feb 2 1 2017 - bsee data center · feb 2 1 2017 100 00/° office of fieid operations . ....

7
U. S. Department of the Interior OMB Control Number: 1014-0016 Bureau of Safety and Environmental Enforcement (BSEE) OMB Approval Expires: August 31,2018 ASSIGNMENT OF FEDERAL OCS PIPELINE RIGHT-OF-WAY GRANT Part A: Assignment Legal description of the Pipeline Right-of-Way Grant being assigned (Please include Segment Number and any accessory information): Right-of-Way OCS-G 9349, Segment Number 8255: A pipeline right-of-way two-hundred feet (200') in width for the operation and maintenance of a 12-3/4 inch pipeline, 7.30 miles in length, to transport oil from Platform A in Block 65, across Blocks 64 and 20, to Platform A in Block 19, all in Green Canyon Area. Assignor(s) does hereby sell, assign, transfer, and convey unto Assignee(s) the following undivided right, title and interest: Insert name and Company number of each Assignor and Assignee. Assi «" or < s > : *i»^Sa^^Brti»^6*™w|»sSf rce " ,age l " terest C » nve '' ed RECEIVED Wild Well Control, Inc. (GOM No. 2998) 1 n n FEB 2 1 2017 100 00/ ° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received Fieldwood Energy Offshore LLC (GOM No. 3035) 100.00% Exhibit "A," which sets forth other provisions between Assignor(s) and Assignee(s), is attached to and made a part of this assignment. For BSEE Use only - Do Not Type Below This Line UNITED STATES OF AMERICA This Assignment of Federal OCS Pipeline Right-of-Way Grant has been filed as of the date stamped on this document and hereby approved by the Bureau of Safety and Environmental Enforcement on the date below. * By >vw^ i^r^^ h i e f ' Pipe ' ine ^ m 2 2 2017 Authorized Official for BSEE Title Approval Date Paperwork Reduction Act of 1995 (PRA) Statement: The PRA (44 U.S.C. 3501 et seq.) requires us to inform you that we collect this information to use in the adjudication process involved in leasmg and lease operations. BSEE uses the information to track ownership of leases in the Federal OCS. Responses are required to obtain or retain a benefit (43 U.S.C. 1334). Proprietary data are covered under 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. Public reporting burden of this form is estimated to average 30 minutes per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the fonn. Direct comments regarding the burden estimate, or any other aspect of this form, to the BSEE Information Collection Clearance Officer, 381 Elden Street, Hemdon, VA 20170. BSEE FORM BSEE-0149 (August 2015 - Supersedes all previous versions ofthis form which may not be used). Page 1 of 2

Upload: others

Post on 10-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FEB 2 1 2017 - BSEE Data Center · FEB 2 1 2017 100 00/° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received ... Should you have any questions

U. S. Department of the Interior OMB Control Number: 1014-0016 Bureau of Safety and Environmental Enforcement (BSEE) OMB Approval Expires: August 31,2018

ASSIGNMENT OF FEDERAL OCS PIPELINE RIGHT-OF-WAY GRANT

Part A: Assignment

Legal description of the Pipeline Right-of-Way Grant being assigned (Please include Segment Number and any accessory information):

Right-of-Way OCS-G 9349, Segment Number 8255: A pipeline right-of-way two-hundred feet (200') in width for the operation and maintenance of a 12-3/4 inch pipeline, 7.30 miles in length, to transport oil from Platform A in Block 65, across Blocks 64 and 20, to Platform A in Block 19, all in Green Canyon Area. Assignor(s) does hereby sell, assign, transfer, and convey unto Assignee(s) the following undivided right, title and interest:

Insert name and Company number of each Assignor and Assignee.

A s s i «" o r < s > : *i»^Sa^^Brti»^6*™w|»sSf r c e " , a g e l " t e r e s t C » n v e ' ' e d

R E C E I V E D Wild Well Control, Inc. (GOM No. 2998) 1 n n

FEB 2 1 2017 1 0 0 0 0 /° Office of Fieid Operations . .

Assignee(s): Pipeline Section Percentage Interest Received

Fieldwood Energy Offshore LLC (GOM No. 3035) 100.00%

Exhibit "A," which sets forth other provisions between Assignor(s) and Assignee(s), is attached to and made a part of this assignment.

For BSEE Use only - Do Not Type Below This Line UNITED STATES OF AMERICA

This Assignment of Federal OCS Pipeline Right-of-Way Grant has been filed as of the date stamped on this document and hereby approved by the Bureau of Safety and Environmental Enforcement on the date below. *

By > v w ^ i ^ r ^ ^ h i e f ' P i p e ' i n e ^ m 2 2 2017 Authorized Official for BSEE Title Approval Date

Paperwork Reduction Act of 1995 (PRA) Statement: The PRA (44 U.S.C. 3501 et seq.) requires us to inform you that we collect this information to use in the adjudication process involved in leasmg and lease operations. BSEE uses the information to track ownership of leases in the Federal OCS. Responses are required to obtain or retain a benefit (43 U.S.C. 1334). Proprietary data are covered under 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. Public reporting burden of this form is estimated to average 30 minutes per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the fonn. Direct comments regarding the burden estimate, or any other aspect of this form, to the BSEE Information Collection Clearance Officer, 381 Elden Street, Hemdon, VA 20170.

B S E E F O R M B S E E - 0 1 4 9 (August 2015 - Supersedes all previous versions ofthis form which may not be used). P a g e 1 o f 2

Page 2: FEB 2 1 2017 - BSEE Data Center · FEB 2 1 2017 100 00/° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received ... Should you have any questions

Part B - Certification and Acceptance 1. Assignor(s) certifies it is the owner of the interest in the above-described Federal OCS Pipeline Right-of-Way Grant that is

hereby assigned to the Assignee(s) specified above.

2. DEBARMENT COMPLIANCE: Assignee shall comply with the Department of the Interior's nonprocurement debarment and suspension regulations as required by Subpart B of 2 CFR Part 1400 and shall communicate the requirement to comply with these regulations to persons with whom it does business related to this record title interest assignment by including this term in its contracts and transactions.

3 EQUAL OPPORTUNITY AND AFFIRMATIVE ACTION COMPLIANCE CERTIFICATION: Assignor(s) and Assignee(s) certify that they are in full compliance with Equal Opportunity Executive Order 11246, as amended, and the implementing regulations at 41 CFR 60-01 - Obligations of Contractors and Subcontractors; and 41 CFR 60-2 - Affirmative Action Programs. These requirements are for the purpose of preventing discrimination against persons on the basis of race, color, religion, sex, or national origin. These regulations have specific performance requirements.

4. Assignee's execution of this assignment constitutes acceptance of all applicable terms, conditions, stipulations and restrictions pertaining to the right-of-way grant described herein. Applicable terms and conditions include, but are not limited to, an obligation to conduct all operations in accordance with 30 CFR 250 and 550, Subpart J and to fumish and maintain such bond(s) as may be required by the Lessor pursuant to regulations at 30 CFR 556. This assignment is subject to the Outer Continental Shelf Lands Act of August 7, 1953, 67 Stat. 462; 43 U.S.C. 1331 etseq., as amended (the "Act"), and Assignee(s) is subject to, and must fully comply with, all applicable regulations now or to be issued under the Act. Notwithstanding any agreement between the Assignor(s) and Assignee(s), the parties' liability to the Bureau of Safety and Environmental Enforcement is govemed by 30 CFR 250.

This Assignment of Federal OCS Pipeline Right-of-Way Grant will be made effective between the parties hereto as of November i, 2016 } upon approval by the Bureau of Safety and Environmental Enforcement, United States Department of the

Interior.

This instmment may be executed in any number of counterparts, each of which will be deemed an original instrument, but all of which together will constitute but one and the same instmment provided. However, this instmment and any other counterpart hereof, will not be binding unless and until executed by all of the parties, and will not be accepted by the Bureau of Safety and Environmental Enforcement unless all counterparts are filed simultaneously.

I certify that the statements made herein by the undersigned are tme, complete, correct to the best of my knowledge and belief, and are made in good faith.

Title 18 U.S.C. Sec. 1001 makes it a crime for any person knowingly and willfully to make to any Department or agency of the United States any false, fictitious or fraudulent statements or representations as to any matter within itsjurisdiction.

trol, Inc. ASSIGNOR

By:_ Name: Title:

Execution Date Execution Date

Fieldwood Energy Offshore LLC ASSIGNEE (GQM No. 3035)

Name: Joi+fTSmith

T i t l e : V i c e president

ASSIGNEE

By:_

Execution Date

Name: Title:

ExeCutic

Attach Notary Acknowledgement (not mandatory)

Execution Date

B S E E FORM BSEE-0149 (August 2015 - Supersedes all previous versions ofthis form which may not be used). Page 2 of 2

Page 3: FEB 2 1 2017 - BSEE Data Center · FEB 2 1 2017 100 00/° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received ... Should you have any questions

Part B - Certification and Acceptance 1. Assignor(s) certifies it is the owner of the interest in the above-described Federal OCS Pipeline Right-of-Way Grant that is

hereby assigned to the Assignee(s) specified above.

2. DEBAR1V1ENT COMPLIANCE: Assignee shall comply with the Department of the Interior's nonprocurement debarment and suspension regulations as required by Subpart B of 2 CFR Part 1400 and shall communicate the requirement to comply with these regulations to persons with whom it does business related to this record title interest assignment by including this term in its contracts and transactions.

3. EQUAL OPPORTUNITY AND AFFIRMATIVE ACTION COMPLIANCE CERTIFICATION: Assignor(s) and Assignee(s) certify that they are in full compliance with Equal Opportunity Executive Order 11246, as amended, and the implementing regulations at 41 CFR 60-01 - Obligations of Contractors and Subcontractors; and 41 CFR 60-2 - Affirmative Action Programs. These requirements are for the purpose of preventing discrimination against persons on the basis of race, color, religion, sex, or national origin. These regulations have specific performance requirements.

4. Assignee's execution of this assignment constitutes acceptance of all applicable terms, conditions, stipulations and restrictions pertaining to the right-of-way grant described herein. Applicable terms and conditions include, but are not limited to, an obligation to conduct all operations in accordance with 30 CFR 250 and 550, Subpart J and to furnish and maintain such bond(s) as may be required by the Lessor pursuant to regulations at 30 CFR 556. This assignment is subject to the Outer Continental Shelf Lands Act of August 7, 1953, 67 Stat. 462; 43 U.S.C. 1331 et seq., as amended (the "Act"), and Assignee(s) is subject to, and must fully comply with, all applicable regulations now or to be issued under the Act. Notwithstanding any agreement between the Assignor(s) and Assignee(s), the parties' liability to the Bureau of Safety and Environmental Enforcement is governed by 30 CFR 250.

This Assignment of Federal OCS Pipeline Right-of-Way Grant will be made effective between the parties hereto as of November 1,2016 Upon approval by the Bureau of Safety and Environmental Enforcement, United States Department of the

Interior.

This instrument may be executed in any number of counterparts, each of which will be deemed an original instrument, but all of which together will constitute but one and the same instrument provided. However, this instrument and any other counterpart hereof, will not be binding unless and until executed by all of the parties, and will not be accepted by the Bureau of Safety and Environmental Enforcement unless all counterparts are filed simultaneously.

I certify that the statements made herein by the undersigned are true, complete, correct to the best of my knowledge and belief, and are made in good faith.

Title 18 U.S.C. Sec. 1001 makes it a crime for any person knowingly and willfully to make to any Department or agency of the United States any false, fictitious or fraudulent statements or representations as to any matter within itsjurisdiction.

ASSIGNOR ~ ASS,C N 0 R

Name: Godfi4d L. Gebhardt Name:

Title: President Title:

hxecution Date Execution Date

ASSIGNEE ASSIGNEE

By: By: Name: Name: Title: Title:

Execution Date Execution Date

Attach Notary Acknowledgement (not mandatory)

B S E E FORM BSEE-0149 (August 2015 - Supersedes all previous versions ofthis form which may not be used). Page 2 of 2

Page 4: FEB 2 1 2017 - BSEE Data Center · FEB 2 1 2017 100 00/° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received ... Should you have any questions

FIELDWDDD E » Y

February 20, 2017

United States Department ofthe Interior Bureau of Safety and Environmental Enforcement 1201 Elmwood Park Boulevard, GE1035A New Orleans, LA 70123-2394 Attn: Pipeline Section

Re: Assignment of Federal OCS Pipeline Right-of-Way Grant OCS-G 9349, Segment No. 8255

R E C E I V E D FEB212W7

Office of Fteid ^ i o n s pipeline Section

Ladies and Gentlemen:

Please find enclosed three (3) originals of the Assignment of Federal OCS Pipeline Right-of-Way Grant OCS-G 9349, Segment No. 8255 by and between Wild Well Control, Inc. (GOM No.2998) as Assignor, and Fieldwood Energy Offshore LLC (GOM No. 3035) as Assignee.

We request that the Assignment be approved effective November 1, 2016 and that one (1) approved copy ofthe assignment be returned to the undersigned.

Additionally, enclosed is a pay-gov receipt in the amount of $201.00 evidencing payment ofthe applicable filing fees.

OSFR for this Right-of-Way is already in place.

Should you have any questions pertaining to the enclosed request, please do not hesitate to contact the undersigned at 713-969-1237 or [email protected].

Sincerely,

Fieldwood Energy Offshore LLC

tacy Clark Land Technician

Enclosures

Fieldwood Energy LLC • 2000 W. Sam Houston Pkwy S, Suite 1200 • Houston, Texas 77042 (713) 969-1000 main • (713) 969 1099 fax

Page 5: FEB 2 1 2017 - BSEE Data Center · FEB 2 1 2017 100 00/° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received ... Should you have any questions

Page 1 of 1

Paygov Receipt

Your payment is complete Pay.gov Tracking ID: 260PIONC Agency Tracking ID: 75188830478 Form Name: BSEE Pipeline ROW Grant Assignment Application Name: BSEE Pipeline ROW Grant Assignment - CH/CH

Payment Information Payment Type: Debit or credit card Payment Amount: $201.00 Transaction Date: 02/20/2017 02:47:56 PM EST Payment Date: 02/20/2017 Region: Gulf of Mexico Contact: Lacy Clark 713-969-1237 ROW Number 1-25: 9349, ROW Number 26-50: Assignor: Wild Well Control, Inc. 2998 Assignee: Fieldwood Energy Offshore LLC 3035

Account Information Cardholder Name: Fieldwood Energy LLC Card Type: Master Card Card Number: ************7372

Email Confirmation Receipt Confirmation Receipts have been emailed to: [email protected]

2/20/2017

Page 6: FEB 2 1 2017 - BSEE Data Center · FEB 2 1 2017 100 00/° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received ... Should you have any questions

3/17/2017 DEPARTMENT OF THE INTERIOR Mail - Re: ROW Bonding For Assignments

Marshall, Mafalda (Cissy) <[email protected]>

Re: ROW Bonding For Assignments 1 message

Marshall, Mafalda (Cissy) <[email protected]> Fri, Mar 17, 2017 at 8:51 AM To: "Denson, David" <[email protected]>

Thank you bavid, appreciate the explanation.

May I continue to ask for clearance on individual ROW assignments, even though I know that they will be cleared, since I need an email confirmation from BOEM in my records?

Thanks again for all your help!

Cissy Marshall Program Specialist BSEE Pipeline Section 504-731-7843 [email protected]

On Thu, Mar 16, 2017 at 9:57 PM, Denson, David <[email protected]> wrote: y Hello Cissy - You are clear to approve. Since we are on this 6 month NTL, pause, we are allowing all assignments to

be approved without supplemental bonding. Once we start up implementation again, all of these assignments will be j addressed through tailored plans. If you get an application for a new ROW without a predecessor on the ROW, then

RMOG would require supplemental bonding.

David

On Thu, Mar 16, 2017 at 4:52 PM, Marshall, Mafalda (Cissy) <[email protected]> wrote: David,

Does this mean that I have clearance for my assignment approval now or would I have to wait until RMOG requires bonding?

Kind of confused.

Thank you, Cissy

Forwarded message From: David Denson <[email protected]> Date: Thu, Mar 16, 2017 at 9:01 AM Subject: Re: ROW Bonding For Assignments To: "Marshall, Mafalda (Cissy)" <[email protected]> Cc: George Tropiano <[email protected]>, Wanda Lilly <[email protected]>, Paul Arceneaux <[email protected]>

https://mail.google.com^^ 1/2

Page 7: FEB 2 1 2017 - BSEE Data Center · FEB 2 1 2017 100 00/° Office of Fieid Operations . . Assignee(s): Pipeline Section Percentage Interest Received ... Should you have any questions

3/17/2017 DEPARTMENT OF THE INTERIOR Mail - Re: ROW Bonding For Assignments

Good Morning Cissy - Since these are considered non sole, RMOG does not require supplemental bonding at this time.

Thanks

On Mar 15, 2017, at 5:41 PM, Marshall, Mafalda (Cissy) <[email protected]> wrote:

Good afternoon,

Need to know if the following ROW's are adequately bonded for assignment conveyances:

609349 $1,896,384 Wild Well Control Inc to Fieldwood Energy Offshore LLC

(#03035)

S02816 $564,300 Apache Corp to Fieldwood Energy LLC (#3295)

629068 $3,490,369 Apache Deepwater LLC to Stone Energy Offshore LLC (#03065)

608528 $1,896,384 Mobil Producing Texas & New Mexico Inc to Fieldwood SD Offshore LLC (#02865)

Thanks you, Cissy Marshall Program Specialist BSEE Pipeline Section 504-731-7843 [email protected]

David L Denson Risk Management Operations Group Bureau of Ocean Energy Management (504) 736-7538

http://www.boem.gov/Risk-Management/

https://mail.google.com/m^^ 2/2