC at UC-99, Distt: Nankana

Sahib, (NA-136) 2.000 1.822 -0.178 91%

8Const: of PCC at UC-Ganaish Pur, Distt:

Nankana Sahib, (NA-136) 3.500 3.430 -0.070 98%

9Const: of PCC at UC-Bhagaira, Distt:

Nankana Sahib, (NA-136) 3.500 2.479 -1.021 71%

10

Installation of Water Filteration Plant at Ghula

Watowan, Distt: Nankana Sahib (NA-136) 1.000 0.970 -0.030 97%

11Const: of PCC at UC Haft Ladar, Distt:

Nankana Sahib, (NA-136) 3.500 3.404 -0.096 97%

12Const: of Culverts at Macharala, Distt:

Nankana Sahib (NA-136)0.500 0.489 -0.011 98%

13

Installation of Water Filteration Plant at

Chachkay Gill, Distt: Nankana Sahib (NA-

136)

1.000 0.763 -0.237 76%

14

Installation of Water Filteration Plant at Basa

Harpur, Distt: Nankana Sahib (NA-136) 1.000 0.963 -0.037 96%

15Installation of Water Filteration Plant at Haft

Ladar, Distt: Nankana Sahib (NA-136) 1.000 0.765 -0.235 77%

50.000 12-Nov-12708

Page 306

Page 307: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

16Const: of PCC at UC Miran Pur, Distt:

Nankana Sahib, (NA-136) 3.500 2.891 -0.609 83%

17Installation of Water Filteration Plant at UC

Lagar, Distt: Nankana Sahib (NA-136) 1.000 0.963 -0.037 96%

18Const: of PCC and Soling at UC-Bhikhi,

Distt: Nankana Sahib, (NA-136) 3.000 2.842 -0.158 95%

19

Installation of Water Filteration Plant at

Mohallah Liaqat DSP, Distt: Nankana Sahib

(NA-136)

1.000 0.960 -0.040 96%

19 50.000 43.205 -6.795

Ch.Aitzaz Ahsan dated 18.12.12

Senator

1

Construction of PCC / Sewerage at Shadi

Pura, Jaddah Colony, Mehmood Booti, in

Various Streets UC-39, Distt: Lahore.

7.000 6.900 -0.100 99%

2

Construction of PCC / Sewerage / Tuff Tile at

Salamat Pura, Haji Pura, Karim Nagar, Takia

Darbar Wali in Various Streets UC-40, Distt:

Lahore.

2.500 2.463 -0.037 100%

3

Construction of PCC / Sewerage / Tuff Tile at

Kotli Kaasi, Gulbahar Colony in Various

Streets UC-40, Distt: Lahore.

5.000 3.006 -1.994 60%

4

Construction of PCC / Sewerage / Carpet

Road at Harbanse Pura, Qalander Pura,, in

Various Streets UC-41, Distt: Lahore.

9.000 8.924 -0.076 100%

5

Construction of PCC / Sewerage at Siraj

Pura, in Various Streets UC-42, Distt:

Lahore.

3.000 2.923 -0.077 100%

6

Construction of PCC / Sewerage at, Muslim

Abad, in Various Streets UC-42, Distt:

Lahore.

3.500 3.428 -0.072 100%

7

Construction of PCC / Sewerage at Wali Park

Fateh Garh, in Various Streets UC-43, Distt:

Lahore.

8.000 7.762 -0.238 97%

50.000 12-Nov-12708

100.000 18-Dec-12812

Page 307

Page 308: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Construction of PCC / Sewerage at Taj

Mehal Park, Bhattah Gadian wala, in Various

Streets UC-44, Distt: Lahore.

4.000 3.124 -0.876 78%

9

Construction of PCC / Sewerage at Fateh

Garh, in Various Streets UC-44, Distt:

Lahore.

4.500 4.377 -0.123 97%

10

Construction of PCC / Sewerage at Mian

Colony near Abadi Area Sukh Nehar, in

Various Streets UC-45, Distt: Lahore.

8.000 6.775 -1.225 85%

11

Construction of PCC / Sewerage at Angoori

Bagh Link G.T Road and Peoples Colony, in

Various Streets UC-46, Distt: Lahore.

8.000 7.929 -0.071 100%

12

Construction of PCC / Sewerage at Link

Sohwari Bazar, in Various Streets UC-47,

Distt: Lahore.

7.500 7.290 -0.210 97%

13

Construction of PCC / Sewerage / Tuff Tile at

Mughal Pura, in Various Streets UC-48,

Distt: Lahore.

4.500 3.798 -0.702 84%

14

Construction of PCC / Sewerage at Mian Mir

Colony, in Various Streets UC-54, Distt:

Lahore.

2.500 2.375 -0.125 95%

15

Construction of PCC / Sewerage / Tuff Tile at

Gulstan Colony, Habibia Colony, Maqbool

Park and Rehmat Colony, Eid Gah Chobacha

in Various Streets UC-55, Distt: Lahore.

7.000 3.925 -3.075 56%

16

Construction of PCC / Sewerage at Ghazi

Abad, Riaz Pura, Taj Pura, in Various Streets

UC-56, Distt: Lahore.

6.500 4.465 -2.035 69%

17

Construction of PCC / Sewerage at Taj Pura,

in Various Streets UC-57, Distt: Lahore. 2.500 1.939 -0.561 78%

18

Construction of PCC / Sewerage at Mohallah

Nabi Nagar, Mohallah Dar-ul-Islam,

Mundaran Wala Takia UC-58, Distt: Lahore.3.500 2.962 -0.538 85%

19

Construction of PCC / Nallah at Nizamabad

Link Street Main Bazar UC-58, Distt: Lahore. 3.500 3.025 -0.475 86%

100.000 18-Dec-12812

Page 308

Page 309: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

19 100.000 87.390 -12.610

Ch Pervaiz Elahi

State Guest Hosue dated 5.3.13

976 05-Mar-13 1.500

Construction of washroom for camp office of

Dy Prime Minister/Senior Federal Minister in

State Guest House Lahore

1.500 -1.500

1.500 -1.500

Sardar Tufail Ahmed Khan dated 19.10.12

Notable, NA-138

1

Const: of Soling and Culvert from Canal Kot

Sardar Muhammad Khan to Naziree Proteen

Farm, NA-138, Distt: Kasur.

1.139 1.116 -0.023 100%

2

Rehabilitation / Repair of Metalled Road and

Drain at Kot Chajju Khan Wala, NA-138,

Distt: Kasur.

1.750 1.708 -0.042 100%

3

Rehabilitation / Repair of Metalled Road and

Nallah at Olakh Ottar, NA-138, Distt: Kasur. 4.248 2.168 -2.080 51%

4

Rehabilitation / Repair of Metalled Road and

Nallah at Dhalla Maini, NA-138, Distt: Kasur. 3.000 2.885 -0.115 100%

5

Rehabilitation / Repair of Metalled Road and

Nallah at Rawal Jhanghar, NA-138, Distt:

Kasur.

3.800 2.059 -1.741 54%

6Const: of Soling and Drain at Mudkay Dhari

Wal, NA-138, Distt: Kasur.1.500 1.470 -0.030 100%

CCD-II, Lahore

50.000 19-Oct-12601

Page 309

Page 310: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Rehabilitation / Repair of Metalled Road and

Nallah at Handal, NA-138, Distt: Kasur. 3.800 2.785 -1.015 73%

8Const: of PCC Street and Drain at Chak

No.54, NA-138, Distt: Kasur.1.900 1.911 0.011 100%

9

Const: of Metalled Road from Mir Sahib Road

to Bhatti Town, Kot Radha Kishan, NA-138,

Distt: Kasur.

3.300 3.265 -0.035 100%

10

Rehabilitation / Repair of Metalled Road and

Nallah from Nathoki Village to Ratti Pindi, NA-

138, Distt: Kasur.

10.163 9.852 -0.311 97%

11Const: of Soling and Drain at Haveli Safaid

Khan, NA-138, Distt: Kasur.0.700 0.681 -0.019 100%

12Const: of Soling and Drain at Village Khara,

NA-138, Distt: Kasur.1.000 0.949 -0.051 100%

13Const: of PCC Street / Soling and Drain at

Mustafa Abad, NA-138, Distt: Kasur.4.000 3.325 -0.675 83%

14Const: of Soling and Drain at Rao Khan

Wala, NA-138, Distt: Kasur.1.000 0.980 -0.020 100%

15Const: of Soling and Drain at Sirhali Khurd,

NA-138, Distt: Kasur.1.000 0.980 -0.020 100%

16Const: of Soling and Drain at Raja Jang,

NA-138, Distt: Kasur.2.700 2.638 -0.062 100%

17

Const: of Soling and Drain at Village Kallay

Wala, UC-Orrarah, NA-138, Distt: Kasur. 1.000 0.980 -0.020 100%

18

Const: of Soling and Drain at Village

Orrarah Nau & Orrarah Kohna, UC-Orrarah,

NA-138, Distt: Kasur.

2.000 1.960 -0.040 100%

19

Const: of Soling and Drain at Village

Gaddoki, UC-Ibrahim Abad, NA-138, Distt:

Kasur.

2.000 1.960 -0.040 98%

19 50.000 43.672 -6.328

50.000 19-Oct-12601

Page 310

Page 311: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Dr.Azeem UD Din Lakhvi dated 12.11.12

Notable, NA-140

1

Const: of Metalled Road at Canal to Tara

Ghar Chowk UC-Gohar Hithar Tehsil & Distt:

Kasur, NA-140.

5.000 4.783 -0.217 96%

2Const: of Metalled Road at UC-Qull Tehsil

Chunian Distt: Kasur, NA-140.7.000 6.810 -0.190 97%

3Const: of Metalled Road at UC-Talwandi

Tehsil Chunian Distt: Kasur, NA-140.5.000 4.672 -0.328 60%

4Const: of Metalled Road at UC-Khai Tehsil

Chunian Distt: Kasur, NA-140.1.500 1.400 -0.100 93%

5

Const: of Metalled Road at UC-Marali Chowk

to Graveyard Khudian UC-Khudian Tehsil &

Distt: Kasur, NA-140.

3.500 2.338 -1.162 40%

6

Const: of Metalled Road at Basti Mera to

Kangan Pur UC-Kanganpur, Tehsil Chunian

Distt: Kasur, NA-140.

3.500 3.205 -0.295 35%

7Const: of Soling / Drain at UC-Allahabad

Tehsil Chunian Distt: Kasur, NA-140.3.500 3.430 -0.070 100%

8Const: Soling / Drain at UC-Gelan Hithar

Tehsil Chunian Distt: Kasur, NA-140.3.000 2.940 -0.060 100%

9Const: Soling / Drain at UC-Landa Wala

Tehsil Chunian Distt: Kasur, NA-140.3.000 2.912 -0.088 100%

10Const: Soling / Drain at UC-Qul Tehsil

Chunian Distt: Kasur, NA-140.2.000 1.950 -0.050 100%

11Const: of Soling / Drain at UC-Jajal Tehsil

Chunian Distt: Kasur, NA-140.2.000 1.954 -0.046 100%

12Const: of Soling / Drain at UC-Khai Tehsil

Chunian Distt: Kasur, NA-140.1.500 1.464 -0.036 100%

13Const: of Soling / Drain at UC-Usman Wala

Tehsil & Distt: Kasur, NA-140.2.000 1.954 -0.046 100%

14Const: of Soling / Drain at UC-Dholan Tehsil

& Distt: Kasur, NA-140.2.000 1.960 -0.040 100%

15Const: of Soling / Drain at UC-Pial Kalan

Tehsil & Distt: Kasur, NA-140.3.000 2.832 -0.168 100%

16Const: of Soling / Drain at UC-Beroon

Khudian Tehsil & Distt: Kasur, NA-140.1.500 1.466 -0.034 100%

50.000 12-Nov-12706

Page 311

Page 312: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17

Protection Reiver Bund with Earth Filling at

UC-Mokal Tehsil Chunian Distt: Kasur, NA-

140.

1.000 0.954 -0.046 100%

17 50.000 47.024 -2.976

Sardar Talib Hussain Nakai dated 27.8.12

Mna, NA-142

1

Construction of Metalled Road from Buggi

Wali Pulli to Kot Jathool (Alpa Minor) UC-

Alpa Kalan, NA-142, Distt: Kasur.

14.700 14.570 -0.130 100%

2

Construction of Metalled Road from Rakh

Wala to Behar Wal (Remaining Portion), NA-

142, Distt: Kasur.

11.200 10.933 -0.267 100%

3

Construction of Metalled Road from Hallah

Road Thokar to Kot Baba Rattay Khan, NA-

142, Distt: Kasur.

12.200 7.803 -4.397 64%

4

Construction & Rehabilitation of Metalled

Road from Adda Sheikhum to Jhoke

Sheikhum, NA-142, Distt: Kasur.

12.540 11.823 -0.717 94%

5

Const: of Soling / Drain / Nallah and Culverts

in Village Jaggo Wala Chak No.40, UC-

Sheikham, NA-142, Distt: Kasur.

2.560 2.509 -0.051 100%

6

Construction & Rehabilitation of Metalled

Road / Soling and Nallah from Beharwal

Kalan to Kot Hitram to Kot Raja till Thathi

Ottar Grid Station, NA-142, Distt: Kasur..

26.000 22.386 -3.614 86%

7

Construction & Rehabilitation of Metalled

Road / Retaining Wall / Nallah from

Bhoonekey Sarai Mughal Road to Katarmal,

UC-Rakh Wala, NA-142, Distt: Kasur.

20.800 16.021 -4.779 77%

7 100.000 86.045 -13.955

50.000 12-Nov-12706

100.000 27-Aug-12107

Page 312

Page 313: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Akram Masih Gill dated 4.10.12

MNA, NA-340

1

Const: of Soling and Drain at Union Council

No.60 & 18, Tehsil Chunian, Distt: Kasur. 1.000 0.987 -0.013 98%

2Const: of Metalled Road at Kalarkabad, Post

Office Khas, Distt: Kasur.2.000 1.137 -0.863 75%

2 3.000 2.124 -0.876

Malik Ghulam Habib Awan dated 11.9.12

PP-158

1Const: of Janazgah at Village Narror, UC-53,

PP-158, Distt: Lahore.2.000 1.960 -0.040 100%

2Const: of PCC Street and Nallah at Mar

Mari, UC-50, PP-158, Distt: Lahore.2.000 1.906 -0.094 100%

3Const: of Soling and Nallah at Talwara, UC-

50, PP-158, Distt: Lahore.2.000 1.960 -0.040 100%

4

Const: of Soling / PCC Street and Nallah at

Tajh Garh, UC-52, PP-158, Distt: Lahore. 3.000 2.940 -0.060 100%

5Const: of PCC Street and Nallah at Village

Natt, UC-52, PP-158, Distt: Lahore.1.500 1.470 -0.030 100%

6

Const: of Soling / PCC Street and Nallah at

Wara Shah Muhammad, UC-61, PP-158,

Distt: Lahore.

2.000 1.958 -0.042 100%

7Const: of Soling / PCC Street and Nallah at

Nathoki, UC-53, PP-158, Distt: Lahore.3.000 2.940 -0.060 100%

8Const: of PCC Street and Nallah at

Banghali, UC-61, PP-158, Distt: Lahore.3.000 2.901 -0.099 100%

9Const: of PCC Street and Nallah at Chappa,

UC-53, PP-158, Distt: Lahore.1.500 1.470 -0.030 100%

9 20.000 19.505 -0.495

3.000 04-Oct-12503

20.000 11-Sep-12344

Page 313

Page 314: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Ghulam Habib Awan dated 14.12.12

PP-158

1Const: of Soling / PCC Street and Nallah in

UC-Baseen, PP-158, Distt: Lahore.5.000 -5.000

2Const: of Soling / PCC Street and Nallah in

UC-Dogran Kalan, PP-158, Distt: Lahore.5.000 -5.000

3Const: of Soling / PCC Street and Nallah in

UC-53, Manhala, PP-158, Distt: Lahore.4.518 4.518 90%

4

Const: of Soling / PCC Street and Nallah in

UC-61, Banghyali, PP-158, Distt: Lahore. 3.169 3.169 60%

5

Const: of Soling / PCC Street and Nallah in

UC-65, Hadiyara, , PP-158, Distt: Lahore.

6Const: of Soling / PCC Street and Nallah in

UC-62, Barki, PP-158, Distt: Lahore.

6 10.000 7.687 -2.313

Ch.Muhammad Ilyaas Khan dated 12.9.12

Ex-MPA, PP-175

1Const: of PCC Street / Soling / Drain and

Nallah at Raja Jang, PP-175, Distt: Kasur.20.000 19.407 -0.593 100%

2Const: of Soling / Drain and Nallah at Village

Lakhnay Kay, PP-175, Distt: Kasur.4.000 2.789 -1.211 70%

3Const: of Soling / Drain and Nallah at Village

Sirhali Kalan, PP-175, Distt: Kasur.9.000 7.335 -1.665 82%

4Const: of Soling / Drain and Nallah at Village

Atheel Pur, PP-175, Distt: Kasur.2.500 2.440 -0.060 100%

5Const: of Soling / Drain and Nallah at Village

Bhoja, PP-175, Distt: Kasur.2.500 2.450 -0.050 100%

6Const: of Nallah at New Abadi Bonga

Ganda Singh, PP-175, Distt: Kasur.2.000 1.960 -0.040 100%

6 40.000 36.381 -3.619

30.000 14-Dec-12811

40.000 12-Sep-12371

Page 314

Page 315: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Akhtar Hussain Naul dated 11.9.12

MPA, PP-176

1

Construction / Rehabilitation of Metalled

Road By Pass of Olakh Ottar, PP-176, Distt:

Kasur.

4.500 4.410 -0.090

2

Construction / Rehabilitation of Metalled

Road from Olakh Ottar to Naul Ottar, PP-176,

Distt: Kasur.

6.000 5.880 -0.120

3

Construction of Metalled Road along Handal

Canal, Wara Tarkhana, PP-176, Distt: Kasur. 2.500 2.437 -0.063

4

Construction of Metalled Road from Wara

Pathana to Gorrukey Jhuggian, PP-176,

Distt: Kasur.

2.500 1.243 -1.257

5

Construction of Metalled Road from Jawahar

Singh Wala to Havali Changhar, PP-176,

Distt: Kasur.

4.500 1.921 -2.579

5 20.000 15.891 -4.109

Malik Akhtar Hussain Naul dated 14.12.12

MPA, PP-176

1

Const: of PCC Street / Drain and Boundary

Wall of Graveyard at Mohallah Jamiya

Farooqia , UC No.14, City Kot Radha Kishan,

PP-176, Distt: Kasur.

2

Const: of PCC Street and Drain at

Mohallah Balochan, UC No.14, City Kot

Radha Kishan, PP-176, Distt: Kasur.

3

Const: of PCC Street / Drain and Boundary

Wall of Primary School at Teacher Colony ,

UC No.15, City Kot Radha Kishan, PP-176,

Distt: Kasur.

20.000 11-Sep-12345

30.000 14-Dec-12811

Page 315

Page 316: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Const: of PCC Street and Drain at Chowki

Mohallah, UC No.15, City Kot Radha Kishan,

PP-176, Distt: Kasur.

5Const: of Soling and Drain in Village Chak

55, UC- Chak 55, PP-176, Distt: Kasur.

6

Const: of Soling and Drain in Village Mudkay,

UC- Mudkay, PP-176, Distt: Kasur. 3.300 -3.300 40%

7

Const: of Soling and Drain in Village Olakh

Ottar, UC- Olakh Ottar, PP-176, Distt: Kasur. 3.300 3.234 -0.066 95%

8Const: of Soling and Drain in Village Zafar

Kay, UC- Zafar Kay, PP-176, Distt: Kasur.3.400 2.946 -0.454 95%

8 10.000 6.180 -3.820

Sardar Muhammad Hussain Dogar dated 10.9.12

MPA, PP-179

Const: of Soling and Drain at UC-Rajowalno,

PP-179, Distt: Kasur2.000 1.959 -0.041 100%

Const: of Soling and Drain at UC-Gohar

Hathar, PP-179, Distt: Kasur2.000 1.399 -0.601 70%

Const: of Soling and Drain at UC-Olakh

Hathar, PP-179, Distt: Kasur2.000 1.960 -0.040 100%

Const: of Soling and Drain at UC-Fetah Pur,

PP-179, Distt: Kasur3.000 2.940 -0.060 100%

Const: of Soling and Drain at UC-Khai

Hathar, PP-179, Distt: Kasur1.000 0.913 -0.087 100%

Const: of Metalled Road at Malam Khurd to

Gohar Minor Pull, PP-179, Distt: Kasur5.000 2.685 -2.315 54%

Const: of Metalled Road at Ganja Minor to

Gohar, PP-179, Distt: Kasur5.000 4.893 -0.107 98%

20.000 16.749 -3.251

30.000 14-Dec-12811

342 10-Sep-12 20.000

Page 316

Page 317: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Jhanzaib Hasan dated 17.10.12

Notable, PP-180

1

Const: of PCC Street / Soling and Nallah in

Village Mokal, UC-Mokal, PP-180, Distt:

Kasur.

17.700 6.987 -10.713 45%

2

Const: of PCC Street / Soling and Nallah in

Village Theengh More,UC-Theengh More,

PP-180, Distt: Kasur.

3

Const: of PCC Street / Soling and Nallah in

Village Kangan Pur, UC-Kangan Pur, PP-

180, Distt: Kasur.

2.300 -2.300 20%

4

Const: of PCC Street / Soling and Nallah in

Village Jajal UC-Jajal, PP-180, Distt: Kasur.

4 20.000 6.987 -13.013

Sardar Muhammad Hussain Dogar dated 14.12.12

MPA, PP-179

1

Const: of Soling / PCC Street and Nallah in

Village Jora, Village Noor Pur and Village

Fateh Pur UC-Fateh Pur, PP-179, Distt:

Kasur.

3.000 2.905 -0.095 95%

2

Const: of Soling / Nallah and Bridge in Village

Rattanay Wala, Village Thati Usman Wala

and Village Gohar Hithar UC-Gohar Hithar,

PP-179, Distt: Kasur.

3

Const: of Soling and Nallah in Village Jagoo

Wala, Village Kacha Paka and Village

Dhollan UC-Dhollan, PP-179, Distt: Kasur.

4Const: of Soling / PCC Street and Nallah in

City Khuddian, PP-179, Distt: Kasur.3.000 2.940 -0.060 95%

5

Const: of Soling and Nallah in Vilage

Mehmood Pura and Village Qabar Kot UC-

Khuddian Rural, PP-179, Distt: Kasur.

2.000 1.942 -0.058 95%

40.000 17-Oct-12549

30.000 14-Dec-12811

Page 317

Page 318: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Const: of Soling and Nallah in Village

Dhalla, Village Marali and Village Olakh

Hithar, UC-Olakh Hithar, PP-179, Distt:

Kasur.

7

Const: of Soling and Nallah in Village

Sanda, Village Said Pur and Village Sikandar

Pur UC-Khai Hithar, PP-179, Distt: Kasur.

8

Const: of Soling and Nallah in Village Bhair,

Village Baghiyana and Village Talwandi, UC-

Talwandi, PP-179, Distt: Kasur.

9

Const: of Soling and Nallah in Village

Daokay and Village Qull UC-Qull, PP-179,

Distt: Kasur.

10

Const: of Soling and Nallah in Village Kot

Salamat Pura, Village Dhingh Shah and

Village Pial Kalan UC-Pial Kalan, PP-179,

Distt: Kasur.

11

Const: of Soling and Nallah in Village Mandi

Usman Wala UC-Mandi Usman Wala, PP-

179, Distt: Kasur.

12

Const: of Soling and Nallah in Village Rajo

Wal UC-Rajo Wal, PP-179, Distt: Kasur. 2.000 -2.000 15%

12 10.000 7.787 -2.213

CH.Amjad Ali Meo dated 5.9.12

MPA, PP-182

1Const: of Soling and Drain at Rosa Tiba UC

56 Jago Ki PP-182, Distt: Kasur. 1.500 1.421 -0.079 100%

2Const: of Soling and Drain at Village Bhai

Kot UC-64, PP-182 Distt: Kasur.4.500 4.410 -0.090 100%

3

Const: of Soling and Drain at Village

Narowal UC-69 Chak No. 35, PP-182 Distt:

Kasur.

1.500 1.427 -0.073 100%

4

Const: of Soling and Drain at Village Kado

Ranjer, UC-55, Deo Sial PP-182, Distt:

Kasur.

1.000 0.937 -0.063 100%

30.000 14-Dec-12811

20.000 05-Sep-12192

Page 318

Page 319: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5Const: of Soling and Drain at Village Deo

Sial UC-55, Deo Sial, PP-182 Distt: Kasur.1.500 1.420 -0.080 100%

6

Const: of Soling and Drain at Village Dakan

Pura, UC-65, Bhowawal PP-182, Distt:

Kasur.

1.500 0.728 -0.772 49%

7Const: of Soling and Drain at Village Jhago

ki UC-65 Bhowawal, PP-182 Distt: Kasur.1.000 0.938 -0.062 100%

8Const: of Soling and Drain at Village Sada,

UC-54, PP-182 Distt Kasur.2.000 1.958 -0.042 100%

9

Const: of Soling / P.C.C / Tuff Tile and Drain

at Sheraz Colony, UC -23/3, City Pattoki, PP-

182 Distt: Kasur.

4.000 3.908 -0.092 100%

10

Const: of Soling / P.C.C / Tuff Tile and Drain

at Madni Colony, UC- 21/1, City Pattoki PP-

182, Distt Kasur.

1.000 0.710 -0.290 71%

11

Const: of Soling and Drain at Muzamal

Street UC-23/3, City Pattoki, PP -182, Distt

Kasur.

0.500 0.483 -0.017 100%

11 20.000 18.340 -1.660

CH.Amjad Ali Meo dated 14.12.12

MPA, PP-182

1

Const: of Soling / Drain / Culverts / PCC &

Tuff Tiles at UC-21/1 City Pattoki PP-182,

Distt: Kasur.

2

Const: of Soling / Drain / Culverts / PCC &

Tuff Tiles at UC-22/2 City Pattoki PP-182,

Distt: Kasur.

4.000 -4.000 15%

3

Const: of Soling / Drain / Culverts / PCC &

Tuff Tiles Flooring at UC-23/3 City Pattoki PP-

182, Distt: Kasur.

4

Const: of Soling / Drain / Culverts / PCC &

Tuff Tiles at UC-69 Chak No.35, PP-182,

Distt: Kasur.

5

Const: of Soling / Drain & Culverts Chak No.4

Jagoo Wala at UC-56, PP-182, Distt: Kasur. 2.000 -2.000 20%

20.000 05-Sep-12192

20.000 14-Dec-12811

Page 319

Page 320: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6Const: of Soling / Drain & Culverts at Jodh

Singh UC-57, PP-182, Distt: Kasur.2.000 -2.000 20%

7

Const: of Soling / Drain & Culverts at Pattoki

Kehna Chak No.36 & 37 UC-68, Awan, PP-

182, Distt: Kasur.

2.000 -2.000 20%

8Const: of Soling / Drain & Culverts at UC-54

Sidha PP-182, Distt: Kasur.

9Const: of Soling / Drain & Culverts at UC-55

Deo Sial PP-182, Distt: Kasur.

10

Const: of Soling / Culverts & Boundary Wall

at Kando Ranget UC-55 Deo Sial, PP-182,

Distt: Kasur.

11

Const: of Soling / Drain & Culverts at Chak

No.7 & 9 UC-64, Bhai Kot, PP-182, Distt:

Kasur.

12

Const: of Soling / Drain & Culverts at Chak

No.21, 24 & 29 UC-65 Bhobay Wal, PP-182,

Distt: Kasur.

13Const: of Soling / Drain & Culverts at UC-63

Habibabad, PP-182, Distt: Kasur.

13 10.000 -10.000

Muhammad Mumtaz Khalid dated 12.9.12

Notable (PP-184)

1

Const: of PCC Street / Soling / Tuff Tiles /

Drain / Sewer Line and Culvert in City Bhai

Pheru, UC-Bhai Pheru, PP-184, Distt: Kasur.5.000 4.690 -0.310 100%

2

Const: of PCC Street / Soling / Drain and

Culvert in Village Nathay Khalsa, UC-Nathay

Khalsa, PP-184, Distt: Kasur.

2.500 2.425 -0.075 100%

3

Const: of PCC Street / Soling / Drain and

Culvert in Village Deena Nath, UC-Deena

Nath, PP-184, Distt: Kasur.

2.500 2.450 -0.050 100%

20.000 14-Dec-12811

30.000 12-Sep-12372

Page 320

Page 321: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Const: of PCC Street / Soling / Drain and

Culvert in Village Lambay Jageer, UC-

Lambay Jageer, PP-184, Distt: Kasur.

2.500 2.401 -0.099 100%

5

Const: of Soling / Drain and Culvert in

Village Khan Kay More, UC-Khan Kay More,

PP-184, Distt: Kasur.

2.500 1.768 -0.732 71%

6

Const: of Soling / Drain and Culvert in

Village Ghuman Kay, UC-Ghuman Kay, PP-

184, Distt: Kasur.

2.500 2.423 -0.077 100%

7

Const: of Soling / Drain and Culvert in

Village Baghiyana, UC-Baghiyana, PP-184,

Distt: Kasur.

2.500 2.384 -0.116 100%

8

Const: of Soling / Drain / Nallah and Culvert

in Village Phuliyani, UC-Phuliyani, PP-184,

Distt: Kasur.

2.500 2.421 -0.079 100%

9

Const: of Soling / Drain and Culvert in

Village Kanwain Jhoke, UC-Kanwain, PP-

184, Distt: Kasur.

2.500 2.406 -0.094 100%

10

Const: of PCC Street / Soling / Drain and

Culvert in Village Bhoay Assal, UC-Bhoay

Assal, PP-184, Distt: Kasur.

2.500 1.821 -0.679 73%

11

Const: of Soling / Drain and Culvert in

Village Jamber, UC-Jamber, PP-184, Distt:

Kasur.

2.500 2.203 -0.297 88%

11 30.000 27.392 -2.608

Sardar Muhammad Asif Nakai dated 26.9.12

MPA, PP-183

1Const: of Metalled Road from Megha to

Anahay Di Wahan, PP-183, Distt: Kasur.5.000 4.853 -0.147 97%

2

Const: / Rehabilitation of Metalled Road

Hanjaray Kalan to Megha, PP-183, Distt:

Kasur.

15.000 14.646 -0.354 98%

3Const: of Soling and Nallah in UC-Behar

Wall, PP-183, Distt: Kasur.3.000 2.940 -0.060 100%

4Const: of Soling and Nallah in UC-Rakh

Wala, PP-183, Distt: Kasur.3.000 2.872 -0.128 96%

30.000 12-Sep-12372

50.000 26-Sep-12434

Page 321

Page 322: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5Const: of Soling and Nallah in UC-27 Chak,

Dhollan, PP-183, Distt: Kasur.3.000 2.834 -0.166 94%

6Const: of Soling and Nallah in UC-Jajja

Kalan, PP-183, Distt: Kasur.3.000 2.883 -0.117 96%

7Const: of Soling and Nallah in UC-Allpa

Kalan, PP-183, Distt: Kasur.3.000 2.850 -0.150 95%

8Const: of Soling and Nallah in UC-Hallah, PP-

183, Distt: Kasur.3.000 2.880 -0.120 96%

9Const: of Soling and Nallah in UC-Padhana,

PP-183, Distt: Kasur.3.000 2.934 -0.066 100%

10Const: of Soling and Nallah in UC-Hanjray

Kalan, PP-183, Distt: Kasur.3.000 2.711 -0.289 90%

11Const: of Soling and Nallah in UC-Sheikhum,

PP-183, Distt: Kasur.3.000 2.940 -0.060 100%

12Const: of Soling and Nallah in UC-39, Chak

Awan, PP-183, Distt: Kasur.3.000 2.446 -0.554 82%

12 50.000 47.789 -2.211

Pir Mukhtar Ahmed dated 26.9.12

PP-182

1

Const: of PCC Street / Soling and Nallah in

UC-Waha Radha Ram, PP-182, Distt: Kasur. 5.000 -5.000 15%

2

Const: of PCC Street / Soling / Tuff Tiles and

Nallah in UC No.21, City Pattoki, PP-182,

Distt: Kasur.

6.579 -6.579 15%

3

Const: of PCC Street / Soling / Tuff Tiles and

Nallah in UC No.22, City Pattoki, PP-182,

Distt: Kasur.

4.211 -4.211 15%

4

Const: of PCC Street / Soling / Tuff Tiles and

Nallah in UC No.23, City Pattoki, PP-182,

Distt: Kasur.

4.210 -4.210 15%

4 20.000 -20.000

50.000 26-Sep-12434

30.000 26-Sep-12432

Page 322

Page 323: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Rao Shahid Qayyum Khan dated 26.9.12

PP-181

1Const: of Soling and Nallah in UC-Wan

Khara, PP-181, Distt: Kasur.

2Const: of Soling and Nallah in UC-Kot

Sandrus, PP-181, Distt: Kasur.

3Const: of Soling and Nallah in UC No.17 &

18, PP-181, Distt: Kasur.3.000 1.485 -1.515 55%

4Const: of Soling and Nallah in UC-Munday

Ki, PP-181, Distt: Kasur.

5Const: of Soling and Nallah in UC-Mojo Ki,

PP-181, Distt: Kasur.

6Const: of Soling / Tuff Tiles and Nallah in UC-

Jamsheer, PP-181, Distt: Kasur.4.000 1.945 -2.055 50%

7Const: of Soling / Tuff Tiles and Nallah in UC-

Mullah Pur, PP-181, Distt: Kasur.

8Const: of Soling and Nallah in UC-Jand

Wala, PP-181, Distt: Kasur.3.000 2.214 -0.786 65%

9Const: of Soling and Nallah in UC-Deo Sial,

PP-181, Distt: Kasur.

10Const: of Soling and Nallah in UC-Arzani

Pur, PP-181, Distt: Kasur.

11Const: of Soling and Nallah in UC-Gellan,

PP-181, Distt: Kasur.

12Const: of Soling and Nallah in UC-Saddha,

PP-181, Distt: Kasur.

12 10.000 5.644 -4.356

Ch. Muhammad Ilyas Khan, dated 12.11.12

Notable

1

Const: of Nallah at Rohi Pir Darbar Berron

Mustafa Abad Laliyani, UC-Mustafa Abad,

PP-175, Distt: Kasur.

20.000 12.175 -7.825 65%

2Const: of Metalled Road Rohi Pir Road

Mustafa Abad, Laliyani, PP-175, Distt:

Kasur.

15.000 12.140 -2.860 70%

30.000 26-Sep-12433

35.000 12-Nov-12707

Page 323

Page 324: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2 35.000 24.315 -10.685

Ch Manzoor dated 14.12.12

Notable

1

Const: of Metalled Road and Nallah from

Hari Har to Village Mianwala, NA-139, Distt:

Kasur.

16.400 4.895 -11.505 30%

2

Const: of Soling and Drain in Village

Qadiwind, UC- Qadiwind, NA-139, Distt:

Kasur.

3.000 2.850 -0.150 100%

3Const: of Soling and Drain in Village Maan,

UC- Maan, NA-139, Distt: Kasur.3.000 1.792 -1.208 100%

4

Const: of Soling and Drain in Village Bahadar

Pura, UC- Bahadar Pura, NA-139, Distt:

Kasur.

3.000 2.168 -0.832 72%

5

Const: of Soling and Drain in Village Sheikh

Aamad, UC- Sheikh Aamad, NA-139, Distt:

Kasur.

3.000 2.910 -0.090 100%

6Const: of Soling and Drain in Village Fateh

Pur, UC- Fateh Pur, NA-139, Distt: Kasur.1.800 1.712 -0.088 100%

7

Const: of Soling and Drain in Village Hardo

Sahari, UC- Hardo Sahari, NA-139, Distt:

Kasur.

3.000 2.900 -0.100 100%

8

Const: of Soling and Drain in Village Kotli Rai

Abu Bakar, UC- Kotli Rai Abu Bakar, NA-

139, Distt: Kasur.

3.000 2.844 -0.156 100%

9

Const: of Soling and Drain in Village Roshan

Bheela, UC- Roshan Bheela, NA-139, Distt:

Kasur.

3.000 2.850 -0.150 100%

10

Const: of Soling and Drain in Village

Sehjehra, UC- Sehjehra, NA-139, Distt:

Kasur.

3.000 2.861 -0.139 100%

11

Const: of Soling and Drain in Village

Bhaddian, UC- Bhaddian, NA-139, Distt:

Kasur.

3.000 2.890 -0.110 100%

12

Const: of Soling and Drain in Village Bazaid

Pur, UC- Bazaid Pur, NA-139, Distt: Kasur. 3.000 2.871 -0.129 100%

50.000 14-Dec-12804

Page 324

Page 325: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13

Const: of Soling and Drain in Village Hussain

Khan Wala, UC- Hussain Khan Wala, NA-

139, Distt: Kasur.

1.800 1.638 -0.162 91%

13 50.000 35.181 -14.819

Ghulam Bibi Bharwana dated 19.10.12

MNA, NA-87

1Construction of Soling & Drains Azafi Abadi

Sulman, District Jhang (NA-87).1.000 0.98 -0.020 100%

2Construction of Soling & Drains Chak No.210

Tarar, District Jhang (NA-87).1.000 0.966 -0.034 100%

3Construction of Soling & Drains Chak No.197

Nelianwali, District Jhang (NA-87).1.000 0.96 -0.040 100%

4Construction of Soling & Drains Chak

No.250, Gungdro, District Jhang (NA-87).1.500 1.43 -0.066 100%

5

Construction of Soling & Drains Chak

No.245, Suggal Azafi Abadi, District Jhang

(NA-87).

1.000 0.96 -0.043 100%

6Construction of Soling & Drains Chak

No.194,Sial Da District Jhang (NA-87).1.000 0.97 -0.030 100%

7

Construction of Soling & Drains Chak

No.225, Chuchkana, District Jhang (NA-87). 1.000 0.95 -0.047 100%

8

Construction of Soling & Drains Chak

No.190, Aarbi Azafi Colony, District Jhang

(NA-87).

1.000 0.959 -0.041 100%

9

Construction of Soling & Drains Chak

No.188, Massal Pur Azafi Abadi District

Jhang (NA-87).

1.000 0.95 -0.050 100%

10

Construction of Soling & Drains Chak

No.192, Batti Wala shraqi, District Jhang (NA-

87).

1.500 1.43 -0.075 100%

CCD, Jhang

50.000 14-Dec-12804

100.000 19-Oct-12600

Page 325

Page 326: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Construction of Soling & Drains Kot Nagabet

Bhowana, District Jhang (NA-87).0.500 0.477 -0.023 100%

12

Construction of Soling & Drains Chak

No.449, Azafi Abadi, District Jhang (NA-87). 1.000 0.96 -0.040 100%

13Construction of Soling & Drains Chak

No.450, Sahu, District Jhang (NA-87).1.000 0.99 -0.010 100%

14

Construction of Soling & Drains Chak

No.452, Aherianwala, District Jhang (NA-87). 1.000 0.960 -0.040 100%

15Construction of Soling & Drains Chak

No.219, Mirjana, District Jhang (NA-87).1.000 0.953 -0.047 100%

16Construction of Soling & Drains Chak

No.443,Khundway, District Jhang (NA-87).1.000 0.953 -0.047 100%

17Construction of Soling & Drains Chak

No.445, Sohia, District Jhang (NA-87).1.000 0.96 -0.040 100%

18Construction of Soling & Drains Khewa,

District Jhang (NA-87).2.000 1.92 -0.080 100%

19Construction of Soling & Drains Balu Shabal,

District Jhang (NA-87).1.000 0.996 -0.004 100%

20Construction of Soling & Drains Chak

No.263, Pathoana, District Jhang (NA-87).1.000 0.950 -0.050 100%

21Construction of Soling & Drains Chak

No.163, Dubba, District Jhang (NA-87).2.000 1.89 -0.109 100%

22Construction of Soling & Drains Chak

No.230, Sheikhana, District Jhang (NA-87).0.500 0.490 -0.010 100%

23Construction of Soling & Drains Chak

No.253, Nanga, District Jhang (NA-87).1.000 0.97 -0.029 100%

24Construction of Soling & Drains Chak

No.254, Chadhar, District Jhang (NA-87).1.000 0.97 -0.033 100%

25Construction of Soling & Drains Chak

No.255, Bhojia, District Jhang (NA-87).1.000 0.96 -0.044 100%

26Construction of Soling & Drains Chak

No.181, Bhojia, District Jhang (NA-87).1.500 1.46 -0.040 100%

27Construction of Soling & Drains Chak

No.264, Mahni, District Jhang (NA-87).1.500 1.11 -0.391 100%

28Construction of Soling & Drains Abadi Gojra

More, District Jhang (NA-87).1.000 0.97 -0.031 100%

100.000 19-Oct-12600

Page 326

Page 327: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

29Construction of Soling & Drains Chak

No.220, Ghanwan, District Jhang (NA-87).1.000 0.96 -0.045 100%

30

Construction of Soling & Drains Chak

No.466, Deputy Wala , District Jhang (NA-

87).

1.500 1.47 -0.030 100%

31

Construction of Soling & Drains Chak

No.466, Gajdi Numbar Dar Muhammad Khan

Khnowana, District Jhang (NA-87).

2.000 1.94 -0.060 100%

32Construction of Soling & Drains Bugga

Mangeny, District Jhang (NA-87).1.000 0.98 -0.020 100%

33Construction of Soling & Drains Chak

No.232, Noul, District Jhang (NA-87).1.000 0.96 -0.040 100%

34

Construction of Soling & Drains Abadi

Ghulam Jafar Putwari Adda Shabir Abad,

District Jhang (NA-87).

0.500 0.50 100%

35Construction of Soling & Drains Chak

No.171, Mangany, District Jhang (NA-87).1.500 1.45 -0.047 100%

36Construction of Soling & Drains Chak No.191

Khokhran, District Jhang (NA-87).1.000 0.96 -0.045 100%

37

Construction of Soling & Drains Chak

No.453, Khandanwala, District Jhang (NA-

87).

1.500 1.45 -0.053 100%

38Construction of Soling & Drains Chak

No.221, Doghrra, District Jhang (NA-87).0.500 0.490 -0.010 100%

39Construction of Soling & Drains Mangeny to

Thatta Shahdat, District Jhang (NA-87).1.000 0.98 -0.019 100%

40Construction of Soling & Drains Chak

No.195, Bhallo, District Jhang (NA-87).1.000 0.95 -0.050 100%

41Construction of Soling & Drains Thatta

Sirnanga Bhowana, District Jhang (NA-87).0.500 0.49 -0.015 100%

42

Construction of Soling & Drains Chak

No.238, Bulrr Wala Colony Emin Wala

District Jhang (NA-87).

1.000 0.97 -0.028 100%

43

Construction of Soling & Drains Chak

No.223, Ramana Khushal Ka, District Jhang

(NA-87).

1.000 0.94 -0.059 100%

44

Construction of Soling & Drains Chak

No.223, Ramana Baqar Ka, Awan Colony,

District Jhang (NA-87).

1.000 0.950 -0.050 100%

100.000 19-Oct-12600

Page 327

Page 328: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

45Construction of Soling & Drains Chak

No.444, Gawans, District Jhang (NA-87).1.000 0.95 -0.050 100%

46Construction of Soling & Drains Chak

No.440, Lillana, District Jhang (NA-87).1.000 0.91 -0.091 100%

47

Construction of Soling & Drains Chak

No.160, Nagi Sial Azafi Colony, District

Jhang (NA-87).

1.000 0.95 -0.055 100%

48Construction of Soling & Drains Chak

No.169, Ouray, District Jhang (NA-87).1.000 0.95 -0.047 100%

49

Construction of Soling & Drains Chak

No.266, Abadi Ameeray Wali, District Jhang

(NA-87).

1.000 0.96 -0.036 100%

50

Construction of Soling & Drains Chak

No.181, Khichian Azafi Abadi, District Jhang

(NA-87).

1.000 0.96 -0.044 100%

51Construction of Soling & Drains Chak

No.168, Samur, District Jhang (NA-87).1.000 0.96 -0.045 100%

52Construction of Soling & Drains Chak No.441

Cheema, District Jhang (NA-87).1.000 0.96 -0.039 100%

53

Construction of Rooms & Verandha

Governemnt Girls High School Chak No.199,

Rehmoana, District Jhang (NA-87).

2.000 1.60 -0.396 100%

54

Construction of Soling & Drains Bhowana

Abadi Sheikh Fazal Hussain, District Jhang

(NA-87).

0.500 0.49 -0.010 100%

55

Construction of Soling & Drains Chak No.

458, Abadi Wasoana, District Jhang (NA-87). 0.500 0.49 -0.010 100%

56

Construction of Soling & Drains Chak

No.459, Syed Wala, District Jhang (NA-87). 0.500 0.49 -0.011 100%

57

Construction of Soling & Drains Chak

No.459, Abadi Latto, District Jhang (NA-87). 0.500 0.49 -0.015 100%

58

Construction of Soling / Drains and Nallah

Chak No.166, Doka, District Jhang (NA-87). 1.000 0.960 -0.040 100%

100.000 19-Oct-12600

Page 328

Page 329: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

59

Construction of Soling / Drains and Nallah

Chak No.201, Joungy Lack , District Jhang

(NA-87).

1.000 0.96 -0.041 100%

60Construction of Soling & Drains Chak

No.179, Khisir, District Jhang (NA-87).1.000 0.95 -0.047 100%

61

Construction of Soling & Drains Chak

No.243, Ahmad Nagar, District Jhang (NA-

87).

0.500 0.47 -0.027 100%

62Construction of Soling & Drains Chak

No.231, Kamoka, District Jhang (NA-87).0.500 0.490 -0.010 100%

63Construction of Soling & Drains Chak

No.240, Malaka, District Jhang (NA-87).0.500 0.47 -0.027 100%

64

Construction of Soling & Drains Chak

No.174, Abadi Mehar Ahmad Yar Bhojowana,

District Jhang (NA-87).

1.000 0.96 -0.037 100%

65

Construction of Soling & Drains Chak

No.175, Abadi Faisal Khan Balouch, District

Jhang (NA-87).

0.500 0.47 -0.035 100%

66Construction of Soling & Drains Chak

No.196,Jeween Ka, District Jhang (NA-87).1.500 1.45 -0.055 100%

67

Construction of Soling & Drains Abadi Mehdi

Abad Thatta Muhammd Shah, (Fiaz

Hadir)District Jhang (NA-87).

1.500 1.46 -0.036 100%

68

Construction of Soling & Drains Chak

No.177,Anwar Reema, District Jhang (NA-

87).

1.000 0.96 -0.037 100%

69Construction of Soling & Drains Chak

No.247, Baral, District Jhang (NA-87).1.000 0.95 -0.047 100%

70Construction of Soling & Drains Chak

No.257, Araian, District Jhang (NA-87).1.000 0.64 -0.359 100%

71

Construction of Soling & Drains Chak

No.458, Dairy Wala, District Jhang (NA-87). 1.500 1.47 -0.029 100%

72Construction of Soling & Drains Pakkay

Wala, District Jhang (NA-87).1.000 0.94 -0.058 100%

73Construction of Soling & Drains Mouza

Sahma, District Jhang (NA-87).1.000 1.97 0.970 100%

100.000 19-Oct-12600

Page 329

Page 330: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

74

Construction of Soling & Drains Chak

No.226,Bharwana Azafi Abadi District Jhang

(NA-87).

1.000 0.96 -0.042 100%

75

Construction of Soling & Drains Chak

No.461, Murad Shah, District Jhang (NA-87). 1.500 1.44 -0.056 100%

76

Construction of Soling & Drains Chak

No.240, Abadi Mochiwala, District Jhang (NA-

87).

1.000 0.95 -0.054 100%

77

Construction of Soling & Drains Koriana

Junobi Abadi Ch: Muhammad Akram Jutt,

District Jhang (NA-87).

1.000 0.92 -0.081 100%

78

Construction of Soling / Drains and Nallah

Chak No.204, Jotay , District Jhang (NA-87). 1.500 1.40 -0.104 100%

79Construction of Nallah Havli Bata , District

Jhang (NA-87).1.000 0.98 -0.020 100%

80Construction of Soling & Drains Chak

No.442, Waseeran, District Jhang (NA-87).1.000 0.98 -0.024 100%

81Construction of Soling & Drains Chak

No.442, Laial, District Jhang (NA-87).1.000 0.98 -0.024 100%

82Construction of Soling & Drains Chak No.242

Marrlo District Jhang (NA-87).1.000 0.95 -0.050 100%

83Construction of Barr Room at Tehsil Council

Bhowana, District Jhang (NA-87).1.500 0.98 -0.522 100%

84

Construction of Soling & Drains Chak

No.240, Darbar Peer Fateh Shah District

Jhang (NA-87).

1.000 0.97 -0.030 100%

85

Construction of Soling & Drains Chak

No.242, Thatta Sir Nanga, District Jhang (NA-

87).

1.000 0.95 -0.052 100%

86Construction of Soling & Drains Pindi Kaler

Wala, District Jhang (NA-87).0.500 0.49 -0.010 100%

87

Construction of Soling & Drains Chak

No.464, Gorry Wala, District Jhang (NA-87). 1.000 0.98 -0.020 100%

88

Construction of Soling & Drains Chak

No.453, Abadi Saed Korry, and Haji Korry,

District Jhang (NA-87).

1.000 0.98 -0.024 100%

100.000 19-Oct-12600

Page 330

Page 331: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

89

Construction of Soling & Drains Chak

No.476, Virk Basti Mian Muhammd Ali

Janjoua, District Jhang (NA-87).

1.000 0.96 -0.045 100%

90

Construction of Soling & Drains Chak

No.202, Salat Kay Rajoka Ch: Khalid Jagga

District Jhang (NA-87).

0.500 0.48 -0.020 100%

91

Construction of Soling & Drains Kurian Wala

School to Imam Bargha, District Jhang (NA-

87).

0.500 0.31 -0.192 100%

92Construction of Soling & Drains Chak

No.205, District Jhang (NA-87).1.000 0.97 -0.030 100%

93

Construction of Soling & Drains Chak

No.249, Syed Wala Ramzan Bhojowana,

District Jhang (NA-87).

0.500 0.48 -0.025 100%

94Construction of Soling & Drains Chak

No.266, Maghiana, District Jhang (NA-87).1.000 0.96 -0.043 100%

95

Construction of Soling & Drains Chak

No.167, Many Bhojian, District Jhang (NA-

87).

1.000 0.97 -0.028 100%

96

Construction of Soling & Drains Abadi Nasir

Jappa Profesor Bhowana, District Jhang (NA-

87).

0.500 0.49 -0.010 100%

97

Construction of Soling & Drains Chak No.210

Tarar Rodday Banglow Murrad Waka,

District Jhang (NA-87).

0.500 0.48 -0.022 100%

98

Construction of Soling & Drains Abadi Ch:

Abdul Sattar Warraich Bhowana, District

Jhang (NA-87).

0.500 0.49 -0.010 100%

99

Construction of Soling / Drains and Nallah

Chak No.446, Bhojian, District Jhang (NA-

87).

1.000 0.99 -0.010 100%

100Construction of Soling & Drains Chak

No.243, Saboana, District Jhang (NA-87).0.500 0.48 -0.024 100%

100 100.000 84.985 -15.015

100.000 19-Oct-12600

Page 331

Page 332: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sheikh Waqas Akram dated 4.1.13

MNA, NA-89

1Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-86, District Jhang.4.000 3.85 -0.148 100%

2

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-90, NA-89, District

Jhang.

8.000 7.60 -0.399 100%

3

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-91, NA-89, District

Jhang.

6.000 5.83 -0.166 100%

4

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-92, NA-89, District

Jhang.

2.500 2.42 -0.084 100%

5

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-93, NA-89 District

Jhang.

2.500 2.42 -0.080 100%

6

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-89, NA-89, District

Jhang.

5.000 4.85 -0.150 100%

7

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-87, NA-89, District

Jhang.

6.000 5.80 -0.197 100%

8

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-88, NA-89, District

Jhang.

5.000 4.85 -0.150 100%

9

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-97, NA-89, District

Jhang.

6.000 5.91 -0.088 100%

10

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-96, NA-89, District

Jhang.

5.000 4.83 -0.175 100%

11

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-98, NA-89, District

Jhang.

7.000 6.70 -0.300 100%

12

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-52, NA-89, District

Jhang.

4.000 3.68 -0.321 100%

100.000 04-Jan-13844

Page 332

Page 333: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-53, NA-89, District

Jhang.

5.000 4.87 -0.127 100%

14

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-50, NA-89, District

Jhang.

5.000 4.88 -0.119 100%

15Construction of Sewerage, Soling, Drains,

Nallah, in UC-64, NA-89, District Jhang.4.000 3.80 -0.196 100%

16

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-54, NA-89, District

Jhang.

4.000 3.80 -0.202 100%

17

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-45,NA-89, District

Jhang.

7.000 6.57 -0.430 100%

18

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-46, NA-89, District

Jhang.

5.000 4.71 -0.292 100%

19

Construction of M/Road, Sewerage, Soling ,

Drain, Nallah and PCC slab in UC-47, NA-89,

District Jhang.

3.500 3.29 -0.208 100%

20Construction of M/Road, in UC-64, NA-89,

District Jhang.3.500 3.40 -0.100 100%

21

Construction of Sewerage, Soling, Drains,

Nallah, PCC Slab in UC-99, NA-89 District

Jhang.

2.000 1.88 -0.117 100%

21 100.000 92.551 -7.449

Sheikh Waqas Akram dated

MNA, NA-89

1

Const: of Soling and Drain at Abadi Mehr

Bahader Sanpal, Mehr Umer Draz Sial, Bagh

Mouza Lak Badhar Abadi Jund Wala, Talli

Wala, Owkian Wali and Siallan Wali, UC-99,

NA-89, District Jhang.

2.500 2.42 -0.077 100%

100.000 04-Jan-13844

100.000 14-Nov-12411

Page 333

Page 334: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Const: of Soling and Drain at Abadi Haji

Ghulam Fareed, Abadi Deewan Wali, UC-99,

NA-89, District Jhang.

2.500 2.42 -0.083 100%

3

Const: of Soling and Drain and Nallah at

Abadi Arian Wali, Rasheed Dinga Wali,

Javaid Lak Wali, UC-99, NA-89, District

Jhang.

3.000 2.85 -0.153 100%

4

Const: of Solingl and Drain and Nallah at

Abadi Khoh Utley Wala, Ratti Wala Chah

Kumely Wali, UC-99, NA-89, District Jhang.3.000 2.59 -0.411 100%

5

Const: of Soling and Drain and Nallah at

Abadi Chah Okan Badharan, Deegany Wali,

Nawan Kot, UC-99, NA-89, District Jhang.3.000 2.84 -0.165 100%

6

Const: of Soling and Drain at Abadi Sharif

Nol, Nazar Nol, Sarffaraz Jutha Wala,

M.Khan Dinga Sial Mouza Lak Badhar UC-

99, NA-89, District Jhang.

2.500 2.42 -0.077 100%

7

Construction of Soling and Drain at Abadi

Haq Nawaz Numberdar Zafer Dinga Noor

Muhammad Cheela, Allah Ditta Kalasan,

Ministery Sultan, Ministry Sultan Falaqkl Sher

Dinga, Ghulam Shabir Patwari, Mouza Lak

Badhar UC-99, NA-89, District Jhang.

2.500 2.40 -0.101 100%

8

Const:of Soling/Sewerage and Drain, PCC at

Mohallah Kot Akbar Malah Wali, Mohallah Ali

Muhammad Arain, UC-90, NA-89, District

Jhang.

4.000 3.85 -0.147 100%

8 100.000 21.786 -78.214

Akram Masih Gill dated 4.10.12

MNA NA-334

503 04-Oct-12 30.000 1

Renovation of Paresh Parest Senate Marteen

Churlch at Christan Colony Near Rasheed

Chowk District Jhang.

1.000 0.971 -0.029 100%

100.000 14-Nov-12411

Page 334

Page 335: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1 1.000 0.971 -0.029

Sahabzada M Mehboob Sultan dated 22.10.12

MNA, NA-91

1Construction of M/Road from Main Ahmad

Pur Sial Road to 5 Marla Scheme Union

Counsil Ahmad Pur Sial District Jhang (NA-

5.000 4.031 -0.969 81%

2

Construction of M/Road from Basti Kunal

Khokharan to Chak NO.3/3-R, Union Consil

Easa Wala District Jhang (NA-91).

5.000 4.822 -0.178 100%

3

Construction ofl M/Road from Main Muzafar

Garh Khushab Road to Chak No.11/3-L, and

Basti Jam Muhammad Hayat Union Consil

Hazarat Sultan Bahoo District Jhang (NA-91).

5.000 3.917 -1.083 78%

4

Construction / Repair of M/Road froml Pull

Gagan to Kari Wala Abadi Akhtar Khan

Balouch, Union Consil Hasoo Balail District

Jhang (NA-91).

6.000 4.409 -1.591 73%

5

Construction / Repair of M/Road from Adda

Neko Kara to Basti Neko Kara Union Consil

Kot Mapal, District Jhang (NA-91).

4.000 3.963 -0.037 100%

6

Construction of M/Road from Main Khushab

Muzafar Garh Road Adda Nasirabad to Sat

Kota Union Consil Duri Gondal, District

Jhang (NA-91).

5.000 3.897 -1.103 78%

6 30.000 25.039 -4.961

Syed Hassan Murtaza dated 18.10.12

MPA, PP-74

592 18-Oct-12 20.000 1

Rehabilitation/Widening of Metalled Road

From Chiniot Faisalabad Link Road Rajoa

Saddat Adda to Rajoya Saddat District

Chiniot (PP-74).

30.000 22-Oct-12603

Page 335

Page 336: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Syed Hassan Murtaza dated 14.12.12

MPA, PP-74

1

Construction of Soling & Drains Mouza

Thatha Glotran Abadi Rasool Nigar

Faisalabad Road District Chiniot (PP-74)

0.500 0.480 -0.020 100%

2Construction of Soling, Drains and Nalla

Chak No 150 District Chiniot (PP-74)0.500 0.482 -0.018 100%

3Construction of Soling & Drains Mouza

Noshera District Chiniot (PP-74)0.500 0.479 -0.021 100%

4

Construction of Soling & Drains Mouza Harsa

Bhola Banday wala Master Jaffer Ali Kalro

District Chiniot (PP-74)

0.500 0.485 -0.015 100%

5Construction of Soling & Drains Chak No 240

Abadi Malhrey District Chiniot (PP-74)0.500 0.478 -0.022 100%

6Construction of Soling & Drains Chak No 138

Qazi Haral District Chiniot (PP-74)0.500 0.479 -0.021 100%

7

Construction of Soling & Drains Mouza

Hindlana Motor Balawal Khan Jappa District

Chiniot (PP-74)

0.500 0.477 -0.023 100%

8Construction of Soling & Drains Chak No

207& 156 District Chiniot.(PP-74)1.500 1.450 -0.050 100%

9Construction of Soling & Drains Jamal Jatti

Faisalabad Road District Chiniot (PP-74)0.500 0.485 -0.015 100%

10Construction of Soling & Drains in Rajoya

Saddat District Chiniot (PP-74)1.500 1.450 -0.050 100%

11Construction of Soling & Drains Chak No 136

District Chiniot (PP-74)0.500 0.480 -0.020 100%

12Construction of Soling & Drains Chak No 239

District Chiniot (PP-74)0.500 0.476 -0.024 100%

13Construction of Soling & Drains Mouza Qaim

Nigar District Chiniot (PP-74)0.500 0.479 -0.021 100%

14

Construction of Soling & Drains Abadi Kannal

Mustafa Nako Kara District Chiniot (PP-74) 0.500 0.479 -0.021 100%

15Construction of Soling & Drains Mouza

Bhukharian District Chiniot (PP-74)0.500 0.479 -0.021 100%

30.000 14-Dec-12811

Page 336

Page 337: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

16Construction of Soling, Drains and Nalla

Chak No 139 District Chiniot (PP-74)0.500 0.485 -0.015 100%

16 10.000 9.143 -0.857

Qamar Hayat Kathia dated 6.9.12

MPA, PP-79

250 06-Sep-12 50.000 1

Widening / Improvement of Metalled Road

Multan Road to Dab Kalan, Tehsil Shorkot,

District Jhang (PP-79).

50.000 22.103 -27.897 75%

1 50.000 22.103 -27.897

Qamar Hayat Kathia dated 5.3.13

MPA, PP-79

1016 05-Mar-13 1.400 1.400 -1.400

1.400 -1.400

Brig Zahid Malik dated 26.9.12

Notable

435 26-Sep-12 15.000 1

Construction of Metalled Road from Bumbay

Wala Chak -216 TDA to Dagar Kotli Tehsil

Mankera District Bhakkar (Phase-II) 15.000 12.092 -2.908 81%

1 15.000 12.092 -2.908

Shah Muhammad dated 26.9.12

Notable

916 26-Sep-12 18.000 1Construction of M/Road, PCC, Nallah and

Drain in Abadi Jabi, District Khushab.18.000 4.892 -13.108 40%

1 18.000 4.892 -13.108

30.000 14-Dec-12811

Page 337

Page 338: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Rai Muhammad Aslam Khan Kharal dated 8.10.12

Ex-MNA, NA-143

1Const. of soling/Drain at 44/GD Bhakawar

Wala & Shahdi Pur Distt: Okara NA-1430.743 -34.257 70%

2

Const. of soling/Drain at Bahadar Nagar

Farm & Narka Thatha Dakhli Alawal, Distt:

Okara NA-143

0.827 0.827 75%

3Const. of soling/Drain at Ratly 45/GD

Distt:Okara NA-1430.843 0.843 55%

4Const. of soling/Drain at 22/GD Distt:Okara

NA-1430.744 0.744 14%

5Const. of Soling/Drain at 40/GD & 41 GD Rai

Pur, Distt:Okara NA-14316%

6Const. of soling/Drain at Gashkorian

(Rajputan) Distt:Okara NA-1430.721 0.721 15%

7

Const. of Soling/Drain/PCC & Compound

Wall at Village Ferooz Bakhshu Distt:Okara

NA-143

0.835 0.835 13%

8Const. of Soling/Drain at Noual Plot & Village

Fojian Distt:Okara NA-143_

9Const. of Bridge at Minor Piralli & repair of

Bridge Rai Fazal Distt:Okara NA-143_

10

Const: of Nalla/Soling at Mangun & Soling at

Abadi Allahyar Khichi 12/GD Distt: Okara NA-

143

1.632 1.632 10%

11Const. of Tuff Paver at Basti Abdul Sattar

Distt: Okara NA-14310%

12

Const: of Nalla at Abadi Rana Kot Siraj Din,

Kot Permesheri Das & Mirok Distt: Okara NA-

143

0.386 0.386 16%

13Const. of Soling/Drain at Chak No.19/1-R &

14/1-R Distt:Okara NA-143_

14Const. of Soling/Drain at Chak No.17/1-R

Distt:Okara NA-14315%

35.000

CCD, Sahiwal

515 80.000 08-Oct-12

Page 338

Page 339: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15Const. of Soling/Drain at Chak No.18/1-R

Distt:Okara NA-1430.640 0.640 15%

16

Const. of Soling/Drain at Rai Ghulam

Mustafa Dakhli Bala Kot Distt:Okara NA-143 17%

17

Const. of Soling/Drain at Chochak/Mubalke/

Bazeeda Village Distt: Okara NA-143 10%

18Const. of Tuff Paver Hussain Colony -Okara

City0.515 0.515 15%

19Const. of Soling/Drain Harri Pur Chopra Kot

Sattar Distt:Okara NA-1430.808 0.808 10%

20Const. of Soling/Drain Kohila Mahdoram

Mouza Mirak Distt:Okara NA-143_

21Const. of Soling Mouza Anayat Ke

Distt:Okara NA-14318%

22Const. of Soling/Drain Barn Pur Distt:Okara

NA-14310%

23Const. of Soling /Drain Chak No.43/3-R ,

47/3-R, 52/3-R Distt:Okara NA-143_

24Const. of Soling /Drain Chak No.45/3-R

Distt:Okara NA-14318%

25

Const. of Soling/Drain & PCC/Khala at

Mouza Masan ka, Abadi kot Anwer khan

dakhli Tariq Abad Jandraka Distt:Okara NA-

143

_

26Const. of Soling /Drain Mouza Thatha Khiwa

Distt:Okara NA-14317%

27

Const. of Soling /Drain Mouza Basti Riaz

Abad Dakhli Bangla Gogera Distt:Okara NA-

143

_

28

Const. of Soling /Drain Abadi Mouza Thatha

Tahir to Abadi Zulifqar Wattoo Distt:Okara

NA-143

_

29Const. of Soling /Drain Chak No.27/GD

Distt:Okara NA-143_

30Const. of Soling /Drain Chak No.13/GD

Bogeray Distt:Okara NA-143_

35.000515 80.000 08-Oct-12

Page 339

Page 340: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

31Const: of Swerage Nalla at Chak No. 16/1-R

Distt:Okara NA-14310%

32Const. of Soling /Drain Chak No. 11/1-R

Distt:Okara NA-14317%

33Const. of Soling /Drain Mouza Dill Bagh Rai

Distt:Okara NA-143_

34

Const. of Tuff Paver at Tehsildar Bar Renala

khurd & PCC at Village Shekhu Sharif Distt:

Okara NA-143

35Const. of soling/Drain at Ratly 45/GD

Distt:Okara NA-143

36Const. of soling/Drain at 22/GD Distt:Okara

NA-143

37Const. of Soling/Drain at 40/GD & 41 GD Rai

Pur, Distt:Okara NA-143

38Const. of Soling/Drain at 42/GD Distt:Okara

NA-143

39Const. of soling/Drain at 11/GD Kalay Pul &

9/GD, Distt:Okara NA-143

40Const. of soling/Drain at Bombiy Gashkorian

Distt:Okara NA-143

41Const. of soling/Drain at Gashkorian

(Rajputan) Distt:Okara NA-143

42

Const. of Soling/Drain/PCC & Compound

Wall at Village Ferooz Bakhshu Distt:Okara

NA-143

43Const. of Soling/Drain at Yung Pur

Distt:Okara NA-143

44Const. of Soling/Drain at Noual Plot & Village

Fojian Distt:Okara NA-143

45Const. of Bridge at Minor Piralli & repair of

Bridge Rai Fazal Distt:Okara NA-143

46Const. of Soling/PCC at Mouza Jaboka Distt:

Okara NA-43

47

Const: of Nalla/Soling at Mangun & Soling at

Abadi Allahyar Khichi 12/GD Distt: Okara NA-

143

48Const: of PCC at Abadi Kot Rai Hassan Khan

Merdani Distt: Okara NA-143

35.000515 80.000 08-Oct-12

Page 340

Page 341: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

49Const. of Tuff Paver at Basti Abdul Sattar

Distt: Okara NA-143

50

Const: of Nalla at Abadi Rana Kot Siraj Din,

Kot Permesheri Das & Mirok Distt: Okara NA-

143

51

Const. of Soling/Drain at Usman Gogera

Khas, Thatha Hassan ka & Hammad Ka,

Distt: Okara NA-143

51 35.000 8.694 -26.306

Syed Sumsam Ali Bukhari dated 7.9.12

MNA, NA-145

1Const: of Nallah at Sakhi Abdal Tehsil

Renala, NA-145, Distt: Okara.2.500 2.461 -0.039 95%

2Const: of Soling and Drain at Battian, NA-

145, Distt: Okara.1.200 1.086 -0.114 95%

3

Const: of Soling and Drain at Dakhali Abadi

Awan Uttar, Tehsil Depal Pur, NA-145, Distt:

Okara.

0.800 0.757 -0.043 95%

4Const: of Soling and Drain at 9/1-R, Tehsil

Renala, NA-145, Distt: Okara.2.000 1.919 -0.081 95%

5

Const: of PCC at Govt. Housing Scheme,

Renala City, Tehsil Renala, NA-145, Distt:

Okara.

0.400 0.389 -0.011 97%

6

Const: of Metalled Road and Nallah from

Madarssa Aqssa to Azam Town, Tehsil

Renala, NA-145, Distt: Okara.

1.900 0.895 -1.005 50%

7Const: of PCC at Madina Colony, Renala

City, Tehsil Renala, NA-145, Distt: Okara.1.000 0.743 -0.257 95%

8Const: of Metalled Road 5/1-R, Tehsil

Renala, NA-145, Distt: Okara.2.000 1.094 -0.906 65%

9

Const: of Metalled Road Kot Dr. Ramzan

Bhutta Mohabat, Tehsil Depal Pur, NA-145,

Distt: Okara.

3.000 1.230 -1.770 40%

236

35.000515

51.160 07-Sep-12

80.000 08-Oct-12

Page 341

Page 342: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10Const: of Soling and Drain at 24-D, Tehsil

Depal Pur, NA-145, Distt: Okara.1.000 0.972 -0.028 95%

11

Const: of Soling and Drain at Thata Mehar

Shah, Tehsil Depal Pur, NA-145, Distt:

Okara.

1.000 0.951 -0.049 95%

12

Const: & Rehabilitation of Metalled Road at

Anwaar Shaheed Colony, Renala City, NA-

145, Distt: Okara.

2.300 1.041 -1.259 40%

13Const: of Nallah at Village 20/2-L, Tehsil

Renala, NA-145, Distt: Okara.0.500 0.482 -0.018 95%

14Const: of PCC at 20/2-L Village, Tehsil

Renala, NA-145, Distt: Okara.1.000 0.939 -0.061 70%

15

Const: of Metalled Road from Kasur Road

to Kot Sufi Muhammad, Tehsil Depal Pur, NA-

145, Distt: Okara.

2.100 0.964 -1.136 40%

16Const: of Soling and Drain at 4/1-L, Tehsil

Renala, NA-145, Distt: Okara.1.000 0.930 -0.070 95%

17Const: of Metalled Road at 10/1-R, Tehsil

Depal Pur, NA-145, Distt: Okara.0.800 0.416 -0.384 55%

18Const: of Nallah at 1/1-L, Tehsil Renala, NA-

145, Distt: Okara1.250 0.782 -0.468 80%

19Const: of Metalled Road 1/1-R, Tehsil

Renala, NA-145, Distt: Okara.3.850 2.172 -1.678 50%

20Const: of Soling and Drain at 5/1-L, Tehsil

Renala, NA-145, Distt: Okara.1.000 0.792 -0.208 80%

21Const: of Soling and Drain at 10/1-AL,

Tehsil Renala, NA-145, Distt: Okara.1.400 0.994 -0.406 95%

22Const: of Nallah at 21/2-L, Tehsil Renala,

NA-145, Distt: Okara.2.000 1.930 -0.070 95%

23Const: of Metalled Road at Chak No.3/1-

RA, NA-145, Distt: Okara.3.690 1.758 -1.932 50%

24Const: of Metalled Road from Chak No.15/1-

AL to 34/1-AL, NA-145, Distt: Okara.8.310 3.985 -4.325 50%

25 Const: of Soling and Drain at Jandran

Kalan, Tehsil Depal Pur, NA-145, Distt:

Okara.

1.000 0.928 -0.072 90%

26Const: of Nallah at Hussain Ghar, Tehsil

Depal Pur, NA-145, Distt: Okara.0.660 0.633 -0.027 97%

236 51.160 07-Sep-12

Page 342

Page 343: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

27

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

3.500 0.115 -3.385 30%

27 51.160 31.358 -19.802

Syed Sumsam Ali Bukhari dated 15.10.12

MNA, NA-145

1

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

2.411 -52.393 90%

2

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.958 0.958 90%

3

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.790 1.790 80%

4

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.632 0.632 80%

5

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

2.618 2.618 90%

6

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.480 0.480 95%

7

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.334 1.334 90%

8

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.904 0.904 92%

9

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.936 0.936 95%

10

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.726 0.726 90%

236

54.804

51.160 07-Sep-12

54.804 15-Oct-12536

Page 343

Page 344: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.636 0.636 95%

12

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.916 0.916 95%

13

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.458 0.458 95%

14

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

_

15

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

20%

16

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.336 0.336 95%

17

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.500 0.500 50%

18

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.874 0.874 90%

19

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

2.648 2.648 75%

20

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.689 0.689 95%

21

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.699 0.699 65%

22

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.357 0.357 55%

23

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.750 1.750 97%

54.80454.804 15-Oct-12536

Page 344

Page 345: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

24

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.727 0.727 90%

25

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.910 0.910 95%

26

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.433 1.433 95%

27

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

2.239 2.239 65%

28

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

2.716 2.716 65%

29

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.297 1.297 90%

30

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.373 1.373 95%

31

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.847 1.847 85%

32

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

2.498 2.498 95%

33

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.613 0.613 95%

34

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.478 0.478 95%

35

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

18%

36

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.917 0.917 95%

54.80454.804 15-Oct-12536

Page 345

Page 346: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

37

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.298 0.298 50%

38

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

1.696 1.696 85%

39

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.286 0.286 95%

40

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.898 0.898 95%

41

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.646 0.646 22%

42

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.451 0.451 95%

43

Const: / Rehabilitation of Metalled Road and

Nallah at Village Kalowal, Tehsil Renala, NA-

145, Distt: Okara.

0.456 0.456 95%

43 54.804 44.4310 -10.373

Syed Sumsam Ali Bukhari dated 23.11.12

MNA, NA-145

1

CONSTRUCTION OF SOLING & DRAIN AT

ABADI GOWALDIAN WALA TEHSIL DEPAL

PUR DISTT; OKARA NA-145

0.500 0.467 -0.033 85%

2

CONSTRUCTION OF SOLING & DRAIN AT

ABADI SADIQUE MAYO TEHSIL DEPAL

PUR DISTT; OKARA NA-145

0.500 -0.500 20%

3

CONSTRUCTION OF SOLING & DRAIN AT

ABADI RAFIQUE TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.500 0.478 -0.022 90%

4

CONSTRUCTION OF SOLING & DRAIN AT

QURAISHI ABADI TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.500 0.477 -0.023 100%

54.80454.804 15-Oct-12536

100.000 23-Nov-12758

Page 346

Page 347: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

CONSTRUCTION OF SOLING & DRAIN AT

ABADI ALA ABAD TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.250 0.239 -0.011 95%

6

CONSTRUCTION OF SOLING & DRAIN AT

ABADI MIRZA SAIF ULLAH TEHSIL DEPAL

PUR DISTT; OKARA NA-145

0.400 0.382 -0.018 95%

7

CONSTRUCTION OF SOLING & DRAIN AT

BHUKEN TEHSIL DEPAL PUR DISTT;

OKARA NA-145

2.000 1.945 -0.055 95%

8

CONSTRUCTION OF SOLING & DRAIN AT

ABADI ASIF BHATTI TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.500 0.475 -0.025 95%

9

CONSTRUCTION OF SOLING & DRAIN AT

ABADI HAJI NOSHA TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.400 0.392 -0.008 95%

10

CONSTRUCTION OF SOLING & DRAIN AT

ABADI ABAL TEHSIL DEPAL PUR DISTT;

OKARA NA-145

0.250 0.237 -0.013 95%

11

CONSTRUCTION OF NEW/

REHABILITATION OF ROAD QILMA

CHOCK TO PULL 2-L TEHSIL RENALA

KHURD DISTT; OKARA NA-145

1.130 0.819 -0.311 20%

12

CONSTRUCTION OF TUFF PAVER ANA

SEWERAGE AT PHATAK BAZAR RENALA

CITY TEHSIL RENALA KHURD DISTT;

OKARA NA-145

1.450 1.307 -0.143 95%

13

CONSTRUCTION OF PCC AT 55/2-L

COLONY RENALA CITY TEHSIL RENALA

DISTT; OKARA NA-145

2.000 1.130 -0.870 55%

14

CONSTRUCTION OF PCC AT LALA TARIQ

STREET HOUSING COLONY RENALA CITY

TEHSIL RENALA DISTT; OKARA NA-1450.525 0.458 -0.067 22%

15

CONSTRUCTION OF SOLING AND DRAIN

AT NEW ABADI RAJOWAL TEHSIL DEPAL

PUR DISTT; OKARA

1.000 0.839 -0.161 70%

16CONSTRUCTION OF SOLING & DRAIN AT

CHAH RUSTAM DISTT; OKARA NA-1450.500 -0.500 22%

100.000 23-Nov-12758

Page 347

Page 348: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17

CONSTRUCTION OF PCC AT 7/1-L

CAPTAN WALI GALI TEHSIL RENALA

KHURD DISTT; OKARA NA-145

0.590 0.562 -0.028 95%

18

CONSTRUCTION OF SOLING & DRAIN AT

SHAMAS KE TEHSIL DEPAL PUR DISTT;

OKARA NA-145

0.500 0.477 -0.023 95%

19

CONSTRUCTION OF SOLING & DRAIN AT

DHOOL GALAN TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.500 0.477 -0.023 95%

20

CONSTRUCTION OF SOLING & DRAIN AT

JHUJ KHURD TEHSIL DEPAL PUR DISTT;

OKARA NA-145

2.000 1.959 -0.041 15%

21

CONSTRUCTION OF SOLING & DRAIN AT

DOLIAN WALI BASTI TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.500 0.478 -0.022 95%

22

CONSTRUCTION OF SOLING & DRAIN AT

STREET HAJI M.ALI & STREET DARBAR

DUOD BANDGI (SHER GHAR) TEHSIL

DEPAL PUR DISTT; OKARA NA-145.

0.680 0.655 -0.025 95%

23

CONSTRUCTION OF SOLING & DRAIN AT

12/1-L TEHSIL RENALA KHURD DISTT;

OKARA NA-145.

1.500 1.498 -0.002 95%

24

CONSTRUCTION OF SOLING & DRAIN AT

WALI COLONY TEHSIL RENALA KHURD

DISTT; OKARA NA-145

1.000 0.898 -0.102 85%

25

CONSTRUCTION OF SOLING & DRAIN AT

24-D TEHSIL DEPAL PUR DISTT; OKARA

NA-145

0.500 0.476 -0.024 90%

26

CONSTRUCTION OF SOLING & DRAIN AT

22/2-L 76 BURJI TEHSIL RENALA KHURD

DISTT; OKARA NA-145

_

27

CONSTRUCTION OF SOLING & DRAIN AT

KOT SARWER DAKHALI 24/2-L TEHSIL

RENALA KHURD DISTT; OKARA NA-145

1.000 0.905 -0.095 90%

28

CONSTRUCTION OF SOLING & DRAIN AT

22/2-L 85 BURJI TEHSIL RENALA KHURD

DISTT; OKARA NA-145

_

100.000 23-Nov-12758

Page 348

Page 349: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

29

CONSTRUCTION OF SOLING & DRAIN

AT13/1-L TEHSIL RENALA KHURD DISTT;

OKARA NA-145

0.500 0.475 -0.025 90%

30

CONSTRUCTION OF SOLING & DRAIN AT

20-D TEHSIL DEPAL PUR DISTT; OKARA

NA-145

0.500 0.476 -0.024 95%

31

CONSTRUCTION OF SOLING & DRAIN AT

29-D TEHSIL DEPAL PUR DISTT; OKARA

NA-145

0.700 0.675 -0.025 90%

32

CONSTRUCTION OF SOLING & DRAIN AT

ISLAM PUR TEHSIL RENALA KHURD

DISTT; OKARA NA-145.

1.000 0.975 -0.025 97%

33

CONSTRUCTION OF METALLED ROAD

FROM SHER GHAR BY PASS

CHOORASTA ROAD TO HUJRA BY PASS

CHOORASTA ROAD TEHSIL DEPAL PUR

DISTT; OKARA NA-145

6.000 3.047 -2.953 55%

34

CONSTRUCTION OF PCC AT 2/1-A-GD

BONGI BHATTIAN TEHSIL RENALA

KHURD DISTT; OKARA NA-145

0.500 0.477 -0.023 90%

35

CONSTRUCTION OF SOLING & DRAIN AT

KOT SYED ZILE HUSNAIN SHAH TEHSIL

DEPAL PUR DISTT; OKARA NA-145

0.500 0.475 -0.025 90%

36

CONSTRUCTION OF PCC AT 14/1-L

TEHSIL RENALA KHURD DISTT; OKARA

NA-145

2.100 0.818 -1.282 15%

37

RE-HABILITATION OF METALLED ROAD

FROM FROM PULL 5/1-AL TO VILLAGE

1/1/AL TEHSIL RENALA KHURD DISTT;

OKARA NA-145

4.150 4.061 -0.089 95%

38

CONSTRUCTION OF SOLING FROM

THATA SAID ALI SHAH TO WAN KHERA

TEHSIL RENALA KHURD DISTT; OKARA

NA-145

2.300 2.253 -0.047 95%

39

CONSTRUCTION OF SOLING & DRAIN AT

BHAI KE TEHSIL DEPAL PUR DISTT;

OKARA NA-145

0.500 0.476 -0.024 95%

100.000 23-Nov-12758

Page 349

Page 350: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

40

CONSTRUCTION OF SOLING & DRAIN AT

1/1-L TEHSIL RENALA KHURD DISTT;

OKARA NA-145.

0.100 0.095 -0.005 20%

41

CONSTRUCTION OF SOLING & DRAIN AT

5/1-AL TEHSIL RENALA KHURD DISTT;

OKARA NA-145.

1.500 0.711 -0.789 55%

42

RE-HABILITATION OF METALLED ROAD

20/2LTEHSIL RENALA KHURD DISTT;

OKARA NA-145

0.550 -0.550 20%

43

CONSTRUCTION OF SOLING FROM

DARSE DHALIANA TO LAI SHADO TEHSIL

RENALA KHURD DISTT; OKARA NA-1452.300 1.381 -0.919 15%

44

CONSTRUCTION OF PCC AT 5/1-AL

TEHSIL RENALA KHURD DISTT; OKARA

NA-145

1.984 1.940 -0.044 85%

45Const of Tuff Paver at Adda Akhtar Abad

Dakhli, Distt: Okara . Na-1450.500 -0.500 _

46

CONSTRUCTION OF SOLING & DRAIN AT

25/2-L PULL ABADI PULL WALI TEHSIL

RENALA KHURD DISTT; OKARA NA-145.

0.500 0.476 -0.024 95%

47

CONSTRUCTION OF SOLING AT 5/1-R

TEHSIL RENALA KHURD DISTT; OKARA

NA-145.

0.500 0.476 -0.024 85%

48

CONSTRUCTION OF PCC AT 26/2-L

TEHSIL RENALA KHURD DISTT; OKARA

NA-145

2.000 1.770 -0.230 85%

49

CONSTRUCTION OF PCC AT 16/1-L

TEHSIL RENALA KHURD DISTT; OKARA

NA-145

2.000 1.689 -0.311 80%

50

CONSTRUCTION OF SOLING AND DRAIN

AT ABADI DR.ABDUL HAMID BUKHARI

CHAK 54/2-L TEHSIL OKARA DISTT;

OKARA NA-145

1.500 1.403 -0.097 95%

51

CONSTRUCTION OF SOLING AND DRAIN

4-D TEHSIL OKARA DISTT; OKARA NA-145 1.000 -1.000 18%

100.000 23-Nov-12758

Page 350

Page 351: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

52

CONSTRUCTION OF SOLING AND DRAIN

AT 33-D TEHSIL OKARA DISTT; OKARA NA-

145

1.000 0.911 -0.089 95%

53

CONSTRUCTION OF SOLING & DRAIN AT

5/1-L TEHSIL RENALA KHURD DISTT;

OKARA NA-145

2.000 1.768 -0.232 85%

54

CONSTRUCTION OF NALA AT KARMAN

WALA SHARIF TEHSIL RENALA KHURD

DISTT; OKARA NA-145

2.500 0.167 -2.333 20%

55

CONSTRUCTION OF PCC & SEWARAGE

AT KHIZAR TOWN (MEMOOD GAZNOVI

ROAD)RENALA CITY TEHSIL RENALA

KHURD DISTT; OKARA NA-145

2.000 0.945 -1.055 30%

56

CONSTRUCTION OF PCC AT RANA NAZIR

STREET RENALA CITY TEHSIL RENALA

KHURD DISTT; OKARA NA-145

0.500 0.474 -0.026 95%

57

CONSTRUCTION OF SOLING & DRAIN AT

LARASIB TOWN RENALA CITY TEHSIL

RENALA KHURD DISTT; OKARA NA-145

0.800 0.733 -0.067 95%

58

CONSTRUCTION OF SOLING & DRAIN AT

25-D TEHSIL DEPAL PUR DISTT; OKARA

NA-145

0.400 0.351 -0.049 90%

59

CONSTRUCTION OF SOLING & DRAIN AT

26-D TEHSIL DEPAL PUR DISTT; OKARA

NA-145

0.350 0.313 -0.037 85%

60

CONSTRUCTION OF PCC AT HAJI JAWAID

STREET RENALACITY TEHSIL RENALA

KHURD DISTT; OKARA NA-145

0.200 0.196 -0.004 95%

61

CONSTRUCTION OF SOLING & DRAIN AT

ANWAR SHAHEED COLONY RENALA

CITY TEHSIL RENALA KHURD DISTT;

OKARA NA-145

0.400 0.378 -0.022 85%

62

CONSTRUCTION OF SOLING & DRAIN AT

8/1-RA TEHSIL RENALA KHURD DISTT;

OKARA NA-145

1.000 0.975 -0.025 97%

63

CONSTRUCTION OF SOLING & DRAIN AT

ABADI RANA SARWAR /ALEEM TOWN

RENALA CITY TEHSIL RENALA KHURD

DISTT; OKARA NA-145

0.400 0.382 -0.018 95%

100.000 23-Nov-12758

Page 351

Page 352: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

64

CONSTRUCTION OF PCC AT MALIK

GHULAM QADAR STREET TEHSIL OKARA

DISTT; OKARA NA-145

0.500 0.381 -0.119 95%

65

CONSTRUCTION OF METALLED ROAD AT

ZAMEER ABAD TO LANDIAN WALA

TEHSIL RENALA KHURD DISTT; OKARA

NA-145

8.000 1.239 -6.761 15%

66

CONSTRUCTION OF PCC AT MAKKA

MADINA TOWN TEHSIL OKARA DISTT;

OKARA NA-145

2.100 2.000 -0.100 95%

67

CONSTRUCTION OF SOLING AND DRAIN

AT 33/1-AL TEHSIL RENALA DISTT;

OKARA NA-145

1.000 0.894 -0.106 80%

68CONSTRUCTION OF PCC AT 32/1-AL

TEHSIL RENALA DISTT; OKARA NA-1451.000 0.944 -0.056 95%

69

CONSTRUCTION OF PCC,SOLING AND

DRAIN AT 27/1-AL TEHSIL RENALA

DISTT; OKARA NA-145

1.000 0.584 -0.416 55%

70

CONSTRUCTION OF SOLING AND DRAIN

AT 26/1-AL TEHSIL RENALA DISTT;

OKARA NA-145

0.500 0.476 -0.024 95%

71

CONSTRUCTION OF PCC, SOLNG AND

DRAIN AT 28/1-AL TEHSIL RENALA DISTT;

OKARA NA-145

1.000 -1.000 15%

72

CONSTRUCTION OF PCC, SOLNG AND

DRAIN AT 31/1-AL TEHSIL RENALA DISTT;

OKARA NA-145

0.500 0.479 -0.021 95%

73

CONSTRUCTION OF SEWER LINE BASTI

REHIM BAKASH TEHSIL RENALA DISTT;

OKARA

0.875 0.392 -0.483 15%

74

CONSTRUCTION OF PCC AT ROBINA

TOWN TEHSIL RENALA DISTT; OKARA NA-

145

3.190 2.610 -0.580 80%

75CONSTRUCTION OF SOLING AT JUGIAN

RAMO DISTT; OKARA NA-1452.000 1.420 -0.580 65%

76

CONSTRUCTION OF PCC AT 7/1-R

AMEEN WALA TEHSIL RENALA DISTT;

OKARA NA-145

2.000 1.645 -0.355 55%

100.000 23-Nov-12758

Page 352

Page 353: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

77

CONSTRUCTION OF SOLING AND DRAIN

AT 19/1-AL TEHSIL RENALA DISTT;

OKARA NA-145

0.500 0.482 -0.018 95%

78CONSTRUCTION OF PCC AT AMAN WALA

DISTT; OKARA NA-1451.000 0.968 -0.032 95%

79

CONSTRUCTION OF NALA & DRAIN AT

11/1-AL TEHSIL RENALA KHURD DISTT;

OKARA NA-145

1.000 0.641 -0.359 65%

80

CONSTRUCTION OF SOLING AND DRAIN

AT HUSSAIN GHAR TEHSIL DEPAL PUR

DISTT; OKARA NA-145

0.600 0.511 -0.089 70%

81

CONSTRUCTION OF METALLED ROAD

AND B/WALL AT NEW ABADI KARMAN

WALA TEHSIL OKARA DISTT; OKARA NA-

145

1.300 0.607 -0.693 85%

82

CONSTRUCTION OF SOLING, DRAIN AND

PCC AT NEAR AMAM BARGA AND

SCHOOL STREETSHER GHAR TEHSIL

DEPALPUR DISTT; OKARA NA-145.

1.226 0.797 -0.429 45%

83

CONSTRUCTION OF SOLING & DRAIN AT

GHUS PUR GHJRAN DISTT; OKARA NA-

145

1.000 0.970 -0.030 95%

84CONSTRUCTION OF SOLING & DRAIN AT

ABADI TOLA DISTT; OKARA0.400 0.378 -0.022 60%

85CONSTRUCTION OF SOLING & DRAIN AT

ABADI TOPAL DISTT; OKARA0.400 0.384 -0.016 96%

86

CONSTRUCTION OF SOLING & DRAIN AT

17-D TEHSIL DEPAL PUR DISTT; OKARA

NA-145

1.000 0.968 -0.032 96%

87

REHABILITATION OF METALLED ROAD AT

L-PLOT LASHARIAN TEHSIL RENALA

KHURD DISTT; OKARA

2.000 1.535 -0.465 15%

87 100.000 71.077 -28.923

Main ManzoorAhmed Watto dated 3.9.12

MNA, NA-146

100.000 23-Nov-12758

Page 353

Page 354: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Const. of new metalled road in Moza Ratepur

Tehsil Depalpur District Okara NA 146 4.000 3.871 -0.129 90%

2

Const of new metalled road in Moza Hakam

Sadharke Tehsil Depalpur District Okara NA

146

4.000 2.370 -1.630 70%

3

Const of new metalled road from

Dharmewala to 5 Marla SchemeTehsil

Depalpur District Okara NA 146

4.000 3.219 -0.781 85%

4

Const of new metalled road from Moza Isra

Kamboh to Moza Mali SinghTehsil Depalpur

District Okara NA 146

6.000 3.910 -2.090 65%

5

Const of new metalled road from Moza Nehal

Tejeka to Abadi Mian Ameer Bodla & Mian

Akram BodlaTehsil Depalpur District Okara

NA 146

4.000 1.780 -2.220 60%

6

Const of new metalled road in Chak Shah

Muhammad (Internal Road)Tehsil Depalpur

District Okara NA 146

2.000 1.909 -0.091 65%

7

Const of new metalled road from Haveli

Depalpur raod to Chak 16/DTehsil Depalpur

District Okara NA 146

4.000 3.195 -0.805 85%

8

Const of new metalled road from Chak 7/D to

Moza Salloo NorekaTehsil Depalpur District

Okara NA 146

5.000 4.729 -0.271 85%

9

Const of new metalled road from Haveli Hujra

Raod to Gangoowal via loomrhi Tehsil

Depalpur District Okara NA 146

6.000 3.790 -2.210 60%

10

Const of new metalled road from Moza Sham

din to Moza Saluwal (remaining)Tehsil

Depalpur District Okara NA 1464.000 2.560 -1.440 60%

11

Const of new metalled road from Basti Noor

Ellahi to Abadi Ch. Addul wahid Tehsil

Depalpur District Okara NA 146

4.000 2.460 -1.540 65%

12

Const of new metalled road from Police

Station Saddar Depalpur to Abadi Sardar

Saleem HaiderTehsil Depalpur District Okara

NA 146

3.000 1.923 -1.077 60%

50.000 03-Sep-12178

Page 354

Page 355: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12 50.000 35.716 -14.284

Main ManzoorAhmed Watto dated 3.9.12

MNA, NA-146

1Const. of Soling/ Drain and Nallah UC Shah

Yaka Tehsil Depalpur Distt: Okara.5.000 2.906 -2.094 85%

2Const. of Soling/ Drain and Nallah UC Chipli

Pur Tehsil Depalpur Distt: Okara.5.000 4.687 -0.313 85%

3Const. of Soling/ Drain and Nallah UC Tara

Singh Tehsil Depalpur Distt: Okara.5.000 3.972 -1.028 85%

4Const. of Soling/ Drain and Nallah UC Sobha

Ram Tehsil Depalpur Distt: Okara.5.000 4.788 -0.212 95%

5Const. of Soling/ Drain and Nallah UC Pippli

Pahar Tehsil Depalpur Distt: Okara.5.000 4.799 -0.201 95%

6

Const. of Soling/ Drain and Nallah UC Qila

Jawant Singh Tehsil Depalpur Distt: Okara. 5.000 4.841 -0.159 90%

7

Const. of Soling/ Drain and Nallah UC Ratta

Khanna Tehsil Depalpur Distt: Okara. 5.000 4.900 -0.100 97%

8Const. of Soling/ Drain and Nallah UC Awan

Kalan Tehsil Depalpur Distt: Okara.5.000 4.871 -0.129 95%

9

Const. of Soling/ Drain and Nallah UC

Mazher Abad Tehsil Depalpur Distt: Okara. 5.000 3.920 -1.080 95%

10Const. of Soling/ Drain and Nallah UC

Mancherian Tehsil Depalpur Distt: Okara.5.000 4.286 -0.714 80%

11

Const. of Soling/ Drain and Nallah UC Koikay

Bahawal Tehsil Depalpur Distt: Okara. 5.000 4.791 -0.209 95%

12Const. of Soling/ Drain and Nallah UC Bhon

Manzabta Tehsil Depalpur Distt: Okara.5.000 4.284 -0.716 95%

13Const. of Soling/ Drain and Nallah UC

Behlopur Tehsil Depalpur Distt: Okara.5.000 4.538 -0.462 95%

14Const. of Soling/ Drain and Nallah UC Kani

Pur Tehsil Depalpur Distt: Okara.5.000 4.203 -0.797 85%

03-Sep-12179 150.000

Page 355

Page 356: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15Const. of Soling/ Drain and Nallah UC Judjh

KalanTehsil Depalpur Distt: Okara.5.000 4.662 -0.338 95%

16Const. of Soling/ Drain and Nallah UC

Rehmat Wala Tehsil Depalpur Distt: Okara.5.000 4.853 -0.147 95%

17

Const. of Soling/ Drain and Nallah UC

Bhoman Shah Tehsil Depalpur Distt: Okara. 5.000 3.849 -1.151 80%

18Const. of Soling/ Drain and Nallah UC

Rajowal Tehsil Depalpur Distt: Okara.5.000 4.823 -0.177 95%

19Const. of Soling/ Drain and Nallah UC Jeth

Pur Tehsil Depalpur Distt: Okara.5.000 4.803 -0.197 95%

20Const. of Soling/ Drain and Nallah UC

Mustafa Abad Tehsil Depalpur Distt: Okara.5.000 4.823 -0.177 95%

21

Const. of Street Tuff Paver, Soling, Drain

Type-II ,Nallah, Sewerage and PCC UC

No.103 Tehsil Depalpur Distt: Okara.

5.000 3.986 -1.014 80%

22

Const. of street Tuff Paver, Soling, Drain

Type-II ,Nallah,Sewerage and PCC UC

No.104 Tehsil Depalpur Distt: Okara.

5.000 2.835 -2.165 70%

23

Const. of Street Tuff Paver, Soling, Drain

Type-II ,Nallah, Sewerage and PCC UC

No.105 Tehsil Depalpur Distt: Okara.

5.000 4.900 -0.100 98%

24

Const. of Street Tuff Paver, Soling,Drain

Type-II, Nallah, Sewerage and PCC UC

No.109 Tehsil Depalpur Distt: Okara.

5.000 4.822 -0.178 95%

25

Const. of Street Tuff Paver, Soling, Drain

Type-II, Nallah, Sewerage and PCC UC

No.110 Hujrah Shah Moqeem Distt: Okara.

5.000 3.899 -1.101 85%

26

Const. of Street Tuff Paver, Soling. Drain

Type-II, Nallah, Sewerage and PCC UC

No.111 Hujrah Shah Moqeem Distt: Okara.

5.000 2.099 -2.901 80%

27

Const. of Street Tuff Paver, Soling, Drain

Type-II, Nallah, Sewerage and PCC UC

Bhutta Mohabbat Tehsil Depalpur Distt:

Okara.

5.000 4.814 -0.186 97%

28

Const. of Soling/ Drain Type-II and Nallah UC

Pandit Manfool Pur Tehsil Depalpur Distt:

Okara.

5.000 4.609 -0.391 90%

03-Sep-12179 150.000

Page 356

Page 357: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

29Const. of Soling/ Drain Type-II and Nallah UC

Amli MotiTehsil Depalpur Distt: Okara.5.000 4.832 -0.168 95%

30

Const. of Soling/ Drain Type-II and Nallah UC

Shah Nawaz Tehsil Depalpur Distt: Okara. 5.000 4.836 -0.164 95%

30 150.000 131.231 -18.769

Main ManzoorAhmed Watto dated 27.9.12

MNA, NA-146

459 27-Sep-12 5.800 5.800 -5.800

5.800 -5.800

Main ManzoorAhmed Watto dated 26.2.13

MNA, NA-146

1Repair and Rehabilitation of Depalpur Baseer

Pur Road in NA-146, Okara.10.000 5.968 -4.032 60%

2Repair and Rehabilitation of Diyram to

Nehran Wala Road in NA-146, Okara.10.000 5.659 -4.341 60%

3

Construction of Culverts, Pavement of

Streets and Repair of Roads in NA-146 (PP-

187 & PP-192), Okara.

15.000 10.227 -4.773 85%

3 35.000 21.854 -13.146

Main Khurram Jhangir Watto dated 3.9.12

MNA, NA-147

03-Sep-12179

35.000 26-Feb-13987

150.000

Page 357

Page 358: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1

Const. of Metalled Road Havelly Pakpattan

Road to Abadi Mian Bashir Khan Kals to

Kotla, Abadi Iqbal Khan, Abadi Mian Khushi

Muhammad Kals and Abadi Mian Shah Din

Khan Wattoo Distt: Okara.

4.823 -175.177 65%

2Const. of Metalled Road Haji Muhammad

Hussain Amin Kot Distt: Okara.0.568 0.568 60%

3

Const. of Metalled Road Depalpur Wasawe

Wala Road to Abadi Shiehan Wali Abadi

Mian Ahmed Shuja Wattoo, Abadi Mian

Naseem Wattoo to Graveyard to Havelly

Wasawe Wala Road Distt: Okara.

4.347 4.347 55%

4Const. of Metalled road from Qadir Abad to

Mahla Bukan Distt: Okara3.425 3.425 85%

5

Const. of Metalled Road Dhuliana Village to

Graveyard Dhuliana (Ehsan Bai Road)

Distt:Okara.

2.353 2.353 60%

6Const.of Metalled Road from Kharal Kalan to

Jhugian Azeem Distt: Okara.1.696 1.696 60%

7Const. of Metalled Road from Rukan Pura to

near Abadies Rukan Pura Distt:Okara7.753 7.753 90%

8

Const. of Metalled Road from Chak Allah Din

Chishti to Mohib Ali Ottar (Remaining portion)

Distt:Okara.

1.930 1.930 65%

9

Const. of Metalled Road from bheni

sulemanki to doonaba dalail ka and chak

bareka.

5.471 5.471 60%

10

Const. of Metalled Road from Abadies 42/SP

Sumadnri Khaney Kay and Khaloo Kay to

Minor Havelly Lakha Distt:Okara.

3.686 3.686 90%

11

Const. of Metalled Road from Havelly

Sulemanki road to Abadi Mian Fateh Baz

Bhidhal to Link Canal Distt:Okara

6.365 6.365 60%

12Const. of Metalled Road for village Chura

Maneka (Remaining portion) Distt:Okara2.004 2.004 60%

13Const. of Metalled Road of Village Sodeka

Distt:Okara0.895 0.895 60%

14Const. of Metalled road from Muhammad Pur

road (Remaining portion) Distt:Okara1.437 1.437 90%

180.000180.000 03-Sep-12155

Page 358

Page 359: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15Const. of Metalled Road village Adil Kay to

Canal (Remaining portion) Distt:Okara2.129 2.129 85%

16Const. of Metalled Road Basirpur Depalpur

road to Ijaz Nagar Arora Jager Distt:Okara1.226 1.226 75%

17Const. of Metalled Road from old Lalikay to

Abadi Mian Arif Lalaikay Distt:Okara2.481 2.481 35%

18

Const. of Metalled road from Mar Komboh to

Bagian Tibbian via Abadi Mian Aurangzeeb

Dareka Distt:Okara

4.198 4.198 85%

19Const. of Metalled Road from Mian Hassan

Maneka Niki Maneki Distt:Okara0.970 0.970 95%

20Const. of Metalled Road from Village

Thakerka Banda Distt:Okara3.550 3.550 85%

21Const. of Metalled Road(Remaining portion)

of Jahangir Abad Distt:Okara3.822 3.822 95%

22

Const. of Metalled Road from Head

Sulemanki road to Head Sulemanki Colony

Distt:Okara

3.629 3.629 80%

23

Const. of Metalled Road Baseer pur Roheela

Road to Abadi Chak Ahmad Yar Distt:Okara 1.305 1.305 60%

24Const. of Metalled road from Attari to Chak

Rafi Abad Distt:Okara4.341 4.341 85%

25

Const. of Metalled road of Nama Jindeka to

Qaim Jindeka (Remaining portion)

Distt:Okara

1.051 1.051 60%

26

Const. of Metalled Road pull Jhall Molia

Chishti to Abadi Kalay Khan Malik Zahoor

Jindeka Distt:Okara

1.854 1.854 60%

27Const. of Metalled road from Pir Ghani road

to Rukay Kay Dakhli Sumandi Distt:Okara2.109 2.109 60%

28

Const. of Metalled Road Javed Malkana

Chowk to Liaqat Malkana Residence /Lakhoo

Malkana Road Distt:Okara

0.952 0.952 60%

29Const. of Remaining portion Guder Malkana

to Khajoor Wala Distt:Okara1.326 1.326 60%

30

Construction/Repair and rehabilitation of

Road and Const. of Drain /Nallah at Kalason

Hameed Distt:Okara

1.914 1.914 90%

180.000180.000 03-Sep-12155

Page 359

Page 360: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

31Const. of Remaining road shamad Distt:

Okara 1.875 1.875 85%

32Const. Of Metalled Road Koy Ki Jageer

Distt:Okara1.156 1.156 60%

33 Const. of Battak Stadium Distt:Okara 0.959 0.959 90%

34Const. of Baseer pur Havelly Lakha road to

Gangu Tahar Dist:Okara 1.278 1.278 60%

35

Const. of sitting area and provision of Rooms

at Wasewa Wala Stadium Distt:Okara 0.970 0.970 90%

36Const. of liberary at Jamia Naeemia Havelly

Lakha Distt:Okara 0.949 0.949 95%

37

Const. of Security Gates, Monuments,

fountains, repair of streets at Wasawewala

Distt:Okara

2.164 2.164 75%

38Const. of PCC &Laying of Soling/ Tuff tiles at

Wasawe Wala Distt:Okara.2.727 2.727 60%

39Special/Repair of Basir Pur to Mouza Gahlan

Distt Okara. N.A-147_

40Repair of Rohela road to Chak Qaim Distt

Okara. N.A-1470.684 0.684 50%

41Repair of Gulab Das road Distt Okara. N.A-

1471.426 1.426 95%

42S/repair Sukha Ladhuka to Parmanand Distt

Okara. N.A-1473.721 3.721 90%

43

Repair of Road Khajour Wala To Adda

Makkayana to Kasur Boundary Distt Okara.

N.A-147.

7.304 7.304 95%

44

Construction of M/Road Remaining Portion

Abadi Malik Mushtaq Pull Minor Shereen

Rohela. Disst Okara.

0.957 0.957 95%

45

Construction of Mian Manzoor Ahmed

Wattoo Academic Block at Govt High School

Haveli Lakha. Distt Okara. N.A-147

6.748 6.748 70%

46

Rehbilitation of Metalled road from Jhall

Bungha sham singh to juggian khan singh,

Distt: Okara.

1.814 1.814 30%

180.000180.000 03-Sep-12155

Page 360

Page 361: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

47

Const of metalled road from juggian sham

singh road to abadi mian sarfraz khan dakhli

haril, Distt: Okara

1.575 1.575 30%

47 180.000 119.917 -60.083

Main Khurram Jhangir Watto dated 26.2.13

MNA, NA-147

988 26-Feb-13 15.000 1

Construction of Culverts and Pavement of

Streets in NA-147 (PP-188 & PP-193),

(Havelli Lakha, Baseer Pur, Maandi Ahmad

Abad, Amli Ke Sohag, Chak Murad, Tarbat

Shah Hussain, Village Giana, Amira Teja Ka,

Bhela Gulab Singh, Guddar Malkana Farid

pur Sohag, Wasawe Wala, Jahagir

Abad,Okara.

15.000 11.874 -3.126 85%

1 15.000 11.874 -3.126

Ghulam Farid Kathia dated 2.10.12

MNA, NA-161

1Construction of Soling, Drain Type-II and

PCC Korey Shah Zereen Distt. Sahiwal2.000 1.900 -0.100 100%

2Construction of Soling, Drain Type-II and

Class Room 52/GD Distt. Sahiwal2.000 1.828 -0.172 80%

3Construction of Soling and Drain Type-II

132/9-L Distt. Sahiwal1.000 0.833 -0.167 90%

4Construction of Soling and Drain Type-II

55/GD Distt. Sahiwal1.000 0.941 -0.059 100%

5Construction of Soling and Drain Type-II

53/GD Distt. Sahiwal1.000 0.962 -0.038 95%

6Construction of Water Course Abadi

Mummar Distt. Sahiwal1.000 0.975 -0.025 100%

180.000180.000 03-Sep-12155

46.000 02-Oct-12482

Page 361

Page 362: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7Construction of Metalled Road and Sewerage

96/6-R Distt. Sahiwal1.000 0.466 -0.534 55%

8Construction of Metalled Road 97/6-R Distt.

Sahiwal1.000 0.945 -0.055 85%

9Construction of Metalled Road 92/6-R Distt.

Sahiwal1.000 0.542 -0.458 20%

10Construction of Metalled Road 93/6-R Distt.

Sahiwal1.500 0.611 -0.889 35%

11Construction of Soling and Drain Type-II 90/6-

R Distt. Sahiwal0.500 0.462 -0.038 55%

12Construction of Soling 115/9-L Distt. Sahiwal

1.000 0.979 -0.021 100%

13Construction of Soling and Drain Type-II 87/6-

R Distt. Sahiwal1.500 1.476 -0.024 55%

14Construction of Soling, and Drain Type-II

88/6-R, Madhali Distt. Sahiwal1.000 0.969 -0.031 100%

15Construction of Metalled Road 88/6-R Ratti

Tibbi Distt. Sahiwal1.000 0.944 -0.056 85%

16Construction of Sewerage Kot Khadam Distt.

Sahiwal2.000 1.946 -0.054 90%

17Construction of Soling and Drain Type-II

Nama Siyal Distt. Sahiwal1.000 0.973 -0.027 96%

18Construction of Soling and Drain Type-II 78/5-

L Distt. Sahiwal1.000 0.961 -0.039 100%

19Construction of Drain Type-II 82/5-L Distt.

Sahiwal0.500 0.376 -0.124 55%

20 Construction of Soling 80/5-L Distt. Sahiwal 1.000 0.945 -0.055 100%

21Construction of Metalled Road 82/5-L,

Khokhran Distt. Sahiwal1.000 0.964 -0.036 92%

22 Repair of Road 81/5-L Distt. Sahiwal 1.000 0.947 -0.053 90%

23Construction of Metalled Road 111/9-L Distt.

Sahiwal1.000 0.947 -0.053 90%

24Construction of Metalled Road 109/9-L Distt.

Sahiwal1.000 0.839 -0.161 85%

25Construction of Metalled Road 96/9-L Distt.

Sahiwal1.000 0.600 -0.400 55%

26Construction of Soling and Drain Type-II 96/9-

L Distt. Sahiwal1.000 0.974 -0.026 100%

46.000 02-Oct-12482

Page 362

Page 363: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

27Construction of Soling and Drain Type-II

101/9-L Distt. Sahiwal1.000 0.959 -0.041 95%

28Construction of Drain Type-II 139/9-L Distt.

Sahiwal1.000 0.959 -0.041 100%

29Construction of Drain Type-II 99/9-L, Jagga

Colony Distt. Sahiwal0.500 0.332 -0.168 70%

30Construction of Soling and Drain Type-II

Bahawal Fatyana Distt. Sahiwal1.000 0.972 -0.028 100%

31Construction of Soling Nama Samore Distt.

Sahiwal0.500 0.490 -0.010 70%

32Construction of PCC Hussnain Abad Distt.

Sahiwal1.000 0.980 -0.020 100%

33Construction of Soling Sellabat Key Kathia

Distt. Sahiwal1.000 0.974 -0.026 100%

34Construction of Soling 63/GD Distt. Sahiwal

1.000 0.968 -0.032 100%

35Construction of Metalled Road 90/9-L Distt.

Sahiwal1.000 0.514 -0.486 55%

36Construction of Metalled Road 123/9-L Distt.

Sahiwal1.000 0.942 -0.058 95%

37Construction of Soling 124/9-L Distt. Sahiwal

0.500 0.489 -0.011 100%

38Construction of Sewerage 60-61/GD Distt.

Sahiwal0.500 0.430 -0.070 75%

39Construction of Soling Noor Key Distt.

Sahiwal0.500 0.489 -0.011 100%

40 Construction of Soling 93/9-L Distt. Sahiwal 0.500 0.475 -0.025 100%

41 Construction of Soling 94/9-L Distt. Sahiwal 1.000 0.963 -0.037 100%

42Construction of Metalled Road 145/9-L Distt.

Sahiwal1.000 0.905 -0.095 90%

43Construction of Metalled Road 89/6-R Distt.

Sahiwal1.000 0.563 -0.437 50%

44Construction of Soling and Drain Type-II

104/9-L Distt. Sahiwal1.000 0.969 -0.031 100%

45Construction of Soling 138/9-L, Abadi

Khurram Distt. Sahiwal1.000 0.878 -0.122 100%

46Construction of Soling Abadi Kharlan Wali

Distt. Sahiwal1.000 0.951 -0.049 100%

46.000 02-Oct-12482

Page 363

Page 364: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

46 46.000 40.507 -5.493

Ghulam Farid Kathia dated 9.1.13

MNA, NA-161

1

CONSTRUCTION OF SOLING IN KOREY

SHAH ZARIEN, SAHIWAL, NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 01/34.

1.000 0.914 -0.086 90%

2

CONSTRUCTION OF SOLING/ NALLAH

ADDA SHABEEL 71/4-R, 53/GD, SAHIWAL

NA-161, PWP-II FOR THE YEAR 2012-2013,

S.NO. 02/34

1.500 _ 10%

3

CONSTRUCTION OF METALLED ROAD IN

VILLAGE 59/GD, SAHIWAL NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 03/341.500 _ _

4

CONSTRUCTION OF METALLED ROAD &

REPAIR OF ROAD 56/GD, SAHIWAL NA-

161 PWP-II FOR THE YEAR 2012-2013,

S.NO. 04/34.

1.500 -1.500 _

5

CONST: OF SOLING ABADI KUTAB

TRANA, SAHIWAL NA-161, PWP-II FOR

THE YEAR 2012-2013, S.NO. 05/34.

1.000 0.756 -0.244 85%

6

CONSTRUCTION OF METALLED ROAD &

REPAIR OF ROAD WAH MAIR SHAH,

SAHIWAL NA-161 PWP-II FOR THE YEAR

2012-2013, S.NO. 06/34.

1.500 0.312 -1.188 35%

7

CONSTRUCTION OF SEWERAGE IN 88/6-

R, ABADI GOGEY SAHIWAL NA-161

PWP-II FOR THE YEAR 2012-2013, S. NO.

07/34

1.500 -1.500 _

8

CONSTRUCTION OF SOLING, NALLAH

AND M/ROAD MOUZA CHEENA KARMALI,

SAHIWAL NA-161 PWP-II FOR THE YEAR

2012-2013, S. NO. 08/34

2.000 0.762 -1.238 40%

9

CONSTRUCTION OF METALLED ROAD

ABADI RAJA DULU, SAHIWAL NA-161 PWP-

II FOR THE YEAR 2012-2013, S.NO. 09/341.500 -1.500 _

50.000 09-Jan-13871

Page 364

Page 365: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10

CONSTRUCTION OF SOLING

QABARISTAN ROAD 88/6-R NAIKI ,

SAHIWAL NA-161, PWP-II FOR THE YEAR

2012-2013, S.NO. 10/34.

1.000 0.974 -0.026 90%

11

CONSTRUCTION OF METALLED ROAD

CHAK GULLY WALA, SAHIWAL NA-161

PWP-II FOR THE YEAR 2012-2013, S.NO.

11/34

1.500 0.548 -0.952 35%

12

CONSTRUCTION OF PCC, METALLED

ROAD & REPAIR OF ROAD HABIB TOWN,

85/6-R, 96/6-R SAHIWAL NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 12/34

2.420 -2.420 13%

13

CONST: OF SEWERAGE ABID COLONY

85/6-R, KOT ALLAH DIN, SAHIWAL NA-161,

PWP-II FOR THE YEAR 2012-2013, S.NO.

13/34.

2.000 -2.000 10%

14

CONSTRUCTION OF SOLING AND DRAIN

ESTERAN WESTRAN 86/9-L, SAHIWAL NA-

161 PWP-II FOR THE YEAR 2012-2013,

S.NO. 14/34

1.100 0.531 -0.569 50%

15

CONSTRUCTION OF BOUNDARY WALL

OF HOSPITAL CHAK 145/9-L SAHIWAL, NA-

161 ,PWP-II FOR THE YEAR 2012-2013 ,

SR. NO. 15/34

1.000 -1.000 _

16

CONSTRUCTION OF NALLAH, SOLING

AND DRAIN CHAK 138/9-L OLD & NEW

SAHIWAL NA-161 PWP-II FOR THE YEAR

2012-2013, Sr. No. 16/34

1.510 0.662 -0.848 45%

17

CONSTRUCTION OF METALLED ROAD

KUTAB SHAHANA FROM CHOWK

SARWER TO COMPRIHENSIVE SCHOOL,

SAHIWAL NA-161 PWP-II FOR THE YEAR

2012-2013, S.NO.17/34

2.000 -2.000 12%

18

CONSTRUCTION OF SOLING AND REPAIR

OF ROAD AHSAN ABADI SAHIWAL NA-161

PWP-II FOR THE YEAR 2012-2013, Sr. No.

18/34

1.500 -1.500 13%

50.000 09-Jan-13871

Page 365

Page 366: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

19

CONSTRUCTION OF SOLING 112/9-L,

ABADI JOOTA, SAHIWAL NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 19/34.

1.000 0.658 -0.342 60%

20

REHBLITATION OF SCHOOL & SOLING

CHAK 138/9-L, ZAFAR ABAD, SAHIWAL NA-

161 PWP-II FOR THE YEAR 2012-2013,

S.NO. 20/34.

2.800 -2.800 _

21

CONSTRUCTION OF SOLING 129/9-L

CHOOTI, SAHIWAL NA-161 PWP-II FOR

THE YEAR 2012-2013, S.NO. 21/34.

1.000 0.947 -0.053 95%

22

CONSTRUCTION OF METALLED ROAD

CHAK 139/9-L, SAHIWAL NA-161 PWP-II

FOR THE YEAR 2012-2013,S.NO. 22/34

1.500 0.347 -1.153 35%

23

CONSTRUCTION OF SOLING AND DRAIN

CHAK 155/9-L, SAHIWAL NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 23/34

1.100 1.078 -0.022 95%

24

CONSTRUCTION OF SOLING AND DRAIN

77/5-L & 78/5-L , SAHIWAL, NA-161

PWP-II FOR THE YEAR 2012-2013, S.NO.

24/34.

1.500 0.759 -0.741 50%

25

CONSTRUCTION OF SOLING ADDA

SHABIL 116/9-L, SAHIWAL NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 25/34

1.000 0.944 -0.056 90%

26

CONSTRUCTION OF SOLING AND DRAIN

CHAK 118/9-L, SAHIWAL, NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 26/34.1.500 -1.500 12%

27

CONSTRUCTION OF SOLING AND DRAIN

SALAM PURA, SAHIWAL, NA-161 PWP-

II FOR THE YEAR 2012-2013, S.NO.

27/34.

1.500 0.994 -0.506 75%

28

CONSTRUCTION OF SOLING ABADI

BOJIAN 117/9-L , SAHIWAL NA-161 PWP-II

FOR THE YEAR 2012-2013, S.NO. 28/34.1.000 0.813 -0.187 80%

29

CONSTRUCTION OF METALLED ROAD &

REPAIR OF ROAD CHAK 120/9-L,

SAHIWAL NA-161 PWP-II FOR THE YEAR

2012-2013, S.NO. 29/34

2.500 0.627 -1.873 20%

50.000 09-Jan-13871

Page 366

Page 367: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

30

CONST: OF COMPOUND WALL OF GRAVE

YARD CHAK NO. 86/6-R, SAHIWAL, NA-161

,PWP-I FOR THE YEAR 2012-2013 , SR.

NO. 30/34

1.500 -1.500 14%

31

CONSTRUCTION OF SOLING, DRAIN AND

PCC 134/9-L 135/9-L, DIST. SAHIWAL NA-

161 PWP-II FOR THE YEAR 2012-2013,

SR. NO. 31/34

1.750 -1.750 14%

32

CONSTRUCTION OF SOLING & POST

OFFICE CHAK 89/6-R, SAHIWAL NA-161

PWP-II FOR THE YEAR 2012-2013, Sr. No.

32/34

1.265 -1.265 13%

33

CONSTRUCTION OF SOLING/DRAIN

106/9-L,107/9-L & 108/9-L, SAHIWAL, NA-

161 PWP-II FOR THE YEAR 2012-2013,

S.NO. 33/34.

1.500 0.437 -1.063 35%

34

CONSTRUCTION OF BRIDGE OVER

MINOR AT 115/9-L TO 113/9-L, SAHIWAL

NA-161 PWP-II FOR THE YEAR 2012-2013,

S.NO. 34/34.

0.555 -0.555 5%

34 50.000 13.063 -36.937

Shahzad Saeed Cheema dated 7.9.12

MPA PP224

268 07-Sep-12 160.000 100.000 -100.000

100.000 -100.000

50.000 09-Jan-13871

Page 367

Page 368: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Nauman Ahmed Langrial dated 17.10.12

MNA, NA-163

1Const. of Soling/Drain Chak No.69/12-L and

(Baba Jumman Shah) Distt: Sahiwal1.000 0.976 -0.024 100%

2

Const. of Metalled Road (New) and soling

and repair of Road Dera Haji Nasrullah to

Chak No.89/12-L Distt: Sahiwal

6.600 6.461 -0.139 95%

3Const. of Soling and Drain Chak No.53/12-L

(Tibba) Distt: Sahiwal1.000 0.978 -0.022 100%

4Const. of soling Mian Khaira Chak No.98/12-

L Distt: Sahiwal0.500 0.489 -0.011 100%

5Const. of Metalled Road Chak No.98/12-L

Distt: Sahiwal1.000 0.979 -0.021 95%

6Const. of Sewerage Chak No.107/12-L Distt:

Sahiwal5.000 4.598 -0.402 90%

7Repair of Metalled Road Chak No.117/7-DR

Distt: Sahiwal3.000 2.927 -0.073 100%

8Const. of soling Riaz Babo 117/7DR Distt:

Sahiwal1.500 1.484 -0.016 100%

9Const. of Khall Manzoor Budro Distt: Sahiwal

1.000 0.976 -0.024 100%

10Const.of Soling Shah Muhammad Tarer

Mouza Sawa Distt: Sahiwal1.000 0.977 -0.023 100%

11Const. of soling Abadi Shahkot Chak

No.113/7-CR Distt: Sahiwal1.000 0.978 -0.022 100%

12Repair & Rehabilitation of Metalled Road

Chak No.111/12-L Distt: Sahiwal0.800 0.613 -0.187 85%

13Const. of Metalled Road Chak No.40/12-L

Distt: Sahiwal1.000 0.975 -0.025 90%

14Const,. of Khall Moga Noor Numberdar Chak

No.116/7-CR Distt: Sahiwal1.000 0.979 -0.021 100%

15Const. of Khall Moga Manik Badro Chak

No.117/7-DR Distt: Sahiwal1.250 1.224 -0.026 100%

16Const. of Metalled Road Chak No.120/13-AL

Distt: Sahiwal1.000 0.979 -0.021 100%

17Const. of Metalled Road Chak No.5/14-L

Distt: Sahiwal1.375 1.340 -0.035 100%

100.000 17-Oct-12555

Page 368

Page 369: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18Const. of Metalled Road Chak Burgi Distt:

Sahiwal1.000 0.616 -0.384 75%

19Const. of Filtration Plant Chak No.49/12-L

Distt: Sahiwal2.500 2.185 -0.315 85%

20Const. of Soling Chak No.108/12-L Distt:

Sahiwal1.000 0.980 -0.020 100%

21Const. of Metalled Road Chak No.49/12-L

Distt: Sahiwal2.000 1.951 -0.049 95%

22Const. of Metalled Road Chak No.97/12-L

Distt: Sahiwal1.000 0.980 -0.020 95%

23Const. of Soling/Drain Abadi Amir Pur Distt:

Sahiwal0.800 0.784 -0.016 95%

24Const. of Sewerage at Chak NO.4/14-L Distt:

Sahiwal0.600 0.585 -0.015 95%

25Const. of Metalled Road Chak No.120/7-CR

Distt: Sahiwal1.000 0.618 -0.382 70%

26Const. of soling Chak No.121/7ER Distt:

Sahiwal0.600 0.584 -0.016 100%

27Const. Soling Chak No.14/14-L Distt:

Sahiwal1.000 0.976 -0.024 100%

28Const. of soling/drain Chak No.19/14-L Distt:

Sahiwal1.000 0.979 -0.021 100%

29Const. of Sewerage Chak No.95/12-L Distt:

Sahiwal1.000 0.765 -0.235 75%

30Const. of Big Drain (2x2ft) Chak No.60/12-L

Distt: Sahiwal8.000 7.680 -0.320 90%

31Const. of Metalled Road Dera Imran Warach

Chak No.60/12-L Distt: Sahiwal0.800 0.783 -0.017 65%

32Const. of Soling and Nallah (1-1/2x1-1/2)

Chak No.26/14-L Distt: Sahiwal2.400 2.340 -0.060 100%

33Const. of Sewerage Soling Chak NO.99/12-L

Distt: Sahiwal1.600 1.517 -0.083 90%

34Const. of Soling/Drain and Khall Chak

No.90/12-L Distt: Sahiwal1.800 1.756 -0.044 90%

35Const. of Khall Chak No.92/12-L Distt:

Sahiwal1.000 0.978 -0.022 100%

36Const. of Khall Moga Fayyaz Khokhar Distt:

Sahiwal1.000 0.970 -0.030 100%

100.000 17-Oct-12555

Page 369

Page 370: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

37Const. of Khall Chak No.56-A/12-L Moga

YOusaf Distt: Sahiwal1.000 0.975 -0.025 100%

38Const. of Soling/Drain Chak No.21/14-L Distt:

Sahiwal2.100 2.035 -0.065 100%

39Const. of Khall Chak No.118/7-CR Distt:

Sahiwal2.500 2.181 -0.319 80%

40Const. of Soling Chak No.10/14-L Dera Allah

Gegh Distt: Sahiwal0.500 0.487 -0.013 100%

41Const. of soling/Drain Chak No.22/14-L Distt:

Sahiwal1.500 1.466 -0.034 100%

42Const. of Khall Chak No.95/12-L Distt:

Sahiwal2.000 1.857 -0.143 80%

43Const. of Khall & Soling Chak No.55/12-L

(Rari) Distt: Sahiwal4.500 4.427 -0.073 100%

44Const. of Soling/Drain Chak No.57/12-L (Pull)

Distt: Sahiwal1.400 1.360 -0.040 100%

45Const. of Soling Chak No.76/12-L Distt:

Sahiwal0.500 0.477 -0.023 100%

46Const. of Soling & Sewerage Chak No.66/12-

L Distt: Sahiwal0.500 0.458 -0.042 95%

47Const. of Sewerage pipe Line Chak No.167/9-

L Distt: Sahiwal1.000 0.975 -0.025 100%

48Const. of Soling Chak No.13/14-L Dera Tariq

Arrian Distt: Sahiwal0.800 0.777 -0.023 80%

49Const. of Metalled Road Chak No.58/12-L

Distt: Sahiwal1.375 1.375 100%

50Const. of Khall Chak No.109/12-L Distt:

Sahiwal1.000 0.980 -0.020 100%

51Const. of Metalled Road Chak No.30/14-L

Dera Nawaz Jhukar Distt: Sahiwal1.500 1.465 -0.035 100%

52Const. of Soling Drain Adda Okanwala Distt:

Sahiwal 1.000 0.941 -0.059 95%

53Const. of Metalled Road Chak No. 29/14-L

Dera Siddique Arrian Distt: Sahiwal2.500 2.440 -0.060 100%

54

Const. of Metalled Road Soling & Nallah

Chak No.56/12-L Sayyadan Wala Distt:

Sahiwal

0.800 0.780 -0.020 100%

55Const. of Sewerage & Soling Chak No.47/12-

L Distt: Sahiwal0.500 0.487 -0.013 100%

100.000 17-Oct-12555

Page 370

Page 371: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

56Const. of road Soling & Nallah UC No.76 , 77

& 78 Distt: Sahiwal3.700 3.614 -0.086 95%

57Const of Khall chak No. 113/7-R Distt:

Sahiwal.3.500 3.412 -0.088 95%

58Const of Metalled road chak No. 16/14-L

Distt: Sahiwal.1.000 -1.000 10%

59Const : of Soling Drain Chak No. 56-A/12-L

Distt: Sahiwal1.200 1.171 -0.029 90%

60Const: of Soling Culverts Chak No. 28/14-L

Distt: Sahiwal.0.800 0.783 -0.017 95%

61Const: of Soling Drain Chak No. 98/12-L,

Distt: Sahiwal0.800 0.775 -0.025 90%

62Const: of khall Chak No. 54/12-L Distt:

Sahiwal0.500 0.489 -0.011 90%

63Const of Soling/Repair of Church Chak No.

52/12-L Distt: Sahiwal0.500 0.489 -0.011 90%

64Const of Soling/Nali & Church Viranda Chak

No. 90/12-L,Distt: Sahiwal0.900 0.685 -0.215 70%

65Const of Soling Chak No. 91/12-L, Distt:

Sahiwal.1.000 0.980 -0.020 95%

65 100.000 94.301 -5.699

Pir Muhammad Shah Khagga dated 10.10.12

Notable, NA-164

1Construction of Mettalled Road Sindhay khan

road to Dhera Shau Baloch, Distt: Pakpattan.5.000 2.825 -2.175 60%

2Const. of Metalled Road Chak Jewan Shah

Distt: Pakpattan2.500 1.479 -1.021 45%

3

Construction of Mettalled Road from Road to

Tubewell Rao Nizam Din (Dakhli Kartar Pur),

Distt: Pakpattan.

2.500 1.356 -1.144 50%

4

Construction of Mettalled Road from Kotla

Zaman khan to Thatta Chaddaran Wala

(Dakhli Tibbi Kaloo Wali), Distt: Pakpattan.

5.000 _

5

Construction of Mettalled Road from Dhera

Ashiq Muhammad khan (Dakhli Abadi Chak

Quddrat Ullah), Distt: Pakpattan.

2.500 1.356 -1.144 50%

100.000 17-Oct-12555

50.000 10-Oct-12522

Page 371

Page 372: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of Mettalled Road from Road to

Tubewell Muhammad Hasal Bodla

Numberdar Dakhli Ahmed Sher, Distt:

Pakpattan.

2.500 -2.500 12%

7Const. of Metalled Road Chak No.72/D Distt:

Pakpattan2.500 1.385 -1.115 55%

8

Const. of Metalled Road from Tube well Haji

Hassan Rakhia to Abadi Haji Anwar Madhol

Distt: Pakpattan

2.500 1.635 -0.865 45%

8 Total 25.000 10.036 -14.964

RAO QAISER ALI KHAN dated 30.11.12

MPA, PP-186

1

CONSTRUCTION OF SOLING AND DRAIN

AT 22-D TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.439 -0.061 90%

2CONSTRUCTION OF SOLING AT 23-D

TEHSIL DEPAL PUR DISTT;OKARA 0.200 0.190 -0.010 90%

3

CONSTRUCTION OF SOLING AND DRAIN

AT 24-D TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.478 -0.022 90%

4

CONSTRUCTION OF SOLING AND DRAIN

AT 25-D TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.250 -0.250 20%

5

CONSTRUCTION OF SOLING AND DRAIN

AT 26-D TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.478 -0.022 95%

6

CONSTRUCTION OF SOLING AND DRAIN

AT 28-D TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.475 -0.025 95%

7

CONSTRUCTION OF SOLING AND DRAIN

AT 29-D TEHSIL DEPAL PUR

DISTT;OKARA PP-186

1.000 0.950 -0.050 95%

8CONSTRUCTION OF SOLING AND DRAIN

AT 35-D DISTT;OKARA PP-1860.500 0.471 -0.029 90%

9CONSTRUCTION OF SOLING AND DRAIN

AT 37-D DISTT;OKARA PP-1860.500 0.473 -0.027 95%

50.000 10-Oct-12522

35.000 30-Nov-12773

Page 372

Page 373: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10

CONSTRUCTION OF SOLING AND DRAIN

AT 12/1-L TESIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.480 -0.020 95%

11

CONSTRUCTION OF SOLING AT BONGA

SODI WAL TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.468 -0.032 90%

12

CONSTRUCTION OF BRIDGE AT SHER

NAGAR TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.264 -0.236 55%

13

CONSTRUCTION OF SOLING AND DRAIN

AT FAROOQ NAGAR TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.475 -0.025 90%

14

CONSTRUCTION OF SOLING AND DRAIN

AT FAKHAR TOWN TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.478 -0.022 90%

15

CONSTRUCTION OF SOLING AND DRAIN

AT KOT NADAR SHAH TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.300 0.256 -0.044 85%

16

CONSTRUCTION OF SOLING AND DRAIN

AT KHINGRAN WALA TEHSIL DEPAL PUR

DISTT;OKARA PP-186

0.500 0.476 -0.024 90%

17CONSTRUCTION OF SOLING AT AJJO

WALA DISTT;OKARA PP-1860.250 0.190 -0.060 85%

18CONSTRUCTION OF SOLING AND DRAIN

AT ISLAM PUR DISTT;OKARA 0.500 0.466 -0.034 95%

19

CONSTRUCTION OF SOLING AND DRAIN

AT SEHLE WAL VILLAGE DISTT;OKARA

PP-186

0.500 0.418 -0.082 100%

20CONSTRUCTION OF SOLING AND DRAIN

AT PINDI MOHLAN DISTT;OKARA PP-1860.500 0.471 -0.029 95%

21CONSTRUCTION OF SOLING AND DRAIN

AT PINDI MOHARAN DISTT;OKARA PP-

186

0.500 0.427 -0.073 95%

22

CONSTRUCTION OF SOLING AND DRAIN

AT QILA JEWIND SING DISTT;OKARA PP-

186

0.500 -0.500 20%

23CONSTRUCTION OF SOLING AND DRAIN

AT ABADI JANDE WALI DISTT;OKARA PP-

186

0.400 0.331 -0.069 90%

35.000 30-Nov-12773

Page 373

Page 374: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

24

CONSTRUCTION OF SOLING AND DRAIN

AT 5/1-RA TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.480 -0.020 92%

25

CONSTRUCTION OF SOLING AND DRAIN

AT 4/1-RA TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.468 -0.032 95%

26

CONSTRUCTION OF SOLING AND DRAIN

AT MADINA TOWN TEHSIL RENALA

KHURD DISTT;OKARA PP-186

0.500 0.479 -0.021 95%

27

CONSTRUCTION OF SOLING AND DRAIN

AT 3/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.466 -0.034 95%

28CONSTRUCTION OF DRAIN AT 4/1-L

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.750 0.613 -0.137 85%

29

CONSTRUCTION OF SOLING AND DRAIN

AT 5/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.476 -0.024 95%

30

CONSTRUCTION OF SOLING AND DRAIN

AT 6/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.475 -0.025 95%

31

CONSTRUCTION OF SOLING AND DRAIN

AT 7/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.481 -0.019 95%

32

CONSTRUCTION OF SOLING AT 17/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 0.476 -0.024 95%

33

CONSTRUCTION OF SOLING AND DRAIN

AT 19/1-AL TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.600 0.572 -0.028 95%

34

CONSTRUCTION OF SOLING AND DRAIN

AT1 3/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.474 -0.026 95%

35

CONSTRUCTION OF SOLING AND DRAIN

AT23/2-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

1.900 1.741 -0.159 100%

36

CONSTRUCTION OF SOLING AND DRAIN

AT 14/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.700 0.678 -0.022 100%

35.000 30-Nov-12773

Page 374

Page 375: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

37

CONSTRUCTION OF SOLING AND DRAIN

AT 11/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.452 -0.048 100%

38

CONSTRUCTION OF SOLING AND DRAIN

AT 15/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.600 0.583 -0.017 95%

39

CONSTRUCTION OF SOLING AND

WATER SUPPLY AT 31/1-AL & 32/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

1.400 1.204 -0.196 95%

40

CONSTRUCTION OF PCC AT STREET

RANA ABDUL REHMAN RENALA CITY

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.250 -0.250 18%

41

CONSTRUCTION OF SOLING AT 14/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.800 0.770 -0.030 95%

42

CONSTRUCTION OF SOLING AND DRAIN

AT 25/1-AL TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.477 -0.023 95%

43

CONSTRUCTION OF SOLING AT 2/1-L

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 0.476 -0.024 100%

44

CONSTRUCTION OF SOLING AT 26/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 0.476 -0.024 100%

45

CONSTRUCTION OF SOLING AT 27/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 0.476 -0.024 100%

46

CONSTRUCTION OF SOLING AT 28/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 -0.500 15%

47

CONSTRUCTION OF SOLING AT 16/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.800 0.776 -0.024 95%

48

CONSTRUCTION OF SOLING AT 24/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 0.476 -0.024 95%

35.000 30-Nov-12773

Page 375

Page 376: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

49

CONSTRUCTION OF SOLING AT BASTI

RAHIM BAKASH RENALA CITY TEHSIL

RENALA KHURD DISTT;OKARA PP-186

0.500 0.473 -0.027 100%

50

CONSTRUCTION OF SOLING AND DRAIN

AT 16/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.477 -0.023 95%

51

CONSTRUCTION OF PCC AT 33/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.800 0.639 -0.161 95%

52

CONSTRUCTION OF SOLING AND DRAIN

AT 34/1-AL TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.250 0.178 -0.072 95%

53

CONSTRUCTION OF SOLING AT30/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 0.477 -0.023 95%

54

CONSTRUCTION OF SOLING AT 21/2-L

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.800 0.783 -0.017 95%

55

CONSTRUCTION OF SOLING AT 22/2-L

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.250 0.235 -0.015 95%

56

CONSTRUCTION OF SOLING AND DRAIN

AT 17/1-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.475 -0.025 95%

57

CONSTRUCTION OF SOLING AND DRAIN

AT 12/1-AL KARKANI TEHSIL RENALA

KHURD DISTT;OKARA PP-186

0.250 0.244 -0.006 100%

58

CONSTRUCTION OF NALA AT 11/1-AL

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

1.000 0.925 -0.075 90%

59

CONSTRUCTION OF NALA AT 20/2-L

TEHSIL RENALA KHURD DISTT;OKARA

PP-186

0.500 0.480 -0.020 95%

60

CONSTRUCTION OF SOLING AND DRAIN

AT 1/1-R TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.472 -0.028 95%

61

CONSTRUCTION OF SOLING AND DRAIN

AT 28/2-L TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.470 -0.030 95%

35.000 30-Nov-12773

Page 376

Page 377: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

62

CONSTRUCTION OF SOLING AND DRAIN

AT 27/2-LTEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.500 0.407 -0.093 95%

63

CONSTRUCTION OF SOLING AND

SEWERAGE AT BASTI HAZOOR SAHIB

WALI TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.650 0.534 -0.116 90%

64

CONSTRUCTION OF SOLING AND DRAIN

AT 13/1-AL TEHSIL RENALA KHURD

DISTT;OKARA PP-186

0.300 0.264 -0.036 85%

64 35.000 30.732 -4.268

Ms.Rubina Shaheen Watto dated 31.8.12

MPA, PP-188

1Const : of Soling and Drain in UC-Rukan

Pura, PP-188 Distt: Okara.1.490 1.462 -0.028 100%

2Const : of Soling and Drain in UC-Gaddar

Malkana , PP-188 Distt: Okara.1.740 1.729 -0.011 95%

3Const : of Soling and Drain in UC-Maroof ,

PP-188 Distt: Okara.1.800 1.719 -0.081 95%

4Const : of Soling and Drain in UC-Phalan

Tuli , PP-188 Distt: Okara.1.450 1.450 98%

5Const : of Soling and Drain in UC-Kani Pur ,

PP-188 Distt: Okara.2.350 2.350 95%

6Const : of Soling and Drain in UC-Qadir

Abad , PP-188 Distt: Okara.2.000 1.883 -0.117 100%

7Const : of Soling and Drain in UC-

Muhammad Nagar , PP-188 Distt: Okara.2.000 1.924 -0.076 95%

8Const : of Soling and Drain in UC-Dhaliana ,

PP-188 Distt: Okara.1.480 1.445 -0.035 95%

9Const : of Soling and Drain in UC-Roheela ,

PP-188 Distt: Okara.1.800 1.703 -0.097 85%

10Const : of Soling and Drain in UC-Kaleer ,

PP-188 Distt: Okara.1.900 1.849 -0.051 80%

35.000 30-Nov-12773

20.000 31-Aug-12154

Page 377

Page 378: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Const : of Soling and Drain in UC-Bhella

Ghulab Singh , PP-188 Distt: Okara.1.990 1.956 -0.034 100%

11 20.000 19.470 -0.530

Ms.Rubina Shaheen Watto dated 14.12.12

MPA, PP-188

1

Construction of Soling, Drains, Nallah, Tuff

Tiles, Sewerage in Baseerpur City Depalpur,

District Okara.

4.000 -4.000

2

Construction of Soling, Drains, Nallah, Tuff

Tiles, in Mandi Ahmed Abad Depalpur,

District Okara.

1.400 -1.400

3

Construction of Soling, Drains, Nallah, in UC

Bheela Ghulab Singh Depalpur, District

Okara.

4

Construction of Soling, Drains, Nallah,

Boundary Wall, Bridge in UC Roheela

Tajeka Depalpur, District Okara.

0.500 0.967 0.467 90%

5

Construction of Soling, Drains, Nallah and

Cause Way in UC Dhulliana Depalpur,

District Okara.

1.000 -1.000

6

Construction of Soling, Drains, Nallah and

Boundary Wall in UC Guddar Malkana

Depalpur, District Okara.

7Construction of Soling, Drains, Nallah, in UC

Qadir Abad Depalpur, District Okara.

8Construction of Soling, Drains, Nallah, in UC

Phulan Tulli Depalpur, District Okara.1.500 -1.500

9Construction of Soling, Drains, Nallah, in UC

Kani Pur Depalpur, District Okara.

10

Construction of Soling, Drains, Nallah, Cause

Way and Dispensary in UC Kalear Kalan

Depalpur, District Okara.

1.200 -1.200

11

Construction of Soling, Drains, Nallah and

Culverts in UC Maroof Depalpur, District

Okara.

20.000 31-Aug-12154

30.000 14-Dec-12811

Page 378

Page 379: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Construction of Soling, Drains, Nallah and

Small Bridge in UC Muhammad Nagar

Depalpur, District Okara.

13

Construction of Soling, Drains, Nallah and

small Bridge in UC Rukan Pura Depalpur,

District Okara.

0.400 -0.400

13 10.000 0.967 -9.033

Pir Ghualm Mohi UD Din dated 21.11.12

Notable, PP-189

1Const. of Soling, Drain/PCC at thatha

Syedan, Distt: Okara PP-189.1.000 -1.000

2

Const. of Soling/Drain at Abadi Bhatian

Mouza Alwal ke Akbar, Distt: Okara, PP-189. 1.000 -1.000

3Const. of Soling/Drain at Mouza Akbar, Distt:

Okara, PP-189.0.700 -0.700

4Const. of Nallah at Abadi Gugera Mouza

Akbar, Distt: Okara PP-189.0.300 -0.300

5Const. of Soling/Drain at Mouza Murdani,

Distt: Okara PP-189.0.800 -0.800

6Const. of Soling/Drain at 30/GD, Distt: Okara

PP-189.1.000 -1.000

7Const. of Soling/Drain at 31/GD, Distt: Okara

PP-189.1.000 -1.000

8Const. of Soling/Drain at Thatha Yaru ka

Mouza Murdani, Distt: Okara PP-189.0.500 -0.500

9Const. of Soling/Drain at Fatuana, Distt:

Okara PP-189.0.800 0.507 -0.293 63%

10Const. of Soling/Drain at 24/GD, Distt: Okara

PP-189.1.800 0.964 -0.836 54%

11Const. of Nallah Chak No. 21/GD, Distt:

Okara PP-189.2.700 -2.700

12Const. of Soling/Drain at 28/2-R, 29,30,34,

Distt: Okara PP-189.2.800 -2.800

30.000 14-Dec-12811

20.000 21-Nov-12726

Page 379

Page 380: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13Const. of Soling/Drain at Gogera khas Distt:

Okara PP-189.0.800 0.355 -0.445 44%

14Const. of Soling/Drain at Lai Fazal Shah,

Distt: Okara PP-189.1.000 -1.000

15Const. of Soling/Drain at Mouza Burj Jewey

khan, Distt: Okara PP-189.0.700 -0.700

16Const. of Soling/Drain at thatha Saleem ka

dakhli Murdani, Distt: Okara PP-189.0.700 0.603 -0.097 86%

17Const: of Soling/Drain at Jathyana dakhli

abadi, Distt: Okara PP-189.0.700 0.513 -0.187 73%

18Const: of Soling/Tuff Tilles at Mouza Bangla

Gogera, Distt: Okara PP-189.0.700 -0.700

19Const. of Soling/Drain at 43/GD, Distt: Okara

PP-189.1.000 -1.000

19 20.000 2.942 -17.058

SYED SHABBAR MUSTAFA SHERAZI dated 5.3.13

Notable, PP-222

1Const. of Soling/Drain Chak No.87/6-R UC

No.4 (Gali No.3,5 & 9) Distt: Sahiwal1.000 -1.000

2Const. of Soling/Drain Chak No.89/6-R UC

No.5(Gali No.2,4 , 3& 6)Distt: Sahiwal1.500 -1.500

3Const. of Soling/Drain Chak No.92/6-R UC

No.6 (Gali No.1,4 , 5& 7)Distt: Sahiwal1.000 -1.000

4Const. of Soling/Drain Muhammad Pur UC

No.8 (Gali No.1,4 , 5& 8)Distt: Sahiwal1.500 -1.500

5Const. of Soling/Drain Chak No.88/9-L UC

No.9 (Gali No.5,3,7 ) Distt: Sahiwal1.000 -1.000

6Const. of Soling/Drain Chak No.91/9-L UC

No.10 (Gali No.1,4 , 5& 6)Distt: Sahiwal1.500 -1.500

7Const. of Soling/Drain Chak No.93/9-L UC

No.11 (Gali No.2,4 , 5& 7)Distt: Sahiwal1.500 -1.500

8

Const. of Soling /Drain Chak No.133/9-L UC

No.12 (Gali No.3,5 , 6& 8)Distt: Sahiwal 1.000 -1.000

9Const. of Soling /Drain Chak No.58/GD UC

No.14 (Gali No.2,4 , 3& 7)Distt: Sahiwal1.500 -1.500

20.000 05-Mar-13920

20.000 21-Nov-12726

Page 380

Page 381: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10Const. of Soling /Drain Orang Abad UC

No.15 (Gali No.5,7 , 9& 11)Distt: Sahiwal1.500 -1.500

11

Const. of Soling /Drain Chak No.144/9-L UC

No.31 (Gali No.6,4 , 5& 10)Distt: Sahiwal 1.500 -1.500

12Const. of Soling/Drain Chak No.119/9-L UC

No.32 (Gali No.2,5 , 9& 11)Distt: Sahiwal1.000 -1.000

13

Const. of Soling /Drain Chak No.112/9-L UC

No.36 (Gali No.5,7 , 9, 10 & 11)Distt: Sahiwal 2.000 -2.000

14

Const. of Soling /Drain Kameer Town

Committee UC No.52(Gali No.1,3 ,5,7, 9 &

12) Distt: Sahiwal

2.500 -2.500

14 20.000 -20.000

Malik Iqbal Ahmed Langrial dated 10.10.12

MPA, PP-226

1Rehabilitation and Widening of Metalled

Road Mian Paki Road Distt: Sahiwal3.000 2.927 -0.073 98%

2Const. of Metalled Road Link Road Chak

No.73/12-L to 72/12-L Distt: Sahiwal4.000 3.926 -0.074 98%

3Const. of Soling Chak No.73/12-L Distt:

Sahiwal0.500 0.489 -0.011 100%

4Const. of Metalled Road Chak No.73/12-L

Abadi Pehlwan to Chak 33 Distt: Sahiwal 2.000 1.956 -0.044 98%

5Const. of Metalled Road Chak No.72/12-L

Distt: Sahiwal1.000 0.980 -0.020 98%

6Const. of Soling/Drain Chak No.37/14-L Distt:

Sahiwal1.000 0.981 -0.019 98%

7Const. of Khall Chak No.73/12-L Distt:

Sahiwal1.000 0.978 -0.022 98%

8Const. of Khall & Soling Chak No.19/14-L

Distt: Sahiwal 1.000 0.980 -0.020 98%

9Const. / Rehabilitation of Metalled Road

Chak No.20/14-L Distt: Sahiwal2.500 2.446 -0.054 98%

10Const. of Soling/Drain Chak No.30/14-L Distt:

Sahiwal1.000 0.979 -0.021 98%

20.000 05-Mar-13920

50.000 10-Oct-12514

Page 381

Page 382: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Const. of soling Chak No.23/14-L Distt:

Sahiwal1.500 1.463 -0.037 98%

12Const. of soling/Drain Chak No.22/14-L Distt:

Sahiwal0.500 0.489 -0.011 98%

13Const.of soling /Pull Rajbah Chak No.24/14-L

Distt: Sahiwal1.000 -1.000

14Const. of Soling Chak No.25/14-L Abadi

Ghareeb Abad Mohallah Distt: Sahiwal0.500 0.489 -0.011 100%

15Const. of soling/drain Chak No.78/12-L Distt:

Sahiwal0.500 0.490 -0.010 100%

16Const. of Boundary Wall Janaz Gah/ Soling

Darbar Chak No.14/14-L Distt: Sahiwal1.500 1.465 -0.035 100%

17Const. of soling/drain Chak No.119/13-AL

Distt: Sahiwal1.000 0.906 -0.094 91%

18Const. of Khall Mouza Dado Wana Abadi

Sarfraz Sanpal Distt: Sahiwal0.500 0.488 -0.012 100%

19Const. of soling Chak No.117/7-DR Basti

Sanpal Distt: Sahiwal0.500 0.478 -0.022 100%

20Const. of Khall ,Soling & Drain Chak

No.18/11-L Distt: Sahiwal1.000 0.978 -0.022 100%

21Const. of soling/drain Chak No.76/12-L Distt:

Sahiwal0.500 0.476 -0.024 100%

22Const. of soling /Drain Chak No.44/5-L

Faujian Wali Distt: Sahiwal0.500 -0.500

23Const. of Soling/Drain Chak No.84/5-L and

Small Bridge Pull Bagri Distt: Sahiwal0.700 0.685 -0.015 100%

24

Const. of Metalled Road/Drain Chak

No.34/12-L and Sewerage 41/12-L Distt:

Sahiwal

1.200 0.764 -0.436 64%

25Const. of soling/Drain Chak No.3/10-L Distt:

Sahiwal0.500 0.488 -0.012 100%

26Const. of Metalled Road Chak No.6/11-L

Distt: Sahiwal0.500 0.489 -0.011 100%

27Const. of soling/Drain Chak No.34/14-L Distt:

Sahiwal1.000 0.980 -0.020 100%

28Repair of Road Chak No.29/14-L Distt:

Sahiwal1.000 0.978 -0.022 100%

29Const. of soling Chak No.73-A/5-L Distt:

Sahiwal0.500 0.476 -0.024 100%

50.000 10-Oct-12514

Page 382

Page 383: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

30Const. of Metalled Road Chak No.71/4-R

Main Road to Mosque Distt: Sahiwal0.500 0.484 -0.016 97%

31Const. of Soling/Drain 20 Form Iqbal Nagar

Distt: Sahiwal0.500 0.488 -0.012 98%

32Const. of Nallah & Soling Chak No.165/9-L

Kalali Distt: Sahiwal0.500 0.489 -0.011 100%

33Const. of soling Adda Iqbal Nagar Distt:

Sahiwal0.500 0.487 -0.013 100%

34Const. of Sewer Line Chak No.86/6-R Distt:

Sahiwal 1.000 -1.000

35Const. of Soling Chak No.71/12-L Dera

Malik Bashir to Pull Matiana Distt: Sahiwal1.500 1.470 -0.030 100%

36Const. of Soling Chak No.70/12-L Dera

Arrian Jandran & Village Distt: Sahiwal1.000 0.978 -0.022 100%

37Const. of soling Chak No.71/12-L Abadi

Baluchan Distt: Sahiwal0.500 0.487 -0.013 100%

38Const. of Metalled Road Chak No.73/12-L

Abadi Gavesaran Distt: Sahiwal1.000 0.617 -0.383 62%

39Repair of Road Chak No.69/12-L Kamand to

72/12-L Distt: Sahiwal0.500 0.489 -0.011 100%

40Const. of soling/Drain Chak No.74/12-L Distt:

Sahiwal0.500 0.482 -0.018 100%

41Const. of soling/Drain Chak No.75/12-L Distt:

Sahiwal0.500 0.486 -0.014 100%

42Repair of Road Chak No.75/12-L Distt:

Sahiwal1.000 0.980 -0.020 100%

43Const. of soling Chak No.58/5-L Ghunnu

Distt: Sahiwal0.500 0.489 -0.011 100%

44

Const. of Boundary Wall,Qabristan Metalling

& Nallas Mandhiol Chak No.56/12-L Distt:

Sahiwal

1.000 0.979 -0.021 98%

45Const. of soling Nallah Chakl No.83/12-L

Distt: Sahiwal1.000 0.979 -0.021 100%

46Const. of soling /Drain Chak No.18/14-L

Abadi Shah Muhammad Distt: Sahiwal0.500 0.488 -0.012 100%

47Const. of soling Chak No.53/12-L Tibba

Mandia Wala Distt: Sahiwal1.000 0.980 -0.020 100%

48Const. of Soling Chak No.26/14-L Distt:

Sahiwal0.500 0.488 -0.012 100%

50.000 10-Oct-12514

Page 383

Page 384: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

49Const. of Soling Chak No.80/12-L Distt:

Sahiwal0.500 0.487 -0.013 100%

50Const. of Metalled Road Chak No.71/12-L

Distt: Sahiwal2.000 1.955 -0.045 98%

51Const. of Metalled Road Chak No.61/12-L

Distt: Sahiwal1.600 -1.600

51 50.000 44.006 -5.994

Mian Farooq Ahmed Khan Maneka dated 17.10.12

Notable, PP-227

1

Const. of Metalled Road Bonga Hayyat to

Bhatha Maroof Sukhara via 65/D Distt:

Pakpattan PP-227

2Widening/Improvement of Metalled Road Bail

Gunj to 6/SP Distt: Pakpattan PP-227

3Repair of Metalled Road Pir Ghani Distt:

Pakpattan

3

Saeed Ahmed dated 4.10.12

Notable, Sahiwal

488 04-Oct-12 9.895 1Const: and Repair of Metalled Road from Pul

56/5-L to 63/5-L Distt: Sahiwal9.895 4.734 -5.161 50%

1 9.895 4.734 -5.161

Rana Amir Shahzad Tahir dated 5.3.13

Notable, Sahiwal

1Const. of Soling /Drain UC No.01 (Gali

No.5,6,9 & 10) Distt: Sahiwal-20.000

2Const. of Soling /Drain UC No.16 (Gali

No.2,3,4 & 10) Distt: Sahiwal

3Const. of Soling /Drain UC No.17 (Gali

No.2,5,9 & 11) Distt: Sahiwal

20.000

50.000 10-Oct-12514

40.000 17-Oct-12550

25.000 05-Mar-13919

Page 384

Page 385: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4Const. of Soling /Drain UC No.18 (Gali

No.1,6,11 & 10) Distt: Sahiwal

5Const. of Soling /Drain UC No.19 (Gali

No.6,8,10 & 3) Distt: Sahiwal

6Const. of Soling /Drain UC No.20 (Gali

No.1,5,8 , 2 & 11 ) Distt: Sahiwal

7Const. of Soling /Drain UC No.21 (Gali

No.3,5,7 , 2 & 90) Distt: Sahiwal

8Const. of Soling /Drain UC No.22 (Gali

No.2,5,.3 & 10) Distt: Sahiwal

9Const. of Soling /Drain UC No.23 (Gali

No.5,6,9 & 11) Distt: Sahiwal

10Const. of Soling /Drain UC No.24 (Gali

No.1,7 ,6 , 10 & 12) Distt: Sahiwal

11Const. of Soling /Drain UC No.25 (Gali

No.2,3,4,9 & 10) Distt: Sahiwal

12Const. of Soling /Drain UC No.27 (Gali

No.5,6,9 & 10) Distt: Sahiwal

13Const. of Soling /Drain UC No.28 Distt:

Sahiwal

14Const. of Soling /Drain UC No.29 Distt:

Sahiwal

15Const. of Metalled Road at Chak No.57/5-L

Distt: Sahiwal

16Const. of soling at Jahaz Ground (East)

Sahiwal

17Const. of soling at Jahaz Ground (West)

Sahiwal

18Const. of soling at Muslim Bin Aqeel Colony

Sahiwal Sahiwal

19 Const. of soling at Bhotto Nagar Sahiwal

19 20.000 -20.000

20.00025.000 05-Mar-13919

Page 385

Page 386: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Dr.Azhar Mahmood Ch dated 5.3.13

Notable, Sahiwal

1

CONSTRUCTION OF SOLING, DRAIN, PCC

AND SEWERAGE IN CHAK NO. 4/1-RA, 5/1-

RA, 23/1-RB, UC-35 DISTT: OKARA. PP-

186.

1.500 -1.500

2

CONSTRUCTION OF SOLING AND PCC IN

CHAK NO. 12/1-AL, 14/1-AL, 16/1-AL, 19/1-

AL, UC-44 DISTT: OKARA. PP-186.

1.500 -1.500

3

CONSTRUCTION OF SOLING IN CHAK NO.

22/D AND BONGA SODIWAL, UC-68 DISTT:

OKARA. PP-186.

0.500 -0.500

4

CONSTRUCTION OF SOLING IN CHAK NO.

31/1-AL, 34/1-AL, 35/D, UC-45 DISTT:

OKARA. PP-186.

1.500 -1.500

5

CONSTRUCTION OF SOLING/DRAIN IN

CHAK NO. 24/2-L, 26/2-L, 27/2-L, UC-39

DISTT: OKARA. PP-186.

1.000 -1.000

6

CONSTRUCTION OF SOLING IN CHAK NO.

18/1-L, 19/1-L, 20/1-L, 21/1-L, 23/1-L UC-39

DISTT: OKARA. PP-186.

2.500 -2.500

7

CONSTRUCTION OF PCC AND

SEWERAGE IN CHAK NO. 8/1-L, 10/1-L,

12/1-L, UC-37 DISTT: OKARA. PP-186.

1.500 -1.500

8

CONSTRUCTION OF SOLING/DRAIN IN

CHAK NO. 14/1-L, 16/1-L, UC-38, DISTT:

OKARA. PP-186.

0.500 -0.500

9

CONSTRUCTION OF SOLING IN CHAK NO.

4/1-L, 5/1-L, 6/1-L, 7/1-L UC-40 DISTT:

OKARA. PP-186.

1.000 -1.000

10

CONSTRUCTION OF SOLING/DRAIN,

SEWERAGE AND PCC IN AZAM TOWN,

MADINA TOWN, LEHRASAB TOWN AND

BASTI RAO SAHIB, UC-101 DISTT: OKARA.

PP-186.

1.500 -1.500

11CONSTRUCTION OF PCC IN UC-102

DISTT: OKARA. PP-186.2.500 -2.500

20.000 05-Mar-13921

Page 386

Page 387: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

CONSTRUCTION OF SEWERAGE IN ALVI

TOWN, HAMEED TOWN, C-BLOCK

HOUSING SCHEME, UC-102 DISTT:

OKARA. PP-186.

1.000 -1.000

13

CONSTRUCTION OF SOLING/DRAIN IN

HAMEED TOWN, UC-102, DISTT: OKARA.

PP-186.

1.000 -1.000

14

CONSTRUCTION OF SOLING/DRAIN IN

SHER NAGER, BHUTTA MOHABAT AND

CHAK NO. 29/D UC-RATTA KHANA DISTT:

OKARA. PP-186.

1.500 -1.500

15

CONSTRUCTION OF SOLING/DRAIN IN

CHAK NO. 24/D, 26/D AND 35/D UC-

MUSTAFABAD, DISTT: OKARA. PP-186.

1.000 0.257 -0.743 35%

15 20.000 0.257 -19.743

Sardar Sheharyar Mokal dated 5.3.13

Notable, Sahiwal

1

CONSTRUCTION OF METALLED ROAD

MOUZA 40/D TO ABADI DHAYN WALI,

DISTT: OKARA. S. NO. 01/06

4.000 -4.000

2

CONSTRUCTION OF METALLED ROAD

FAREED KOT TO KHOI FAQUARAN WALI,

DISTT: OKARA. S. NO. 02/06

4.000 -4.000

3CONSTRUCTION OF METALLED ROAD

CHAK LALLO PUR, DISTT: OKARA. S. NO.

03/06

2.000 -2.000

4

CONSTRUCTION OF METALLED ROAD

NAWAN CHAK TO 42/D, DISTT: OKARA.

S.NO. 04/06

4.000 -4.000

5

REPAIR OF METALLED ROAD

PAKPATTAN ROAD TO BAHRI PUR,

DISTT: OKARA. S.NO. 05/06

2.500 -2.500

6REPAIR OF METALLED ROAD WENDLA

JAHANGIR, DISTT: OKARA. S.NO. 06/063.500 -3.500

6 20.000 -20.000

20.000 05-Mar-13921

20.000 05-Mar-13924

Page 387

Page 388: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Punjab

CCD, Multan

Syed Ali Musa Gillani dated 24.8.12

Mna, NA-148

1

Const. of Tuff Paver, Soling, Drain and Nala

Kothay Wala Sharqi and Gharbi UC Kothay

wala NA-148 Distt. Multan.

5.000 4.700 -0.300 100%

2

Const. of Tuff Paver, Soling, Drain and Nala

in Basti Khaghay Wala Mouza Khagha UC

Kotla Maharan NA-148 Distt. Multan.

5.000 4.750 -0.250 100%

3

Const. of M/Road in Basti Khaghay Wala,

Pull Qayum Shah Wali to Basti Khaghay

Wala NA-148 Distt. Multan.

5.000 4.666 -0.334 100%

4Const. of M/Road in basti Louther Basti Riaz

Abad, in UC Louther NA-148 Distt. Multan.5.000 4.800 -0.200 100%

5Const of tuff paver, Drain and Nala Nai Basti

Louther in UC-Louther NA-148 Distt Multan. 5.000 4.721 -0.279 100%

6

Improvement & Construction of M/Road Old

Shujabad Road To Farooq Pura Tehsil &

Distt. Multan NA-148

12.430 11.800 -0.630 100%

7

Const of tuff paver, Drain and Nalla basti

Chah Ashiq Wala UC- Budhla Sant NA-148

Distt Multan.

5.000 4.800 -0.200 100%

8

Const. of M/Road, and Nala Basti Lal Wala

Mouza Mong Watt UC Tatay Pur NA-148

Distt. Multan.

3.817 3.500 -0.317 100%

9

Const. of Tuff Paver, Drain, Soling and Nala

Basti Gulabi, Basti Batha, Basti Chanayan

Wala UC Tatay Pur NA-148, Distt. Multan.

3.298 3.200 -0.098 100%

10

Const. of Tuff Paver, Drain, Soling and Nala

Basti Sanda Ghulam Hussain , Chapraan

Wala UC Tatay Pur NA-148, Distt. Multan.

2.885 2.800 -0.085 100%

11

Const. of Tuff Paver, Soling, Drain and Nala

Mouza Azam Hans UC Kothay wala NA-148

Distt. Multan.

2.500 2.100 -0.400 100%

100.000 24-Aug-1297

Page 388

Page 389: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Const. of Tuff Paver, Soling, Drain and Nala

Mouza Jalal Abad UC Kothay wala NA-148

Distt. Multan.

2.500 2.424 -0.076 100%

13Const. of Soling Drain and Nala Basti

Rasheeda NA-148 Distt. Multan.2.500 2.400 -0.100 100%

14

CONSTRUCTION OF SEWER LINE/

COLLECTING TANK, M/ROAD AND TUFF

PAVERS, IN BASTI JALIL U.C. BUDHLA

SANT, NA-148, DISTRICT MULTAN

20.000 19.637 -0.363 100%

15Const. of M/Road, Soling and Nala UC

Mattital NA-148 District Multan10.000 9.423 -0.577 100%

16Const. of Tuff Paver, Soling and Nala Qadir

Pur Raan City NA-148 District Multan5.070 4.905 -0.165 100%

17Const. of Tuff Paver, Soling and Nala Qutab

Pur NA-148 District Multan5.000 4.848 -0.152 100%

17 100.000 95.474 -4.526

Syed Ali Musa Gillani dated 22.10.12

MNA, NA-148

1

Const. of M/Road Soling & Drain Basti

Rammu wali Tailan & 13 Khou ( Massalli ) to

Dr. Sharif 14 Khou NA-148, Distt. Multan.

2

Const. of M/Road,Soling, Drain & Tuff Tile

Basti Baloochan wali , Basti Frooq abad

Jhanra NA-148, Distt. Multan.

3

Const. of Soling, Nala & Tuff in UC Abbas

Pur Mouza Kirpal Pur PP -201 NA-148, Distt.

Multan.

4.780 100%

4

Const. of Soling Tuff Paver Drain & Nala

Mouza Sanda Ghulam Hussain UC Tate Pur

NA-148, Distt. Multan.

2.347 100%

5Const. of Soling Tuff Paver Drain & Nala

Mongwat UC Tate Pur NA-148, Distt. Multan.3.393 100%

6Const. of Soling Tuff Paver Drain & Nala Tate

Pur UC Tate Pur NA-148, Distt. Multan.3.807 100%

140.000141.700 22-Oct-12629

100.000 24-Aug-1297

Page 389

Page 390: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Constraction of Metallad Road Soling Drain

Nala & Tuff Tile Basti Sujan Pur Mouza

Gohar Kirpal Pur Mouza Said Pur Bhattian

Mouza Deharr PP-201 NA-148, Distt.

Multan.

19.434 100%

8

Constraction of Metallad Road Soling Drain

Nala & Tuff Tile Mouza Bukhsheesh Garh,

Mouza Chak Gagran & Shakh e Madina UC

Muttital NA-148, Distt. Multan.

8.848

9

Const. of M/Road from vehari Road via Chah

Chawan wala to Banay wala UC-72 Dumra in

NA-148 Distt. Multan

9.788 100%

10

Const. of M/Road,Soling, Drain & Nala Basti

Khaghay wala Basti Kotla Maharan in UC-73

Kotla Mharan NA-148, Distt. Multan.

9.117 100%

11

Const. of M/Road,Soling, Drain & Nala Bhai

Veer Aslam Chairman Khoh,Khoh Sillan

wala, Shahab Pull to Basti Islam Pura, 3 coat,

Kotla Maharan UC-73 Kotla Mharan NA-148,

Distt. Multan.

9.118 100%

12Const. of Nala Chak 1 /H Hans UC-73 Kotla

Mharan NA-148, Distt. Multan.1.069

13

Const. of M/Road,Pull Bangle wala to Basti

Jassay wala UC-69 Bangle wala NA-148,

Distt. Multan.

10.344 100%

14

Const. of Soling Drain Nala & Metalled

Road,Pull array wala to Bhaini Today wala

Baghon Khan, Basti Today wala, Basti

Rashida Bangle wala Sharqi Gurbi NA-148,

Distt. Multan.

8.799 100%

15

Constraction of Metallad Road Soling Drain

Nala & Tuff Tile in Kayan Pur and Noor shah

Colony UC - 48 Kotla Abdul Fateh NA-148,

Distt. Multan.

9.651 100%

16

Constraction of Metallad Road Soling Drain

Nala & Tuff Tile in Pir Khurshid Colony & Eid

Ghah UC - 48 Kotla Abdul Fateh NA-148,

Distt. Multan.

9.691 100%

140.000141.700 22-Oct-12629

Page 390

Page 391: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

16 140.000 110.186 -29.814

Syed Yousaf Raza Gillani dated 23.8.12

Ex-MNA, NA-151

1

Const. of M/Road, Soling, Drain and Nala

Main Road Qadirpur Raan to Chah Pari Wala

Qita No. 05, UC Qadirpur Raan, NA-148

District Multan

5.700 5.468 -0.232 100%

2

Const. of Soling, Tuff Paver, Drain, Nala Gali

Janaz Gah Wali, Gali Haji Sharif Darkhan

Wali, Gali Rahim Bukhsh Wali, Gali Masjid

Ibrahim wali, Gali Iqbal Sabzi wala, Gali

Master Shafi wali, Gali Shahid Ahmed Sheikh

wali Near Mohallah Kiker walaUC Qadirpur

Raan, NA-148 District Multan

7.850 7.371 -0.479 100%

3

Const. of M/Road from Main Qadirpur Raan

(hospital Street) to Madrassa Jamia Khalid-

Bin-Waleed UC Qadirpur Raan, NA-148

District Multan

6.500 6.219 -0.281 100%

4Completion Of Sports Centre at Qadirpur

Raan Distt. Multan.3.000 -3.000

5

Const. of M/ Road, TuffPaver,Soling and

Nala Mouza Akaramabad Mouza Riazabad

UC-Louther NA-148 District Multan

5.000 4.236 -0.764 85%

6

Const. of M/ Road, TuffPaver,Soling and

Nala Mouza Louther UC-Louther NA-148

District Multan

5.000 4.794 -0.206 100%

7

Const. of Soling, TuffPaver, Drain and Nala

Mouza Tatay Pur UC-Tatay Pur, NA-148

District Multan

5.000 4.526 -0.474 91%

8

Const. of Soling, TuffPaver, Drain and Nala

Mouza Chapran Wala, UC-Tatay Pur, NA-

148 District Multan

2.500 2.400 -0.100 100%

9

Const. of Soling, TuffPaver, Drain and Nala

Mouza Sanda Ghulam Hussain, UC-Tatay

Pur, NA-148 District Multan

2.500 2.336 -0.164 100%

300.000 23-Aug-1273

Page 391

Page 392: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10Const. of M/Road Basti Raan Qazi Wala, NA-

148 District Multan5.100 4.946 -0.154 100%

11Const. of M/Road Budhla Road to Basti Tahli

wala, NA-148 District Multan4.000 3.862 -0.138 100%

12

CONSTRUCTION OF M.ROAD AND

NALA/DRAIN FROM PULL BANGLE WALA

TO BASTI MARI MANGU MAL VIA DERA

SAJJAD KHAN BALOCH, BANGLE WALA,

NA-148, DISTRICT MULTAN

21.975 12.202 -9.773 56%

13

CONSTRUCTION OF NALA/DRAIN AND

SOLING IN JAVAID TOWN, SAJJAD TOWN,

BASTI SYEDAY WALA AND BASTI DELAY

WALA, U.C. QADIRPUR RAAN, NA-148,

DISTRICT MULTAN

10.000 9.602 -0.398 100%

14

CONSTRUCTION OF SOLING AND

CULVERT FROM LALEASAN ROAD TO

CHAH JADAY WALA, U.C. QADIRPUR

RAAN, NA-148, DISTRICT MULTAN

1.800 1.745 -0.055 100%

15

CONSTRUCTION OF SOLING FROM

QADIR PUR TATAY PUR ROAD TO BASTI

SHAH WALA, U.C. QADIR PUR RAAN, NA-

148, DISTRICT MULTAN

1.350 1.263 -0.087 100%

16

CONSTRUCTION OF SOLING FROM

QADIR PUR RAAN ROAD TO KHO GHOUS

WALA, U.C. QADIRPUR RAAN, NA-148,

DISTRICT MULTAN

1.850 1.772 -0.078 100%

17

CONSTRUCTION OF NALA/DRAIN,

SOLING, CULVERT AND BRIDGE FROM

LALESAN ROAD TO BASTI WADU WALA,

ALONG RIAZABAD MINOR, U.C. QADIR

PUR RAAN, NA-148, DISTRICT MULTAN

2.500 2.436 -0.064 100%

18

CONSTRUCTION OF SOLING BASTI

MALIK JAVAID ASLAM KHO MUNSHI

WALA, NEAR PULL YARAY WALI, NA-148,

DISTRICT MULTAN

0.850 0.824 -0.026 100%

300.000 23-Aug-1273

Page 392

Page 393: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

19

CONSTRUCTION OF M/ROAD FROM MAN

SUI GAS LINE TO BASTI ALYAR, U.C.

QADIR PUR RAAN, NA-148, DISTRICT

MULTAN

2.650 2.152 -0.498 81%

20

CONSTRUCTION OF TUFF PAVERS,

NALA/DRAIN AND SOLING NEAR PULL

CHORIAN WALI, U.C. QADIR PUR RAAN,

NA-148, DISTRICT MULTAN

0.950 0.741 -0.209 78%

21

CONSTRUCTION OF NALA/DRAIN, TUFF

PAVERS, M.ROAD, SOLING AND BRIDGE

CHAH WAZIN WALA, CHAH SAID WALA,

MOUZA KHERABAD, U.C. QADIR PUR

RAAN, NA-148, DISTRICT MULTAN

7.500 7.254 -0.246 100%

22

Constraction of Tuff Tile at Mohallah Rehman

Pura Islahi Committee,Ch Alla h Ditta Ch

Irshad Sufi Muhammad Hussain NA-151

Piran Ghaib District Multan.

3.148 2.745 -0.403 87%

23

Constraction of Tuff Tile at Sharif Pura Haji

Bhatti, Suleman Qureshi, Akhtar Pehalwan,

Mirza Bashir, Thag Pugh Group, Munna Bhai

& Baba Islam NA-151 Piran Ghaib District

Multan.

4.754 4.658 -0.096 100%

24

Constraction of Tuff Tile at Hassan Pura,

Javaid Nagar , Ahmad Pura & Takin wala

NA-151 Piran Ghaib District Multan.

9.715 6.034 -3.681 62%

25

Constraction of Tuff Tile at Bimillah Colony,

Qadir Abad Mughal Pura Gulshan Colony

Mohallah Piran Ghaib, Bughti St:, Ashraf

Abad, Madina Colony,Bagh Hussain &

Station Piran Ghaib NA-151 Piran Ghaib

District Multan.

10.750 2.487 -8.263 23%

26

Constraction of Metalled Road ,Madina

Colony & Mahar Ramzan Javaid NA-151

Piran Ghaib District Multan.

1.633 1.568 -0.065 100%

27

Improvement & Construction of M/Road

Shujabad Canal to Basti Kohawat Mouza

Thathi Kohawat Distt. Multan NA-151

12.000 11.570 -0.430 100%

300.000 23-Aug-1273

Page 393

Page 394: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

28

Construction of M/Road Chak (Mahni Hittar)

Road to Mouza Noon Adhwana Bye Pass UC

-60 Nawab Pur Distt. Multan NA-15114.000 7.315 -6.685 52%

29

Const. of M/Road and Cause way from

Kalaband Pacca Makhdoom to Pattan Beli

via Saad Ali Pur School NA-151 Distt. Multan.

(Phase-I)

12.000 4.501 -7.499 38%

30

Const. of M/Road and Cause way from

Kalaband Pacca Makhdoom to Pattan Beli

via Saad Ali Pur School NA-151 Distt. Multan.

(Phase-II)

8.000 3.580 -4.420 45%

31

Const. of M/Road form Existing M/Road Khou

Bukhari Wala to Khou Hinjran wala NA-151

Distt. Multan.

4.550 2.946 -1.604 65%

32

Const. of M/Road, Tuff Tile and Drain from

Bosan Road (Khadal By Pass) to Basti

Khadal, Khou Thull wala NA-151 Distt.

Multan.

3.530 1.888 -1.642 53%

33

Const. of M/Road and Sewerage from Kotla

Saadat Road to Peer Akbar Shah via Boys

Middle School and Seddique Abad UC-62 NA-

151 Distt. Multan.

4.300 2.723 -1.577 63%

34

Const. of Janaza Gah Basti Neehalay wala

(Siddique Abad) UC-62 NA-151 Distt. Multan. 3.000 2.007 -0.993 67%

35

Const. of Sewerage and Tuff Tile in Basti

Garray wala and Mouza Binda Sandila UC 59

NA-151 Distt. Multan.

1.035 0.296 -0.739 29%

36

Const. of Tuff Tile , Drain and Nallah in Basti

Noor Pur UC 60Nawab Pur NA-151 Distt.

Multan.

3.400 2.883 -0.517 85%

37

Const. of M/Road from Basti Jhoke Ballu to

Basti Zafar Dad and Hospital PP-200, NA-

151 Distt. Multan.

5.068 2.287 -2.781 45%

38

Const. of Soling, Tuff Tile and Sewerage

Basti Jhoke Ballu, Basti Sial and Basti Zafar

Wala PP-200, NA-151 Distt. Multan.

4.932 4.396 -0.536 89%

300.000 23-Aug-1273

Page 394

Page 395: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

39Const. of B/wall Graveyard of Bosan Uttar PP-

200, NA-151 Distt. Multan.4.000 1.158 -2.842 29%

40Const. of Soling, Nallah Basti Bosan Uttar

UC-64, PP-200, NA-151 Distt. Multan.1.700 0.743 -0.957 44%

41Const. of Sewerage Basti Ghous Wala UC

Punj Khoua PP-200, NA-151 Distt. Multan.3.200 -3.200

42

Const. of M/Road, Soling,Tuff Paver, Nalla

and Drain Basti Sahi Chawan, Nawab Pur

road Nasheman Colony street No.7 Kalroo

wali PP-200, NA-151 Distt. Multan.

3.600 -3.600

43

Const. of Soling and Drian Chah Array Wala,

Basti Ailam Pur UC-65 PP-200, NA-151 Distt.

Multan.

1.500 1.477 -0.023 100%

44

Const. of Soling Khou Shareef Wala (Basti

Sahi Chawan) and Basti Jalal Shah UC-65

PP-200, NA-151 Distt. Multan.

0.800 0.757 -0.043 100%

45Const. of Soling Khou Array Wala UC-65 PP-

200, NA-151 Distt. Multan.1.200 0.901 -0.299 75%

46

Const. of M/Road/Improvement of M/Road

and Nala in New Abadi Liaqat Abad UC-64

PP-200, NA-151 Distt. Multan.

1.000 -1.000

47

Const. of Soling and Drain Basti Bibi Pur

Mouza Bibi Pur UC-62 PP-200, NA-151 Distt.

Multan.

0.600 0.583 -0.017 100%

48Const. of Soling Basti Hirawat (Siddique

Abad) PP-200, NA-151 Distt. Multan.0.700 -0.700

49

Const. of Soling and drain Basti Hathradi,

Chah Bagh Wala and Pallay Wala Mouza

Alpa PP-200, NA-151 Distt. Multan.

1.200 1.144 -0.056 100%

50Const. of Tuff Tile and RCC Slab Ada Band

Bosan PP-200, NA-151 Distt. Multan.0.500 -0.500

51

Const. of M/Road Basti Jhoke Ballu and

Mouza Akbar Pur PP-200, NA-151 Distt.

Multan.

4.185 2.778 -1.407 66%

52

Const. of Soling Drain Basti Jhoke Ballu,

Basti Siyalan wali Shokat Colony Chah Ishaq

Wala, Janay Wali Pull, Basti Cheena Mouza

Akbar Pur PP-200, NA-151 Distt. Multan.

5.815 4.134 -1.681 71%

300.000 23-Aug-1273

Page 395

Page 396: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

53

Const. of M/Road and Soling Professor

Street, Rub Nawaz Street, khichi Street and

Sheikh Allah Ditta (Bahadar Pur) PP-200, NA-

151 Distt. Multan.

3.550 2.500 -1.050 70%

54

Const. of M/Road/Improvement of Road and

tuff Tile Mustafa Street, Basti Labar, Iqbal

Wains Street, Naseem zaidi street, Ghulam

Qasim Mahay and Talib Bhatti Street` PP-

200, NA-151 Distt. Multan.

6.450 -6.450

55

Const. of M/Road in Street No.9 and 10 New

Gulgasht Colony` PP-200, NA-151 Distt.

Multan.

3.000 1.535 -1.465 51%

56Const. of M/Road from Gotay Wali Pull to

River Chinab PP-200, NA-151 Distt. Multan. 2.200 -2.200

57Const. of M/Road Pull Aroka to Dubay Wala

Pull via Basti Islamabad, NA-151 Distt.

Multan.

9.000 8.755 -0.245 97%

58Repair of M/Road Basti Salay Mahay to Pull

Aroka NA-151 Distt. Multan.3.000 1.218 -1.782 41%

59

Const. of Soling, in Different Mouzas Umer

Pur, Chak Mahni, Jhabil Pur, Noor Pur and

Basti Islamabad NA-151 District Multan

4.390 4.162 -0.228 100%

60

Const. of Drain in Mouzas Umer Pur, Chak

Mahni, Jhabil Pur, Noor Pur and Basti

Islamabad NA-151 District Multan

1.385 1.318 -0.067 100%

61Const. of B/Wall and Janaza Gah Graveyard

Olia Nawab NA-151 Distt. Multan. 5.000 0.899 -4.101 18%

62Const. of M/Road Kachi Khoi (Babay Ka

dera) Chak 14-M/R NA-148 Distt. Multan.6.970 6.697 -0.273 100%

63

Const. of M/Road , Soling Chah Oudan Wala

, Chah Allah Yar wala Mouza Chapran NA-

148 Distt. Multan.

5.000 4.700 -0.300 100%

64

Const. of Soling, Drain and Culverts Basti

Kothay Wala , Basti Bootay Wala , Basti

Jhanday Wala, Mouza Botay Wala UC-79 NA-

148 Distt. Multan.

3.000 2.900 -0.100 100%

65

Const. of Soling, Drain and Culvert Basti

Chatha , Basti Bazdar, Basti Shor kot UC-79

Bootay Wala NA-148 Distt. Multan.

2.000 1.900 -0.100 100%

300.000 23-Aug-1273

Page 396

Page 397: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

66

Const. of Soling, Drian Tuff Tile Ghareeb

Abad, Khou Kher Shah Wala, 5 Marla

Scheme Basti Rasheed Abad NA-148 Distt.

Multan.

3.000 2.610 -0.390 87%

67

Const. of Soling,Nala, Drian, Tuff Tile 1-

Hans UC Kotla Maharan and Dunya pur

Mohallah Akhtar Abad Distt. Multan.

2.665 1.520 -1.145 57%

67 300.000 204.422 -95.578

Syed Abdul Kadir Gillani dated 10.9.12

MNA, NA-151

1

Const. of M/Road, Soling and Nala Tibba

Masood Pur , Khair Pur Bhutta UC-52 PP-

198, NA-151 District Multan

7.688 7.455 -0.233 100%

2

Const. of Soling, Tuff Paver and Nala Chah

Qazi wala, Nai wala, Khair Pur Bhutta UC-52

PP-198, NA-151 District Multan

4.314 4.064 -0.250 100%

3

Const. of Soling, Tuff Paver, Drain, Nala

Mohallah Raj Ghat, Bakhsh wala and Mazhar

Khakhi Street UC-53 PP-198, NA-151 District

Multan

7.000 6.478 -0.522 100%

4

Const. of M/Road, Tuff Paver, Soling and

Nala Wazir Town and Ahmad bad UC-54 PP-

198, NA-151 District Multan

5.000 4.900 -0.100 100%

5

Const. of Soling and Nala Youhana Abad

and Hashmi Block UC-54 PP-198, NA-151

District Multan

5.000 4.900 -0.100 100%

6

Const. of M/Road, Tuff Paver, Soling and

Nala Rana Wajid Street, Malik Eisa street,

Ashiq Bosan street Chah Dhoray wala and

Rana Shokat street near Nawab Pur Bhatta

UC-55 PP-198, NA-151 District Multan

6.470 4.563 -1.907 71%

7

Const. of M/Road Nasheman Colony Main

Street Near Masjid Al Habib UC-55 PP-198,

NA-151 District Multan

3.000 2.866 -0.134 100%

300.000 23-Aug-1273

300.000 10-Sep-12329

Page 397

Page 398: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Const. of M/Road, Tuff Paver, Soling and

Nala Moeen Abad and Bua Pur Khaniwal

Road Hasan abad and Mamu wala UC-56 PP-

198, NA-151 District Multan

6.801 6.612 -0.189 100%

9

Const. of M/Road, Tuff Paver, Soling and

Nala Gulshan Iqbal Colony Link Qasim Bela

Minor street chah Yousaf Wala UC-127

Qasim Bella PP-198, NA-151 District Multan

4.727 4.850 0.123 100%

10

WIDENING OF M/ROAD FROM HOSPITAL

MARDAN PUR TO HOUSE ALLAH

WADHAYA, NA-151, DISTRICT MULTAN

10.584 9.279 -1.305 88%

11

CONSTRUCTION OF SOLING AND

CULVERT FROM CHAH JATHLAN WALA

TO CHAH BAGHI WALA, U.C. 55, NA-151,

DISTRICT MULTAN

2.172 2.062 -0.110 100%

12

CONSTRUCTION OF M/ROAD FROM

RANGO SHAH BRARAN ROAD TO RANGO

SHAH WALA, CHAH JATHLAN WALA VIA

BASTI CHAH KARIM BUX WALA, U.C. 55,

NA-151, DISTRICT MULTAN

3.491 3.235 -0.256 93%

13

CONSTRUCTION OF FLOOD

PROTECTION BUND, MOUZA HAMROT

AND M/ROAD OF TIBA MASOOD PUR

(GANJI BASTI), BASTI AHMAD PUR, NA-

151, DISTRICT MULTAN

14.620 13.760 -0.860 100%

14

CONSTRUCTION OF M/ROAD FROM MAIN

QASIM BELLA ROAD TO GRAVEYARD

MOUZA ARJAWAIN SHARIF, NA-151,

DISTRICT MULTAN

2.172 2.082 -0.090 100%

15

CONSTRUCTION OF SOLING AND WATER

COURSE, IN, KHO NIZAM WALA, KHOI

SYEDAN WALI, MOUZA BASTI NO

BAIROON, U.C. 61, SALEY MAHEY, NA-151

, DISTRICT MULTAN

4.056 3.826 -0.230 100%

300.000 10-Sep-12329

Page 398

Page 399: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

16

CONSTRUCTION OF M/ROAD, TUFF

PAVERS, DRAIN AND SOLING IN BASTI

CHAH WALA, BASTI DIN PUR, BASTI

KAMBOH WALA AND BASTI RASUL PUR,

MOUZA NEELKOT, NA-151, DISTRICT

MULTAN

6.266 6.087 -0.179 100%

17

CONSTRUCTION OF M.ROAD/ SOLING

AND CULVERT IN BASTI ARAEIN WALA

TO BASTI MUNSHI WALA, MOUZA BUCH

MUBARAK, BINDA SANDILA, NA-151,

DISTRICT MULTAN

4.997 4.841 -0.156 100%

18

CONSTRUCTION OF TUFF PAVERS AND

NALA/DRAIN IN BASTI NEHALEY WALA

AND BASTI HARAWAT, U.C. PUNJ KHOUA,

NA-151, DISTRICT MULTAN

10.017 9.765 -0.252 100%

19

CONSTRUCTION OF M/ROAD AND

SOLING FROM HOUSE PHULARWAN TO

CHAH ARI WALA, AND KHO MALIK

FAYYAZ JHAKRI, U.C. 129, PP-199, NA-

151, DISTRICT MULTAN

6.665 4.379 -2.286 66%

20

CONSTRUCTION OF M/ROAD AND TUFF

PAVERS IN ZIKRIA COLONY, LIAQAT

ABAD AND KHO MIAN AZAM TO ZAFAR

RAAN, U.C. 33, 34 & 48, PP-199, NA-151,

DISTRICT MULTAN

5.079 5.758 0.679 90%

21

CONSTRUCTION OF FLOOD

PROTECTION BUND FROM SPUR NO.4

TO RD.267 OF SHUJABAD BRANCH, NA-

151, DISTRICT MULTAN

13.771 5.410 -8.361 39%

22

CONSTRUCTION OF SOLING AND

NALA/DRAIN IN VARIOUS STREET, U.C.

52, NA-151, DISTRICT MULTAN

1.506 1.460 -0.046 100%

23

CONSTRUCTION OF M/ROAD AND

SOLING FROM HUSSAIN ABAD CHAH

ARBI WALA, MOUZA BINDA MALANA, U.C.

59, PP-199, NA-151, DISTRICT MULTAN

6.297 6.261 -0.036 100%300.000 10-Sep-12329

Page 399

Page 400: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

24

CONSTRUCTION OF SOLING AND

NALA/DRAIN IN JHOK KHUDA BAKHSH

AND CHAK NIAZ ABAD GHAGHRA, U.C.

94, PP-199, NA-151, DISTRICT MULTAN

1.326 1.233 -0.093 100%

25

CONSTRUCTION OF SOLING AND

NALA/DRAIN IN KHO MEY WALA, FATWAL

PUR AND ADHI BAGH, U.C. 92, PP-199, NA-

151, DISTRICT MULTAN

1.489 1.333 -0.156 100%

26

CONSTRUCTION OF TUFF PAVERS,

SOLING AND NALA/DRAIN IN STREET

GHARIB ABAD, BASTI SHORKOT, SAKHI

BAHODIN, SANDRI WALA, PIR SHAH

WALA, IN U.C. 50, PP-199, NA-151,

DISTRICT MULTAN

4.167 3.980 -0.187 100%

27

CONSTRUCTION OF TUFF PAVERS,

DRAIN/NALA AND SOLING IN KIRSCHAN

COLONY, MOUZA JANGAL BAHERA, U.C.

128, PP-199, NA-151, DISTRICT MULTAN

2.103 2.014 -0.089 100%

28

CONSTRUCTION OF M/ROAD OF BASTI

LABARAAN, U.C. 91, PP-199, NA-151,

DISTRICT MULTAN

2.812 1.754 -1.058 62%

29

CONSTRUCTION OF M/ROAD, SOLING,

AND DRAIN/NALA IN BASTI TARKHAN

WALA AND CHAH KHAJI WALA, MOUZA

THATHI LAL, CHAH BOLAY WALA, MOUZA

BAKHRI, U.C. 129, PP-199, NA-151,

DISTRICT MULTAN

4.785 4.665 -0.120 100%

30

CONSTRUCTION OF M/ROAD, TUFF

PAVERS, WATER COURSE, NALA/DRAIN

AND SOLING IN VARIOUS STREETU.C. 61,

NA-151, DISTRICT MULTAN

10.000 9.700 -0.300 100%

300.000 10-Sep-12329

Page 400

Page 401: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

31

CONSTRUCTION OF M/ROAD, TUFF

PAVERS, WATER COURSE, NALA/DRAIN

AND SOLING IN VARIOUS STREET, RANA

SABIR HOUSE TO 31 NO. TUBEWELL,

MATITAL ROAD TO DEVRA FACTORY,

STREET, MALIK ARSHAD, MAIN STREET

ZIKRIA COLONY, NEAR JINAH MARKET

NEW MULTAN, NA-151, DISTRICT

15.507 14.822 -0.685 100%

32

CONSTRUCTION OF M/ROAD, TUFF

PAVERS AND CULVERT IN VARIOUS

STREET U.C. 57, JAHANGIR ABAD, NA-

151, DISTRICT MULTAN

20.457 19.883 -0.574 100%

33

CONSTRUCTION OF SOLING AND

CULVERT IN MOUZA FAZIL PUR, U.C. 59,

NA-151, DISTRICT MULTAN

8.849 8.583 -0.266 100%

34

CONSTRUCTION OF FLOORING, TUFF

PAVERS AND SEWER LINE, IN AL-NOOR

COLONY, MOHALLAH AL-HUSSAIN,

MOHALLAH NOORI MASJID, BASTI

GOUSIA AND PIREY WALA, U.C. NO. 129,

NA-151, DISTRICT MULTAN

9.985 9.609 -0.376 100%

35

CONSTRUCTION OF FLOORING, TUFF

PAVERS, SOLING AND SEWER LINE, IN

BHAINI MALIK FAYYAZ, RAFIQ DAK-

KHANAY WALI GALLY, MASJID ALLAH

WALI AND BASTI GOUSIA, U.C. NO. 129,

NA-151, DISTRICT MULTAN

9.580 9.179 -0.401 100%

36

CONSTRUCTION OF SOLING AND

CULVERT IN U.C. 59, NA-151, DISTRICT

MULTAN

3.157 2.963 -0.194 100%

37

CONSTRUCTION OF WATER COURSE

AND SOLING IN JHALARI SHUMALI,

DISTRICT MUZAFFAR GARH.

8.000 7.603 -0.397 100%

38

CONSTRUCTION OF SOLING AND

CULVERT OF CHAK NIAZ AND AMBALA

KHOKHAR, MOUZA SHER SHAH, NA-151,

DISTRICT MULTAN

3.728 3.647 -0.081 100%

300.000 10-Sep-12329

Page 401

Page 402: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

39

CONSTRUCTION OF M/ROAD, TUFF

PAVERS/ P.C.C, SEWER LINE, IN U.C. NO.

55, NEALKOT, NA-151, DISTRICT MULTAN15.000 14.320 -0.680 100%

40

CONSTRUCTION OF M/ROAD, TUFF

PAVERS, WATER COURSE, NALA/DRAIN

AND SOLING IN VARIOUS STREET U.C.

67, MATITAL, NA-151, DISTRICT MULTAN

10.000 9.749 -0.251 100%

41

CONSTRUCTION OF M.ROAD/ SOLING

AND CULVERT IN JHOK VAINS, (VARLI),

NA-151, DISTRICT MULTAN

4.997 4.843 -0.154 100%

42

CONSTRUCTION OF M/ROAD FROM

CHAH PEEPAL WALA, MOUZA ALPA

BHAINI MAHAR HAQ NAWAZ HIRAJ, NA-

151, DISTRICT MULTAN

2.365 2.210 -0.155 93%

43

IMPROVEMENT/CONSTRUCTION OF

STREET/ROAD, TUFF PAVERS/P.C.C,

NALA/DRAIN, CULVERT, AND

PURFICATION PLANT, IN U.C. SHER

SHAH, NA-151, DISTRICT MULTAN

20.000 19.500 -0.500 100%

43 300.000 276.483 -23.517

Nawab Liaqat Ali Khan dated 26.9.12

Mna, NA-152

1

Const. of Bridge, Soling Basti Khoja at Khoja

Minor Eisa Khan District Multan NA-152 1.000 0.970 -0.030 100%

2

Const. of M/Road Tuff Tile, Drain,Soling &

Saldge Different Abadies UC Qadir Pur Larr

District Multan NA-152

3.000 2.942 -0.058 100%

3Const. of Bridge, Soling Faizpur Minor Near

Targarh District Multan NA-1521.250 1.220 -0.030 100%

4

Const. of Soling, Drain Chah Balouch wala

Mouza Wahi Bakhar District Multan NA-152 1.000 0.957 -0.043 100%

300.000 10-Sep-12329

100.000 26-Sep-12441

Page 402

Page 403: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Const. of Sewerage, Tuff Tile Hospital wali

Street Basti Malook District Multan NA-152 3.000 2.910 -0.090 100%

6

Const. of M/Road Rukan Hati Road to

House Haji Khalid Meo District Multan NA-

152

1.000 0.974 -0.026 100%

7

Const. of M/Road Chak Jhaller Road to Basti

Lal Khan Tehsil Shujabad District Multan NA-

152

2.000 1.940 -0.060 100%

8

Const. of M/Road Basti Jamal wala to

Punjani Tehsil Shujabad District Multan NA-

152

2.000 1.944 -0.056 100%

9

Const. of Soling Muqeempur Raja Ram Road

to Javed wala Mouza Shah Mousa Shujabad

District Multan NA-152

2.300 2.231 -0.069 100%

10Const. of M/Road Lar to Gagian wala,&

alabad to kori wala District Multan NA-1522.900 2.823 -0.077 100%

11

Const. of M/Road Yaqoob Hospital

Rukanabad to Chah Chakley wala Mouza

Jangal Faizpur District Multan NA-152

2.350 2.297 -0.053 100%

12

Const. of Soling old Multan Road to

residence Yousaf Awan Chak R.s District

Multan NA-152

1.000 0.968 -0.032 100%

13Const. of M/Road Sikandarabad Basti to Girls

School District Multan NA-1522.000 1.940 -0.060 100%

14

Const. of M/Road Band Mochi Pura to Bari

Jhoke Mouza Sherpur District Multan NA-152 2.000 1.950 -0.050 100%

15Const. of M/Road Hospital Zarif Shaheed

Road to Mate Hatti District Multan NA-1522.000 1.267 -0.733 63%

16Const. of M/Road Waris Abad Mouza Gajju

Hatta, District Multan NA-1521.000 0.975 -0.025 98%

17

Const. of M/Road Qureshi More to Wali

Muhammad Master via Dera Mian Naseer

Bodla Mouza Chadhar District Multan NA-

152

2.400 2.380 -0.020 100%

18

Const. of M/Road Shujabad Basti Malook

Road to Topan wala Mouza Shahpur District

Multan NA-152

2.400 2.340 -0.060 100%

100.000 26-Sep-12441

Page 403

Page 404: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

19

Const. of M/Road Basti Khalil wala Near TV

Boster Jeawan wala District Multan NA-152 2.000 1.948 -0.052 100%

20

Const. of M/Road Bhohlu wala to

Gamanwala Mouza Khoja District Multan NA-

152

2.000 1.946 -0.054 100%

21Const. of M/Road Mochi Pura Road to Bhoja

wala District Multan NA-1521.000 0.950 -0.050 100%

22

Const. of M/Road Bilal Pur to Taragharh

Malik Umar Farooq District Multan NA-152 2.500 2.450 -0.050 100%

23

Const. of M/Road Baqar Abad to Mehmood

Shah Mouza Ameer Pur District Multan NA-

152

1.750 1.682 -0.068 100%

24Const. of M/Road Sanday wala to Rattan

wala District Multan NA-1521.000 0.970 -0.030 100%

25Const. of M/Road Hotel Wali Shah Masry

Qasba Sani District Multan NA-1521.000 0.680 -0.320 68%

26

Const. of Tuff Tile & Drain Roshan wala

Mouza Wahi Bhakkar District Multan NA-152 0.700 -0.700

27

Const of Metalled Road (Remaining Portion)

Raja Ram Phattak to Manghay wala Tehsil

Shujabad District Multan NA-1523.900 3.499 -0.401 90%

28

Const of Metalled Road (Remaining Portion)

Khan Pur Qazian to Ghallo More Tehsil

Shujabad District Multan NA-152

1.500 1.425 -0.075 100%

29

Const of Metalled Road Kali Pull to Manghay

Hati UC 5 Faiz District Multan NA-152 2.900 2.823 -0.077 100%

30

Const of Metalled Road Tuff Tile Drain and

Soling Basti Traggar Tehsil Shujabad District

Multan NA-152

4.300 4.171 -0.129 100%

31

Const of Tuff Tile Drain Zareef Shaheed

Basti Jalal abad Tehsil Shujabad District

Multan NA-152

4.000 3.455 -0.545 86%

100.000 26-Sep-12441

Page 404

Page 405: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

32

Const of Metalled Road Railway Station to

Basti Hadan Wali Tehsil Shujabad District

Multan NA-152

1.000 0.970 -0.030 100%

33

Const of Soling Petrol Pump Zareef Shaheed

Lodhran Shujabad Road to Dera Ahmed

Bodla Tehsil Shujabad District Multan NA-

152

1.000 0.980 -0.020 100%

34

Const of Metalled Road Chak Jhalar Road to

Basti Bhojay wala District Multan NA-152 2.000 1.947 -0.053 100%

35Const of Tuff Tile Drain Different street in

Basti Malook District Multan NA-1521.500 1.455 -0.045 100%

36

Const of Metalled Road Bahawalpur road to

High school Basti Malook link Traggar District

Multan NA-152

2.800 2.733 -0.067 100%

37

Const of Metalled Road Basti Kewal wala

Mouza Wahi Bhakkar Tehsil Shujabad

District Multan NA-152

1.000 0.962 -0.038 100%

38

Const of Metalled Road Ramzan Wala to

Hadees abad Tehsil Shujabad District Multan

NA-152

1.000 0.973 -0.027 100%

39

Const of Soling Road Keekar wala Deray

wala Jeewan wala and Laloo wala Wahin

Bhakkar Tehsil Shujabad District Multan NA-

152

2.800 2.727 -0.073 100%

40

Const of Soling & Drain Eisa wala near Bagh

wala Tehsil Shujabad District Multan NA-152 1.000 0.890 -0.110 89%

41Const of Tuff Tile & Drain Bagh wala Tehsil

Shujabad District Multan NA-1521.000 0.970 -0.030 100%

42

Const of Metalled Road Sports Ground

Ramzan Wala to Dera Farukh Kareem Marral

District Multan NA-152

1.500 0.823 -0.677 55%

43

Const of Tuff Tile & Drain Bangla Nehar

Street Abdul Kareem Ghouri Shujaabad

District Multan NA-152

0.750 0.736 -0.014 100%

44

Const of Metalled Road Bye Pass Tabligi

Markaz to Chit wala Marali Wahin Tehsil

Shujabad District Multan NA-152

3.000 2.850 -0.150 100%

100.000 26-Sep-12441

Page 405

Page 406: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

45

Const of Metalled Road Tuff Tile Drain and

Soling Remaining Portion Islam Pur and

Taray wala Tehsil Shujabad District Multan

NA-152

2.700 3.990 1.290 90%

46

Const of Tuff Tile Soling & Drain in Abadi

Sikandarabad Tehsil Shujabad District

Multan NA-152

4.000 3.900 -0.100 100%

47

Const of Tuff Tile Soling & Drain in Chak

No.1 Shamali Tehsil Shujabad District Multan

NA-152

3.000 2.971 -0.029 100%

48

Const of Metalled Road Larr Shujabad Road

7 Chak to Thakaray wala and Carpet Main

Street Zikria Town Multan District Multan NA-

152

3.800 3.336 -0.464 88%

49Const of Tuff Tile & Drain Basti Mahram

Malik Zafar Kalroo District Multan NA-1522.000 1.949 -0.051 100%

50

Const of Metalled Road Marri Noon Road to

Zareef Shaheed to Girls High School District

Multan NA-152

1.000 0.970 -0.030 100%

50 100.000 95.159 -4.841

Hamid Yar Hiraj dated 19.10.12

MNA, NA-157

1Const. of Soling, Drain, Nala and Culverts

UC-08 Distt. Khanewal NA-1575.100 4.600 -0.500 90%

2Const. of Soling, Drain, Nala and Culverts

UC-10 Distt. Khanewal NA-1573.000 1.345 -1.655 45%

3

Const. of Soling, Drain and Culverts Village

Shanti Nagar UC-23 Distt. Khanewal NA-157 3.500 3.372 -0.128 100%

4

Const. of Soling, Drain, Nala and Culverts

Mouza Mahni Siyal UC-59 Distt. Khanewal

NA-157

2.000 -2.000

5

Const. of Soling, Drain, Nala and Culverts

New Abadi Allahbad UC-63 Distt. Khanewal

NA-157

1.500 1.267 -0.233 84%

100.000 26-Sep-12441

20.000 19-Oct-12610

Page 406

Page 407: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Const. of M/Road Chaki Wala, Ahmad Wala,

Mouza Allah Hoo UC-67 NA-157 Distt.

Khanewal

2.400 2.246 -0.154 100%

7

Special Repair of M/Road from Abdul

Hakeem By Pass to Basti Umeed Garh UC-

68 Distt. Khanewal NA-157

2.500 2.100 -0.400 84%

7 20.000 14.930 -5.070

Hamid Yar Hiraj dated 29.11.12

MNA, NA-157

772 29-Nov-12 50.000 50.000 -50.000

50.000 -50.000

CH.Iftikhar Nazir dated 24.8.12

Mna, NA-159

1Const. of Soling & Drain Type-II UC 26

Jahanian City PP-219 NA-159 3.000 -3.000

2Const. of Soling & Drain Type-II UC Mian

Pur PP-219 NA-159 2.000 -2.000

3Const. of Soling & Drain Type-II UC Rahim

Shah PP-219 NA-159 2.000 -2.000

4Const. of Soling & Drain Type-II UC Wahni

wal PP-219 NA-159 2.000 -2.000

5Const. of Soling & Drain Type-II UC 140 PP-

219 NA-159 2.000 -2.000

6Const. of Soling & Drain Type-II UC 157 PP-

219 NA-159 2.000 -2.000

7Const. of Soling & Drain Type-II UC 149 PP-

219 NA-159 2.000 -2.000

20.000 19-Oct-12610

30.000 24-Aug-1298

Page 407

Page 408: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Const. of Soling & Drain Type-II, Nala,

M/Road, Boundary wall Chak # 80/10-R

Perowal School UC

15.16,17,19,21,24,88,89,90,91,92 PP-218

NA-159

15.000 14.300 -0.700 95%

8 30.000 14.300 -15.700

CH.Iftikhar Nazir dated 6.9.12

Mna, NA-159

1Const. of Soling, Drain, Sewerage, Tuff Tile,

Nala UC-26 PP-219, NA-159 Distt. Khanewal 4.000 2.600 -1.400 65%

2Const. of Soling, Drain, Sewerage, Nala UC

Mian Pur PP-219, NA-159 Distt. Khanewal 2.000 1.938 -0.062 100%

3Const. of Soling, Drain, Sewerage, Nala UC

Rahim Shah PP-219, NA-159 Distt.

Khanewal

2.000 1.839 -0.161 100%

4Const. of Soling, Drain, Sewerage, Nala UC

Vehni Wall PP-219, NA-159 Distt. Khanewal 2.000 1.575 -0.425 100%

5

Const. of Soling, Drain, Sewerage, Nala UC

Thatha Sadiq Abad PP-219, NA-159 Distt.

Khanewal

2.000 1.200 -0.800 60%

6Const. of Soling, Drain, Sewerage, Nala UC-

35 PP-219, NA-159 Distt. Khanewal 2.000 1.937 -0.063 100%

7Const. of Soling, Drain, Sewerage, Nala UC-

28 PP-219, NA-159 Distt. Khanewal 2.000 1.300 -0.700 65%

8Const. of Soling, Drain, Sewerage, Nala UC-

37 PP-219, NA-159 Distt. Khanewal 2.000 1.944 -0.056 100%

9Const. of Soling, Drain, Sewerage, Nala UC-

31 PP-219, NA-159 Distt. Khanewal 2.000 1.934 -0.066 100%

10

Const. of Soling, Drain, Sewerage, Tuff Tile,

Nala Uc's PP-218, NA-159 Distt. Khanewal

(Phase-I)

5.000 4.513 -0.487 90%

11

Const. of Soling, Drain, Sewerage, Tuff Tile,

Nala Uc's PP-218, NA-159 Distt. Khanewal

(Phase-II)

5.000 2.675 -2.325 54%

11 30.000 23.455 -6.545

30.000 24-Aug-1298

30.000 06-Sep-12169

Page 408

Page 409: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

CH.Iftikhar Nazir dated 29.11.12

Mna, NA-159

1

Const. of Soling, M/Road , Sewerage, Nala,

Tuff Tile, Drain type-II and B/Wall UC-26 PP-

219, NA-159 Distt. Khanewal.

-

2

Const. of Soling, Tuff Tile, Nala, Drain type-II

and Sewerage UC-33 Rahim Shah PP-219,

NA-159 Distt. Khanewal.

-

3

Const. of Soling, Tuff Tile, Nala, Drain type-II

and Sewerage UC-34 Vehni Wall PP-219,

NA-159 Distt. Khanewal.

-

4

Const. of Soling, Tuff Tile, Nala, Drain type-II

and Sewerage UC-37 PP-219, NA-159 Distt.

Khanewal.

-

5

Const. of Soling, Tuff Tile, Nala, Drain type-II

and Sewerage UC-31 PP-219, NA-159 Distt.

Khanewal.

-

6

Const. of Soling, Tuff Tile, Nala, Drain type-II

and Sewerage UC-32 Mian Pur PP-219, NA-

159 Distt. Khanewal.

-

6

Azeem Khan Doltana/Ms Natasha Doltana dated 24.8.12

Mna, NA-168

1

Const.of Soling/Tuff Tile & Boundry Wall of

Garevyard of ludden city Distt Vehari NA-168

PWP-II, 2012-13

7.250 3.443 -3.807 47%

2Const.of Ludden Press calub Distt Vehari

NA-168 PWP-II, 2012-13 2.750 -2.750

2 10.000 3.443 -6.557

Mehmood Hayyat Khan Tochi dated 8.8.12

20.000 29-Nov-12771

10.000 24-Aug-1295

Page 409

Page 410: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

MNA, NA-170

1

Repair of M/Road Mailsi Mitroo Road to

Bagha More Via Chowk mailsi NA-170 Distt

Vehari

16.000 15.200 -0.800 100%

2Repair of M/Road At Chak No 112 /WB NA-

170 Distt Vehari3.721 3.572 -0.149 100%

3

Repair of M/Road Girls High School To Harri

Pur & Hasan Abad Ghalla Mandi Mailsi NA-

170 Distt Vehari

5.226 4.965 -0.261 100%

4Repair of M/Road at 315/ WB Dunia Pur

Road NA-170 Distt Vehari5.053 4.800 -0.253 100%

4 30.000 28.537 -1.463

Mehmood Hayyat Khan Tochi dated 29.11.12

MNA, NA-170

1Const.of M/Road At UC Arain Wahin Distt

Vehari NA-170 PWP-II, 2012-134.700 2.239 -2.461 48%

2

Const.of M/Road At Mouza Fatih Pur and

warsiwhain &chatt whain Distt Vehari NA-170

PWP-II, 2012-13

5.700 4.868 -0.832 85%

3

Const.of M/Road At Mailsi City & Ram Kali

&43/WB Distt Vehari NA-170 PWP-II, 2012-

13

4.300 3.582 -0.718 83%

4Const.of M/Road At Chak No198/WB Distt

Vehari NA-170 PWP-II, 2012-135.000 2.036 -2.964 41%

5Const.of M/Road At 04 Chak Distt Vehari NA-

170 PWP-II, 2012-134.700 2.120 -2.580 45%

6Const.of M/Road At Chak no 1M & kot Malik

Distt Vehari NA-170 PWP-II, 2012-133.600 1.607 -1.993 45%

7

Const.of M/Road At Mouza Chakliar & 12No

scheem Distt Vehari NA-170 PWP-II, 2012-

13

5.000 4.099 -0.901 82%

8Const.of Soling chah Dadoana &Jalla Jeem

Distt Vehari NA-170 PWP-II, 2012-132.710 1.996 -0.714 74%

30.000 08-Aug-1227

50.000 29-Nov-12769

Page 410

Page 411: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Const.of Soling / Drain & Nala At Chatt

Whain & Nizam abad Distt Vehari NA-170

PWP-II, 2012-13

4.420 -4.420

10

Const.of Nala At Chak No

110/WB,116/WB,&128/WB Distt Vehari NA-

170 PWP-II, 2012-13

2.870 1.209 -1.661 42%

11

Const.of M/Road At Mirran Pur & Marri Mittru

Distt Vehari NA-170 PWP-II, 2012-13 4.300 2.236 -2.064 52%

12Const.of M/Road At Chak no 190/WB Distt

Vehari NA-170 PWP-II, 2012-134.700 2.419 -2.281 51%

13

Const.of M/Road At Chak no 122/WB

&146/WB & 335/WB Distt Vehari NA-170

PWP-II, 2012-13

5.700 2.347 -3.353 41%

14Const.of M/Road At G0dder ammam Distt

Vehari NA-170 PWP-II, 2012-132.300 1.645 -0.655 100%

14 50.000 32.403 -17.597

Salahuddin Dogar dated 12.9.12

Senator

1

PROVISION OF MISSING FACILITIES IN

YOUTH HOSTEL MULTAN (SUB HEAD AIR

CONDTIONING WORK ,

ELECTRIFICATION AND BORING OF

PUMPING SET.

8.470 8.200 -0.270 100%

2

CONST. OF OVER HEAD RESIRVORE AND

PROVISION OF MISSING FACILITIES IN

YOUTH HOSTEL MULTAN SUPPLY

FURNITURE .

5.000 4.485 -0.515 100%

2 13.470 12.685 -0.785

50.000 29-Nov-12769

13.470 12-Sep-12328

Page 411

Page 412: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Salahuddin Dogar dated 12.9.12

Senator

1

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-36,37,38, NA-149, Distt. Multan.

7.500 6.930 -0.570 92%

2

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-39,40, NA-149, Distt. Multan.

5.000 4.835 -0.165 100%

3

Improvement/Const. of Tuff Paver,Flooring,

Drain, Sewerage in Verious Street UC-11,12,

NA-149, Distt. Multan.

1.000 0.969 -0.031 100%

4

Improvement/Const. of Tuff Paver,Flooring,

Drain, Sewerage in Verious Street UC-27, NA-

149, Distt. Multan.

4.000 3.823 -0.177 100%

5

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-41,42, NA-149, Distt. Multan.

4.000 3.840 -0.160 100%

6

Improvement/Const. of Tuff Paver,Drain,

Sewerage in Verious Street UC-44 NA-149,

Distt. Multan.

2.000 1.191 -0.809 60%

7

Const. of M/Road Jhok Ghamoo Marqaz Lar

Near Qasba Minor NA-152, PP-203 District

Multan.

3.000 2.907 -0.093 100%

8Const. of tuff paver and covered drain at 8

Kassi and Chak 1/H District Multan.2.500 2.424 -0.076 100%

9Const. of M/Road Mouza Kotla Abul Fateh

District Multan.5.000 4.753 -0.247 100%

10Const. of Toe Wall Quillah Kohna Qasim

Bagh Stadium District Multan.1.209 1.179 -0.030 100%

11Const. of Nala, Sewerage and Soakage Pit

Wazir abad Jam Pur District Rajan Pur.2.000 1.946 -0.054 100%

12

Const of Jym and Supply of exercise

equipment at Sports ground from in District

Multan

5.462 -5.462

13

Providing and installation of Street/Roads

Lights in various UC's of NA-149 Distt.

Multan

4.000 3.700 -0.300 100%

100.000 12-Sep-12368

Page 412

Page 413: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14Const of Park at Chowk Dera Adda Multan

(SH: Electrification)1.500 1.400 -0.100 100%

15

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-01,02, NA-149, Distt. Multan.

7.000 6.642 -0.358 100%

16

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-03, 04, NA-149, Distt. Multan.

7.000 6.664 -0.336 100%

17

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-05,06, NA-149, Distt. Multan.

7.000 6.644 -0.356 100%

18

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-07, 08, NA-149, Distt. Multan.

7.000 0.035 -6.965 1%

19

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-09,10 NA-149, Distt. Multan.

7.000 6.666 -0.334 100%

20

Improvement/Const. of M/Road, Tuff

Paver,Drain, Sewerage in Verious Street UC-

17,18,19 NA-149, Distt. Multan.

3.000 2.900 -0.100 100%

21

Const. of M/Road and Sewer Line From

Bahawalpur road to wasif Butt Factory &

Chack No. 20 MR Dunapur road Distt.

Multan.

2.845 2.760 -0.085 100%

22

Improvement/Const. of M/Road, Tuff

Paver,Flooring, Drain, Sewerage in Verious

Street UC-43,45 NA-149, Distt. Multan.

6.000 5.690 -0.310 100%

23

Const. of M/Road and Bridge from Kamoki

Minor to Thatha Khokhran (Hari Pur) Distt.

Gujjranwala.

4.984 4.770 -0.214 100%

23 100.000 82.668 -17.332

100.000 12-Sep-12368

Page 413

Page 414: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Usman Bhatti dated 10.8.12

MPA, PP-194

1

IMPROVEMENT OF STREET/ROAD,

CARPET, TUFF PAVERS/P.C.C, SOLING,

NALA/DRAIN, SEWER LINE, IN U.C. NO. 1,

2, 3, 4, 5 & 40, PP-194, DISTRICT MULTAN

9.000 8.413 -0.587 100%

2

IMPROVEMENT OF STREET/ROAD,

CARPET, TUFF PAVERS/P.C.C, SOLING,

NALA/DRAIN, SEWER LINE, IN U.C. NO. 6,

7, 8, 9, & 10, PP-194, DISTRICT MULTAN

9.000 8.100 -0.900 100%

3

PROVIDING AND INSTALLATION OF

STREET LIGHTS/ELECTRICITY IN U.C. 1,

2, 3, 4, 5, 6, 7, 8, 9, & 10, (VARIOUS U.C.)

DISTRICT MULTAN

2.000 1.908 -0.092 100%

3 20.000 18.421 -1.579

Muhammad Usman Bhatti dated 14.12.12

MPA, PP-194

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Malik Muhammad Amir Dogar dated 7.9.12

MPA, PP-198

1

Const of tuff paver and soling basti shorkot

sharqi and basti shor kot gharbi UC-127 PP-

198 Distt Multan.

3.414 3.200 -0.214 100%

2

Const of tuff paver and drain Munir hussain

shah street , Kousar abbas Shah street Imam

Bargah main bazar Qasim Bela street UC-

127 PP-198 Distt Multan.

1.769 1.690 -0.079 100%

3

Const of soling and Sewer line Irfan Shah

street, Disposal chowk to christian colonyUC-

127 PP-198 Distt Multan.

2.133 2.052 -0.081 100%

4Const of Bridge over Sullage carrier in

Mouza Kotla Abul Fateh UC-128 Distt

Multan.

1.291 1.256 -0.035 100%

20.000 10-Aug-1243

20.000 07-Sep-12285Page 414

Page 415: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Const of tuff paver and Sewer Line basti

Awan abad Jhakhar Pur (Qari Bilal) UC-129

PP-198 Distt Multan.

0.887 0.822 -0.065 100%

6

Const of M/Road & Tuff Paver bosan road to

bhagu wala, Nasheman colony Waqas

qureshi street and Basti Mehmood kot Abid

Thaheem street UC-55 PP-198 Distt Multan.

4.530 4.320 -0.210 100%

7

Const of tuff paver and soling and Nalla

basti Sewera and Chah Oukan wala,

Deemay wala UC-55 PP-198 Distt Multan.

2.641 2.550 -0.091 100%

8Const of tuff paver Mouza Tindini (Riaz

Sura) UC-53 PP-198 Distt Multan. 0.959 0.920 -0.039 100%

9

Const of M/Road from nadra abad Phatak

chowk to masjid Nimra UC-128 PP-198 Distt

Multan.

2.376 2.252 -0.124 100%

9 20.000 19.062 -0.938

Malik Muhammad Amir Dogar dated 14.12.12

MPA, PP-198

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Syed Nazim Hussain Shah dated 11.9.12

MPA, PP-199

1

CONSTRUCTION OF NALA/DRAIN AND

SOLING IN KHO BANAN WALA, BASTI

KARARI, MOUZA TIBA MASOOD PUR, U.C.

52 AND U.C. 50, PP-199, NA-151, DISTRICT

MULTAN

3.348 -3.348

20.000 07-Sep-12285

20.000 11-Sep-12321Page 415

Page 416: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

CONSTRUCTION OF TUFF PAVERS,

NALA/DRAIN, BRIDGE AND SOLING IN

LIAQAT ABAD, MOHALLAH NIZAM ABAD,

KHO DHORAY WALA, BASTI ALAMGEER,

KHO CHELIAN WALA, BASTI WAAN

CHATA, BASTI BAHAWAL PUR SUKHA

AND VARIOUS STREET, U.C. 34, 33, 35,

49, PP-199, NA-151, DISTRICT MULTAN

5.973 3.162 -2.811 53%

3

CONSTRUCTION OF M.ROAD, TUFF

PAVERS, NALA/DRAIN, BRIDGE AND

SOLING IN BASTI KHUDA DAD WARD

NO.7, 9, CHAH PATHAN WALA, NEAR

STATION PIR MUKHTIAR MOUZA SULTAN

PUR HAMAR AND DARBAR MOUZA

THATHI LAL, U.C. 51, 129, 94, PP-199, NA-

151, DISTRICT MULTAN

4.468 1.260 -3.208 28%

4

CONSTRUCTION OF TUFF PAVERS,

NALA/DRAIN AND SOLING IN CHAK NIAZ

ABAD, KHO RANOL WALA, KODARI WALA,

CHAH SOFIAN WALA, BASTI CAMP,

STREET ASGHAR THAHIM, SAEED

COLONY PURANI CHAND MARI, U.C. 94,

128, 52, 48, PP-199, NA-151, DISTRICT

MULTAN

6.211 5.603 -0.608 90%

4 20.000 10.025 -9.975

Syed Nazim Hussain Shah dated 14.12.12

MPA, PP-199

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Ahmed Hassan Dehr dated 7.9.12

MPA, PP-200

1Const. of Soling in UC 56 Multan PP-200 NA-

151.3.200 2.994 -0.206 100%

2Const. of Soling in UC 57 Multan PP-200 NA-

151.2.000 1.951 -0.049 100%

20.000 11-Sep-12321

20.000 07-Sep-12298

Page 416

Page 417: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3Const. of Soling in UC 58 Multan PP-200 NA-

151.1.600 1.558 -0.042 100%

4Const. of Soling in UC 59 Multan PP-200 NA-

151.1.600 1.551 -0.049 100%

5Const. of Soling in UC 60 Multan PP-200 NA-

151.1.600 1.552 -0.048 100%

6Const. of Soling in UC 61 Multan PP-200 NA-

151.1.600 1.564 -0.036 100%

7Const. of Soling in UC 62 Multan PP-200 NA-

151.2.000 1.949 -0.051 100%

8Const. of Soling in UC 63 Multan PP-200 NA-

151.1.600 1.560 -0.040 100%

9Const. of Soling in UC 64 Multan PP-200 NA-

151.1.600 1.559 -0.041 100%

10Const. of Soling in UC 65 Multan PP-200 NA-

151.1.600 1.549 -0.051 100%

11Const. of Soling in UC 67 Multan PP-200 NA-

151.1.600 1.556 -0.044 100%

11 20.000 19.343 -0.657

Dr.Akhtar Malik dated 7.9.12

MPA, PP-202

1

Const.of Soling/Drains At Basti Sultan Mouza

adda arey wahen Mailsi Distt Vehari PP-239

PWP-II, 2012-13

1.957 100%

2

Const.of Soling At Chah booty wala mouza

Bahader Balooch Mailsi Distt Vehari PP-239

PWP-II, 2012-13

0.622 100%

3

Const.of Soling At Chah Naway wala mouza

Shaman Mailsi Distt Vehari PP-239 PWP-II,

2012-13

0.640 100%

4

Const.of Soling Basri mehrook to mouza

khan pur Mailsi Distt Vehari PP-239 PWP-II,

2012-13

1.959 100%

20.000

20.000 07-Sep-12298

20.000 07-Sep-12289

Page 417

Page 418: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Const.of Tuff Tile Tehsil Bazar Mailisi City

Mailsi Distt Vehari PP-239 PWP-II, 2012-13 1.140 100%

6

Const.of Sewerage Basti Gareeb

AbadKehroor Mailisi Distt Vehari PP-239

PWP-II, 2012-13

0.950 100%

7

Const.of Soling Basti Bakhan Wali Mouza

Jalla Jeem Distt Vehari PP-239 PWP-II, 2012-

13

0.974 100%

8Const.of Soling Primery School Hassan Abad

Distt Vehari PP-239 PWP-II, 2012-130.488 100%

9

Const.of Soling At Chah Bangal wala mouza

torbah Mailsi Distt Vehari PP-239 PWP-II,

2012-13

0.970 100%

10Const.of Sewerage gulzar twon Mailisi Distt

Vehari PP-239 PWP-II, 2012-131.165 100%

11

Const.of Soling At Gali haji sakhawat hussain

wali Mailsi Distt Vehari PP-239 PWP-II, 2012-

13

0.291 100%

12

Const.of Tuff Tile Cercaler road Mailisi Gali

Mateen Khan Wali Distt Vehari PP-239 PWP-

II, 2012-13

0.518 100%

13

Const.of Soling At Mouza Dhamaky Azafi

Abadi Mailsi Distt Vehari PP-239 PWP-II,

2012-13

1.500 100%

14

Const.of M/road chah maroof wala toBahman

Wala mailisi Distt Vehari PP-239 PWP-II,

2012-13

1.468 90%

15

Const.of M/road Mouza Dhoda to Link road

Mailsi Distt Vehari PP-239 PWP-II, 2012-13 3.135 100%

15 20.000 17.777 -2.223

Dr.Akhtar Malik dated 14.12.12

MPA, PP-202

811 14-Dec-12 30.000 10.000 -10.000

20.000 20.000 07-Sep-12289

Page 418

Page 419: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10.000 -10.000

Mian Muhammad Aamir Ghani Marral dated 24.8.12

MPA, PP-203

1

Const. of Soling, Drain , Sullage Carrier,

Sewerage, Culvert and 02 Nos Bridges on

Nala Wali Muhammad UC-90, 91, 85 and

Chadhar PP-203 Multan.

14.000 12.491 -1.509 89%

2Const. of Soling, Drain Culvert at 3-Faiz PP-

203 Multan.2.500 2.434 -0.066 100%

3

Const. of Soling, Drain, Culvert and Bridge

on rana Minor at 10-Faiz UC-99, PP-203

Distt. Multan.

3.500 3.350 -0.150 100%

3 20.000 18.275 -1.725

Mian Muhammad Aamir Ghani Marral dated 14.12.12

MPA, PP-203

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Syed Ahmad Mujtaba Gillani dated 6.9.12

MPA, PP-206

1

Const of M/Road From Dera Hafiz Basheer

Ruck to Basti Fateh Muhammad& Umer Pur

Road from Pull Judge wala to Chah Hassan

wala Graveyard & From Kanhoo House to

Chah Matee-U-llah PP-206 Jalal Pur Peer

wala multan

7.615 7.208 -0.407 100%

2

Const. of Soling, From Basti Bait Wahi to

Basti GulNub & Sawa to Basti Khilji Wala

Bahadar Pur & Basti Sabra Ponta Road to

Basti Ghalwaan PP 206 Jalal Pur Peer Wala

Distt Multan

6.110 5.742 -0.368 100%

20.000 24-Aug-12287

20.000 06-Sep-12279

Page 419

Page 420: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Const. of Soling From Satluj Road to

Manzoor Nagar Moza & From Main Road to

Basti Qazi Aslam,& Laying Of Tuff Tile

StreeT Ameer Ahmad Khilji & Sheikh Ikram

Wali & Main Road To Chah Haji Muhammad

Wala Chah Raheem Wala PP-206 Jalal Pur

Peer Wala Distt Multan

6.275 4.636 -1.639 74%

3 20.000 17.586 -2.414

Syed Ahmad Mujtaba Gillani dated 14.12.12

MPA, PP-206

10.000 -10.000

811 14-Dec-12 30.000

10.000 -10.000

Mehr Abbas Zafar Hiraj dated 28.9.12

MPA, PP-213

1

Const. of Soling Chah Mehram wala to Bara

Kita Mouza Mola Pur District Khanewal PP-

213.

2.000 1.517 -0.483 76%

2

Const. of Soling/Drain Type-II Rasheeda

Road to Chah Bagh wala, Ch. Sikandar Ali

Tahir Bara Kita Nia, Master Wajid Ali, Chah

Mehram wala Mouza Mola Pur District

Khanewal PP-213.

2.000 0.955 -1.045 48%

3

Const. of M/Road Hijan Vahi Road to Khou

Sardar wala Mouza Hijan Vahi District

Khanewal PP-213.

3.000 1.375 -1.625 46%

4Const. of Soling/Drain Type-II Hijan Vahi

District Khanewal PP-213.1.000 0.845 -0.155 85%

20.000 06-Sep-12279

20.000 28-Sep-12452

Page 420

Page 421: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Const. of Soling/Drain Type-II Basti Khawar

Abad Mouza Nabi Pur District Khanewal PP-

213.

1.050 0.884 -0.166 84%

6

Const. of Soling/Drain Type-II Mouza

Balouchan UC Man Kot District Khanewal PP-

213.

1.000 0.885 -0.115 89%

7

Const. of Soling/Drain Type-II Basti Thul

Najeeb UC Salar Whain District Khanewal

PP-213.

1.000 0.892 -0.108 89%

8

Const. of Drain Type-II, Pucca Khal Chah

Machian wala Basti Ghazi Abad Mouza Man

Kot District Khanewal PP-213.

0.750 0.602 -0.148 80%

9

Const. of Soling & Drain Type-II, Basti Jala

Niach, Sheikh Zahoor Mouza Kokar Hatta

District Khanewal PP-213.

1.000 0.760 -0.240 76%

10

Const. of Soling & Drain Type-II, Tariq Abad,

Karmo wala, Mushtaq Abad Amba wala,

Chah Sumandri Khou, Pir wala, Qaim wala,

Kali wala, Dhoori wala, Tahli wala, Chah

Shamlat District Khanewal PP-213.

2.200 1.534 -0.666 70%

11

Const. of Soling & Drain Type-II, Shamlot

Riaz Abad, Khati Chore UC Mamdal District

Khanewal PP-213.

1.100 0.896 -0.204 81%

12

Const. of Soling Chah Sapalan wala Mouza

Mubarik Pur UC Nabi Pur District Khanewal

PP-213.

0.700 0.616 -0.084 88%

13

Const. of Pacca Khal and Drain Type-II Basti

Mamdal UC Mamdal District Khanewal PP-

213.

1.000 0.845 -0.155 85%

14

Const. of Soling & Drain Type-II Chah Mania

wala Mouza Ibrahim Pur District Khanewal

PP-213.

1.000 0.839 -0.161 84%

15

Const. of Pacca Khal Chah Muhammad

Shah wala Mouza Ameer Garh Chah Ari wala

Mouza Ibrahim Pur District Khanewal PP-

213.

1.200 1.015 -0.185 85%

15 20.000 14.460 -5.540

20.000 28-Sep-12452

Page 421

Page 422: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Muhammad Yar Hiraj dated 19.10.12

MPA, PP-215

1

Const. of soling, Sewerage Drain at Bismilla

Town Near Ghousia Petrol Pump Abdul

Hakeem District Khanewal PP-215

6.544 6.061 -0.483 93%

2

Const. of M/Road Dehalay wala Mouza

Ameer Garh Abdul Hakeem District

Khanewal PP-215

0.651 0.402 -0.249 62%

3

Const. of M/Road Cotton Factory Bagar

Road to Khou Sher wala Abdul Hakeem

District Khanewal PP-215

2.307 -2.307

4

Const. of Soling Jinnah Abadi Shahdat

Qandla to Middle School Shahdat Qandla UC

Ameed Garh Abdul Hakeem District

Khanewal PP-215

6.519 6.375 -0.144 98%

5

Const. of Soling Shahdat Qandla Road to

Bhaini Lashkar walai UC Ameed Garh Abdul

Hakeem District Khanewal PP-215

1.087 0.789 -0.298 73%

6

Const. of Soling Bagar Link Canal Pul Shadat

Qandla to Darbar Pir Ochi Shah Graveyard

UC Ameed Garh District Khanewal PP-2157.515 6.500 -1.015 86%

7

Const. of Soling from M/Road Shahdat

Qandla to Bhaini Wali Dad Qandla UC

Umeed Garh District Khanewal PP-215

0.990 0.700 -0.290 71%

8

Const. of Soling Makhdoom Pur Kabir wala

Road Bhatta Stop to Basti Dak wala Mouza

Noor Pur Kabirwala District Khanewal PP-

215

2.426 1.000 -1.426 41%

9

Const. of Soling Kabirwala Makhdoom Pur

Road Adda Noor Pur Colony Kabirwala

District Khanewal PP-215

0.744 0.698 -0.046 94%

10Const. of Soling Basti Sanpal Mouza Jahan

Pur District Khanewal PP-2151.242 0.759 -0.483 61%

11

Const. of Soling Dera Haji Jehangir Pahoor

Mouza Jahan Pur District Khanewal PP-215 0.546 0.464 -0.082 85%

50.000 19-Oct-12608

Page 422

Page 423: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Const. of Soling 3/9-R Mouza Sheikhan wala

to Graveyard District Khanewal PP-215 2.625 1.800 -0.825 69%

13

Const. of Soling Chah Ghamay wala Mouza

Makhdoom Pur District Khanewal PP-215 0.546 0.410 -0.136 75%

14

Const. of Soling Chah Ziyadat Khan wala

Mouza Makhdoom Pur District Khanewal PP-

215

0.552 0.507 -0.045 92%

15

Const. of Soling Chah Sufi Afzal Pahoor ASI

Mouza Muhammad Pur District Khanewal

PP-215

0.849 0.828 -0.021 100%

16Const. of M/Road Chaki wala to Ahmed wala

District Khanewal PP-2152.346 -2.346

17

Const. of Soling Bhaini Mehar Muhammad

Iqbal Hiraj 7-AH to Darbar Mosan Shah 8-V

Banovi District Khanewal PP-215

3.624 3.381 -0.243 93%

18Const. of Soling 8-V M/Road to BHQ Kot

Bahadar District Khanewal PP-2151.421 -1.421

19

Const. of M/Road Culvert Chaki Mahanay

wala Basti Jaffarabad Mouza Allah Hoo

District Khanewal PP-215

4.766 2.402 -2.364 50%

20Re-hablitation of M/Road 8-Vanoi to Qita

Pahooran of District Khanewal PP-2152.700 -2.700

20 50.000 33.076 -16.924

Abdul Razzaq Khan dated 6.9.12

Ex-MPA, PP-218

1Const. of soling, Drains, and Nala UC No.15

Khanewal.

2.000 1.912 -0.088 100%

2Const. of soling, Drains, and Nala UC No.16

Khanewal.

3.000 2.936 -0.064 100%

3Const. of soling, Drains, and Nala UC No.17

Khanewal.

5.000 4.790 -0.210 100%

50.000 19-Oct-12608

40.000 06-Sep-12246

Page 423

Page 424: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4Const. of soling, Drains, and Nala UC No.18

Khanewal.

2.000 1.923 -0.077 100%

5Const. of soling, Drains, and Nala UC No.19

Khanewal.

2.000 1.918 -0.082 100%

6Const. of soling / Re-soling Drains, and Nala

UC No.21 Khanewal.

3.000 2.890 -0.110 100%

7Const. of soling, Drains, and Nala UC No.22

Khanewal.

3.000 2.761 -0.239 100%

8Const. of soling / Re-soling/Boundry wall,

Drains, and Nala UC No.24 Khanewal.

4.000 3.246 -0.754 81%

9Const. of soling, Drains, and Nala UC No.88

Khanewal.

3.000 2.951 -0.049 100%

10Const. of soling, Drains, and Nala UC No.89

Khanewal.

3.000 2.840 -0.160 100%

11Const. of soling / Re-soling, Drains, and

Nala UC No.90 Khanewal.

3.500 2.366 -1.134 68%

12Const. of soling, Drains, and Nala UC No.91

Khanewal.

3.000 2.793 -0.207 100%

13Const. of soling / Re-soling, Drains,Nala &

Sewerage UC No.92 Khanewal.

3.500 3.274 -0.226 100%

13 40.000 36.600 -3.400

Ch.Fayyaz Ahmed Warraich dated 7.9.12

Ex-MPA, PP-232

1

Providing and Purification plant chak

No.249/EB District Vehari PP-232 PWP-II

2012-13.

2.500

1.212 -1.288 48%

2Const.of Soling chah Bakhu wala Jumlara

District Vehari PP-232 PWP-II 2012-13.

1.300 1.234 -0.066 100%

3Const.of Nallah At chak No.423/EB District

Vehari PP-232 PWP-II 2012-13.

1.800 1.687 -0.113 100%

4Const.of Soling,Drain chak No.285/EB

District Vehari PP-232 PWP-II 2012-13.

0.800 0.776 -0.024 100%

5Improvement of road chak No. 437/EB

District Vehari PP-232 PWP-II 2012-13.

2.200 2.027 -0.173 100%

40.000 06-Sep-12246

20.000 07-Sep-12286

Page 424

Page 425: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Providing and installation road lights chak

No.437/EB District Vehari PP-232 PWP-II

2012-13

3.800

3.686 -0.114 100%

7

Const.of Khall , Soling,Drain, chak

No.227/EB District Vehari PP-232 PWP-II

2012-13.

1.000

0.967 -0.033 100%

8

Const.of Soling,Drain, chak No.247/EB 5

Marla scheme District Vehari PP-232 PWP-II

2012-13.

1.000

0.922 -0.078 100%

9Const.of Soling,Drain, chak No.233/EB

District Vehari PP-232 PWP-II 2012-13.

1.000 0.812 -0.188 81%

10Const.of Soling,Drain, chak No.136/EB

District Vehari PP-232 PWP-II 2012-13.

1.000 0.776 -0.224 78%

11

Const.of Soling Basti Hambow wal chak

No.373/EB District Vehari PP-232 PWP-II

2012-13.

0.600

0.582 -0.018 100%

12Const.of Soling Drain chak No.124/EB

District Vehari PP-232 PWP-II 2012-13.

1.000 0.959 -0.041 100%

13Const.of Soling chak No.371/EB District

Vehari PP-232 PWP-II 2012-13.

1.000 0.950 -0.050 100%

14Const.of Soling Drain chak No.175/EB

District Vehari PP-232 PWP-II 2012-13.

1.000 0.950 -0.050 100%

14 20.000 17.540 -2.460

Ch.Fayyaz Ahmed Warraich dated 14.12.12

MPA, PP-232

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

20.000 07-Sep-12286

Page 425

Page 426: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Khalid Saleem dated 3.9.12

MPA, PP-233

1

Const.of Soling At Chak No 337/EB Tehsil

Burewala District Vehari PP-233 PWP-II

2012-13.

1.200 1.153 -0.047 100%

2

Const.of Soling /Drain and Tuff Tile,Nala &

Sewerage At Chak No 437/EB ,New K Block

&Bhutto Coloney Tehsil Burewala District

Vehari PP-233 PWP-II 2012-13.

2.000 1.940 -0.060 100%

3

Providing & Installation Of Pure Fication

Plant In Chak No 495/EB Tehsil Burewala

District Vehari PP-233 PWP-II 2011-12.

2.000 1.900 -0.100 100%

4

Const.of M/Road At Chak No 461/EB ,

Tehsil Burewala District Vehari PP-233 PWP-

II 2012-13.

1.000 0.970 -0.030 100%

5

Providing & Installation Of Pure Fication

Plant In Chak No 469/EB Tehsil Burewala

District Vehari PP-233 PWP-II 2011-12.

2.000 1.900 -0.100 100%

6

Const.of Soling and Drain At Chak No

257/EB Tehsil Burewala District Vehari PP-

233 PWP-II 2012-13.

0.500 0.484 -0.016 100%

7

Const.of Soling and Drain At Chak No

263/EB Tehsil Burewala District Vehari PP-

233 PWP-II 2012-13.

0.500 0.490 -0.010 100%

8

Const.of Soling / Drain &Nala At Chak

No,323/EB Tehsil Burewala District Vehari

PP-233 PWP-II 2012-13.

1.000 0.970 -0.030 100%

9

Const.of Soling and Drain At Chak No

253/EB Tehsil Burewala District Vehari PP-

233 PWP-II 2012-13.

1.000 0.977 -0.023 100%

10

Const.of Soling / Drain At Chak No 463/EB

Tehsil Burewala District Vehari PP-233 PWP-

II 2012-13.

1.000 0.970 -0.030 100%

11

Const.of Soling / Drain & Sewerage At Riaz

Abad Aziz Abad &Anwer Twon Tehsil

Burewala District Vehari PP-233 PWP-II

2012-13.

1.000 0.970 -0.030 100%

20.000 03-Sep-12204

Page 426

Page 427: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Const.of Soling /Drain &Sewerage Azeem

Abad &fazal Abad Tehsil Burewala District

Vehari PP-233 PWP-II 2012-13.

1.000 0.970 -0.030 100%

13

Const.of Tuff Tile At Shah Faiz Coloney

Tehsil Burewala District Vehari PP-233 PWP-

II 2012-13.

1.000 0.970 -0.030 100%

14

Const.of Seweragr Tuff Tile C,Block ,Tehsil

Burewala District Vehari PP-235 PWP-II

2012-13.

1.500 1.425 -0.075 100%

15

Const.of Soling and Pull At 5/L Canal Chak

No 445/EB ,Tehsil Burewala District Vehari

PP-233 PWP-II 2012-13.

0.500 0.481 -0.019 100%

16

Const.of M/Road At Iqbal Nagger Gali No 7

Tehsil Burewala District Vehari PP-233 PWP-

II 2012-13.

1.000 0.970 -0.030 100%

17

Const.of Sewerag,Soling,Drain And

Providing Water Pump For Filtretion Plant Lat

Bhattian Tehsil Burewala District Vehari PP-

233 PWP-II 2012-13.

1.800 1.746 -0.054 100%

17 20.000 19.286 -0.714

Sardar Khalid Saleem dated 14.12.12

MPA, PP-233

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Nawabzada Sheryar Ali Khan dated 10.8.12

MPA, PP-234

1Const.of Pull Khader Branch Uc Sharif abad

District Vehari PP-234 PWP-II 2011-12.

2.000 1.900 -0.100 100%

20.000 03-Sep-12204

20.000 10-Aug-1244

Page 427

Page 428: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2Const.of Nala Uc Ludden District Vehari

PP-234 PWP-II 2012-13.

1.000 0.972 -0.028 100%

3Const.of Soling At Sadiq abad uc-25

District Vehari PP-234 PWP-II 2012-13.

1.500 1.462 -0.038 100%

4

Const.of Soling at uc Sharifabad (Asif

Kashmery) District Vehari PP-234 PWP-II

2012-13.

1.000

0.970 -0.030 100%

5Const.of Pull Chah Batti wali District Vehari

PP-234 PWP-II 2012-13.

1.000 -1.000

6

Const.of Soling Mouza Mustafa abad Basti

Karam pur District Vehari PP-234 PWP-II

2012-13.

1.500

1.458 -0.042 100%

7

Const.of Soling uc Ghafoor wah and Mouza

Faiz wah District Vehari PP-234 PWP-II

2012-13.

1.000

0.969 -0.031 100%

8

Const.of Boundary wall of Qaberstan Mian

Hakim District Vehari PP-234 PWP-II 2012-

13.

1.000

0.970 -0.030 100%

9Const.of Soling Mouza Lakha District

Vehari PP-234 PWP-II 2012-13.

1.000 0.975 -0.025 100%

10Const.of Soling Mouza Dad Kamera District

Vehari PP-234 PWP-II 2012-13.

0.500 0.485 -0.015 100%

11Const.of Soling Mouza Gaffoor wah District

Vehari PP-234 PWP-II 2012-13.

1.000 0.970 -0.030 100%

12Const.of Pull Ghulam Qader District Vehari

PP-234 PWP-II 2012-13.

1.000 0.976 -0.024 100%

13Const.of Soling chak No.56/KB District

Vehari PP-234 PWP-II 2012-13.

0.500 0.485 -0.015 100%

14

Const.of Soling chak Bahno & Toot Hattem

Ali District Vehari PP-234 PWP-II 2012-13.

0.500

0.480 -0.020 100%

15Const.of Soling Basti Hashim Doultana

District Vehari PP-234 PWP-II 2012-13.

0.500 0.485 -0.015 100%

16Const.of Soling Haji Kareem Bakhsh District

Vehari PP-234 PWP-II 2012-13

1.000 0.970 -0.030 100%

17Const.of Soling Mouza Shajo deh District

Vehari PP-234 PWP-II 2012-13.

0.500 0.479 -0.021 100%

18Const.of Soling Mouza Jhadow District

Vehari PP-234 PWP-II 2012-13.

1.000 0.970 -0.030 100%

20.000 10-Aug-1244

Page 428

Page 429: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

19Const.of Soling chak No.62/KB District

Vehari PP-234 PWP-II 2012-13.

1.000 0.972 -0.028 100%

20Const.of Nala Abdul Ghulam Shah District

Vehari PP-234 PWP-II 2012-13.

1.500 1.455 -0.045 100%

20 20.000 18.403 -1.597

Nawabzada Sheryar Ali Khan dated 14.12.12

MPA, PP-234

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Malik Nosher Khan Langrial dated 7.9.12

MPA, PP-235

1

Const.of Soling and Drain At Chak No

545/EB Tehsil Burewala District Vehari PP-

235 PWP-II 2012-13.

1.000 0.970 -0.030 100%

2

Const.of Soling and B/Wall of graveyard At

Chak No 148/EB Tehsil Burewala District

Vehari PP-235 PWP-II 2012-13.

2.000 1.940 -0.060 100%

3

Const.of Soling and Drain At Chak No

188/EB Mian Pakhi Tehsil Burewala District

Vehari PP-235 PWP-II 2012-13.

1.000 0.970 -0.030 100%

4

Const.of Soling and Nala At Chak No

150/EB ,&144/EB Tehsil Burewala District

Vehari PP-235 PWP-II 2012-13.

1.000 0.973 -0.027 100%

5

Const.of M/Road At Chak No 180/EB

(23,Gujjran Wali) Tehsil Burewala District

Vehari PP-235 PWP-II 2012-13.

2.300 2.185 -0.115 100%

6

Const.of Soling At Chak No 168/EB,(Dera

Gujjran Wala) Tehsil Burewala District Vehari

PP-235 PWP-II 2012-13.

0.500 0.485 -0.015 100%

20.000 10-Aug-1244

20.000 07-Sep-12283

Page 429

Page 430: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Const.of Soling and Drain At Chak No

537/EB Tehsil Burewala District Vehari PP-

235 PWP-II 2012-13.

1.000 0.971 -0.029 100%

8

Const.of Soling / Drain &Sewerage At Chak

No,453/EB Tehsil Burewala District Vehari

PP-235 PWP-II 2012-13.

0.700 0.679 -0.021 100%

9

Const.of Soling At Chak No 35/WB

&27/WB Tehsil Burewala District Vehari PP-

235 PWP-II 2012-13.

1.000 0.970 -0.030 100%

10

Const.of Soling and Drain At Channu Moor,

Zaffer Colony & Akhter Tawon Tehsil

Burewala District Vehari PP-235 PWP-II

2012-

1.000 0.950 -0.050 100%

11

Const.of Soling and Drain At Chak

No,31/WB & 21/WB Tehsil Burewala District

Vehari PP-235 PWP-II 2012-13.

1.000 0.970 -0.030 100%

12

Const.of Soling Of Graveyard At Chak No

473/EB , 455/EB Tehsil Burewala District

Vehari PP-232 PWP-II 2012-13.

1.000 0.970 -0.030 100%

13

Const.of Soling At Chak No 509/EB Tehsil

Burewala District Vehari PP-235 PWP-II

2012-13.

0.700 0.682 -0.018 100%

14

Const.of Soling and Drain At Chak No

571/EB ,Tehsil Burewala District Vehari PP-

235 PWP-II 2012-13.

1.000 0.971 -0.029 100%

15

Const.of Soling / Drain and At Chak No

160/EB ,Tehsil Burewala District Vehari PP-

235 PWP-II 2012-13.

0.500 0.485 -0.015 100%

16

Const.of M/Road At Chak No 509/EB

Tehsil Burewala District Vehari PP-235 PWP-

II 2012-13.

2.300 2.185 -0.115 100%

17

Const.of M/Road At Chak No 23/WB Tehsil

Burewala District Vehari PP-235 PWP-II

2012-13.

2.000 1.900 -0.100 100%

17 20.000 19.256 -0.744

20.000 07-Sep-12283

Page 430

Page 431: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Malik Nosher Khan Langrial dated 14.12.12

MPA, PP-235

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Tariq Iqbal Ch. dated 21.1.13

MPA, PP-236

908 21-Jan-13 20.000 10.000 -10.000

10.000 -10.000

Sardar Muhammad Khan Khachi dated 7.9.12

MPA, PP-239

1

Const.of Soling/Drains At Basti Sultan Mouza

adda arey wahen Mailsi Distt Vehari PP-239

PWP-II, 2012-13

2.016 2.000 -0.016 99%

2

Const.of Sewerage Mohallaha Hafiz abad

Mailisi city Distt Vehari PP-239 PWP-II, 2012-

13

1.350 -1.350

3

Const.of Soling At Chah booty wala mouza

Bahader Balooch Mailsi Distt Vehari PP-239

PWP-II, 2012-13

0.640 0.512 -0.128 80%

4

Const.of Soling At Chah Naway wala mouza

Shaman Mailsi Distt Vehari PP-239 PWP-II,

2012-13

0.665 0.567 -0.098 85%

5

Const.of Soling Basri mehrook to mouza

khan pur Mailsi Distt Vehari PP-239 PWP-II,

2012-13

2.000 1.960 -0.040 98%

20.000 07-Sep-12299

Page 431

Page 432: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Const.of Tuff Tile Tehsil Bazar Mailisi City

Mailsi Distt Vehari PP-239 PWP-II, 2012-13 1.175 0.945 -0.230 80%

7

Const.of Sewerage Basti Gareeb

AbadKehroor Mailisi Distt Vehari PP-239

PWP-II, 2012-13

1.000 0.821 -0.179 82%

8

Const.of Soling Basti Bakhan Wali Mouza

Jalla Jeem Distt Vehari PP-239 PWP-II, 2012-

13

1.030 0.849 -0.181 82%

9Const.of Soling Primery School Hassan Abad

Distt Vehari PP-239 PWP-II, 2012-130.520 0.050 -0.470 90%

10

Const.of Soling At Chah Bangal wala mouza

torbah Mailsi Distt Vehari PP-239 PWP-II,

2012-13

1.000 0.800 -0.200 80%

11Const.of Sewerage gulzar twon Mailisi Distt

Vehari PP-239 PWP-II, 2012-131.214 1.007 -0.207 83%

12

Const.of Soling At Gali haji sakhawat hussain

wali Mailsi Distt Vehari PP-239 PWP-II, 2012-

13

0.300 0.291 -0.009 97%

13

Const.of Tuff Tile Cercaler road Mailisi Gali

Mateen Khan Wali Distt Vehari PP-239 PWP-

II, 2012-13

0.540 0.378 -0.162 70%

14

Const.of Soling At Mouza Dhamaky Azafi

Abadi Mailsi Distt Vehari PP-239 PWP-II,

2012-13

1.550 1.283 -0.267 83%

15

Const.of M/road chah maroof wala toBahman

Wala mailisi Distt Vehari PP-239 PWP-II,

2012-13

1.700 1.084 -0.616 64%

16

Const.of M/road Mouza Dhoda to Link road

Mailsi Distt Vehari PP-239 PWP-II, 2012-13 3.300 1.777 -1.523 54%

16 20.000 14.324 -5.676

20.000 07-Sep-12299

Page 432

Page 433: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Khawaja Sheraz Mahmood dated 10.9.12

MNA, NA-171

1

Construction of P.C.C & Rehabilitation of

Metalled Road Basti Narri, Bughlani Tehsil

Tounsa Sharif District D.G.Khan NA-171.

1.800 1.760 -0.040 100%

2

Construction of Metalled Road Indus High

Way Road to Basti Rangrra along Distry No.

33 Tehsil Tounsa Sharif District D.G.Khan

NA-171.

14.990 14.643 -0.347 100%

3

Construction of Metalled Road Basti Mir Khar

Tehsil Tounsa Sharif District D.G.Khan NA-

171 (Phase-I).

5.000 4.850 -0.150 100%

4

Construction of Metalled Road Basti Mir Khar

and Basti Malana Tehsil Tounsa Sharif

District D.G.Khan NA-171 (Phase-II).

14.993 14.343 -0.650 100%

5

Rehabilitation / Construction of Metalled

Road Indus High Way Road to Diara-Din-

Panah Tehsil Tounsa Sharif District

D.G.Khan NA-171

14.363 13.915 -0.448 100%

6

Construction of Metalled Road Indus High

Way Road to Basti Bohar Tehsil Tounsa

Sharif District D.G.Khan NA-171.

4.000 3.919 -0.081 100%

7

Construction of Metalled Road Indus High

Way Road to Basti Sarri wah Tehsil Tounsa

Sharif District D.G.Khan NA-171.

4.000 3.890 -0.110 100%

8

Construction of Metalled Road Indus High

Way Road to Basti Manzoor Abad and

Darbar Norang Shah Bukhari Tehsil Tounsa

Sharif District D.G.Khan NA-171.

5.854 5.613 -0.241 100%

9

Construction of Metalled Road Bodo Road to

Basti Kukran via Al-Furqan Public School

Tehsil Tounsa Sharif District D.G.Khan NA-

171.

5.000 4.790 -0.210 100%

9 70.000 67.723 -2.277

CCD, Muzaffargarh

70.000 10-Sep-12333

Page 433

Page 434: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Jaffar Khan Leghari dated 17.10.12

MNA, NA-174

1

Construction of Metalled Road from pull

Dhora Hajana to Basti Tolay wala U/C Kotla

Mughlan District Rajan Pur NA-174.

4.626 4.454 -0.172 100%

2

Construction of Metalled Road from Nala

Palewah to Basti Ismail Ahmadani U/C Kot

Thair District Rajan Pur NA-174.

4.071 3.873 -0.198 100%

3

Construction and Rehabilitation of Metalled

Road from Rodh Kohei to Basti Ismile Khan

Dhandla U/C Tal Shumali District Rajan Pur

NA-174.

1.989 1.894 -0.095 100%

4

Rehabilitation of Metalled Road from Mir

Nagar to Basti Mukhtiyar Nawaz Khan Deena

U/C Burrary wala District Rajan Pur NA-174.2.450 2.338 -0.112 100%

5

Construction of Metalled Road from Harrand

Road to Dajal Canal via Dajal Hospital U/C

Dajal district Rrajan Pur NA-174.3.619 3.430 -0.189 100%

6

Construction of Metalled Road from Existing

Metalled Road to Basti Mithoo Khan

Bashmani U/C Rindan District Rajan Pur NA-

174.

4.010 3.930 -0.080 100%

7

Construction of Metalled Road from Jakhar

Chowk to Basti Shah Nawaz Jakhar U/C Kot

Tahir District Rajan Pur NA-174.

4.014 3.833 -0.181 100%

8

Construction of Metalled Road Narri Moor to

Pull Hasoo Kaloi to Dhandla Road U/C Tal

Shumali District Rajan Pur NA-174.

5.967 5.688 -0.279 100%

9

Rehablitation of Metalled Road from Nala

Salam to Boy High School & City Kotla

Mughlan District Rajan Pur NA-174.

3.752 3.571 -0.181 100%

10

Construction and Rehabilitation of Metalled

Road Choti Bye Pass District Rajan Pur NA-

174.

5.502 5.242 -0.260 100%

10 40.000 38.253 -1.747

40.000 17-Oct-12552

Page 434

Page 435: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Mian Mohsin Ali Qureshi dated 14.1.13

MNA, NA-176

880 14-Jan-13 25.000 1

Constriction of Tuff Paver Tibba Karbala,

Mohallah Ghamun Shah Basti Sindhi Mouza

Kotla Rang Pur & Kot Addu City Tehsil Kot

Addu District Muzaffargarh NA-176.

25.000 -25.000

1 25.000 -25.000

Jamshaid Ahmed Khan Dasti dated 30.8.12

MNA, NA-178

1

Construction of Soling Saifullah Sial Thathan

Sialan Tehsil & District Muzaffargarh NA-178. 0.500 0.475 -0.025 100%

2

Construction of Metalled Road Ali pur Road

Near Abdatian Acadmy to Jaway wala and

Darbar Hamid Sultan Tehsil & District

Muzaffargarh NA-178.

6.500 6.326 -0.174 100%

3

Construction of Metalled Road Res: Imran

Dhatotar to Basti Channar Hafiz Khair

Muhammad Tehsil & District Muzaffargarh

NA-178.

4.000 3.888 -0.112 100%

4

Construction of Metalled Road Ahmad

Mohana Shah Jamal to Jamia masjid Tehsil

& District Muzaffargarh NA-178.

2.000 1.939 -0.061 100%

5

Construction of Tuff Paver & Drain Street

mukhtiar Qalandarani Tibba Kareem abad

Tehsil & District Muzaffargarh NA-178.

1.000 0.950 -0.050 100%

6

Construction of Tuff Paver & Drain Mohallah

Chah Mithu wala Tehsil & District

Muzaffargarh NA-178.

0.500 0.490 -0.010 100%

7

Construction of Tuff Paver & Drain Mohallah

Chah Mattay wala U/C No.35 Tehsil & District

Muzaffargarh NA-178.

0.500 0.477 -0.023 100%

52.000 30-Aug-12136Page 435

Page 436: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Construction of Tuff Paver & Drain Mohallah

Bukhari wala Tehsil & District Muzaffargarh

NA-178.

1.700 1.618 -0.082 100%

9

Construction of Tuff Paver & Drain street

Mahar Ayoub Mahar Pur Tehsil & District

Muzaffargarh NA-178.

0.500 0.488 -0.012 100%

10

Construction of Tuff Paver & Drain Mohallah

Hafizabad Jamia Rahseedia Shah Jamal

Tehsil & District Muzaffargarh NA-178.

2.500 2.335 -0.165 100%

11

Construction of Tuff Paver B/Wall Rataining

Wall & Drain Shahbaz Dasti Dasti wala

inamabad Mohallah Tibbi Hussain abad

majeed Kakar Mohallah Din Pur tibbi Nonari

Janaja Gah Tehsil & District Muzaffargarh NA-

178.

4.463 4.267 -0.196 100%

12

Construction of Metalled Road Muhammad

Aslam Bhutta U/C Manka Bhutta District

Muzaffargarh NA-178.

9.837 9.691 -0.146 100%

13

Construction of Metalled Road Khajan Darya

to Basti Chenner U/C Shah Jamal NA-178

District Muzaffargarh NA-178.

8.000 7.866 -0.134 100%

14

Construction of Building block for Eye ward at

District Headqutter Hospital Muzaffargarh NA-

178 (with installation of Water pump at

Bodo).

10.000 9.800 -0.200 100%

14 52.000 50.610 -1.390

Jamshaid Ahmed Khan Dasti dated 10.9.12

MNA, NA-178

1

Construction of Metalled Road at Pull Bhandi

to Basti Bhandi District Muzaffargarh NA-178. 4.500 4.401 -0.099 100%

2

Construction of Metalled Road at Basti

Daramri Murad Abad District Muzaffargarh

NA-178.

4.500 4.293 -0.207 100%

52.000 30-Aug-12136

50.000 10-Sep-12341

Page 436

Page 437: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of Metalled Road at Basti Qazi

Muhi-ud-Din District Muzaffargarh NA-178. 3.500 3.248 -0.252 100%

4

Construction of Metalled Road at Dowlat Pur

U/C Nohan wala District Muzaffargarh NA-

178.

2.250 2.182 -0.068 100%

5

Construction of Metalled Road at Basti Nazir

Shah U/C Danni to Basti Allah Dewaya

District Muzaffargarh NA-178.

4.500 4.014 -0.486 100%

6

Construction of Metalled Road at Kalan Shah

U/C Usman Koria District Muzaffargarh NA-

178.

5.000 4.943 -0.057 100%

7

Construction of Metalled Road at Liyaqat

Abad Hospital District Muzaffargarh NA-178. 3.500 3.231 -0.269 100%

8Construction of Metalled Road at Waloot,

Shah Kamal District Muzaffargarh NA-178.3.500 3.325 -0.175 100%

9

Construction of Metalled Road at Basti

Shabir Shah U/C Usman Koria District

Muzaffargarh NA-178.

3.500 3.392 -0.108 100%

10

Construction of Metalled Road at Basti Jam

Younis Near Tarrari Canal District

Muzaffargarh NA-178.

4.500 4.224 -0.276 100%

11

Construction of Metalled Road at Basti Molvi

wala U/C Tarrari District Muzaffargarh NA-

178.

2.250 2.105 -0.145 100%

12

Construction of Metalled Road at Basti

Mashori to Chah Bakhoo wala Iqbal Gurmani

and 2 Nos Slab at Nang wah Near Jamal

Shah District Muzaffargarh NA-178.

3.000 2.910 -0.090 100%

13

Construction of Metalled Road at Rakba Noor

Khan, Rasheed Khan Ex-Councilor District

Muzaffargarh NA-178.

3.500 3.225 -0.275 100%

14

Construction of Metalled Road in front of

Kamran Floor mill to House Sheikh Naveed

Talari District Muzaffargarh NA-178.

2.000 1.923 -0.077 100%

14 50.000 47.416 -2.584

50.000 10-Sep-12341

Page 437

Page 438: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Jamshaid Ahmed Khan Dasti dated 18.9.12

MNA, NA-178

207 18-Sep-12 10.000 1Construction of Press Club Building at

Muzaffargarh.10.000 9.750 -0.250

1 10.000 9.750 -0.250

Sardar Abdul Qayyum Khan dated 30.8.12

MNA, NA-180

1

Construction of PCC and Drain Mir Wala C/O

Haji Rasool Bux Jatoi District Muzaffargarh

NA-180.

1.520 1.444 -0.076 100%

2

Construction of Metalled Road Malana

Chowk to Basti Haseeb Abad and Basti Haji

Muhammad Hussain Mouza Yaki Wali C/O

Amjad Hijbani District Muzaffargarh NA-180.

4.585 4.338 -0.247 100%

3

Construction of Metalled Road Sial Chowk to

Fateh Pur Janoobi C/O Haji Zulfiqar Walwat

District Muzaffargarh NA-180.

4.585 4.528 -0.057 100%

4

Construction of PCC and Drain Mouza Dani

C/O Mazhar Shah District Muzaffargarh NA-

180.

1.520 1.385 -0.135 100%

5

Construction of Bridge, PCC and Drain

Mouza Basti Arif C/O Nasrullah Gopang

District Muzaffargarh NA-180.

3.264 3.120 -0.144 100%

6

Construction of Metalled Road Basti Daisi to

Khair Pur Saadat C/O Hafiz Allah Wasaya

Daisi District Muzaffargarh NA-180.6.596 6.319 -0.277 100%

7

Construction of Metalled Road Basti Naiko

Kara C/O Zafar District Muzaffargarh NA-

180.

4.585 4.213 -0.372 100%

8

Construction of Metalled Road and Culvert

Basti Barmani Mouza Vidad and Shahbaz

Pur C/O Constable Bashir District

Muzaffargarh NA-180.

1.465 0.301 -1.164 100%

9Construction of Metalled Road Dera Mian

Iqbal Dah District Muzaffargarh NA-180.1.880 1.786 -0.094 100%

30.000 30-Aug-1270

Page 438

Page 439: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9 30.000 27.434 -2.566

Sardar Abdul Qayyum Khan dated 12.11.12

MNA, NA-180

1

Construction of Bridge on Jatoi Branch

Mouza Mir Wala C/O Haji Rasool Bux Jatoi

District Muzaffargarh NA-180.

4.194 4.038 -0.156 100%

2

Construction of Bridge on Muzaffargarh

Branch near Basti Fateh Pur Mouza Fateh

Pur C/O Haji Bahadur Hussain District

Muzaffargarh NA-180.

4.494 4.354 -0.140 100%

3Construction of Metalled Road Mouza Phulen

Sharif District Muzaffargarh NA-1801.312 1.275 -0.037 100%

4

Providing and Installation of Purification

Water Plant In Basti Walwat Mouza Fateh

Pur District Muzaffargarh NA-180.

2.500 2.471 -0.029 100%

5

Providing and Installation of Purification

Water Plant In Basti JumaWali Mouza Mithan

Wala District Muzaffargarh NA-180.

2.500 2.381 -0.119 100%

6

Providing and Installation of Purification

Water Plant In Basti Babran Mouza Nawan

Dera District Muzaffargarh NA-180.

2.500 2.384 -0.116 100%

7

Providing and Installation of Purification

Water Plant In Samal Jatoi Tehsil Jatoi

District Muzaffargarh NA-180.

2.500 2.180 -0.320 100%

7 20.000 19.083 -0.917

Sardar Bahadar Ahmed Khan dated 6.9.12

MNA, NA-181

1

Const: of Metalled Road Chak No. 243/TDA

to Shuhrat Wala and Dinpur District Layyah

NA-181.

8.000 7.775 -0.225 100%

2

Const: of Metalled Road Basti Balochan to

Husaini More, Basti Burana to Basti Malana,

Ada Bhai Wala to Mulan wala, Head Mochi

Road to Chak 329/TDA, District Layyah NA-

181.

12.000 11.708 -0.292 100%

20.000 12-Nov-12671

95.000 06-Sep-12240

Page 439

Page 440: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Const: of Metalled Road Wara Road to Basti

Wara Purana and Chak No. 84/TDA, District

Layyah NA-181.

4.000 3.847 -0.153 100%

4

Const: of Metalled Road Basti Sargani to

Basti Balochan, MM Road to Chak No.

299/TDA and Kanjan Wala to Nawan Kot

District Layyah NA-181.

7.500 7.132 -0.368 100%

5

Const: of Metalled Road Tail Indus Road to

Chak No. 113/TDA, Nawan Kot Road to

Bakhshi Satar Wala, Jand Wala to Gojar

wala and Chak No.87/TDA District Layyah

NA-181.

12.000 11.616 -0.384 100%

6

Const: of Metalled Road Chak No. 268-A/TD

to Basti Chishti and Basti Siwag to Basti

Sabhaya wala District Layyah NA-181.6.000 5.850 -0.150 100%

7Const: of Metalled Road MM Road to Chak

No. 107/ML District Layyah NA-181.5.000 4.788 -0.212 100%

8Const: of Bridge Nala Mouza Wadhay Wali

District Layyah NA-181.5.000 4.750 -0.250 100%

9Const: of Metalled Road Chak No. 250/TDA

District Layyah NA-181.1.000 0.961 -0.039 100%

10Const: of Metalled Road Chak No. 224/TDA

District Layyah NA-181.0.500 0.475 -0.025 100%

11

Const: of PCC, Tuff Pavers & Drain Mouza

Aoulakh Nashaib Chak No. 116/TDA, U/C

Shahpur, Mouza Sanjh Isra, Mouza Khokhar

Isra Nashaib, Mouza Khokhar Isra Beroon,

Chak No. 115-A/TDA U/C Sahu wala, Mouza

Laskani Wala, Mouza Baseera, Mouza

Sheinh wala U/C Baseera and Mouza

Marhanwali, Mouza Rang Shah, Tibbi Khurd,

Tibbi Kalan, 79-A/TDA, U/C Samtia, 96/ML,

95/ML, 80-B/TDA, U/C 90/ML, 219/TDA,

93/ML, 234/TDA, 222/TDA, U/C Shoukat

Abad9 District Layyah NA-181.(u/c haitu

Thesil kallur kot Bhakkar).

12.000 11.566 -0.434 100%

95.000 06-Sep-12240

Page 440

Page 441: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Const: of PCC, Tuff Pavers & Drain Mouza

Daphi, Mouza Wara Sehran, Mouza

Mongarh, Mouza Wadhay Wali, Mouza

Mosan Shah, Mouza Dinpur, U/C Wara

Sehran, Mouza Karor Nashaib, Chak No.

84/TDA, U/C Karor Thaljandi, Chak No. 99-

A/TDA, Chak No. 105/TDA, U/C Garay wala

District Layyah NA-181.

7.000 6.844 -0.156 100%

13

Const: of PCC, Tuff Pavers & Drain Karor

City, Fatehpur City, 109/ML, 96/TDA and

Chak No. 241/TDA, 107/ML, 247/TDA, U/C

Fatehpur Rural, 297/TDA, 294/TDA, U/C

Noshehra Thal Kalan, 306/TDA, 314/TDA,

U/C Aoulakh Thal Kalan District Layyah NA-

181.

10.000 9.799 -0.201 100%

14

Const: of PCC, Tuff Pavers & Drain & Bridge

Chak No. 379/TDA, U/C Rafiq Abad,

331/TDA, 330/TDA, U/C Jamal Chapri, U/C

Choubara City District Layyah NA-181.

5.000 4.859 -0.141 100%

14 95.000 91.970 -3.030

Sardar Muhammad Yousaf Khan Laghari dated 23.11.12

PP 224

1

Construction of Metalled Road from Kot

Chutta Drahma Road to Basti Shad Wala via

Basti Khosa Saujani Basti Dhater Wala

District D.G.Khan NA-173.

10.582 10.061 -0.521 100%

2

Construction of Metalled Road from Kapper

Shah Wala to Basti Bashmani Wala U/C

Mamoori District D.G.Khan NA-173.

5.426 5.263 -0.163 100%

3

Construction of Metalled Road from Kot

Chutta Jhoke Road to Basti Kanhoo Wala

District D.G.Khan NA-173.

5.612 5.345 -0.267 100%

95.000 06-Sep-12240

110.000 23-Nov-12760

Page 441

Page 442: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of Metalled Road from Ghous

Abad - Jhoke Uttra Road Basti Jamal Sikhani

U/C Jhoke Uttra District D.G.Khan NA-173.9.539 9.243 -0.296 100%

5

Construction of Metalled Road from Indus

High Way Kakar Petroleum to Basti Noor

Muhammad Dhandla And Link to Basti Laddi

U/C Nalana District D.G.Khan NA-173.

8.052 7.850 -0.202 100%

6

Construction of Metalled Road from N-55 to

House Muhammad Khan Luind, Shahdan

Lund District D.G.Khan NA-173.

4.866 4.609 -0.257 100%

7

Construction of Metalled Road from Bagar

Wala to Basti Hussain Shah Wala U/C Ramin

District D.G.Khan NA-173.

4.993 4.765 -0.228 100%

8

Construction of Metalled Road from Kocha

Kokari Road to Basti Sanjrani U/C Ramin

District D.G.Khan NA-173.

4.933 4.785 -0.148 100%

9

Construction of Metalled Road from Lal

Chowk to Basti Jalal U/C Gaddai District

D.G.Khan NA-173.

5.890 4.820 -1.070 100%

10

Construction of Metalled Road from Basti Tibi

Lashari to Chah Nehal Wala Via Chah Darry

Wala, Mulan Wala And Jaind Wala U/C

Mamoori District D.G.Khan NA-173.

9.000 8.650 -0.350 100%

11

Construction of Metalled Road from Kot

Chutta Jhoke Road to Basti Dodiani District

D.G.Khan NA-173.

11.039 10.416 -0.623 100%

12

Construction of Metalled Road from Jakhar

Imam Shah to Basti Khojay Wala District

D.G.Khan NA-173.

8.651 8.475 -0.176 100%

13

Construction of Metalled Road from Ghaous

Abad - Aali Wala Road to Ghaous Abad -

Jhoke Road U/C Ghaous Abad District

D.G.Khan NA-173.

6.015 5.835 -0.180 100%

14

Construction of Metalled Road from N-55

Kala to Basti Arrain U/C Kala District

D.G.Khan NA-173.

2.216 2.058 -0.158 100%

110.000 23-Nov-12760

Page 442

Page 443: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Construction of Metalled Road from Hydar

Wala Regulator to Basti Ghulam Abbas

Khoja U/C Haji Ghazi Gharbi District

D.G.Khan NA-173.

4.599 4.415 -0.184 100%

16

Construction of Metalled Road from

D.G.Khan Jampur Road to Basti Badoi

District D.G.Khan NA-173.

3.388 3.116 -0.272 100%

17

Construction of Metalled Road from Wani

Wala to Basti Mian Umar along Baja Minor

U/C Pir Addal District D.G.Khan NA-173.

5.199 5.001 -0.198 100%

17 110.000 104.707 -5.293

Sardar Muhammad Khan Leghari dated 12.11.12

MPA, PP-245

1

Construction of Metalled Road from Maseet

wala Badroo to Basti Thamber U/C

Darkhwast Jamal Khan District D.G.Khan PP-

245.

6.000 5.810 -0.190 100%

2

Construction of Culverts at Khatto Near Basti

Jaffar ahmdani, U/C Darkhwast Jamal Khan

District D.G.Khan PP-245.

1.500 1.419 -0.081 100%

3

Construction of Drain / Soling / Culverts in

U/C Darkhwast Jamal Khan District

D.G.Khan PP-245.

2.500 2.425 -0.075 100%

4

Construction of Drain / Soling / Culverts and

lying of pipe line with GST Area of U/C

Mutafariq Chohan District D.G.Khan PP-245.10.000 9.788 -0.212 100%

5

Construction of Drain / Soling / Concrete

Flooring / Culverts Tuff Tiles and Culverts in

U/C Choti Zarien District D.G.Khan PP-245.6.000 5.833 -0.167 100%

6

Construction of Drain / Soling / Culverts in the

areas of U/C Basti Fouja District D.G.Khan

PP-245.

6.000 5.854 -0.146 100%

714

110.000 23-Nov-12760

50.000 12-Nov-12

Page 443

Page 444: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Construction of Drain / Soling / Culverts in the

areas of U/C Nawan District D.G.Khan PP-

245.

6.000 5.846 -0.154 100%

8

Construction of Drain / Soling / Concrete

Flooring / Tuff tiles and culverts at U/C Sakhi

Sarwar District D.G.Khan PP-245.

6.000 5.841 -0.159 100%

9

Construction of Drain / Soling / Culverts and

laying of water supply pipe lines in U/C Choti

Bala District D.G.Khan PP-245.

6.000 5.852 -0.148 100%

9 50.000 48.668 -1.332

Sardar Akhtar Gorchani dated 6.9.12

MPA, PP-248

1Construction of Drain Soling and Culverts

U/C Fazal Pur District Rajan Pur PP-248.3.000 2.850 -0.150 100%

2Construction of Drain Soling and Culverts

U/C Haji Pur District Rajan Pur PP-248.3.000 2.842 -0.158 100%

3Construction of Drain Soling and Culverts

U/C Noshera District Rajan Pur PP-248.3.000 2.857 -0.143 100%

4Construction of Drain Soling and Culverts

U/C Harrand District Rajan Pur PP-248.2.000 1.905 -0.095 100%

5

Construction of Drain Soling and Culverts

U/C Wah Lashari District Rajan Pur PP-248. 2.000 1.900 -0.100 100%

6

Construction of Drain Soling and Culverts

U/C Kotla Mughlan District Rajan Pur PP-

248.

2.000 1.905 -0.095 100%

7

Construction of Drain Soling and Culverts

U/C Muhammad Pur District Rajan Pur PP-

248.

2.000 1.905 -0.095 100%

8Construction of Drain Soling and Culverts

U/C Bukhara District Rajan Pur PP-248.2.000 1.900 -0.100 100%

9Construction of Drain Soling and Culverts

U/C Dajal District Rajan Pur PP-248.2.000 1.905 -0.095 100%

714 50.000 12-Nov-12

40.000 06-Sep-12209

Page 444

Page 445: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10Construction of Drain Soling and Culverts

U/C Noor Pur District Rajan Pur PP-248.1.000 0.950 -0.050 100%

11Construction of Drain Soling and Culverts

U/C Tal Shumali District Rajan Pur PP-248.1.000 0.950 -0.050 100%

12

Construction of Drain Soling and Culverts

U/C Burrady Wala Tal Shumali District Rajan

Pur PP-248.

1.000 0.950 -0.050 100%

13

Construction of Metalled Road from Burrday

Wala Road to Basti Unher District Rajan Pur

PP-248.

4.000 3.838 -0.162 100%

14

Construction of Metalled Road from Adda

Qasab to Basti Fida Hussain Khosa District

Rajan Pur PP-248.

4.000 3.837 -0.163 100%

15Rehabilitation of Metalled Road Haji Pur City

and Bye Pass District Rajan Pur PP-248.4.000 3.833 -0.167 100%

16

Construction of Metalled Road from Basti

Jam Hazara to Flood Bund Basti Noor Wala

U/C Muhammad Pur District Rajan Pur PP-

248.

4.000 3.823 -0.177 100%

16 40.000 38.150 -1.850

Engr.Malik Bilal Ahmed Khan dated 14.12.12

MPA, PP-252

1

Construction of Metalled Road Malik Ramzan

Angra Bait Sohani District Muzaffargarh PP-

252.

3.400 3.324 -0.076 100%

2

Construction of Metalled Road from Jinko

Road to Aman Chowk District Muzaffargarh

PP-252.

4.800 4.738 -0.062 100%

3Construction of Metalled Road Yara Shaheed

District Muzaffargarh PP-252.1.500 1.450 -0.050 100%

4Construction of Bridge Slab on Nala Sardar

District Muzaffargarh PP-252.0.300 0.286 -0.014 100%

4 10.000 9.798 -0.202

40.000 06-Sep-12209

30.000 14-Dec-12811

Page 445

Page 446: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Mehr Irshad Ahmed Khan Sial dated 13.9.12

MPA, PP-254

391 13-Sep-12 20.000 1

Construction of Metalled Road at Pull Server

wala, U/C Rang Pur,Metalled Road Lal Pur

Chowk to Jam Hafiz Ghulam Qadir, U/C

Taleeri, D.G.Khan Road to Hayat Nagar U/C

No.34 Tuff Paver at Mohallah Khurshid Abad,

Chah Billo wala, Mohallah Nawab Town Basti

Mukhtar Hans, Basti Gujja U/C Taleeri, Basti

Choonain, Basti Malik Mashoor chah Qasai

wala, U/C Bhutta Pur with including

compoined all at Janaza Gah U/C Khan Pur

Baga Sher, PP-254 District Muzaffargarh.

20.000 19.599 -0.401 100%

1 20.000 19.599 -0.401

Mehr Irshad Ahmed Khan Sial dated 14.12.12

MPA, PP-254

1

Construction of Tuff Paver and Drain U/C

Rang Pur Chak Farazi, Murababad Bhutta

Pur and Muzaffargarh City PP-254 District

Muzaffargarh.

3.800 -3.800

2

Rehabilitation of Metalled Road near

Muzaffargarh City PP-254 District

Muzaffargarh.

1.900 1.650 -0.250 92%

3Construction of Nala in PP-254 District

Muzaffargarh. 1.800 1.705 -0.095 100%

4

Construction of Brick soling and Drain U/C

Rang Pur, Murrad Abad, Butta Pur, Chak

Farazi, Taleeri, Lutkaran, Muzaffargarh city

PP-254 District Muzaffargarh.

2.500 2.425 -0.075 100%

4 10.000 5.780 -4.220

30.000 14-Dec-12811

Page 446

Page 447: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Shahzad Rasool Khan dated 10.9.12

MPA, PP-260

1

Construction of Metalled Road Basti Darkhan

to Basti Moray Wala Qabrasran Mouza

phullan C/O Qasim Mirani District

Muzaffargarh PP-260.

4.829 4.659 -0.170 100%

2

Construction of Metalled Road Azmat Pur to

Head Punj Nand Road District Muzaffargarh

PP-260.(village Haitu Teh k.Kot Bhakkar)10.969 10.719 -0.250 100%

3

Construction of Metalled Road Basti Bakhan

Shah Colony and Basti Makwal District

Muzaffargarh PP-260.

4.202 3.969 -0.233 100%

3 20.000 19.347 -0.653

Sardar Shahzad Rasool Khan dated 14.12.12

MPA, PP-260

811 14-Dec-12 30.000 1

Construction of Metalled Road from Azmat

Pur road to Basti Ramzan Khan Gopang,

Fateh Pur to Basti Choorr Wala, Bridge

Mochi Wala to Jinah Colony and Basti

Kamrate Mouza Jhugi Wala District

Muzaffargarh PP-260. (village Haitu Teh

k.Kot Bhakkar)

10.000 9.754 -0.246 100%

1 10.000 9.754 -0.246

Sardar Amir Talal Gopang dated 10.10.12

MPA, PP-261

1

Construction of Bridge from Madni Chowk to

Dera Ch: Mehboob Ahmad Barnala Qadra

Minor District Muzaffargarh PP-261.

1.245 1.208 -0.037 100%

2

Construction of Soling from Metalled Bin

Mullan Wali to Basti Afzal Khan Gopang

District Muzaffargarh PP-261.

1.842 1.771 -0.071 100%

20.000 10-Sep-12337

50.000 10-Oct-12532

Page 447

Page 448: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of Metalled Road and Bridge

from Girry Road to Basti Boharr and Basti

Unarr District Muzaffargarh PP-261.

11.241 11.011 -0.230 100%

4

Construction of Soling from Ali Pur Bye Pass

Road to Basti Doctor Nazir Ahmad Chandia,

Seet Pur Road to Ali Town District

Muzaffargarh PP-261.

1.319 1.280 -0.039 100%

5

Construction of Metalled Road from Gulshan

Rasool Road to Graveyard and Basti

Lashkari Wala District Muzaffargarh PP-261.

4.948 4.723 -0.225 100%

6

Construction of Metalled Road and Bridge

from Basti Dullay Wala to Basti Hote Wala

District Muzaffargarh PP-261.

7.643 7.394 -0.249 100%

7

Construction of Soling and Drain in Khan

Garh Doma Tehsil Ali Pur District

Muzaffargarh PP-261.

4.545 4.408 -0.137 100%

8

Construction of Metalled Road from Latti

Road to Basti Kabootri C/O Ch: Qurban Ali

District Muzaffargarh PP-261.

5.281 5.132 -0.149 100%

9

Construction of Metalled Road from Fateh

Pur Road to Mir Wala and Basti Ghalwan

District Muzaffargarh PP-261.

5.281 5.130 -0.151 100%

10

Construction of Metalled Road from Lati

Road to Basti Abdul Aziz Jatoi District

Muzaffargarh PP-261.

6.655 6.422 -0.233 100%

10 50.000 48.479 -1.521

Ch.Altaf Hussain dated 10.10.12

PP-262

513 10-Oct-12 40.000 1

Construction of PCC, Tuff Paver, Drain and

Culverts U/C Fateh Pur City, U/C Samtia, U/C

Garray Wala U/C Karor City, U/C Thall Jandi,

U/C 98/ML, U/C Shaukat Abad U/C Warra

Sehran U/C Fateh Pur Rawal U/C 306

Metalled Road MM Road to Basti Wahlah

and Metalled Road MM Road to Basti

Mukhtar Arrain District Layyah PP-262.

20.000 19.449 -0.551 100%

1 20.000 19.449 -0.551

50.000 10-Oct-12532

Page 448

Page 449: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Abbas Bhatti dated 10.9.12

MPA, PP-263

291 10-Sep-12 20.000 1

Const: of Metalled Road, Tuff Paver, PCC,

Bridge and Drain Chak No.110/TDA, Chak

No.256/TDA, Basti Multani, Dera Rafique

Khan, Tibbi Pathan Wala, Warra Sehrra,

Basti Khangar, Dera Haji Manzoor, Dera Abid

Shah, Basti Dulloo, Dera Munir Bhatti, Basti

Dadoo Khan, Basti Joya, Basti Gurmani,

Dera Munna Driver, Dera Aslam, Madarsa

Rajan Shah, Basti Chheena, Basti Haji

Naseer, Basti Mahr Muhammad Yar Thind,

Basti Naza Gishkori, Basti Qureshi, Darbar

Hassan Sher, Basti Dhilloo, Basti Bada, Basti

Kumbharan, Basti Dana Baja, Basti

Muhammad Bukhash Bhatti, Chak No. 297,

Basti Muhammd Nazar Wains, Basti Ashiq

Wains, Basti Joota, Dera Jumma Khan, Basti

Siwag, Basti Bhumb Wala and Shah Pur

Doratta District Layyah PP-263.

20.000 19.209 -0.791

1 20.000 19.209 -0.791

Safdar Abbas Bhatti dated 14.12.12

MPA, PP-263

811 14-Dec-12 30.000 10.000 -10.000

10.000 -10.000

Page 449

Page 450: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Shahabudin Khan Sihar dated 17.10.12

Notable, PP-263

1

Construction of PCC, Tuff Paver, Drain and

Culverts U/C Shadu Khan and U/C Kotla Haji

Shah District Layyah.

5.386 5.128 -0.258 100%

2

Construction of PCC, Tuff Paver, Drain and

Culverts U/C Noshera, U/C Thal Kalan Shah

U/C Shah Pur, U/C Sahoo Wala District

Layyah.

7.307 7.087 -0.220 100%

3

Construction of PCC, Tuff Paver, Drain and

Culverts U/C Warra Sehrra U/C Thal Jandi

U/C Chowk Azam ,U/C Chowk Azam Rural

U/C Basira and U/C Garray Wala District

Layyah.

7.307 7.100 -0.207 100%

3 Total 20.000 19.315 -0.685

Sardar Ashiq Khan Gopang dated 12.9.12

Notable

1

Construction of Metalled Road from Middle

School Khan Pur Norranka to Dera Malik

Qasim District Muzaffargarh NA-180.

12.000 11.760 -0.240 100%

2

Construction of Metalled Road from Khan

Garh Doma Bye Pass Road to Sirki Road via

Tharoo Wali District Muzaffargarh NA-180.2.468 2.415 -0.053 100%

3

Flood Protection Bund on Right Bank of River

Indus from Metalled Road Basti Thaheem to

Basti Bosan Tehsil Ali Pur District

Muzaffargarh NA-180 (Phase-III).

8.983 8.800 -0.183 100%

4

Rehabilitation/Construction of Metalled Road

from Jatoi Road to Basti Naiko Kara Barna

Qadra Minor District Muzaffargarh NA-180.4.274 4.065 -0.209 100%

5Construction of Tuff Paver and Drain Village

Haitu U/C Haitu The Kalur Kot Bhakkar. 2.000 1.956 -0.044 100%

40.000 17-Oct-12551

80.000 12-Sep-12370

Page 450

Page 451: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of Boundary Wall of Graveyard

and Soling/Drain Basti Lodhra District

Muzaffargarh NA-180.

3.000 2.910 -0.090 100%

7

Rehabilitation/Construction of Metalled Road

from Urla Road to Basti Chowkidar District

Muzaffargarh NA-180.

4.467 4.265 -0.202 100%

8

Construction of Tuff Paver and Drain Basti

Saleem Rind, Imam Bargah and khair pur

District Muzaffargarh NA-180.

2.000 1.920 -0.080 100%

9

Construction of Metalled Road from Middle

School Hassan Wala to Metalled Road Lal

Barnal Khan Nala District Muzaffargarh NA-

180.

2.468 2.348 -0.120 100%

10

Construction of Tuff Paver and Drain Street

Abu Bakar Wali and Exchange Road to

House Ulfat Hussain Rind District

Muzaffargarh NA-180.

1.931 1.834 -0.097 100%

11

Construction of Tuff Paver and Soling from

Qadra Nala to Graveyard and Jatoi Road

House Allah Yar Gabole District Muzaffargarh

NA-180.

1.990 1.906 -0.084 100%

12

Construction of Tuff Paver and Drain Ali

Town Mohallah Kumbharan C/O Babar

Yaqoob District Muzaffargarh NA-180.

3.000 2.860 -0.140 100%

13

Flood Protection Bund on Right Bank of River

Indus from Metalled Road Basti Thaheem to

Basti Bosan Tehsil Ali Pur District

Muzaffargarh NA-180 (Phase-II).

31.419 30.790 -0.629 100%

13 80.000 77.829 -2.171

Niaz Ahmed Jhakar dated 4.10.12

Notable

1

Construction of Bridge over Rever Creek at

Nala Sandhal Mouza Gut wala District

Layyah NA-182

40.000 39.358 -0.642 100%

2Construction of Metalled Road at Sipper

Jakkar Pakka District Layyah NA-182.4.000 3.945 -0.055 100%

80.000 12-Sep-12370

81.000 04-Oct-12500

Page 451

Page 452: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of Metalled Road at Gudara

Chowk North-F Band Kotla Qazi Gut District

Layyah NA-182.

9.000 8.840 -0.160 100%

4

Construction of Metalled Road Chak No.

357/TDA to Basti Shah Wala District Layyah

NA-182.

4.500 4.258 -0.242 100%

5

Construction of Metalled Road Chak No.

426/TDA to Dhori Adda District Layyah NA-

182.

9.000 8.817 -0.183 100%

6Construction of Metalled Road Chak No. 122-

A/TDA District Layyah NA-182.4.500 4.308 -0.192 100%

7

Construction of Metalled Road Chak No.

153/TDA to Chak No. 155/TDA District

Layyah NA-182.

4.000 3.906 -0.094 100%

8Construction of Metalled Road at Bait Dewan

District Layyah NA-182.4.500 4.354 -0.146 100%

9

Construction of Metalled Road at Chak No.

153 Alif Street Advocate Naveed Gujjar

District Layyah NA-182

1.500 1.441 -0.059 100%

9 81.000 79.227 -1.773

Malik Mudassar Abbas Khar dated 1.11.12

Notable

679 01-Nov-12 5.500 1

Construction of Metalled Road from Sinwan

Thatha Gurmani Road to Basti Pepal Wala

Rahim Ali Shah Via Fateh Twon Sinawan in

District Muzaffargarh.

5.500 5.324 -0.176 100%

1 5.500 5.324 -0.176

81.000 04-Oct-12500

Page 452

Page 453: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Akhtar Gorchani dated 5.3.13

Notable

1Construction of Drain Soling and Culverts

U/C Noshera District Rajan Pur PP-248.1.500 1.444 -0.056 100%

2Construction of Drain Soling and Culverts

U/C Harrand District Rajan Pur PP-248.1.500 1.444 -0.056 100%

3

Construction of Drain Soling and Culverts

U/C Muhammad Pur District Rajan Pur PP-

248.

1.500 1.470 -0.030 100%

4Construction of Drain Soling and Culverts

U/C Bukhara District Rajan Pur PP-248.1.500 1.419 -0.081 100%

5Construction of Drain Soling and Culverts

U/C Noor Pur District Rajan Pur PP-248.1.500 1.456 -0.044 100%

6

Construction of Drain Soling and Culverts

U/C Burrady Wala / Allahabad District Rajan

Pur PP-248.

1.000 0.971 -0.029 100%

7

Construction of Bridge on Fazal Wah Minor

Basti Malik Mazhar Khokhar District Rajanpur

PP-248.

1.500 1.264 -0.236 100%

7 10.000 9.468 -0.532

Muhammad Saddique Khan dated 27.8.12

MNA, NA-154

1

Construction of M/Road from Lodhran

Khanewal Road to Basti Bhatti Wala, Basti

Thalli Wala & Sardary Wala Tehsil & District

Lodhran NA-154.

11.000 10.250 -0.750 95%

2

Construction of Soling Road Nazir Shah

Road to Basti Bahishti Wala Tehsil & District

Lodhran NA-154.

1.400 1.361 -0.039 100%

3

Construction of M/Road from Barati Road to

Pull Doran Wala Tehsil & District Lodhran NA-

154.

8.900 8.321 -0.579 90%

CCD, Bahawalpur

10.000 5/3//131015

100.000 27-Aug-12100

Page 453

Page 454: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction / Repair of M/Road from Pull

Bhattian to Basti Ghulama Wala Road Tehsil

& District Lodhran NA-154.

1.900 1.850 -0.050 100%

5

Construction of M/Road from Lodhran Haveli

Naseer Khan Road to Basti Mullon Wala to

Darbar Shan Sher Tehsil & District Lodhran

NA-154.

6.600 6.187 -0.413 90%

6

Construction of M/Road from Main Jalal Pur

Lodhran Road, Basti Maharan Wala

Dareshak Form Tehsil & District Lodhran NA-

154.

0.700 0.373 -0.327 70%

7

Construction of M/Road from Main Road

Gopal Canal to Pull Thalli Wala to Basti

Kotanrian Wala Tehsil & District Lodhran NA-

154.

8.800 3.231 -5.569 50%

8

Construction of M/Road from Haveli Naseer

Khan Road near Basti Kalian Wali to Basti

Hassan Wala Mouza Hussainabad Tehsil &

District Lodhran NA-154.

4.300 4.024 -0.276 90%

9

Construction of M/Road from Mohabbat Wala

to Basti Elaichi Wala Mouza Kamal Pur

Tehsil & District Lodhran NA-154.

5.900 5.734 -0.166 90%

10

Construction of M/Road from Basti Pand

Wala to Basti Arey Wala Mouza Kamal Pur

Jatial Tehsil & District Lodhran NA-154.

4.900 4.301 -0.599 90%

11

Construction of M/Road from Main Jalal Pur

Lodhran Road to Dareshak Form Tehsil &

District Lodhran NA-154.

1.900 1.029 -0.871 75%

12

Construction of M/Road from Lodhran Kehror

Pacca Road to Basti Danwaran Tehsil &

District Lodhran NA-154.

7.200 6.650 -0.550 85%

13

Construction of M/Road from Main Road,

Basti Konki Wala, Basti Lasorri Wala Mouza

Sandhi Wala Tehsil & District Lodhran NA-

154.

2.300 1.957 -0.343 95%

14

Construction of M/Road from Lodhran

Bypass via Basti Fareedabad to Bypass

Tehsil & District Lodhran NA-154.

4.100 3.729 -0.371 90%

100.000 27-Aug-12100

Page 454

Page 455: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Construction of M/Road from Jalal Pur Road,

Bhuteiji Morr to Basti Bhuteiji Tehsil & District

Lodhran NA-154.

8.900 7.472 -1.428 90%

16

Construction of Soling, Soling Road to High

School Kotha Utera Tehsil & District Lodhran

NA-154.

1.800 1.765 -0.035 100%

17

Construction of M/Road from Lodhran

Bahawalpur Road near Chak 100/M School

to Basti Khopian Wali Mouza Adam Wahin

Tehsil & District Lodhran NA-154.

4.000 3.578 -0.422 90%

18

Construction of M/Road from Super Chowk to

Basti Khanewal via Basti Kamrri Wala, Basti

Aqal Wala Tehsil & District Lodhran NA-154.5.000 4.039 -0.961 95%

19

Construction of Bridge Jalal Pur Canal Kot

Peer Saadat Tehsil & District Lodhran NA-

154.

1.500 1.422 -0.078 100%

20

Construction of M/Road from Purani Basti to

Tibbi Ghulvan via Bhutta Colony Tehsil &

District Lodhran NA-154.

8.900 5.380 -3.520 85%

20 100.000 82.653 -17.347

Muhammad Saddique Khan dated 27.8.12

MNA, NA-154

1Construction of Tuff Tile in Chak No. 97/M

Tehsil & District Lodhran NA-154.8.000 6.527 -1.473 60%

2Construction of Tuff Tile Adam Wahan Tehsil

& District Lodhran NA-154.5.000 3.523 -1.477 70%

3Construction of Tuff Tile Basti Younas Wala

Tehsil & District Lodhran NA-154.1.000 0.912 -0.088 100%

4

Construction of Tuff Tile in Basti Khanewala

Lodhran City Tehsil & District Lodhran NA-

154.

4.000 3.551 -0.449 65%

5

Construction of Tuff Tile in Basti Dhorey

Wala Mouza Kotla Ali Dasti Tehsil & District

Lodhran NA-154.

4.700 3.770 -0.930 75%

6Construction of Tuff Tile in Basti Rajapur

Tehsil & District Lodhran NA-154.5.000 4.165 -0.835 60%

100.000 27-Aug-12100

48.000 27-Aug-12101

Page 455

Page 456: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Construction of Sludge Carrier in Basti Thathi

Sameja Tehsil & District Lodhran NA-154. 3.800 2.069 -1.731 75%

8Construction of Tuff Tile in Basti Matnay Wali

Tehsil & District Lodhran NA-154.5.000 3.793 -1.207 60%

9

Construction of Tuff Tile in Basti Beeri Wala

Mouza Thaathi Sameja Tehsil & District

Lodhran NA-154.

1.000 0.858 -0.142 100%

10

Construction of Tuff Tile in Basti Mohabbat

Wala Mouza Kamalpur Jattial Tehsil &

District Lodhran NA-154.

1.000 0.955 -0.045 100%

11

Construction of Tuff Tile in Basti Shah Wala

Mouza Thathi Sameja Tehsil & District

Lodhran NA-154.

1.000 0.692 -0.308 60%

12Construction of Tuff Tile in Basti Lahorian

Tehsil & District Lodhran NA-154.5.000 2.522 -2.478 65%

13Construction of Tuff Tile in Basti Hayat Pur

Tehsil & District Lodhran NA-154.2.500 2.010 -0.490 65%

14Construction of Tuff Tile in Haveeli Naseer

Khan Tehsil & District Lodhran NA-154.1.000 0.935 -0.065 100%

14 48.000 36.282 -11.718

Muhammad Saddique Khan dated 11.9.12

MNA, NA-154

1

Construction of M/Road from Lodhran Jalal

Pur near Pull Sodal Wali to Pull Dal Wala,

Pull Bagh Wala & Misson Wala Tehsil &

District Lodhran NA-154

20.000 19.540 -0.460 100%

2

Construction of M/Road from Lodhran Jalal

Pur Road near Pathan Wala Pulli to Kondi

Road Tehsil & District Lodhran NA-154.

9.400 8.952 -0.448 100%

3

Construction of M/Road from Pull Sher Shah

via Murshed Wah to Deepay Wala Road

Tehsil & District Lodhran NA-154.

11.000 6.167 -4.833 75%

48.000 27-Aug-12101

100.000 11-Sep-12343

Page 456

Page 457: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of M/Road from Haveeli Naseer

Khan Road via Basti Nabora to Danwari

Wala Road Tehsil & District Lodhran NA-154.6.500 6.134 -0.366 100%

5

Construction of M/Road from Sukhera Chowk

to Basti Haji Zahoor Sukhera Tehsil & District

Lodhran NA-154.

4.800 4.178 -0.622 95%

6

Construction of M/Road from Thatti Sameja

to Kamal Pur Road with Pull Gopal Canal

Tehsil & District Lodhran NA-154.

14.500 13.499 -1.001 95%

7

Construction of Soling Road from Sikandri

Minor to Basti Kohlo Mouza Wahi Naich &

Pull of Minor Tehsil & District Lodhran NA-

154.

3.200 2.951 -0.249 100%

8

Construction of M/Road from Haveeli Nasir

Khan Road via Basti Mangha to Darbar

Qattal Shaheed Mouza Kot Lal Shah Tehsil &

District Lodhran NA-154.

2.100 1.279 -0.821 85%

9

Construction of M/Road at Basti Mistri Wala

Mouza Kot Lal Shah Tehsil & District Lodhran

NA-154.

1.200 1.065 -0.135 95%

10

Construction of M/Road from Gogran

Mandhali Road near Middle School Mandhali

via Ali Wala to Bhader Thaheem Road Tehsil

& District Lodhran NA-154.

8.100 7.882 -0.218 95%

11

Construction of Soling from Supper Road to

New Basti Qubool Wala Tehsil & District

Lodhran NA-154.

1.900 1.807 -0.093 100%

12

Construction of M/Road from Darbar Matnay

to Basti Matnay Wala via Gachi Wala Tehsil

& District Lodhran NA-154.

6.500 6.189 -0.311 95%

13

Construction of M/Road from Primary School

Chak No. 89/M to Basti Sawan Wala, Khoh

Ghulam Hussain Baloch Tehsil & District

Lodhran NA-154.

4.500 4.078 -0.422 95%

14

Construction of M/Road from Adda Phattan

Wala to Basti Lakhay Wala UC 49/M

(Remaining Portion) Tehsil & District Lodhran

NA-154.

5.400 5.214 -0.186 100%

100.000 11-Sep-12343

Page 457

Page 458: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Construction of Soling Khan Wah Chang

More to Basti Cha Nazir Ahmed Meo Chak

No. 94/M Tehsil & District Lodhran NA-154.

0.900 0.882 -0.018 100%

15 100.000 89.817 -10.183

Arif Aziz Sheikh dated 20.9.12

MNA, NA-183

1

Construction of M/Road Shah Muhammad

Maral Allah Bux Channar Karam Wah Dhadi

Tehsil Ahmed Pur East District Bahawal Pur

NA-183.

4.219 1.985 -2.234 70%

2

Construction of M/Road Existing M/Road to

Basti Maher Bashir Ahmed Sial Kot Khaleefa

Tehsil Ahmed Pur East District Bahawal Pur

NA-183.

4.514 2.616 -1.898 80%

3

Construction of M/Road from Kot Khaleefa

Road to Kulyar Road (Remaining Portion)

Tehsil Ahmed Pur East District Bahawal Pur

NA-183.

3.898 2.545 -1.353 85%

4

Construction of M/Road Bhalkay Wali Morri

to Basti Kulyar Tehsil Ahmed Pur East

District Bahawal Pur NA-183.

6.369 4.789 -1.580 90%

4 19.000 11.935 -7.065

Ms.Khadeja Amir Yar Waran dated 12.9.12

MNA, NA-184

1

Construction of M/Road Bahawal Wah to

Mahi Tibba More Tehsil & District Bahawal

Pur NA-184.

10.000 9.288 -0.712 95%

2

Construction of M/Road Basti Tibba More to

Abbasi More & Basti Akram Sandha to Nahar

Wali Tehsil & District Bahawal Pur NA-184.20.000 18.876 -1.124 95%

100.000 11-Sep-12343

19.000 20-Sep-12404

30.000 12-Sep-12387

Page 458

Page 459: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2 30.000 28.164 -1.836

Ms.Khadeja Amir Yar Waran dated 8.10.12

MNA, NA-184

489 08-Oct-12 50.000 1

Construction of M/Road, Soling & Bridge

Basti Miani, Basti Sandha, Basti Haji Iqbal,

Basti Jam Miraj, Kot Dadoo Ghallo, Kachi

Wah & Basti Mulvian Tehsil & District

Bahawalpur NA-184.

50.000 30.926 -19.074 75%

1 50.000 30.926 -19.074

Syed Ashgar Shah dated 17.1.13

Notable, NA-188

1

Repair of M/Road Adda Feder to Bonga

Balochan Tehsil Minchinabad District

Bahawal Nagar NA-188 Phase-I (Notable).

12.500 -12.500

2

Repair of M/Road Adda Feder to Bonga

Balochan Tehsil Minchinabad District

Bahawal Nagar NA-188 Phase-II (Notable).

12.500 -12.500

2 25.000 -25.000

Syed Mumtaz Alam Gillani dated 12.9.12

MNA, NA-189

1

Construction of Remaining Work of M/Road

Maharsharif Pump Chowk to Bhabra Wala

Khoh Tehsil Chishtian District Bahawal Nagar

NA-189.

5.000 4.791 -0.209 97%

2

Widening Improvement M/Road from Chak

Abdullah to Chak No. 28/G Tehsil Chishtian

District Bahawal Nagar NA-189.

20.000 19.560 -0.440 97%

50.000 17-Jan-13901

100.000 12-Sep-12369

Page 459

Page 460: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of M/Road Malikpura to Basti

Mehram Dhudi Tehsil & District Bahawal

Nagar NA-189.

5.000 4.635 -0.365 96%

4

Construction of M/Road Chak No. 6/G to

Chak No. 24/G Tehsil Chishtian District

Bahawal Nagar NA-189.

15.000 13.423 -1.577 97%

5

Construction of M/Road at Chak No. 5/G

Tehsil Chishtian District Bahawal Nagar NA-

189.

5.000 4.788 -0.212 96%

6

Construction of M/Road Chak No. 12/G to

Farid Kot Tehsil Chishtian District Bahawal

Nagar NA-189.

15.000 13.999 -1.001 97%

7Providing of Water Supply Pipe at Gulab Ali

Tehsil & District Bahawal Nagar NA-189.3.750 1.749 -2.001 85%

8

Construction of M/Road Chak No. 38/F to

Qaziwala Road Tehsil Chishtian District

Bahawal Nagar NA-189.

20.000 19.266 -0.734 96%

9

Construction of M/Road Pull Sirajwah Canal

to Bakhoo Shah Tehsil & District Bahawal

Nagar NA-189.

5.000 4.826 -0.174 97%

10Construction of Pakka Nala 310/HR Tehsil

Fort Abbas District Bahawal Nagar NA-189.3.750 0.729 -3.021 50%

11

Construction of M/Road Existing M/Road to

Darbar Masoom Shah Mouza Shadam Shah

UC Mahta Jhedo Tehsil Chishtian District

Bahawal Nagar NA-189.

2.500 2.084 -0.416 96%

11 100.000 89.850 -10.150

Ch.Abdul Ghafoor dated 1.10.12

MNA, NA-190

1Repair of M/Road College Road Chishtian

Distt Bahawal Nagar NA-190.6.570 6.364 -0.206 95%

2

Repair of M/Road Manghair Sharif To

Chishtian Chishtian Distt Bahawal Nagar NA-

190.

5.000 4.838 -0.162 95%

100.000 12-Sep-12369

50.000 01-Oct-12473

Page 460

Page 461: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3Construction of Tuff Tile at City Area

Chishtian District Bahawal Nagar NA-190.4.657 3.757 -0.900 95%

4

Construction of Tuff Tile Jamia Qasim Ul

Aloom Faqir Wali Tehsil Haroonabad District

Bahawal Nagar NA-190.

1.415 1.324 -0.091 100%

5

Construction of M/Road Chak No 34/3R Bare

Tehsil Haroonabad District Bahawal Nagar

NA-190.

0.832 0.779 -0.053 100%

6

Construction of M/Road Chak No 22/3R

Tehsil Haroonabad District Bahawal Nagar

NA-190.

4.793 4.379 -0.414 95%

7

Repair of M/Road Chak No 61/4R to 64/4R

Tehsil Haroonabad District Bahawal Nagar

NA-190.

5.000 4.407 -0.593 95%

8

Construction of M/Road Chak No 173/M

Tehsil Chishtian District Bahawal Nagar NA-

190.

3.827 3.631 -0.196 95%

9

Construction of Remaining Soling Chak No.

429/6-R Tehsil Haroonabad District Bahawal

Nagar NA-190.

1.361 1.308 -0.053 100%

10

Construction of Remaining Work of Mill

M/Road Chishtian City District Bahawal

Nagar NA-190.

6.717 6.165 -0.552 95%

11

Rehabilitation of Water Supply Scheme Chak

No. 142/6R Tehsil Haroonabad District

Bahawal Nagar NA-190.

9.472 8.474 -0.998 95%

12

Rehabilitation of Water Supply Scheme Chak

No. 127/M Chishtian District Bahawal Nagar

NA-190.

0.356 -0.356 100%

12 50.000 45.426 -4.574

Ch.Abdul Ghafoor dated 7.12.12

MNA, NA-190

1Maintenance of M/Road Chishtian City

District Bahawal Nagar NA-190.2.228 2.159 -0.069 95%

50.000 01-Oct-12473

50.000 07-Dec-12792

Page 461

Page 462: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction / Maintenance of M/Road Azafi

Basti 171/M Tehsil Chishtian District Bahawal

Nagar NA-190.

1.800 1.746 -0.054 95%

3 Construction of M/Road 33/3R Tehsil

Haroonabad District Bahawal Nagar NA-190.

3.600 3.490 -0.110 96%

4

Construction of Approach Road Chak No.

177/M Tehsil Chishtian District Bahawal

Nagar NA-190.

1.500 1.367 -0.133 95%

5Construction of Soling Chak No 96/F Tehsil

Chishtian District Bahawal Nagar NA-190.0.850 0.829 -0.021 100%

6

Remaining Work of M/Road Chak No. 20/3R

Gulshan Colony Tehsil Haroonabad District

Bahawal Nagar NA-190.

3.600 3.461 -0.139 96%

7 Construction of M/Road 107/6R Tehsil

Haroonabad District Bahawal Nagar NA-190.

1.300 1.260 -0.040 96%

8

Construction of wall Of Water Pound Chak

No. 432/6R (Gharbi) Tehsil Haroonabad

District Bahawal Nagar NA-190.

1.200 1.170 -0.030 100%

9

Providing of Water Supply Pipe Chak No.

32/3-R Tehsil Haroonabad District Bahawal

Nagar NA-190.

0.400 0.388 -0.012 100%

10

Construction of Sports Ground Higher

Secondary School Dahranwala Tehsil

Chishtian District Bahawal Nagar NA-190.

4.000 -4.000 25%

11

Construction Remaining Portion of Soling

Chak No. 18/1R Tehsil Haroonabad District

Bahawal Nagar NA-190.

1.500 1.460 -0.040 100%

12

Construction of M/Road Pull Ashiq

Muhammad To Nooran Balochan Tehsil

Chishtian District Bahawal Nagar NA-190.

3.900 3.800 -0.100 96%

13

Maintenance of M/Road Chak No. 8/FW

Sethan Wala To Bakhshan Khan Tehsil

Chishtian District Bahawal Nagar NA-190.

2.500 2.430 -0.070 96%

14

Construction of Sewerage W-Block Satellite

Town Chishtian District Bahawal Nagar NA-

190.

0.430 0.321 -0.109

50.000 07-Dec-12792

Page 462

Page 463: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Providing Earth Work & Soling at Chowk

Chak No. 9/3R Tehsil Haroonabad District

Bahawal Nagar NA-190.

1.000 0.970 -0.030 100%

16Repair of M/Road Chak No. 31/3R Tehsil

Chishtian District Bahawal Nagar NA-190.1.500 1.455 -0.045 100%

17

Construction of Approach Road 6/FW Azafi

Basti Tehsil Chishtian District Bahawal

Nagar NA-190

1.352 1.318 -0.034 100%

18

Construction of Water Tank Chak No. 104/6R

Tehsil Haroonabad District Bahawal Nagar

NA-190.

1.600 1.560 -0.040 100%

19 Construction of Soling Chak No. 46/3R Tehsil

Haroonabad District Bahawal Nagar NA-190.

2.500 2.451 -0.049 100%

20

Construction of Approach Road Chak No.

169/M Tehsil Chishtian District Bahawal

Nagar NA-190.

1.260 1.233 -0.027 100%

21

Construction of Walls of Water Tank Chak

No. 429/6R Choti Tehsil Haroonabad District

Bahawal Nagar NA-190.

0.500 0.489 -0.011 100%

22

Construction of Janazgah Chak No. 30/3-R

Azafi Basti Tehsil Haroonabad District

Bahawal Nagar NA-190.

1.500 1.107 -0.393 95%

23

Construction of Walls of Water Tank & Play

Ground Chak No. 210/F Tehsil Chishtian

District Bahawal Nagar NA-190.

1.300 1.272 -0.028 100%

24

Construction of Janazgah Chak No. 429/6-R

Tehsil Haroonabad District Bahawal Nagar

NA-190.

1.500 0.978 -0.522 95%

25

Construction of Approach Road Chak No.

45/3R Tehsil Haroonabad District Bahawal

Nagar NA-190.

1.350 1.316 -0.034 100%

26 Repair of Cattle Pond 38/3R Tehsil

Haroonabad District Bahawal Nagar NA-190.

0.800 0.780 -0.020 100%

27

Rehabilitation of Water Tank Chak No. 12/1R

Tehsil Haroonabad District Bahawal Nagar

NA-190.

1.300 1.268 -0.032 100%

50.000 07-Dec-12792

Page 463

Page 464: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

28

Construction of Sewerage Scheme at Chak

No. 54/F Tehsil Chishtian District Bahawal

Nagar NA-190.

2.000 1.950 -0.050 100%

29

Construction of Remaining Portion of Soling

Chak No. 14/FW Tehsil Chishtian District

Bahawal Nagar NA-190.

0.380 0.358 -0.022 100%

30Rehabilitation of Water Supply 47/F Tehsil

Chishtian District Bahawal Nagar NA-190.1.050 -1.050

31

Construction of Toilets Boys Primary School

Chak No. 46/F Tehsil Chishtian District

Bahawal Nagar NA-190.

0.300 0.114 -0.186 75%

31 50.000 42.500 -7.500

Syed Hamid Saeed Kazmi dated 8.10.12

MNA, NA-192

1

Construction of Soling Basti Ashiq Saeedi to

KLP Road Mouza Rum Tehsil Liaqat Pur

District Rahim Yar Khan NA-192.

1.950 1.503 -0.447 90%

2

Construction of M/Road from Basti Jam

Muhammad Bux to Dera Mehmood Akbar

Maharvi Tehsil Liaqat Pur District Rahim Yar

Khan NA-192.

4.330 1.780 -2.550 45%

3

Construction of M/Road from Basti Jangla to

Pull Shamas Minor UC Jam Pur Tehsil Liaqat

Pur District Rahim Yar Khan NA-192.8.485 3.178 -5.307 45%

4

Construction of M/Road from KLP Road to

Basti Malik Muhammad Amjad & Basti

Muhammad Zafar Tehsil Liaqat Pur District

Rahim Yar Khan NA-192.

4.182 1.809 -2.373 45%

5

Construction of Soling UC Chak No. 10/A

Tehsil Liaqat Pur District Rahim Yar Khan NA-

192.

6.200 5.318 -0.882 80%

6

Construction of Soling UC Ahmed Ali Lard

Tehsil Liaqat Pur District Rahim Yar Khan NA-

192.

4.270 3.686 -0.584 90%

50.000 07-Dec-12792

150.000 08-Oct-12526

Page 464

Page 465: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

Construction of Soling Chak No. 132/NP

Tehsil Liaqat Pur District Rahim Yar Khan NA-

192.

4.230 3.096 -1.134 80%

8

Construction of Soling from Existing M/Road

to Basti Unrian UC Dufli Kabeer Khan Tehsil

Liaqat Pur District Rahim Yar Khan NA-192.1.899 1.365 -0.534 75%

9

Construction of M/Road from Ghangi More to

Basti Jam Abdur Rehman Bangla Kheheri

Tranda Ghorgage Tehsil Liaqat Pur District

Rahim Yar Khan NA-192.

4.222 2.127 -2.095 80%

10

Construction of M/Road from Shahi Road to

Post Office Madni Masjid Feroza Tehsil

Liaqat Pur District Rahim Yar Khan NA-192.4.682 1.689 -2.993 80%

11

Construction of M/Road from Khan Bala

Aminabad Road to Basti Dasian Tehsil Liaqat

Pur District Rahim Yar Khan NA-192.5.550 1.945 -3.605 65%

11 50.000 27.496 -22.504

Mian Abdus Sattar dated 5.10.12

MNA, NA-193

1

Construction of M/Road from Chak No. 13/P

to Basti Kabeer Khan, Suleman Khan

Khushak & School Jan Muhammad Kalhora

Tehsil Khan Pur District Rahim Yar Khan NA-

193.

2

Construction of M/Road from Main Road to

Basti Hafiz Zahir-ul-Haq Tehsil Khan Pur

District Rahim Yar Khan NA-193.

3

Construction of M/Road from Jetha Bhutta

Main Road to Basti Dak Wala, Basti

Chachran Tehsil Khan Pur District Rahim Yar

Khan NA-193.

150.000 08-Oct-12526

100.000 05-Oct-12496

Page 465

Page 466: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of M/Road from Zahir Pir Road

to Basti Bukhoo Khan (Remaining Portion)

Tehsil Khan Pur District Rahim Yar Khan NA-

193.

5

Construction of M/Road from Chak No. 92

Road to Haji Allah Ditta Chak No. 25/P Tehsil

Khan Pur District Rahim Yar Khan NA-193.

6

Construction of M/Road from Mud Shadoo to

Basti Munshi Abdul Kareem (Remaining

Portion) Tehsil Khan Pur District Rahim Yar

Khan NA-193.

7

Construction of M/Road from M/Road Chak

No. 1/P (inside Portion) Tehsil Khan Pur

District Rahim Yar Khan NA-193.

8

Construction of M/Road from Shikar Pur

Road to Basti Rafique Kalhora (Remaining

Portion) Tehsil Khan Pur District Rahim Yar

Khan NA-193.

9

Construction of M/Road from KLP Road Ice

Factory to Basti Habib Ullah Burrar via Basti

Kaloo Tehsil Khan Pur District Rahim Yar

Khan NA-193.

10

Construction of M/Road from Chak No. 64/P

to Chak No. 63/P Tehsil Liaqat Pur District

Rahim Yar Khan NA-193.

11

Construction of M/Road from Chak No. 43/P

to Basti Kotli Tehsil Khan Pur District Rahim

Yar Khan NA-193.

12

Construction of M/Road from Bagho Bahar

Road to Basti Thaheem via Mondi Minor

(Remaining Portion) Tehsil Khan Pur District

Rahim Yar Khan NA-193.

13

Construction of M/Road from Chowk Nadir

Shaheed Feroza Road to Basti Nabi Bux

Lashari Tehsil Khan Pur District Rahim Yar

Khan NA-193.

100.000 05-Oct-12496

Page 466

Page 467: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14

Construction of M/Road & Water course from

Darbar Jhetha Bhutta Road to Basti Mian

Qadir Bux Tehsil Khan Pur District Rahim Yar

Khan NA-193.

15

Construction of M/Road from Basti Haji Khan

Muhammad to Basti Lathi via Chak No. 30/P

Jhol Minor Tehsil Khan Pur District Rahim

Yar Khan NA-193.

16

Construction of M/Road from Basti Ahmed

Din Jhullan to Basti Ahmed Bux Jhullan

Tehsil Khan Pur District Rahim Yar Khan NA-

193.

17

Construction of M/Road from Basti Okhar

Wand to Basti Jalal Din Tehsil Khan Pur

District Rahim Yar Khan NA-193.

18

Construction of M/Road from Khan Pur, Kan

di Wahi Road to Basti Sardar Mureed Ahmed

Khan Tehsil Khan Pur District Rahim Yar

Khan NA-193.

19

Construction of M/Road from Existing

M/Road to Basti Kotla Mahi Tehsil Khan Pur

District Rahim Yar Khan NA-193.

20

Construction of M/Road from Existing

M/Road Chak No. 225/1L to Basti Wariam

Numberdar Tehsil Khan Pur District Rahim

Yar Khan NA-193.

21

Construction of M/Road from Khan Pur, Kan

di Wahi Road to Dera Dr. Fida-ur-Rehman

Tehsil Khan Pur District Rahim Yar Khan NA-

193.

22

Construction of M/Road from Yousaf Town

Road to Basti Dukkar Gharibabad Tehsil

Khan Pur District Rahim Yar Khan NA-93.

23

Construction of M/Road from Khan Pur

Cholistan Road to Dera Haji Mukhtiar Ahmed

Tehsil Khan Pur District Rahim Yar Khan NA-

193.

100.000 05-Oct-12496

Page 467

Page 468: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

24

Construction of M/Road from Liaqat Pur,

Khan Pur Road to Basti Faqir Bukhsh

Chacha Tehsil Khan Pur District Rahim Yar

Khan NA-193.

25

Construction of M/Road from Bagho Bahar

(Satellite Town-II) to Neil Garh Road Tehsil

Khan Pur District Rahim Yar Khan NA-193.

25

Mian Abdus Sattar dated 5.10.12

MNA, NA-193

1

Construction of Water Supply / Tuff Tiles /

Sewerage / Soling & M/Road UC-70/A City

Khan Pur District Rahim Yar Khan NA-193.

3.303 90%

2

Construction of Water Supply / Tuff Tiles /

Sewerage / Soling & M/Road UC-71/B City

Khan Pur District Rahim Yar Khan NA-193.

2.213 65%

3

Construction of Water Supply / Tuff Tiles /

Sewerage / Soling & M/Road UC-72/C City

Khan Pur District Rahim Yar Khan NA-193.

2.864 55%

4

Construction of Water Supply / Tuff Tiles /

Sewerage / Soling & M/Road UC-73/D City

Khan Pur District Rahim Yar Khan NA-193.

1.379 45%

5

Construction of Water Supply / Tuff Tiles /

Sewerage / Soling & M/Road UC-74/E City

Khan Pur District Rahim Yar Khan NA-193.

1.061 40%

6

Construction of Water Courses for Jetha

Bhutta & Ghulan Galkala Tehsil Khan Pur

District Rahim Yar Khan NA-193.

3.054 75%

7

Construction of M/Road Madrassa Siraj-ul-

Uloom City Khan Pur Road to Basti Metla

and Basti Shafi Patwari Tehsil Khan Pur

District Rahim Yar Khan NA-193.

1.450 55%

8

Construction of Class Rooms for Government

Elementary School Basti Mian Muhammad

Islam Tehsil Khan Pur District Rahim Yar

Khan NA-193.

0.984 45%

47.413

100.000 05-Oct-12496

47.413 05-Oct-12497

Page 468

Page 469: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Construction of M/Road Bagho Bahar Road

to Basti Jam Akram Tehsil Khan Pur District

Rahim Yar Khan NA-193.

0.947 100%

10

Construction of M/Road Girls College Road

to House Mian Abdus Sattar via Musjid Umer

Farooq New Sadiq Colony Bahawalpur.1.909 100%

11Repairing of Bagho Bahar Road Tehsil Khan

Pur District Rahim Yar Khan NA-193.

12

Repair & Improvement of Bypass Darbar

Jetha Bhutta Road Tehsil Khan Pur District

Rahim Yar Khan NA-193.

1.749 95%

12 47.413 20.913 -26.500

Makhdum Khusro Bakhtyar, Barrister PP-288 (33.435), PP-289(31.926), PP-291 (24.639)dated 26.9.12

NA-194

1

Construction of M/Road from Basti Ghulam

Yaseen Korai to 4-R Minor, Chak No. 62

Road to Sui Gas to Basti Jam Abdul Malik

and Basti Jam Shafique Khaliti to Sangi

Minor and Haji Mukhtiar Ahmed to Basti

Qutab Din Thul Ganga Tehsil Khan Pur

District Rahim Yar Khan.

14.300 0.007 -14.293 0%

2

Construction of M/Road from Basti Ghulam

Nabi to Jam Mehr, Railway Phatak to

Mohallah Muhammad Pura, Basti Haji Mitho

Khan to Pull Pacca Qureshian and Pull

Makhan Bela to Basti Ranjha Tehsil Khan

Pur District Rahim Yar Khan.

17.600 0.007 -17.593 0%

3

Construction of M/Road from Basti Kadden to

Basti Ghaleja, Fateh Pur Kamal Road Basti

Hakeem Ali Bux and from Pull Lanjiwar to

Basti Sardar Muhammad Khosa Tehsil Khan

Pur District Rahim Yar Khan.

10.360 0.007 -10.353 0%

47.41347.413 05-Oct-12497

90.000 26-Sep-12436

Page 469

Page 470: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Repair of M/Road from National Highway to

Sardar Saeed Ahmed Lowlai Tehsil Khan Pur

District Rahim Yar Khan.

0.800 0.007 -0.793 1%

5

Repair & Improvement of M/Road from

Missonabad Road to Pacca Qureshian and

Rahim Yar Khan Road to Basti Malik Akkoo

Tehsil Khan Pur District Rahim Yar Khan.

9.545 0.007 -9.538 0%

6

Construction of M/Road from Girls Primary

School Kotla Pathan to Basti Kalkan, Ghous

Pur to Basti Rafique Ahmed, Missonabad to

Basti Haji Safdar and from Tail Lower Nawan

Kot to Basti Shah Da Khoo Tehsil Khan Pur

District Rahim Yar Khan.

15.862 0.007 -15.855 0%

7

Construction of M/Road from Prochara Road

to Basti Kotla Arain Dashtian and Makhan

Bela Road to Basti Dashtian Tehsil Khan Pur

District Rahim Yar Khan.

9.752 0.007 -9.745 0%

8

Construction of M/Road from Basti Noor

Shah Qadir Pur Road to Fish Form via Basti

Mohsin Tehsil Khan Pur District Rahim Yar

Khan.

4.000 0.007 -3.993 0%

9

Construction of M/Road from Kot Sikandar to

New Hassan Petroleum Tehsil Khan Pur

District Rahim Yar Khan.

2.500 0.007 -2.493 0%

10

Construction of M/Road from Shah Pur Road

to Basti Hassan Gillani Mouza Rang Pur

Tehsil & District Rahim Yar Khan.

2.021 0.007 -2.014 0%

11

Construction of M/Road from Sehja Railway

Phatak to Old Primary School via Chah Arib

Tehsil Khan Pur District Rahim Yar Khan.2.500 0.007 -2.493 0%

12

Repair & Improvement of M/Road from KLP

Road near Mohsin Alamdar to Darbar Udhan

Shah Tehsil Khan Pur District Rahim Yar

Khan.

0.760 0.007 -0.753 1%

12 90.000 0.084 -89.916

90.000 26-Sep-12436

Page 470

Page 471: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Makhdoom Shahabuddin dated 1.10.12

MNA, NA-194

1

Construction of M/Road Adda Yousaf Abad

To Sadiq Branch to Mianwali Qureshian

Tehsil & District Rahim Yar Khan NA-194.

8.000 0.006 -7.994 20%

2

Construction of M/Road Rukan Pur Road to

Basti Biraran Galor Masso Khan Tehsil &

District Rahim Yar Khan NA-194.

7.000 0.006 -6.994 20%

3

Construction of M/Road Fouji Petroleum KLP

Road to Ablani Chachar Kotla Rai Ghabool

Tehsil & District Rahim Yar Khan NA-194.6.000 1.186 -4.814 80%

4

Construction of M/Road Obata Road to Basti

Mian Akhtar Mouza Obata Tehsil & District

Rahim Yar Khan NA-194.

6.000 0.561 -5.439 40%

5

Construction of Adda Qasim Wala to Basti

Syed Abid Hussain Shah Tehsil & District

Rahim Yar Khan NA-194.

6.000 0.006 -5.994 20%

6

Construction of M/Road Payee Ahana to

Thakal Mouza Payee Ahna Tehsil & District

Rahim Yar Khan NA-194.

7.000 0.006 -6.994 25%

7

Construction of M/Road Badly Khan Dashti

Mouza Guluwali to Basti Sawan Khan Dashti

Tehsil & District Rahim Yar Khan NA-194.4.000 0.006 -3.994 25%

8

Construction of M/Road Basti Darkhana

Road to Basti Jam Shabbir Numberdar Tehsil

& District Rahim Yar Khan NA-194.

5.000 0.006 -4.994 20%

9

Construction of M/Road Kot Samaba Road to

Qasba Jalalpur Tehsil & District Rahim Yar

Khan NA-194.

5.000 0.006 -4.994 20%

10

Construction of M/Road Rukan Pur Road to

Basti Soba Khan Dashti via Basti Abdul

Ghaffar Tehsil & District Rahim Yar Khan NA-

194.

5.000 0.006 -4.994 25%

200.000 01-Oct-12476

Page 471

Page 472: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11

Construction of M/Road Makhan Bela Basti

Jam Sajjad Ahna Tehsil & District Rahim Yar

Khan NA-194.

5.000 0.006 -4.994 25%

12

Construction of M/Road Tranda Moulvian to

Basti Mian Kahlil Mouza Mohal Tehsil &

District Rahim Yar Khan NA-194.

5.000 1.627 -3.373 70%

13

Construction of M/Road Nowan Kot Road to

Basti Sufi Muhammad Aslam Tehsil & District

Rahim Yar Khan NA-194.

5.000 0.006 -4.994 25%

14

Construction of M/Road Basti Syed Karam

Hussain Shah to Basti Allah Din Mouza

Gahnalar Tehsil & District Rahim Yar Khan

NA-194.

5.000 1.173 -3.827 55%

15

Construction of M/Road Chak No. 94/NP to

Basti Chaudhary Waqas Tehsil & District

Rahim Yar Khan NA-194.

5.000 0.006 -4.994 20%

16

Construction of M/Road Garhi Road to Basti

Arain to Basti Khan Muhammad Cutt Mouza

Ghulam Nabi Lar Tehsil & District Rahim Yar

Khan NA-194.

5.000 0.006 -4.994 25%

17

Construction of M/Road Mori Road to Basti

Master Muhammad Nawaz Mouza Mori

Tehsil & District Rahim Yar Khan NA-194.

4.000 0.006 -3.994 20%

18

Construction of M/Road Malik Pur Road to

Basti Malik Ayaz Malik Tehsil & District

Rahim Yar Khan NA-194.

4.000 0.006 -3.994 20%

19

Construction of M/Road Neher 3-L To Basti

Ghotia Gahnalar Tehsil & District Rahim Yar

Khan NA-194.

4.000 0.006 -3.994 25%

20

Construction of M/Road Thakal to Basti

Chandia Lar Mouza Thakal Tehsil & District

Rahim Yar Khan NA-194.

4.000 0.006 -3.994 25%

21

Construction of Remaining Road Chak No.

90/NP to Basti Batwani Tehsil & District

Rahim Yar Khan NA-194.

4.000 1.771 -2.229 70%

22

Construction of M/Road Garhi Road

Faizabad to Gulo Wali Tehsil & District

Rahim Yar Khan NA-194.

4.000 0.006 -3.994 25%

200.000 01-Oct-12476

Page 472

Page 473: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

23

Construction of M/Road Basti Dhandhu to

Basti Ghulam Nabi Manuk Mouza Manuk

Tehsil & District Rahim Yar Khan NA-194.

4.000 1.458 -2.542 55%

24

Construction of M/Road Mao Mubarak Road

to Basti Heer 75/NP Tehsil & District Rahim

Yar Khan NA-194.

4.000 1.590 -2.410 60%

25

Construction of M/Road Thull Hassan Road

to Basti Farooq Korai Thull Hassan Tehsil &

District Rahim Yar Khan NA-194.

4.000 0.006 -3.994 20%

26

Construction of M/Road Shah Pur Road to

Basti Manzoor Ahmed Teachry Tehsil &

District Rahim Yar Khan NA-194.

4.000 1.343 -2.657 55%

27

Construction of M/Road Pacca Qureshian to

Basti Haleem Khan Rind Tehsil & District

Rahim Yar Khan NA-194.

4.000 0.006 -3.994 25%

28

Construction of M/Road Chachran Road to

Basti Jam Sadeeq Pahore Bakhrani Tehsil &

District Rahim Yar Khan NA-194.

4.000 1.807 -2.193 60%

29

Construction of M/Road Basti Jam Bakhsh

Arain Mouza Ghose Pur Tehsil & District

Rahim Yar Khan NA-194.

4.000 1.707 -2.293 60%

30

Construction of M/Road Chachran Road to

Haji Pur Road Chachran Sharif Tehsil &

District Rahim Yar Khan NA-194.

4.000 1.471 -2.529 65%

31

Construction of M/Road Kota Samaba

Mianwali Road to Yaroo Wala Khoh Mouza

Sonak Tehsil & District Rahim Yar Khan NA-

194.

2.000 1.295 -0.705 55%

32

Construction of M/Road Mianwali Qureshian

Road to Basti Ghulam Ali Khan Mouza Sonak

Tehsil & District Rahim Yar Khan NA-194.2.000 1.623 -0.377 60%

33

Construction of M/Road Fateh Pur Road to

Basti Khan Muhammad Koria Sonak Tehsil &

District Rahim Yar Khan NA-194.

2.000 1.576 -0.424 65%

34

Construction of M/Road Dodhy Sanghi road

to Basti Master Khuda Bukhsh Meher Tehsil

& District Rahim Yar Khan NA-194.

2.000 2.298 0.298 65%

200.000 01-Oct-12476

Page 473

Page 474: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

35

Construction of M/Road Dodhy Songhy Road

to Basti Sahib Yar Khan Dody Songhi Tehsil

& District Rahim Yar Khan NA-194.2.000 0.006 -1.994

36

Construction of M/Road Garhi Road to Basti

Muhammad Bukhsh Korai Tehsil & District

Rahim Yar Khan NA-194.

2.000 1.499 -0.501 65%

37

Construction of M/Road Basti Kamala to

Basti Sabu Jajja Abasian Tehsil & District

Rahim Yar Khan NA-194.

2.000 1.487 -0.513 65%

38

Construction of M/Road Garhi Road to Basti

Sohrab Kurai Mitha Mirani Tehsil & District

Rahim Yar Khan NA-194.

2.000 1.967 -0.033 60%

39

Construction of M/Road Ahmad Kudan Basti

Birohi to Haji Ghulam Ahmed Tehsil & District

Rahim Yar Khan NA-194.

2.000 1.969 -0.031 60%

40

Construction of M/Road & Sewerag Mohalla

Gulshan Fareed Gali No. 03 Tehsil & District

Rahim Yar Khan NA-194.

1.000 1.646 0.646 60%

41

Construction of M/Road Dina Nala to Basti

Meer Pur Kotla Mudhu Tehsil & District

Rahim Yar Khan NA-194.

3.000 2.058 -0.942 65%

42

Construction of M/Road Basti Haji Piyara

Awan to Basti Sonat Ram Mouza Laran

Tehsil & District Rahim Yar Khan NA-194.

3.000 2.033 -0.967 65%

43

Construction of M/Road Sonak Road to Basti

Karim Bukhsh Jaffrani Tehsil & District Rahim

Yar Khan NA-194.

3.000 0.006 -2.994 25%

44

Construction of M/Road Pull Qadru Wali to

Basti Jam Raheem Ronjha Lal Garh Tehsil &

District Rahim Yar Khan NA-194.

3.000 2.275 -0.725 65%

45

Construction of M/Road Remaining Portion

Basti Khalifa to Head Hamid Minor Mouza

Hamid Pur Tehsil & District Rahim Yar Khan

NA-194.

3.000 1.956 -1.044 60%

46

Construction of M/Road Basti Khai Khair

Shah Tehsil & District Rahim Yar Khan NA-

194.

3.000 0.006 -2.994 25%

200.000 01-Oct-12476

Page 474

Page 475: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

47

Construction of M/Road Tibbi Kori to Basti

Haji Karam Din Tehsil & District Rahim Yar

Khan NA-194.

3.000 3.504 0.504 60%

48

Construction of M/Road Basti Rab Nawaz To

Basti Loharan Mouza Laran Tehsil & District

Rahim Yar Khan NA-194.

3.000 3.772 0.772 70%

49

Construction of M/Road Basti Khokhran to

Basti Abdul Rehman Kaneera Tehsil &

District Rahim Yar Khan NA-194.

3.000 2.451 -0.549 60%

50

Construction of M/Road Chachran Road Pull

Pahoran to Basti Jalal Pur Tehsil & District

Rahim Yar Khan NA-194.

3.000 3.272 0.272 65%

51

Construction of M/Road Basti Abdul Rasheed

Khosa to Haji Ibraheem Dhama Tehsil &

District Rahim Yar Khan NA-194.

3.000 0.066 -2.934 25%

52

Construction of M/Road Basti Haji Ghulam

Hassan Pahore Tehsil & District Rahim Yar

Khan NA-194.

3.000 3.266 0.266 70%

52 200.000 55.839 -144.161

Makhdoom Shahabuddin dated 7.2.13

NA-194

947 07-Feb-13 20.000 1

Sanitation / Rehabilitation of Infrastructure of

Chachran Sharif District Rahim Yar Khan NA-

194.

20.000 -20.000

1 20.000 -20.000

Javed Iqbal Warriach dated 17.9.12

Mna,. NA-196

1

Construction of M/Road from Bagho Bahar

Kot Samaba Road to Basti Johiwal UC

Bahishti Tehsil & District Rahim Yar Khan NA-

196.

3.000 2.914 -0.086 100%

200.000 01-Oct-12476

100.000 17-Sep-12397

Page 475

Page 476: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of M/Road from Bagho Bahar

Kot Samaba Road to Kacha Gulzar Tehsil &

District Rahim Yar Khan NA-196.

3.000 2.914 -0.086 100%

3

Construction of M/Road from Bagho Bahar

Kot Samaba Road to Jinnah Abadi Tehsil &

District Rahim Yar Khan NA-196.

2.000 1.954 -0.046 100%

4

Construction of M/Road Chak No. 106/P

Basti Kanju Tehsil & District Rahim Yar Khan

NA-196.

1.300 1.261 -0.039 100%

5Construction of M/Road Mohallah Sadaat

Tehsil & District Rahim Yar Khan NA-196.1.000 0.965 -0.035 100%

6

Construction of M/Road Noray Wali

Qabristan to Tibbi Mouza Bandoor Tehsil &

District Rahim Yar Khan NA-196.

3.000 2.886 -0.114 100%

7

Construction of M/Road Sakhi Sarwar Colony

Street No.05 Darbar Wali Tehsil & District

Rahim Yar Khan NA-196.

0.800 0.629 -0.171 100%

8

Construction of Soling & Sewerage Rehmat

Colony Kot Samaba Tehsil & District Rahim

Yar Khan NA-196.

0.600 0.563 -0.037 100%

9Construction of M/Road Chak No. 93/P

Tehsil & District Rahim Yar Khan NA-196.2.000 1.870 -0.130 100%

10

Construction of M/Road Basti Ghulam

Fareed Bhapper Mouza Goth Raza Tehsil &

District Rahim Yar Khan NA-196.

0.800 0.508 -0.292 85%

11

Construction of Mouza Hussain Abad UC

Dari Azeem Tehsil & District Rahim Yar Khan

NA-196.

1.500 1.470 -0.030 100%

12

Construction of Soling Road Chak No. 93/P

to Dera Sabir Tehsil & District Rahim Yar

Khan NA-196.

1.000 0.899 -0.101 100%

13

Construction of Soling Mao Mubarak Raod to

Basti Malikan near Basti Peer Shaheedan

UC 30/A Tehsil & District Rahim Yar Khan

NA-196.

1.600 1.565 -0.035 100%

14

Construction of M/Road and Sewerage Atta

Road Girls College near Aghosh School

System Fazilat Town UC 31/B Tehsil &

District Rahim Yar Khan NA-196.

1.000 0.633 -0.367 90%

100.000 17-Sep-12397

Page 476

Page 477: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

15

Construction of Tuff Tile Street No. 3, Masjid

Sughran and Residence Mistri Rafiq Zafar

UC 31/B Tehsil & District Rahim Yar Khan

NA-196.

1.930 1.890 -0.040 100%

16

Construction of Sewerage Street No. 10

Jinnah Park UC 32/C Tehsil & District Rahim

Yar Khan NA-196.

1.000 0.928 -0.072 100%

17

Construction of Sewerage Street No. 16 near

Masjid Khizara Jinnah Park UC 32/C Tehsil &

District Rahim Yar Khan NA-196.

0.800 0.770 -0.030 100%

18

Construction of M/Road, Shahbaz Colony

Basti Koraja UC 33/D Tehsil & District Rahim

Yar Khan NA-196.

1.900 1.127 -0.773 90%

19

Construction of M/Road Koucha Sadaat

Circular Road, Lala Rukh to Masjid Noori UC

34/F Tehsil & District Rahim Yar Khan NA-

196.

0.800 0.677 -0.123 100%

20

Construction of Sewerage, Tuff Tile Nafees

Colony, Front of Railway Goddam, Street

Takia Lal Faqir to House Jam Qasim UC

34/E Tehsil & District Rahim Yar Khan NA-

196.

1.600 1.535 -0.065 100%

21

Construction of Tuff Tile Mohalla Usmania,

M/Road Mohallah Qamar Abad UC 35/F

Tehsil & District Rahim Yar Khan NA-196.

1.560 1.303 -0.257 95%

22

Construction of Tuff Tile & Sewerage Jam

Bashir Ahmed Khambra UC 36/G Tehsil &

District Rahim Yar Khan NA-196.

1.510 1.453 -0.057 100%

23

Construction of Tuff Tile & Sewerage Katchi

Abadi Tibbi Laran UC 36/G Tehsil & District

Rahim Yar Khan NA-196.

0.700 0.678 -0.022 100%

24

Construction of M/Road Chowk Cadet School

Hussain Abad UC 37/H Tehsil & District

Rahim Yar Khan NA-196.

0.800 0.438 -0.362 80%

25

Construction of Tuff Tile & Sewerage Street

No. 5, House Naimat, M/Road House Karim

Bakhsh UC 38/I Tehsil & District Rahim Yar

Khan NA-196.

1.028 0.991 -0.037 100%100.000 17-Sep-12397

Page 477

Page 478: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

26

Construction of Sewerage & Tuff Tile House

Bao Khan Street No. 10, Shah Faisal Colony

Street No. 6 and Muhammad Saleem

Gacchal House Karim Bukhsh UC 38/I Tehsil

& District Rahim Yar Khan NA-196.

1.500 1.453 -0.047 100%

27

Construction of M/Road Pulli Haji M. Hashim

Mouza Khair Pur UC Amin Garh Tehsil &

District Rahim Yar Khan NA-196.

1.527 1.459 -0.068 100%

28

Construction of Soling & Sewerage Girjaghar

Mouza Sultan and Mouza Khair Pur UC Amin

Garh Tehsil & District Rahim Yar Khan NA-

196.

0.745 0.601 -0.144 100%

29

Construction of M/Road from Patti Ponwara,

Bari Bangla UC 84/P Tehsil & District Rahim

Yar Khan NA-196.

4.000 3.914 -0.086 100%

30

Construction of Soling Chak No. 75/P UC

Darri Azeem Tehsil & District Rahim Yar

Khan NA-196.

2.000 1.940 -0.060 100%

31

Construction of M/Road Basti Jam Khuda

Bux Matila, Dera Anwer Azeem & Chak No.

133/P Tehsil & District Rahim Yar Khan NA-

196.

4.500 4.385 -0.115 100%

32

Construction of M/Road Chak No. 242/P Abe

Hayat & Chak No. 56/P Tibba Haji Sadiq

Tehsil & District Rahim Yar Khan NA-196.3.000 2.928 -0.072 100%

33

Construction of M/Road Chak No. 136/P &

Chak No. 134/P UC Waha Kona Tehsil &

District Rahim Yar Khan NA-196.

5.000 4.841 -0.159 100%

34

Construction of M/Road Basti Dost

Muhammad Khan & Chak No. 110/P Tibba

Khan Pur Tehsil & District Rahim Yar Khan

NA-196.

3.800 2.343 -1.457 80%

35

Construction of Bridge Basti Kanju, Tranda

Minor & Putton Manara Minor Tehsil &

District Rahim Yar Khan NA-196.

2.700 2.619 -0.081 100%

100.000 17-Sep-12397

Page 478

Page 479: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

36

Construction of M/Road Teacher Colony &

Basti Bagho UC Kot Samaba Tehsil & District

Rahim Yar Khan NA-196.

3.300 3.178 -0.122 100%

37

Construction of Tuff Tiles Iqbal Town Putton

Minra UC Ameen Garh Tehsil & District

Rahim Yar Khan NA-196.

0.600 0.575 -0.025 100%

38

Construction of Soling Basti Dandoo & Basti

Faqir Abdul Malik UC 84/P Tehsil & District

Rahim Yar Khan NA-196.

2.500 2.416 -0.084 100%

39

Construction of Soling Imtiaz Colony Abu

Zaibi Road UC 51 Tehsil & District Rahim Yar

Khan NA-196.

0.800 0.714 -0.086 100%

40

Construction of M/Road Basti Rais Rahim

Bux UC Wah Kona Tehsil & District Rahim

Yar Khan NA-196.

2.500 2.424 -0.076 100%

41

Construction of M/Road Basti Rais Ghulam

Rasool Abu Zaibi Colony UC Uman Garh

Tehsil & District Rahim Yar Khan NA-196.

3.000 2.940 -0.060 100%

42

Construction of M/Road Dera Ghulam Jafar

Khosa Chak No. 122/P UC Waha Kona

Tehsil & District Rahim Yar Khan NA-196.

2.000 1.920 -0.080 100%

43

Construction of M/Road Basti Ghulam Rasool

Saboori & Basti Balochan Abu Zaibi Road

Tehsil & District Rahim Yar Khan NA-196.1.300 -1.300 30%

44

Construction of M/Road Basti Mukhtiar

Mouza Khair Pur UC Amin Garh Tehsil &

District Rahim Yar Khan NA-196.

2.000 1.917 -0.083 100%

45

Construction of Soling / Sewerage Basti

Khokhran Tranda Saway Khan Tehsil &

District Rahim Yar Khan NA-196.

2.000 1.949 -0.051 100%

46

Construction of Water Supply Scheme Chak

No. 113/P District Rahim Yar Khan NA-196. 6.528 2.944 -3.584 60%

47

Construction of Water Supply Scheme Chak

No. 104/P District Rahim Yar Khan NA-196. 6.247 4.240 -2.007 90%

100.000 17-Sep-12397

Page 479

Page 480: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

48

Construction of Water Supply Scheme

Tranda Saway Khan District Rahim Yar Khan

NA-196.

2.225 1.834 -0.391 95%

48 100.000 86.355 -13.645

Abdul Rehman Khan Kanju dated 6.9.12

EX-Nazim (Notable)

1

Construction of M/Road from Government

Girls Middle School to Government Boys

High School Ameer Pur Sadat District

Lodhran.

1.800 1.757 -0.043 100%

2

Construction of M/Road from Pull Mehmood

to Dera Akhtar Dukkar District Lodhran. 2.100 1.042 -1.058 85%

3

Construction of M/Road from Basti Sher

Muhammad Jutt to Chak No. 323/WB District

Lodhran.

4.400 4.116 -0.284 100%

4

Construction of M/Road from Basti Jameel

Awan Wali to Chak No. 357/WB District

Lodhran.

4.900 4.778 -0.122 100%

5

Construction of M/Road from Phattak Qutab

Pur via Rukkan Din Pur to Chak No. 319/WB

District Lodhran.

4.900 4.774 -0.126 100%

6

Construction of M/Road from Basti Khaggey

Wala to Chak No. 346/WB District Lodhran. 4.800 4.673 -0.127 100%

7

Construction of M/Road from Chak No.

374/WB to Chak No. 363/WB District

Lodhran.

4.900 4.587 -0.313 95%

8

Construction of M/Road from Dunya Pur

Dakoota Road to Chak No. 305/WB District

Lodhran.

4.300 3.751 -0.549 85%

9

Construction of Tuff Tiles from Rapper Road

to Dera Shahid Khan Utera District Lodhran. 0.650 0.530 -0.120 100%

100.000 17-Sep-12397

80.000 06-Sep-12242

Page 480

Page 481: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10

Construction of M/Road & Tuff Tile Pull

Gopal Link Road Main to Dera Abdul

Rehman Khan Kanju Tehsil Dunya Pur

District Lodhran.

8.450 4.205 -4.245 80%

11

Construction of M/Road Basti Gograin Wala

to Basti Purana Khoh Dera Javed Khan

District Lodhran.

5.000 2.272 -2.728 70%

12Construction of M/Road Chatta Pahor to

Chak No. 291/WB District Lodhran.5.000 2.823 -2.177 70%

13

Construction of M/Road & Bridge Warsi

Wahan Road to Dera Malik Allah Nawaz

Tehsil Dunya Pur District Lodhran.

6.300 3.785 -2.515 70%

14Construction of Boundary Wall around water

tank Chatta Pahor District Lodhran.2.000 1.914 -0.086 100%

15

Construction of M/Road from Basant Minor to

Basti Dobay Wala via Ameer Sir District

Lodhran.

5.100 4.900 -0.200 100%

16

Construction of Soling from Narangen Ameer

Pur Road to Panvaran Wali via Rang Wala

District Lodhran.

5.400 3.811 -1.589 85%

17

Construction of M/Road from Tube Well

Imam Bux Wagen to Jhoke Aheer Morr

Mouza Juss District Lodhran.

4.900 2.816 -2.084 75%

18

Construction of M/Road from Athara Lat to

Mat Wala Khoo Mouza Seaker UC Tibbi

Wadan District Lodhran.

5.100 3.023 -2.077 80%

18 Total 80.000 59.557 -20.443

Mian Muhammad Shafique Arain dated 14.12.12

MPA, PP-207

1

Construction of Soling and Boundry Wall

Chak No.346/WB, Chak No.390/WB, Chak

No.368/WB, Chak No.369/WB, Chak

No.388/WB and Chak No.389/WB District

Lodhran PP-207.

1.000 -1.000

2Construction of Soling and Water Supply

Jallah Arain District Lodhran PP-207.2.500 -2.500

80.000 06-Sep-12242

10.000 14-Dec-12811

Page 481

Page 482: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of Soling Road Basti Mosam

Wala,Chak No.35/M and Chak No.37/M

District Lodhran PP-207.

1.000 -1.000

4

Construction of Soling Road Basti Kotli

Wajwa, Chak No.363/WB, Chak No.364/WB

and Chak No.377/WB District Lodhran PP-

207.

1.500 -1.500

5

Construction of Soling and Bridge Basti Mian

Pur,Chak No.348/WB, Chak No.349/WB and

Chak No.347/WB District Lodhran PP-207.

6

Construction of Soling and Bridge Basti

Akram Raan,Chak No.371/WB, Chak

No.370/WB, Chak No.350/WB, Chak No.

351/WB and Chak No.372/WB District

Lodhran PP-207.

7

Construction of Soling Road Chak No.16/M,

Chak No.33/M, Chak No.44/M and Chak

No.43/M District Lodhran PP-207.1.000 -1.000 10%

8

Construction of Soling and Water Supply

Basti Dolla Arain,Chak No.340/WB and Chak

No.327/WB District Lodhran PP-207.

9

Construction of Soling and Tuff Paver Basti

Akbar Abad,Basti Hayat and Dunyapur City

District Lodhran PP-207.

1.000 -1.000

10

Construction of Soling Basti Lappan Wala

Jalla Arain and Chak No.1-4/MPR District

Lodhran PP-207.

11Construction of Soling and Water Supply

Mouza Balail District Lodhran PP-207.1.000 -1.000 15%

12

Construction of Soling Qutab Pur,Chak

No.355/WB,Chak No.353/WB, Chak

No.321/WB and Darbar Charagh Shah

District Lodhran PP-207.

13

Construction of Soling and Culvert Basti

Jumma Wala, Dunya Pur West and Chak

No.25/M Amin Dukkar District Lodhran PP-

207.

1.000 -1.000

10.000 14-Dec-12811

Page 482

Page 483: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13 Total 10.000 -10.000

Muhammad Akram Khan dated 7.9.12

MPA, PP-208

1

Construction of M/Road Choki Masti to

Ameer Pur Sadat via Oakan Wala Tehsil

Kehror Pacca District Lodhran PP-208.

4.600 4.054 -0.546 95%

2

Construction of M/Road Rind Jada Road

Chah Khandan Wala to Chah Raees Wala

Mouza Rind Jada Haji Atta Muhammad

Raees Tehsil Kehror Pacca District Lodhran

PP-208.

3.500 3.296 -0.204 75%

3

Construction of M/Road (Remaining Portion)

Basti Inayat Ali Wali Mouza Ali pur Kanju

Tehsil Kehror Pacca District Lodhran PP-208.2.400 2.254 -0.146 55%

4

Construction of M/Road from Pull Banglow

Hamid Pur to Banglow Hamid Pur (along

canal) Tehsil Kehror Pacca District Lodhran

PP-208.

3.200 2.915 -0.285 75%

5

Construction of M/Road Chak No. 267/WB to

Noor Garh Tehsil Dunya Pur District Lodhran

PP-208.

6.300 6.149 -0.151 70%

5 20.000 18.668 -1.332

Muhammad Akram Khan dated 14.12.12

MPA, PP-208

1

Construction of Soling Road Chak

No.309/WB, 223/WB, 311/WB, 269/WB,

295/WB, 291/WB, 235/WB, 211/WB, 233/WB

District Lodhran PP-208.

-10.000

10.000

20.000 07-Sep-12282

30.000 14-Dec-12811

Page 483

Page 484: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Construction of Soling Road Basti Shadi Pur,

Basti Samandri, Basti Khangran, Chak

No.7/M, Chah Yousaf Wala District Lodhran

PP-208.

3

Construction of Soling and Tuff Tile Road

Chak No.285-87/WB, 227/WB, Chak Sarla,

253/WB, 219/WB, Basti Odaan Wali and

Basti Hayat Pur District Lodhran PP-208.

4

Construction of Soling and Tuff Tile Road

Basti Choki Kuhna, Basti Gulhar, Basti

Goonga, Basti Rizwi Abad, Mouza Sabz Kot

and Basti Fida Hussain Khokhar District

Lodhran PP-208

5

Construction of Soling Road Basti Hawai

Adda, Chak No. 251/WB, 221/WB, 267/WB

and Chak 9/M District Lodhran PP-208

5 10.000 -10.000

Rana Ijaz Ahmed Noon dated 7.9.12

MPA, PP-209

1

Construction of Soling & Drain at Mohallah

Zafarabad & Baloch Colony Tehsil Kehror

Pacca District Lodhran PP-209.

2.500 2.413 -0.087 100%

2

Construction of Soling & Drain Bakhshi Wala

& Jallo Wala Tehsil Kehror Pacca District

Lodhran PP-209.

2.500 2.434 -0.066 100%

3

Construction of Soling & Drain Mohallah

Rehmania & Rajpootan Tehsil Kehror Pacca

District Lodhran PP-209.

2.500 1.591 -0.909 64%

4

Construction of Tuff Tile Street Syeda Sufia

Naqvi Tehsil Kehror Pacca District Lodhran

PP-209.

0.500 0.014 -0.486 3%

5

Construction of Tuff Tile Basti Maseet Wala

& Kuttia Tehsil Kehror Pacca District Lodhran

PP-209.

4.000 3.851 -0.149 100%

10.000

30.000 14-Dec-12811

20.000 07-Sep-12290

Page 484

Page 485: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of Soling Road Rana Sajjad

Hussain Advocate Tehsil Kehror Pacca

District Lodhran PP-209.

2.000 1.953 -0.047 100%

7

Construction of Soling & Drain at Khajji Wala,

Sadiq Wala & Dargahi Shah Tehsil Kehror

Pacca District Lodhran PP-209.

2.000 1.652 -0.348 83%

8

Construction of Soling Basti Sukhairan, Jang

Sheer, Karam Wala, Bagh Wala & Allah

Abad Tehsil Kehror Pacca District Lodhran

PP-209.

2.000 1.954 -0.046 100%

9

Construction of Soling Road Munshi Wala,

Beer Wala & Bhunjar Wala Tehsil Kehror

Pacca District Lodhran PP-209.

2.000 1.955 -0.045 100%

9 20.000 17.817 -2.183

Rana Ijaz Ahmed Noon dated 14.12.12

MPA, PP-209

1

Construction of Soling Road Basti Ameer

Pur,Hambal Wala,Babal Wala,Rana Saleem

and Rana Allah Yaar UC Dakhna Gharoo

District Lodhran PP-209.

2

Construction of Soling Road Basti Safeelan,

Hakeem Atta Muhammad, Gulam Wala,

Marla Scheme Machi Wahga and Afzal Kanju

UC Farid Abad District Lodhran PP-209.

2.500 -2.500 30%

3

Construction of Soling Road Basti Master

Muhammad Yar, Basti Lundi, Jall Wala, Kund

Wala and Mochi Pura UC Chelay Wahn

District Lodhran PP-209.

4

Construction of Bridge Zeerak Wahn Minor

and Soling Road Basti Hasil Wala, Mari

Qutab, Rana Gulam Rasool Noon, Ahsan

Joya UC Rana Wahn District Lodhran PP-

209.

20.000 07-Sep-12290

30.000 14-Dec-12811Page 485

Page 486: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Construction of Soling Road Basti Mochi

Wala, Atta Muhammad, Jandan Wala and

Awanan Wala Wasso Wala UC Massa Kotha

District Lodhran PP-209.

6

Construction of Soling Road Basti

Muhammad Yaar Wad, Basti Sajjad Baig UC

Tibbi Wadan District Lodhran PP-209.

2.500 -2.500 25%

7

Construction of Soling Road Basti Rizwi

Shah, Zordar Meo, Makhdoom Wala,

Mashooq Meo and Wallan Wala Billan Wala

UC Bahawal Garh District Lodhran PP-209.

2.500 -2.500 20%

8

Construction of Soling Road Basti Usman

Wagan, Jhoke Balochan, Shah Nawaz

Wagan and Malik Ahmad Bux UC Naseer Di

Wahan District Lodhran PP-209.

2.500 -2.500 35%

9

Construction of Soling Road Basti Malik Altaf

Rid, Chand Khan, Malik Mehmood and

Haveli Wala UC Jamrani Wah District

Lodhran PP-209.

10

Construction of Soling Road Basti Mian

Khalid Phull, Allah Wasaya Meo, Jhoke

Laran and Malik Riaz Boka UC Shah Pur

Phull District Lodhran PP-209.

10 10.000 -10.000

Sahibzada Ghazain Abbasi dated 6.9.12

MPA, PP-268

280 06-Sep-12 20.000 1

Construction of M/Road / Soling Basti Gull

Sher Khan, Basti Raees Saeed, Basti

Chaudhary Munir & Basti Numberdar Bagey

Shah Tehsil Ahmed Pur East District

Bahawalpur PP-268.

20.000 16.629 -3.371 95%

1 20.000 16.629 -3.371

30.000 14-Dec-12811

Page 486

Page 487: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sahibzada Ghazain Abbasi dated 14.12.12

MPA, PP-268

811 14-Dec-12 30.000 1

Construction of Soling UC Khurram Pur, UC

Mehrab Wala, UC Kulab, UC Sokhail, UC

Tibbi Ezat Tehsil Ahmed Pur East District

Bahawalpur PP-268.

10.000 6.594 -3.406 70%

1 10.000 6.594 -3.406

Shahrukh Malik dated 7.9.12

MPA, PP-270

293 07-Sep-12 20.000 1

Construction of Soling / Water Course Basti

Jalalabad, Sheikh Shujra Basti Rama, Basti

Jindo Mission Tehsil & District Bahawal Pur

PP-270.

20.000 18.590 -1.410 95%

1 20.000 18.590 -1.410

Shahrukh Malik dated 14.12.12

MPA, PP-270

811 14-Dec-12 30.000 1

Construction of Soling UC Jamal Channar,

UC Sheikh Shujra, UC Khano Wali, UC

Jamrani Kona Tehsil & District Bahawalpur

PP-270.

10.000 5.853 -4.147 65%

1 10.000 5.853 -4.147

Ehsan-ul-Haq Ch. dated 6.9.12

MPA, PP-275

245 06-Sep-12 50.000 50.000 -50.000

Transferred to MEPCO

50.000 -50.000

Muhammad Tariq Amin Hotian dated 7.9.12

Page 487

Page 488: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

MPA, PP-278

1

Construction of Mosque Building At Chak

Hotiana Tehsil & District Bahawal Nagar PP-

278.

4.258 0.994 -3.264 23%

2

Construction of Soling & Drain at UC No. 12

Takht Mohal, UC No. 9 Kalia Shah, UC No.

17 Toba Qalandar Shah, UC No. 10, UC No.

16 Rojhean Wale, UC No. 116 Kabotre, & UC

No. 117 Muhammad Pur Sansaran Tehsil &

District Bahawal Nagar PP-278.

5.742 5.607 -0.135 100%

2 10.000 6.601 -3.399

Mian Muhammad Tariq Amin Hotiana dated 14.12.12

MPA, PP-278

811 14-Dec-12 30.000 1

Repair of M/Road Chak Hotiyana, Soling /

Drain / PVC Pipe / RCC Pipe at UC No. 15

Musa Bhota, UC No. 11Sanateka, UC No. 10

Qasimka, UC No. 16 Rojhan Wali, UC No. 09

Kalia Shah, UC No. 17 Toba Qalandar Shah,

UC No. 12 Takht Mahal, UC No. 18

Rabnawaz Pura, UC No. 117 Laleka, UC No.

113 Fidai Shah, UC No. 14 Peer Sikandar

Tehsil & District Bahawal Nagar PP-278.

10.000 1 -9.000 0.014

1 10.000 1.000 -9.000

Mian Muhammad Ali Laleka dated 7.9.12

MPA, PP-281

294 07-Sep-12 20.000 1

Construction of Tuff Tile at Rail Bazar, Bano

Bazar, Taleem-ul-Nisa & Street Ahle Hadees

Chishtian District Bahawal Nagar PP-281.20.000 11.935 -8.065 80%

1 20.000 11.935 -8.065

300.000 07-Sep-12300

Page 488

Page 489: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Mian Muhammad Ali Laleka dated 14.12.12

MPA, PP-281

1

Construction of Soling & Drain UC No.45, UC

No. 57, UC No. 59, UC No. 56, UC No. 60 &

UC No.46 Tehsil Chishtian District Bahawal

Nagar PP-281.

-10.000

2

Construction of PCC Street UC No. 37

Chishtian City District Bahawal Nagar PP-

281.

3

Construction of M/Road Railway Crossing

Liaqat Road to Degree College Road

Haroonabad District Bahawal Nagar PP-281.

4Construction of Pakka Nala 241/HL Tehsil

Fort Abbas District Bahawal Nagar PP-281.20%

4 10.000 -10.000

Sardar Muhammad Afzal Tatla dated 12.9.12

MPA, PP-282

1

Construction of M/Road at Chak No. 111/6-R

Tehsil Haroonabad District Bahawal Nagar

PP-282.

1.500 1.464 -0.036 100%

2

Construction of Cattle Pound Walls & RCC

Pipe Chak No. 439/6-R Tehsil Haroonabad

District Bahawal Nagar PP-282.

1.000 0.857 -0.143 100%

3

Construction of Soling Basti Samabad

Dharanwala Tehsil Chishtian District Bahawal

Nagar PP-282.

1.000 0.974 -0.026 100%

4

Construction of M/Road Chak No. 174/M

Dharanwala Tehsil Chishtian District Bahawal

Nagar PP-282.

1.700 1.662 -0.038 100%

5

Construction of M/Road Chak No. 171/M

Tehsil Chishtian District Bahawal Nagar PP-

282.

1.200 1.168 -0.032 100%

10.00030.000 14-Dec-12811

17.000 12-Sep-12384

Page 489

Page 490: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of M/Road Chak No. 130/6-R

Tehsil Haroonabad District Bahawal Nagar

PP-282.

2.200 2.143 -0.057 100%

7

Providing of Water Supply Pipe Chak No.

110/6-R Tehsil Haroonabad District Bahawal

Nagar PP-282.

1.000 0.970 -0.030 100%

8

Construction of M/Road Dera Tahir Rasheed

to Chak No. 11/1-R Tehsil Chishtian District

Bahawal Nagar PP-282.

2.400 2.350 -0.050 100%

9

Construction of Water Pound Walls & RCC

Pipe Chak No. 440/6-R (Arrain Wali) Tehsil

Haroonabad District Bahawal Nagar PP-282.1.000 0.971 -0.029 100%

10

Construction of Soling Chak No. 128/M

(West) Tehsil Chishtian District Bahawal

Nagar PP-282.

1.000 0.981 -0.019 100%

11

Construction of M/Road Chak No. 37/3-R

Tehsil Haroonabad District Bahawal Nagar

PP-282.

1.500 1.458 -0.042 100%

12

Construction of Water Supply Pipe Shaheed

Chowk Tehsil Haroonabad District Bahawal

Nagar PP-282.

0.500 0.495 -0.005 100%

13

Construction of Cattle Pound Chak No. 8/1-R

Tehsil Chishtian District Bahawal Nagar PP-

282.

1.000 0.965 -0.035 100%

13 17.000 16.458 -0.542

Sardar Muhammad Afzal Tatla dated 14.12.12

MPA, PP-282

1Construction of M/Road Mahar Sharif Tehsil

Chishtian District Bahawal Nagar PP-282.

2

Construction of M/Road Chak No. 106/6-R &

Chak No. 433/6-R Tehsil Haroonabad District

Bahawal Nagar PP-282.

17.000 12-Sep-12384

30.000 14-Dec-12811

Page 490

Page 491: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of M/Road Chak No. 141/M,

Chak No. 177/M, Chak No. 175/M, Chak No.

174/M, Chak No. 118/M, Chak No. 138/M &

Chak No. 37/3R Tehsil Chishtian District

Bahawal Nagar PP-282.

10.000 -10.000 30%

4

Construction of Soling Model Town

Dahranwala, Chak No. 207/M & PVC Pipe

140/M Azafi Basti School Wale Tehsil

Chishtian District Bahawal Nagar PP-282.

5

Construction of Water Pond Chak No. 443/6-

R, Chak No. 32/3-R & Dera Tahir Rasheed

11/1-R Tehsil Haroonabad District Bahawal

Nagar PP-282.

6

Construction of Pakka Nala Chak No. 241/HL

Tehsil Fort Abbas District Bahawal Nagar PP-

282.

7

Construction of M/Road Chak No. 13/G

Street Irshad Chohan Tehsil Chishtian

District Bahawal Nagar PP-282.

8

Construction of M/Road Darbar Baba

Phulkari Shah 109/6-R Tehsil Haroonabad

District Bahawal Nagar PP-282.

8 10.000 -10.000

Shaukat Mehmood Basra dated 7.9.12

MPA, PP-283

284 07-Sep-12 20.000 1

Construction of M/Road, Soling & Sewerage

at Chak No. 165/M Tehsil Chishtian District

Bahawal Nagar PP-283.

20.000 19.572 -0.428 99%

1 20.000 19.572 -0.428

30.000 14-Dec-12811

Page 491

Page 492: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Shaukat Mehmood Basra dated 14.12.12

MPA, PP-283

1

Construction of Boundary Wall of Eid Gah,

Sitting Steps of High School, Room in

Haroon Club & Bar Room in Civil Court

Haroonabad District Bahawal Nagar PP-283.

2

Construction of Soling Sewerage in Talib

Councilar & Asghar and Washroom in

Ghallah Mandi Haroonabad District Bahawal

Nagar PP-283.

1.150 -1.150 30%

3

Construction / Maintenance of M/Road in City

Area Haroonabad Tehsil Haroonabad District

Bahawal Nagar PP-283.

5.000 -5.000

4

Construction of Soling Sewerage Street

Obaid Ullah Joyia Faqir Wali, Chak No. 147/6-

R & Repair of Tank at Chak No. 138/6-R &

127/6-R Tehsil Haroonabad District

Bahawalnagar PP-283.

5

Construction / Repair of M/Road 138 to 132/6-

R, 76/4-R to Chakian Wala & Chak No 160/7-

R & Water Tank at Chak No 137/6-R Tehsil

Haroonabad District Bahawal Nagar PP-283.

6

Construction of Soling, Sewerage & M/Road

at Chak No. 100/6-R, 121/6-R & Chak No.

144/6-R Tehsil Haroonabad District Bahawal

Nagar PP-283.

3.850 -3.850

6 10.000 -10.000

Sardar Ghazafar Ali Khan Langha dated 7.9.12

MPA, PP-285

292 07-Sep-12 1

Widening / Improvement of M/Road from Jun

Pur to Adda Dhand Mori via Thull Hamza

Dera Faridi, Tehsil Liaqat Pur District Rahim

Yar Khan PP-285.

20.000 15.121 -4.879 90%

1 20.000 15.121 -4.879

30.000 14-Dec-12811

Page 492

Page 493: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Sardar Ghazafar Ali Khan Langha dated 14.12.12

MPA, PP-285

1

Widening / Improvement of M/Road Dera

Fareedi to Thull Hamza Tehsil Liaqat Pur

District Rahim Yar Khan PP-285.

10.000 0.100 -9.900 10%

2

Construction of M/Road from Basti Sardar

Amin Khan Baloch Tehsil Liaqat Pur District

Rahim Yar Khan PP-285.

3

Construction of M/Road from Sidhu Wali

More Panjnad Canal to Basti Tibbi Jhullan

Tehsil Liaqat Pur District Rahim Yar Khan PP-

285.

4

Widening / Improvement of M/Road Jan Pur

Chowk to Kamati Chowk Allah Abad Tehsil

Liaqat Pur District Rahim Yar Khan PP-285.

5

Construction of M/Road More 120 Panjnad

Canal to Sidhu Wali Tehsil Liaqat Pur District

Rahim Yar Khan PP-285.

6

Construction of Bridge / Soling Canal Sharif

Minor Basti Sardar Niaz Khan Tehsil Liaqat

Pur District Rahim Yar Khan PP-285.

7

Construction of M/Road from Basti

Muhammad Nawaz Numberdar Tehsil Liaqat

Pur District Rahim Yar Khan PP-285.

7 10.000 0.100 -9.900

Col® Naveed Sjid dated 10.9.12

MPA, PP-287

1

Construction of M/Road from Shahi Road to

Basti Khadim Sindhu Chak No. 4/A &

Remaining Portion of Chak No. 3/A, Tehsil

Liaqat Pur District Rahim Yar Khan PP-287.

7.118 7.001 -0.117 100%

2

Construction of M/Road Madni Masjid Bazar

Feroza Town Tehsil Liaqat Pur District Rahim

Yar Khan PP-287.

1.481 1.441 -0.040 100%

30.000 14-Dec-12811

20.000 10-Sep-12296Page 493

Page 494: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of M/Road from Basti Jharkian

to Ghullah Mandi Road Feroza Tehsil Liaqat

Pur District Rahim Yar Khan PP-287.4.185 4.100 -0.085 100%

4

Construction of M/Road from Chowk Nadir

Shaheed Road Feroza to Basti Salwani

Tehsil Liaqat Pur District Rahim Yar Khan PP-

287.

3.409 3.369 -0.040 100%

5

Construction of M/Road from Chowk Nadir

Shaheed Road Dera Jam Naeem Feroza to

Basti Mumdani Tehsil Liaqat Pur District

Rahim Yar Khan PP-287.

3.807 3.727 -0.080 100%

5 20.000 19.638 -0.362

Col® Naveed Sajid dated 14.12.12

MPA, PP-287

1

Repair of M/Road from Chak No. 87/A to

Adda Gulshan Farid and Construction of New

M/Road Chak No. 86/A, 85/A & 43/A (Dera

Muhammad Azhar Shah) Tehsil Liaqat Pur

District Rahim Yar Khan PP-287.

0.043 -9.957 15%

2

Construction of M/Road from Abbasi Road to

Muzammil Shaheed Road Liaqat Pur City

District Rahim Yar Khan PP-287.

3

Construction of M/Road from Channi Goth

Liaqat Pur Road to Chak No. 51/A & 52/A

Tehsil Liaqat Pur District Rahim Yar Khan PP-

287.

3 10.000 0.043 -9.957

10.000

20.000 10-Sep-12296

30.000 14-Dec-12811

Page 494

Page 495: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Col ® Naveed Sajid dated 7.5.12

MPA, PP-287

2959 07-May-12 50.000 1

Water Supply Scheme for Feroza Town,

Tehsil Liaqat Pur District Rahim Yar Khan PP-

287.

1

Mian Shafi Muhammad dated 11.10.12

MPA, PP-288

1

Construction of M/Road from Mori Hazrat Pir

Shataba to Basti Chaudhary Mouza Pai Ahna

Tehsil Khan Pur District Rahim Yar Khan PP-

288.

2

Construction of Sludge Carrier at Adda

Nawan Kot City Tehsil Khan Pur District

Rahim Yar Khan PP-288.

2

Mian Muhammad Aslam dated 7.9.12

MPA, PP-289

1

Construction of M/Road from Basti Haji Khan

Muhammad to Dera Jam Abdul Hameed UC

Marri Allah Bachaya Tehsil Khan Pur District

Rahim Yar Khan PP-289.

2.000 1.952 -0.048 100%

2

Construction of M/Road from Bagho Bahar

Road to Chak 28/P UC Marri Allah Bachaya

Tehsil Khan Pur District Rahim Yar Khan PP-

289.

3.700 3.577 -0.123 100%

3

Construction of M/Road from Basti Qazian to

Basti Saddique Ahmed UC Marri Allah

Bachaya Tehsil Khan Pur District Rahim Yar

Khan PP-289.

2.200 2.148 -0.052 100%

3.000 11-Oct-12562

20.000 07-Sep-12297 Page 495

Page 496: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of M/Road from Jam Pur Road

to Basti Khalil Ahmed Jam UC Kotla Pathan

Tehsil Khan Pur District Rahim Yar Khan PP-

289.

1.700 1.634 -0.066 100%

5

Construction of M/Road from Basti Seth

Abdul Hameed to Basti Dhak Laran Tehsil

Khan Pur District Rahim Yar Khan PP-289.

4.400 4.252 -0.148 100%

6

Construction of M/Road from Pull Koti Nahar

to Basti Riddan Mouza Kalkan UC Kotla

Pathan Tehsil Khan Pur District Rahim Yar

Khan PP-289.

2.700 2.610 -0.090 100%

7

Construction of M/Road from Latki Sehja

Road to Nawa Khoo Basti Bakhrani UC

Sehja Tehsil Khan Pur District Rahim Yar

Khan PP-289.

3.300 3.241 -0.059 100%

7 20.000 19.414 -0.586

Mian Muhammad Aslam dated 4.12.12

MPA, PP-289

1

Construction of M/Road from Zahir Pir Road

to Jam Allah Divia, Basti Jam Ghulam

Muhammad & Basti Hamza Shaheed Aqil

Arain UC Jajja Abbasian Tehsil Khan Pur

District Rahim Yar Khan PP-289.

2

Construction of M/Road from Zahir Pir Road

to Canal Bank Khai Khair Shah Basti Lal

Arain & Soling UC Ghazi Pur Mouza Phul

Lolai Tehsil Khan Pur District Rahim Yar

Khan PP-289.

3

Construction of M/Road from Jamali Nagar

Road to Basti Jam Dodha Arain & Ghulla

Godown Chak No. 63/P to Nawan Kot UC

Sehja Tehsil Khan Pur District Rahim Yar

Khan PP-289.

10.000 0.058 -9.942 20%

4

Construction of M/Road from Chak No. 34/P

to Sher Garh Minor UC Latki Tehsil Khan Pur

District Rahim Yar Khan PP-289.

20.000 07-Sep-12297

30.000 04-Dec-12811

Page 496

Page 497: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4 10.000 0.058 -9.942

Makhdoom Muhammad Irtaza   dated 12.9.12

MPA, PP-291

302 12-Sep-12 11.000 1

Construction of Government Girls Primary

School Basti Gagra Mouza Bakhshan Arain

UC Tibbi Gul Muhammad, Government Boys

Primary School Basti Doday Da Mud UC

Bahudipur Qureshian & Government Boys

Primary School Basti Yaroo Da Khoo UC

Sonak Tehsil & District Rahim Yar Khan PP-

291.

11.000 10.128 -0.872 97%

1 11.000 10.128 -0.872

Makhdoom Muhammad Irtaza   dated 4.12.12

MPA, PP-291

1

Construction of Soling UC Glor Masso Khan,

UC Mian Wali Sheikhan, UC Thul Khair

Muhammad, UC Bahodi Pur Qureshian, UC

Tibbi Gull Muhammad & UC Haji Pur Tehsil &

District Rahim Yar Khan PP-291.

-10.000 15%

2

Construction of Bridge on Sadiq Branch Basti

Rais Haji Tahir UC Mianwali Qureshian

Tehsil & District Rahim Yar Khan PP-291.

3

Construction of Bridge on Mehmood Minor

Basti Haji Muhammad Ayub Khokhar UC Glor

Masso Khan Tehsil & District Rahim Yar

Khan PP-291.

3 10.000 -10.000

10.00030.000 04-Dec-12811

Page 497

Page 498: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Engr.Javed Akbar dated 7.9.12

MPA, PP-293

1

Construction of M/Road, Sewerage Soling

Basti Raheem Bukhsh Burra / Bashir Burra

Mouza UC 30/A Tehsil & District Rahim Yar

Khan PP-293.

2.500 2.406 -0.094 100%

2

Construction of M/Road, Sewerage Tuff Tile

Oad Colony Gharib Abad Abu-ul-Hassan

Colony UC 31/B Tehsil & District Rahim Yar

Khan PP-293.

2.000 1.919 -0.081 100%

3

Construction of M/Road, Sewerage Soling &

Tuff Tile Basti Siraj Basti Dhangaran, Deri

Sanghi UC 32/C Tehsil & District Rahim Yar

Khan PP-293.

1.000 0.988 -0.012 100%

4

Construction of M/Road, Sewerage Soling &

Tuff Tile Street No. 05 Jinnah Park

(Remaining Portion) Tehsil & District Rahim

Yar Khan PP-293.

1.000 0.600 -0.400

5

Construction of M/Road, Sewerage Soling &

Tuff Tile Basti Khair Muhammad Lar, Basti

Qaim Din, UC 33/D Tehsil & District Rahim

Yar Khan PP-293.

2.500 2.414 -0.086 100%

6

Construction of M/Road, Sewerage & Tuff

Tile Rehmat Colony Dastagir Colony Hafiz

Colony, UC 33/D Tehsil & District Rahim Yar

Khan PP-293.

1.000 0.971 -0.029 100%

7

Construction of M/Road, Sewerage & Tuff

Tile UC 34/E & UC 35/F Tehsil & District

Rahim Yar Khan PP-293.

1.000 0.925 -0.075 100%

8

Construction of M/Road, Sewerage & Tuff

Tile UC 35/F Tehsil & District Rahim Yar

Khan PP-293.

1.000 0.946 -0.054 100%

9

Construction of M/Road, Sewerage, Tuff Tile

& Boundary Wall Graveyard Chak No. 72/NP

UC 36/G Tehsil & District Rahim Yar Khan

PP-293.

2.000 1.933 -0.067 100%

20.000 07-Sep-12295

Page 498

Page 499: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

10

Construction of M/Road, Sewerage & Tuff

Tile Streets Gulshan-e-Usman & Hussain

Abad UC 37/H Tehsil & District Rahim Yar

Khan PP-293.

1.000 0.956 -0.044 100%

11

Construction of M/Road, Sewerage & Tuff

Tile Basti Kumharan, Shafi Town, Shafi

Town, Gulshan-e-Arjumand, UC 38/I Tehsil &

District Rahim Yar Khan PP-293.

1.000 0.909 -0.091 100%

12

Construction of M/Road, Sewerage & Tuff

Tile Shah Faisal Colony, Qazzafi Colony UC

38/I Tehsil & District Rahim Yar Khan PP-

293.

1.000 0.932 -0.068 100%

13

Construction of M/Road, Sewerage Soling &

Tuff Tile Basti Haji Ahmed, Rehmat Colony

UC RYK Deh Tehsil & District Rahim Yar

Khan PP-293.

1.000 0.977 -0.023 100%

14

Construction of M/Road, Sewerage Soling &

Tuff Tile UC Amin Garh Tehsil & District

Rahim Yar Khan PP-293.

1.000 0.976 -0.024 100%

15

Construction of M/Road, Sewerage Soling &

Tuff Tile UC Amin Garh RYK Deh Tehsil &

District Rahim Yar Khan PP-293.

1.000 0.860 -0.140 100%

15 20.000 18.712 -1.288

Engr.Javed Akbar dated 4.12.12

MPA, PP-293

1

Construction of M/Road, Tuff Tile, Sewerage

Park UC 30/A Tehsil & District Rahim Yar

Khan PP-293.

2

Construction of Passengers Waiting Rooms

Tehsil & District Rahim Yar Khan PP-293.

3

Construction of Sewerage, Water Supply &

Tuff Tiles UC 30/A Tehsil & District Rahim

Yar Khan PP-293.

20.000 07-Sep-12295

30.000 04-Dec-12811

Page 499

Page 500: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of M/Road, Tuff Tile, Sewerage

UC 31/B Tehsil & District Rahim Yar Khan PP-

293.

1.000 -1.000 15%

5

Construction of Tuff Tile & Sewerage UC

31/B Tehsil & District Rahim Yar Khan PP-

293.

1.000 -1.000 10%

6

Construction of Water Supply, Sewerage,

Tuff Tile & Boundary Wall Tehsil & District

Rahim Yar Khan PP-293.

7

Construction of M/Road, Tuff Tile, Sewerage

UC 32/C Tehsil & District Rahim Yar Khan

PP-293.

8

Construction of Tuff Tile & Sewerage UC

32/C Tehsil & District Rahim Yar Khan PP-

293.

9

Construction of Sewerage, Tuff Tiles & Water

Supply, Repair of Park UC 32/C Tehsil &

District Rahim Yar Khan PP-293.

10

Construction of M/Road, Tuff Tile, Sewerage

UC 33/D Tehsil & District Rahim Yar Khan

PP-293.

1.000 -1.000 18%

11

Construction of Tuff Tile & Sewerage UC

33/D Tehsil & District Rahim Yar Khan PP-

293.

12

Construction of Water Supply, Sewerage &

Tuff Tiles UC 33/D Tehsil & District Rahim

Yar Khan PP-293.

1.000 -1.000 15%

13

Construction of M/Road, Tuff Tile, Sewerage

UC 34/E Tehsil & District Rahim Yar Khan PP-

293.

1.000 -1.000 18%

14

Construction of Boundary Wall, Water

Supply, Sewerage & Tuff Tiles UC 34/E

Tehsil & District Rahim Yar Khan PP-293.

15

Construction of Tuff Tile, Sewerage & Water

Supply UC 34/E Tehsil & District Rahim Yar

Khan PP-293.

16

Construction of Tuff Tile & Sewerage, Park

UC 35/F Tehsil & District Rahim Yar Khan PP-

293.

1.000 -1.000 15%30.000 04-Dec-12811

Page 500

Page 501: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

17

Construction of Sewerage, Water Supply &

Tuff Tiles UC 35/F Tehsil & District Rahim

Yar Khan PP-293.

18

Construction of Boundary Wall, Soling, Water

Supply, Sewerage & Tuff Tiles UC 35/F

Tehsil & District Rahim Yar Khan PP-293.1.000 -1.000 18%

19

Construction of M/Road, Tuff Tile, Sewerage

UC 36/G Tehsil & District Rahim Yar Khan

PP-293.

20

Construction of Tuff Tile & Sewerage UC

36/G Tehsil & District Rahim Yar Khan PP-

293.

21

Construction of Boundary Wall, Soling, Drain,

Sludge Carrier & Street Lights UC 36/G

Tehsil & District Rahim Yar Khan PP-293.

22

Construction of M/Road, Tuff Tile, Sewerage

UC 37/H Tehsil & District Rahim Yar Khan

PP-293.

1.000 -1.000 10%

23

Construction of Passengers Waiting Rooms

Tehsil & District Rahim Yar Khan PP-293.

24

Construction of Sewerage, Tuff Tiles & Water

Supply UC 37/H Tehsil & District Rahim Yar

Khan PP-293.

25

Construction of Tuff Tile & Sewerage UC 38/I

Tehsil & District Rahim Yar Khan PP-293.

26

Construction of Water Supply, Tuff Tiles,

Sewerage & M/Road UC 38/I Tehsil & District

Rahim Yar Khan PP-293.

1.000 -1.000 15%

27

Construction of Soling, Sewerage, Tuff Tiles

& Water Supply UC 38/I Tehsil & District

Rahim Yar Khan PP-293.

1.000 -1.000 18%

28Construction of Soling, Tuff Tiles, Sewerage,

Boundary Wall, Bridge UC Amin Garh Tehsil

& District Rahim Yar Khan PP-293.

30.000 04-Dec-12811

Page 501

Page 502: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

29

Construction of Soling, Tuff Tiles, Sewerage,

Bridge UC Rahim Yar Khan Deh Tehsil &

District Rahim Yar Khan PP-293.

30

Construction of Soling, Bridge, Sewerage,

Tuff Tiles UC Rahim Yar Khan Deh Tehsil &

District Rahim Yar Khan PP-293.

30 10.000 -10.000

Ch.Javed Hussain Gujjar dated 12.9.12

MPA, PP-294

1

Construction of Tuff Tiles Basti Malkan, Basti

Numberdar, Basti Vachani, Basti Mir

Muhammad Da Shaher & Basti Langra

Saylan Tehsil & District Rahim Yar Khan PP-

294.

3.100 2.383 -0.717 100%

2

Construction of Tuff Tiles Street Khalid

Abbasi Dari Azeem, Basti Basher Makin Dari

Azeem & Street Riaz Dhandu Dari Azeem

Tehsil & District Rahim Yar Khan PP-294.

1.900 1.744 -0.156 100%

3

Construction of Tuff Tiles & Sewerage Street

the Learning House School Tarinda Swaye

Khan (Ashraf Colony) Tehsil & District Rahim

Yar Khan PP-294.

0.600 0.579 -0.021 100%

4Construction of Soling Basti Warni Tehsil &

District Rahim Yar Khan PP-294.0.700 0.659 -0.041 100%

5

Construction of Soling Basti Kokari Chak No.

116/P Teba Chak No. 115/P, Basti Ramzan

Chachar, Chak No. 114/P Tehsil & District

Rahim Yar Khan PP-294.

2.600 2.523 -0.077 100%

6

Construction of Soling Basti Mahar Phago

Chak No. 138/P Tehsil & District Rahim Yar

Khan PP-294.

0.800 0.722 -0.078 100%

7

Construction of Soling Chak No. 39/P UC

Behshti, Basti Ghareebabad Basti Behshti

Tehsil & District Rahim Yar Khan PP-294.

1.500 1.342 -0.158 100%

30.000 04-Dec-12811

19.400 12-Sep-12349

Page 502

Page 503: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

8

Construction of Soling Mori Abbasia to Basti

Channa, Dera Muneer Jut Basti Channa,

Dera Rao Fareed Basti Channa Tehsil &

District Rahim Yar Khan PP-294.

2.200 2.129 -0.071 100%

9

Construction of Soling Minority Colony No. 02

Sunny Pull Tehsil & District Rahim Yar Khan

PP-294.

0.700 0.629 -0.071 100%

10

Construction of Soling Chak No. 228/P

Chaman, Chak No. 225/P Chaman, Basti

Bago Kharal, Chak No. 233/P, Basti Abdul

Ghanni Shar Tehsil & District Rahim Yar

Khan PP-294.

2.500 2.388 -0.112 100%

11

Construction of Soling Basti Taraylian Kandy

Wali, Basti Khera Kandy Wali Tehsil &

District Rahim Yar Khan PP-294.

1.800 1.714 -0.086 100%

12

Construction of Soling Chak Manzoor Arain

UC Behshti Tehsil & District Rahim Yar Khan

PP-294.

1.000 0.954 -0.046 100%

12 19.400 17.766 -1.634

Ch.Javed Hussain Gujjar dated 4.12.12

MPA, PP-294

1

Construction of Soling Basti Sikandarabad

Pahor, Basti Malkan Chak No. 101/P, Basti

Ch. Razzak Cheema Chak No. 107/P & Ch.

Ashraf Arain Tibba Chak No. 87/P Tehsil &

District Rahim Yar Khan PP-294.

0.450 -0.450 15%

2

Construction of Soling Basti Balochan Mouza

Sadiq Pur, Basti Malkan Mouza Sadiq Pur &

Chak No. 116/P Tehsil & District Rahim Yar

Khan PP-294.

1.300 -1.300 18%

3

Construction of Soling Basti Gharri Sanghi &

Basti Saleh Muhammad Sanghi Tehsil &

District Rahim Yar Khan PP-294.

1.000 -1.000 18%

19.400 12-Sep-12349

30.000 04-Dec-12811

Page 503

Page 504: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction of Soling Chak No. 133/P More

to Basti Wah Faqiran & Chak No. 133/P More

to Malik Shabbir Rind Tehsil & District Rahim

Yar Khan PP-294.

1.300 -1.300 10%

5

Construction of Soling Bhoran Shah to Dera

Mukhtiar Chak No. 84/P Tehsil & District

Rahim Yar Khan PP-294.

6

Construction of Soling Chak No. 106/P

Masjid More to Basti Din Muhammad Metla,

Chak No. 106/P Basti Rais Murad & Basti

Hakran Chak No. 123/P Tehsil & District

Rahim Yar Khan PP-294.

1.100 -1.100

7

Construction of Soling Chak No. 221/P Dera

Ch. Asif, Chak No. 136/P & Basti Balochan

Chak No. 134/P Tehsil & District Rahim Yar

Khan PP-294.

8

Construction of Soling Basti Mud Bukhshan &

Ch. Shoukat Tibba Chak No. 140/P Tehsil &

District Rahim Yar Khan PP-294.1.425 -1.425 15%

9

Construction of Soling Sam Nala to Basti

Dhillon UC Bahishti & Mud Dino Tibba to

Abdul Hakeem Tehsil & District Rahim Yar

Khan PP-294.

1.425 -1.425 10%

10

Construction of Soling Dera Patafi to Chak

No. 228/P via Shah Nawaz Solangi &

Construction of Bridge Chak No. 228/P Tehsil

& District Rahim Yar Khan PP-294.

1.250 -1.250 18%

11

Construction of Soling Basti Kabul Khan

Chak No. 54/P & Basti Rais Farid Burra Chak

No. 56/P Tehsil & District Rahim Yar Khan

PP-294.

12

Construction of Soling Dera Jam Iqbal

Punwar Patti Punwaran & Minority Abadi

Dara Jugwar Tehsil & District Rahim Yar

Khan

30.000 04-Dec-12811

Page 504

Page 505: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

13

Construction of Soling Dera Majeed Nazir to

Nazim Abad & Tibba Haji Darwaish Chak No.

75/P Tehsil & District Rahim Yar Khan PP-

294.

14

Construction of Soling Basti Chachran Chak

No. 93/P & M/Road to Dera Master Iqbal

Chak No. 133/P Tehsil & District Rahim Yar

Khan PP-294.

15

Construction of Soling Basti Balochan Chak

No. 55/P & Basti Rais More Warind Chak No.

55/P Tehsil & District Rahim Yar Khan0.750 -0.750 18%

16

Construction of Soling Basti Ladda Arain to

Jam Riaz Tehsil & District Rahim Yar Khan

PP-294.

16 10.000 -10.000

Rais Sohail Ahmed dated 8.10.12

Notable (PP-290)

1

Construction of M/Road Remaining Portion of

M/Road Basti Kan De Wahi, Mud Bhora, Pull

10/P to Tibbi & Remaining Portion of Basti

Mud Bhora Tehsil Khan Pur District Rahim

Yar Khan.

2

Construction of M/Road Mud Mangla Road to

Basti Badani, Neil Garh, Basti Shabbir Pitafi

& Mud Mangla Road to Basti Gulkala, Neil

Garh Tehsil Khan Pur District Rahim Yar

3

Construction of M/Road Remaining Portion of

Chak No. 114/1-L, Chak No. 103/1-L Bagho

Bahar & Dera Rais Illahi Bukhsh Chak No.

115/1-L UC-45/P Tehsil Khan Pur District

Rahim Yar Khan.

4

Construction of M/Road Basti Dhoop Sari,

Jetha Bhutta & Sewerage Scheme Khalil

Colony, UC-73/D Tehsil Khan Pur District

Rahim Yar Khan.

30.000 04-Dec-12811

20.000 08-Oct-12499

Page 505

Page 506: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

Construction of Pull Ab-e-Hayat at Chak No.

111/1-L UC-45/P Tehsil Khan Pur District

Rahim Yar Khan.

6

Construction of M/Road Remaining Portion of

Basti Thaheem Tehsil Khan Pur District

Rahim Yar Khan.

6

Sardar Rais Muhammad Ibrahim dated 4.12.12

MPA, PP-297

1

Construction of M/Road from Tillo Road to

Basti Muhammad Hussain Shar Numberdar

Mouza Gorh Meela Tehsil Sadiq Abad

District Rahim Yar Khan PP-297.

10.000 -10.000

2Repair of M/Road from Canal Bank to Bongh

City Road via Mohallah Awan Tehsil Sadiq

Abad District Rahim Yar Khan PP-297.

3

Construction of M/Road from Khair Abad to

Basti Haji Azeem Mouza Dhandi Tehsil Sadiq

Abad District Rahim Yar Khan PP-297.

4

Construction of M/Road from Basti Adam Pur

to Basti Rais Badar Din Merhom Mouza Goth

Aaloo Tehsil Sadiq Abad District Rahim Yar

Khan PP-297.

5

Construction of M/Road from Pull Kandair to

Basti Nazar Muhammad Shar Mouza Kandair

Tehsil Sadiq Abad District Rahim Yar Khan

PP-297.

6

Repair of M/Road from Walhar Machi Goth

Road to Basti Rehmani Tehsil Sadiq Abad

District Rahim Yar Khan PP-297.

7

Construction of M/Road from Kot Sabzal

Road to Basti Rana Farooq Ahmed Tehsil

Sadiq Abad District Rahim Yar Khan PP-297.

8

Construction of M/Road Bandor Road to

Basti Abbas Khan Abbasi from Tehsil Sadiq

Abad District Rahim Yar Khan PP-297.

20.000 08-Oct-12499

30.000 04-Dec-12811

Page 506

Page 507: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

Construction of M/Road from Adda Khan Da

Khoo to Chak No. 177/P UC 173/P Tehsil

Sadiq Abad District Rahim Yar Khan PP-297.

10

Construction of M/Road from Kot Sabzal

Road to Basti Adam Tehsil Sadiq Abad

District Rahim Yar Khan PP-297.

11

Construction of M/Road from Bohi Warr Dino

Shah Road to Basti Tariq Dahar UC Sanjar

Pur Tehsil Sadiq Abad District Rahim Yar

Khan PP-297.

11 10.000 -10.000

Visit to Chachran Sharif dated 7.1.13

Col® Naveed Sajid, MPA, PP-287

1

Construction of M/Road Remaining Portion of

M/Road Basti Kan De Wahi, Mud Bhora, Pull

10/P to Tibbi & Remaining Portion of Basti

Mud Bhora Tehsil Khan Pur District Rahim

Yar Khan.

2

Construction of M/Road Mud Mangla Road to

Basti Badani, Neil Garh, Basti Shabbir Pitafi

& Mud Mangla Road to Basti Gulkala, Neil

Garh Tehsil Khan Pur District Rahim Yar

Khan.

3

Construction of M/Road Remaining Portion of

Chak No. 114/1-L, Chak No. 103/1-L Bagho

Bahar & Dera Rais Illahi Bukhsh Chak No.

115/1-L UC-45/P Tehsil Khan Pur District

Rahim Yar Khan.

4

Construction of M/Road Basti Dhoop Sari,

Jetha Bhutta & Sewerage Scheme Khalil

Colony, UC-73/D Tehsil Khan Pur District

Rahim Yar Khan.

5

Construction of Pull Ab-e-Hayat at Chak No.

111/1-L UC-45/P Tehsil Khan Pur District

Rahim Yar Khan.

30.000 04-Dec-12811

50.000 07-Jan-132559-A

Page 507

Page 508: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

6

Construction of M/Road Remaining Portion of

Basti Thaheem Tehsil Khan Pur District

Rahim Yar Khan.

6

Tahir Iqbal Ch. dated 30.10.12

Notable

1

Const.of Sewerage main chowk masjid wala

toward north chak No53/WB and soling gali

Murtaza Sahiwal PP-236 PWP-II, 2012-130.900 0.878 -0.022 100%

2

Const.of Soling from Chak No.47/WB to

Basti Mahmood Kharal Distt Vehari PP-236

PWP-II, 2012-13

1.700 0.664 -1.036 39%

3

Const.of Soling and raising of man hole chak

No.30/WB Distt Vehari PP-236 PWP-II, 2012-

13

1.000 0.970 -0.030 100%

4

Const.of Road,Soling/remaining portion chak

No.57/WB to M/R chak no.65/WB Distt

Vehari PP-236 PWP-II, 2012-13

1.500 1.469 -0.031 100%

5

Const.of M/road from pull Gadran wala to

Basti Muhammad Yar Chadhar on Khadar

Canal Mouza Qadar abad uc 25 Distt Vehari

PP-236 PWP-II, 2012-13

4.500 4.348 -0.152 100%

6

Const.of Soling Basti Ghulam Rasool Arian

chak No.47/WB Distt Vehari PP-236 PWP-

II, 2012-13

0.850 0.824 -0.026 100%

7

Const.of Soling and Drain Ghafrain wali chak

No.28/WB Distt Vehari PP-236 PWP-II, 2012-

13

0.700 0.652 -0.048 100%

8Const.of M/R from Murad road 77/WB road to

M/R chak No.75/WB Dera Rustam Gujjar

Distt Vehari PP-236 PWP-II, 2012-13

3.850 3.734 -0.116 100%

9Const.of soling and drains basti Bhatta Ikram

District Vehari PP-236 PWP-II, 2012-13 3.000 2.338 -0.662 100%

10

Const.of soling , sewerage and drains 3

marla scheme Pir Murad Vehari Distt Vehari

PP-236 PWP-II, 2012-13

3.000 0.688 -2.312 23%

50.000 07-Jan-132559-A

30.000 30-Oct-12517

Page 508

Page 509: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Const.of Soling Graveyard chah No.47/WB

Distt Vehari PP-236 PWP-II, 2012-13 2.400 2.337 -0.063 100%

12

Const.of Boundary wall Jinaz Gah 224/WB

and Boundary wall Dispensary 226/EB

Boundary wall G.G.P.S chak No.222/EB Distt

Vehari PP-236 PWP-II, 2012-13

0.800 0.772 -0.028 100%

13Const.of M/R from Murad road 56/WB Distt

Vehari PP-236 PWP-II, 2012-132.300 2.235 -0.065 100%

14

Const.of Solling and Drain Mouza Jangal

Barali District Vehari PP-236 PWP-II, 2012-

13

0.500 0.485 -0.015 100%

15

Const.of Solling Chak No. 60/WB Malik

Anjum Nawaz Bhera &Khaliq Dalmia District

Vehari PP-236 PWP-II, 2012-13

1.000 0.873 -0.127 87%

16

Const.of Solling and Drain Chak No. 64/WB

Malik Muhammad Gujjar PP-236 District

Vehari PP-236 PWP-II, 2012-13

0.500 0.484 -0.016 100%

17

Const.of Solling and Drain Chak No. 58/WB

PP-236 District Vehari PP-236 PWP-II, 2012-

13

1.000 0.873 -0.127 87%

18

Const.of Solling and Drain Chak No. 66/WB

PP-236 District Vehari PP-236 PWP-II, 2012-

13

0.500 0.485 -0.015 100%

18 30.000 25.109 -4.891

Sindh

S.A.Iqbal Qadri dated 24.8.12

MNA, NA-241

1

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-01 TO UC-04

ORANGI TOWN, KARACHI.

12.846 12.530 -0.316 98%

CCD-I, Karachi

30.000 30-Oct-12517

100.000 24-Aug-1279

Page 509

Page 510: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-01 TO UC-05

ORANGI TOWN, KARACHI.

10.000 9.751 -0.249 98%

3

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-01 TO UC-04

ORANGI TOWN, KARACHI.

20.778 20.605 -0.173 99%

4

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-01 TO UC-04

ORANGI TOWN, AND UC-06 SITE TOWN

KARACHI.

10.000 9.616 -0.384 96%

5

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-01 TO UC-03

ORANGI TOWN, AND UC-06 SITE TOWN

KARACHI.

9.028 8.086 -0.942 89%

6

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-01 AND UC-03

ORANGI TOWN, KARACHI.

9.802 9.766 -0.036 98%

7

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-04 AND UC-05

ORANGI TOWN, KARACHI.

8.772 7.606 -1.166 87%

8

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-04 AND UC-05

ORANGI TOWN, KARACHI.

8.772 7.567 -1.205 86%

100.000 24-Aug-1279

Page 510

Page 511: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

RE-HABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-04 AND UC-05

ORANGI TOWN, KARACHI.

10.000 9.751 -0.249 98%

9 100.000 95.278 -4.722

DR.Abdul Qadir Khanzada dated 24.8.12

MNA, NA-242

1

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-7 & 08 ORANGI

TOWN, KARACHI. (NA – 242) PWP-II

(212-2013) (PACKAGE –I) ,

10.000 8.540 -1.460 85%

2

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-7 & 08 ORANGI

TOWN, KARACHI. (NA – 242) PWP-II

(212-2013) (PACKAGE –II)

10.000 7.404 -2.596 74%

3

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-6 & 09 ORANGI

TOWN, KARACHI. (NA – 242) PWP-II

(212-2013) (PACKAGE –I)

10.000 9.506 -0.494 95%

4

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-6 & 09 ORANGI

TOWN, KARACHI. (NA – 242) PWP-II

(212-2013) (PACKAGE –II)

10.000 9.861 -0.139 98%

100.000 24-Aug-1279

100.000 24-Aug-1280

Page 511

Page 512: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

REHABILITATION /CONSTRUCTION OF

C.C ROAD / PATH AND IMPROVEMENT OF

WATER SUPPLY LINE IN UC-06 TO UC-

09 ORANGI TOWN, KARACHI. (NA – 242)

PWP-II (2012-2013) ( PACKAGE-I )

5.005 4.216 -0.789 84%

6

REHABILITATION /CONSTRUCTION OF

C.C ROAD / PATH AND IMPROVEMENT OF

WATER SUPPLY LINE IN UC-06 TO UC-

09 ORANGI TOWN, KARACHI. (NA – 242)

PWP-II (2012-2013) ( PACKAGE-II )

5.005 3.041 -1.964 77%

7

CONSTRUCTION OF RCC OPEN DRAIN

FROM SECTOR 12 TO METRO CINEMA,

UC-12, ORANGI TOWN, KARACHI

(NA – 242) FOR THE YEAR 2012-2013

P.W.P-II ( PHASE –III )(PACKAGE-I)

25.035 24.496 -0.539 98%

8

CONSTRUCTION OF RCC OPEN DRAIN

FROM SECTOR 12 TO METRO CINEMA,

UC-12, ORANGI TOWN, KARACHI

(NA – 242) FOR THE YEAR 2012-2013

P.W.P-II ( PHASE –III )(PACKAGE-II)

24.955 24.547 -0.408 99%

8 100.000 91.611 -8.389

Abdul Waseem dated 24.8.12

MNA, NA-243

1

Construction /Re – Habilitation of Metalled

Road and Improvement of Sewerage System

in Sector 5-C and Sector 5-L, New Karachi

Town, Karachi

100.000 8.252 -91.748 86%

2

Construction /Re – Habilitation of Metalled

Road in Surjani Town Ship, Gaddap Town,

Karachi

8.410 8.410 84%

3

Construction /Re – Habilitation of Metalled

Road and Improvement of Sewerage / Water

System in UC-06,Gaddap Town, Karachi2.758 2.758 32%

100.000 24-Aug-1280

100.000 24-Aug-1281

Page 512

Page 513: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Construction / Re – Habilitation of Metalled

Road and Improvement of Sewerage / Water

System In Sector-03,5A and Sector 5-M at

New Karachi Town, Karachi

4.924 4.924 49%

5

Construction /Re – Habilitation of Metalled

Road, C.C. Roads / Paths and Improvement

of Sewerage / Water System in Sector 5-D, 5-

E, 5-F, New Karachi Town, Karachi

8.887 8.887 89%

6

Construction /Re – Habilitation of Metalled

Road, C.C. Roads / Paths and Improvement

of Sewerage and Water System in UC-07 to

UC-09, New Karachi Town, Karachi

8.936 8.936 89%

7

Construction /Re – Habilitation of Metalled

Road, C.C. Roads / Paths and Improvement

of Sewerage and Water System in UC-13,

Orangi Town, Karachi

9.295 9.295 96%

8Up- Gradation of Play Ground in UC-07, New

Karachi Town, Karachi 7.221 7.221 82%

9

up- Gradation of Electrical installation of

(1)Srjani chowrangi to Macca

Restaurant(Sector 5-A) North Karachi.(II)

Macca Restaurant to Baba More (Sector 5-

A1) North Karachi (III) Surjani Side)

11.212 11.212 90%

9 100.000 69.895 -30.105

Sheikh Saleh UD Din dated 24.8.12

MNA, NA-244

1

CONSTRUCTION OF MODEL PARK IN

SECTOR 15-A, NORTH NAZIMABAD

TOWN, KARACHI

100.000 17.075 -82.925 98%

2

RE – HABILITATION / CONSTRUCTION OF

METALLED ROAD, C.C. ROAD / PATH AND

IMPROVEMENT OF SEWERAGE / WATER

SUPPLY PIPE LINE IN SECTOR-11-G, 11-

D, 11-E AND 11-J AT NORTH KARACHI,

NEW KARACHI TOWN, KARACHI

9.702 9.702 80%

100.000 24-Aug-1281

100.000 24-Aug-1282

Page 513

Page 514: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

RE – HABILITATION / CONSTRUCTION OF

METALLED ROAD, C.C. ROAD / PATH AND

IMPROVEMENT OF SEWERAGE / WATER

SUPPLY PIPE LINE IN UC-03 TO UC-06 AT

NEW KARACHI TOWN, KARACHI

9.529 9.529 95%

4

RE – HABILITATION / CONSTRUCTION OF

METALLED ROAD, C.C. ROAD / PATH AND

IMPROVEMENT OF SEWERAGE / WATER

SUPPLY PIPE LINE IN UC-09 AND UC-10

AT NORTH NAZIMABAD TOWN, KARACHI

9.738 9.738 97%

5

RE – HABILITATION / CONSTRUCTION OF

METALLED ROAD, C.C. ROAD / PATH AND

IMPROVEMENT OF SEWERAGE / WATER

SUPPLY PIPE LINE IN UC-09 AND UC-10

AT NORTH NAZIMABAD TOWN, KARACHI

9.607 9.607 98%

6

RE – HABILITATION / CONSTRUCTION OF

METALLED ROAD, C.C. ROAD / PATH AND

IMPROVEMENT OF SEWERAGE / WATER

SUPPLY PIPE LINE IN F.B. AREA,

GULBERG TOWN, KARACHI

9.316 9.316 96%

7

RE – HABILITATION / CONSTRUCTION OF

METALLED ROAD, C.C. ROAD / PATH AND

IMPROVEMENT OF SEWERAGE / WATER

SUPPLY PIPE LINE IN F.B. AREA,

GULBERG TOWN, KARACHI

9.506 9.506 98%

8

RE – HABILITATION / CONSTRUCTION OF

METALLED ROAD, C.C. ROAD / PATH AND

IMPROVEMENT OF SEWERAGE / WATER

SUPPLY PIPE LINE IN F.B. AREA,

GULBERG TOWN, KARACHI

9.798 9.798 98%

9

Up gradation of Cricket grounds, Play Land

Area at North Nazimabad,North

Karachi,Karachi

8.791 8.791 94%

100.000 24-Aug-1282

Page 514

Page 515: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9 100.000 93.062 -6.938

Sufyun Yousaf dated 24.8.12

MNA, NA-246

1

DEVELOPMENT UP GRADATION OF PARK

IN UC-03 & UC-06 GULBERG TOWN

KARACHI

30.000 5.917 -24.083 76%

2

DEVELOPMENT UP GRADATION OF PARK

IN UC-07 & UC-08 LIAQUATABAD TOWN

KARACHI

10.000 7.891 -2.109 98%

3

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-1 TO UC-06

GULBERG TOWN , KARACHI.

10.000 19.122 9.122 96%

4

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF AND SEWERAGE /

WATER SYSTEM IN UC-6 TO UC-08

LIAQUATABAD TOWN, KARACHI.

20.000 8.731 -11.269 87%

5

UP GRADATION OF KINDENY CENTER IN

BLOCK # 06 NEAR TAHIR VULLA

GULBERG TOWN KARACHI ( DIALYSIS

HALL , ICU UNIT AND ADMINISTRATIVE

BLOCK .

10.000 7.837 -2.163 76%

6

Supply of Medical & Surgical Equipments for

Kidney Centre in F.B Area Block No 6 Near

Tahir Villa Gulberg Town.

20.000 -20.000

6 100.000 49.498 -50.502

100.000 24-Aug-1284

Page 515

Page 516: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Khush Bakht Shujat dated 24.8.12

MNA, NA-250

1REHABILITATION OF BITUMINOUS ROAD

UC-10, KARACHI.10.000 9.722 -0.278 100%

2REHABILITATAION OF LAYING OF C.C.

FLOORING UC-10, KARACHI.10.000 9.755 -0.245 100%

3PARK DEVELOPMENT AT CLIFTON UC-10,

KARACHI.7.500 4.195 -3.305 56%

4LAYING OF C.C. FLOORING AND

SEWERAGE LINE UC-11, KARACHI.10.000 9.629 -0.371 100%

5REHABILITATION OF BITUMINOUS ROAD

UC-11, KARACHI.10.000 8.927 -1.073 89%

6LAYING OF C.C. FLOORING AND

SEWERAGE LINE UC-09, KARACHI.10.000 9.149 -0.851 91%

7REHABILITATION OF BITUMINOUS ROAD

UC-09, KARACHI.10.000 9.447 -0.553 94%

8REHABILITATION OF BITUMEN ROAD AT

BAZATTA LINE, KARACHI.5.000 4.725 -0.275 95%

9REHABILITATION OF C.C. FLOORING AT

BAZATTA LINE, KARACHI.5.000 4.875 -0.125 100%

10

REHABILITATION OF C.C. ROAD AT DHOLI

KHATTA SAPARI COMPOUND KCB,

KARACHI.

10.000 9.744 -0.256 100%

11

REHABILITATION OF BITUMEN ROAD AT

DHOLI KHATTA SAPARI COMPOUND KCB,

KARACHI.

10.000 9.759 -0.241 100%

12LAYING SEWERAGE LINE AT DHOLI

KHATTA SUPARI COMPOUND KCB, 2.500 2.413 -0.087 100%

12 100.000 92.340 -7.660

100.000 24-Aug-1287

Page 516

Page 517: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Syed Haider Abbas Rizvi dated 24.8.12

MNA, NA-253

1

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM PARADISE

BAKERY TO FAHAD SQUARE IN UC-11 &

12 GULSHAN-E-IQBAL TOWN, KARACHI.

10.196 10.189 -0.007 98%

2

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM PARADISE

BAKERY TO FAHAD SQUARE IN UC-11 &

12 GULSHAN-E-IQBAL TOWN, KARACHI.

10.196 10.296 0.100 98%

3

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM PARADISE

BAKERY TO FAHAD SQUARE IN UC-11 &

12 GULSHAN-E-IQBAL TOWN, KARACHI.

9.606 8.182 -1.424 98%

4

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM UC-12 & 13

GULSHAN-E-IQBAL TOWN,AND UC-04

GADDAP TOWN KARACH

10.000 9.613 -0.387 96%

5

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM UC-12 & 13

GULSHAN-E-IQBAL TOWN,AND UC-04

GADDAP TOWN KARACHI

10.000 9.505 -0.495 95%

6

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM UC-12 & 13

GULSHAN-E-IQBAL TOWN,AND UC-04

GADDAP TOWN KARACHI.(

10.000 9.410 -0.590 94%

100.000 24-Aug-1291

Page 517

Page 518: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

7

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM UC-10,11 & 12

GULSHAN-E-IQBAL TOWN, KARACHI

10.000 9.400 -0.600 94%

8

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM UC-10,11 & 12

GULSHAN-E-IQBAL TOWN, KARACHI

10.000 9.789 -0.211 97%

9

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM UC-10,11 & 12

GULSHAN-E-IQBAL TOWN, KARACHI.

10.000 9.734 -0.266 97%

10

REHABILITATION /CONSTRUCTION OF

METALLED ROAD C.C ROAD/ PATH AND

IMPROVEMENT OF SEWERAGE /

WATER SYSTEM FROM UC-10,11 & 12

GULSHAN-E-IQBAL TOWN, KARACHI.

10.000 9.583 -0.417 98+%

10 100.000 95.701 -4.299

Sher Muhammad Baloch dated 7.9.12

MNA, NA-258

1

Rehabilitation/Improvement of Sewerage

System and C.C. flooring at UC Gaddap,

Gaddap Town Karachi.

10.000 9.779 -0.221 80%

2

Rehabilitation/Improvement of Sewerage

System and C.C flooring at Ibrahim Hydri Bin

Qasim Town Karachi.

10.000 9.616 -0.384 98%

3Construction of C.C. flooring at Gabol Stop

Gaddap Town Karachi.5.000 4.877 -0.123 100%

CCD-III, Karachi

100.000 24-Aug-1291

50.000 07-Sep-12224

Page 518

Page 519: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4Const. of C.C. flooring at Hammal Baloch

Goth Gaddap Town Karachi.5.000 4.696 -0.304 98%

5

Construction of C.C. flooring at Soomar

Kandani and Ismail Kandani Gaddap Town

Karachi

5.000 4.873 -0.127 100%

6Construction of Compound Wall at Football

Ground Ghreebabad Malir Town Karachi.4.000 1.890 -2.110 47%

7Const. of Community at Baksha Bandi Jo

Goth Gaddap Town Karachi.4.000 1.626 -2.374 30%

8

Construction of Surface Water Tank at

Baksha Bandi Jo Goth Gaddap Town

Karachi.

4.000 2.197 -1.803 51%

9Const. of Community Centre at Dawood Goth

Malir, Malir Town Karachi.3.000 1.476 -1.524 45%

10

Construction of Govt. College at Baitullah

Goth Deh Landhi near Malir River Bin Qasim

Town Karachi

30.000 14.692 -15.308 75%

11Construction of High School at UC Gadap

Town Karachi1.740 -1.740

12

Construction of High School at Pathan Goth

Maidan Imam Bux Bhuro Village Gaddap

Town karachi

1.241 1.240 -0.001 100%

13

Construction of High School at Ilyas Ibrahim

Hydri UC Rehri Bin Qasim Town Karachi 0.375 0.305 -0.070 81%

14

Construction of Football Stadium at Dumba

Goth Nea Super Highway Gaddap Town,

karachi

0.551 0.187 -0.364 34%

14 50.000 57.454 7.454

Sher Muhammad Baloch dated 12.9.12

MNA, NA-258

358 12-Sep-12 18.000 18.000 -18.000

50.000 07-Sep-12224

Page 519

Page 520: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

18.000 -18.000

Abdul Qadir Patel dated 28.9.12

MNA, NA-239

1

Upgradation 0f Sewerage system CC

Flooring and Road at different streets in 9-

/1,9-E/1,9-a,9-B,9-C,9-D Sector 12 block

A,B,C,D,E & F, Saeedabad, Baldia Town

Karachi.

(PHASE - II)

9.365 9.010 -0.355 100%

2

Replacement of Sewerage Lines &

Renovation of Metalled Road in Sector I & II

Haroon Bahria Co-operative Society,

HBCHS, Baldia Town Karachi.

(PHASE-II)

15.310 14.850 -0.460 100%

3

Replacement of Sewerage Lines &

Renovation of Metalled Road in Sector III &

IV Haroon Bahria Co-operative Society,

HBCHS, Baldia Town Karachi.

(PHASE-II)

25.320 23.720 -1.600 100%

3 50.000 47.580 -2.420

Muhammad Ayub Sheikh dated 24.8.12

MNA, NA-254

1

Cement concrete at 32/E Nassir Colony, 31/A

Allah wala town U/C-02 Korangi town

Karachi.

6.400 6.378 -0.022 100%

2

Cement Concrete flooring at streets of Allah

tawakal road U/C-06 Korangi town Karachi. 6.400 6.368 -0.032 100%

3Cement Concrete flooring at streets at 33/C

U/C-06 & 07 Korangi town Karachi.7.700 7.640 -0.060 100%

CCD-VI, Karachi

50.000 28-Sep-12424

100.000 24-Aug-1292

Page 520

Page 521: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

4

Cement Concrete flooring in Q-Area Korangi

No.02 U/C- 07 Korangi town Karachi. 6.720 6.720 100%

5

Cement Concrete flooring in Y-Area, 40/C

and 48/C area U/C- 03 Korangi town

Karachi.

6.720 6.709 -0.011 100%

6

Cement Concrete flooring in T-Area,and 48/B

sector U/C- 04 Korangi town Karachi. 6.720 6.657 -0.063 100%

7

Cement Concrete flooring in D-Area,51/A

area and 51/L area U/C- 09 Korangi town

Karachi.

9.320 9.320 100%

8

Construction of road from Chakra Goth Link

road 12000 to 32/C up to Nala U/C-02

Korangi town Khi

10.800 10.795 -0.005 100%

9

Constructions of road from Main stop Korangi

No.01Bazar to U/C-06 office Korangi town

Karachi.

5.170 5.170 100%

10

Construction of road from Korangi No.02 R-

Chowki to Vita Chowrangi U/C-06 & 07

Korangi town Karachi

13.380 13.176 -0.204 100%

11Construction of road Q Area Korangi No.02

U/C-07 Korangi Khi2.600 2.574 -0.026 100%

12

Construction of road at sector Y-area Patang

wali street and adjoining streets U/C-03

Korangi town Karachi

5.170 4.740 -0.430 100%

13

Construction of road in sector 41/B (LRBT) to

Model Park U/C-04 korangi town Karachi. 10.800 10.800 100%

14Const of road from Sector-E and streets UC-

09 Korangi town Khi2.100 2.080 -0.020 100%

14 100.000 99.127 -0.873

100.000 24-Aug-1292

Page 521

Page 522: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Syed Asif Hasnain dated 24.8.12

MNA, NA-255

1

Improvement of road in UC-6 to UC-11

Landhi Town Karachi (Near Charagh Hotel

Area 4A street nos. 27,37, 49,57, near Imran

Shaheed Park and near EDHI centre Korangi

#5 ).

15.000 14.720 -0.280 100%

2Construction of Naseem Hameed Athletic

academy at Landhi Town Karachi.15.000 4.600 -10.400 75%

3

Providing & laying Sewerage & Water supply

pipe lines in UC-6 to UC-12 Landhi town

Karachi (Area 5A, Area 4C , Street # 14 near

dhamaka pan shop, Area 35B, 35C, K

–Area , J-area, Near Tayyaba Masjid

Zamman town, I-area , area 36G, Area 5C )

20.000 19.520 -0.480 100%

4

Replacement / Rehabilitation of 48”dia, 36”

dia , 30” dia 24”dia, 18”dia & 12” dia RCC

Main Trunk sewer (Lower Landhi) from

10000 road to Area 36B Landhi along with

362 road Landhi Town Karachi

49.150 39.900 -9.250 98%

4 100.000 78.740 -21.260

Khawaja Soahil Mansoor dated 24.8.12

MNA, NA-240

1Improvement of Sewerage Line in streets at

Shershah Kemari Town Karachi.12.060 2.721 -9.339

2

Rehabilitation of Bitumen Road Shah Nawaz

Chowk to Meva Shah Graveyard , Raxer Line

Site Town Karachi.

6.210 3.586 -2.624

CCD-VI, Karachi

100.000 24-Aug-1293

100.000 24-Aug-1278

Page 522

Page 523: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction of Cement Concrete Pavement

in streets at Hasrat Mohani Colony, Ajmari

Colony and villayat abad at Site Town

Karachi.

7.730 6.539 -1.191 100%

4Improvement of Water Supply System at

Hasrat Mohani Colony SITE Town Karachi.5.000 -5.000

5

Providing & Laying P.E. Pipe Golimar

Chowrangi to Hasrat Mohani Colony pumping

station SITE Town Karachi.

10.000 7.095 -2.905

6

Rehabilitation of Bitumen Road (Dual

Carriageway) Naurus Chowrangi to Rexer

Bridge with lane marking, Cat Eyes etc at

SITE Town Karachi.

20.000 19.336 -0.664 100%

7

Improvement of Sewerage System Block-A,C

& 4-A Sector Kaim Khani colony Bladia Town

Karachi.

9.125 8.479 -0.646 100%

8

Rehabilitation of Bitumen Road (Main Road)

Kaim Khani Colony Baldia Town Karachi. 9.311 8.127 -1.184 100%

9

Construction of CC Pavement at Block-A,C

and Sector 4-A Kaim Khani Colony Baldia

Town Karachi.

7.564 4.337 -3.227 100%

10

Construction of Cement Concrete Pavement

at Dehli Colony, Kokan Colony, Sector 5G,

5J, 9D, 8A,8C,8D and Kaim Khani Colony

Baldia Town Karachi..

8.000 7.302 -0.698 100%

11Improvement of water supply system at

Baldia Town Karachi.5.000 3.152 -1.848 100%

11 100.000 70.674 -29.326

Iqbal Muhammad Ali Khan dated 24.8.12

MNA, NA-256

1

Construction / Rehabilitation of Bitumen

Road in Overseas Bunglows at Gulistan - e-

JauharGulshan-e-Iqbal Town Karachi

9.000 8.418 -0.582 100%

2

Construction / Rehabilitation of Bitumen

Road & Sewerage systeminGulistan - e-

JauharGulshan-e-Iqbal Town Karachi

6.000 5.755 -0.245 100%

100.000 24-Aug-1278

100.000 24-Aug-1294

Page 523

Page 524: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Construction / Rehabilitation of Bitumen

Road, CC Pavement & Sewerage system at

10A Gulistan-e-JoharGulshan-e-Iqbal Town

Karachi

5.000 4.131 -0.869 100%

4

Construction / Rehabilitation of Bitumen

Road, CC Pavement & Sewerage system in

UC-1 to UC-2, Shah Faisal Town Karachi.10.000 6.547 -3.453 100%

5

Construction / Rehabilitation of Bitumen

Road & Sewerage system in UC-3 to UC-4,

Shah Faisal Town Karachi.

10.000 7.867 -2.133 79%

6

Construction / Rehabilitation of Bitumen

Road, CC Pavement & Sewerage system in

UC-5 to UC-6, Shah Faisal Town Karachi.10.000 9.484 -0.516 100%

7

Construction / Rehabilitation of Bitumen

Road in Baba Walayat toMadina Market UC-

7 Shah Faisal Town Karachi.

10.000 9.515 -0.485 100%

8

Improvement of, Sewerage System & Water

Supply System at T&T Cololony& UC-2 at

Shah Faisal Town Karachi.

3.000 1.409 -1.591 47%

9

Construction / Rehabilitation of Bitumen

Road in Rafah-e-Aam Society &Shamsi

Society at Shah Faisal Town Karachi

3.000 2.871 -0.129 100%

10

Construction of Boundary Wall &

Rehabilitation of Model Park @

Rafah-e-Aam Gymkhana Ground Shah

Faisal Town Karachi.

Construction of Boundary Wall &

Rehabilitation of Model Park @

Rafah-e-Aam Gymkhana Ground Shah

Faisal Town Karachi.

9.800 9.056 -0.744 92%

11

Construction / Rehabilitation of Bitumen

Road, CC Pavement at Model Colony Malir

Town Karachi

5.000 4.741 -0.259 100%

100.000 24-Aug-1294

Page 524

Page 525: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

12

Construction / Rehabilitation of Bitumen

Road, CC Pavement at MoinabadMalir Town

Karachi.

5.000 4.766 -0.234 100%

13

Construction of Boundary Wall &

Rehabilitation of Model Park @ Nishter

Ground Model Colony MalirTown Town

Karachi.

8.100 2.227 -5.873 27%

14

Rehabilitation Of Park & Installation of

Garden Furniture in Railway Housing Society

Gulistan-e-Johar Karachi.

1.100 1.036 -0.064 100%

15

Construction / Rehabilitation of Bitumen

Road, CC Pavement at Dada Bhai Town &

KDA Scheme-I, Karachi.

5.000 4.778 -0.222 100%

15 100.000 82.601 -17.399

Farhat Mahmood Khan dated 24.8.12

MNA, NA-245

1

Rehabilition/ Improvement of Metalled Road

at UC-01, Paposh Nagar Nazimabad Town,

Karachi.

25.000 15.589 -9.411 80%

2Rehabilition/ Improvement of Metalled Road

at North Karachi Town, Karachi.25.000 21.213 -3.787 90%

3

Rehabilition/ Improvement of Metalled Road

& Sewerage system at UC-01, Paposh Nagar

Karachi, Nazimabad Town, Karachi.

25.000 24.401 -0.599 97%

4

Rehabilitation/Improvement of Metalled

Road and C.C flooring at North Nazimabad

Town Karachi.

25.000 24.452 -0.548 98%

4 100.000 85.655 -14.345

CCD-IX, Karachi

100.000 24-Aug-1294

100.000 24-Aug-1283

Page 525

Page 526: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Nadeem Ehsan dated 24.8.12

MNA, NA-247

1

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 01, Liaquatabad

Town Karachi.

20.000 9.984 -10.016 98%

2

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 02, Liaquatabad

Town Karachi.

10.000 9.799 -0.201 100%

3

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 03, Liaquatabad

Town Karachi.

10.000 9.768 -0.232 99%

4

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 04, Liaquatabad

Town Karachi.

10.000 9.098 -0.902 90%

5

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 05, Liaquatabad

Town Karachi.

10.000 9.186 -0.814 99%

6

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 09, Liaquatabad

Town Karachi.

10.000 9.624 -0.376 92%

7

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 10, Liaquatabad

Town Karachi.

10.000 9.799 -0.201 97%

8

Rehabilittion / Improvement of Mattled Road

and CC Footpath at UC - 11, Liaquatabad

Town Karachi.

10.000 9.692 -0.308 96%

9

Supply of Medical l equipment at Abbasi

Shaheed Hospital UC-11 District Central

Karachi.

10.000 -10.000

9 100.000 76.950 -23.050

Sardar Nabeel Ahmed Gabool dated 7.9.12

MNA, NA-248

1

Rehabilitation / improvement of Sewerage

System and C.C.Flooring at UC-01 to UC-04

Lyari Town, Karachi

10.000 8.459 -1.541 85%

100.000 24-Aug-1285

50.000 07-Sep-12223

Page 526

Page 527: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

Rehabilitation / improvement of Sewerage

System and C.C.Flooring at UC-02 to UC-10

Lyari Town, Karachi

15.000 14.681 -0.319 80%

3

Rehabilitation / improvement of Sewerage

System and C.C.Flooring at UC-03 to UC-04

Lyari Town, Karachi

15.000 14.653 -0.347 83%

4

Rehabilitation / improvement of Sewerage

System and C.C.Flooring at UC-05 to UC-06

and UC-07 Lyari Town, Karachi

10.000 9.764 -0.236 98%

4 50.000 47.557 -2.443

Sardar Nabeel Ahmed Gabool dated 4.10.12

MNA, NA-248

1

Construction of Road CC Flooring and

Sewerage System at UC-2 Lyari Town,

Karachi

10.000 6.053 -3.947 61%

2

Construction of Road CC Flooring and

Sewerage System at UC-3 Lyari Town,

Karachi

10.000 5.044 -4.956 15%

3

Construction of Road CC Flooring and

Sewerage System at UC-7 Lyari Town,

Karachi

10.000 8.947 -1.053 10%

4Constructionof Road from UC-1 to UC-2 Near

Navy Residence Colony Lyari Karachi10.000 1.603 -8.397 16%

5

Construction/Reconstruction of Anjuman

Pishinia Baloch Welfare Center at UC-10,

Lyari Town, Karachi

4.000 1.510 -2.490 12%

6

Construction/Reconstruction of Abdul

Rasheed Shaheed Welfare Center at UC-1,

Lyari Town, Karachi

6.000 1.510 -4.490 25%

6 50.000 24.667 -25.333

50.000 07-Sep-12223

50.000 04-Oct-12490

Page 527

Page 528: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Syed Amir Ali Shah dated 12.9.12

MNA, NA-221

1

Construction of link road to Village Jam

Khan Vighio U/C Masu Bhurgari Taluka &

District Hyderabad.

2.840 1.898 -0.942 100%

2

Construction of link road from Masu Bhurgari

road to Village Gul Muhammad Chalgari U/C

Masu Bhurgari Taluka and District

Hyderabad.

1.210 0.864 -0.346 100%

3

Construction of C.C Road/Streets and By

lanes at Villages Bachal Sandh, Masu

Bhurgari and Allah dito Sandh UC Masu

Bhurgari Taluka & District Hyderabad.

1.150 1.108 -0.042 100%

4

Construction of C.C Road/Streets and By

lanes at Villages Khan Dahri and Bachoo

Dahri UC Masu Bhurgari Taluka & District

Hyderabad.

1.000 0.609 -0.391 100%

5

Construction of C.C Road/Streets and By

lanes at Village Budhani UC Masu Bhurgari

Taluka & District Hyderabad.

0.725 0.684 -0.041 100%

6

Construction of C.C Road from Jatoi House

to Muhammad Thebo House at Park view UC-

II Qasimabad District Hyderabad.

0.400 0.010 -0.390 3%

7

Construction of Culvert at Village Muhammad

Ali Samoo UC Masu Bhurgari Taluka &

District Hyderabad.

0.175 0.008 -0.167 5%

7 7.500 5.181 -2.319

Ghulam Ali Nizamani dated 12.9.12

MNA, NA-224

356 12-Sep-12 50.000 1

WIDENING / RECONDITIONING OF ROAD

FROM MATLI TO TALHAR VIA DANDO

DISTRICT BADIN. (PHASE-II)

50.000 6.224 -43.776 20%

CCD- Hyderabad

7.500 12-Sep-12219

Page 528

Page 529: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

1 50.000 6.224 -43.776

Ghulam Ali Nizamani

MNA, NA-224 Million

1

Const. of Road from Talhar Matli Road

Towards Existing Road via Village Hashim

Lashari & Village Usman Lashari I/c

prestress bridge (150 Rft) on old Phulali

39.120 29.147 -9.973 98%

2

Const. of Road from Akram Cannal to Raja

Khanani Road via Village Usman Dasti i/c pre-

stress bridge 140 Rft on Akram canal

28.050 26.931 -1.119 92%

3

Const./Re-conditioning ofRoad from existing

road of Matli Talhar to Akram Cannal via

Village Haji Samooj

16.900 14.989 -1.911 90%

3 Total 60.000 71.067 11.067

Dr.Abdul Wahid Soomro dated 28.9.12

MNA, NA-237

1

CONSTRUCTION OF METALLED ROAD

FROM THATTA HYDERABAD ROAD TO

K.B. FEDER RD-113 NEAR HASHIM FAQIR

U/C ONGAR TALUKA AND DISTRICT

THATTA.

4.410 4.369 -0.041 100%

2

CONSTRUCTION OF METALLED ROAD

FROM MANIK BEHRANI TO WAZIR

KHOSO U/C TANDO HAFIZ

SHAH TALUKA AND DISTRICT THATTA.

4.410 4.358 -0.052 100%

3

CONSTRUCTION OF METALLED ROAD

FROM HAJI AHMED SHAIKH TO HAJI

KATIAR U/C MIRPUR SAKRO TALUKA

SAKRO DISTRICT THATTA.

4.410 4.333 -0.077

4

CONSTRUCTION OF METALLED ROAD

FROM THATTA HYDERABAD ROAD TO

HAJI USMAN BROHI U/C CHUTTO CHAND

TALUKA & DISTRICT THATTA.

4.402 4.402 100%

60.000 03-Feb-09703

100.000 28-Sep-12425

Page 529

Page 530: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

5

CONSTRUCTION OF METALLED ROAD

JANGHRI VILLAGE ROAD TO ALLAH BUX

SHORO U/C JHAMPIR DISTRICT THATTA.

4.403 1.234 -3.169

6

CONSTRUCTION OF METALLED ROAD

FROM VILLAGE CHARAN MEMON TO

GAN MUHAMMAD JAT U/C DOOMANI

DISTRICT THATTA

6.604 2.730 -3.874

7

CONSTRUCTION OF METALLED ROAD

FROM YOUSIF SHORO TO HAJI HAYAT

RAIS U/C KALA KOT TALUKA AND

DISTRICT THATTA.

6.594 6.465 -0.129

8

CONSTRUCTION OF METALLED ROAD

FROM SAKRO BUHARA ROAD TO

DARGAH PIR NOOR

SHAH U/C BUHARA TALUKA MIRPUR

SAKRO DISTRICT THATTA.

2.510 2.489 -0.021 100%

9

CONSTRUCTION OF METALLED ROAD

VILLAGE BOTO MAKAN TO QADIR BUX

SHORO U/C TANDO HAFAZ SHAH

TALUKA AND DISTRICT THATTA.

4.410 0.866 -3.544 20%

10

CONSTRUCTION OF METALLED ROAD

FROM SATYOON JHAMPIR ROAD TO

VILLAGE ABDUL REHMAN JHAKRO U/C

CHUTTO CHAND TALUKA AND DISTRICT

THATTA.

4.382 4.352 -0.030 100%

11

CONSTRUCTION OF METALLED ROAD

FROM K.B. FEEDAR TO VILLAGE MALIR

KHOSO U/C ONGAR TALUKA AND

DISTRICT THATTA.

2.763 2.695 -0.068 100%

12

CONSTRUCTION OF METALLED ROAD

FROM MUHAMMAD USMAN SOOMRO TO

VILLAGE ABDUL SATTAR SOOMRO U/C

KALA KOT TALUKA AND DISTRICT

THATTA

4.382 4.367 -0.015 100%

13

CONSTRUCTION OF METALLED ROAD

FROM MAKLI GHULAMULLAH ROAD TO

RAMZAN JOKHIO U/C MAKLI TALUKA AND

DISTRICT THATTA.

8.603 8.603 100%

100.000 28-Sep-12425

Page 530

Page 531: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

14

CONSTRUCTION OF METALLED ROAD

FROM HAJI GHULAM MUHAMMAD BROHI

TO HAJI LIAQUAT BROHI U/C CHUTTO

CHAND TALUKA AND DISTRICT THATTA.

4.410 4.410 100%

15

CONSTRUCTION OF CULVERTS ( 05

NOS.) AND EARTH FILLING AT VILLAGE

GHULAN CHUTTO U/C TANDO HAFFIZ

SHAH TALUKA AND DISTRICT THATTA.

1.528 1.459 -0.069 95%

16

CONSTRUCTION OF METALLED ROAD

FROM BAGHAR MORI TO VILLAGE ALI

HASSAN SHORO U/C DOOMANI DISTRICT

THATTA

8.630 3.524 -5.106 41%

17

CONSTRUCTION OF METALLED ROAD

GHARO GHULAMULLAH ROAD TO

YAQOOB BABRO U/C GUJJO TALUKA AND

DISTRICT THATTA

4.382 4.178 -0.204 95%

18

CONSTRUCTION OF METALLED ROAD

FROM GHULAMULLAH GHARO ROAD TO

BABO NAHIO U/C GHULAMULLAH

DISTRICT THATTA

4.410 4.410 100%

19

CONSTRUCTION OF METALLED ROAD

FROM CHACH MRIAN KHOR SIM NALA

BRIDGE TO VILLAGE AKBAR KHAN

MALKANI DISTRICT THATTA.

4.410 2.004 -2.406 45%

20

CONSTRUCTION AND RECONDITIONING

OF ROAD FROM THATTA SUJAWAL ROAD

TO DARS FACTORY THATTA CITY

DISTRICT THATTA.

5.891 5.733 -0.158 100%

21

CONSTRUCTION AND RECONDITIONING

OF ROAD FROM EDHI CENTER THATTA

TO KHONI TALAB THATTA CITY DISTRICT

THATTA

5.056 3.456 -1.600 68%

21 100.000 80.437 -19.563

100.000 28-Sep-12425

Page 531

Page 532: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ramesh Lal dated 16.11.12

Mna, NA-334

712 16.11.2012 20.000 2.000 -2.000

2.000 -2.000

Ramesh Lal dated 16.11.12

Mna, NA-334

712 16.11.2012 20.000 5.000 -5.000

5.000 -5.000

Mushahid Hussain Syed dated 1.11.12

Senator

675 1//11/2012 8.000 1

Const. of Rest House Dargah Syed Ali

Gohar, Distt:Khairpur Mirs

(Part of this Directive 6.5 Million in

Islamabad)

2.500 -2.500

1 2.500 -2.500

Aftab Shahban Mirani dated 5.9.12

MNA, NA-202

1

CONST; OF OPEN SURFACE DRAIN

FROM KHAIR MUHAMMAD SHOP TO

MASHOOQ LABANO VIA MUHAMMAD

YOUNIS JUNEJO UC. 8 SHIKARPUR.

0.500 0.461 -0.039 100%

CCD- Larkana

CCD- Sukkur

30.000 05-Sep-12173

Page 532

Page 533: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

2

CONST; OF C.C. ROAD AND DRAIN FROM

MAIN ROAD TO DHANI BUX SOOMRO

HOUSE JAKHRA MOHALLA AND

MUHAMMAD BACHAL SANJRANI HOUSE

TO LINK ROAD UC. 4 SHIKARPUR CITY.

0.500 0.494 -0.006 100%

3

CONST; OF C.C. ROAD AND DRAIN FROM

ABDUL GHANI HOUSE TO KHALIFA YAR

MUHAMMAD MOSQUE, MAST ABDUL

RAHMAN STREET,UC.7 SHIKARPUR CITY.

0.500 0.491 -0.009 100%

4

CONST; OF C.C. ROAD AND DRAIN FROM

ATTA MUHAMMAD MIRANI TO MUNCHI

GHULAM HUSSAIN MIRANI HOUSE AND

HAJI LATIF SHAH HOUSE UC. 8

SHIKARPUR CITY.

0.500 0.349 -0.151

5CONST; OF TWO ROOMS AT CHAMBER

OF COMMERCE SHIKARPUR CITY. 1.000 0.490 -0.510 100%

6

CONST; OF C.C. ROAD AND DRAIN FROM

BHALLO BHUTTO HOUSE TO ABDUL

HAKEEM HOUSE VIA NOOR MUHAMMAD

BHUTTO HOUSE UC. 8 SHCIKARPUR

CITY.

0.500 0.485 -0.015 100%

7

CONST; OF C.C. ROAD AND DRAIN NEAR

SOOMRA MOHALLA KALAL HOUSE TO

SAEED HOUSE UC.6 SHCIKARPUR CITY. 0.500 0.490 -0.010 100%

8REPAIR OF MOSQUE AT KARBALA IMAM

BARGAH UC. 7 SHIKARPUR CITY. 0.500 0.486 -0.014 100%

9

CONST; OF C.C. ROAD AND DRAIN AT

JOUNGAL SANJRANI HOUSE TO DR.

WAZIR HOUSE UC.6.

0.500 0.483 -0.017 100%

10

CONST; OF C.C. ROAD AND DRAIN AT

VARIOUS STREET OF NEW SHIKARPUR

UC. 4 SHCIKARPUR CITY.

0.500 0.456 -0.044 100%

30.000 05-Sep-12173

Page 533

Page 534: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11

CONST; OF C.C. ROAD AND DRAIN FROM

AYAZ SANJRANI TO SIKANDAR SANJRANI

VIA JAN MUHAMMAD SANJRANI HOUSE

UC. 4. SHCIKARPUR CITY.

0.500 0.480 -0.020 100%

12

CONST; OF C.C. ROAD AND DRAIN FROM

RAICE GUL MUHAMMAD SANJRANI

HOUSE VIA NOORI MOSQUE TO BRIDGE

AND MUNCHI IMAM HOUSE TO BHORAL

SANJRANI HOUSE DAWAN SHAH

MOHALLA UC. 4 SHCIKARPUR CITY.

0.500 0.485 -0.015 100%

13

CONST; OF C.C. ROAD AND DRAIN AT

VILLAGE MUREED SUHANDRO

UC.RAHIMABAD.

0.500 0.490 -0.010 100%

14

CONST; OF C.C. ROAD AND DRAIN FROM

DR.DIN MUHAMMAD HOUSE TO MADINA

MASJID NEAR CITY POST OFFICE

KHANPUR CITY.

0.500 0.474 -0.026 100%

15

CONST; OF C.C. ROAD AND DRAIN AT

VILLAGE MUHAMMAD RAMZAN BROHI

UC. ZERKHAIK TALUKA KHANPUR.

0.500 0.439 -0.061 100%

16

CONST; OF C.C. ROAD AND DRAIN FROM

ABDUL KHALIQUE HOUSE VIA SAEED

HOUSE & ALLAH WARYO HOUSE AT

VILLAGE YOUSUF BHATTI

1.000 0.965 -0.035 100%

17

CONST; OF C.C. ROAD AND DRAIN FROM

MOSQUE TO ABDUL HAKEEM

SOHANDHRO AT VILLAGE HAJI

MUHAMMAD BACHAL UC.RAHIMABAD.

0.500 0.492 -0.008 100%

18

CONST; OF C.C. ROAD AND DRAIN FROM

USMAN HOUSE TO IRSHAD HOUSE VIA

MIR MUHAMMAD HOUSE AT VILLAGE

TALIB CHANNA DISTRICT SHIKARPUR.

0.500 0.484 -0.016 100%

19

CONST; OF C.C. ROAD AND DRAIN FROM

ABDUL FATAH HOUSE TO UTAQ AT

VILLAGE MULAN TAHIR SUHANDHRO UC

RAHIMABAD.

0.500 0.468 -0.032 100%

30.000 05-Sep-12173

Page 534

Page 535: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

20

CONST; OF C.C. DRAIN AND BRICK

PAVEMENT FROM MAIN ROAD TO HAJI

HAZAR KHAN HOUSE AT VILLAGE AHMED

KHAN PATHAN UC. ZERKHAIL

1.000 0.970 -0.030 100%

21

CONST; OF C.C. ROAD AND DRAIN FROM

SHTREET OF BAPAR MOHALLA TO

MUNEER MANGI HOUSE VIA ASHIQUE

MANGANHAR HOUSE TO CHOWK

NOHANI PIR AT HANPUR CITY.

0.500 0.487 -0.013 100%

22

CONST; OF C.C. ROAD AND DRAIN FROM

ALI HASSAN HOUSE TO MUHAMMAD

HASSAN HOUSE AT VILLAGE MIR

MUHAMMAD PAHORE UC. RAHIMABAD.

0.500 0.477 -0.023 100%

23

CONST; OF C.C. ROAD AND DRAIN FROM

HAJI AMIR BUX NANDWANI TO KHAN

LMUHAMMAD HOUSE AT VILLAGE HAJI

JALAL DIN NANDWANI UC.PIR BUX

SHUJHRA.

0.500 0.495 -0.005 100%

24

CONST; OF C.C. ROAD AND DRAIN FROM

YASEEN HOUSE TO ANWAR ALI KALADI

AT VILLAGE GOHRAM KHALIDI UC.

DAKHO DISTRICT SHIKARPUR.

0.500 0.467 -0.033 100%

25

CONST; OF C.C. ROAD AND DRAIN FROM

MUHAMMAD SHARIF HOUSE TO SHAH

DINO HOUSE AT VILLAGE MUHAMMAD

SHARIF PAHORE DISTRICT SHIKARPUR.

0.500 0.490 -0.010 100%

26

CONSTRUCTION OF SURFACE DRAIN AT

VILLAGE THARHIO UC. THARIO DISTRICT

SHIKARPUR.

0.500 0.474 -0.026 100%

27

CONST; OF C.C. ROAD AND DRAIN AT

VILLAGE JAN MUHAMMAD KHATRIAN

UC.ZERKHAIL DISTRICT SHIKARPUR.

0.500 0.489 -0.011 100%

28CONST; OF C.C. ROAD AT MANGAN HAR

MOHALLA AT KHANPUR CITY. 0.500 0.490 -0.010 100%

29

CONST; OF C.C. ROAD AND DRAIN FROM

ALLAH BUX UTAQ TO CHILDREN PARK

CITY KHANPUR.

0.500 0.478 -0.022 100%

30.000 05-Sep-12173

Page 535

Page 536: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

30

CONST; BOUNDARY WALL AT SHAHEED

BADSHAH GRAVEYARD KHANPUR CITY. 0.500 0.493 -0.007 100%

31

REPAIR/RENOVATION OF HISTORICAL

MOSQUE AT VILLAGE NOOR MUHAMMAD

DISTRICT SHIKARPUR

1.000 1.000 100%

32CONST; OF C.C. ROAD VILAGE SAHAB

DEH TONG UC.THAINRIC0.500 0.495 -0.005 100%

33

CONSTRUCTION OF METALLED ROAD AT

VILLAGE DATO PAHORE UC. RAHIMABAD

TALUKA KHANPUR DISTT;SHIKARPUR.1.500 0.775 -0.725 100%

34

CONST; OF RETAINING WALL AT VILLAGE

MULAN TAHIR SUHANDHRO ,UC.

RAHIMABAD DISTRICT SHIKARPUR.

0.500 0.483 -0.017 100%

35

CONSTRUCTION OF RETAINING WALL

NEAR VILLAGE DATO PAHORE UC.

RAHIMABAD.

0.700 0.680 -0.020 100%

36

CONST; OF BRIDGE ON SAJI SHAKH

NEAR VILLAGE DATTO PAHORE

DISTRICT SHIKARPUR.

1.000 0.990 -0.010 100%

37

CONST; C.C.ROAD AND DRAIN FROM

MUHAMMAD USMAN KHOHARO HOUSE

TO MOSQUE AT VILLAGE ARBAB

KHOHARO UC. MIAN JO KOTH DISTRICT

SHIKARPUR.

0.500 0.490 -0.010 100%

38

CONST; OF C.C. ROAD AND DRAIN FROM

RAHMAN JHULLAN HOUSE TO SHAHBAN

HOUSE AT VILLAGE ZERKHAIL UC.

ZERKHAIL.

0.500 0.479 -0.021 100%

39

CONST; OF C.C. ROAD AND DRAIN FROM

ALI KHAN TO BILAWAL HOUSE VILLAGE

BILAWAL WAH UC. KARAN SHIKARPUR0.500 0.466 -0.034 100%

40

CONST; OF C.C. ROAD AND DRAIN FROM

MADINA MOSQUE TO HAJI ALLAH

WARYO KANDHRO VIA BASHIR AHMED

BHUTTO HOUSE AT VILLATE JARO UC.

JARO SHCIKARPUR .

0.500 0.484 -0.016 100%

30.000 05-Sep-12173

Page 536

Page 537: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

41

CONST; OF OPEN SURFACE DRAIN

FROM ARBELO HOUSE TO SIM SHAKH AT

VILLAGE HAJI GHULAM HAIDER JAFFERI

UC. KARAN DISTRICT SHIKARUR.

0.500 0.491 -0.009 100%

42

CONST; OF C.C. ROAD AND DRAIN AT

VILLAGE JINDAL KHAN BURIRO DISTRICT

SHIKARPUR.

0.800 0.789 -0.011 100%

43

CONST; OF C.C. ROAD AND DRAIN FROM

SYED NAWAB ALI SHAH HOUSE TO JAN

MUHAMMAD LODHRO AT VILLAGE

LODHRA UC. LODHRA DISTRICT

SHIKARPUR.

0.500 0.488 -0.012 100%

44

CONST; OF C.C. ROAD AND DRAIN FROM

MAKHNO BHUTTO HOUSE TO ALI DINO

BHUTTO AT VILLAGE JANNOO DISTRICT

SHIKARPUR.

0.500 0.483 -0.017 100%

45

CONST; OF C.C. ROAD AND DRAIN FROM

RAHIM BUX HOUSE TO SHAHBAN HOUSE

AT VILLAGE ABDUL RAHIM JAFFERI UC.

SULTAN KOT DISTRICT SHIKARPUR.

0.500 0.487 -0.013 100%

46

CONST; OF C.C. ROAD AND DRAIN FROM

MUHAMMAD PIARYAL HOUSE TO MEER

MUHAMMAD SOOMRO HOUSE NEAR

D.P.O OFFICE FOUJDARI ROAD UC. 6

SHIKARPUR.

0.500 0.482 -0.018 100%

47

CONST; OF BOUNDARY WALL AT

DARGAHI SHAH HAJI LATIF SHAH UC.8

SHIKARPUR.

0.500 0.483 -0.017 100%

48

CONST; OF C.C.ROAD & DRAIN FROM

GHOUSIA MOSQUE TO RAHIM BUX

SHAIKH VIA EXCISE OFFICE UC.7 SHAIKH

MOHALLA SHIKARPUR CITY.

0.500 0.479 -0.021 100%

49

CONST; OF C.C. ROAD AND DRAIN SETH

SHAH BAGGI BURIRO HOUSE TO

MUHAMMAD AFZAL HOUSE UC.7

SHIKARPUR CITY

0.500 0.487 -0.013 100%

30.000 05-Sep-12173

Page 537

Page 538: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

50

CONST; OF BOUNDARY WALL AT

IMAMBARGAH KAZMI OPPOSITE

JAMKHANA UC. 6 SHIKARPUR.

0.500 0.448 -0.052 100%

51

CONST; OF C.C. ROAD AND DRAIN FROM

ABDUL GHANI HOTEL TO FIDA HUSSAIN

HOUSE,ABDUL KHALIQUE

COLONY,MEHMOOD SHAH STREET UC. 4

SHIKARPUR CITY.

0.500 0.480 -0.020 100%

52

CONST; OF C.C. ROAD AND DRAIN NEAR

MIRANI HOUSE SHIKARPUR CITY. 0.500 0.490 -0.010 100%

52 30.000 27.701 -2.299

Shahid Hussain Bhutto dated 7.9.12

MNA, NA-204

1

RECONDITIONING OF METALLED ROAD

FROM VILLAGE KHUDA BUX CHANDIO TO

VILLAGE KEHAR VIA VILLAGE GADANI20.000 10.153 -9.847 55%

2LINK ROAD BETWEEN LARKAN

NAUDERO ROAD TO AQIL ROAD.5.000 3.787 -1.213 75%

3CONSTRUCTION OF C.C. ROAD AND

DRAIN AT UC. FATEHPUR LARKANA.2.000 1.966 -0.034 100%

4CONSTRUCTION OF C.C. ROAD AND

DRAIN AT UC. AQIL LARKANA2.000 1.973 -0.027 100%

5CONSTRUCTION OF C.C. ROAD AND

DRAIN AT UC. RATOKOT LARKANA.2.000 1.938 -0.062 100%

6CONSTRUCTION OF C.C. ROAD AND

DRAIN AT UC. PATHAN LARKANA. 2.000 1.978 -0.022 100%

7CONSTRUCTION OF C.C. ROAD AND

DRAIN AT UC. MAHAR WADA, LARKANA4.000 3.941 -0.059 100%

8 CONSTRUCTION OF C.C. ROAD AND

DRAIN AT UC. NIACH LARKANA. 3.000 2.977 -0.023 100%

30.000 05-Sep-12173

50.000 07-Sep-12254

Page 538

Page 539: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

9

CONSTRUCTION OF C.C. ROAD AND

DRAIN AT UC. RASHID WAGAN LARKANA. 3.000 2.949 -0.051 100%

10CONST:OF C.C. ROAD AND DRAIN AT UC.

BERO CHANDIO LARKANA. 3.000 2.946 -0.054 100%

11

CONSTRUCTION OF METALLED ROAD

AND C.C. BLOCK AND DRAIN AT VILLAGE

GHARI KHUDA BUX BHUTTO.

3.000 2.973 -0.027 100%

12

CONSTRUCTION OF C.C. ROAD AND

DRAIN AT VARIOUS STREETS OF UC. 1

LARKANA.

1.000 0.988 -0.012 100%

12 50.000 38.569 -11.431

Shahid Hussain Bhutto dated 6.12.12

MNA, NA-204

1Construction of CC Road and Drain at Village

UC Pathan Qalandarabad.1.000 0.622 -0.378

2Construction of CC Road and Drain at

Various Streets of Sachal Colony Larkana5.000 4.971 -0.029 100%

3Construction of CC Road and Drain at

Various Streets of Baharpur UC.63.000 2.942 -0.058 100%

4Construction of CC Road and Drainat Anaj

Mandi Mohallah UC.13.000 2.076 -0.924 69%

5Construction of CC Road and drain at Anwar

Shaikh UC Phull1.500 0.014 -1.486 1%

6Construction of CC Road and Drain at Garhi

Mangsi1.500 0.456 -1.044 30%

7Construction of CC Road and Drain at Baitul

Mall Colony Municipal Colony UC.93.000 2.932 -0.068 100%

8Construction of CC Road and Drain at

Siddiqueabad UC Naich1.000 -1.000

9

Construction of Metalled Road at Galib Nagar

Mohallah from Ali Gohar Sangi House to

Main Road UC.6

2.000 1.015 -0.985 51%

10Construction of CC Road and Drain at

Rahmatpur Meat Market Larkana2.500 2.449 -0.051 98%

50.000 06-Dec-12791

50.000 07-Sep-12254

Page 539

Page 540: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

11Repair/Renovation work of Graveyard at

Fatehpur and Ratodero1.500 0.661 -0.839 44%

12Construction of CC Road and Drain at Village

Agani.1.500 -1.500

13Construction of Tuff Tile at Jafferi Imam

Bargah Resham Gali Larkana3.000 -3.000

14Construction of CC Road and Drain at

Khudabad Mohalla Larkana UC.33.000 1.487 -1.513 50%

15

Construction of CC Road and Drainat Village

Gadani Karim Bux Junejo UC Dhamrah 1.000 0.772 -0.228 77%

16Construction / Renovation work of Imam

Bargah at Garhi Khuda Bux Bhutto3.000 -3.000

17 Construction of CC Road and Drain at UC.2 2.000 -2.000

18Construction of CC Road and Drain at Village

Amanat Ali Abro UC Naich.2.000 1.983 -0.017 100%

19Construction of CC Road and Drain at Miseri

Shah Village Arija.1.500 0.013 -1.487 1%

20Construction of CC Road and Drain at Village

Ganja Tunia.2.000 1.956 -0.044 100%

21 Construction of CC Road and Drain at UC.4 2.000 1.437 -0.563 72%

22 Construction of CC Road and Drainat UC.9 2.000 0.13 -1.870 7%

23Construction of CC Road and Drain at Ahsan

Colony.2.000 0.607 -1.393 30%

23 50.000 26.523 -23.477

Nazir Ahmed Bughio dated 28.9.12

MNA, NA-205

1

CONSTRLUCTION OF COMMUNITY

CENTRE AT VILLAGE KANOORI

UC.PURANOABAD TALUKA BAKRANI.

3.000 2.289 -0.711 80%

2

CONSTRUCTION OF COMMUNITY

CENTRE AT VILLAGE GHULAM HYDER

CHANNO UC. KARANI TALUKA DOKRI.

3.000 1.625 -1.375 55%

50.000 06-Dec-12791

28-Sep-12416 18.700

Page 540

Page 541: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

CONSTRUCTION OF LINK ROAD FROM

DISPOSAL WORK TO RIYAZ HUSSAIN

MACHI NEW MUHALLA AT VILLAGE NEW

GUDD UC-PURANOABAD TALUKA

BAKRANI.

5.200 4.453 -0.747 85%

4

CONSTRUCTION OF CULVERT AT

VILLAGE WADHA UC. YARO LAKHAIR

TALUKA DOKRI.

1.000 0.982 -0.018 100%

5

CONSTRUCTION OF CULVERT OVER

MONDER WAH NEAR VILLAGE IMAM BUX

UC.MURADI TALUKA NASIRABAD.

1.000 0.792 -0.208 80%

6

CONSTRUCTION OF CULVERT OVER SIM

SHAKH NEAR VILLAGE KANDI/

MUHAMMAD HASSAN BURDIN UC.DERA

TALUKA NASIRABAD.

1.000 0.938 -0.062 100%

7

CONSTRUCTION OF CULVERT OVER SIM

SHAKH NEAR VILLAGE BAHADUR

GADEHI UC. DERA TALUKA NASIRABAD..1.000 0.968 -0.032 100%

8

CONSTRUCTION OF CULVERT OVER

BUTH SHAKH NEAR VILLAGE GHULAM

MUSTAFA ABAD UC. DERA TALUKA

NASIRABAD.

1.000 0.983 -0.017 100%

9

CONSTRUCTION OF RETAINING WALL

VILLAGE JARA WAHOOCHA UC.

MURADIN TALUKA NASIRABAD.

(PHASE.II)

2.500 2.425 -0.075 100%

9 18.700 15.455 -3.245

Ramesh Lal dated 9.8.12

MNA, NA-334

32 9.8.2012 4.000 4.000 -4.000

4.000 -4.000

28-Sep-12416 18.700

Page 541

Page 542: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

Ramesh Lal dated 16.11.12

MNA, NA-334

712 16.11.2012 20.000 13.000 -13.000

13.000

Jam Muhammad Yousaf dated 28.8.12

MNA, NA-270

114 28-Aug-12 100.000 100.000 -100.000

100.000

Rehmatullah Kakar dated 14.10.12

Notable

1

Installation of Tube Well for Drinking Water

Supply Purpose with pump Room at Killi

Malik Sharif Masazai Distt: Killa Abdullah

Sub Head: Borign of Tube Well and

Instalation of Submersible Pumping Set

2

Installation of Tube Well for Drinking Water

Supply Purpose with pump Room at Killa

Ayub Haji Gul shah Masazia Distt: Killa

Abdullah

Sub Head: Borign of Tube Well and

Instalation of Submersible Pumping Set

CCD-VI, Khuzdar

Balochistan

CCD-VI, Khuzdar

20.000 14-Oct-12564

Page 542

Page 543: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Implementation Status of the Prime Minister Directives

Executing Agency Pakistan Public Works Department

Directive

Cost

Directive

Date

Directive

No.

Amount

Released

(In Million)

Name of Scheme

Saving/

Excess (In

Million)

Phyiscal

progress

Executing

Agency

Exp.

Incurred (In

Million)

S.No

Compiled by Dte. General Audit Works (F) on the basis of information provided by AGPR, Pak PWD and Director B&A, Pak PWD

3

Installation of Tube Well for Drinking Water

Supply Purpose with pump Room at Killa

Kakozai Mohammad Lal Distt: Killa Abdullah

Sub Head: Borign of Tube Well and

Instalation of Submersible Pumping Set

4Installation f Water Purification Plant at Killi

Maik Sharif Massazai Distt: Killa Abdullah

5

Installation of Water Purification Plant at Killi

Malik Harder Massazai Distt: Killa Abdullah

5

777 16.3.2013 6.000 PAK PWD 6.000

1034 16.3.2013 10.000 PAK PWD 10.000

1035 16.3.2013 40.000 PAK PWD 40.000

1036 16.3.2013 40.000 PAK PWD 40.000

1037 16.3.2013 10.000 PAK PWD 10.000

Total 106.000 106.000

NOTE: AS PER AGPR, FUNDS AGAINST FOLLOWING DIRECTIVES HAVE BEEN RELEASED TO DIRECTOR BUDGET AND ACCOUNTS PAK PWD BUT THESE

FUNDS HAVE NOT BEEN ACCOUNTED FOR/SHOWN AS RECEIVED BY THE DIRECTOR B&A, PAK PWD

20.000 14-Oct-12564

Page 543

Page 544: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 544

Page 545: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 545

Page 546: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 546

Page 547: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 547

Page 548: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 548

Page 549: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 549

Page 550: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 550

Page 551: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 551

Page 552: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 552

Page 553: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 553

Page 554: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 554

Page 555: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 555

Page 556: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 556

Page 557: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 557

Page 558: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 558

Page 559: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 559

Page 560: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 560

Page 561: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 561

Page 562: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 562

Page 563: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 563

Page 564: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 564

Page 565: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 565

Page 566: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 566

Page 567: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 567

Page 568: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 568

Page 569: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 569

Page 570: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 570

Page 571: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 571

Page 572: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 572

Page 573: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 573

Page 574: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 574

Page 575: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 575

Page 576: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 576

Page 577: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 577

Page 578: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 578

Page 579: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 579

Page 580: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 580

Page 581: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 581

Page 582: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 582

Page 583: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 583

Page 584: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 584

Page 585: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 585

Page 586: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 586

Page 587: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 587

Page 588: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 588

Page 589: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 589

Page 590: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 590

Page 591: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 591

Page 592: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 592

Page 593: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 593

Page 594: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 594

Page 595: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 595

Page 596: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 596

Page 597: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 597

Page 598: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 598

Page 599: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 599

Page 600: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 600

Page 601: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 601

Page 602: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 602

Page 603: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 603

Page 604: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 604

Page 605: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 605

Page 606: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 606

Page 607: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 607

Page 608: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 608

Page 609: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 609

Page 610: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 610

Page 611: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 611

Page 612: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 612

Page 613: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 613

Page 614: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 614

Page 615: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 615

Page 616: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 616

Page 617: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 617

Page 618: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 618

Page 619: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 619

Page 620: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 620

Page 621: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 621

Page 622: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 622

Page 623: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 623

Page 624: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 624

Page 625: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 625

Page 626: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 626

Page 627: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 627

Page 628: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 628

Page 629: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 629

Page 630: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 630

Page 631: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 631

Page 632: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 632

Page 633: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 633

Page 634: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 634

Page 635: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 635

Page 636: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 636

Page 637: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 637

Page 638: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 638

Page 639: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 639

Page 640: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 640

Page 641: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 641

Page 642: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 642

Page 643: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 643

Page 644: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 644

Page 645: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 645

Page 646: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 646

Page 647: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 647

Page 648: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 648

Page 649: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 649

Page 650: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 650

Page 651: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 651

Page 652: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 652

Page 653: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 653

Page 654: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 654

Page 655: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 655

Page 656: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 656

Page 657: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 657

Page 658: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 658

Page 659: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 659

Page 660: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 660

Page 661: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 661

Page 662: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 662

Page 663: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 663

Page 664: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 664

Page 665: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 665

Page 666: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 666

Page 667: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 667

Page 668: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 668

Page 669: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 669

Page 670: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 670

Page 671: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 671

Page 672: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 672

Page 673: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 673

Page 674: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 674

Page 675: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 675

Page 676: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 676

Page 677: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 677

Page 678: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 678

Page 679: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 679

Page 680: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 680

Page 681: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 681

Page 682: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 682

Page 683: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 683

Page 684: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 684

Page 685: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 685

Page 686: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 686

Page 687: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 687

Page 688: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 688

Page 689: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 689

Page 690: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 690

Page 691: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 691

Page 692: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 692

Page 693: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 693

Page 694: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 694

Page 695: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 695

Page 696: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 696

Page 697: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 697

Page 698: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 698

Page 699: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 699

Page 700: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 700

Page 701: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 701

Page 702: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 702

Page 703: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 703

Page 704: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 704

Page 705: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 705

Page 706: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 706

Page 707: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 707

Page 708: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 708

Page 709: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 709

Page 710: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 710

Page 711: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 711

Page 712: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 712

Page 713: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 713

Page 714: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 714

Page 715: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 715

Page 716: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 716

Page 717: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 717

Page 718: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 718

Page 719: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 719

Page 720: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 720

Page 721: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 721

Page 722: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 722

Page 723: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 723

Page 724: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 724

Page 725: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 725

Page 726: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 726

Page 727: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 727

Page 728: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 728

Page 729: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 729

Page 730: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 730

Page 731: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 731

Page 732: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 732

Page 733: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 733

Page 734: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 734

Page 735: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 735

Page 736: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 736

Page 737: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 737

Page 738: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 738

Page 739: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 739

Page 740: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 740

Page 741: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 741

Page 742: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 742

Page 743: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 743

Page 744: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 744

Page 745: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 745

Page 746: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 746

Page 747: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 747

Page 748: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 748

Page 749: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 749

Page 750: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 750

Page 751: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 751

Page 752: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 752

Page 753: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 753

Page 754: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 754

Page 755: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 755

Page 756: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 756

Page 757: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 757

Page 758: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 758

Page 759: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 759

Page 760: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 760

Page 761: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 761

Page 762: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 762

Page 763: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 763

Page 764: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 764

Page 765: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 765

Page 766: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 766

Page 767: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 767

Page 768: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 768

Page 769: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 769

Page 770: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 770

Page 771: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 771

Page 772: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 772

Page 773: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 773

Page 774: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 774

Page 775: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 775

Page 776: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 776

Page 777: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 777

Page 778: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 778

Page 779: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 779

Page 780: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 780

Page 781: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 781

Page 782: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 782

Page 783: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 783

Page 784: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 784

Page 785: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 785

Page 786: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 786

Page 787: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 787

Page 788: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 788

Page 789: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 789

Page 790: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 790

Page 791: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 791

Page 792: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 792

Page 793: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 793

Page 794: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 794

Page 795: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 795

Page 796: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 796

Page 797: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 797

Page 798: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 798

Page 799: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 799

Page 800: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 800

Page 801: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 801

Page 802: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 802

Page 803: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 803

Page 804: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 804

Page 805: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 805

Page 806: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 806

Page 807: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 807

Page 808: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 808

Page 809: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 809

Page 810: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 810

Page 811: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 811

Page 812: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 812

Page 813: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 813

Page 814: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 814

Page 815: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 815

Page 816: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 816

Page 817: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 817

Page 818: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 818

Page 819: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 819

Page 820: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 820

Page 821: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 821

Page 822: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 822

Page 823: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 823

Page 824: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 824

Page 825: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 825

Page 826: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 826

Page 827: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 827

Page 828: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 828

Page 829: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 829

Page 830: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 830

Page 831: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 831

Page 832: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 832

Page 833: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 833

Page 834: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 834

Page 835: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 835

Page 836: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 836

Page 837: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 837

Page 838: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 838

Page 839: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 839

Page 840: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 840

Page 841: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 841

Page 842: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 842

Page 843: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 843

Page 844: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 844

Page 845: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 845

Page 846: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 846

Page 847: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 847

Page 848: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 848

Page 849: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 849

Page 850: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 850

Page 851: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 851

Page 852: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 852

Page 853: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 853

Page 854: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 854

Page 855: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 855

Page 856: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 856

Page 857: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 857

Page 858: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 858

Page 859: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 859

Page 860: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 860

Page 861: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 861

Page 862: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 862

Page 863: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 863

Page 864: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 864

Page 865: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 865

Page 866: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 866

Page 867: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 867

Page 868: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 868

Page 869: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 869

Page 870: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 870

Page 871: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 871

Page 872: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 872

Page 873: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 873

Page 874: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 874

Page 875: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 875

Page 876: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 876

Page 877: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 877

Page 878: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 878

Page 879: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 879

Page 880: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 880

Page 881: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 881

Page 882: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 882

Page 883: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 883

Page 884: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 884

Page 885: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 885

Page 886: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 886

Page 887: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 887

Page 888: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 888

Page 889: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 889

Page 890: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 890

Page 891: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 891

Page 892: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 892

Page 893: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 893

Page 894: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 894

Page 895: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 895

Page 896: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 896

Page 897: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 897

Page 898: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 898

Page 899: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 899

Page 900: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 900

Page 901: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 901

Page 902: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 902

Page 903: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 903

Page 904: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 904

Page 905: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 905

Page 906: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 906

Page 907: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 907

Page 908: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 908

Page 909: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 909

Page 910: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 910

Page 911: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 911

Page 912: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 912

Page 913: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 913

Page 914: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 914

Page 915: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 915

Page 916: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 916

Page 917: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 917

Page 918: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 918

Page 919: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 919

Page 920: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 920

Page 921: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 921

Page 922: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 922

Page 923: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 923

Page 924: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 924

Page 925: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 925

Page 926: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 926

Page 927: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 927

Page 928: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 928

Page 929: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 929

Page 930: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 930

Page 931: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 931

Page 932: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 932

Page 933: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 933

Page 934: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 934

Page 935: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 935

Page 936: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 936

Page 937: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 937

Page 938: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 938

Page 939: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 939

Page 940: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 940

Page 941: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 941

Page 942: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 942

Page 943: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 943

Page 944: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 944

Page 945: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 945

Page 946: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 946

Page 947: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 947

Page 948: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 948

Page 949: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 949

Page 950: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 950

Page 951: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 951

Page 952: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 952

Page 953: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 953

Page 954: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 954

Page 955: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 955

Page 956: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 956

Page 957: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 957

Page 958: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 958

Page 959: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 959

Page 960: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 960

Page 961: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 961

Page 962: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 962

Page 963: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 963

Page 964: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 964

Page 965: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 965

Page 966: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 966

Page 967: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 967

Page 968: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 968

Page 969: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 969

Page 970: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 970

Page 971: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 971

Page 972: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 972

Page 973: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 973

Page 974: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 974

Page 975: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 975

Page 976: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 976

Page 977: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 977

Page 978: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 978

Page 979: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 979

Page 980: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 980

Page 981: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 981

Page 982: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 982

Page 983: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 983

Page 984: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 984

Page 985: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 985

Page 986: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 986

Page 987: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 987

Page 988: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 988

Page 989: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 989

Page 990: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 990

Page 991: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 991

Page 992: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 992

Page 993: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 993

Page 994: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 994

Page 995: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 995

Page 996: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 996

Page 997: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 997

Page 998: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 998

Page 999: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 999

Page 1000: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1000

Page 1001: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1001

Page 1002: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1002

Page 1003: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1003

Page 1004: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1004

Page 1005: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1005

Page 1006: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1006

Page 1007: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1007

Page 1008: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1008

Page 1009: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1009

Page 1010: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1010

Page 1011: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1011

Page 1012: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1012

Page 1013: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1013

Page 1014: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1014

Page 1015: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1015

Page 1016: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1016

Page 1017: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1017

Page 1018: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1018

Page 1019: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1019

Page 1020: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1020

Page 1021: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1021

Page 1022: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1022

Page 1023: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1023

Page 1024: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1024

Page 1025: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1025

Page 1026: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1026

Page 1027: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1027

Page 1028: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1028

Page 1029: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1029

Page 1030: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1030

Page 1031: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1031

Page 1032: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1032

Page 1033: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1033

Page 1034: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1034

Page 1035: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1035

Page 1036: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1036

Page 1037: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1037

Page 1038: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1038

Page 1039: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1039

Page 1040: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1040

Page 1041: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1041

Page 1042: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1042

Page 1043: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1043

Page 1044: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1044

Page 1045: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1045

Page 1046: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1046

Page 1047: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1047

Page 1048: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1048

Page 1049: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1049

Page 1050: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1050

Page 1051: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1051

Page 1052: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1052

Page 1053: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1053

Page 1054: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1054

Page 1055: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1055

Page 1056: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1056

Page 1057: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1057

Page 1058: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1058

Page 1059: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1059

Page 1060: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1060

Page 1061: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1061

Page 1062: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1062

Page 1063: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1063

Page 1064: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1064

Page 1065: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1065

Page 1066: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1066

Page 1067: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1067

Page 1068: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1068

Page 1069: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1069

Page 1070: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1070

Page 1071: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1071

Page 1072: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1072

Page 1073: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1073

Page 1074: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1074

Page 1075: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1075

Page 1076: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1076

Page 1077: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1077

Page 1078: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1078

Page 1079: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1079

Page 1080: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1080

Page 1081: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1081

Page 1082: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1082

Page 1083: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1083

Page 1084: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1084

Page 1085: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1085

Page 1086: (Federal), Islamabad [1. PWP-II Pakistan Public Works Department]

Page 1086