Page 1: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,
Page 2: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

February 27, 2006

MEMORANDUM FOR: E. William Brach, DirectorSpent Fuel Project OfficeOffice of Nuclear Materials

Safety and Safeguards

FROM: Michael E. Mayfield, Director/RA/Division of EngineeringOffice of Nuclear Reactor Regulation

SUBJECT: DISPOSITION OF DRAFT REPORT ENTITLED, "A PRELIMINARYNUMERICAL STUDY OF THE HAZARD FROM LOCAL LANDSLIDETSUNAMI SCENARIOS AT THE DIABLO CANYON SITE INCENTRAL CALIFORNIA"

This memorandum is to inform you of the Office of Nuclear Reactor Regulation's (NRR's)disposition of the subject draft report, which was transmitted to NRR via a memorandum fromJohn Moninger, dated February 3, 2005. The draft report was prepared under subcontract tothe Center for Nuclear Waste Regulatory Analysis (CNWRA), in support of your staff'sevaluation of the Pacific Gas & Electric (PG&E) application for an Independent Spent FuelStorage Installation (ISFSI) at the Diablo Canyon site. The letter from the CNWRA's, principalinvestigator, John Stamatakos, to your staff Project Manager, James Randall Hall, datedMarch 17, 2004, noted that in Dr. Stamatakos' professional opinion the draft report used amethodology that is "beyond the state of the art." Subsequent correspondence from CNWRAmanagement has confirmed that the draft report has not been accepted by CNWRA and hasnot gone through the CNWRA quality assurance process. Thus, the draft report's technicalbasis is not supported by CNWRA.

Based on our discussions of the report and the need for a technical review, we jointly asked theU.S. Nuclear Regulatory Commission's (NRC's) Seismic Issues Technical Advisory Group(SITAG) to perform such a review. The SITAG assessment of the draft report was transmittedto Michele Evans and Gene Imbro in a memorandum from Andrew Murphy, datedNovember 17, 2005. The SITAG concluded that the draft report was based on low resolutiondata having considerable uncertainty and that it was not suitable for use in regulatoryapplications. The SITAG also provided (1) a recommendation that the draft report be providedto PG&E for their information as they finalized their own reassessment of the tsunami hazardfor the Diablo Canyon site, and (2) recommendations for additional NRC research to addressthe tsunami hazard.

CONTACT: Clifford Munson, DE/EGCB301-415-2529

Page 3: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

E. W. Brach

We subsequently considered an approach to release the draft report to PG&E andto provide the staffs assessment of the report to place the report in context for the public.However, following the discussions with the Commission technical assistants onJanuary 18, 2006, the staff received direction from the Commission that the report was not tobe released, absent a thorough review by the staff and, resolution of the staff comments.

Unrelated to the staff's evaluation of this draft report, the President's Office of Science andTechnology Policy (OSTP) released a report entitled "Tsunami Risk Reduction for the UnitedStates: A Framework for Action." The multi-agency efforts described in the OSTP reportincludes one of the tsunami mechanisms proposed in the draft report provided by the CNWRAsubcontractor in the OSTP broad review of tsunami issues.

Given the speculative nature of the draft report, the SITAG assessment of that draft report, theCommission direction to not release the draft report absent further staff assessment, and theongoing technically robust and broad review by the OSTP, the NRR staff is terminating anyfurther consideration of the draft report. The staff will be investing our continuing efforts inparticipating in the OSTP effort, seeking to build on the comprehensive efforts being conductedby the National Oceanographic and Atmospheric Agency (NOAA), the U.S. Geological Survey(USGS), and the National Science Foundation. We believe that participating with theseorganizations will provide a more technically credible base to broaden our technicalunderstanding and inform our efforts to reassess tsunami design criteria in our StandardReview Plan (NUREG-0800) than could be obtained by further efforts to evaluate the tsunamiassessment methodology described in the draft report.

Page 4: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

E. W. Brach -2-

We subsequently considered an approach to release the draft report to PG&E andto provide the staff's assessment of the report to place the report in context for the public.However, following the discussions with the Commission technical assistants onJanuary 18, 2006, the staff received direction from the Commission that the report was not tobe released, absent a thorough review by the staff and, resolution of the staff comments.

Unrelated to the staff's evaluation of this draft report, the President's Office of Science andTechnology Policy (OSTP) released a report entitled "Tsunami Risk Reduction for the UnitedStates: A Framework for Action." The multi-agency efforts described in the OSTP reportincludes one of the tsunami mechanisms proposed in the draft report provided by the CNWRAsubcontractor in the OSTP broad review of tsunami issues.

Given the speculative nature of the draft report, the SITAG assessment of that draft report, theCommission direction to not release the draft report absent further staff assessment, and theongoing technically robust and broad review by the OSTP, the NRR staff is terminating anyfurther consideration of the draft report. The staff will be investing our continuing efforts inparticipating in the OSTP effort, seeking to build on the comprehensive efforts being conductedby the National Oceanographic and Atmospheric Agency (NOAA), the U.S. Geological Survey(USGS), and the National Science Foundation. We believe that participating with theseorganizations will provide a more technically credible base to broaden our technicalunderstanding and inform our efforts to reassess tsunami design criteria in our StandardReview Plan (NUREG-0800) than could be obtained by further efforts to evaluate the tsunamiassessment methodology described in the draft report.

ISTRIBUTION:

DE R/F RidsNmssSfpo RidsNrrDe RidsNrrDeEgcb

CMunson

ADAMS Accession No.: ML060460441INDICATE IN BOX "C"=COPY W/O ATTACHMENT/ENCLOSURE, "E"=COPY W/ATT/ENCL, "N" = NO COPY

OFFICE DE/D I

NAME MMayfield

DATE 02/27/2006

OFFICIAL RECORD

Page 5: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

Workplace XT: Print View Page 1 of 2

Gibson, Lauren I Thursday, August 7, 2014

Document: t' Disposition of Draft Report Entitled, "A Preliminary Numerical Study of the Hazard from LocalLandslide Tsunami Scenarios at the Diablo Canyon Site in Central California." (Version 6.0, Released)ID: {AO372503-C9E6-4A40-9E4E-6FCC97001030}

Class: Official Record

Class Properties

Property Value

Document Title Disposition of Draft Report Entitled, "A Preliminary Numerical Study of the Hazard from Local Landslide TsunamiScenarios at the Diablo Canyon Site in Central California."

Record Information

Accession Number

* Estimated Page Count

*< Document Date

* Document Type

Author Name

* Author Affiliation

Addressee Name

Addressee Affiliation

Docket Number

License Number

Case/Reference Number

Document/Report Number

Package Number

Document Date Received

Date Reviewed for Public Release

Date Docketed

Related Date

* Vital Records Category

Document Status

* Media Type

* Physical File Location

*< FACA Document

Date to be Released

Distribution List Codes

Contact Person

Text Source Flag

Official Record?

Replicated

ForeMost File Code (Latest)

ForeMost Document Number

URL

Value Not Defined. Required Class: Record

ML060460441

3

Feb 27, 2006

"Memoranda"

"Mayfield M E"

"NRC/NRR/ADES/DE"

"Brach E W"

"NRC/NMSS/SFPO"

"05000275"; "05000323"

"DPR-080"; "DPR-082"

"FOIA/PA-2014-0222"

Apr 25, 2014

No

Electronic

ADAMS

No

Apr 25, 2014

Native Application

Yes

Yes

NRR-09-02-303

848998.1

https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.j sp?minorVersion... 08/07/2014

Page 6: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

Workplace XT: Print View

DDMS Item ID

ASLBP Number

Date Declared

LSN Number

Hearing Transcript Page Range

Hearing Party Exhibit Number

Hearing Official Exhibit Number

Hearing Issues

Hearing Party Identifier

Keyword

ADAMS ItemID

l Availability

Comment

* Document Sensitivity

ADAMS Version Comment

ADAMS Checked out By User

ForeMost File Code Set (MV)

ADAMS Archived?

ADAMS Permanent Version?

ADAMS Added By User

ADAMS Checked In By User

ADAMS Date Added

ADAMS idmPublish

ADAMS Checkin Date

Created By User

Created On

File Name

Original File Name

Page 2 of 2

"exb3"; "nrr-106"; "oarc20060804mab8"; "OARC20140417dnd-Changed Availability, Sensitivity, Added SUNSIComment, Review and Release Date."; "SUNSI Review Complete"; "tjb2"; "utsPARS"; "oarc20140627jrr3-FOIANumber Added to Case Reference."

060460441

Publicly Available

Non-Sensitive

"NRR-09-01-12:848994.1"; "NRR-09-02-303:848998.1"

No

Yes

kkf

ORPDaemonl

Feb 15, 2006

Feb 27, 2006

adamsxtcs synchronizer

Sep 23, 2010

ML060460441.pdf

tsunami memo.wpd

System Properties

Property

Added By User:

Added On:

Modified By User:

Modified On:

ID:

Is Checked Out:

Is Current Version:

Major Version:

Minor Version:

Version Status:

Size:

Mime Type:

Record Information:

Value

System CS Synchronizer

9/23/10 6:57 PM

Repetto, John

6/27/14 1:37 PM

{A0372503-C9E6-4A40-9E4E-6FCC97001030}

False

True

6

0

Released

1 KB

application/pdf

https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.jsp?minorVersion... 08/07/2014

Page 7: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

May 05, 2005

MEMORANDUM TO: Brian E. Thomas, Acting Deputy DirectorLicensing and Inspection DirectorateSpent Fuel Project Office, NMSS

Eugene V. Imbro, ChiefMechanical and Civil Engineering BranchDivision of Engineering, NRR

Michele G. Evans, ChiefEngineering Research Applications BranchDivision of Engineering Technology, RES

FROM: James R. Hall, Sr. Project Manager /RA/Licensing SectionSpent Fuel Project Office, NMSS

SUBJECT: SUMMARY OF INTERNAL MEETING WITH NRR AND RES TODISCUSS CONTRACTOR REPORT ON TSUNAMI HAZARDSANALYSIS

On April 28, 2005, an internal meeting was held between staff from the Office of NuclearMaterial Safety and Safeguards (NMSS), the Office of Nuclear Reactor Regulation (NRR), andthe Office of Research (RES), to discuss a contractor's report on tsunami hazards analysis thatwas prepared as part of the NRC's review of an application for an independent spent fuelstorage installation (ISFSI) at the Diablo Canyon site. On February 3, 2005, NMSS had sent amemorandum to NRR and RES transmitting the contractor's report for information. AlthoughNMSS did not rely on the information in the report in reaching a licensing decision on the DiabloCanyon ISFSI, NMSS recognized that the issues identified in the report could have broaderapplicability and should be provided to the other program offices for consideration.

The meeting participants agreed that the information in the contractor's report warrants furtherreview by NRC staff, in that the report raises questions regarding the use of new methods andassumptions in evaluating tsunami hazards. The participants also agreed that the SeismicIssues Technical Advisory Group (SITAG), led by RES with membership from NRR and NMSS,would take the lead in reviewing the subject report, and in making recommendations for anyfurther NRC action. The SITAG chairman stated that it would take the group from one to sixmonths to develop its recommendations, and emphasized that the group's existing work on.Early Site Permits would remain its first priority.

Page 8: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

-2-

This meeting summary serves to document the participants' agreement on the NRC's approachfor evaluating this report, and to assign this task to the SITAG. A list of attendees is provided inthe attachment.

Attachment: Attendee List

Page 9: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

-2-May 05, 2005

This meeting summary serves to document the participants' agreement on the NRC's approachfor evaluating this report, and to assign this task to the SITAG. A list of attendees is provided inthe attachment.

Attachment: Attendee List

DISTRIBUTION: NONPUBLIC

NRC File CenterWHodgesKManoly, NRR

SFPO r/fBTripathiGBagchi, NRR

NMSS r/fSBaggettRBarrett, RES

EWBrach GBjorkmanMMayfteld, NRRNChokshi, RES AMurphy, RES

E:\Filenet\ML051290085.wpd ML051290085

OFC SFPO I SFPO I SFPONAME JRHaII EZiegler RLewis

DATE 05/ 04 /05 05/04/05 05/ 05/05

OFFICIAL RECORD COPY

Page 10: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

Attachment

ATTENDANCE LIST

Name Office

Bill BrachWayne HodgesBrian ThomasBob TripathiRandy HallMike MayfieldNilesh ChokshiAndy Murphy

NMSS/SFPONMSS/SFPONMSS/SFPONMSS/SFPONMSS/SFPONRR/DERES/DRAARES/DET

Page 11: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

Workplace XT: Print View Page 1 of 2

Gibson, Lauren I Thursday, August 7, 2014

Document: t 05/05/05 Memo to B. Thomas from J. Hall - Summary of Internal Meeting with NRR and RES toDiscuss Contractor Report on Tsunami Hazards Analysis. (Version 3.0, Released)ID: {AFEDC7BA-SD5B-481B-BEF4-1El6B7CF1684)

Class: Official Record

Class Properties

Property

* Document Title

Value

05/05/05 Memo to B. Thomas from J. Hall - Summary of Internal Meeting with NRR and RES to DiscussContractor Report on Tsunami Hazards Analysis.

Record Information

Accession Number

* Estimated Page Count

* Document Date

* Document Type

Author Name

* Author Affiliation

Addressee Name

Addressee Affiliation

Docket Number

License Number

Case/Reference Number

Document/Report Number

Package Number

Document Date Received

Date Reviewed for Public Release

Date Docketed

Related Date

* Vital Records Category

Document Status

* Media Type

* Physical File Location

* FACA Document

Date to be Released

Distribution List Codes

Contact Person

* Text Source Flag

Official Record?

Replicated

ForeMost File Code (Latest)

ForeMost Document Number

URL

Value Not Defined. Required Class: Record

ML051290085

4

May 5, 2005

"Meeting Summary"; "Memoranda"

"Hall J R"

"NRC/NMSS/SFPO/SLID"

"Evans M G"; "Imbro E V"; 'Thomas B E"

"NRC/NMSS/SFPO"; "NRC/NRR/DE/EMCB"; "NRC/RES/DET/ERAB"

"FOIA/PA-2014-0222"

Apr 25, 2014

Apr 28, 2005

No

Electronic

ADAMS

No

Apr 25, 2014

Native Application

Yes

Yes

RES-07-02-06

683539.1

https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.j sp?minorVersion... 08/07/2014

Page 12: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

Workplace XT: Print View

DDMS Item ID

ASLBP Number

Date Declared

LSN Number

Hearing Transcript Page Range

Hearing Party Exhibit Number

Hearing Official Exhibit Number

Hearing Issues

Hearing Party Identifier

Keyword

ADAMS ItemID

Availability

Comment

* Document Sensitivity

ADAMS Version Comment

ADAMS Checked out By User

ForeMost File Code Set (MV)

ADAMS Archived?

ADAMS Permanent Version?

ADAMS Added By User

ADAMS Checked In By User

ADAMS Date Added

ADAMS idmPublish

ADAMS Checkin Date

Created By User

Created On

File Name

Original File Name

Page 2 of 2

"dnw"; "lafl"; "NMSS/RGN Materials-001"; "oarc20060719mab8"; "OARC20140417dnd-Changed Availability,Sensitivity, Added SUNSI Comment, Review and Release Date."; "SISP Review Complete"; "SUNSI ReviewComplete"; "utsPARS"; "oarc20140627jrr3-FOIA Number Added to Case Reference."

051290085

Publicly Available

Non-Sensitive

"NMSS-06-02-06:683460.1"; "NRR-04-02-06:683536.1"; "RES-07-02-06:683539.1"

No

Yes

ssm

ORPDaemonl

May 9, 2005

May 9, 2005

adamsxt-pSsynchronizer

Sep 19, 2010

ML051290085.pdf

Tsunami04282005internalsummary.wpd

System Properties

Property

Added By User:

Added On:

Modified By User:

Modified On:

ID:

Is Checked Out:

Is Current Version:

Major Version:

Minor Version:

Version Status:

Size:

Mime Type:

Record Information:

Value

System P8 Synchronizer

9/19/10 3:41 AM

Repetto, John

6/27/14 1:37 PM

{AFEDC7BA-8D5B-481B-BEF4-1E16B7CF1684}

False

True

3

0

Released

1 KB

application/pdf

https://adamsxt.nrc.gov/Worl-kp-laceXT/operations/PropertyPrintView.jsp?minorVersion... 08/07/2014

Page 13: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

January 17, 2006

MEMORANDUM TO:

FROM:

SUBJECT:

Michele G. Evans, Branch ChiefEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research

Eugene V. Imbro, Deputy DirectorDivision of EngineeringOffice of Nuclear Reactor Regulation

Andrew J. Murphy, Chairman IRA/ A. Hsia forSeismic Issues Technical Advisory GroupEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research

Transmittal of Seismic Issues Technical Advisory Group UpdatedEvaluation of Tsunami Hazard Report

On November 17, 2005, the Seismic Issues Technical Advisor Group (SITAG)

transmitted to you its evaluation of a report entitled, "A Preliminary Numerical Study of the

Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central

California, Summary Report (Draft)". Since that time, SITAG has interacted with you and other

NRC managers and identified the need to update the evaluation. The updated evaluation is

enclosed.

Enclosure:1. Staff Evaluation of "A Preliminary Numerical Study of the Hazard from Local LandslideTsunami Scenarios at the Diablo Canyon Site in Central California, Summary Report (Draft)"

cc: M. Cunningham, RESJ. Wiggins, RESM. Mayfield, NRR

Page 14: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

MEMORANDUM TO:

FROM:

SUBJECT:

January 17, 2006

Michele G. Evans, Branch ChiefEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research

Eugene V. Imbro, Deputy DirectorDivision of EngineeringOffice of Nuclear Reactor Regulation

Andrew J. Murphy, Chairman IRA/ A. Hsia forSeismic Issues Technical Advisory GroupEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research

Transmittal of Seismic Issues Technical Advisory Group UpdatedEvaluation of Tsunami Hazard Report

On November 17, 2005, the Seismic Issues Technical Advisor Group (SITAG)

transmitted to you its evaluation of a report entitled, "A Preliminary Numerical Study of the

Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central

California, Summary Report (Draft)". Since that time, SITAG has interacted with you and other

NRC managers and identified the need to update the evaluation. The updated evaluation is

enclosed.

Enclosure:1. Staff Evaluation of "A Preliminary Numerical Study of the Hazard from Local LandslideTsunami Scenarios at the Diablo Canyon Site in Central California, Summary Report (Draft)"

cc: M. Cunningham, RESJ. Wiggins, RES

M. Mayfield, NRR

DISTRIBUTION: DET r/f ERAB r/f SITAG A. Hsia R. Karas W.E. Brach R. Pierson R. Hall

DOCUMENT NAME: E:\Fllenet\ML060170114.wpd

OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO,: Pkg.: ML060170138 TEMPLATE NO. RES-006Publicly Available? (Y or N) N DATE OF RELEASE TO PUBLIC N/A SENSITIVE? NTo receive a cop of this document, indicate in the box "C" = Copy without enclosures V" =Copy with enclosures "N" =No copy

OFFICE RES/DET/ERAB E RES/DET/ERAB iNAME A. Murphy A.Hsia /RA/for A.M.DATE 1/17/06 1/17/06

Official Record Copy

Memo:ML060170114, Enclosure: ML060170129

Page 15: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

Workplace XT: Print View Page 1 of 2

Gibson, Lauren I Thursday, August 7, 2014

Document: 't (Memo) Transmittal of Seismic Issues Technical Advisory Group Updated Evaluation of TsunamiHazard Report. (Version 7.o, Released)ID: {D4F337D2-9EDA-4475-9B28-2458715131FO0

Class: Official Record

Class Properties

Property

*• Document Title

Record Information

Value

(Memo) Transmittal of Seismic Issues Technical Advisory Group Updated Evaluation of Tsunami Hazard Report.

Accession Number

* Estimated Page Count

* Document Date

* Document Type

Author Name

* Author Affiliation

Addressee Name

Addressee Affiliation

Docket Number

License Number

Case/Reference Number

Document/Report Number

Package Number

Document Date Received

Date Reviewed for Public Release

Date Docketed

Related Date

* Vital Records Category

Document Status

* Media Type

* Physical File Location

Value Not Defined. Required Class: Record

ML060170114

2

Jan 17, 2006

"Memoranda"

"Murphy A J"

"NRC/RES/DET/ERAB"

"Evans M G"; "Imbro E V"

"NRC/RES/DET"; "NRC/RES/DET/ERAB"

"05000275"; "05000323"

"DPR-080"; "DPR-082"

"FOIA/PA-2014-0222"

Apr 25, 2014

No

Electronic

ADAMS

No

Apr 25, 2014

Native Application

Yes

Yes

RES-13-02-07

979398.1

* FACA Document

Date to be Released

Distribution List Codes

Contact Person

* Text Source Flag

Official Record?

Replicated

ForeMost File Code (Latest)

ForeMost Document Number

URL.

https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.j sp?minorVersion... 08/07/2014

Page 16: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

Workplace XT: Print View

DDMS Item ID

ASLBP Number

Date Declared

LSN Number

Hearing Transcript Page Range

Hearing Party Exhibit Number

Hearing Official Exhibit Number

Hearing Issues

Hearing Party Identifier

Keyword

ADAMS ItemID

*W Availability

Comment

* Document Sensitivity

ADAMS Version Comment

ADAMS Checked out By User

ForeMost File Code Set (MV)

ADAMS Archived?

ADAMS Permanent Version?

ADAMS Added By User

ADAMS Checked In By User

ADAMS Date Added

ADAMS idmPublish

ADAMS Checkin Date

Created By User

Created On

File Name

Original File Name

Sy~st~em P~r0Perie

Property

Added By User:

Added On:

Modified By User:

Modified On:

ID:

Is Checked Out:

Is Current Version:

Major Version:

Minor Version:

Version Status:

Size:

Mime Type:

Record Information:

Page 2 of 2

"ALA"; "JRR3"; "oarc20060804mab8"; "OARC20140425dnd-Added SUNSI Comment, Review and Release Date.";"SUNSI Review Complete"; "utsPARS"; "oarc20140627jrr3-FOIA Number Added to Case Reference."

060170114

Publicly Available

Non-Sensitive

"NRR-09-01-12:810391.1"; "NRR-09-02-303:810394.1"; "RES-13-02-07:979398. 1"

No

Yes

nxil

ORPDaemonl

Jan 17, 2006

Jan 31, 2006

adamsxt-p8_synchronizer

Sep 19, 2010

ML060170114.pdf

Transmitta memo for updated SITAG Tsunami Paper Evaluation .wpd

Value

System P8 Synchronizer

9/19/10 10:17 PM

Repetto, John

6/27/14 1:37 PM

{D4F337D2-9EDA-4475-9B28-2458715131F0}

False

True

7

0

Released

1 KB

application/pdf

https://adamsxt.nrc gov/WorkplaceXT/operations/PropertyPrintView.jsp?minorVersion... 08/07/2014

Page 17: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

CHARTER FOR THE NUCLEAR REGULATORY COMMISSION'SFREEDOM OF INFORMATION ACT RESPONSE TASK FORCE

Objective

In support of the effort to consolidate and process the Freedom of Information Act (FOIA)requests related to the Japan nuclear events beginning on March 11, 2011, NRC hasestablished an Intra-agency FOIA Response Task Force (TF). The TF consists of subjectmatter experts representative of each Program Office who are knowledgeable of the technicalinformation contained within these FOIA requests. The Office of General Counsel (OGC) willprovide legal advice and assistance.

Scope

The scope of the NRC FOIA Response TF and responsibilities include the following:

1. Expedite and coordinate the review of agency records related to the events in Japan.The review of agency records will occur in four phases:

a. Phase 1 - Selected key information from the first seven days of activating theHeadquarters Operations Center (HOC) will be collected and reviewed. Thisinformation includes:

i. NRC Situation Reports (SITREPs);ii. One-page briefing sheets;

iii. Executive team (ET) phone audio transcription;iv. ET, Reactor Safety Team (RST), Protective Measures Team (PMT), and

Liaison Team (LIA) chronology and logs with attachments;v. RST reactor status slides;vi. International information and radiological monitoring results

1. Ministry of Economy, Trade, and Industry (METI)2. Ministry of Education, Culture, Sports, Science, and Technology

(MEXT)3. International Atomic Energy Agency (IAEA)

vii. Meteorological information from the National Oceanic and AtmosphericAdministration (NOAA)

viii. Department of Energy (DOE) Situation Reportsix. WASHFAX emails (i.e., agendas and meeting summaries from the

Interagency Policy Committee (IPC), Deputies Committee (DC), and

Principals Meetings)

b. Phase 2 - Other information requested from the first seven days of the Japanevents will be collected and reviewed. This information includes:

Page 18: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

i. HOC e-mail accounts (-66 in total)ii. FOIA resource e-mail account

iii. Main phone audio transcriptions from the RST, PMT, LIA (International

and Federal), HOOs

c. Phase 3 - Any outstanding information requested from the first seven days of theJapan events will be collected and reviewed. This information includes:

i. Individual e-mail accounts identified in FOIA requestsii. Remaining HOC phone/bridge audio transcription (-99 phones/bridges)

d. Phase 4 - Next seven days of information from phase 1, phase 2, and phase 3 ofthis charter.

2. Identify sensitive information within agency records that should be withheld under aFOIA exemption. A foreseeable harm statement should be developed, as appropriate.

3. Identify information which requires consultation with other Federal agencies, companies,and foreign governments.

4. Consult with OIS to ensure that FOIA requesters are engaged at the end of each phaseof the record collection and review process, to inform them of available information, andreconfirm whether this information meets their needs.

5. Propose and implement improvement recommendations (OIS or TF) to the work flowprocess that support the deliberate and diligent processing of Japan related FOIArequests.

Coordination and Communication

The NRC FOIA Task Force will:

1. Provide periodic status updates to NRC internal stakeholders, including NSIRmanagement, the NRC's FOIA/PA Officer and the OIS Integrated Project Team (IPT), ofthe TF progress made in satisfying FOIA/PA requests.

2. Ensure that communication channels (i.e., NRC daily announcements, yellowannouncements, FOIA Sharepoint site, NRC Public website) are effectively used toinform the agency and public of the progress made in satisfying Japan related FOIArequests.

3. Ensure that FOIA requesters are engaged at the end of each phase of the recordcollection and review process, to inform them of available information, and reconfirmwhether this information meets their needs.

Page 19: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

4. Ensure that the information identified as withholdable under a FOIA exemption is

coordinated with the NRC's FOIA/PA Officer and OGC.

5. Provide support to OIS in implementation of its communication plan for the FOIAinitiative.

Expected Product and Schedule

The expected output product to be delivered from the TF to the FOIA/PA group is a bundledpackage of information separated into one of the following four categories: Release in Full,Release in Part, Withhold in Full, and Referral to other agency. The information identified asIreleasable in full or part' will be made publically available in ADAMS, and available on the NRCpublic website as a single, bundled package.

Short-term Schedule Milestones

Collect phase 1 documents, excluding ET audio transcription - Friday, June 24, 2011

Transcribe ET phone recording (1-1/2 months) - Monday, July 18, 2011

Complete review and segregation, or referral of, phase 1 documents - August 8, 2011

Staffing

The FOIA Response Task Force consists of the following members:

Team Leader:Team Members:

Administrative Support:

OIS FOIA Expert:OIS IPT Project Mgr.:OGC Contact:

Anthony Bowers, NSIRJohn Shoemaker, NSIRBeth Doolittle, NMSSQuynh Nguyen, NRR (Rotating TA - See schedule)Jeffery Lynch, FSMERam Subbaratnam, NRODon Palmrose, NROJoe Zabel, RES

Carolyn Siu, RES

Mary Jean RaphaelRussell FickenPat Hirsch and Jeremy Suttenburg (backup)

Additional task force members will be added as needed.

Page 20: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,

EDO Interface

A monthly brief (update) will be provided at EDO senior leadership meeting.