Page 1: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Federal AviationAdministration

By: Giles Strickler, UCS Program Manager

Procurement Policy (AJA-A11)

Date: September 22, 2010

Unified Contracting System (UCS)

Industry Day

Page 2: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 2Federal AviationAdministration

Industry Day Purpose

• Communicate FAA requirements for the Unified Contracting System (UCS).

• Provide responses to Industry questions regarding UCS integration services.

• Incorporate Industry comments into the final UCS integration services procurement (where applicable).

Page 3: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 3Federal AviationAdministration

History• June 2009

– The FAA posted a market survey

• September 2009 – The FAA issued a Request For Information (RFI) for UCS

• December 2009 – The FAA cancelled the RFI

• May 2010 – The FAA issued Solicitation Information Request (SIR) for an

enterprise-wide Business Process Management Suite (BPMS)

• August 2010 – The FAA issued a RFI for UCS Integration Services

Page 4: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 4Federal AviationAdministration

UCS Scope• Automating / streamlining current manual processes

• Provide traceability from requirements to SOW and evaluation, award, deliverables and administration

• Electronic data/record management – (i.e. paperless contract)

• Mechanism to link legacy systems / information

FAA Procurement Process (v1.0)

PR Creation(in PRISM)

Requisition Manager Approves PR

(in PRISM)

PR Assigned to CO by PO Manager

(in PRISM)

PR Complete// Includes All Required

Documentation?

Create Evaluation Plan and Procurement Plan

Management Review

SIR> $100K?

-Discuss SIR-Answer Questions

-QA SIR-Amend SIR

Receive Proposals / Quotes

for SIR

Evaluate Proposals

(In Accordance With SIR Criteria)

Note: Section LSection M

SSO Makes the Source Selection

Negotiate Pricing-Too High/Too Low

-Overall Reasonableness

Cost Eval Report CO, Price Analyst,

and DCAA Evaluate

Cost

Tech Eval Report Tech Eval Lead

Submits Findings to CO and SSEB

EEO/OFCCP Clearance

>$10M

-CO Sends Award Notification to PAO

-PAO Sends Congressional

Notification / Public Affairs>$3.5M

Award- Obligate Funding

-FPDS(in PRISM)

Announce Award to Public

Notify Unsuccessful Vendors

Distribute Contracts

Protest Document (if applicable)

Yes

No

Planning Pre-Award Award Administration/Post-Award

Post Public Announcements

(mandatory for over $100/

Award>100K?

CostEvaluation

TechnicalEvaluation

COTR and Property Administrator Delegation &

Confirmation of Training

GFP/GFM/CAP(Government

Furnished Property or Materials,Contractor Acquired Property))

Invoice AnalysisReview of Invoices for Construction (Payroll, Fringe Benefits, etc.)

and Services (Labor Categories, etc.)

Perform Acceptance

Payment Approval

Closeout Process-Liquidate Damages

-GFP/GFM -Contractor Access

FinalRelease from

Vendor/Contractor

PRISM/DELPHI Reconciliation

PRISM Closeout

Archive

Closeout

Process Decision Terminator DocumentLegend:

Vendor Begins Performance

-Pre-Award Confirm/Check CCR & EPLS to

Make Sure Vendors Are Responsible

- SSEB Recommends- SSO or CO Decides

Legal and SecurityReview

Management Review

Legal Review

-Pre-Award Confirm/Check CCR & EPLS to

Make Vendor Responsibility Determination

PRISM DELPHI Manual

Issue SIR

Create SIR-Contract Writing

-SOW -CLINs -Etc.-Attachments -Wage

Rates -Drawings

Post Public Announcement (mandatory for over $100K)

Create Evaluation Plan and Procurement Plan

Pre-Planning-PMO Approval

-CFO Approval-CIO Approval-GFP/GFM/CAP Evaluation Optional

(SOW, IGCE, 1600.77, Drawings, Other Relevant PR Pkg Checklist

Items)

-Discuss SIR-Answer Questions

-QA SIR-Amend SIR

Receive Proposals / Quotes

for SIR

CostEvaluation

TechnicalEvaluation

Management Review

Award- Award Letter

Cost Eval Report CO, Price Analyst, &

DCAA EvaluateCost Proposal

Tech Eval Report Tech Eval Lead

Submits Findings to CO and SSEB

Announce Award to Public

Notify Unsuccessful Vendors

Protest (if applicable)

Manual** **A Manual Process and future Document Management

Small Business Co-ordination

Concur

Non-Concur

Yes

No

Yes

No

Administration of Contract Performance

TechnicalEvaluation

Create Award Decision Document

TechnicalEvaluation

Government and Vendor Complete

Necessary Contract Paperwork

Revise SIR(if needed)

Revise SIR (if needed)

Page 5: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 5Federal AviationAdministration

UCS Scope (details)

• Develop using the FAA’s enterprise Business Process Management Suite (BPMS), by Progress/Savvion.

• An integrated, end-to-end system that utilizes automated workflow processes, functions, and standards based on the FAA’s Acquisition Management System (AMS).

• Incorporate workflow management, electronic document management, and integration with financial management system(s)… an All-in-One Acquisition Solution

• Develop a standards based / open architect solution using FAA enterprise applications – e.g., e-mail, Knowledge Sharing Network (KSN), document

management application, BPMS, Financials, etc.

Page 6: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 6Federal AviationAdministration

UCS Scale

• Nation-wide implementation

– 3 Service Areas (comprised of 9 regions)

– 2 Centers

– Headquarters

• 500 First-Tier / Core Users

– e.g., Contracting Officers / Specialists

• 10,000 – 15,000 Second-Tier FAA Users

– e.g., COTRs, Program Offices, Purchase Card Holders, Requisitioners, etc.

• 10,000+ External / Vendor Community Users

Page 7: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 7Federal AviationAdministration

UCS Phases

• Pilot: (performed prior to UCS Integration Services award)

– Initiates the use of the FAA’s Enterprise BPMS solution – Initial / limited processes mapped / automated and

interfaces developed

• Phase 1:– Complete automation manual processes– Further develop system interfaces and dashboards /

user interfaces– Develop trainer and system training

• Phase 2: – Expand functionality and add interfaces

Page 8: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 8Federal AviationAdministration

Required Services

Page 9: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 9Federal AviationAdministration

Task 1: Task Planning and Management

Vendor will Develop and Deliver:• Resource loaded, detailed schedule of the

activities for each task.• Risk Management Plan • Track and report program / task progress with

project management tools / applications

Page 10: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 10Federal AviationAdministration

Task 2: Process Map Analysis & Design

Vendor will assist the FAA in:• Analyzing existing business process maps

representing the FAA’s “As Is” processes, and develop additional process details.

• Recommend changes to improve efficiency and effectiveness with the FAA’s acquisition and procurement processes.

Page 11: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 11Federal AviationAdministration

Task 3: User Interface & Dashboard Design

• FAA will provide initial user interfaces (UI) and dashboards.

• Vendor will review and analyze the UI / dashboards for opportunities to streamline and improve the UI / dashboards.

• Vendor will develop and implement additional UI / dashboards as needed.

Vendor will assist the FAA with the design and development of User Interface and Dashboard:

Page 12: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 12Federal AviationAdministration

Task 4: Dashboard and Metrics

• Improve visibility into procurement information through simulations, dashboards, reports, and metrics

• Define metrics and reporting requirements• Establish mechanism for collecting data to

support metrics and reporting• Submit a list of standard reports and metrics

for implementation

Vendor will work with the FAA to:

Page 13: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 13Federal AviationAdministration

Task 5: Development and Automation

Vendor will work with the FAA to:• Complete the effort to develop a fully functional

automated procurement system (based on the FAA’s Acquisition Management System - AMS) ready for production roll-out and general use.

Page 14: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 14Federal AviationAdministration

Task 6: Interface Design and Integration

Vendor will work with the FAA to:• Determine the optimal interface method (e.g.,

Service Oriented Architecture (SOA), web services, Application Programming Interface (API) environment)

• Design, develop, test, and document the interface

Page 15: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 15Federal AviationAdministration

Task 7: Testing Support

Vendor will:• Support the UCS Program Office testing

efforts for each release• Work with testing team to diagnose and

correct issues / defects in a timely manner

Page 16: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 16Federal AviationAdministration

Task 8: Change Management Support

Vendor will:• Install and configure UCS into the FAA’s

production environment.• Collect change requests using a tool (e.g.,

suggestion field) built within UCS.• Establish a Change Control Board to

review/approve Change Requests.• Implementation planning and instructions.

Page 17: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 17Federal AviationAdministration

Task 9: User Support

Vendor will:• Develop a User Support Plan designed for

receiving, tracking, and resolving UCS support requests (help tickets)

Page 18: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 18Federal AviationAdministration

Task 10: User Training

Vendor will:• Develop a training plan, syllabus, and schedule for an

initial set of 500 core UCS users and 20 Trainers. • Conduct “train-the-trainer” training with a “hands on”

emphasis using a UCS system. • Develop an on-line training course as an introduction

to UCS for all users• Establish a training environment with an installed

version of UCS • Provide backup support to FAA trainers if and when

requested

Page 19: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 19Federal AviationAdministration

Task 11: Document Conversion Planning

Vendor will work with the FAA to:• Develop and provide a set of

recommendations for the FAA to proceed with the conversion of paper documents / artifacts into UCS

• Collect legacy data (in paper and electronic forms) and import into UCS

Page 20: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 20Federal AviationAdministration

Task 12: Financial System Interface

Vendor will work with the FAA to:• Develop a detailed plan for implementing the

Contractor’s solution for the interface between UCS and the FAA’s financial system; implement the interface

• Develop and implement a detailed data conversion plan

• Develop and implement a detailed plan for phasing out and decommissioning the FAA’s current version of PRISM and interface to the FAA’s financial system.

Page 21: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 21Federal AviationAdministration

Procurement Strategy & Schedule

Procurement Strategy:• Will be developed / finalized based on the

information collected by this RFI

Schedule (anticipated):• Fall 2010 – release of UCS Integration SIR• Winter 2011 – award of UCS Integration SIR• Summer / Fall 2011 – start of UCS implementation

Page 22: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 22Federal AviationAdministration

QUESTIONS?

Please provide your name and company when asking questions.

Page 23: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 23Federal AviationAdministration

Advisory Notes

• Presentation as well as all questions and answers will be posted by COB September 24, 2010 on:

– FAA Contract Opportunities (FAACO) http:faaco.faa.gov

– FedBizOpps www.fedbizopps.com

• Previously submitted questions to the RFI are also posted at the above locations.

• Submit RFI responses to John Gamble, Contracting Officer, by COB September 29, 2010.

– Phone: (202) 267- 4008– [email protected]

Page 24: Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System

Unified Contracting System (UCS) 24Federal AviationAdministration

Thank you for attending the UCS

Industry Day!