feast & famine workshop december 1st, 2015 master of land

34
Prepared for: Feast & Famine Workshop December 1st, 2015 John ter Borg Graduate Studies UBC Master of Land & Water Systems

Upload: others

Post on 20-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Feast & Famine Workshop December 1st, 2015 Master of Land

Prepared for:Feast & Famine WorkshopDecember 1st, 2015

John ter BorgGraduate Studies UBC

Master of Land & Water Systems

Page 2: Feast & Famine Workshop December 1st, 2015 Master of Land

Outline

4

1.Agriculture Water Supply

2.Salt Wedge

3.Salinity

4.Study

Page 3: Feast & Famine Workshop December 1st, 2015 Master of Land

Lower Fraser River

5

Page 4: Feast & Famine Workshop December 1st, 2015 Master of Land

ALR – METRO VANCOUVER

6

Page 5: Feast & Famine Workshop December 1st, 2015 Master of Land

7

AGRICULTURE WATER DEMAND - DELTA

(Year 2080 Estimate)

Page 6: Feast & Famine Workshop December 1st, 2015 Master of Land

8

Agriculture Water Supply

Page 7: Feast & Famine Workshop December 1st, 2015 Master of Land

DELTA AGRICULTURAL WATER SUPPLY

9

Page 8: Feast & Famine Workshop December 1st, 2015 Master of Land

EAST RICHMOND AGRICULTURAL WATER SUPPLY

10

Page 9: Feast & Famine Workshop December 1st, 2015 Master of Land

11

Salt Wedge

Page 10: Feast & Famine Workshop December 1st, 2015 Master of Land

12

SALT WEDGE

Page 11: Feast & Famine Workshop December 1st, 2015 Master of Land

13

ESTUARY DIMENSIONS

Page 12: Feast & Famine Workshop December 1st, 2015 Master of Land

14

TIDAL RANGE – FRASER RIVER

11 foottidal range

Page 13: Feast & Famine Workshop December 1st, 2015 Master of Land

15

Fraser River – Partially Mixed Estuary

Page 14: Feast & Famine Workshop December 1st, 2015 Master of Land

16

Salinity

Page 15: Feast & Famine Workshop December 1st, 2015 Master of Land

17

CROP SALT TOLERANCE

Page 16: Feast & Famine Workshop December 1st, 2015 Master of Land

18

400 µS/cmcranberry threshold

Ocean water 35,000 ppm(about 3.5% salt)

CROP SALT TOLERANCE

Page 17: Feast & Famine Workshop December 1st, 2015 Master of Land

19

DELTA - IRRIGATION SUPPLY

Avg. Monthly SalinityRed = Oct. 2008Blue = Nov. 2008

400 µS/cm

cranberry threshold

Page 18: Feast & Famine Workshop December 1st, 2015 Master of Land

RICHMOND SALINITY MONITORING

20

Salinity

Level Safe

70% of

time

Page 19: Feast & Famine Workshop December 1st, 2015 Master of Land

RICHMOND SALINITY MONITORING

21

Salinity

Level safe

25% of

time

Page 20: Feast & Famine Workshop December 1st, 2015 Master of Land

22

Study

Page 21: Feast & Famine Workshop December 1st, 2015 Master of Land

23

Salinity Benchmarking

Salt wedge isprimarily influenced by:

1) Fraser River flow rate (discharge)2) Tidal fluctuations (sea level)3) Channel depth (dredging)

Page 22: Feast & Famine Workshop December 1st, 2015 Master of Land

24

N

Source (2013): googlemaps

INTAKE LOCATIONS

10

9

76

5

4

3

21

Irrigation IntakesDelta1. Mason PS2. Chillukthan Slough (15 km)3. Green Slough4. McDonald PS (20 km)5. 80th St FB “Tasker” (25 km)6. 96th St FB (28.5 km)7. Highway 91 FB (30 km)Richmond8. Finn Slough, South9. No. 6 Rd. South10. No. 7 Rd. North11. No. 8 Rd. North

11

8

Page 23: Feast & Famine Workshop December 1st, 2015 Master of Land

GLOBAL TEMPERATURE ANOMALIES

25

Page 24: Feast & Famine Workshop December 1st, 2015 Master of Land

CANADIAN TEMPERATURE TRENDS

26

(1948 - 2012)

Page 25: Feast & Famine Workshop December 1st, 2015 Master of Land

SEA LEVEL RISE - HISTORIC

27Ref: Sea level rise adaptation primer, A toolkit to build adaptive capacity on Canada’s south coasts, January 2013BC Ministry of Environment (Arlington Group)

Page 26: Feast & Famine Workshop December 1st, 2015 Master of Land

28

SEA LEVEL RISE - PROJECTED

Ref: Sea level rise adaptation primer, A toolkit to build adaptive capacity on Canada’s south coasts, January 2013BC Ministry of Environment (Arlington Group)

Page 27: Feast & Famine Workshop December 1st, 2015 Master of Land

Sea Level Rise

29

Sea LevelRise

Projection(year)

7. 3.0 m

6. 2.5

5. 2.0 m 2200

4. 1.5

3. 1.0 m 2100

2. 0.5

1. 0 m 2015

Page 28: Feast & Famine Workshop December 1st, 2015 Master of Land

30

FRASER RIVER - HYDROGRAPH

Page 29: Feast & Famine Workshop December 1st, 2015 Master of Land

Hydrograph Change

31

September OctoberJanuary April

Page 30: Feast & Famine Workshop December 1st, 2015 Master of Land

32

Dredging

Page 31: Feast & Famine Workshop December 1st, 2015 Master of Land

33

Dredging – Depth

11.5 FootDepth

Page 32: Feast & Famine Workshop December 1st, 2015 Master of Land

34

Dredging – Navigational Channel

Page 33: Feast & Famine Workshop December 1st, 2015 Master of Land

Dredging - Scenarios

35

Dredging

Depth (m)

Navigation

Channel

10. 20 m

9. 19 m

8. 18 m Panama Canal drafts

7. 17 m

6. 16 m

5. 15 m

4. 14 m

3. 13.2 m PMV - Post tunnel

2. 12 m

1. 11.5 m Massey Tunnel (59’)

- 10.7 m 1976

- 8.7 m 1960’s

- 5 m Without dredging

Page 34: Feast & Famine Workshop December 1st, 2015 Master of Land

36

PRESENTATION OF DATA