FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS FOR FY 2012 MINISTRIES, DEPARTMENTS AND AGENCIES (MDAs)
FEDERAL CAPITAL TERRITORY (FCT)
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Variation of the scope of work for the Contract for Design and Construction of Abuja Rail Mass Transit Project (Lots 1&3) from 60.67km to 45.245km (Lots 1A73)
Messrs China Civil Engineering and Construction Corporation (CCECC)
Federal Capital Territory Administration
USD823,540,545.87 payable at the prevailing exchange rate at the time of payment inclusive of 5% VAT and 5% Variation on prices
18/07/12 36 Months
2 Award of Phase II of the Contract for the provision of Infrastructure to Apo Estate Layout
Messrs Cat Construction Group (Nig.) Ltd
Federal Capital Territory
N2,834,769,961.53 05/09/12 30 Months
3 Award of Phase II of the Contract for the Construction of Southern Parkway from Christian Center, S8/S9 to Ring Road I, (RRI), Abuja
Messrs Setraco (Nigeria) Ltd
Federal Capital Territory
N10,901,225,367.90 05/09/12 30 Months
4 EXTENSION OF CONTRACT FOR THE UPWARD REVIEW OF CONTRACT SUMS FOR THE RESIDENT SUPERVISION OF COMPLETION OF ROADS B6/B12, AIRPORT EXPRESSWAY AND OUTER NORTHERN EXPRESSWAY PROJECTS
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
4a Upward review of the contract sum for the Resident Supervision of Roads and Bridges as well as Water, Storm Drainage, Foul Sewage, Electricity and Telecommunication aspects of the Construction of Roads B6, B12, Circle Road & other Arterial in the Central Area of the Federal Capital City
Messrs Yolas Consultant Limited
Federal Capital Territory
N446,757,419.33 12/09/12
Extended Completion Period of 66 Months
4b Revision of the Contract for Resident Supervision of the Expansion and Rehabilitation of Airport Expressway Lots I and II
Messrs Ben Mose & Partners
Federal Capital Territory
N303,398,978.40 12/09/12
Extended Completion Period of 32 Months
4c Revision of the Contract for Resident Supervision of the Expansion and Rehabilitation of Outer Northern Expressway Lots I and II
Messrs Etteh Aro & Partners
Federal Capital Territory
N327,330,815.70 12/09/12
Extended Completion Period of 38 Months
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
5 Award of Contract for the provision of Phase II of the Primary Engineering Infrastructure to Mbora District, Abuja
Messrs Sammya (Nigeria) Limited
Federal Capital Territory
N13,288,553,286.59 12/09/12 36 Months
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
6 Award of Phase I Contract for the Construction and equipping of 220-Bed Gwarimpa District General Hospital, Abuja.
Messrs Mabelt Construction Company Ltd
Federal Capital
Territory
N3,028,753,563.28 31/10/12 86 Weeks
7 Award of Contract for the Rehabilitation of the ECOWAS Parliament Building, Abuja
Messrs Julius Berger (Nigeria) PLC
Federal Capital
Territory
Administration
N3,432,642,614.96 07/11/12 12 Months
8 Award of Contract for the Rehabilitation and re-building of the United Nations (UN) Office building in Abuja
Messrs Julius Berger (Nigeria) Plc
Federal Capital Territory Administration
N5,153,043,922.40 21/11/12 16 Months
9 Award of Contract for the Design and Construction of a 150-seater capacity Banquet Hall and other related works within the Presidential Villa, Abuja
Messrs Julius Berger (Nigeria) Plc
Federal Capital Territory Administration
N2,235,237,181.80 28/11/12 12 Months
10 Award of Contract for the Resurfacing of Existing Roads and Remedial Works on Bridges in Garki 1 and Wuse 1 Districts of the Federal Capital City
Messrs Arab Contractors (OAO) (Nig.) Ltd.
Federal Capital Territory Administration
N2,789,106,137.80 28/11/12 12 Months
11 Approval for Revised Estimated Total Cost (RETC) of the Contract for the Construction of Tanks 1 & 6 and associated Trunk Mains
Messrs Sarplast (WA) Ltd,
Federal Capital Territory Administration
N20,260,337,643.67 28/11/12 24 Months
12 Approval for Variation Order No. 2 on the Contract for the Provision of Complimentary Engineering Infrastructure Facilities to the Federal Capital City (FCC), Abuja
Messrs Julius Berger (Nig.) Plc
Federal Capital Territory Administration
N15,964,942,982.77 Plus €187,419,600.72
28/11/12 15 Months
FEDERAL MINISTRY OF AVIATION
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1a Award of Contract for the Construction of five(5) new Terminal Buildings at Nnamdi Azikwe International Airport (NAIA), Abuja; Murtala Mohammed International Airport (MMIA), Lagos; Mallam Aminu Kano International Airport (MAKIA), Kano; Port Harcourt International Airport(PHIA), Port Harcourt and Akanu Ibiam International Airport (AIIA), Enugu and 6 Cargo Terminals at NAIA, MMIA, MAKIA, PHIA, AIIA and Asaba Airport
Messrs China Civil Engineering and Construction Company (CCECC)
Federal Ministry of Aviation
N106,157,085,819.44 05/09/12 24 Months
1b
Provision of post-contract consultancy services for the projects
i) Triad Associates
ii) Mechelec Consultant Ltd
iii) Ngonyama Okpanum &
Federal Ministry of Aviation
N4,362,619,965.18 Provided within the contract sum of N106,157,085,819.44
05/09/12
Associates iv) Interractive
Engineering Consult Ltd
v) Design Union Consulting Ltd
vi) Globarch Associates
vii) CDP Partnership Ltd
viii) Archaid Consultants Ltd
2 Award of Contract for the Construction of one (1) International Terminal Building in Bayelsa Airport, Yenagoa including 1 Control Tower and 1 Power House
Messrs China Civil Engineering Construction Company (CCECC)
Ministry of Aviation
N13,912,715,456.15 inclusive of consultancy provision of 4.7%
21/11/12 24 Months
3 Award of Contract for the augmentation of pre/post Contract Consultancy
Messrs Interactive Engineering Consult Ltd
Ministry of Aviation
N232,777,516.12 28/11/12
Services for the improvement of power supply at Murtala Muhammad International Airport (MMIA) Ikeja, Lagos
FEDERAL MINISTRY OF COMMUNICATIONS TECHNOLOGY
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Provision of Consultancy Services for Open Access Model for Development
Messrs KPMG Professional Services
Ministry of Communications Technology
N311,156,882.00 28/11/12 6 Months
FEDERAL MINISTRY OF EDUCATION
1 Contract for the Printing and distribution of Primaries three, four, five and six textbooks in English Language, Mathematics, Basic Science & Technology, Social Studies and Library Resources Materials for Junior Secondary Schools (JSS) Students in Public Schools, Nationwide, by the Universal Basic Education Commission (UBEC) Ministry of Education
S/N
Description of Project(Book Title)
Publisher/Contractor Quantity/No. of Copies
Unit Cost(N) Total Cost in Naira (Incl. Transportation)
I) Printing and Distribution of Macmillan New Primary Mathematics Book 4 for Five States
Macmillan 186,380 650 121,147,000.00
ii) Printing and Distribution of Macmillan Brilliant Primary Social Studies Book 3 for thirty two States
Macmillan 3,122,910 490 1,530,225,900.00
iii) Printing and Distribution of Macmillan New Primary Mathematics Book 4 for thirty two States
Macmillan 2,321,440 490 1,137,505,600.00
iv) Printing and Distribution of Macmillan Brilliant Primary Social Studies Book 5 for twenty-three States
Macmillan 2,203,090 480 1,057,483,200.00
v) Printing and Distribution of Think and Do Activity-Based Science Book for Primary 4 for twenty-three States
Macmillan 910,259 351 319,500,909.00
vi) Printing and Distribution of Think and Do Activity-Based Science Book for Primary 5 for twenty-three States
Macmillan 789,600 351 277,149,600.00
vii) Printing and Distribution of Think and Do Activity-Based Science Book for Primary 6 for twenty-two States
Macmillan 747,930 351 262,523,430.00
viii) Printing and Distribution of 39 Assorted Titles of Library Resource Materials for Thirty-Three States:
Creative writing 24 Titles
Core Reference Titles for JSS 9 Titles
Encyclopaedia 6 Titles
Macmillan
621,600 233,100 155,400
350 610 900
217,560,000.00 142,191,000.00 139,860,000.00
ix) Printing and Distribution of HEBN Basic Science & Technology Book 4 for Fourteen States
HEBN 504,980 520 262,589,600.00
x) Printing and Distribution of HEBN Basic Science & Technology Book 5 for Fourteen States
HEBN 504,980 495 249,965,100.00
xi) Printing and Distribution of HEBN Basic Science & Technology Book 6 for Fourteen States
HEBN 504,980 520 262,589,600.00
xii) Printing and Distribution of UP PLC Basic Science & Technology Book 4 for Eleven States
UP PLC 671,000 490 328,790,000.00
xiii) Printing and Distribution of UP PLC Basic Science & Technology Book 5 for Eleven
UP PLC 671,000 490 328,790,000.00
States
xiv) Printing and Distribution of UP PLC Basic Science & Technology Book 6 for Eleven States
UP PLC 671,000 505 338,855,000.00
TOTAL 6,976,725,939.00
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
2 Award of Contract for the Supply and Installation of 80 Units of PS960 Image Mark Reader Scanners
Messrs Data Science (Nigeria) Limited
Federal Ministry of Education/NECO
N1,992,000,000.00 14/11/12 8 Weeks
FEDERAL MINISTRY OF ENVIRONMENT
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Sagbama Erosion Control Rehabilitation Works, Bayelsa State
Messrs Nigerian Westminster Dredging and Marine Limited
Federal Ministry of Environment
N1,500,545,418.75 05/09/12 12 Months
FEDERAL MINISTRY OF FINANCE
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the procurement of 2No. New KND P.249 Aluminium High Speed Boats with Back-up Spare Parts and Training of Crew Members for Nigeria Customs Service (NCS) Marine Operations
Messrs. Kobus NavalDesign/Portplus Limited
Ministry of
Finance/Nigeria
Customs Service
N3,072,563,164.60
inclusive of 5% VAT
09/05/12 9 Months
2 Review of Contract sum for the rehabilitation of Phase I of the Ministry of Finance Office Complex
Messrs A&K Construction Limited
Ministry of Finance/FCDA
N2,263,231,068.22 25/07/12 56 Weeks
FEDERAL MINISTRY OF HEALTH
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Regulatory and Business Practices Improvement and Information Management (E-NHIS) Project for National Health Insurance Scheme (NHIS)
Messrs Accenture (Nigeria) Ltd
Federal Ministry
of Health/NHIS
USD1,386,964.45 for the
Project with 40% Federal
Government/NHIS
Contribution of
USD554,785.78 payable at
the prevailing exchange
rate at the time of payment
directly to International
Finance Corporation (IFC)
as payment to the
contractor
13/06/12
2 Approval for the release of fund for the procurement of contraceptives as counterpart funding of the Federal Republic of Nigeria
United Nations Fund for Population Activities (UNFPA)
Federal Ministry of Health
USD3,000,000.00 14/11/12 2012, 2013, 2014
3 Award of Contract for the procurement of routine immunization vaccines from the United Nations International Childrens’ Emergency Fund (UNICEF)
UNICEF Federal Ministry of Health
USD2,460,912.38 at the prevailing exchange rate at the time of procurement
28/11/12
4 Engagement of International Dispensary Association (IDA) for the procurement of 2nd line Anti-TB drugs for the management of side effects, clearing and distribution of the procured items for 500 multiple Drug Resistant Tuberculosis (MDR-TB) patients in Nigeria
International Dispensary Association (IDA)
Federal Ministry of Health
N297,872,488.00 28/11/12
6 Months per batch for 2 batches
FEDERAL MINISTRY OF LAND, HOUSING AND URBAN DEVELOPMENT
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Revision of the Contract Sum for the Construction of the Federal Secretariat Complex at Yenagoa, Bayelsa State
Messrs Trenur (Nigeria) Limited
Federal Ministry of Land, Housing and Urban Development
N3,121,821,857.85 19/09/12 100 Weeks
2 Award of Contract for completion of construction of the Zik Mausoleum at Onitsha, Anambra State
Messrs BNL Engineering and Construction Company Limited
Ministry of Lands, Housing and Urban Development
N1,496,531,400.83 03/10/12 13 Months
MINISTRY OF NIGER DELTA AFFAIRS
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Construction of Sagbemi-Kiribo-Gada-Igbekibo Road in Ondo State
Messrs Done Frat Jercess Construction Ltd
Ministry of Niger Delta Affairs
N3,554,991,342.11 07/11/12 24 Months
2 Award of contract for the Consultancy Services for the Engineering Design of the Extension of the East-West Road (Section iv) form Oron in Akwa Ibom State to Calabar in Cross River State
Messrs Siraj (Nigeria) Limited
Ministry of Niger Delta Affairs
N671,417,165.09 24/10/12 9 Months
MINISTRY OF PETROLEUM RESOURCES
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the supply, installation and commissioning of Printing Press equipment under the Petroleum Training Institute Upgrade project at Effurun, Delta State
Messrs. Ali-Rezi Limited
Ministry of
Petroleum
Resources
N1,226,322,209.37 25/04/12 12 Months
2 Approval for cost adgustment, scope variation, and extension of timelines of contract for the expansion of the Escravos – Lagos Pipeline Phase II
Messrs Zakhem Construction (Nigeria) Ltd.,
Ministry of Petroleum Resources
USD602,921,904.50 Plus N4,618,266,784.00
05/12/12 24 Months Extension
3
AWARD OF CONTRACTS FOR THE ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)OF OB3 PIPELINE PROJECT LOTS A AND B
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
Lot A Engineering, Procurement and Construction (EPC) Contract of the OB3 Gas Pipeline Project
Messrs. Nestoil Plc Ministry of
Petroleum
Resources
N19,250,013,456.24
Plus
USD192,500,134.48
(VAT Inclusive) Equiv.
N49,414,784,529.26
at Exch. Rate of
N156.70/USD and a
Provisional Sum of
N46,000,000.00
Plus
USD1,880,000.00 to
cater for contingency
25/04/12 24 Months
for unforeseen works
and additional work
scope; Engineers’
expenses on detailed
design review and
construction
supervision; Factory
Acceptance Test (FAT)
and Training on
Equipment as well as
spare parts for 2 years
completion and
operational
Consumable for 1 year
with a completion
period of 24 months
Lot B Engineering, Procurement and Construction (EPC) Contract of the OB3 Gas Pipeline Project
Messrs. Oilserv Ltd Ministry of
Petroleum
Resources
N29,520,0429,031.33
Plus
USD83,924,564.75
(VAT Inclusive) Equiv.
N42,671,408,327.65
at Exch. Rate of
25/04/12 24 Months
N156.70/USD and a
Provisional Sum of
N46,000,000.00
Plus
USD1,480,000.00 to
cater for contingency
for unforeseen works
and additional work
scope; Engineers’
expenses on detailed
design review and
construction
supervision; Factory
Acceptance Test (FAT)
and Training on
Equipment as well as
spare parts for 2 years
completion and
operational
Consumable for 1 year
with a completion
period of 24 months
4
AWARD OF CONTRACTS FOR THE DEVELOPMENT OF THE NATIONAL COLLEGE OF PETROLEUM STUDIES, KADUNA (NCPSK)
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Construction of Student Hostel (Lot 1A)
Messrs. Prince & Princess Properties
Ministry of Petroleum Resources
N1,048,566,008.75
25/04/12
52 Weeks
2 Construction of Student Hostel (Lot 1B)
Messrs. Kashnur Nigeria Ltd
N1,048,253,446.82 52 Weeks
3 Construction of Multipurpose Hall (Lot 2A)
Messrs. Faranab Investment Ltd
N551,059,476.25 40 Weeks
4 Construction of Staff School (Lot 3B)
Messrs. Terraina Construction Ltd
N294,537,452.50 30 Weeks
TOTAL N2,942,416,384.32
5
AWARD OF CONTRACTS FOR THE PETROLEUM TECHNOLOGY DEVELOPMENT FUND (PTDF) PROJECTS/ THE EQUIPPING OF INFORMATION COMMUNICATION TECHNOLOGY (ICT) CENTRES AT VARIOUS EDUCATIONAL INSTITUTIONS
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Provision of Computer, Furniture, Installation and Commissioning
Messrs. Ziontain Resources Ltd
Ministry of Petroleum Resources
N3,754,904,455.80
25/04/12
60 Weeks
2 VSAT facilities Installation and Commissioning
Messrs. Galaxy Backbone
N710,286,126.62 60 Weeks
3 Provision of Water Borehole and Water Reticulation
Messrs. Altex Engr. Oil and Gas
N856,565,905.56 48 Weeks
4 Provision of Generator/Solar Backup
Messrs. Coldwell Investment Ltd
N3,097,282,530.00 60 Weeks
5 Renovation of existing building (North West)
Messrs. Deetech (Nig.) Ltd
N117,637,061.00 36 Weeks
6 Renovation of existing building (North East)
Messrs. Wood Hill Engineering
N81,863,722.50 36 Weeks
7 Renovation of existing building (South West)
Messrs. Ededeku Devu Services
N106,040,340.00 36 Weeks
8 Renovation of existing building (South East)
Messrs. SGD Resources Ltd
Ministry of Petroleum Resource
N85,673,700.00
25/04/12
9 Renovation of existing building (North Central)
Messrs. Sammy Development Resources Ltd
N144,709,949.50 36 Weeks
10 Renovation of existing building (South South)
Messrs. SGD Resources Ltd
N93,964,500.00 36 Weeks
TOTAL (B) N9,048,928,290.98
GRAND TOTAL (A&B) N9,897,243,923.57
6 AWARD OF CONTRACT FOR THE CONSTRUCTION PROJECTS FOR SECONDARY AND PRIMARY SCHOOLS AT OKERENKOKO AND OPOROZA COMMUNITIES OF DELTA STATE
PROPOSED SECONDARY SCHOOL AT OKERENKOKO
S/N LOT RECOMMENDED CONTRACTOR
IMPLEMENTING AGENCY
CONTRACT PRICE (N) DATE COMPLETION
PERIOD
1 1
Messrs. Fairwelcome (Nigeria) Ltd
Ministry of Petroleum Resource
239,762,176.50 27/04/12 25 Weeks
2 2
Messrs. Pet-darl & Company Ltd
Ministry of Petroleum Resource
134,454,421.50
25/04/12
22 Weeks
3 3 Messrs. Nyemaro (Nig) Ltd 197,252,674.50 17 Weeks
4 4 Messrs. Odrich (Nig) Ltd 228,993,894.00 16 Weeks
5 5 Messrs. Shadro (Nig) Ltd 223,372,065.00 16 Weeks
6 6
Messrs. Cannan Land Group (WA) Ltd
171,134,271.00 12 Weeks
7 7 Messrs. Imakel (Nig) Ltd 95,063,399.55 16 Weeks
8 8B Messrs. Imakel (Nig) Ltd 47,064,223.50 8 Weeks
9 8C Messrs. Petvonne Resources 66,194,016.00 12 Weeks
10 8D Messrs. Hymet Resources 111,191,256.75 12 Weeks
11 9 Messrs. Gearnin Ventures Ltd
Ministry of Petroleum Resource
245,028,845.00
25/04/12
8 Weeks
12 9B Messrs. Biemoni (Nig) Ltd 59,067,949.50 4 Weeks
Sub Total 1,818,579,192.80
PROPOSED PRIMARY SCHOOL AT OPOROZA
S/N LOT RECOMMENDED CONTRACTOR
IMPLEMENTING AGENCY
CONTRACT PRICE (N) DATE COMPLETION
PERIOD
13 10 Messrs. MBF International Ltd
Ministry of Petroleum Resources
163,260,436.50
25/04/12
16 Weeks
14 11 Messrs. Biemoni (Nig) Ltd 90,933,727.50 16 Weeks
15 12 Messrs. Sunny Ebi Ltd 170,783,928.00 16 Weeks
16 14 Messrs. P&P Construction Ltd 88,979,415.00 25 Weeks
17 15
Messrs. Pisces Gold Resource Ltd
Ministry of Petroleum Resource
87,640,560.00
25/04/12
25 Weeks
18 16 Messrs. Niccus Industries Ltd 69,511,890.00 25 Weeks
19 17
Messrs. Henry & Nicks Associates Ltd
220,108,350.00 25 Weeks
20 18 Messrs. Rajco (Nig) Ltd 50,737,050.00 25 Weeks
21 19 Messrs. Rajco (Nig) Ltd 154,168,350.00 25 Weeks
22 20 Messrs. Ojone Properties 130,195,800.00 25 Weeks
23 21 Messrs. Rajco (Nig) Ltd 98,490,000.00 25 Weeks
24 22 Messrs. Rajco (Nig) Ltd 64,074,937.50 27 Weeks
25 23 Messrs. SGD Ltd 97,778,058.00 12 Weeks
Sub Total 1,486,662,502.50
Grand Total 3,305,241,695.30
7
AWARD OF CONTRACT IN RESPECT OF ADDITIONAL WORKS AT THE PETROLEUM TRAINING INSTITUTE (PTI) EFFURUN, DELTA STATE
S/N DESCRIPTION OF PROJECT
NAME OF CONTRACTOR
IMPLEMENTING AGENCY
PRICE (N) DATE COMPLETION
PERIOD
1 Construction of New Road – Lot 1
Messrs. Barger Consort Ltd
Ministry of Petroleum Resources
247,487,326.82
25/04/12
10 Weeks
2 Flood Control – Lot 3
Messrs. Kezma Links Limited
147,807,043.52 24 Weeks
3 Water Supply at Admin Block
Messrs. Adroit Investment Ltd
23,369,930.85 16 Weeks
4 Water Supply at Incinerator Lot 5
Seda (Nig) Ltd 26,001,007.50 16 Weeks
5 Water Supply at New Hostel Lot A – Lot 6
Messrs. Interraf Construction Ltd
20,761,650.00 16 Weeks
6 Water Supply at New Hostel Lot B – Lot 7
Charlecc (Nig) Ltd
Ministry of Petroleum Resource
29,919,750.00
25/04/12
16 Weeks
7 Water Supply at Laboratory and Training Centre – Lot 8
Messrs. Mobol Ventures Ltd
47,723,455.00 16 Weeks
8 Furniture, Fittings & Fixtures at Training Centre - Lot 9
Messrs. Oak mount Company Ltd
39,057,558.75 16 Weeks
9 Furniture, Fittings & Fixtures at Lab Lot A – Lot 10
Messrs. Danestof Tech Ltd
94,137,240.75 8 Weeks
10 Furniture & Equipping of Lab Lot B – Lot 11
Messrs. Global Business Integrated
99,979,304.00 16 Weeks
11 Furniture, Fittings & Fixtures at New Admin Block Extension – Lot 12
Messrs. Danestof Tech Ltd
108,831,501.24 8 Weeks
12 External Lighting – Lot 13
Messrs. Danestof Tech (Nig) Ltd
265,082,281.45 16 Weeks
13 Construction of Changing Room & Public Toilets
Messrs. Tebonel (Nig) Ltd
27,136,000.00 16 Weeks
14 Gate House & Demonstration Ground Civil Works
Messrs. Obomesco (Nig) Ltd
22,322,322.00 12 Weeks
15 Construction of Ticket Boot
Messrs. Saint Bobo Oil Ltd
Ministry of Petroleum Resource
19,240,554.00
25/04/12
12 Weeks
16 Construction of Spectators Stand
Messrs. Fadfen Global Ltd
31,412,725.00 12 Weeks
17 Construction of Volley Ball Court
Messrs. Base two Associates Ltd
13,787,432.00 16 Weeks
18 Construction of Basket Ball Court
Messrs. Ruf-Flair (Nig) Ltd
14,687,726.00 16 Weeks
19 Rehabilitation of existing Lawn Tennis Court at Main Campus
Messrs. Vigho Concept (Nig) Ltd
43,156,726.00 16 Weeks
20 Rehabilitation of Water Treatment Plant at Conference Centre
Messrs. Royal Approach (Nig) Ltd
19,260,726.14 16 Weeks
21 Rig Site transformer and Ancillary works
Messrs. Otega Resources Ltd
57,110,655.00 16 Weeks
22 Upgrade of Conference Centre Water Distribution Network
Messrs. Akpos (Nig) Ltd
22,793,662.00 16 Weeks
23 Supply of Generator at Conference Centre
Messrs. Aoeu Ventures Ltd
41,499,500.00 10 Weeks
24 Renovation of Students Social Centre
Messrs. Edfort Ltd manuex Corporate
Ministry of Petroleum Resource
30,895,147.00
25/04/12
12 Weeks
25 Construction of X-ray building
Messrs. Cee & Jay Company (Nig) Ltd
17,701,920.00 16 Weeks
26 Renovation of Multi Storey AF/3
Messrs. Fembuild Concept Ltd
29,209,617.00 12 Weeks
27 Renovation of lecture’s Office Block
Messrs. Aluminium Gold Engineering Ltd
90,727,004.00 30 Weeks
28 Generator Synchronizing Panel & Associate Work
Messrs. Digbits Controls (Nig) Ltd
66,910,305.00 10 Weeks
29 Supply and maintenance equipment
Messrs. Hasting Global Resources
47,317,832.00 16 Weeks
8
AWARD OF CONTRACTS FOR THE DEVELOPMENT OF THE SECOND PHASE OF FEDERAL POLYTECHNIC EKOWE, BAYELSA STATE – HOST COMMUNITIES INTEGRATED PROJECTS
S/N DESCRIPTION OF PROJECT
NAME OF CONTRACTOR
IMPLEMENTING AGENCY
PRICE (N) DATE COMPLETION
PERIOD
1 Construction of Town Hall/ Furnishing Ekowe Village (Lot HC – 1)
Samarco Engineering Ltd
Ministry of Petroleum Resources
98,689,075.57
25/04/12
30 Weeks
2 Construction of Town Hall/ Furnishing Biebu Village (Lot HC – 2)
Imakel (Nig) Ltd 98,689,075.57 30 Weeks
3 Construction of Town Hall/ Furnishing Okon - Gbene Village (Lot HC – 3)
Bekepere Integrated Service Ltd
98,689,075.57 30 Weeks
4 Construction of Town Hall/ Furnishing Ikian Biri Village (Lot HC – 4)
Ibomowei (Nig) Ltd
98,689,075.57 30 Weeks
5 Construction of Town Hall/ Furnishing Polobogou Village (Lot HC – 5)
Klasic Oil Inspection
98,689,075.57 30 Weeks
6 Construction of Town Hall/ Furnishing Opuama Village (Lot HC – 6)
Margoy Integrated Services Ltd
98,689,075.57 30 Weeks
7 Construction of 2No Block of 3 Classroom & Computer Lab in Primary School – Ekowe Village (Lot HC – 7)
Dolawealth Eng Services Consult (Nig) Ltd
84,509,007.56 35 Weeks
8 Construction of 2No Block of 3 Classroom & Computer Lab in Primary School – Nange – Ama Village (Lot HC – 8)
Samad Projects Ltd
Ministry of Petroleum Resource
79,102,230.50
25/04/12
35 Weeks
9 Construction of 2No Block of 3 Classroom & Computer Lab in Primary School – Peremabiri Village (Lot HC – 9)
Custom Modules Consultants Ltd
80,449,875.34 35 Weeks
10 Construction of 2No Block of 3 Classroom & Computer Lab in Primary School – Ikoromgben Village (Lot HC – 10)
Chibet Investment
78,978,675.10 35 Weeks
11 Construction of 2No Block of 3 Classroom & Computer Lab in Primary School – Eniwari Village (Lot HC – 11)
Hebron Global Eng. (Nig) Ltd
82,853,153.75 35 Weeks
12 Construction of 2No Block of 3 Classroom & Computer Lab in Primary School – Oyeregbene (Lot HC – 12)
Beb International Ltd
82,853,153.75 35 Weeks
13 Construction of Single Storey Secondary School Building with Computer Room – Community Sec. Sch. Eniwari (Lot HC – 13)
Dagi Furo (Nig) Ltd
180,100,218.00 42 Weeks
14 Construction of Single Storey Secondary School Building with Computer Room – Govt. Sec. Sch. Opuama (Lot HC – 14)
Paudisman (Nig.) Ltd
191,582,951.00 42 Weeks
15 Construction of Single Storey Secondary School Building with Computer Room – Community Sec. Sch. Peremabiri (Lot HC – 15)
Continental Base Ltd
190,723,516.00
25/04/12
42 Weeks
16 Construction of Single Storey Secondary School Building with Computer Room – Ube Sec. Sch. Polobugo (Lot HC – 16)
Amazon Energy Ltd
82,243,259.84 42 Weeks
17 Construction of Single Storey Secondary School Building with Computer Room – Ekowe Sec. Sch. Block A (Lot HC – 17)
Tecnimed (Nig) Ltd
195,679,985.82 42 Weeks
18 Construction of Single Storey Secondary School Building with Computer Room – Ekowe Sec. Sch. Block B (Lot HC – 18)
Petvonne (Nig) Ltd
195,679,985.82 42 Weeks
19 Provision of Borehole, Water tanks for Ekowe Village (Lot HC – 19)
Mobol Ventures Ltd
225,678,000.00 35 Weeks
20 Solar Powered Street Lights for Ekowe Village (Lot HC – 20)
Johnson Fox Ltd 196,296,159.00 20 Weeks
21 Sand Filling of Land at Liaison Office Site (Lot HC – 22)
Saidi (Nig) Ltd 238,564,234.00 12 Weeks
22 Construction of Warehouse at Liaison Office Site (Lot HC – 22)
Johnson Construction Ltd
Ministry of Petroleum Resource
168,547,234.40
25/04/12
32 Weeks
23 Supply of Clinic Equipment (Lot HC – 22)
Zone Int. Ltd 234,570,690.20 24 Weeks
24 Supply of Generators (Lot HC – 23)
Technology Support Centre Ltd
226,569,630.00 10 Weeks
25 Supply of Computers to 6No. Primary Schools (Lot HC – 25)
Abafem Ventures Ltd
136,132,269.00 21 Weeks
26 Supply of Computers to 6No. Secondary Schools (Lot HC – 26)
Panchioti Global 190,813,980.20 21 Weeks
27 Supply of Computer to Community School Staff (Lot HC – 27)
Niyi & Tonye Ltd 84,876,531.00 18 Weeks
28 Supply of Classroom Furniture to 6No. Primary Schools (Lot HC – 28)
Generali Construction Zone Ltd
76,432,986.00 28 Weeks
29 Supply of Classroom Furniture to 6No. Secondary Schools (Lot HC – 29)
Canaan Land West Africa Ltd
90,467,900.00 28 Weeks
30 Supply of Books to Secondary and Primary Schools (Lot HC – 30)
Anthonia Stevens 73,200,765.20 18 Weeks
31 Shopping Centre (Lot HC – 31)
Sabena Global Services Ltd
209,129,404.20 44 Weeks
MINISTRY OF POWER
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the major overhaul and restoration of Plant Unit GT17 at Ughellli Power Plc.,
Messrs Sematech/MJB Ltd.,
Ministry of Power USD11,408,383.20 payable at the prevailing exchange rate at the time of payment PLUS N90,600,000.00 for Custom Duty, Port Charges, Security, Community Issues and Logistics
13/06/12 90 days
2 Award of Contract for the restoration of 4No. Plant Units and Balance of Plant at Omotosho Power Plc
China Machinery and Engineering Corporation
Ministry of Power USD10,092,771.15 Plus N78,753,893.30 for 5% VAT
18/07/12 6 Months
3 Award of Contract for the supply and installation of parts for the 2x150MW Units 411G1 and 411G3 Generators at Shiroro Hydroelectric Plc
Messrs ANDRITZ HYDRO GmBH
Ministry of Power €2,075,754.00 payable at the prevailing exchange rate at the time of payment Plus N13,326,340.68 to be retained by Shiroro Hydroelectric Plc to cover 1% CISS fees and 2% Port & Handling charges
18/07/12 8 Months
4 PROCUREMENT OF 6No. 60MVA 132/33KV AND 2No. 300MVA 330/132/33KV POWER TRANSFORMERS FOR THE TRANSMISSION COMPANY OF NIGERIA
4i Contract for the design, manufacture and supply of 6 units of 60MVA 132/33kv Power Transformers complete with spare parts and accessories
Messrs Liaoning Efacec Electrical Equipment Co. (LEEEC) Ltd
Ministry of Power
USD3,340,300.00 payable at prevailing exchange rate at the time of payment Plus N104,083,079.94 inclusive of VAT
25/07/12 10 Months
4ii Contract for the design, manufacture and supply of 2 units of 300MVA 300/ 132/33kv Power Transformers complete
Messrs Von Roll Transformers Ltd
Ministry of Power
USD5,421,300.00 payable at prevailing exchange rate at the time of payment
25/07/12 8 Months
with spare parts and accessories Plus N168,687,544.41 inclusive of VAT
5 REVISION OF THE CONTRACT SUM FOR THE CONSTRUCTION OF 2x30/40MVA 132/33KV SUBSTATIONS AT MBALANO, OHAFIA AND OKIGWE AS WELL AS CONSTRUCTION OF 3RD BENIN-ONITSHA 330KV DOUBLE CIRCUIT TRANSMISSION LINE FOR THE TRANSMISSION COMPANY OF NIGERIA
5i Revision of the Contract Sum for the construction of 2 x 30/40MVA 132/33KV Substation at Mbalano, Abia State
Messrs Union Allied Engineering Ltd.
Ministry of Power
USD6,201,080.87 payable at prevailing exchange rate at the time of payment Plus N441,580,472.50
25/07/12 12 Months
5ii Revision of the Contract Sum for the construction of 2 x 30/40MVA 132/33KV Substation at Ohafia, Abia State
Messrs Union Allied Engineering Ltd.
Ministry of Power USD6,245,136.60 Plus N428,309,324.00
25/07/12 12 Months
5iii Revision of the Contract Sum for the construction of 2 x 30/40MVA 132/33KV Substation at Okigwe, Imo State
Messrs Union Allied Engineering Ltd.
Ministry of Power USD5,751,097.25 Plus N413,595,030.50
25/07/12 12 Months
5iv Revision of the Contract Sum for the construction of 3rd Benin-Onitsha double circuit transmission line
Messrs KEC International Limited
Ministry of Power
USD30,483,106.25 payable at prevailing exchange rate at the time of payment Plus N2,099,884,790.00
25/07/12 July, 2012
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
6a
Award of Contract for the Engineering, Procurement and Construction of the Hydroelectric Power Project
Messrs Sinohydro Corporation/China National Electrical Engineering Corporation
Ministry of Power
USD377,723,701.31 Plus ¥3,701,664,848.66CNY Plus N44,007,398,398.00 Equiv. N162,990,364,379.30 inclusive of all taxes
14/11/12 4 Years
6b Award of Contract for Project Consultancy and Supervision of the 700MW Zungeru Hydroelectric Power Project
Messrs Coyne etBellier/Decrown West Africa Company Limited
Ministry of Power USD21,775,237.63 14/11/12 4 Years
7 Award of Contract for the Completion and Commissioning of the Obudu-Ogoja 132kv Double Circuit Transmission Line
Messrs KEC International Limited
Ministry of Power/Transmission Company of Nigeria (TCN)
USD3,552,218.34 payable at the exchange rate at the time of payment Plus N580,304,418.81 (equivalent to N1,142,503,358.75 at an exchange rate of USD1.0 = 158.267) inclusive of a provisional sum of N222,577,070.81 for 5% VAT, 5% Contingency sum, 10% for Right of Way
28/11/12 18 Months
compensation and 3.5% of C&F for Port Clearing Charges
8 Award of Contract for the Supply of Materials for Reconductoring of Delta – Effurun 132kv Transmission Line (20.68km long)
Dalekovod-Solex Limited
Ministry of Power/Transmission Company of Nigeria (TCN)
€450,614.08 payable at the prevailing rate of exchange Plus N19,947,800.00 inclusive of 5% VAT
28/11/12 32 weeks
9 Revision of the Contract Sum for the Construction of Jos – Kafanchan Double Circuit Transmission Line Project
Messrs Energo (Nigeria) Limited
Ministry of Power/Transmission Company of Nigeria (TCN)
€4,944,916.00 payable at prevailing rate of exchange at the time of payment Plus N470,858,483.50
28/11/12
MINISTRY OF TRADE AND INVESTMENT
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the procurement of Six (6) Mobile Training Laboratory Workshops by Industrial Training Fund (ITF)
Messrs Valentino Resources (Nigeria) Limited
Ministry of Trade and Investment
N763,083761.02 24/10/12 Three Months
FEDERAL MINISTRY OF TRANSPORT
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the Consultancy Services for the Development of a 25-year National Ports Master Plan for the Ministry of Transport/Nigerian Ports Authority (NPA)
Messrs. CPCS Transcom International in association with DHV, Seaport, Tripple E and Magnartis
Ministry of
Transport/Nigerian
Ports Authority (NPA)
CAD1,339,350
(Canadian Dollars)
Plus
€384,360
(Equiv.
N266,972,949.97)
inclusive of all taxes
payable at the
prevailing exchange
rate at the time of
payment
25/04/12 9 Months
2 Augmentation of the Consultancy Fees for Condition Assessment Survey, Development of Scope of Works and Bill of Quantities and Supervision of the Rehabilitation of the Existing Railway System including Apapa and Port-Harcourt Ports, Railway Network and Sidings
Messrs. Roughton International
Ministry of Transport Revised Estimated
Total Cost of
£5,615,836.13
payable at the
prevailing exchange
rate at the time of
payment inclusive of
02/05/12 18 Months
all taxes
3 Award of Contract for the Shore Protection/Dredging Reclamation Works at Selected Sites along River Niger
Messrs. Evomec Global Services Limited
Ministry of Transport N2,128,466,655.00 02/05/12 8 Months
4 Award of Contracts for the Construction of an Inland River Port at Jamata, Lokoja
Messrs. Inter-Bau Construction Ltd
Ministry of
Transport/National
Inland Waterways
(NIWA)
N4,112,346,572.26
inclusive of of all taxes
02/05/12 57 Weeks
5 Award of Contract for the Dredging of Channel along Orashi River from Oguta Lake to Degema in Imo/Rivers State
Messrs. Simidia S. and I. International Company Limited
Ministry of
Transport/National
Inland Waterways
(NIWA)
N2,028,600,000.00 02/05/12 12 Months
6 Award of Contract for Shore Erosion Control Works at Akipelai, Ayakoro and Otuoke Towns in Bayelsa State
Messrs. Mangrovetech Construction and Engineering Nigeria Ltd
Ministry of Transport N7,503,344,599.00 02/05/12 14 Months
7
AWARD OF CONTRACTS FOR THE DESIGN AND CONSTRUCTION OF FAST MOVING SECURITY PATROL BOATS (FPB) FOR LAGOS PILOTAGE DISTRICT FOR THE MINISTRY OF TRANSPORT/NIGERIAN PORTS AUTHORITY
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
7a 2No. 17M Manta MK ASD Messrs Kobus Naval Design (KND) of South Africa in association with Messrs Melsmore Marine (Nigeria) Limited
Ministry of
Transport/Nigerian
Ports Authority
USD9,429,143.05
payable at the
prevailing exchange
rate at the time of
payment, inclusive of
all taxes
27/06/12 12 Months
7b
1No. 32M Manta AD
Messrs OCEA of France in association with Messrs Anglestone Limited
Ministry of
Transport/Nigerian
Ports Authority
USD10,451,938.30
payable at the
prevailing exchange
rate at the time of
payment, inclusive of
all taxes
27/06/12 12 Months
8 Award of Contract for the Procurement of 4No. Fast Moving 40-45 Passengers Waterbus for the Ministry of Transport/National Inland Waterways (NIWA)
Messrs A.I.A International Limited
Ministry of
Transport/National
Inland Waterways
(NIWA)
N321,510,000.00
inclusive of all taxes
27/06/12 6 Months
9 Award of Contract for the Procurement of 3No. Fast Moving Security Boats for the Ministry of Transport/National Inland Waterways (NIWA)
Messrs Oil Response Limited
Ministry of
Transport/National
Inland Waterways
(NIWA
N233,625,000.00 27/06/12 6 Months
10 Award of Contract for the Procurement of 12/10 Cutter Suction Dredger with Ancillary Equipment for Ministry of Transport/National Inland Waterways (NIWA
Messrs Fosomji Global Ventures Ltd
Ministry of
Transport/National
Inland Waterways
(NIWA
N236,666,012.19
inclusive of all taxes
27/06/12 4 Months
11 AWARD OF CONTRACTS FOR THE RECLAMATION OF ABAM-NNUJU-IGBIRI-OBA-OJIMBA-OKUJAGU-AMA WATER FRONT AND RESIDENT SUPERVISION CONSULTANCY SERVICES OF THE RECLAMATION WORKS FOR MINISTRY OF TRANSPORT
S/N ITEM/SERVICE NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
11a Award Of Contracts For The Reclamation Of Abam-Nnuju-Igbiri-Oba-Ojimba-Okujagu-Ama Water Front and Back Swamps
Messrs Roudo (Nigeria) Limited
Ministry of Transport
N7,941,584,858.63 27/06/12 24 Months
11b Award of Contract for the Resident Supervision Consultancy Services for the Reclamation works
Messrs ETAT Consulting Limited
N383,251,938.63 27/06/12
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
12 Award of Contract for the Implementation of Addendum No. 2 (2nd Segment: Lagos-Kano) for the Ministry of Transport
Messrs China Civil Engineering Construction Company (CCECC) Nigeria Limited
Ministry of Transport
USD1,487,782,196.00 payable at the prevailing exchange rate at the time of payment inclusive of all taxes
18/07/12 36 Months
13
Award of Contracts for Consultancy Services for the Feasibility Studies of New Standard Gauge Railway Lines for the Federal Ministry of Transport
S/N Project Lot Consultancy Firm
Implementing Agency
Cost Date Completion
Period
13a Lot 1 - Lagos-Ibadan-Oshogbo-Baro-Abuja (615km) High Speed
Messrs CPCS Transcom
Federal Ministry of Transport
N284,562,603.00 26/09/12 7 Months
13b Lot 2 – Lagos-Shagamu-Ijebu-Ode-Ore-Benin City (300km)
Messrs Team Nig. Ltd Federal Ministry of
Transport N165,310,275.00 26/09/12 7 Months
13c Lot 3 – Ajaokuta (Eganyi)- Obajana-Jakura-Baro-Abuja with additional line from Ajaokuta to Otukpo (533km)
Messrs Siraj Nig. Ltd Federal Ministry of
Transport N443,154,907.11 26/09/12 7 Months
13d Zaria-Kaura Namoda-Sokoto-Ilela (520km)
Messrs Team Nig. Ltd Federal Ministry of
Transport N214,560,920.00 26/09/12 7 Months
13e Benin-Agbor-Onitsha-Nnewi-Owerri-Aba with additional line form Onitsha-Enugu-Abakaliki (500km)
Messrs Team Nig. Ltd Federal Ministry of
Transport N226,816,661.63 26/09/12 7 Months
TOTAL N1,334,405,366.74
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
14 Award of Contract for Consultancy Services (Supervision) for the Construction of inland River Port at Jamata, Lokoja (Lot 4)
Messrs HIKIMAH Associates Limited
Ministry of Transport
N121,114,875.00 inclusive of all taxes
28/11/12 57 weeks
15 Award of Contract for the Supply of Radiation and Explosive Detection Devices for the Ministry of Transport/Nigerian Transport Authority
Messrs Ebonite (Nigeria) Limited
Ministry of Transport/Nigerian Transport Authority
N189,733,635.00 inclusive of VAT
28/11/12 4 Months
16 AWARD OF CONTRACT FOR REHABILITATION OF RAILWAY TRACK NETWORK – EASTERN LINE (PORT-HARCOURT TO MAIDUGURI)
S/N Project Description Contractor
Implementing Agency
Cost Date Completion Period
1 Rehabilitation of the Railway Track Network – Eastern Line Contract 3 (km 0 +00 to km 463 Port Harcourt to Makurdi)
Messrs Eser Contracting and Industry Company (Turkey)
Federal Ministry of Transport
N19,165,202,237.54
28/11/12
10 Months
2 Rehabilitation of the Railway Track Network – Eastern Line Contract 4 (km 463 to 803 Makurdi to Kuru
Messrs CGGC Global Projects (Nigeria) Limited
N24,451,691,626.97 8 Months
3 Rehabilitation of the Railway Track Network – Eastern Line Contract 7 (km 803 to km 1443 Kuru to Maiduguri
Messrs Lingo (Nigeria) Limited in association with Strasky Husty and Partners Limited of Czech Republic
N23,720,359,033.79 10 Months
Total N67,337,252,898.30
17
CONTRACT FOR THE FEASIBILITY STUDIES OF NEW STANDARD GAUGE RAILWAY LINE
S/N PROJECT TITLE CONSULTANT
IMPLEMENTING AGENCY
COST DATE DURATION
1a Lot 1A: Eganyi (Near Ajaokuta) – Lokoja-Abaji-Abuja (IDU0 (280km approx.)
Messrs CrestHill Engineering Ltd.,
Ministry of Transport
N144,003,024.00 05/12/12 7 Months
1b Lot 1C : Coastal Rail Line Route – Benin City – Sapele – Warri – Yenagoa – PotHarcourt – Aba – Uyo – Calabar Akampa – Ikom –Obudu Cattle Ranch (673km approx)
Messrs CPCS Transcom
Ministry of Transport
N334,016,907.84 05/12/12 7 Months
TOTAL N478,019931.84
FEDERAL MINISTRY OF WATER RESOURCES
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Approval of the Revised Estimated Total Cost for the Gurara Water Transfer Project Lot B, Construction of Azara-Jere Irrigation Scheme
Messrs SCC (Nigeria) Limited
Federal Ministry of Water Resources
Revised Estimated Total Cost of N26,447,872,659.49
29/08/12
Extended Completion period of 18 Months
2 Approval of the Revised Estimated Total Cost for the Construction of Ilesha Dam and Water Supply Scheme (Phase I)
Messrs Reynolds Construction Company (Nigeria)Limited
Federal Ministry of Water Resources
Revised Estimated Total Cost of N3,699,950,856.91
29/08/12 18 Months
3 Approval for upward review of the Contract Sum for Shagari Irrigation Project in Sokoto State
Messrs CGC (Nigeria) Limited
Federal Ministry of Water Resources
N317,922,210.72 14/11/12
Additional Completion Period of 6 Months
4 Approval for the payment of the outstanding Consultancy fees and the Extension of Consultancy Contract for the implementation of the Ogwashi-Uku Multi-Purpose Dam Project
Messrs Vibro Engineering Company Limited
Federal Ministry of Water Resources
Total Contract Sum of N188,181,672.50
21/11/12 24 Months
5 Award of contract for the rehabilitation of Obudu Dam
Messrs Consolidated Construction (Nigeria) Limited
Ministry of Water Resources
N1,165,944,304.65 15/08/12 12 Months
FEDERAL MINISTRY OF WORKS
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1a Award of Contract No. 6126 for the Rehabilitation of Owerri-Umuahia Road Sections I, II & III in Imo/Abia State
Messrs. Zerock Construction Nigeria Limited
Ministry of Works N4,207,774,864.51 09/05/12 24 Months
1b Award of Contract No. 6127 for the Construction of 2No. Bridges along Auchi Polytechnic Ekperi-Agenebode Road in Edo State
Messrs. Niger Construction Ltd
Ministry of Works N1,330,416,048.02 09/05/12 12 Months
2a Award of Contract for the Construction of Nkporo-Abriba-Ohafia Road in Abia State
Messrs Dutum Construction (Nigeria) Limited
Ministry of Works N2,739,105,600.20 30/05/12 18 Months
2b Award of Contract for the Rehabilitation of Ada Okere-Ukoni-Amedokhian Road in Edo State
Messrs ARC Marine & Civil Contractors Limited
Ministry of Works N2,225,954,172.75 30/05/12 14 Months
3 Award of Contract for Transaction Advisory Services for Design, Build, Finance and Operate (DBFO) on the 2nd Niger Bridge linking Anambra and Delta States
Messrs Roughton International Ltd
Federal Ministry of Works
N325,638,828.00 08/08/12 16 Months
4 Additional works on the subsisting Contract No.5879 (Dualization of Kano – Maiduguri Road Section II: Shuwarin Azare) for the extension
Setraco (Nigeria) Ltd Federal Ministry of Works
N44,193,730,492.36 08/08/12 40 Months
from Dutse-Kwanar Huguma, a distance of 24.2km
5 Award of Contract for Transportation Advisory Services for Design, Build, Finance and Operate (DBFO) on Apakun – Murtala Mohammed International Airport Road
Messrs Roughton International Ltd
Federal Ministry of Works
N297,746,203.00 08/08/12 12 Months
6 Award of Contract for the rehabilitation and reconstruction of outstanding sections of Benin-Ofosu-Ore - Ajebandele - Shagamu dual carriageway Phase III
Messrs RCC Nigeria Limited
Federal Ministry of Works
N65,223,155,642.34 05/09/12 36 Months
7 Award of Contract for the Construction of Manyam-Ushongo-Lessel-Kartyo-Tse Agberagba-Oju Agila-Ongba Road Section I: Lessel-Wajir-Krtyo-Tse Agberagba in Benue State
Messrs Tilley Gyado & Co. (Nigeria) Ltd
Federal Ministry of
Works
N1,035,824,120.10 26/09/12 14 Months
8 Augmentation of Contract No. 1793 for the Completion of Dualization of Ibadan-Ilorin Road Section I: Ibadan-Oyo Road in Oyo State
Messrs P.W Nigeria Limited
Federal Ministry of Works
N20,143,078,602.67 07/11/12
9 Award of Contract No. 6148 for the Construction of Nnenwe-Uduma-Uburu road Section I
Messrs Setraco (Nigeria0 Limited
Federal Ministry of Works
N11,603,191,818.53 14/11/12 30 Months
(26.274km) in Enugu/Ebonyi States and Section II: Spur TO Ishiagu-Mile 2 road (14km)
10a Award of Contract No. 6140 for the Construction of Wudil-Utai-Achika-Darki-Jigawa road in Kano/Jigawa States
Messrs Birak Engineering & Construction Company Limited
Federal Ministry of Works
N4,393,730,163.90 14/11/12 24 Months
10b Award of Contract No. 6141 for the reconstruction of Section II Phase I of Kontagora-Rijau-Tunga Magajia road (Gulbiri Boka – Shambo village, km 49+500 – km74+000) in Niger State
Messrs Enerco (Nigeria) Limited
Federal Ministry of Works
N3,698,014,603.34 out of the total contract sum of N16,768,091,748.13
14/11/12 48 Months
11 Augmentation of Contract No. 5695 for the completion of the rehabilitation of Funtua-Gusau-Sokoto Road Section III: Sokoto-Talata Mafara
Messrs CGS (Nigeria) Limited
Federal Ministry of Works
Revised Contract Sum of N3,431,539,397.52
14/11/12
12 Award of Contract No. 6142 for the Completion of Auchi Poly-Ekperi-Uzea-Ohe (with Spur to Fugar)-Afuda road in Usugbenun road; Waterworks-Ivue-Ibore/Irua road Section II and the Construction of Pedestrian Bridge at Auchi Poly Main Gate in Edo State
Messrs Niger Construction Limited
Federal Ministry of Works
N8,720,381,609.34 14/11/12 30 Months
13 Augmentation of Contract No. 5991 for the Rehabilitation of 23km from Alesi to Iyamoyong in Obubra Local Government Area as an addendum to the Rehabilitation of Calabar-Ugep-Ogoja-Katsina Ala road SectionII: Ugep-Ikom-Ogoja-Katsina Ala in Cross River and Benue States
Messrs China Civil Engineering Construction Company (CCECC) Nigeria Limited
Federal Ministry of Works
N9,136,126,840.71 21/11/12 30 Months
14 AWARD OF CONTRACTS FOR THE DUALIZATION OF LOKOJA-BENIN ROAD PHASES I OF SECTIONS I-IV IN KOGI AND EDO STATES AND THE CONSTRUCTION OF NGURU-GASHUA-BAYAMARI ROAD SECTION II PHASE I: GASHUA-BAYAMARI IN YOBE STATE
i Dualization of Obajana Junction-Benin, Section I Phase I: Obajana-Okene in Kogi State(C/No. 6135)
Messrs CGC (Nigeria) Limited
Federal Ministry of Works
N11,663,957,682.30 21/11/12 24 Months
ii Dualization of Obajana Junction-Benin, Section II Phase I:Okene-Auchi in Kogi/Edo States(C/No. 6136)
Messrs Mothercat Limited
N11,086,276,140.36 21/11/12 42 Moths
iii Dualization of Obajana Junction-Benin, Section III Phase I: Auchi-Ehor in Edo State(C/No. 6137)
Messrs Dantata and Sawoe (Nigeria)Limited
N11,659,588,909.69 21/11/12 40 Months
iv Dualization of Obajana Junction-Benin, Section IV Phase I: Ehor-Benin City in Edo State(C/No. 6138)
Messrs RCC (Nigeria) Limited
N11,679,997,440.71 21/11/12 36 Months
v Construction of Nguru-Gashua-Bayamari road, Section II (Gashua-Bayamari) in Yobe State (C/No. 6139)
Messrs CCECC (Nigeria) Limited
N6,581,999,666.55 21/11/12 18 Months
15 AWARD OF CONTRACTS FOR THE CONSTRUCTION OF TWO (2) FEDERAL ROADS IN TARABA AND NIGER STATES AND TWO (2) BRIDGES IN KANO STATE
i Contract for the Construction of Mararaban-Pantisawa-Yorro road in Taraba State( C/No. 6143)
Messrs Bliss-Wood Associates Limited
Federal Ministry of Works
N1,187,795,843.85 21/11/12 12 Months
ii Contract for the Construction of Suleja-Bakin Iku-Abuja road in Niger State( C/No. 6144)
Messrs S & M (Nigeria) Limited
N1,185,114,615.37 21/11/12 9 Months
iii Contract for the Construction of Falali Bridge in Sumaila LGA in Kano State (C /No. 6145)
Messrs Horizon Construction Company Limited
N1,160,395,929.00 21/11/12 12 Months
iv Contract for the Construction of Flyover at Kundila Roundabout in Kano State (C/No. 6146)
Messrs Rocad Construction Limited
N2,499,924,850.50 21/11/12
18 Months
16 APPROVAL FOR THE REVIEW OF FIVE (5) CONTRACTS FOR THE DUALIZATION OF KANO-MAIDUGURI ROAD
i Contract for the Dualization of Kano-Maiduguri Road Section I: (Kano-Wudil-Shuarin) in Kano State (C/No. 5878)
Messrs Dantata & Sawoe Construction Comapany Limited
Federal Ministry of Works
Revised Contract Sum of N55,122,713,072.02
21/11/12
ii Contract for the Dualization of Kano-Maiduguri Road Section II: (Shuarin-Azare with extension to dutse) in Bauchi/Jigawa States (C/No. 5879)
Messrs Setraco (Nigeria) Limited
Revised Contract Sum of N65,315,458,261.59
21/11/12
iii Contract for the Dualization of Kano-Maiduguri Road Section III: (Azare-Potiskum) in Bauchi State (C/No. 5880)
Messrs Mothercat Limited
Revised Contract Sum of N45,181,695,740.22
21/11/12
iv Contract for the Dualization of Kano-Maiduguri Road Section IV: (Potiskum-Damaturu) in Yobe State (C/No. 5881)
Messrs CGC (Nigeria) Limited
Revised Contract Sum of N51,903,173,630.22
21/11/12
v Contract for the Dualization of Kano-Maiduguri Road Section V: (Damaturu-Maiduguri) in Borno State (C/No. 5869)
Messrs CCECC (Nigeria) Limited
N67,795,690,880.01 21/11/12
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
17 Award of Contract for the Design, Manufacture, Supply and Commissioning of 2 Sets of Five-Car Diesel Multiple Units (DMUs) each, with a capacity of 540
Messrs CSR NANJING PUZHEN Co. Ltd. And KINTECH (Nigeria) Limited
Ministry of Works N4,334,950,620.00 28/11/12 13 Months
passengers and additional 6Nos. 68 seater Passenger Coaches to be used on Narrow Gauge Tracks (1067mm) (Lot 1)
18a Award of Contract No. 6169 for the Rehabilitation of Umana-Ndiagu-Agba-Ebenebe-Amansi Akwa road with spur to Umumba Road Section II (Umuna Ndiagu-Umunba/Nkwo-Ezeagu Express Obeleagu Section in Enugu State
Messrs CGC (Nigeria) Ltd
Federal Ministry of Works
N10,370,810,187.53 28/11/12 30 Months
18b Award of Contract No. 6170 for the Construction of Ogrute-Umuida-Unadu-Akpanya-Odoru Road in Enugu/Kogi States
Messrs P.W. (Nigeria) Limited
Federal Ministry of Works
N12,362,515,790.63 28/11/12 24 Months
19 Approval for the resuscitation of the Construction of Utoh Bridge with approaches along Asaba-Ebu-Ahia-Uromi in Delta and Edo States including variation order
Messrs Inter-Bau Construction Ltd.,
Ministry of Works N4,435,221,121.60 05/12/12 18 Months
PRESIDENCY – CODE OF CONDUCT BUREAU
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Review of the Contract for the Construction of one block of Nine (9) Storey Office Complex of the Code of Conduct Bureau
Messrs Brunel Engineering Ltd
Presidency/Code of Conduct Bureau
N8,767,647,477.21 inclusive of all taxes
31/10/12 36 Months
PRESIDENCY (NEMA)
1 AWARD OF CONTRACTS FOR THE PURCHASE OF CRITICAL EQUIPMENT FOR THE NATIONAL EMERGENCY MANAGEMENT AGENCY
1a Contract for the supply and delivery of GSSI Life Locator 1No. GSS Life Locator Messrs DAMS-A (Nig) Ltd Presidency/NEMA N161,406,388.00 05/09/12
1b Contract for the supply of Rapid Intervention Vehicles fully equipped with Hydraulic Rescue Equipment (2012 Ford F-550 Diesel 4x4 Rescue Vehicle )
Messrs DAN-CLINTON (Nig.) Ltd
Presidency/NEMA N400,551,272.70 05/09/12
1c Contract for the supply and delivery of fully equipped Emergency Rescue Tender Vehicles (Mercedes Benz 3340 A ACTE ROSS 6X6 – 4500 Chasis Cabin
Messrs B.T.L Brothers Ltd Presidency/NEMA N251,680,000.00 05/09/12
1d Contract for the supply and delivery of 328 sets of Helmets, Harness, Lanyards & Absorbers, Descenders, Fall Arrestors, Ascenders, Aluminium & Steel Carabineers, Quick Links, Large Connectors (Pulley, Anchor Strap, Rigging Plates & Rings, Clamps), Ropes, Sings, Guards, 7 Edge Pads, Cords (Beel Accessory Cord, Sterling Bound, Loop)
Messrs DOM Communications Limited
Presidency/NEMA N120,227,377.64 05/09/12
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
2 Award of Contract for the purchase of 1No. brand new Air Ambulance Cessna Citation Sovereign Jet Aircraft fully equipped and customized with emergency medical facilities
Messrs Sea Jewel Energy Limited
Presidency/NEMA USD23,172,058.24 Plus N909,590,181,.13
21/11/12 32 Weeks
3 AWARD OF CONTRACTS FOR THE SUPPLY AND INSTALLATION OF CRITICAL OPERATIONAL EQUIPMENT BY THE NATIONAL EMERGENCY MANAGEMENT AGENCY (NEMA)
i Contract for the Supply of 7No. Brand New CAT 320D/320DL Hydraulic Excavator
Messrs Tripple K Investment Ltd
Presidency/NEMA N554,050,000.00 21/11/12 15 Weeks
ii Contract for the Supply of 1No. Brand New LODICO Low Loader (Flat Bed) with Tractor head
Messrs Tripple K Investment Ltd
N52,080,000.00 21/11/12 15 Weeks
iii Contract to upgrade NEMA’s existing CISCO VOIP Infrastructure
Messrs Salran International Ltd
N184,785,658.53 21/11/12 12 Weeks
iv Contract for the Supply and Installation of digital Motorola two-way radios, Repeaters and base stations at NEMA’s Headquarters and its Zonal Offices
Messrs Hayes Meridian Group
N271,694,701.47 21/11/12 8 Weeks
PRESIDENCY (NEITI)
S/N ITEM/SERVICE
NAME OF COMPANY
IMPLEMENTING AGENCY
COST DATE DURATION
1 Award of Contract for the conduct of Fiscal Allocation and Statutory Disbursement Audit from 2007 to 2011
Messrs SIAO Presidency/NEITI N148,957,500 28/11/12 9 Months
PRESIDENCY – NATIONAL IDENTITY MANAGEMENT COMMISSION (NIMC)
17a AWARD OF CONTRACT FOR THE SUPPLY OF BLANK SMART CARDS MADE UP OF 100% POLYCARBONATE MATERIALS IN SEVEN (7) LAYERS AND 18 SECURITY FEATURES (FOR NATIONAL IDENTITY MANAGEMENT COMMISSION, NIMC)
S/N Description (Qty) Contractor
Implementing Agency
Cost Date Completion Period
1 3,250,000 units @USD2.64 per unit
Messrs Auspoint Ltd
Presidency/National Identity Management Commission (NIMC)
USD8,583,250.00 N1,332,807,060.00
28/11/12 18 weeks 2 3,250,000 units @USD2.64 per
unit Messrs E-Pay Plus Ltd
USD8,583,250.00 N1,332,807,060.00
3 3,250,000 units @USD2.64 per unit
Messrs Nigerian Security Minting & Printing Coy Ltd
USD8,583,250.00 N1,332,807,060.00
4 3,250,000 units @USD2.64 per unit
Messrs Telnet (Nigeria) Ltd
USD8,583,250.00 N1,332,807,060.00
Sub-Total
N5,331,228,240.00
17b AWARD OF CONTRACT FOR THE CARD PERSONALIZATION
S/N Description (Qty) Contractor
Implementing Agency
Cost Date Completion Period
1 6.5m units @USD0.50 per unit Messrs Chams Consortium Ltd
Presidency/National Identity Management Commission (NIMC)
USD3,250,000.00 N504,660,000.00
28/11/12 18 weeks 2 6.5 units @USD0.50 per unit
Messrs One SecureCard Ltd
USD3,250,000.00 N504,660,000.00
Sub-Total N1,009,320,000.00
NIGER DELTA DEVELOPMENT COMMISION (NDDC)
1
AWARD OF CONTRACTS FOR 44 INFRASTRUCTURAL DEVELOPMENT PROJECTS FOR THE NIGER DELTA DEVELOPMENT COMMISION (NDDC)
S/N PROJECTS DESCRIPTION
SCOPE STATES/ LOCATION
NAME OF CONTRACTOR
BPP REVIEWED COST (N)
COMPLETION PERIOD (WET/DRY WEEKS)
1 Erosion Control works section 1 Bende Road & section 2 Ariam-Ikot Ekepene Road
Site Clearing, earth work, culverts and lined drains, filling shaping of embarnkment, provision of gabion mattress
Abia Messrs Ginscon (Nig) Ltd.
4,022,865,484.00 104
2 Elu-Asaga-Amuka-Amagwu (Ohafia) Usukpani Road Site Clearing and
earth works, asphaltic concerts works on 18KM, construction of 2No bridges of 1x15 and 2x20 meters
Abia Messrs Seina Marine Ltd.
2,280,421,869.00 104
3 Construction of Ikot Akpa Tek-Ique-Odio-Okortip-Opolo Road
Site Clearing and earth works construction of culverts and drains, construction of 2 bridges
Akwa Ibom Messrs Darvct International Ltd.
6,035,365,875.00 104
4 Construction of Ikot-Ekong-Ntafe-Opolom-Ikot Inioang Road
Construction of 56km road, 7Nos bridges 8x15.5 6x20, 5x20, 26x25 and 31x25 spans 2No 1.2m walk ways with 0.9x1.0m drains
Akwa Ibom Messrs Kanison (Nig) Ltd.
12,095,999,502.25 104
5 Construction of Urua Akpan Okon-Ikot Osukpong Urua Inyang Road
Construction of 22.356km, 1200mm diameter of precast pipeclvert of 75m, same as 600mm diameter for 56m line drains
Akwa Ibom Messrs Mortin (Nig) Ltd.
4,172,816,584.12 104
6 Extension of 132KV Line from Ikot Abasi to Ikot Ekpene and Installation of 2x30MVA, 132/33KV on injection substation at Ekperakwa
Construction of 73km of double circuit 132KV line, installation of 2x30/4MVA, 132/33KV transformer Substation, construction of 5km of 11KV line
Akwa Ibom Messrs Income Electrix Ltd.
5,887,979,717.53 76
7 Construction of Okoro Inyong Forshore Proction Reclam area- 45
hacter, installation of geotextile filters, granite boulders 2,000mm concretes jetty 1
Akwa Ibom Messrs F.J.K Okon (Nig) Ltd.
5,196,297,597.75 104
8 Construction of Ikot Ebom-Afaha Obio Eno-Okpoto Uyuat-Nsaa Road and bridges in Itu/Ibiong LGA
Asphaltic concrete dual carriageway, 1No 40 long bridge of 2x20 span 11.0m wide, ring culverts, RC off shoot drains
Akwa Ibom Messrs Consjen Construction Company Ltd.
2,056,989,415.50 104
9 Construction of Ididep-Ekpeyong-Ikot Etim Afaha Itiat Road 10km of asphaltic
concrete carriageway, ring and box culvert
Akwa Ibom Messrs Assaem Global Link Ltd.
2,587,086,259.00 78
10 Construction of internal roads network (phase 1) at Federal University, Otueke
Site clearing, sandfilling of embarkment, culvert and drains, asphaltic concrete overlay on concrete pavement
Bayelsa Messrs Oneplus Holdings (Nig) Ltd.
4,625,666,015.00 104
11 Construction of Opume-Okoroba Road &bridges
Site clearing, sand filling of embankment, culvert and drains, asphaltic concrete 8km, construction of 2Nos. bridges of 1x15 & 2x15meters
Bayelsa Messrs Oneplus Holdings (Nig) Ltd.
2,634,491,970.00 104
12 Ekpirikiri Erosion Control works in Obama, Nembe
Site clearing, sand fills area along shore line, hydraulically pump sand, provide and drive larssen/GB grade 50 sheet piles, reno mattress, provide 50mm thick concrete grade 25, landing aprons with use of 406mm dia, cased piles
Bayelsa Messrs Ednatly (Nig) Ltd
2,730,984,195.00 78
13 Construction of Polaku bridge and approach road, Kolokuma/Opokuma
8km road pavement/survacing bridge of 8x16m
Bayelsa Messrs Ekdena (Nig) Ltd.
1,544,484,768.75 104
14 Dredging/Sandfilling of International Airport
Site clearing, sand fills area along shore line, hydraulically pump sand, fill with sharp sand, to reclaim 4,500,000m2 area, level and spread
Bayelsa Messrs Mangro Vetec Construction & Eng (Nig) Ltd.
11,668,457,115.00 80
15 Construction of specialist hospital project at Atikom
One story building with total floor area of 7052m2
Cross Rivers
Messrs Emostrade Eng. Ltd.
1,214,847,452.18 104
16 Construction of Ikun-Abanwan Road
8km road pavement/surfacing, double cell box drain and culverts
Cross Rivers
Messrs E-Tworx (Nig) Ltd.
1,042,421,908.50 104
17 Construction of Ikot Oko Idem-Ikot Ansa-Ikot Eyo Road 9km road
pavement/surfacing, double cell box drain and culverts
Cross Rivers
Pearl HPW Ltd. 2,079,292,325.00 104
18 Construction of Patani-Agoloma-Toru-Adelfbiri-Toru-Angiiama-Udophori Road
24km length of asphaltic pavement, 5000m concrete line drains, 2Nos. bridges
Delta Messrs Okmas (Nig) Ltd.
7,368,152,830.50 60
19 Canalization of Okparoun Bou in Ogriagene town
Dredging, construction of bondwalls 2000m
Delta Messrs Serena Rock Ltd
2,050,645,553.00 104
20 Sand filling shore protection & land reclamation at Ogiabene town
Site clearing, sand fills area along shore line, hydraulically pump sand, fill with sharp sand, to reclaim 450,000m3, 5No. Landing aprons
Delta Messrs Arc Makine & Civil Contractors Ltd.
2,581,145,600.00 104
21 Construction of Eso-Oheze-Efuboehighae Road, Orhiomwon LGA Earthworks 21.8Ha,
culverts/drains 21,000m, asphaltic concrete, 163,850m2
Edo Messrs 4ND Ventures (Nig) Ltd.
3,390,626,362.50 104
22 Dualization of PH/Owerri Road Junction-Avu-Adapalm-Etekwuru Road (Phase 1)
Construction of precast RCpipe culverts, 900mm dia of 460m, 1200mm dia of 230m, concrete line drain with cover/access slabs 27km
Imo Messrs Hado (Nig) Ltd 6,448,062,762.49 104
23 Construction of township Road in Igbonla in Ilaje LGA
Site clearing and earth work, culvert and drains, Heavy duty interlocking concrete
Ondo Messrs Ferado (Nig) Ltd.
1,044,039,937.50 78
24 Reclamation and sand filling of Ikirigho/Ikorigho zion, Ilaje LGA
Reclaim, 65.54 Hectares, shore protection 1,600m of shore line, Galfan coated Reno mattress, construction of 3 landing aprons
Ondo Messrs United Dominion Construction Company
3,649,942,758.00 104
25 Design of walkway with embankment linking five communities from Ilepede to Obenla in Ese Ode Embankement,
walkway 25meters Ondo
Messrs Riverbrook Energy Ltd.
1,387,337,316.67 26
26 Reclamation of Idiepe Ode Etikan & Ogo Olowayo Communities Phase 1 Reclamation of 45.7
Hectares, dredge, hydraulically sand fill with shore sand, construction of dytes
Ondo Messrs Land pilling & Dredging International Ltd.
3,676,530,000.00 104
27 Construction of Arogbo town shore protection
Clear 10 hectares, installation of Geotextile filters behind sheet pile wall-65,000m2, dredge river sand and backfill behind the sheet pile wall 97,500m2
Ondo Messrs Teresam Ven. Ltd.
4,865,092,155.00 100
28 Dualization of Ahoad-Izombe Road and bridges Phase 2 Earth works-345,
600m2, culverts and lined drain-18,000m, asphaltic surfacing-467,400m2
Regional Messrs Portsman Foundation & Civil works Ltd
7,419,942,200.00 104
29 Construction and rehabilitation of Calabar-Itu-Ikotekpene-Aba Link Road
Rehabilitation and reconstruction of drains and culverts, scarification and reconstruction with asp concrete of 22km of falled portion, rehabilitation of bridge approaches, expansion joints and railings
Regional Messrs Sami Ent. Ltd. 2,121,718,500.00 104
30 Construction of an interstate road along Amaba-Ezere Ozara/Acha-Ivo Road
Construction of 1No. 15m spanx10m width bridge constr of 1No. 15 spanx5m bridge, const of 15.5km road
Regional Messrs Cosmobuilt. (Nig.) Ltd.
3,480,857,061.00 104
31 Dualization of Ahoad-Izombe road & bridges (Phase 1) Asphaltic dual
carriage 43km, 3No. 40m long bridges of 2x20 spans, 11.0m wide, ring boxes
Regional Messrs Inter-Bau Const Ltd.
10,418,573,550.00 104
32 Construction of Isinweke Oriaha, Uboma, Imo Rivers Umuahia EFP-Road Imo and Rivers States
Construction of 16.150km asphaltic road, construction of 4No. bridges, construction 15,000m drains
Regional Messrs Deahyun (Nig) Ltd
5,603,357,408.00 156
33 Dualization of Igwuruta-Etche road
Construction of precast P.C pipe culverts 900mm dia of 135m, concrete drains of 10km, 4x15m span DOP with PRC Beams (30m length at CH.6 + 964.4)
Rivers Messrs Megado Zer (Nig.) Ltd
7,218,374,242.15 33
34 Sand filling of Bakana new site (Phase 1) Degema LGA Reclam 64 Hectares,
shore protection of 1,200m provide and place Reno mattress, const 3 landing aprons
Rivers Messrs Castle bridge (Nig) Ltd
3,459,642,758.00 104
35 Sand filling at Utuechi town Provide and place Reno mattress, const land aprons set on 350mm diameter cased piles filled with reinforced concrete, provide and install of Gec-Textiles filter materials on sand filled embankment
Rivers Messrs Pearl HPW Ltd. 1,200,186,120.00 52
36 Reclamation of shore protection of Obiofu Ogba Egbema/Ndoni LGA Dredge, provide and
install gectextile filter materials, provide and place Galfan remo mattress
Rivers Messrs Allianze Logistics Ltd.
5,215,902,758.00 104
37 Expansion of Ndoni-Ukwu Ishikwe road & Const of bridge across Imonite creek Surface storm water
drain, const of 60m bridge, road pavement and surfacing
Rivers Messrs Chiz Eng. Ltd. 1,467,637,994.81 104
38 Sand filling of Tema Community Asalga
Hydraulically Sand, stockpile and haul to shore line provide and install geotextile filter materials, provide and place Galfan reno mattress, landing aprons, kerb, 500x500mm (1600m length)
Rivers Messrs Bursbery (Nig) Ltd.
2,761,441,620.00 104
39 Erosions Control at Oruama-Engeminahoada west
Reclam 77.35 Hectares, shore protect 3200m shore line, provide and install Geotextile filter materials, provide and place Galfan reno mattress, 3 landing aprons
Rivers Messrs Burnsville, Int. Ser. Ltd.
4,878,359,574.00 104
40 Construction of Umunteke junction-Mkporobe-Obegu-Ihie road, Abia State Site clear – 40
hectares, const 20km pavement culverts and drains
Abia Messrs Agilaire Eng. Solution Ltd.
2,644,717,351.50 104
41 Sore protection at Soku town
Dredge installation of Geotextile filters, const of drains, concrete grade 30 in drains, landing jetty
Rivers Messrs N.P.G. Nig Ltd. 5,073,315,576.00 104
42 Construction of Iwouachang-Upenekane-Qit Beach road Asphaltic surfacing,
culvert and drains, const 2No. bridges – 2x25m, 3x25m
Akwa Ibom Messrs E-Cop Jee Integrated Services Ltd.
3,780,739,260.90 156
43 Supply and distribution of computers to Polytechnics in the Niger Delta Region
Distribution and monitoring, supply of computers
Regional Messrs Colinsgate Ltd. 1,878,987,500.00 36
44 Construction of Agadagba Obon/Arogbo road/bridge with spur to Agwabri-Egbesubiri (Phase 1) Ese Odo
Construction of 1 400m bridge, const. bridge 2 (75m), culvert and drains
Ondo Messrs Piccolo-Bruneli Eng
6,136,367,333.25 52
TOTAL 151,998,292,898.05
15% 22,799,743,934.71
2
Award of Contracts for for 3 Infrastructural Development Projects in 2 States of Niger Delta Region (NDDC)
S/N Project Description Scope State/Location Contractor
BPP Revised Project Cost(N)
Completion Period
3a
Construction of Kira Dere Mogho Road and Bridge on Gokana LGA of Rivers State
Site Clearing & Earthworks;
9.0km Asphaltic Concrete Carriageway;
Reinforced Concrete Line Drains;
Rivers State Messrs Southside Construction Ltd.
2,474,519,928.30 68 Weeks
15m Pipe Culverts;
Crushed Stone Base Course 150mm thick;
Surface Dressing to S2.houlders Embankments;
3b Sand filling and shore protection of Ogbeinama town, Bomadi LGA, Delta State
Reclamation Delta State Messrs Miesematt
Nig. Ltd 3,254,471,000.00 104 Weeks
3c Construction of Umuada Layout Internal Rd. Asaba (6.8km) Delta State
Site Clearing of 6.8km Construction
of drains and culverts, pavements
and surfacing
Delta State Messrs Cronwell Technologies Ltd
1,115,944,202.52 19 Weeks
TOTAL 6,844,935,130.82
3a
AWARD OF CONTRACTS IN RESPECT OF 28 INFRASTRUCTURAL DEVELOPMENT PROJECTS FOR THE NIGER DELTA DEVELOPMENT COMMISSION (NDDC)
S/N PROJECT DESCRIPTION STATE/LOCATION
NAME OF CONTRACTOR
BPP REVIEWED PROJECT COST (N)
DATE COMPLETION PERIOD
1 Construction of Upenekang – Okposo – Unyenge – Orukim Rd Phase 1
Akwa Ibom Messrs Movani Global Services Ltd.
7,575,048,995.85 14/11/12 104 wet/dry weeks
2 Construction swell-Ayama-Igeri-Faoribri-Ekeowe-Crafish Camp Rd
Bayelsa Fasp Associates Ltd.
2,000,000,000.00 14/11/12 104 wet/dry weeks
3 Reclamation works at Pouma Town, Southern Ijaw
Bayelsa Beks Kimse (Nig.) Ltd.
4,821,251,358.00 14/11/12 52 wet/dry weeks
4 Construction of Umuachi Umunze 1- Umude-Umunakanu Rd/Bridge
Imo Silverbrook Investment Ltd.
2,036,136,650.00 14/11/12 104 wet/dry weeks
5 Reclamation and sand filling of Obe Enikanoselu & Environs in Ilaje LGA
Ondo Caramba (Nig) Ltd. 2,736,832,757.00 14/11/12 104 wet/dry weeks
6 Construction of Ebiam Bridge (340m), Obiri-Kom
Rivers Cot Engineering 3,389,484,450.00 14/11/12 104 wet/dry weeks
7 Construction of jetty and shore protection at Okpai-Ndokwa East
Delta Orbit Marine & Energy Services Ltd.
11,184,349,159.87 14/11/12 104 wet/dry weeks
8 Construction of Ogodobiri/Ezebiri Shore Protection works
Delta Viche Resources (Nig.) Ltd.
4,399,536,502.26 14/11/12 104 wet/dry weeks
9 Construction of Oyoku-Assang-Eweme-Okiuso Road with spur (18km) Mbo LGA
Akwa Ibom Higgensmara Ltd. 2,572,691,539.50 14/11/12 104 wet/dry weeks
10 Construction of Inuayet-Ikot Okposo Rd, Ibeno LGA
Akwa Ibom Mangrovetech Construction & Engr. Nig. Ltd.
2,838,618,466.10 14/11/12 104 wet/dry weeks
11 Construction of Bayelsa Palm Otueke Road, Otueke
Bayelsa Weltract Int. Serv Ltd.
2,167,486,789.12 14/11/12 104 wet/dry weeks
12 Construction of Ultra Modern Market, Otueke
Bayelsa Kari Invest Co Ltd. 2,076,905,774.25 14/11/12 104 wet/dry weeks
13 Construction of East West Road-Onopa road with spur to Yenaka, Yenagoa LGA
Bayelsa Benkurt Nig. Ltd. 4,807,741,270.00 14/11/12 104 wet/dry weeks
14 Shore Protection (Concrete Sheet pilling) reclamation work, Akugbene
Delta Best- Amandi Ltd. 3,350,221,875.00 14/11/12 104 wet/dry weeks
15 Construction of 2x15MVA Injection substation and 33/11kv transmission at Ikem Communities, Ngor Okpala LGA
Imo Ginscon Const. Ltd. 1,081,218,231.83 14/11/12 104 wet/dry weeks
16 Construction of Rumuepirikom Internal Roads (Phase 1 & 2) Obio/Akpor LGA
Rivers Cico Industries 2,673,121,782.24 14/11/12 104 wet/dry weeks
17 Supply of treated Mosquito treated nets to LGAs and deworming Program
Regional (all nine states)
Tehinaah Investment Ltd.
1,335,772,680.00 14/11/12 104 wet/dry weeks
18 Rehabilitation and refurbishing of existing Technical Colleges in the Niger Delta Region
Regional (all nine states)
Clarkson (Nig) Ltd. 2,149,161,034.59 14/11/12 104 wet/dry weeks
19 Provision and distribution of Science Equipment and Books to institution and Rehabilitation of Libraries in the Niger Delta Region
Regional (all nine states)
Cajak (Nig.) Ltd. 1,828,704,081.75 14/11/12 104 wet/dry weeks
20 Construction of Uyo-Itam-Ekit Itam-Ikot Nya Road
Akwa Ibom Northcrest Construction Ltd.
3,173,399,748.75 14/11/12 104 wet/dry weeks
21 Construction of 132kv Transmission Lines & 132kv Substation at Okitipupa
Ondo Sege Marine Co. Ltd.
6,073,379,900.87 14/11/12 142 weeks
22 Isampou Dredging, Bayelsa State
Bayelsa State Aziom Multiventures Ltd.
1,713,410,930.04 14/11/12 48 weeks
23 Ekeremor Town Shore Protection
Bayelsa Tenac (Nig.) Ltd. 3,876,287,081.63 14/11/12 72 weeks
3b
AWARD OF CONTRACTS IN RESPECT OF 5NOS. INFRASTRUCTURAL DEVELOPMENT PROJECTS FOR THE NIGER DELTA DEVELOPMENT COMMISSION (NDDC)
S/N LOT NO. PROJECT NAME STATE CONTRACTORS
NDDC REVISED RATE (N)
COMPLETION PERIOD
1 1
Erosion Control works Section 1 Bende Road Section 2 Ariam-Ikot Ekpene
Abia Grinscon (Nig.) Ltd. 6,428,565,200.00 104 weeks
2 19 Construction of Ikum-Abanwan Road
Cross River
Etworx (Nig) Ltd. 1,488,370,810.50 104
3
31
Design and Construction of walk-way with Embankment linking 5 communities from Ilepete to Obenla in Ilaje LGA
Ondo Riverbrook Energy Ltd.
4,394,421,927.33 26
4 45
Sandfilling of Tema Community Asalga
Rivers Bursbery (Nig.) Ltd. 4,429,629,120.00 104
5 51
Supply and Distribution of Computers to Polytechnics in the Niger Delta Region
Regional Collinsgate Ltd. 1,986,925,000.00 36
Total 18,727,912,057.83