February 27, 2006
MEMORANDUM FOR: E. William Brach, DirectorSpent Fuel Project OfficeOffice of Nuclear Materials
Safety and Safeguards
FROM: Michael E. Mayfield, Director/RA/Division of EngineeringOffice of Nuclear Reactor Regulation
SUBJECT: DISPOSITION OF DRAFT REPORT ENTITLED, "A PRELIMINARYNUMERICAL STUDY OF THE HAZARD FROM LOCAL LANDSLIDETSUNAMI SCENARIOS AT THE DIABLO CANYON SITE INCENTRAL CALIFORNIA"
This memorandum is to inform you of the Office of Nuclear Reactor Regulation's (NRR's)disposition of the subject draft report, which was transmitted to NRR via a memorandum fromJohn Moninger, dated February 3, 2005. The draft report was prepared under subcontract tothe Center for Nuclear Waste Regulatory Analysis (CNWRA), in support of your staff'sevaluation of the Pacific Gas & Electric (PG&E) application for an Independent Spent FuelStorage Installation (ISFSI) at the Diablo Canyon site. The letter from the CNWRA's, principalinvestigator, John Stamatakos, to your staff Project Manager, James Randall Hall, datedMarch 17, 2004, noted that in Dr. Stamatakos' professional opinion the draft report used amethodology that is "beyond the state of the art." Subsequent correspondence from CNWRAmanagement has confirmed that the draft report has not been accepted by CNWRA and hasnot gone through the CNWRA quality assurance process. Thus, the draft report's technicalbasis is not supported by CNWRA.
Based on our discussions of the report and the need for a technical review, we jointly asked theU.S. Nuclear Regulatory Commission's (NRC's) Seismic Issues Technical Advisory Group(SITAG) to perform such a review. The SITAG assessment of the draft report was transmittedto Michele Evans and Gene Imbro in a memorandum from Andrew Murphy, datedNovember 17, 2005. The SITAG concluded that the draft report was based on low resolutiondata having considerable uncertainty and that it was not suitable for use in regulatoryapplications. The SITAG also provided (1) a recommendation that the draft report be providedto PG&E for their information as they finalized their own reassessment of the tsunami hazardfor the Diablo Canyon site, and (2) recommendations for additional NRC research to addressthe tsunami hazard.
CONTACT: Clifford Munson, DE/EGCB301-415-2529
![Page 3: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/3.jpg)
E. W. Brach
We subsequently considered an approach to release the draft report to PG&E andto provide the staffs assessment of the report to place the report in context for the public.However, following the discussions with the Commission technical assistants onJanuary 18, 2006, the staff received direction from the Commission that the report was not tobe released, absent a thorough review by the staff and, resolution of the staff comments.
Unrelated to the staff's evaluation of this draft report, the President's Office of Science andTechnology Policy (OSTP) released a report entitled "Tsunami Risk Reduction for the UnitedStates: A Framework for Action." The multi-agency efforts described in the OSTP reportincludes one of the tsunami mechanisms proposed in the draft report provided by the CNWRAsubcontractor in the OSTP broad review of tsunami issues.
Given the speculative nature of the draft report, the SITAG assessment of that draft report, theCommission direction to not release the draft report absent further staff assessment, and theongoing technically robust and broad review by the OSTP, the NRR staff is terminating anyfurther consideration of the draft report. The staff will be investing our continuing efforts inparticipating in the OSTP effort, seeking to build on the comprehensive efforts being conductedby the National Oceanographic and Atmospheric Agency (NOAA), the U.S. Geological Survey(USGS), and the National Science Foundation. We believe that participating with theseorganizations will provide a more technically credible base to broaden our technicalunderstanding and inform our efforts to reassess tsunami design criteria in our StandardReview Plan (NUREG-0800) than could be obtained by further efforts to evaluate the tsunamiassessment methodology described in the draft report.
![Page 4: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/4.jpg)
E. W. Brach -2-
We subsequently considered an approach to release the draft report to PG&E andto provide the staff's assessment of the report to place the report in context for the public.However, following the discussions with the Commission technical assistants onJanuary 18, 2006, the staff received direction from the Commission that the report was not tobe released, absent a thorough review by the staff and, resolution of the staff comments.
Unrelated to the staff's evaluation of this draft report, the President's Office of Science andTechnology Policy (OSTP) released a report entitled "Tsunami Risk Reduction for the UnitedStates: A Framework for Action." The multi-agency efforts described in the OSTP reportincludes one of the tsunami mechanisms proposed in the draft report provided by the CNWRAsubcontractor in the OSTP broad review of tsunami issues.
Given the speculative nature of the draft report, the SITAG assessment of that draft report, theCommission direction to not release the draft report absent further staff assessment, and theongoing technically robust and broad review by the OSTP, the NRR staff is terminating anyfurther consideration of the draft report. The staff will be investing our continuing efforts inparticipating in the OSTP effort, seeking to build on the comprehensive efforts being conductedby the National Oceanographic and Atmospheric Agency (NOAA), the U.S. Geological Survey(USGS), and the National Science Foundation. We believe that participating with theseorganizations will provide a more technically credible base to broaden our technicalunderstanding and inform our efforts to reassess tsunami design criteria in our StandardReview Plan (NUREG-0800) than could be obtained by further efforts to evaluate the tsunamiassessment methodology described in the draft report.
ISTRIBUTION:
DE R/F RidsNmssSfpo RidsNrrDe RidsNrrDeEgcb
CMunson
ADAMS Accession No.: ML060460441INDICATE IN BOX "C"=COPY W/O ATTACHMENT/ENCLOSURE, "E"=COPY W/ATT/ENCL, "N" = NO COPY
OFFICE DE/D I
NAME MMayfield
DATE 02/27/2006
OFFICIAL RECORD
![Page 5: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/5.jpg)
Workplace XT: Print View Page 1 of 2
Gibson, Lauren I Thursday, August 7, 2014
Document: t' Disposition of Draft Report Entitled, "A Preliminary Numerical Study of the Hazard from LocalLandslide Tsunami Scenarios at the Diablo Canyon Site in Central California." (Version 6.0, Released)ID: {AO372503-C9E6-4A40-9E4E-6FCC97001030}
Class: Official Record
Class Properties
Property Value
Document Title Disposition of Draft Report Entitled, "A Preliminary Numerical Study of the Hazard from Local Landslide TsunamiScenarios at the Diablo Canyon Site in Central California."
Record Information
Accession Number
* Estimated Page Count
*< Document Date
* Document Type
Author Name
* Author Affiliation
Addressee Name
Addressee Affiliation
Docket Number
License Number
Case/Reference Number
Document/Report Number
Package Number
Document Date Received
Date Reviewed for Public Release
Date Docketed
Related Date
* Vital Records Category
Document Status
* Media Type
* Physical File Location
*< FACA Document
Date to be Released
Distribution List Codes
Contact Person
Text Source Flag
Official Record?
Replicated
ForeMost File Code (Latest)
ForeMost Document Number
URL
Value Not Defined. Required Class: Record
ML060460441
3
Feb 27, 2006
"Memoranda"
"Mayfield M E"
"NRC/NRR/ADES/DE"
"Brach E W"
"NRC/NMSS/SFPO"
"05000275"; "05000323"
"DPR-080"; "DPR-082"
"FOIA/PA-2014-0222"
Apr 25, 2014
No
Electronic
ADAMS
No
Apr 25, 2014
Native Application
Yes
Yes
NRR-09-02-303
848998.1
https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.j sp?minorVersion... 08/07/2014
![Page 6: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/6.jpg)
Workplace XT: Print View
DDMS Item ID
ASLBP Number
Date Declared
LSN Number
Hearing Transcript Page Range
Hearing Party Exhibit Number
Hearing Official Exhibit Number
Hearing Issues
Hearing Party Identifier
Keyword
ADAMS ItemID
l Availability
Comment
* Document Sensitivity
ADAMS Version Comment
ADAMS Checked out By User
ForeMost File Code Set (MV)
ADAMS Archived?
ADAMS Permanent Version?
ADAMS Added By User
ADAMS Checked In By User
ADAMS Date Added
ADAMS idmPublish
ADAMS Checkin Date
Created By User
Created On
File Name
Original File Name
Page 2 of 2
"exb3"; "nrr-106"; "oarc20060804mab8"; "OARC20140417dnd-Changed Availability, Sensitivity, Added SUNSIComment, Review and Release Date."; "SUNSI Review Complete"; "tjb2"; "utsPARS"; "oarc20140627jrr3-FOIANumber Added to Case Reference."
060460441
Publicly Available
Non-Sensitive
"NRR-09-01-12:848994.1"; "NRR-09-02-303:848998.1"
No
Yes
kkf
ORPDaemonl
Feb 15, 2006
Feb 27, 2006
adamsxtcs synchronizer
Sep 23, 2010
ML060460441.pdf
tsunami memo.wpd
System Properties
Property
Added By User:
Added On:
Modified By User:
Modified On:
ID:
Is Checked Out:
Is Current Version:
Major Version:
Minor Version:
Version Status:
Size:
Mime Type:
Record Information:
Value
System CS Synchronizer
9/23/10 6:57 PM
Repetto, John
6/27/14 1:37 PM
{A0372503-C9E6-4A40-9E4E-6FCC97001030}
False
True
6
0
Released
1 KB
application/pdf
https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.jsp?minorVersion... 08/07/2014
![Page 7: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/7.jpg)
May 05, 2005
MEMORANDUM TO: Brian E. Thomas, Acting Deputy DirectorLicensing and Inspection DirectorateSpent Fuel Project Office, NMSS
Eugene V. Imbro, ChiefMechanical and Civil Engineering BranchDivision of Engineering, NRR
Michele G. Evans, ChiefEngineering Research Applications BranchDivision of Engineering Technology, RES
FROM: James R. Hall, Sr. Project Manager /RA/Licensing SectionSpent Fuel Project Office, NMSS
SUBJECT: SUMMARY OF INTERNAL MEETING WITH NRR AND RES TODISCUSS CONTRACTOR REPORT ON TSUNAMI HAZARDSANALYSIS
On April 28, 2005, an internal meeting was held between staff from the Office of NuclearMaterial Safety and Safeguards (NMSS), the Office of Nuclear Reactor Regulation (NRR), andthe Office of Research (RES), to discuss a contractor's report on tsunami hazards analysis thatwas prepared as part of the NRC's review of an application for an independent spent fuelstorage installation (ISFSI) at the Diablo Canyon site. On February 3, 2005, NMSS had sent amemorandum to NRR and RES transmitting the contractor's report for information. AlthoughNMSS did not rely on the information in the report in reaching a licensing decision on the DiabloCanyon ISFSI, NMSS recognized that the issues identified in the report could have broaderapplicability and should be provided to the other program offices for consideration.
The meeting participants agreed that the information in the contractor's report warrants furtherreview by NRC staff, in that the report raises questions regarding the use of new methods andassumptions in evaluating tsunami hazards. The participants also agreed that the SeismicIssues Technical Advisory Group (SITAG), led by RES with membership from NRR and NMSS,would take the lead in reviewing the subject report, and in making recommendations for anyfurther NRC action. The SITAG chairman stated that it would take the group from one to sixmonths to develop its recommendations, and emphasized that the group's existing work on.Early Site Permits would remain its first priority.
![Page 8: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/8.jpg)
-2-
This meeting summary serves to document the participants' agreement on the NRC's approachfor evaluating this report, and to assign this task to the SITAG. A list of attendees is provided inthe attachment.
Attachment: Attendee List
![Page 9: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/9.jpg)
-2-May 05, 2005
This meeting summary serves to document the participants' agreement on the NRC's approachfor evaluating this report, and to assign this task to the SITAG. A list of attendees is provided inthe attachment.
Attachment: Attendee List
DISTRIBUTION: NONPUBLIC
NRC File CenterWHodgesKManoly, NRR
SFPO r/fBTripathiGBagchi, NRR
NMSS r/fSBaggettRBarrett, RES
EWBrach GBjorkmanMMayfteld, NRRNChokshi, RES AMurphy, RES
E:\Filenet\ML051290085.wpd ML051290085
OFC SFPO I SFPO I SFPONAME JRHaII EZiegler RLewis
DATE 05/ 04 /05 05/04/05 05/ 05/05
OFFICIAL RECORD COPY
![Page 10: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/10.jpg)
Attachment
ATTENDANCE LIST
Name Office
Bill BrachWayne HodgesBrian ThomasBob TripathiRandy HallMike MayfieldNilesh ChokshiAndy Murphy
NMSS/SFPONMSS/SFPONMSS/SFPONMSS/SFPONMSS/SFPONRR/DERES/DRAARES/DET
![Page 11: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/11.jpg)
Workplace XT: Print View Page 1 of 2
Gibson, Lauren I Thursday, August 7, 2014
Document: t 05/05/05 Memo to B. Thomas from J. Hall - Summary of Internal Meeting with NRR and RES toDiscuss Contractor Report on Tsunami Hazards Analysis. (Version 3.0, Released)ID: {AFEDC7BA-SD5B-481B-BEF4-1El6B7CF1684)
Class: Official Record
Class Properties
Property
* Document Title
Value
05/05/05 Memo to B. Thomas from J. Hall - Summary of Internal Meeting with NRR and RES to DiscussContractor Report on Tsunami Hazards Analysis.
Record Information
Accession Number
* Estimated Page Count
* Document Date
* Document Type
Author Name
* Author Affiliation
Addressee Name
Addressee Affiliation
Docket Number
License Number
Case/Reference Number
Document/Report Number
Package Number
Document Date Received
Date Reviewed for Public Release
Date Docketed
Related Date
* Vital Records Category
Document Status
* Media Type
* Physical File Location
* FACA Document
Date to be Released
Distribution List Codes
Contact Person
* Text Source Flag
Official Record?
Replicated
ForeMost File Code (Latest)
ForeMost Document Number
URL
Value Not Defined. Required Class: Record
ML051290085
4
May 5, 2005
"Meeting Summary"; "Memoranda"
"Hall J R"
"NRC/NMSS/SFPO/SLID"
"Evans M G"; "Imbro E V"; 'Thomas B E"
"NRC/NMSS/SFPO"; "NRC/NRR/DE/EMCB"; "NRC/RES/DET/ERAB"
"FOIA/PA-2014-0222"
Apr 25, 2014
Apr 28, 2005
No
Electronic
ADAMS
No
Apr 25, 2014
Native Application
Yes
Yes
RES-07-02-06
683539.1
https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.j sp?minorVersion... 08/07/2014
![Page 12: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/12.jpg)
Workplace XT: Print View
DDMS Item ID
ASLBP Number
Date Declared
LSN Number
Hearing Transcript Page Range
Hearing Party Exhibit Number
Hearing Official Exhibit Number
Hearing Issues
Hearing Party Identifier
Keyword
ADAMS ItemID
Availability
Comment
* Document Sensitivity
ADAMS Version Comment
ADAMS Checked out By User
ForeMost File Code Set (MV)
ADAMS Archived?
ADAMS Permanent Version?
ADAMS Added By User
ADAMS Checked In By User
ADAMS Date Added
ADAMS idmPublish
ADAMS Checkin Date
Created By User
Created On
File Name
Original File Name
Page 2 of 2
"dnw"; "lafl"; "NMSS/RGN Materials-001"; "oarc20060719mab8"; "OARC20140417dnd-Changed Availability,Sensitivity, Added SUNSI Comment, Review and Release Date."; "SISP Review Complete"; "SUNSI ReviewComplete"; "utsPARS"; "oarc20140627jrr3-FOIA Number Added to Case Reference."
051290085
Publicly Available
Non-Sensitive
"NMSS-06-02-06:683460.1"; "NRR-04-02-06:683536.1"; "RES-07-02-06:683539.1"
No
Yes
ssm
ORPDaemonl
May 9, 2005
May 9, 2005
adamsxt-pSsynchronizer
Sep 19, 2010
ML051290085.pdf
Tsunami04282005internalsummary.wpd
System Properties
Property
Added By User:
Added On:
Modified By User:
Modified On:
ID:
Is Checked Out:
Is Current Version:
Major Version:
Minor Version:
Version Status:
Size:
Mime Type:
Record Information:
Value
System P8 Synchronizer
9/19/10 3:41 AM
Repetto, John
6/27/14 1:37 PM
{AFEDC7BA-8D5B-481B-BEF4-1E16B7CF1684}
False
True
3
0
Released
1 KB
application/pdf
https://adamsxt.nrc.gov/Worl-kp-laceXT/operations/PropertyPrintView.jsp?minorVersion... 08/07/2014
![Page 13: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/13.jpg)
January 17, 2006
MEMORANDUM TO:
FROM:
SUBJECT:
Michele G. Evans, Branch ChiefEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research
Eugene V. Imbro, Deputy DirectorDivision of EngineeringOffice of Nuclear Reactor Regulation
Andrew J. Murphy, Chairman IRA/ A. Hsia forSeismic Issues Technical Advisory GroupEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research
Transmittal of Seismic Issues Technical Advisory Group UpdatedEvaluation of Tsunami Hazard Report
On November 17, 2005, the Seismic Issues Technical Advisor Group (SITAG)
transmitted to you its evaluation of a report entitled, "A Preliminary Numerical Study of the
Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central
California, Summary Report (Draft)". Since that time, SITAG has interacted with you and other
NRC managers and identified the need to update the evaluation. The updated evaluation is
enclosed.
Enclosure:1. Staff Evaluation of "A Preliminary Numerical Study of the Hazard from Local LandslideTsunami Scenarios at the Diablo Canyon Site in Central California, Summary Report (Draft)"
cc: M. Cunningham, RESJ. Wiggins, RESM. Mayfield, NRR
![Page 14: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/14.jpg)
MEMORANDUM TO:
FROM:
SUBJECT:
January 17, 2006
Michele G. Evans, Branch ChiefEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research
Eugene V. Imbro, Deputy DirectorDivision of EngineeringOffice of Nuclear Reactor Regulation
Andrew J. Murphy, Chairman IRA/ A. Hsia forSeismic Issues Technical Advisory GroupEngineering Research Applications BranchDivision of Engineering TechnologyOffice of Nuclear Regulatory Research
Transmittal of Seismic Issues Technical Advisory Group UpdatedEvaluation of Tsunami Hazard Report
On November 17, 2005, the Seismic Issues Technical Advisor Group (SITAG)
transmitted to you its evaluation of a report entitled, "A Preliminary Numerical Study of the
Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central
California, Summary Report (Draft)". Since that time, SITAG has interacted with you and other
NRC managers and identified the need to update the evaluation. The updated evaluation is
enclosed.
Enclosure:1. Staff Evaluation of "A Preliminary Numerical Study of the Hazard from Local LandslideTsunami Scenarios at the Diablo Canyon Site in Central California, Summary Report (Draft)"
cc: M. Cunningham, RESJ. Wiggins, RES
M. Mayfield, NRR
DISTRIBUTION: DET r/f ERAB r/f SITAG A. Hsia R. Karas W.E. Brach R. Pierson R. Hall
DOCUMENT NAME: E:\Fllenet\ML060170114.wpd
OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO,: Pkg.: ML060170138 TEMPLATE NO. RES-006Publicly Available? (Y or N) N DATE OF RELEASE TO PUBLIC N/A SENSITIVE? NTo receive a cop of this document, indicate in the box "C" = Copy without enclosures V" =Copy with enclosures "N" =No copy
OFFICE RES/DET/ERAB E RES/DET/ERAB iNAME A. Murphy A.Hsia /RA/for A.M.DATE 1/17/06 1/17/06
Official Record Copy
Memo:ML060170114, Enclosure: ML060170129
![Page 15: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/15.jpg)
Workplace XT: Print View Page 1 of 2
Gibson, Lauren I Thursday, August 7, 2014
Document: 't (Memo) Transmittal of Seismic Issues Technical Advisory Group Updated Evaluation of TsunamiHazard Report. (Version 7.o, Released)ID: {D4F337D2-9EDA-4475-9B28-2458715131FO0
Class: Official Record
Class Properties
Property
*• Document Title
Record Information
Value
(Memo) Transmittal of Seismic Issues Technical Advisory Group Updated Evaluation of Tsunami Hazard Report.
Accession Number
* Estimated Page Count
* Document Date
* Document Type
Author Name
* Author Affiliation
Addressee Name
Addressee Affiliation
Docket Number
License Number
Case/Reference Number
Document/Report Number
Package Number
Document Date Received
Date Reviewed for Public Release
Date Docketed
Related Date
* Vital Records Category
Document Status
* Media Type
* Physical File Location
Value Not Defined. Required Class: Record
ML060170114
2
Jan 17, 2006
"Memoranda"
"Murphy A J"
"NRC/RES/DET/ERAB"
"Evans M G"; "Imbro E V"
"NRC/RES/DET"; "NRC/RES/DET/ERAB"
"05000275"; "05000323"
"DPR-080"; "DPR-082"
"FOIA/PA-2014-0222"
Apr 25, 2014
No
Electronic
ADAMS
No
Apr 25, 2014
Native Application
Yes
Yes
RES-13-02-07
979398.1
* FACA Document
Date to be Released
Distribution List Codes
Contact Person
* Text Source Flag
Official Record?
Replicated
ForeMost File Code (Latest)
ForeMost Document Number
URL.
https://adamsxt.nrc.gov/WorkplaceXT/operations/PropertyPrintView.j sp?minorVersion... 08/07/2014
![Page 16: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/16.jpg)
Workplace XT: Print View
DDMS Item ID
ASLBP Number
Date Declared
LSN Number
Hearing Transcript Page Range
Hearing Party Exhibit Number
Hearing Official Exhibit Number
Hearing Issues
Hearing Party Identifier
Keyword
ADAMS ItemID
*W Availability
Comment
* Document Sensitivity
ADAMS Version Comment
ADAMS Checked out By User
ForeMost File Code Set (MV)
ADAMS Archived?
ADAMS Permanent Version?
ADAMS Added By User
ADAMS Checked In By User
ADAMS Date Added
ADAMS idmPublish
ADAMS Checkin Date
Created By User
Created On
File Name
Original File Name
Sy~st~em P~r0Perie
Property
Added By User:
Added On:
Modified By User:
Modified On:
ID:
Is Checked Out:
Is Current Version:
Major Version:
Minor Version:
Version Status:
Size:
Mime Type:
Record Information:
Page 2 of 2
"ALA"; "JRR3"; "oarc20060804mab8"; "OARC20140425dnd-Added SUNSI Comment, Review and Release Date.";"SUNSI Review Complete"; "utsPARS"; "oarc20140627jrr3-FOIA Number Added to Case Reference."
060170114
Publicly Available
Non-Sensitive
"NRR-09-01-12:810391.1"; "NRR-09-02-303:810394.1"; "RES-13-02-07:979398. 1"
No
Yes
nxil
ORPDaemonl
Jan 17, 2006
Jan 31, 2006
adamsxt-p8_synchronizer
Sep 19, 2010
ML060170114.pdf
Transmitta memo for updated SITAG Tsunami Paper Evaluation .wpd
Value
System P8 Synchronizer
9/19/10 10:17 PM
Repetto, John
6/27/14 1:37 PM
{D4F337D2-9EDA-4475-9B28-2458715131F0}
False
True
7
0
Released
1 KB
application/pdf
https://adamsxt.nrc gov/WorkplaceXT/operations/PropertyPrintView.jsp?minorVersion... 08/07/2014
![Page 17: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/17.jpg)
CHARTER FOR THE NUCLEAR REGULATORY COMMISSION'SFREEDOM OF INFORMATION ACT RESPONSE TASK FORCE
Objective
In support of the effort to consolidate and process the Freedom of Information Act (FOIA)requests related to the Japan nuclear events beginning on March 11, 2011, NRC hasestablished an Intra-agency FOIA Response Task Force (TF). The TF consists of subjectmatter experts representative of each Program Office who are knowledgeable of the technicalinformation contained within these FOIA requests. The Office of General Counsel (OGC) willprovide legal advice and assistance.
Scope
The scope of the NRC FOIA Response TF and responsibilities include the following:
1. Expedite and coordinate the review of agency records related to the events in Japan.The review of agency records will occur in four phases:
a. Phase 1 - Selected key information from the first seven days of activating theHeadquarters Operations Center (HOC) will be collected and reviewed. Thisinformation includes:
i. NRC Situation Reports (SITREPs);ii. One-page briefing sheets;
iii. Executive team (ET) phone audio transcription;iv. ET, Reactor Safety Team (RST), Protective Measures Team (PMT), and
Liaison Team (LIA) chronology and logs with attachments;v. RST reactor status slides;vi. International information and radiological monitoring results
1. Ministry of Economy, Trade, and Industry (METI)2. Ministry of Education, Culture, Sports, Science, and Technology
(MEXT)3. International Atomic Energy Agency (IAEA)
vii. Meteorological information from the National Oceanic and AtmosphericAdministration (NOAA)
viii. Department of Energy (DOE) Situation Reportsix. WASHFAX emails (i.e., agendas and meeting summaries from the
Interagency Policy Committee (IPC), Deputies Committee (DC), and
Principals Meetings)
b. Phase 2 - Other information requested from the first seven days of the Japanevents will be collected and reviewed. This information includes:
![Page 18: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/18.jpg)
i. HOC e-mail accounts (-66 in total)ii. FOIA resource e-mail account
iii. Main phone audio transcriptions from the RST, PMT, LIA (International
and Federal), HOOs
c. Phase 3 - Any outstanding information requested from the first seven days of theJapan events will be collected and reviewed. This information includes:
i. Individual e-mail accounts identified in FOIA requestsii. Remaining HOC phone/bridge audio transcription (-99 phones/bridges)
d. Phase 4 - Next seven days of information from phase 1, phase 2, and phase 3 ofthis charter.
2. Identify sensitive information within agency records that should be withheld under aFOIA exemption. A foreseeable harm statement should be developed, as appropriate.
3. Identify information which requires consultation with other Federal agencies, companies,and foreign governments.
4. Consult with OIS to ensure that FOIA requesters are engaged at the end of each phaseof the record collection and review process, to inform them of available information, andreconfirm whether this information meets their needs.
5. Propose and implement improvement recommendations (OIS or TF) to the work flowprocess that support the deliberate and diligent processing of Japan related FOIArequests.
Coordination and Communication
The NRC FOIA Task Force will:
1. Provide periodic status updates to NRC internal stakeholders, including NSIRmanagement, the NRC's FOIA/PA Officer and the OIS Integrated Project Team (IPT), ofthe TF progress made in satisfying FOIA/PA requests.
2. Ensure that communication channels (i.e., NRC daily announcements, yellowannouncements, FOIA Sharepoint site, NRC Public website) are effectively used toinform the agency and public of the progress made in satisfying Japan related FOIArequests.
3. Ensure that FOIA requesters are engaged at the end of each phase of the recordcollection and review process, to inform them of available information, and reconfirmwhether this information meets their needs.
![Page 19: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/19.jpg)
4. Ensure that the information identified as withholdable under a FOIA exemption is
coordinated with the NRC's FOIA/PA Officer and OGC.
5. Provide support to OIS in implementation of its communication plan for the FOIAinitiative.
Expected Product and Schedule
The expected output product to be delivered from the TF to the FOIA/PA group is a bundledpackage of information separated into one of the following four categories: Release in Full,Release in Part, Withhold in Full, and Referral to other agency. The information identified asIreleasable in full or part' will be made publically available in ADAMS, and available on the NRCpublic website as a single, bundled package.
Short-term Schedule Milestones
Collect phase 1 documents, excluding ET audio transcription - Friday, June 24, 2011
Transcribe ET phone recording (1-1/2 months) - Monday, July 18, 2011
Complete review and segregation, or referral of, phase 1 documents - August 8, 2011
Staffing
The FOIA Response Task Force consists of the following members:
Team Leader:Team Members:
Administrative Support:
OIS FOIA Expert:OIS IPT Project Mgr.:OGC Contact:
Anthony Bowers, NSIRJohn Shoemaker, NSIRBeth Doolittle, NMSSQuynh Nguyen, NRR (Rotating TA - See schedule)Jeffery Lynch, FSMERam Subbaratnam, NRODon Palmrose, NROJoe Zabel, RES
Carolyn Siu, RES
Mary Jean RaphaelRussell FickenPat Hirsch and Jeremy Suttenburg (backup)
Additional task force members will be added as needed.
![Page 20: February 27, 2006February 27, 2006 MEMORANDUM FOR: E. William Brach, Director Spent Fuel Project Office Office of Nuclear Materials Safety and Safeguards FROM: Michael E. Mayfield,](https://reader034.vdocuments.us/reader034/viewer/2022051920/600d28fee48cdd1016350e07/html5/thumbnails/20.jpg)
EDO Interface
A monthly brief (update) will be provided at EDO senior leadership meeting.